Loading...
24230 Spanos 90CITY OF LA QUINTA SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this 20th day of February , 19 90 , by and between A. G. Spanos Construction, Inc. hereinafter referred to as "SUBDIVIDER", AND CITY OF LA QUINTA, a municipal corporation of the State of California, hereinafter referred to as "CITY". WITNESSETH: WHEREAS, the Subdivider has prepared and filed a final subdivision map of Tract No. 24230 in the City of La Quinta, County of Riverside, for approval by the City; and WHEREAS, as a condition precedent to the approval of said map by City, Subdivider is required to offer dedication of those parcels of land intended for streets, highways, and other public use, and also to construct and install or agree to construct and install certain improvements on said dedicated parcels; and WHEREAS, Subdivider, by said map, has offered for dedication to City for public use certain streets and easements shown on said map; and WHEREAS, City desires to accept the streets and easements shown on said map for public use, and certain other such improvements; and WHEREAS, as a condition precedent to the acceptance of the dedication of such streets and easements by City, Subdivider is required to enter into an agreement with the City to construct certain improvements; and WHEREAS, the total cost of such improvements has been estimated by the City Engineer to be approximately $1,782,000.00 Dollars; and WHEREAS, Subdivider, by said map, has proposed to utilize certain parcels of land for private streets, and also to construct and install or agree to construct and install certain improvements; and WHEREAS, even though said private streets shall not be dedicated to City for public use, City desires to insure that said streets are constructed to the same standards and specifications required by City for public streets; and WHEREAS, the total cost of such improvements has been estimated by the City Engineer to be approximately $1,530,000.00 Dollars; NOW, THEREFORE, IT IS AGREED by and between the parties thereto as follows: 1. Subdivider, at his sole cost and expense, shall construct and install the street, drainage,landscaping, domestic water, sanitary sewer and other improvements required to be constructed or agreed to be constructed as a condition precedent to the approval of said final map and acceptance of such streets and easements, as shown on the "Improvement Plans for Tract No.24230"; copy of which is now on file in the office of the City Engineer of the City and which is referred to and incorporated herein as though set forth in full. SUBDIVISION IMPROVEMENT AGREEMENT - Tract 24230 Page 2 2. Subdivider shall furnish to City securities satisfactory in form and substance to City Attorney executed by a corporation authorized to transact surety business in the State of California, one class security to be in the aggregate sum of $5,764,900.00 dollars to assure the faithful performance of this Agreement, said security class hereinafter referred to as "Performance Bond(s)", and one security to be in the aggregate sum of $2,565,000.00dollars to assure the payment of the cost of labor and materials supplied to construct the required improvements, said security class hereinafter referred to as "Payment Bond(s)". All securities furnished pursuant to this Agreement shall be furnished in amounts commensurate with the estimated value of the various improvement items set forth in Exhibit 'A' which is attached hereto and made apart hereof. Subdivider shall furnish a minimum of five (5 ) separate Performance Bonds and a minimum of three (3)separate Payment Bonds as identified by the respective Bond Groups shown in Exhibit W. 3. Portions of the improvements required herein for Tract No. 24230 are offsite improvements and may be subject to separate reimbursement agreement(s) resulting in partial reimbursement of costs to the extent legally possible to the Subdivider as more particularly setforth on the attached Exhibit 'A' all subject to the approval of the City. Reimbursement Agreements shall be subject to the legal requirements of the Municipal Code together with Labor Code Sec. 1770 et. seq.; and 4. Portions of the improvements required herein for Tract No. 24230 may be deferred to later date subject to the approval of the City as hereinafter set forth on the attached Exhibit W. In any event any deferred security shall be furnished to City prior to the approval and recordation of Map for Tract No. 24230. 5. Subdivider shall commence the construction and installation of said improvements within ninety (90) days from the approval of such "Improvement Plans" for Tract No. 24230 by the City Engineer, and shall complete the construction of said improvements within eighteen (18) months from the date of commencement. Subdivider may at its sole discretion extend the completion period described herein past the eighteen (18) months time period to any future date that Subdivider may select. It is understood, however, that a condition precedent to extending the completion period, Subdivider shall furnish to City securities similar in form and substance to those required by Article 2 herein to cover the extended completion period selected by Subdivider. The value of said securities shall be sufficient to insure the performance of improvement work that remains incomplete at the time of said time extension. The security posting amount shall be determined by the City Engineer. 6. Before final approval of the street improvements, the Subdivider will place survey monuments in accordance with the provisions of the State Subdivision Map Act and the Subdivision Ordinance of the City of La Quinta as shown on the Tract Map. After the monuments are set, Subdivider shall furnish to the City Engineer written notice that the monuments have been set, and written proof that the engineer or surveyor has been paid for setting the monuments, or as otherwise provided in the Subdivision Map Act. 7. The City Engineer or his duly authorized representative, upon written request of Subdivider, shall inspect the improvements herein agreed to be constructed and installed by Subdivider, and if determined to be in accordance with the applicable city standards, shall recommend the acceptance of such improvements by the City. SUBDIVISION IMPROVEMENT AGREEMENT - Tract 24230 Page 3 8. The City Engineer, or his duly authorized representative, upon written request of Subdivider, shall inspect the Streets herein agreed to be constructed by Subdivider, and determine if said Streets have been constructed in compliance with the standards and specifications required by City for public streets. 9. Subdivider shall complete such improvements plans including any corrections and revisions thereto necessary to comply with the applicable City standards as determined by the City Engineer, within thirty (30) days after approval of the final map. 10. Subdivider hereby guarantees such improvements for a period of one year following the completion by Subdivider, and acceptance by City, against any defective work or labor done, or defective materials furnished, in the performance of this Subdivision Improvement Agreement by Subdivider and shall repair or replace any such defective work or materials subsequently discovered. 11. The labor and material security required by Article 2 herein shall be retained to secure payment to the contractor, his subcontractors and to persons renting equipment or furnishing labor and materials for six (6) months after completion and approval of the work required by Article 1 herein. 12. Ten percent (10%) of the performance security required by Article 2 herein shall be retained by the City for one (1) year to support the guarantee of the improvements required herein. 13. In the event that the Subdivider fails to perform any obligation hereunder within sixty (60) days after the City has mailed written Notice of Default to the Subdivider at the address given below, the Subdivider authorizes City to perform such obligation and agrees to pay the entire cost of such performance by City. 14. In the event that Subdivider fails to perform any obligation hereunder, Subdivider agrees to pay all costs and expenses incurred by City in securing performance of such obligations, including costs of suit and reasonable attorney's fees. In the event that Subdivider is unable to perform within the time limits herein due to causes beyond his control, such as strikes, acts of God, etc., all time limits will be extended by the same amount of time as caused by such delay. 15. Subdivider hereby binds itself, its executors, administrators and assigns, and agrees to indemnify, defend and hold the City harmless of any losses, claims, demands, actions or causes of action of any nature whatsoever, arising out of or in any way connected with Subdivider's performance hereinunder in the construction of the improvements agreed to be constructed and installed hereunder by the Subdivider, including costs of suit and reasonable attorney's fees. SUBDIVISION IMPROVEMENT AGREEMENT - Tract 24230 Page 4 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first written above. CITY OF LA QUINTA A-'tw 2- By: Ronald L. kiedrowski City Manager City Clerk f SUBDIVIDER: By: Address: er&miah T. Murphy, Vice -Pr ident By. A. G. Spanos Construction, Jack Murphy Stadium Inc 9449 Friars Road San Diego, CA 92108 Subscribed and Sworn to before me this 20th day of February 19 90 OFFICIAL SEAL , Seal of Notary TONI J, LUCCHESI NOTARY PUBLIC - CALIFORNIA Notary Sig ture SAN JOAOUIN COUNTY My Comm. Expires April 19, 1991 REVIEWED AND APPROVED City Onginker Date SUBDIVISION IMPROVEMENT AGREEMENT - Tract 24230 Page 5 EXHIBIT 'A' The following improvements are designated by Bond Groups to permit the phasing of the required improvements together with the required securities: Bond Groups No. 1, No. 2, and No. 3; the Subdivider shall provide Performance Bonds and Payment Bonds prior to the approval and recordation of Map for Tract No. 24230. Improvements are to be accomplished solely at the expense of the Subdivider and to be completed within eighteen (18) months as herein provided in this Agreement. Bond Group No. 4;the Subdivider shall provide Performance Bonds and Payment Bonds prior to the approval and recordation of Map for Tract No. 24230. Improvements are to be completed by the Subdivider within eighteen (18) months as herein provided in this Agreement. Initial cost of improvements is to be borne by the Subdivider. Cost of said improvements or portions thereof may be subject to future reimbursement to the Subdivider by means of reimbursement agreements relating to contiguous properties and the value of improvements benefiting those properties. The requirement to construct improvements for Bond Group No. 4 and the resulting subsequent reimbursements are subject to rights of way being made available by others to the Subdivider during the terms of this agreement. Bond Group No. 5; the Subdivider shall provide Performance Bonds prior to the approval and recordation of the Map for Tract No. 24230. Improvements are deferred for future construction by the City and/or by means of a cooperative agreement with others which is subject to the approval of the City. Construction shall be on an as needed basis as determined by the City. Traffic Signals: The Subdivider shall bear thirty three and one third (33 1/3%) percent of the cost of traffic signals at the intersection of Washington and Avenue 48 including incidentals. Upon written demand of the City the Subdivider shall deposit his share of the estimated cost of traffic signal improvements with the City. Washington Street - Underground Utilities: The Subdivider shall bear all costs of removing aerial electrical and communication lines along the Subdividers frontage of Washington Street and for the construction of all such facilities in underground ducts together will all appurtenant items and costs incidental thereto. The Subdivider may, subject to the approval of the City, enter into cooperative agreement(s) with the utility companies resulting in said utilties being constructed underground at the expense of the Subdivider; or, Upon written demand of the City the Subdivider shall deposit his share of the estimated cost of undergrounding utilities along his Washington Street frontage together with all costs incidental thereto; or, At the sole discretion of the City an underground utility district may be formed for the purpose of SUBDIVISION IMPROVEMENT AGREEMENT Page 6 constructing utilities underground along the Subdivider's Washington Street frontage. The Subdivider hereby agrees to the formation of such a district and to pay all legal assessments accruing to and benefiting his property within the project limits of his frontage. SUBDIVISION IMPROVEMENT AGREEMENT -24230 Page 7 BOND IMPROVEMENT DESCRIPTION r.RnTTP PERFORMANCE PAYMENT nmmn RrWn 1 On -site streets and Drainage $1,530,000 765,000 Improvements Off -site street and Drainage 11522,000 761,000 Improvements Perimeter lots landscaping 300,000 150,000 2 Sanitary sewer facilities 624,000 312,000 Domestic water facilities 894,000 447,000 3 Survey monuments 21,500 -0- 4 Washington Street one southbound lane from via Marquessa to Ave. 48 40,000 20,000 Washington Street at A.P.N. 617-070-005 50,000 25,000 Avenue 47 at A.P.N. 617-020-013 135,000 67,500 I Washington Street/Avenue 47 Intersection 35,000 17,500 5 Traffic Signals at Washington Street and Avenue 48 33,400 -0- Washington Street Underground Utilities 500,000 -0- Adams Street Median between Avenue 47 and Avenue 48' (1/2 width improved with landscaping & irrigation) 80,000 -0- Each improvement item listed hereon may be bonded individually, or bonded collectively with other improvements with a single bond, provided however, that improvements which are grouped together and bonded with a single bond are correspondingly identified in the 'Bond Group' column as being of the same group. Performance Payment Bond Bond Bond Group 1 - Totals = $ Bond Group 2 - Totals = Bond Group 3 - Totals = Bond Group 4 - Totals = Bond Group 5 - Totals = 3,352,000 1,518,000 21,500 260,000 588,400 $ 1,676,000 759,000 -0- 130,000 -0- GRAND TOTALS = $ 51764,900 $ 2,5651000 ` ' . � � Un Bank of America ' TRADE FINANCE SERVICES DATE OF ISSUE: JANUARY CZ) 1993 TO: CITY OF LA QUINTA 78-105 CAI LE ESTADO P.O. BOX 1504 LA QUINTA, CA 92253 AS A RESULT OF THE MERGER BETWEEN BANK OF AMERICA AND SECURITY PACIFIC NATIONAL BANK, SECURITY PACIFIC NATIONAL BANK LETTER OF CREDIT NO. 9011I9IS072SF IS NOW THE OBLIGATION OF NUMBER HAS BEEN THE ASSIGNED NEW BANK TO OF AMERICA" A NEW LETTER OF CREDIT IN ADDITION, THE FILE FOR THIS LETTER OF BEEN RELOCATED TO THE FOLLOWIN8 OFFICE: CREDIT HAS BANK OF AMERICA NT & SA 1850 GATEWAY BLVD., 6TH FLOOR CONCORD, CA 94520 ATTN: LETTER OF CREDIT OPERATIONS DEPT. SWIFT BOFAUS6S TELEX M I_; I. /��� WHEREVER THE SECURITY PACIFIC NATIONAL BANK LETTER OF CREDIT REFERENCED ABOVE APPEARS IN THE LETTER OF CREDIT, NOW TO READ BANK OF AMERICA LETTER OF CREDIT NO. 134651. ALL COMMUNlCATIONS IN RESPECT TO THE ABOVE SECURITY PACIFIC NATIONAL BANK LETTER OF CREDIT ARE NOW TO BE ADDRESSED TOUTHENG BANK OF AMERICA OFFICE AT THE In. REFERENCED ABOVE, LA BANK OF AMERICA'S LETTER OF CREDIT NUMBER. ALL OTHER TERMS OF THE LETTER OF CREDIT REMAIN UNCHANGED. THIS ORIGINAL ADVICE OF RELOCATION IS TO BE ATTACHED TO AND BECOMES AN INTEGRAL PART OF THE REFERENCED LETTER OF CREDIl. T ID (SEE ATTACHED LETTER) BANK oFmwsn|CANATIONAL TRUST AND SAVINGS ASSOCIATION 0 Box*1ow " CONCORD, OAe*nu*-41o* 3SM 758 244 00 'sion Bond —California Bond No................................. Sp aittiful Performance — Public Work Premium $240.00/2 yrs. AMERICAN MOTORISTS INSURANCE COMPANY KEMPER wauww.wC! SUBDIVISION BOND ICI1LIW All igm bg uhPsP lirrUntS: That ............ WILMA._PAC IFIC_,.. INC:... ............................................ ............................................. as Principal, and the American Motorists Insurance Company, a corporation organized and existing under the laws of the State of Illinois and authorized to transact Eurcty City of La Quinta bovines= in the state of California, as Surety, are held and firmly bound unto.................................................... ......................................... ............. ............in the sum of---.TWELjjE _ THOU�I�..AIR..PTO.,r'.�.QQkh&-----..----------- -- -- : -: -: -;----------------- _-----------------------Dollars ($-1a, ORQ,0D......------) I w the payment whereof, well and truly to be made, said Principal and Surety bind themselves, their heirs, dministrators, successors, and assigns, jointly and severally, firmly by these presents. The condition of the foregoing obligation is such that, whereas the above -bounden Principal has entered dated_ 19...... with the.City of La Quinta ....._.._ Ottoa contract,...................................................... --_... ......_....... .............. '}............................................................... ................----------..........to do and perform the following work, to -wit: `aversion/insure removal/reconstruction associated with concrete walks, temporary acing, parking lot removal, removal of temporary sales office (s), and any other -t ems as may be necessary for conversion of the models to R-1 occupancies. =ot Plan #90-441, Lakefront Model Complex for Lake La Quinta (tract 24230) TOa', THEREFORE, if the above -bounden Principal shall well and truly perform the work contracted -formed under said contract. then this obligation sliall be void; otherwise to remain in full force and 20th July 90 NEDand SEALED this................day of --------------------------------------------------- 19......... .... WILMA PACIFIC;_ IN ALL CORRESPONDENCE TO: IES & ASSOCIATES ING GENERAL AGENTS Figueroa St. CALIFORNIA 90041 : (213) 257-8291 ............................ (Seal) --_ ... . ............. ...... ....... .._ Principal It4SURANCE COMPANY ------------------------------------- Attorney-in-Fact OUTSTANDING BOND REPORT Name: A. G. Spanos Construction, Inc. Tract No. 24230 Date of Contract: February 20, 1990 Required Bond Amounts: $3,352,000 - $1,676,000 - $1,518,000 - $ 759,000 - $ 21,500 - $ 260,000 - $ 130,000 - $ 613,400 - Dates of Bond Reductions: streets/drainage/perimeter landscaping labor/materials sewer/water labor/materials monuments future streets labor/materials signals/utilities/median Total reduced to $ 4,440,100 on 3/27/91 $4,440,100 reduced to $520,120 on 9/16/91 (?) $520,120 reduced to $143,920 on 6/18/92 (?) Outstanding Bonds: Amount: $ 5,764,900 $4,440,100 $ 143,920 $ 143,920 $ 60,000 $ 12,000 Bond No. Date Cancelled/Released: LOC #SBY-42870 Replaced on 3/27/91 LOC #9011191 S072SF Reduced on 7/12/91 LOC #9011191 S072SF Replaced on 3/8/93 LOC #134651 3SM 758 243 00 3SM 758 244 00 Released 4/29/91