Loading...
21555-3 Barcon Dev 89CITY OF LA QUINTA SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this 22nd day of March, 1989, by and between BarCon Development ** , hereinafter referred to as "SUBDIVIDER", AND CITY.OF LA QUINTA, a municipal corporation of the State of California, hereinafter referred to as "CITY". ** a California Limited Partnership , on behalf of ParcLaQuinta, a California Joint Venture WITNESSETH: WHEREAS, the Subdivider has prepared and.filed a final subdivision map of Tract No. 21555-3 in the City of La Quinta, County of Riverside, for approval by the City; and WHEREAS, as a condition precedent to the approval of said map by City, Subdivider is required to offer dedication of those parcels of land intended for streets, highways and other public use, and also to construct and install or agree to construct and install certain improvements of said dedicated parcels; and WHEREAS, Subdivider, by said map, has offered for dedication to CITY for public use certain streets and easements shown on said map; and WHEREAS, City desires to accept the streets and easements shown on said map for public use, and certain other such improvements; and WHEREAS, as a condition precedent to the acceptance of the dedication of such streets and easements by City, Subdivider is required to enter into an agreement with the City to construct certain improvements; and WHEREAS, the total cost of such improvements has been estimated by the City Engineer to be approximately $102,240.00 Dollars; and WHEREAS, Subdivider, by said map, has proposed to utilize certain parcels of land for private streets, and also to construct and install or agree to construct and install certain improvements; and WHEREAS, Subdivider, by said map, has not offered for dedication to the City for public use the aforementioned private streets; and WHEREAS, even though said private streets shall not be dedicated to City for public use, City desires to insure that said streets are constructed to the same standards and specifications required by City for public streets; and WHEREAS, the total cost of such improvements has been estimated by the City Engineer to be approximately $ 57,232.00 Dollars; NOW, THEREFORE, IT IS AGREED by and between the parties thereto as follows: 1. Subdivider, at his sole cost and expense, shall construct and install the street, drainage, domestic water, sanitary sewer and other improvements required to be constructed or agreed to be constructed as a condition precedent to the approval of said final map and acceptance of such streets and easements, as shown on the "Improvement Plans for Tract No. 21555-3 ; a copy of which is now on file in the office of the City Engineer of the City and which is referred to and incorporated herein as though set forth in full; except as hereinafter specifically setforth in a&d EXHIBIT 'B' CITY PARTICIPATION IN SAGEBRUSH AVENUE to this SUBDIVISION IMPR VEMENT AGREEMENT. 2. Subdivider shall furnish to City a security sati actory in form and substance to City Attorney executed by a corporation authorized to transact surety business in the State of California on forms approved by the City, one security to be in the sum of $209,404.00 Dollars to assure the faithful performance of this Agreement, and one security to be in the sum of $104,702.00 Dollars to assure payment of the cost of the labor and materials for the improvements required to be constructed or installed hereby. Subdivision Improvement Agreement Page 2 3. Before final approval of the street improvements, the Subdivider will place survey monuments in accordance with the provisions of the State Subdivision Map Act and the Subdivision Ordinance of the City of La Quinta as shown on the Tract Map. The Subdivider, after setting the monuments, shall furnish the City Engineer of the City of La Quinta, written notice of the setting of said monuments and written proof of having paid the engineer or surveyor for the setting of said monuments, or as provided for in the Subdivision Map Act. 4. In accordance with the terms of said subdivision regulation aforesaid, the Subdivider does hereby agree to furnish a security satisfactory in form and substance to the City Attorney in the amount of $ 3,200.00 Dollars to guarantee payment of the cost of setting monuments as stated in Item No.. 3 of this agreement. 5. The City Engineer or his duly authorized representative, upon written request of Subdivider,shall inspect the improvements herein agreed to be constructed and installed by Subdivider, and if determined to be in accordance with the applicable city standards, shall recommend the acceptance of such improvements by the City. 6. Subdivider shall complete such improvement plans including any corrections or revisions thereto necessary to comply with the applicable City standards as determined by the City Engineer, within thirty (30) days after approval of the final map. 7. Subdivider hereby guarantees such improvements for a period of one year following the completion by Subdivider, and acceptance by City, against any defective work or labor done, or defective materials furnished, in the performance of this Subdivision Improvement Agreement by Subdivider and shall repair orreplace any such defective work or materials subsequently discovered. 8. Subdivider shall commence the construction and installation of such improvements within ninety (90) days from the approval of such "Improvement Plans" for Tract No. 21555-3 by the City Engineer, and shall complete such construction and installations within eighteen (18) months from such date of commencement. 9. The labor and material security required herein -at Item No. 2 herein shall be retained by the City for one (1) year to support the guarantee of the improvements by the Subdivider as.required by Item No. 7 herein. 10. Ten percent (10%) of the performance security required by Item No. 2 herein shall be retained by the City for one (1) year to support the guarantee of the improvements by the Subdivider as required by Item No. 7 herein. 11. Subdivider also agrees, at his sole cost and expense, to construct and install to the standards and specifications required by the City, the Private Streets as shown on the aforementioned "Improvement Plans" for Tract No. 21555-3 . 12. Subdivider shall furnish to city a security satisfactory in form and substance to the City Attorney executed by a corporation authorized to transact surety business in the State of California on forms approved by the City, one security to be in the sum of $ 159,472.00 Dollars to assure the faithful performance of this Agreement with respect to said Public and Private Streets, and one security to be in the sum of $ 79,736.00 Dollars to assure payment of the cost of labor and materials for the Public and Private Streets required to be constructed hereby. iorm and s to the City Attorney, o e in the sum f $ 39,000.00 Dollars pa emend of the City for the cost of, future street impro be constru he City on an as needed basis to b ermined by the City and as shown on t e ed Exhibit 'A' Subdivision Improvement Agreement Page 3 14. The City Engineer or his duly authorized representative, upon written request of Subdivider, shall inspect the Streets herein agreed to be constructed by Subdivider, and determine if said Streets have been constructed in compliance with the standards and specifications required by City for public streets. 15. Subdivider hereby guarantees said Public and Private Streets for a period of one year following the completion by Subdivider, and approval by City Engineer, against any defective work or labor done, or defective materials furnished, in the performance of this Subdivision Improvement Agreement by Subdivider and shall repair or replace any such defective work or materials subsequently discovered. 16. Subdivider shall commence the construction and installation of said Public and Private Streets within ninety (90) days from the approval of such "Improvement Plans" for Tract No. 21555-3 by the City Engineer, and shall complete such construction and installations within eighteen (18) months from such date of commencement; provided, however, that Subdivider shall have the option at its sole discretion to extend the completion period described herein past the eighteen (18) months time period to any future date said Subdivider may select. It is understood, however, that as a condition precedent to extending the aforementioned completion period, Subdivider shall furnish the City the securities described in Item No. 12 herein covering any extended completion period selected by Subdivider pursuant to this paragraph. The mount of said securities to be furnished to City pursuant to this paragraph shall be sufficient to insure the performance of additional work to complete, after taking into account work already performed, the aforementioned Private Streets. Said securities amount to insure completion shall be determined by City's engineer. 17. The labor and material security required herein at Item No. 12 shall be retained to secure payment to the constractor, his subcontractors, and to persons renting equipment or furnishing labor or materials for six (6) months after completion and approval of the work provided at Item No. 11 herein by the City Engineer. 18. Ten percent (10%) of the performance security required by Item No. 12 herein shall be retained by the City for one (1) year to support the guarantee of the improvements by the Subdivider as required by Item No. 15 herein. 19. In the event that Subdivider fails to perform any obligation hereunder, Subdivider authorizes City to perform such obligation sixty (60) days after mailing written Notice of Default to Subdivider at the address given below, and agrees to pay the entire cost of such performance by City. 20. In the event that Subdivider fails to perform any obligation hereunder, Subdivider agrees to pay all costs and expenses incurred by City in securing performance of such obligations, including costs of suit and reasonable attorney's fees. In the event that Subdivider is unable to perform within the time limits herein due to causes beyond his control, such as strikes, acts of God, etc., all time limits will be extended by the same amount of time as caused by such delay. 21. Subdivider hereby binds itself, its executors, administrators and assigns, and agrees.to indemnify, defend and hold the City harmless for any losses, claims, demands, actions or causes of action of any nature whatsoever, arising out of or in any way connected with the improvements agreed to be constructed and installed hereunder by the Subdivider, including costs of suit and reasonable attorney's fees. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first written above. CITY OF LA QUINTA By• 0 Ronald L. Kiedrowski City Manager ATTEST: By City C e SUBDIVIDER: By: BARCON By: \ a By: --A a general partner ifornia Limited Partnership Subscribed and Sworn to before me this day of 19 . Seal of Notary REVIEWED AND APPROVED --��-- ineer Date IMPROVMENT AGREEMENT ENT 215 5 — 3----- The construction of —the —raised curbed and landscaped median a-lQng Washington S reet fromAvenue to northerl undary No. 21555 is deferred at this time for futur onstruc i n by the Cit Oman as needed basis to be determine y the City. The Subdivider shall bear. fifty (50%) percent of e cost of the median construction including i�identals. The Subdivider' s estimated., -share `af-_the median construction cost including incidentals is ,000.00 payable Egon demand to the City for construction purp s.-The Subdivider's cost be based on actual construct * ost plus incidentals not to exceed-_39,000.00. Following co m etion of construction of the median, and 9-9-in event th t the divider's deposit exceeds fifty (5 0 %) percent of the 1 cons c c s fh �baTance Sub ivider. e EXHIBIT 'B' TO SUBDIVISION IMPROVEMENT AGREEMENT TRACT NO. 21555-3 CITY PARTICIPATION IN SAGEBRUSH AVENUE The Subdivider shall construct Sagebrush Avenue in accordance with the "Improvement Plans for Tract No. 21555-3" as approved by the City Engineer and in accordance with the provisions of this Subdivision Improvement Agreement. The City will share in the cost of the construction of the southerly eight (81) feet of the Sagebrush Avenue improvements as hereinafter set forth: Vars Subdivider's Cost Vars 32' to 28' SAGEBRUSH AVENUE TYPICAL SECTION (Looking East) - City I s Cost 8' 6' Vars Drive Replace Approachl Driveway COST PARTICIPATION BASED ON AGREED UNIT PRICES: Barcon. Item Unit Price Qty Total 1. Remove AC Pavement $5000sf is $5000.00 2. Excavation and Grading 3. 3" AC - 4" C1 II AB 4. 6" Curb & Gutter 5. Cross Gutter/spandrel $11500 L.S. 80% $9200.00 City of La Quinta Qty T_ -0- -0- 20% $2300.00 $ 0.95/sf 34580 $32851.00 7880 $7486.00 $ 7.10/lf 1200 $8520.00 $ 3.00/sf 1200 $3600.00 6. Remove & Reconstruct $ 2.80/sf -0- -0- Driveway 7. Construct Driveway $ 597.00ea -0- -0- Approach ESTIMATED CONSTRUCTION COSTS: $59,171.00 CITY'S PARTICIPATION: 1320 $9372.00 -0- -0- 1000 $2800.00 4 $2388.00 $24,3.46.00 City Construction Cost: $24,346.00 Plus Construction Engineering (not to exceed 2.5%) 609.00 TOTAL CITY PARTICIPATION = $24,955000 The Subdivider shall construct all improvements required herein. The City will reimburse the Subdivider for City's share of the costs following satisfactory completion of the work and acceptance of the improvements by the City. Reimbursement to the Subdivider shall be based on actual construction quanitities payable at agreed unit prices shown above as determined by the City Engineer. The City's participation is specifically limited to those items shown above. The Subdivider shall bear all other costs related to improvements and no additional reimbursement shall be made therefor. OUTSTANDING BOND REPORT Name: Barcon Development Tract No. 21555-3 Date of Contract: March 22, 1989 Required Bond Amounts: $ 209,404 $104, 702 $ 3,200. $159,472 $ 79,736 Dates of Bond Reductions: June, 1991 - reduced to $20,940 + Payment bonding Outstanding Bonds: Amount: Bond No. $209,404 #977111S $104,702 #977111S $ 3,200 #977114S $125,000 #223552S (all phases) $ 62,500 #223552S (all phases) $101,910 #970225S (all phases) $ 25,000 #223551 S (all phases) $ 25,000 #223551 S (all phases) $ 1,000 #970230S (all phases) Date Cancelled/Released: Released July, 1991 Released July, 1991 Released July, 1991