Paul Gardner/Adams & Signals 95SECTION 1300
AGREEMENT
THIS CONTRACT, by and between the CITY OF LA QUINTA, a municipal corporation, herein referred to as
"City, and Paul Gardner Corporation, herein referred to as, "Contractor".
WITNESSETH:
In consideration of their mutual covenants, the parties hereto agree as follows
1. Contractor shall furnish all necessary labor, material, equipment, transportation and services for
PROJECT NO.95-04, ADAMS STREET EXTENSION/4-SIGNALS, in the City of La Quinta, California pursuant to
the Invitation to Bid, dated December 1,1995, the project Specifications, and Contractor's Bid, dated December 15,1995,
all of which documents shall be considered a part hereof as though fully set herein.
Should any provisions of Contractor's Bid be in conflict with the Notice Inviting Bids, Specifications, or
Us Contract, then the provisions of said Contract, Specifications, and Invitation to Bid shall be controlling, in that order of
precedence. The time frames for construction work shall be in accordance with those specified in the Contractor's Bid.
2. Contractor will comply with all Federal, State, County, and La Quinta Municipal Code, which are, as
amended from time to time, incorporated herein by reference.
3. All work shall be done in a manner satisfactory to the City Engineer.
4. Contractor shall commence work after the issuance of a written Notice to Proceed and agrees to have all
work completed within seventy five (75) consecutive days from the date of Notification to Proceed.
5. In consideration of said work, City agrees to pay Contractor such sums as shall be approved by the City
Engineer at lump sums and/or unit prices stated in the Contractor's Bid, the base consideration of Four hundred seventy
nine thousand, six hundred ninety three dollars ($479,693) plus such additional amounts for adjustments to the
estimated quantities contained in the Bidder's Schedule and for extra work covered by approved Change Orders, if any, as
are provided for in the Specifications, so that the total expenditures on said Contract shall not exceed $479,693 without prior
approval of the City Council and written amendment to this Contract. All payments shall be subject to approval by the City
Engineer and shall be in accordance with the terms, conditions, and procedures provided in the Specifications.
6. The Contractor shall not knowingly pay less than the general prevailing rate for per diem wages, as
determined by the State of California Department of Industrial Relations and referred to in the Invitation to Bid, to any
workman employed for the work to be performed under this contract, and the Contractor shall forfeit as a penalty to the City
the sum of Twenty -Five Dollars ($25.00) for each calendar day, or fraction thereof, for such workman paid by him or by any
subcontractor under him in violation of this provision (Sections 1770-1777, Labor Code of California).
7. Concurrently with the execution of this Contract, Contractor shall furnish bonds of a surety satisfactory
to City, as provided in said Specifications or Invitation to Bid, the cost of which shall be paid by Contractor.
8. Contractor agrees to indemnify, hold harmless, release and defend (even if the allegations are false,
fraudulent or groundless), to the maximum extent permitted by law, the City, its City Council and each member thereof, and
its officers, employees, commission members and representatives, from any and all liability, loss, suits, claims, damages,
costs, judgements and expenses (including attorney's fees and costs of litigation) which in whole or in part are claimed to
result from or to arise out of the usage or operation, including the malfunctioning of, or, any injury caused by, any product
purchased herein, or any acts, errors or omissions (including, without limitation, professional negligence) of Contractor, its
employees, representatives, subcontractors, or agents in connection with the performance of this Contract. The is agreement
to indemnify includes, but is not limited to, personal injury (including death at any time) and damage to property (including,
but without limitation, contract or tort or patent, copyright, trade secret or trademark infringement) sustained by any person
9. Except as otherwise required, Contractor shall concurrently with the execution of this contract, furnish
the City satisfactory evidence of insurance of the kinds and in the amounts provided in said Specifications. This insurance
shall be kept in full force and effect by Contractor during this entire contract and all premiums thereon shall be promptly paid
by it. Each policy shall further state that it cannot be canceled without 30 days unconditional written notice to the City and
shall name the City as an additional insured. Contractor shall furnish evidence of having in effect, and shall maintain,
Workers Compensation Insurance coverage of not less than the statutory amount or otherwise show a certificate of self-
insurance, in accordance with the Workers Compensation laws of the State of California. Failure to maintain the required
amounts and types of coverage throughout the duration of this Contract shall constitute a material breach of this Contract.
10. Contractor shall forfeit as a penalty to City $25.00 for each laborer, workman, or mechanic employed in
the execution of this Contract by said Contractor, or any subcontractor under it, upon any of the work herein mentioned, for
each calendar day during which such laborer, workman, or mechanic is required or permitted to work at other than a rate
of pay provided by law for more than 8 hours in any one calendar day and 40 hours in any one calendar week, in violation
of the provisions of Sections 1810-1815 of the Labor Code of the State of California.
11, In accepting this Contract, Contractor certifies that in the conduct of its business it does not deny the right
of any individual to seek, obtain and hold employment without discrimination because of race, religious creed, color, national
origin, ancestry, physical handicap, medical condition, marital status, sex or age as provided in the California Fair
Employment Practice Act (Government Code Sections 12900, et seq.) Contractor agrees that a finding by the State Fair
Employment Practices Commission that Contractor has engaged during the term of this Contract in any unlawful employment
practice shall be deemed a breach of this Contract and Contractor shall pay to City $500.00 liquidated damages for each such
breach committed under this contract.
12. Contractor also agrees that for contracts in excess of $30,000 and more than 20 calendar days duration,
that apprentices will be employed without discrimination in an approved program in a ratio established in the apprenticeship
standards of the craft involved (Sections 1777.5 and 1777.6, Labor Code of California). Contractors who willfully fail to
comply will be denied the right to bid on public projects for a period of six months in addition to other penalties provided
by law.
13. This Contract shall not be assignable by Contractor without the written consent of City.
14. Contractor shall notify the City Engineer (in writing) forthwith when the Contract is deemed completed.
15. In accepting this Contract, Contractor certifies that no member or officer of the firm or corporation is an
officer or employee of the City except to the extent permitted by law.
16. Contractor certifies that it is the holder of any necessary California State Contractors License and
authorized to undertake the above work.
17. The City, or its authorized auditors or representatives, shall have access to and the right to audit and
reproduce any of the Contractor records to the extent the City deems necessary to insure it is receiving all money to which
it is entitled under the contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract
or for other purposes relating to the Contract.
18. The Contractor shall maintain and preserve all such records for a period of at least three years after
termination of the contract.
19. The Contractor shall maintain all such records in the City of La Quints. If not, the Contractor shall, upon
request, promptly deliver the records to the City or reimburse the City for all reasonable and extra costs incurred in
conducting the audit at a location other than at City offices including, but not limited to, such additional (out of the City)
expenses for personnel, salaries, private auditors, travel, lodging, meals and overhead.
20. The further terms, conditions, and covenants of the Contract are set forth in the Contract Documents, each
of which is by this reference made a part hereof.
Agreement 1300-2
IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below.
Dated: ` —l0—'� `Y
ATT S :
dra Juhola, City Cle
APPROVED AS TO FORM:
LOW
O1—U3—,,4
Dated: 61— 03 -94
CITY OF LA QUINTA,
a California municipal corporation
By: p! )LZL
Glenda Bangerter, May
"CITY"
Dated:
Dated:
CO ig
0e; corn"—n()k)
By:
Name: CAUL iZ 5a,7 t-vZ- -2—
Title: 076 t`5 t�J7
By:
Name: 2 M n105L -
Title: 56z¢c' M?Y
"CONTRACTOR"
(If corporation, affix seal)
Agreement 1300-3
SECTION 1330
WORKERS' COMPENSATION INSURANCE CERTIFICATE
In accordance with California Labor Code Section 1861, prior to commencement of work on the Contract, the Contractor
shall sign and file with the City the following certification:
'I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be
insured against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the performance of
the work of this contract."
Signature 40L 1Z -�NZF-7?-)l
rAUL- g—AlzD)oL�4Z C621)1167(t7.)
Name of Contractor
Title
01-0Z>-94
Date
Workers' Compensation Insurance 130"
BOND NUMBER B1828563
PREMIUM: $5,756.00
EXECUTED IN TRIPLICATE
SECTION 1310
FAITHFUL PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT the City of La Quinta, a municipal corporation, hereinafter designated the City, has, on
December 19, 1995, awarded to Paul Gardner Corporation, hereinafter designated as the Principal, a Contract for
PROJECT NO.95-04, ADAMS STREET EXTENSIONA-SIGNALS, and
WHEREAS, said Principal is required under the terms of said Contract to famish a bond for the faithful
performance of said Contract:
NOW, THEREFORE, we, the Principal, and RELIANCE INSURANCE COMPANY as Surety, are held
and firmly bound unto the City in the just and full amount of Four Hundred Seventy Nine Thousand Six Hundred
Ninety Three dollars ($479,693) lawful money of the United States, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, his or its heirs, executors,
administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and faithfully perform
the covenants, conditions, and agreements in the said contract and any alterations made as therein provided, on his or their
part to be kept and performed, at the time and in the manner therein specified, and in all respects according to their true intent
and meaning, and shall indemnify and save harmless, the City, its officers and agents as therein stipulated, then this obligation
shall become null and void; otherwise it shall be and remain in full force and virtue.
It is acknowledged that the Contract provides for one-year guarantee period, during which time this bond remains
in full force and effort.
And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration,
or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the
same shall, in any way, affect its obligations on this bond, and it does hereby waive notice of any such change, extension of
time, alteration, or addition to the terms of the Contract or to the work or to the specifications. Said Surety hereby waives
the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.
1300-4
Faithrul Ped'onnance Bond
STATE OF CALIFORNIA
SS.
COUNTY OF RIVERSIDE
On DECEMBER 28, 1995 before me, ROSEMARY STANDLEY
PERSONALLY APPEARED MICHAEL D. STONG
personally known to me (or proved to me on the basis of
satisfactory evidence) to be the person(s) whose name(s)
is/are subscribed to the within instrument and acknowl-
edged to me that he/she/they executed the same in his/
her/their authorized capacity(ies), and that by his/her/
their signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s) acted, executed
the instrument.
WITNESS my hand and official seal.
OPTIONAL
ROSEMARY STANDLEY
commiss*N #967459 =
Notvy Pudic • Calilomia M
y� , RIVERSIDE COUNTY pgg
iwvv vvvvo�v�vvvvv
This area for Official Notarial Seal
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER
❑ INDIVIDUAL
❑ CORPORATE OFFICER
TM-E(S)
❑ PARTNER(S) ❑ LIMITED
❑ GENERAL
❑ ATTORNEY -IN -FACT
❑ TRUSTEE(S)
❑ GUARDIAN/CONSERVATOR
❑ OTHER:
SIGNER IS REPRESENTING:
NAME OF PERSON(S) OR ENTITY(IES)
DESCRIPTION OF ATTACHED DOCUMENT
TITLE OR TYPE OF DOCUMENT
NUMBER OF PAGES
DATE OF DOCUMENT
SIGNER(S) OTHER THAN NAMED ABOVE
ID-081 Rev.6/94 ALL-PURPOSE ACKNOWLEDGEMENT
IN WITNESS WI-IEREOF, the Principal and Surety have executed this instrument under their
seals this 28th day of DECEMBER , 19 95 , the name and corporate seal of each
corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority
of its governing body.
(Seal)
(Seal)
�c�i!>7r'�lil
le of Signatory
RELIANCE INSURANCE COMPANY
Surety
ATTORNEY —IN —FACT
Title of Signatory
Faithful Performance Bond 1300-5
BOND NUMBER B1828563
PREMIUM INCLUDED IN PERFORMANCE
BOND
EXECUTED IN TRIPLICATE
SECTION 1320
PAYMENTBOND
KNOW ALL MEN BY THESE PRESENTS:
THAT the City of La Quints, a municipal corporation, hereinafter designated the City, has, on
December 19, 1995, awarded to Paul Gardner Corporation, hereinafter designated as the Principal, a"Contract for
PROJECT NO.95-04, ADAMS STREET EXTENSIONA-SIGNALS , and
WHEREAS, said Principal is required to furnish a bond in connection and with said Contract, providing that if said
Principal, or any of it or its subcontractors shall fail to pay for any materials, provisions, or other supplies used in, upon, for,
or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the Surety
of this bond will pay the same to the extent hereinafter set forth:
NOW, THEREFORE, we, the Principal, and RELIANCE INSURANCE COMPANY , as Surety, are held
and firmly bound unto the City in the just and full amount of Four Hundred Seventy Nine Thousand Six Hundred
Ninety Three dollars ($479,693) lawful money of the United States, for the payment of which sum well and truly to be
made, we bind ourselves, our hens, executors, administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, it or its heirs, executors,
administrators, successors, or assigns, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or
about the performance of the work contracted to be done, or for any work or labor thereon of any kind or for amount due
under the Unemployment Insurance Act with respect to such work or labor, or for any amounts due, or to be withheld
pursuant to Sections 18806 of the Revenue and Taxation Code of the State of California with respect to such work or labor,
then said surety will pay the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay in
case suit is brought upon this bond, such reasonable attorney's fees to the City as shall be fixed by the court.
This bond shall insure to the benefit of any and all persons, companies, and corporations named in Section 3181
of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon
this bond.
And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration,
or addition of the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the
same shall, in any way, affect its obligations of this bond, and it does hereby waive notice of any change, extension of time,
alteration, or addition to the terms of the contract or to the work or to the specifications. Said Surety hereby waives the
provisions of Sections 2819 and 2845 of the Civil Code of the State of California.
Payment Bond 1300-6
STATE OF CALIFORNIA
SS.
COUNTY OF RIVERSIDE
On DECEMBER 28, 1995 ,before me, ROSEMARY STANDLEY
PERSONALLY APPEARED MICHAEL D. STONG
personally known to me (or proved to me on the basis of
satisfactory evidence) to be the person(s) whose name(s)
is/are subscribed to the within instrument and acknowl-
edged to me that he/she/they executed the same in his/
her/their authorized capacity(ies), and that by his/her/
their signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s) acted, executed
the instrument.
WITNESS my hand and official seal.
Signature
�R"
OPTIONAL
ROSEMARY STANDLEY
c co�aeisslor+lI9137459
� , m rrowy wcrl� • elueallr
_ • RR�ER�� E C
� auNE r. tea
This area for Official Notarial Seal
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER
❑ INDIVIDUAL
❑ CORPORATE OFFICER
❑ PARTNER(S) ❑ LIMITED
❑ GENERAL
❑ ATTORNEY -IN -FACT
❑ TRUSTEE(S)
❑ GUARDIAN/CONSERVATOR
❑ OTHER:
SIGNER IS REPRESENTING:
NAME OF PERSON(S) OR ENnfY(IES)
DESCRIPTION OF ATTACHED DOCUMENT
TITLE OR TYPE OF DOCUMENT
NUMBER OF PAGES
DATE OF DOCUMENT
SIGNER(S) OTHER THAN NAMED ABOVE
raosi Rev.6/94 ALL-PURPOSE ACKNOWLEDGEMENT
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their
seals this 28th day of DECEMBER , 19 95 , the name and corporate seal of each
corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority
of its governing body.
(Seal)
(Seal)
�l\U�e71y0�1�1:z�IiS77H7�,+ � �
s—
,'
ME-51Q---AY—(
Title of Signatory
RELIANCE INSURANCE COMPANY
Surety
ATTORNEY —IN —FACT
Title of Signatory
Payment Bond 1300-7
HEAD OFFICE, PHILADELPHIA, PENNSYLVANIA
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, That the RELIANCE INSURANCE COMPANY, a corporation duly organized under the laws of the State
of Pennsylvania, does hereby make, constitute and appoint Michael D. Stong, Individually, of Riverside, California, its true and lawful
Attorneyls)-in-Fact, to make, execute, seal and deliver for and on its behalf, and as its act and deed any and all bonds and undertakings of
suretyship and to bind the RELIANCE INSURANCE COMPANY thereby as fully and to the same extent as if such bonds and undertakings and
other writings obligatory in the nature thereof were signed by an Executive Officer of the RELIANCE INSURANCE COMPANY and sealed and
attested by one other of such officers, and hereby ratifies and confirms all that its said Attorney(s)-in-Fact may do in pursuance hereof.
This Power of Attorney is granted under and by authority of Article VII of the By -Laws of RELIANCE INSURANCE COMPANY which
became effective September 7, 1978, which provisions are now in full force and effect, reading as follows:
ARTICLE VII - EXECUTION OF BONDS AND UNDERTAKING
1. The Board of Directors, the President, the Chairman of the Board, any Senior Vice President, any Vice President or Assistant Vice
President or other officer designated by the Board of Directors shall have power and authority to (a) appoint Attorney(s)-in-Fact and to
authorize them to execute on behalf of the Company, bonds and undertakings, recognizances, contracts of indemnity and other writings
obligatory in the nature thereof, and (b) to remove any such Attorneys) -in -Fact at any time and revoke the power and authority given to them.
2. Attorneyls)-in-Fact shall have power and authority, subject to the terms and limitations of the Power of Attorney issued to them, to
execute and deliver on behalf of the Company, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in
the nature thereof. The corporate seal is not necessary for the validity of any bonds and undertakings, recognizances, contracts of indemnity
and other writings obligatory in the nature thereof.
3. Attorney(s)-in-Fact shall have power and authority to execute affidavits required to be attached to bonds, recognizances, contracts of
indemnity or other conditional or obligatory undertakings and they shall also have power and authority to certify the financial statement of the
Company and to copies of the By -Laws of the Company or any article or section thereof.
This Power of Attorney is signed and sealed by facsimile under and by authority of the following Resolution adopted by the Board of Directors
of RELIANCE INSURANCE COMPANY at a meeting held on the 5th day of June, 1979, at which a quorum was present, and said Resolution
has not been amended or repealed:
'Resolved that the signatures of such directors and officers and the seal of the Company may be affixed to any such
Power of Attorney or any certificates relating thereto by facsimile, and any such Power of Attorney or certificate bearing
such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such Power so executed
and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company, in the future with
respect to any bond or undertaking to which it is attached."
IN WITNESS WHEREOF, the RELIANCE INSURANCE COMPANY has caused these presents to be signed by its Vice President
and its corporate seal to be hereto affixed, this 30 day of September, 1993
RELIANCE INSURANCE COMPANY
09UK vct
4 >4
STATE OF Washington Vice
Vic
COUNTY OF King �M
On this 30 day of September, 1993 personally appeared Lawrence W. Cadstrom
to me known to be the Vice President of the RELIANCE INSURAN PANY, and acknowledged that he executed and attested the
foregoing instrument and affixed the seal of said corporatE�C that Article VII, Section 1, 2, and 3 of the By -Laws of said
Company,and the Resolution, set forth therein, are still in f fi r_( �. fi
`'t F=IiLI�EC` �a
Notary Public in and for State of Washington
\ ,C. �� //'�• ' Residing at Sumner
1, Robyn Layng, Assistant Secretary of the RELIANCE IN IIC(Jj lA do hereby certify that the above and foregoing is a true and
correct copy of a Power of Attorney executed by said RELIA fbSUR COMPANY, which is still in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company this 28TH day of DECEMBER 1995
7-)
Assistant Secretary
BOR-1431 Ed. 3t93
4
CONTRACT: Adams Street Extension/
4 - Signals
CONTRACTOR: Paul Gardner Corporation
901 South Sultana Avenue
P.O. Box 3730
Ontario, CA 91761
CONTRACT
Sheet 1 of 13
PROJECT NO. 95-04
CHANGE ORDER NO. 01
Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following
described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms,
general conditions, and special provisions of the original Contract.
DESCRIPTION OF CHANGE
The contractor shall furnish all labor, equipment and material to preform the Time and Materials Work as follows:
On the south west comer of Fernando and Eisenhower, re -dig traffic signal pole base foundation; Remove and replace concrete sidewalk.
On the north east comer of Washington Street, at the La Quinta Shopping Center entrance, remove abandoned 8" waterline, pickup city signal
pole and prepare pole for standing.
On the south west comer of Washington street, at the La Quinta Shopping Center entrance, Trench for 5" conduit to electrical vault, install 5"
service conduit, trench for 3" conduit to service meter, place concrete foundation and install stub outs for service meter, backfill service trenches
and relocate irrigation lines in conflict with service conduits.
TOTAL COMPENSATION FOR THIS CONTRACT CHANGE ORDER SHALL NOT EXCEED $2,805.79
Previous Contract Amt. Through Change Order No. 0 $ 479,693.00
Add this Change Order $ 2,805.79
Revised Contract Total $ 482,498.79
By reason of this contract change order the time of completion is adjusted as follows: -0- days added/deleted to contract time.
The revised contract completion date shall be: 6 /17 /96
Submitted
Approved By- / 4e6AT►*at.0 Date:
We, the undersigned Contractor, havegiven careful consideration to the change proposed and hereby agree, if this proposal is approved,
that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, andperform all services necessary
to complete the above specified worm and hereby agypt ag f ll payment the amount shown above.
Accepted By: �/ ` ` y Title: V'F)o I
Contractor: %CAUL 6A1201&W _ «02 �1,00 Date: 11-11- 99
F:\PWDEPT\PROJECTS\9504\CCOI. W PD
OCT-30-96 WED 2: 39 PPi PAT17L GAPDIIER N" FA: BIO, 909 984 i "8 P, 1
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE POST OFHCE BOX 3730
9091984-1714 ONTAMO, CAUFORNIA 91761 FAX 909/984-1120
Panafax phone Number
FAX TRANSMITTAL LEAD SHEET
909/984-1128
To verify,, call 909/984-1714
DATE & - - __" Gr, -
Number of pages transmitted, 'ncluding this lead shoot��
i'
if you have any questions or problems regarding this transmittal,
Please contact the sander at the verifying number listed above.
Thank you.
OC.T-29-96 IUE 12; OG P11 PAUL :AKENEP COFF FA,X NO. H9 984 1128
PAUL GARDNER CORPORATION
901 SOJTH SJLIANA AVENUE FAST OFFICE BOX 3730
909/984-1714 ONTARIO, CALIFORNIA V1761
P. 2
FAX 909J984.1126
DAIL[ EXTRA WORK REPORT
CITY OF LA 4UIRTA CONTRACTOR REPORT 1
PROJECT - ADAMS ST EXTENSION/4-5I0NALS, PROJECT 95-04 DATE PERFORMED 08/09/96
DATE OF REPORT 10/29/96
WORK PERFORMED BY
PAUL GARDNER
CORPORATION
DESCRIPTION OF WORK
F IG WE,
S/W CORNER FERNANDO A
EISENHOWER
IEQUIP NO i EQUIPMENT INCURS IRATE 1AMOUNT I LABOR
126 ITRUCK, DUMP, 2 AXLE 1 1.5 1 $17.54 1 $26.31 ILABORER TRAINEE It
1 24 LAIR COMPRESSOR, 100 CFM 1 1.5 1 $5.47 1 $8.21 1 G GARCIA
I [AIR TOOL, 90 LE 1 1.5 I 51.93 1 $1.70
I I I I I
I I
AND/OR WORK DONE BY SPECIALISTS
DESCRIPTION I NO
TAX B 7•75X1
COST OF EQUIPMENT, MATERIALS, & WORK
PAUL GARDNER CORPORATION
POST OFFICE BOX 3730
ONTARIO CALIFORNIA, 91761
(909)984.1714
COST
$0.00
HOURS
OT
REG
OT
REG
OT
REG
REG
REFERENCE CCO
CONTRACTOR JOB 95326
IRATE I AMOUNT
I 1
3 1 $19.62 1 $58.86
i.... i.....2...... YIBDBIDIA{.
JJY.W
.. saw=== ...... eae1ADDED
PERCENTAGE 27.34
$16.09
v m==—====.a.=====ISUBSISTENCE
........ __—==v...ITRAYEL
EXPENSE
--=.r=====---==.o=10THER
saw ... 0...: -I
....:-===== .... ====1TOTAL
COST OF LABOR A
$74.95
ag_=...... -I
8
$36.21
+NARK^UP ON LABOR COST 15%(A) $11.24
*MARK-UP ON EQUIP, MAIL 8 WORK 158(B) $5.43
SUBTOTAL 1 $127.84
BOND 2K1 $2.56
TOTAL THIS REPORT i $130.39
O T-%9-96 TUF 17'06 FM PA7L GARDllFR LORF FAY H, 909 984 1128
PAUL GARDNER CORPORATION
90'; SOUTH SULTANA AVENUE POST OFFICE BOX 3730
909/984-7714 ONTARIC, CAL,FORNIA 91761
DAILY EXTRA WORK REPORT
CITY OF LA OUINTA
PROJECT - ADAMS ST EXTENSION/4-SIGNALS, PROJECT 95-04 DATE PERFORMED 08/14/96
DATE OF REPORT 10/29/96
FAX 909/984-1128
CONTRACTOR REPORT 2
REFERENCE CCO
WORK PERFORMED BY PAUL GARDNER CORPORATION
n........ n. n. vcw RFNOVF ARAMMMFn R-1 1. INE- HIE CORNER WASHINGTON a SHOPPING CTR CONTRACTOR JOS 95326
1EQUIP NO
1 126
1 24
i
I EQUIPMENT IHOURS�
ITRUCK, DUMP, 2 AXLE I
(AIR COMPRESSOR, 100 CFM 1
(AIR TOOL, 90 LB 1
1
1
i
IRATE (AMOUNT I
1 $IT.54 I $17.54 ILABORER
1 $5.47 1 $5.47 I
1 $1.13 1 21.13 1
�
LABOR
TRAIKEE 1 10T
F MAREZ IREG
10T
1HOURS
I
2 1
RE6
IRATE I
I
914.28 1
I I
AMOUNT 1
I
$28.56 1
I
I
I I
I I I
JOT
REG
1 OT
I
( I
I
I
`REG
RE
I
1 I
IGT
I
I I
I I
I
IREG
i
i
i
IOT
'REG
OT
REG
JOT
I
i
i
I I
I
I
IMATERIAL AND/OR WORK DONE Sy SPECIALISTS
____i
NO. + COBT
i
i
I DESCRIPTION
REG
iOT
I
I
I
f I
I
I
IREG
i 1
1
1
I
I I
(
I
I
1••uNoo.===_.....
18UBTOTAL S28.56 1
I I
I
I""ssac=======----JADDED
PERCENTAGE 27.34 $7.81 1
1
I I
I
i........ ''`"=====(TRAVEL
EXPENSE 1
1
I
I
1••••— '=....
ITOTAL CDST OF LABOR A $36.37
I
ISALES TAX B 7.75%1
ITOTAL COST OF EQUIPMENT, MATERIALS,
1
& WORK
1 $0.00
1===—-=°-"-°="===1
I
B 924.14 1
+MARK-UP ON LABOR COST
15%(A)
$5.46
1
+MARK-UP ON EQUIP, MATL R WORK
15%(B)
63.62
I
PAUL GARDNER CORPORATIONSUBTOTAL
I
1
I
$69.58
1 POST OFFICE BOX 3730
BOND
2%1
$1.39 1
1 ONTARIO CALIFORNIA, 91761
1
I
S70.98
1 (909)984 1714
TOTAL THIS REPORT
96 TUE 12; Pig: I GP.Rr'IFR CORE FAX 1a1,. 909 984 1128
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVFNUF POST OFFICE BOX 3730
909/984-1714 ONTARIO, CALiF02NIA 91761
FAX 909/984.1128
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA CONTRACTOR REPORT 3
PROJECT - ADAMS ST EXTENSION/4-SIGNALS, PROJECT 95-04 DATE PERFORMED 09/05/96
DATE OF REPORT 10/20/96
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK TRENCH FOR 5" CONDUIT TO VAULT, S/W CORNER WASHINGTON Q LA QUINTA WIT
REFERENCE CCO
CONTRACTOR JOB 95326
(EQUIP NO
I EQUIPMENT
INCURS IRAT!
JAMQUNT
I LABOR
INCURS
IRATE
I AMOUNT
I 126
ITRUCK, DUMP, 2 AXLE
! 5.5 I $17.54
1 $96.47
[ELECTRICIAN
IOT
I
I
24
(AIR COMPRESSOR, 100 CFM
J 5.5 I $5.47
I $30,09
I R ROSA$
IREG 5.5
I $30.98
I 1170.39
I 124
ITRUCK, 15,500 GVW
I 5.5 I $12.61
I 369.36
(LABORER TRAINEE I
IOT
I
I
I 1
1
1 F MAREZ
IREG 5.5
I 314.28
I 578.54
E I
I I
I I
AL AND/OR WORK DONE BY SPECIALISTS
DESCRIPTION I NO.
BALES TAX N 7.75XI
TOTAL COST OF EQUIPMENT, MATERIALS, & WORK
PAUL GARDNER CORPORATION
POST OFFICE BOX 3730
ONTARIO CALIFORNIA, 91761
(909)984.1714
COST
$0.00
JOT I I
IREG I I
JOT
IREG I I
IOT I I
IREG I J
IDT
IREG I
JOT I I
IREG I I
JOT [ I
IREG J I
JOT I I
IREG I
I i I
I--
............. ... J SUBTOTAL
==z................JADDED PERCENTAGE 27.34
............7 ..... ISUBSISTENCE
EXPENSE
w�..ov�o..o.:r_z (OTHER
I... ....... ITOTAL COST OF LABOR A
$243.93
$68.06
B $195.91
+MARK-UP ON LABOR COST 15%(A) 547,55
+MARK-UP ON EQUIP, MATL & WORK 15%0) $29.39
J�
I
8U5TOTA1. I SS69.83
BOND 2XI S11.80
(-
TOTAL THIS REPORT J $601.63
KT-?9-9; TUF 112:57 PIM PAU GARDNER NRP FAX NO, K9 H4 1128
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE POST OFFICE BOX 3730
Q09/984-1714 ONTARIO, CALIFORNIA 91761
P, 5
FAX 909/954. 1128
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA CONTRACTOR REPORT 4
PROJECT - ADAMS ST EXTENSION/4•SIONALS, PROJECT 95-04 DATE PERFORMED 09/0&/96
DATE OF REPORT 10/29/96
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK INSTALL 5" SERVICE CONDUIT, S/W CORNER WASHINGTON 8 LA GUINTA CIA
[EQUIP NO I EQUIPMENT INCURS IRATE (AMOUNT I LABOR IHOUR$
I 126 ITRUCK, DUMP, 2 AXLE J 4 I $17.54 I 570.16 (ELECTRICIAN JOT
I 24 JAIR COMPRESSOR, 100 CFM I 4 I S5.47 I $21.88 I R ROW IREG
124 ITRUCK, 15.500 GVW I 4 I S12.61 J $50.44 ILABORER TRAINEE i JOT
JAIR TOOL, 35 LB I 4 I 60.53 I $2.12 I F MARE7. IREG
AL AND/OR WORK DONE BY SPECIALISTS
DESCRIPTION I N0.
T, SK $0, PVC, 5.00" J 20
SK $0, PVC, 3" X 48" I i
MIX, BAG I 1
I
I
J
SALES TAX E 7.75X1
TOTAL COST OF EQUIPMENT, MATERIALS, & WORK
PAUL GARDNER CORPORATION
POST OFFICE BOX 3730
ONTARIO CALIFORNIA, 91761
(909)984-1714
COST
$2.9293
$24.5000
52.7000
$58.59
$24.50
$2.70
....uuu.
$6,65 I .......... mamma__'
JOT
IREG
JOT
IREG
JOT
IREG
JOT
IREG
JOT
IREG
IDT
IREG
IOT
IREG
REFERENCE CCO
CONTRACTOR JOB 95326
4 j $30.98
4 I $14.28
AMOUNT
$123.92
$57.12
I I I
SUBTOTAL 8181,04 I
ADDED PERCENTAGE 27,34 $49,50 I
OU96ISTENCE I
TRAVEL EXPENSE I
TOTAL CURT UP LAW"
g 9237.03
♦MARK-UP ON LABOR COST 15%(A) $34.58
+MARK-UP ON EQUIP, NATL & WORK 1S%(B) $35.56
I
I
SUBTOTAL I $537.71
BOND 2%1 $10.75
TOTAL THIS REPORT I $543.46
C' T-30—'G WED 2;33 E��s 7PA'K GJAPDNER CIRE EriX \0, 909 98- 1'`8 P.
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE POST OFFICE BOX 3730
40V/95d"1714 ONTARIO, CALIFORNIA 91761 FAX 909/964-1125
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA CONTRACTOR REPORT 5
PROJECT • ADAMS ST EXTENSION/4-SIOHALS, PROJECT 95.04 DATE PERFORMED 09/11/96
DATE Of REPORT 10/29/96
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK REMOVE & REPLACE SIDEWALK, S/W CORNER EISENHOWER & FERNANDO
(EQUIP ND I EQUIPMENT INOURS IRATE JAMOUNT I LABOR
I 126 ITRUCK, DUMP, 2 AXLE I 1 I $lr.54 I $17.54 JELECTRICIAN
I I I R ROSA$
1 I I I ILABCRER TRAINEE II
t I 1 I I J KENNEDY
I I 1
(MATERIAL AND/OR WORK DONE BY SPECIALISTS
1 DESCRIPTION f NO, COST
ICONCRETE, YD 0.5 S49,1100
SALES TAX & 7.75%1
TOTAL COST OF EQUIPMENT, MATERIALS, & WORK
PAUL GARDNER CORPORATION
POST OFFICE BDX 3730
ONTARIO C,SLIFORM1A, 91761
(909)984.1714
S24.56
S1.90
1
2
REG
OT
REG
OT
REG
OT
REG
REFERENCE CCU
CONTRACTOR JOB 953Z6
`RATE I
AMOUNT
I I
530.98 (
$30.98
I
I $19.62 1
$39.24
ADDED PERCENTAGE 27.34 S19,20 1
SUBSISTENCE
TRAVEL EXPENSE
OTHER i
TOTAL COST
OF
LABOR
A
$89.42
B
$44.00
*MARK-UP ON LABOR COST 15%(A) $13.41
MARK-UP ON EQUIP, MATL & WORK 15%(B) $6.60 1
I
I I
SUBTOTAL i $153.43 I
BOND 2XI 93.01
1-1
TOTAL T141S REPORT 1 5156.80
�=====x=m__z_-I
CC'T-30-96 6IED 0:40 FN F:,'' DiiEF 'aOF,F FA}: 11' 909 984 1 i?E
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE P05T OFFICE BOX 3730
009/984-1714 ON TARIO, CALIFORNIA 91701 FAX 9D91'984-1128
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA CONTRACTOR REPORT 6
PROJECT - ADAMS ST EXTENSION/4-SIONALS, PROJECT 95.04 DATE PERFORMED 09/12/96
DATE OF REPORT 10/29/96
REFERENCE CCO
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK TRENCH FOR SERVICE CONDUIT, S/W CORNER WASHINGTON 8 LA QUINTA CTR CONTRACTOR JOB 95326
1EOUIP NO
I EQUIPMENT IHOURS
IRATE
(AMOUNT
I LABOR
lHOURS
IRATE I
AMOUNT
I
I I
I
I
IELECTRICIAN
JOT
1 124
(TRUCK, 15,500 GVW I
3
1 $12.61
1 $37.83
I R ROSAS
IREG 3
1 $30.98 1
192.94
1 24
JAIR COMPRESSOR, 100 CFM I
3
( $5.47
1 $16.41
1LABORER TRAINEE 1
JOT
I I
I
(AIR TOOL, 35 LB, 2 EA I
6
( $0.53
1 $3.18
1 F MAREZ _
JREG 3
1 $14.28 1
$42.84
I
I I
I
I
1
IQT
I I
IREG
I
I I
I
I
JOT
I I
I
I I
I
I
I
IREG
I
I
I I
I
I
I
JOT
I
I I
I
I
I
I
IREG
I I
1
07
IREG
IMATERIAL AND/OR WORK DONE BY SPECIALISTS
J
I NO,
I
COST I
i
JOT
IREG
I I
I DESCRIPTION
ICONDUIT, SK 40, PVC, 2.00"
1
30 1
10.4493 1
S13.48
1
JOT
I 1
ISWEEP, SK
80, PVC, 2" X 36"
1
1 1
$10.2200 1
$10.22
1
IREG
I 1
JELL, 90, SK 80, 2.00"
1
1 1
$4.8150 1
f4.82
1
JOT
1 I
I
I
I
I
IREG
I I
I i
I
f
JI
I
I
I
I I
1..oao..........
ISUBTOTAL
$135.78
I
I
I
I
J-'-'�'"--.:__===IADDED
PERCENTAGE 27.34
$37.12
ITRAVE$TEXPENSE
...................
1
I
I
j
1.�eccccc.c..��ae_�10THER
I
J
J
J
I.m
--- ==_____=====TOTAL
COST OF LABOR A
$172.90
ISALES TAX
0 7.75%1
I
1
$2.21 1...................I
B
$88.14
ITOTAL COST OF EQUIPMENT, MATERIALS,
6 WORK
1
I
*MARK-UP ON LABOR COST 15%(A)
$25.94
I
+MARK-UP ON EQUIP, MATL 8 WORK 15%(B)
J
$13.22
PAUL GARDNER CORPORATION
POST OFFICE BOX 3730
SUBTOTAL I
BOND 2%1
4300.20
S6.00
ONTARIO CALIFORNIA, 91761
J
I1av
I
(909)984-1714
TOTAL THIS REPORT I
$306.21
cr_c:,nca
00T-29-96 TIUE 12; 09 PIuI PAUL GARIP"LER CORP FtiR 110. 909 98 1128
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE POST OFFICE BOX 3730
909/954-1'/ 14 ONTARIO, CALIFORNIA 91761
P. 8
FAX 909/984-1128
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA CONTRACTOR REPORT 7
PROJECT - ADAMS ST EXTENSION/4-SIQNALS, PROJECT 95-04 DATE PERFORMED 09/13/96
DATE OF REPORT 10/29/96
LARK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK POUR FOUNDATION & STUBOUT, WASHINGTON & LA QUINTA CTR
JEOUIP NO I EQUIPMENT INCURS IRATE (AMOUNT I LABOR
1 124 (TRUCK, 15,500 GW I 2 I 512.61 I $25.22 IELECTRICIAN
R ROSAS
I I
I
I
I
I
I
I
1
MATERIAL AND/OA WORK DONE BY SPECIALISTS
NO.
(ALES TAX B 7.75%I J
TOTAL COST OF EQUIPMENT, MATERIALS, & WORK _
PAUL GARDNER CORPORATION
POST OFFICE BOX 3730
ONTARIO CALIFORNIA, 91761
(909)984.1714
COST
I HOURS
107
IREG
JOT
IREG
JOT
IREG
JOT
IREG
IOT
IREG
JOY
IREG
JOT
IREG
JOT
IREG
JOT
IREG
REFERENCE CCO
CONTRACTOR JOB 95326
IRATE I AMOUNT
1 1
2 1 $30.98 J 961.96
I=_=_=_====.zz==== SU670TAL
SO1.V6
PERCENTAGE 27.34 $16.94 J
I..... .... . 0... elev ISUBSISTENCE
I.zz_zz==_=...e=_..ITRAVEL EXPENSE I
1==ez=c=a.=======zezJOTHER
I=====ee=exvevv=====I
.....ITOTAL COST OF LABOR A $78.90 J
$0.00 J................===I J
B S25.22 J
J
*MARK-UP ON LABOR COST
+MARK-UP ON EQUIP, MATL & WORK
SUBTOTAL
BOND
TOTAL THIS REPORT
15%(A) 611.83
ISMS) $3.78
1 $119,74 J
2%I $2.39
I
1 $122.13
OGi-80-96 'NEE 2 : 4 0 P1,I PAU' GAR"NEP CHP r'AX NO. 909 984 1128 p 4
a,
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE POST OFFICE BOX 3730
909/9840714 ONTAWO, CAUIFORMA 91761
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA
PROJECT - ADAMS ST EXTENSION/4-SIGNALS, PROJECT 95.04 DATE PERFORMED U9123/96
DATE OF REPORT 10/29/96
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK BACKFILL SERVICE TRENCH, S/W CORNER WASHINGTON 8 LA QUINTA CTR
NO J EQUIPMENT
126 ITRUCK, DUMP, 2 AXLE
24 JAIK COMPRESSOA, 100 CFM
IAIR TOOL, 35 LS
2
i
1
MATERIAL AND/OR WORK DONE BY SPECIALISTS
DESCRIPTION
CONDUIT, SK 40, PVC, 3.001, J 19
SWEEP, SK 80, PVC, 3" X 18" J 1
TAX B 7.75X1
COST OF EQUIPMENT, MATERIALS, $ WORK
$17.54
$5.47
$0.53
COS"
$0.9094
$19.0000
INT J LABOR IHOU
$35.08 JLABORER TRAINEE II JOT
$5.47 J F ZUNIGA DREG
$0.53 JLABORER TRAINEE I JOT
I F MAREZ IREG
J JOT
IREG
i JOT
IREG
J JOT
J IREG
J JOT
IREG
J JOT
I JREG
517.2E J JOT
$19.00 i JREG
J JOT
IREG
i--ev=avoece=a=c=_e
FAX 9C9/984.1128
CONTRACTOR REPORT 8
REFERENCE COO
CONTRACTOR JOB 95326
2 I 519.62
I
2 � 514.2E
AMOUNT
$39.24
$28.56
TAL 567.80
PERCENTAGE 27.34 $18.54
STENCE
L EXPENSE
TOTAL COST OF LABOR A $86.34
$80.17
i
•MARK-UP ON LABOR COST
15%(A)
$12.95 J
I
+MARK-UP ON EQUIP, MAIL $ WORK
15%(B)
$12.03
J
I PAUL GARDNER CORPORATION
SUBTOTAL
i
J
J
$191.48 J
POST OFFICE BOX 373D
BOND
2%J
63,83
J ONTARIO CALIFORNIA, 91761
(909)984-1714
TOTAL THIS REPORT
J
$195.31
u E 1 r 1r"T-2n-9r WED 2:41 nM RAU"R71,H 'OR
9H, 9$4 112
PAUL GARDNER CORPORATION
9C1 SOUTH SULTANA AV'NUE POST OFFICE BOX 3730
90919$4.1714 ONTARIO, CALIFORNIA 91741
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA
PROJECT - ADAMS ST EXTENSION/4-SIGNALS, PROJECT 95-04 DATE PERFORMED 10/01/96
DATE OF REPORT 10/29/96
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK PICKUP CITY POLE, PREP FOR STANDING, POLE 6, WASHINGTON B LA QUINTA CTR
EQUIP NO I EQUIPMENT INCURS
124 ITRUCK, 15,500 DVW I 2
79 INYD CRANE, TRUCK MNTO
I PITMAN, NL-858 I 2
I I
I I
I I
I I
I I
( I
I I
ERIAL AND/011 WORK DONE BY SPECIALISTS
DESCRIPTION I N0.
LL SIT, I-' I 1
TAX 2 7.75K1
COST OF EQUIPMENT, MATERIALS, S WORK
.E JAMOUNT I LABOR
112.61 j $25.22 (ELECTRICIAN
I I R ROSAS
$17.66 I $35.32 JLASORER TRAINEE II
I I J VARGAS
I I
I J KENNEDY
1 I
1 I
I (
I I
COST
$45.0000
$45.00
IOT
IREG
IGT
IREG
JOT
IREG
JOT
IREG
IGT
IREG
IGT
IREG
JOT
IREG
I
2
2
2
FAX 9091984-1128
CONTRACTOR REPORT 9
REFERENCE cco
CONTRACTOR JOB 95326
RATE
S30.98
$19.62
119.62
S61.96
$39.24
$39.24
................... IWCIVIAL *IOU." I
PERCENTAGE 27.34 $38.4D I
l=====*v==vqm=w===vwlTRAVEL EXPENSE i
I===========---=====ITOTAL COST OF LABOR A $178,84 J
$3.49
s f109.03 I
I
+MARK-UP ON LABOR COST
*MARK-UP ON EQUIP, MATL 8 WORK
PAUL GARDNER CORPORATION SUBTOTAL
POST OFFICE BOX 3730 BOND
ONTARIO CALIFORNIA, 01161
(909)9B4-1714 TOTAL THIS REPORT
I
15X(A) $26.83 I
15X(8) $16.35 I
I
I $331.04 I
2Xj S6.62
_1
I $337.66 I
m1• , r rn{? Qf - {
OOT-29-96 ICE 12:11 PNI PAUL GAP,:NER CORP FAL NO. .;��7 98� 11
PAUL GARDNER CORPORATION
901 SOUTH SULTANA AVENUE POST OFFICE BOX 3730
VL'V/984 U 14 ONTARIO. CALIFORNIA 9174'
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA
PROJECT - ADAMS ST EXTENSION/4-SIGNALS, PROJECT 95.04 DATE PERFORMED 10/02/96
DATE OF REPORT 10/29/96
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK INSTALL CITY FURNISHED POLE, POLE 6, WASHINGTON & LA QUINTA CTR
NO I EQUIPMENT
124 ITRUCK, 15,500 GVW
79 IHYD CRANE, TRUCK MNTD
I PITMAN, ML-858
HOURS IRATE
2 I $12.61
I
2 I $17.66
(MATERIAL AND/01 WORK DONE BY SPELIALIsM
DESCRIPTION I NO•
I I
I �
I I I
I
I � I
I
I i I
ISALES TAX 8 7.75%I 1
ITDT4L COST OF EQUIPMENT, MATERIALS, & WORK
PAUL GARDNER CORPORATION
POST OFFICE BOX 3730
ONTARIO CALIFORNIA, 91761
(909)984-1714
COST
INT I LABOR
$25.22 ELECTRICIAN
I R ROBAS
$35.32 ILABORER TRAINEE II
I J KENNEDY
(LABORER TRAINEE I
I F MAREZ
2
2
2
REG
OT
REG
OT
REG
OT
REG
FAX 9091964.1128
CONTRACTOR REPORT 10
REFERENCE CCO
CONTRACTOR JOB 93326
RATE
$30.99
$19.62
$14.28
AMOUNT
I
561.96 I
I
$39.24 I
$28.56 I
SUBTOTAL $129.76
ADDED PERCENTAGE 27.34 $35.48
SUBSISTENCE
TRAVEL EXPENSE
I..........rcvoa =-1
I•= =1TOTAL COST OF LABOR A 6165.24
$0.00 I .......... ........= I
B 860.54
+MARK-UP ON LABOR COST
+MARK-UP ON EQUIP, MAIL & WORK
SUBTOTAL
BOND
TOTAL THIS REPORT
,PAoeT c
15%(A) $24.79
IWO) $9.08
I i259.64
2%1 $9.19
CC3-E°-96 7E 17. 1 PH FA"L GARENER i,CRP FAX NC. 9u9 934 1128 F. 1
PAUL GARDNER CORPORATION
9C1 SOUTH SULTANA AVENUE POST O:FICE BOX 3730
909/984-1714 ONTAR10, CAOFORNIA 91761 FAX 909/984.1 i28
DAILY EXTRA WORK REPORT
CITY OF LA QUINTA CONTRACTOR REPORT 11
PROJECT - ADAMS ST EXTENSION/4-SIGNALS, PROJECT 95-04 DATE PERFORMED 10/08/96
DATE OF REPORT 10/29/96
REFERENCE CCO
WORK PERFORMED BY PAUL GARDNER CORPORATION
DESCRIPTION OF WORK RELOCATE SPRINKLER LINES, S/W CORNER WASHINGTON & LA QUINTA CTR CONTRACTOR doh 95326
EQUIP NO I EQUIPMENT
126 ITRUCK, DUMP, 2 AXLE
24 1AIR COMPRESSOR, 100 CFM
HOURS IRATE (AMOUNT
5 I $17.54 I 887.70 I
5 $5.47 $27.35
III
MATERIAL AND/Olt WORK DONE BY SPECIALISTS
I
COST
DESCRIPTION I N0.
CONDUIT, SK 40, PVC, 1.00" i
10 I
$0.2170
CONDUIT, SK 40, Pvc, 1.22511
10
$0.2937
CONDUIT, SK 40, PVC, .75" I
10
$0,1460
ELL, 90, SK 40, PVC, 1.00" i
8 I
81.2200
ELL, 90, SK 40, PVC,
4
$1.7000
ELL, 90, SK 411, PVC, .75"
4
0.7800
COUPLING, PVC, 1.00" I
6
$0.2040
COUPLING, PVC, 1.25" I
6
$0.2720
COUPLING, PVC, .75" i
6 I
$0,1320
.PVC SOLVENT CEMENT, PT I
1 I
$3.9000
13/8" CRUSHED ROCK, TON
1
S93500
I
(SALES TAX 8 7.75%I
ITOTAL COST OF EQUIPMENT, MATERIALS, 8 WORK
LABOR 1NOURS
LABORER TRAINEE 11 IOT
J KENNEDY DREG 5
REG
OT
REG
OT
REG
RATE AMWNI
Si9.ti2 � 598.10
$2,17 10T I
S2.94 I (REG I
$1.46 IOT I
$9.76 1REG
$6.90 I
S3.12
$1.22 •••ISUSTOTAL
$1.63 I===•••••••••••....a IADDED PERCENTAGE 27.34
S0.79
53.90 ... ITRAVEL EXPENSE
I--c.ea=s:ce===•mITOTAL COST OF LABOR A
$26.82
$124.92
$1
1
*MARK-UP ON LABOR COST I5%(A) %18.74
I +MARKUP ON EQUIP, MATL & WORK 15%(B) S24.30
I I I
SUBTOTAL 2%I
PAUL GARDNER CORPORATION SUBT I U.60 I
I POST OFFICE BOX 3734
OND
ONTARIO CALIFORNIA. 91761 TOTAL THIS REPORT I 8336.82
(909)984-1714
PROFESSIONAL SERVICES AGREEMENT:
Sheet I of 2
PROJECT NO. 95-04
Civil Engineering Design Services
Adams Street between Westward Ho and Miles Avenue
CONSULTANT: Mainiero, Smith and Associates, Inc.
777 East Tahquitz Canyon Way, Suite 301
Palm Springs, CA 92262
CONTRACT CHANGE ORDER NO.01
Xkk*kk**kRRXk*k*kk*RRRRRRRk*kk***k*kRRRRRRRRRRkk**kk***RRRRRkk*kRRRRRRRRkk*k**kkk***RRRRRR
Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following
described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms,
general conditions, and special provisions of the original Contract.
*k**RRXkkkk*k*k*RRRRR**kk*k***RRRXRRRRkk*k*kk****RRRRXRRk*k***RRkk**k*****RRRRXRRXk*******
DESCRIPTION OF CHANGE
Provide construction control and field survey staking as outlined per the attached scope of services. Conpensation to be on a time
and materials basis, not to exceed a maximum of $2,500.00.
This Contract Change Order Shall Not Exceed $2,500.00.
*k*k*RRRRXXXRk**RkRRRRkXk**kRRRRXRRRXRR*k***kk*RRRRRRkRX*k*RRRRRkk**RRRRXRRkk***RRRRRRRRRk
Previous Contract Amt. Through Change Order No. -0- S6,500.
Add this Change Order S2.500.
Revised Contract Total S9,000.
By reason of this contra rder the time of completion is adjusted as follows: -0- days added/deleted to contract time.
The original contract mpletion to within seventy-five (75) days from the date specified in the Notice to Proceed to Paul
Gardner Corp. for c truction f j No.
RRRRRRRRRRRRR RRRRR R R RRR RRR k*k*kkkRRRRRRkRkkk***RRR**kkkRRRkk*kk*kRRRRRRRR*kkk*
Submitted
kkk**XXkkkkkkkRRk**k*kRRRRRRXXkkk*kkk**k*RRRRRRkkkk**kk**RR*kk*kRRkkk*kkkkRXk**kk*kk*k*RRR
We, the undersigned Consultant have given careful consideration to the change proposed and hereby agree, if this proposal is approved,
that we will provide all equipment furnish all materials, perform aU labor, except as may be noted above, and perform all services necessary
to complete the above specified work
-and hereby accept as full payment the amount shown above.
Accepted By: ��/�f' /%;�2�� __Title: !/ %Ce
Consultant: !��%/ 2A� G✓M /7f>< { Sir / t/G ' Date: -3 Z�/%!v
F:\pwdept\projects\9504\pswco.wpd
XAM Mainiero, Smith and Associates, Inc.
Planning / Civil Engineering / Land Surveying
777 East Tahquitz Canyon Way, Suite 301 / Palm Springs, California 92262.6784
Telephone (619) 320-9811 / FAX (619) 323-7893
October 31, 1995
Mr. John Freeland
Department of Public Works
CITY OF LA QUINTA
78495 Calle Tampico
La Quinta, California 92253
Re: Proposal for Construction Staking Services
Adams Street between Westward Ho and Miles Avenue
Dear John:
We wish to provide you with the following proposal for construction staking services
related to street improvements for Adams Street. Our proposed scope and fee are based
upon our discussions and the standard staking requirements for a project of this nature.
Scope of Services
We propose to complete the following tasks:
Set clearing limits at 100 ft. stations, mark sawcut of Inco temporary road.
2. Stake edge of pavement at 25 ft. stations, offset on both sides of street with grades
to top of pavement.
Compensation
We propose to complete the above described work for a fixed fee of $3,600. This
includes all labor, material and incidental expenses. Payment will be due upon completion
of the staking services.
If this proposal is acceptable, please return a copy of your signed authorization or a signed
purchase order. Our Standard Contract Provisions dated January 1, 1995, shall be made
a part of this agreement.
We appreciate the opportunity to offer our services to the City and look forward to
completing the work to your satisfaction.
Very truly yours,
�v Y
Robert S. Smith, P.E.
PRE CONSTRUCTION MEETING
ADAMS STREET EXTENSION/ 4-SIGNALS
PROJECT NO. 95-04
4/01 /96 1.00 p.m.
Name Firm Phone/Fax
y
la`
�� ��
r772F--
//9 - 3&- oS24
� ids L/�✓�s� L'/ TY 777- 70 �48
9504snup.dm
Return to:
CITY CLERK
City of La Quinta
P.O. Box 1504
La Quinta, Ca. 92253
NOTICE IS HEREBY GIVEN THAT:
of Document
on MAR 2 7 = as N,,).1-t-t-� f 37R
h,_, not h Co'r a r x v ''sY
o;i^ina
County Recorder
RIVERSIDE COUNTY CALIFORNIA
1. The City of La Quinta, California, is a municipal corporation, organized and incorporated
pursuant to the laws of the State of California.
2. The City Clerk of the City of La Quinta is authorized and directed to execute, on behalf of
said City, any and all notices of completion.
3. The address of the City of La Quinta is City Hall, 78-495 Calle Tampico, La Quinta, California
(P.O. Box 1504, La Quinta, Calif. 92253.
4. The public work improvement - PROJECT NO. 95-04 - on the hereinafter referred to real
property within the City was COMPLETED on the 18`h day of March, 1997.
5. The name of the contractor for such work of improvement was PAUL GARDNER
CORPORATION.
6. The property on which said public work of improvement was completed is in the City of La
Quinta, County of Riverside, State of California, and is described as follows: Adams Street
Extension/4 Signals
7. The street address of said property is: Adams Street Extension; Signal installation at
Miles/Adams; Fred Waring/Adams; Eisenhower/Fernando; and Washington/La Quinta village
Shopping Center.
DATED: March 19 1997
Y OF LA QUINTA, CALIFORNIA
BY
TITLE CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE 1
I hereby certify that I am the City Clerk of the governing board of the City Council of the City
of La Quinta, the political subdivision which executed the foregoing notice and on whose behalf I
make this verification; that I have read said notice, know its contents, and that the same is true.
I certify under penalty of perjury that the foregoing is true and correct.
Executed at La Quinta, California on March 19, 1997.
AUNDRA L. JU OLA, City Clerk
City of La Quinta, California