Loading...
1985 01 15 RDA^ AGENDA LA QUINTA REDEVELOPMENT AGENCY A regular meeting of the La Quinta Redevelo*nent Agen* to be held at City Hall, 78-105 Calle Estado, La Quinta, California. January 15, 1985 7:30 p.m. 1. CALL TO ORDER 2. *LL CALL 3. HE?*RINGs 4. CO*SENT *R A. Approval of the Minutes of a regular meeting of the La Quinta Redevelo*n*nt Agency held Dec*r 18, 1985. 5. BUSINESS SESSION A. Peport fran the Executive Director regarding flood control channel construction. B. Other. 6. ADJOUI**NT BIB] 03-26-1998-U01 03:44:58PM-U01 ADMIN-U01 RDA-U02 01-U02 15-U02 1985-U02 ^ I * MEMORANDUM CITY OF LA QUINTA * To: Honorable Chairman and Members of the Redevelopment Agency From: Frank M. Usher, Executive Director Date: January 11, 1985 Subject: Flood Control Channel Construction The Coachella Valley Water District has received a report from Bechtel Engineering regarding soil evaluation for the Bear Creek channel. It indicates that there would be unreplaced erosion of sand in a natural bottom channel, and that the faced embankment of such a channel may be subject to under- mining and failure. Some additional measures may be taken to stabilize the bottom of a natural channel, however the cost of construction would increase by approximately $2.6 million. A cast in place concrete channel would come in at the originally expected cost for a natural channel. An intermediate measure of a soil cement lined channel would add about $100,000 to the planned cost. In terms of appearance, the natural bed channel is preferable except that the continually maintained width is 80 feet. A lined channel would have a width of 40 feet, with an additional 40 feet needed for side drainage ditches on the west side, but this area would be permitted to regrow with natural vegetation. Both types of construction would permit walking across the channel. A debris basin above Palm Desert is constructed with the soil cement method. We would like to have the Council see this, so that we can have your impression before giving further instruction to Bechtel regarding the type of engineering to be done. I would like to have everyone meet at City Hall on Monday at 1:30 p.m. We will take several cars to Palm Desert and return by 3:00 p.m. for the study session. Tom Levy will explain the engineering concerns. BIB] 03-26-1998-U01 03:44:58PM-U01 ADMIN-U01 RDA-U02 01-U02 15-U02 1985-U02