1987 08 04 RDA AGENDA
LA QUINTA REDEVELOPMENT AGENCY
A regular meeting of the La Quinta
Redevelopment Agency, to be held
at City Hall, 78-105 Calle Estado,
La Quinta, California.
Au9ust 4* i*87 7:30 p...
1. CALL Te CRIER
2. RCLL CALL
3. HEARINGS
4* CINSENT CALENDAR
A. Approval of t e Minutes of a regular meeting of the La
Quinta Redevelopment Agency held June 1& and June 30, 1987.
B. RESOLUTION NO. RA-87-10. APPROVING DENANOS.
1) Notion to approve Consent Calendar. ROLL CALL VOTE)
5. *BUSINESS SESSION
A. Report from City staff regarding improvements to the Cove
area of La Quint..
9. Proposed Redevelopment Agency Budget, 1987-88.
1) Notion to adopt.
6. ADJOURNMENT
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
DATE *DAITEM#
APPROVED *E*ED
oCONTINUED TO
RESOLUTION RA-87-lO
A RESOLUTION OF ThE LA QUINTA REDEVELOPMENT
AGENCY, APPROVING DEMANDS.
BE IT RESOLVED by the La Quinta Redevelopment Agency of the
City of La Quinta, California, to approve demands as shown on the
Demand/Warrant Register dated August 4, 1987.
APPROVED and ADOPTED this August 4, 1987 by the following
roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
CHAIRMAN
ATTEST:
SECRETARY
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
LA OUINTA REDEVELOPMENT AC*CY
Demand/Warrant Re*i8ter
August 4. 1987
checkf Name
Purpose A'nnt
299 John Axt, Security Pacific Tax allocation bonds, Tax Increment 6/30/87 $ 29,778.00
300 Wm Hoyle Auto/phone compensation, July 7114/87 100.00
301 Stanley S*iff Auto/phone compensation, July 7/14/87 100.00
302 Dale Bohnenberger Auto/phone compensation, July 7/14/87 100.00
303 John Pena Auto/phone compensation, July 7/14/87 100.00
304 Judith A Cox Auto/phone compensation, July 7/14/87 100.00
305 John Axt, Security Pacific Tax allocation bonds, Tax Increment 7/27/87 104,254.43
306 Katz-Hollis Projects 1096/04 6 i096-05, May 7/27/87 3,563.75
TOTAL $138,096.18
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
LA QUINTA REDEVELOPMENT AGENCY
*STATEMENT OF FINANCIAL POSITION
At June 30. 1987
4SSETS
Cash in Bank $ 556.52
Restricted Cash $ 3,787,907.00
LAIF Investments $ 429,000.00
Accrued interest receivable $ 8,951.64
Tax increment receivable $ 142,479.56
Restricted interest receivable 0-
Amount available for retirement long-term debt $ 3,811,339.72
Amount to be provided retire long-term debt $16.212,093.00
TOTAL ASSETS $24,392,327.44
*IABILITIES
Accounts payable $ 6,643.33
Bonds payable $20,000,000.00
Due to County of Riverside $ 293,756.00
Notes payable to Water District $ 778.000.00
TOTAL LIABILITIES $2 1,078,399.33
FUND BALANCE $ 3,313,928.11
TOTAL LIABILITIES & FUND EQUITY $24 392.327. 44
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
LA OUINTA REDEVELOPMENT AGENCY
STATEMENT OF REVENUES AND EXPENDITURES
*thBendin June30 1987
COLLECTED ESTIMATED UNCOLLECTED % TO
TO DATE REVENUE BALANCE DATE
REVENUE
Tax Increment $2,605,610.84 $2,207,000.00 $ 398,610.84) 118.1
Interest earned$ 249,725.11 $ 30,000.00 $ 219,725.11) 832.4
Miscellaneous $ 5.00 0- 5.00) 0-
TOTAL $2,855.340.95 $2,237,000.00 $ 618.340.95) 127.6
*XPENDITURES BUDGET UNCOLLECTED % TO
TO DATE L BALANCE DATE
EXPENDITURES
Debt service $1,900,478.00 *2,2O7,O00.00 $ 306,522.00 86.1
Taxing agency $ 28,807.60 $ 30,000.00 $ 1,192.40 96.0
Professional $ 36,179.56 $ 30,000.00 $ 6,179.56) 120.6
Administrative $ 82,585.78 $ 30,000.00 $ 52,585.78) 275.3
Interest exp $ 105,067.50 $ 0- $ 105,067.50) 0-
Net Rev. 86-87 * 702.222.51 0- $ 702,222.51) 0-
TOTAL S2.855.340.95 $2.297.000.00 S 558.340.95) j124.3
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
SA.
OATE AGENDAITE*
MEMORANDUM
APPROVED DE?*1ED
CITY OF LA OL)I*1A oCONTiNUED Jo
To: RON KIEDROWSKI, CITY MANAGER
FROM: FRANK REYNOLDS, CITY ENGINEER
DATE: AUGUST 4, 1987
SUBJECT: REDEVELOPMENT OF LA QUINTA STREETS & DRAINAGE SYSTEMS
BACKGROUND
The City of La Quinta, particularly the 1cove area", has been the
subject of two major studies dealing with infrastructure. These
studies produced a Master Plan for Drainage and a Pavement Management
System. The consulting firm which conducted the studies employed
conventional approaches to design, with the result that the
construction costs to achieve the ideal solutions to existing problems
would exceed $100 million. While theoretically there are financing
mechanisms available to raise that kind of money, from a practical
standpoint it is unlikely to happen.
As a consequence, preliminary studies by staff have been undertaken to
develop strategies which would provide solutions to most of the
problems not all of them within an affordable range.
ThE STUDY AREA
For purposes of this study, the five zones looked at are enclosed in
an area west of Avenida Bermudas and south of Calle Tampico,
primarily because these zones are very similar in configuration and
terrain. The area east of Avenida Bermudas to Calle Ronda is
essentially flat and will of necessity have to be designed on a
different basis than the five zones studied.
ThE PROBLEMS
A discussion list which might be compiled by residents in the Cove
probably would include a myriad of infrastructure elements, but those
which have been identified as occupying high priorities would be
drainage and street improvements. Simply stated, there currently
exist no forms of drainage control, no streets which meet even minimum
construction standards, and no delineation between public
rights-of-way and private property. The absence of these basic
elements of the infrastructure have tended to affect adversely
property values in the area. Our study, therefore, has concentrated
in a preliminary way on those particular deficiencies.
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
* STAFF REPORT
REDEVELOPKENT OF STREETS
AND DRAINAGE SYSTEM
August 4,1987
ASSUMTIONS MADE
In order to arrive at a program which would lead to mitigation of the
ma*or problems, it was necessary to make certain assumptions, which by
their nature are subject to varying degrees of modification. The
assumptions made were as follows:
1. Since a positive drainage system to handle even a 10-year
storm i.e., a storm of a magnitude that will occur 10 times each
100 years), is far beyond the City's financial means, we
proceeded on the basis that we will attempt to use the public
rights-of-way to carry as much runoff as possible and intercept
it at what we would consider to be reasonable intervals to convey
it to existing flood control facilities. Any pipelines installed
would be sized only large enough to convey 11nuisance11 water
generated by over-watering, car washing, etc.
2. Based upon the above, we established five zones, which would
form the basis for a 5-year program to effect the drainage and
street improvements, starting at the top of the Cove to take
advantage of the natural terrain.
3. All streets in the Cove except Avenida Bermudas and
Eisenhower Drive were treated as local residential streets for
setting a proposed structural section and estimating costs. The
two exceptions were designed as major arterials.
4. We may have been incorrect in this assumption, but we
reasoned that the residents in the Cove would prefer to retain
the rural nature of their surroundings as much as possible. We
therefore did not provide for the installation of concrete curb
and gutter throughout most of the area. It may be, and probably
will be necessary to construct some curb sections on those
east-west streets selected to convey the runoff to disposal
facilities. Rather than urbanizing the area with concrete curb
and gutter, we opted for paved drainage swales, which will
serve the same purpose. It would then be possible to delineate
the limit of the public right-of-way by means of a clean edge to
the asphaltic concrete paving, preferably by means of
headerboard. If this assumption is incorrect, the substitution
of concrete curb and gutter will not impact to any great degree
the overall project cost.
5. Previous studies of the Cove have included lowering the
elevations of the existing streets to accommodate those lots
which lie below the existing street grades. The cost of doing
this would be prohibitive. Therefore, a preliminary alternative
plan for protecting those properties from inundation has been
developed. However, it would require that the work involved in
rebuilding driveways would take place on private property, and
this would be outside the scope of the proposed project. It
MEMOFR. 071
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
a STAFF REPORT
REDEVELOPMENT OF STREETS
AND DRAINAGE SYSTEM
August 4,1987
would require the cooperation of the affected residents1 and
perhaps arranging for low interest loans to effect the
improvements.
6. There are several east-west streets in the Cove where no
development has taken place on either side between intersecting
streets. Therefore, the study took into consideration the
possibility that several of these could be abandoned, thus saving
the cost of street improvements, creating larger lots on those
properties abutting them, or making certain lands available for
neighborhood parks.
7. It has been recognized that there are some problem areas in
the Cove which may require painful decisions in their
resolution. Probably the most serious of these has to do with
existing encroachments in the public rights-of-way. Because of
the present lack of delineation between private and public
property, some of the residents have installed miscellaneous
structures, such as fences, and minor to extensive landscaping in
the public right-of-way. These encroachments will interfere with
the construction of the street sections established by the City's
General Plan.
For purposes of this study these conflicts have been ignored, and
costs have been developed on the basis of standard street widths.
ESTIMATES OF COST
Based upon the foregoing assumptions, it is estimated that the costs
per zone, including engineering, would be as follows:
Zone No. 1 Area south of Calle Madrid
$3,500,000
Zone No. 2 Area between Calle Colima and Calle Madrid
$4,600,000
Zone No. 3 Area between Calle Nogales and Calle Colima
$4,000,000
Zone No. 4 Area between Calle Durange and Calle Nogales
$4,300,000
Zone No. 5 Area north of Calle Durango
$4,000,000
Total of 5 Zones $20,400,000
It must be emphasized that the study was done without the benefit of
even cursory survey information, for example, but at this stage our
MEMOFR. 071
Paa* 3
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
STAFF REPORT
REDEVELOPMENT OF STREETS
A*U DRAINAGE SYSTEM
August 4,1987
goal was to arrive at a ballpark" estimate to get some feeling for
the magnitude of such an undertaking.
CONCLUSIONS
1. It appears that the project is economically feasible through the
use of funds acquired through the Redevelopment Agency, or funds from
that Agency supplemented by an assessment district. Another
possibility might be some participation by the City in the street
program, particularly on the major arterials, since they must be
constructed to much higher standards than the other streets in the
area.
2. The scope of the proposed project is limited to drainage and
street improvements. It may be that decisions could be made to
include other elements of the infrastructure, such as undergrounding
electrical and CATV facilities, installation of a natural gas
distribution system, or street lighting at key intersections.
3. The Coachella valley Water District, in recognition of the
deficiencies which exist in the domestic water distribution system,
has planned for the expenditure of one million dollars per year for
the next ten years to upgrade the system. It would be the City
staff's intent to work closely with the CVWD in coordinating their
improvements with ours. Obviously we wish to avoid tearing up newly
constructed streets to install water lines, but the District's million
dollars will go farther if they are not required to resurface their
trenches. The District's General Manager-Chief Engineer estimates
that the savings which could result could compress his 10-year
program to perhaps 7 1/2 years.
RECOMMENDATION
It is recommended that the concept of the proposed project be approved
and that the staff be authorized to solicit proposals from consulting
engineering firms for design work in the event the project goes
ahead. We feel that this is an important initial step. Selection of
a qualified design engineer is a time-consurning process, and if the
project is authorized we should have the design team lined up so that
construction could commence as soon as possible.
NEMOFR. 071
Paae 4
BIB]
10-22-1998-U01
11:05:04AM-U01
ADMIN-U01
RDA-U02
08-U02
04-U02
1987-U02
*r).
DATE AGENDA ITEM #
APPROVED DENIED
*L) CQNTINUED TO
LA QUINTA REDEVELOPMENT AGENCY
BUDGET
FISCAL YEAR 1987-88
ACTUAL PROPOSED
REVENUE 1986-87 1987-88
Tax Increment $ 2,436,016. $ 3,316,000.
Interest 32,337. 32,000.
Total $ 2,468,353. $ 3,348,000.
EXPENDITURES
Debt Service $ 2,363,905. $ 2,259,000.
Pass Through 28,808. 30,000.
Professional and
Administrative Services 93,797. 100,000.
Low Income Housing Fund 927,000.
Total $ 2.486,510. $ 3,316,000.