Loading...
003196 (BLCK)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. icense # Lic. Class Exp. Date .81851 9/30A)7 Date Signature of Contractor f�'1 OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation insurance, as.required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carrier Policy No. S't'A'r.E %I.flyU WZ2952-95 (This section need not be completed if the permit valuation is for $100.00 or less). ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become (subject to the workers' compensation p�pvisions of Section 3700 of the Labor fDate: ode, I shall forthwith comply with thse provisions. / •t Applicant '`-`�"�' �` Warning: Failure to secure Workers' Com �pe nsat on~overage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon th'e above-mentioned property fo ,i6spection purposes. \S gnature (Owner/Agent) Date`�,� BUILDING PERMIT PERMIT964l4-114 CONTROL# 3196 DATE 4/22196 VALUATION S1,440,00 LOT TRACTJOB ADDRESS 53-700 �Cil31�EC ON APN % % -.il IS 11 lj OWNER CONTRACTOR / DESIGNER /ENGIINEER RL S `1 %J -,?1n ,111 `1E, A RY YK♦RZ %7Mr , i, 33700 AVE N1DA: 013REG0N 72372 VIA, VAIL, LA 00lN A CA. 921.53 RANCHO 7MIR 03F. CA 92270 f hl�l Kti�i.to,?3 (451.9}Z2R-227" C_'Bf,f# V USE OF PERMIT ORNh'i M, BUiLt:21Nd..{r 50L,t{ fids 4' OAl DE,—N €1 C)CK. WALL, UNG F'Re:�VfM--13 ti1!.XyX AM) ON BLOCK. WALL WXA I(V/ 2 01,QrX ADD ON -91^'K WALL t,OR 19'/4' A00 CIN BLOCK WALL 4(Y 4 F" I`. 'WALL, 90.00 11 1,440.W) fr►ERMtiT T.F. SUMMARN' Cr1,rs't?.t.TC'1`N FEE $35.-60 ' 11 -11A ' 0N91'1\UCI70N AND PLAN CRECK $3500 LOSS PkR-i AID PEE.`, $0 t"i , , , t , ., It), At. PERM F EARS 4 111 NOW � E $3..00 RECEIPT DATE BY DATE FINALED INSPECTOR f, .:0, ; _.-. —--------- --- -- INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS ' Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final POOLS - SPAS BLOCKWALL APPROVALS steel Set Backs Electric Bond Footings 2 Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Pibg. Test Final !t Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final COMMENTS: Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) Ji,Fitch Engineers Inc. �4 March 25, 1996 M L Construction P. 0. Box 228 La Quinta, Ca. 92253 SUBJECT: Retaining wall calculations Gentlemen: Enclosed please find two copies each of the wall design for 4 foot, 5 foot and 6 foot wall.Each design shows the spacing for the vertical steel. The bond beam should be placed one block from the top of each wall. If there are hollow cells in existing walls, then the steel should be stabbed the full height of the wall. If the wall is solid grouted, it will be necessary to bore.vertical holes for vertical steel at least three blocks into the solid grouting. The holes should be bored twice the size of the vertical steel and each stabbed bar should be grouted with hard rock cement to bond to the steel. If you have any further questions, please feel free to contact me. Respectfully, WM. H. TITCH R.C.E. 12571 CIVIL ENGINEERING — PLANNING —.SURVEYING — DESIGN P.O. BOX 4551 PALM DESERT, CA 92261 (619) 345-7667 Q�cjf ESSIONq� Fy / Title,: -6 -ft -CMU Yard Wall y�' Descr:" c7 Page / of y No. 125 1 Job #: By : KJB Date: 3/19/96 E}�p. /YO7� RetainPro 3.1(c)1993 File: YDWALL. RPF ----- -�` ` - ---- Q -------------------------------------------------------- E GIN��� �@ ---CANTILEVERED RETAINING WALL DESIGN Pg 1 of 2 ------- / N -- ----------- ------------------------------------------- DATA ----------=-- ------ ADDED VERTICAL LOADS -------- Allo aring =_1,875r) - sf Axial DL on Stem = 0 plf Active Lateral EFP = 30.0 pAxial LL on Stem = 0 plf ....Slope Active = 0.0 psf ..Ecc Left of Stem CL = 0.00 in ..Active Press Limit = N/A psf Surcharge over Toe = 0.0 psf Bkfill Slope(0=level)= 0.0:1 Surcharge over Heel = 0.0 psf Passive Lateral = 150 pcf Using Surcharge to resist Soil Density = 110.0 pcf overturning @ Heel Yes Soil Ht over Toe = 1.2 in @ Toe Yes --- ADDED LATERAL LOADS ------- -------- ADJACENT FOOTING ---------- Lateral Load Acting Vertical load = 0 plf On Stem Above Soil = 15.00 psf ...Ecc. (Toe side +) = 0.00 in Footing Width (perp) = 0.00 ft Add'1 Lateral Load = 0.0 plf Face Top Stem to Ftg. CL= 0.00 ft ...height to stop = 0.00 ft Ftg. Base Above/Below Soil ...height to start = 0.00 ft At Wall Face [+/-] = 0.00 ft Footing Type Line ---------------------------- WALL & FOOTING DATA ---------------------- Retained Height = 0.10 ft Toe Width = 0.75 ft Wall Ht. above soil = 5.90 ft Heel Width = 1.25 ft Total Wall Height = 6.00 ft ------- Key Depth = 0.00 in Total Width = 2.00 ft Key Width = 0.00 in Thickness = 12.00 in Key Dist. to Toe = 0.000 ft ------------------------------- SUMMARY ----------------------------y--- ------------------------ -------------------------------- Pressure @ Toe = 1,026 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning = 1.59 :1 Allowable Press. = 1,875 psf Sliding = 2.63 :1 Eccentricity = 7.57 in Allowable Shear = 76.03 psi Resultant Outside Middle Third 1 -Way Shear @ Toe = 5.7 psi --Note_ "Pv: Used for Soil Pres. 1 -Way Shear @ Heel = 1.6 psi -------------- ----------------------------- SLIDING CHECK ------------------------------ Ftg/Soil Friction = 0.250 Tot Lateral Force*1.5= 132.8 # Soil @ Toe Not Used = 0.00 in (-)Passive Pressure = 90.8 # Factor of Safety = 2.63 (-)Friction = 142.1 # Add'1 Force Req'd = 0,0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors) ---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 1,436 0 psf Fy = 60,000 psi Mu - Upward = 405 0 ft-# Upward soil pres. used on heel Mu - Downward = 86 86 ft-# -------- Rebar Choices -------- Mu - Design = 319 86 ft-# Toe(bot) Heel(top) One -Way Shear: #4 @Not Reqd in Not Reqd in vu = 5.66 1.57 psi #5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85= 76.03 .76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00 in #8 @Not Reqd in Not Reqd in Ru = Mu/bd"2 = 0.0 0.0 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio = 0.0018 #10 @Not Reqd in Not Reqd in Fitch Engineers Title: 6 ft. CMU Yard Wall Descr: Page 2 of Al Job #: By:KJB Date: 3/19/96 RetainPro 3.1(c)1993 File:YDWALL.RPF --------------------------------- STEM DESIGN ---------------------------------- (Values shown for concrete stems have been factored) Pg 2`of 2 I- Descending Stem Sections, Highest @ Left -� Stem Construction Data ------------------------------------------------------------------------- Highest (use columns fromleft to right) DESIGN HT. ABOVE FTG. = 0.00 ft WALL TYPE ABOVE HT. Masonry Thickness (nominal) = 6.00 Rebar Size = # 4 in Rebar Spacing = 32.00 in Rebar Placed at Center DESIGNDATA.............. ................................................. fb/Fb + fa/Fa = 0.831 ���������� Lateral Load @ Design Ht = 89 # MOMENT..... Actual = 270 ft-# Allowable = 325 ft-# SHEAR...... Actual = 3.96 psi Allowable = 22.33 psi Embedment Length Req'd = 6.80 Wall Weight = 42.0 psf Rebar Placed at Depth 'd'= 2.75 in MASONRYDATA ............. ................................................ f'm = 1,500 ......... .......... psi Fs = 24,000 psi Grouting Part Special Inspection No n : Es / Em 25.78 Short Term Increase = 1.33 CONCRETE DATA............ .............................. f'c _ ... ...... .......psi Fy = psi ------------------------- SUMMARY OF FORCES & MOMENTS ---------------------- I- Overturning Moments -I- Resisting Moments --� Origin of Force: ---------------- -------- # ft ft-# ------ # ft ft-# Heel Active Press. = --------- 18 0.37 7 ------- ----- --------- Soil over Heel = 8 1.63 13 Toe Active Press. _ -18 0.37 -7 Soil over Toe = 8 0.38 3 Sloped Soil @ Heel = 0 0.00 0 Adjacent Ftg. Load = 0 0.00 0 0 0.00 0 Surcharge @ Heel = 0 0.00 0 Surcharge @ Toe = 0 0.00 0 0 0.00 0 Axial Load on Wall = 0 0 0.00. 0 Load @ Proj. Wall = 89 4.05 358 Averaged Stem Wts. = 252 1.00 252 Earth Behind Stem = 0 0.00 0 Added Lateral Load = 0 0.00 0 Footing Weight = 300 1.00 300 Key Weight = 0 0.00 0 Vert. Componant of = 0 0.00 0 Active Press. --------- --------- -------- --------- TOTALS = 89 358 568 568 - --------. Totals used for Soil Pressure, Pv Included = 568 --------- 568 Pp= 91 # EFP= is # 1026 psf 6" C.M.U. #4 @ 32" Vert @ CL". #4 @ 24" Horiz #4 HORIZ. AS SHOWN _� - _ QRpFESSIpNq Fit NO. 12571 AXP Title;i 5 ft CMU ffard Wall Descr: ' Page / of ,�/ Job #: By:KJB Date: 3/19/96 RetainPro 3.1(c)1993 File:YDWALL.RPF ---- --------- ---- )---- CANTILEVERED RETAINING WALL DESIGN Pg 1 of 2 - ---- '� ���$ ATA ------------- ---------- 0 plf Allowa ing = 1,875 psf- Active Lateral EFP = 30.0 psf ....Slope Active = 0.0 psf ..Active Press Limit = N/A psf Bkfill Slope(0=level)= 0.0:1 Passive -Lateral = 150 pcf Soil Density = 110.0 pcf Soil Ht over Toe = 1.2 in ------ ADDED LATERAL LOADS ------- Lateral Load Acting ------------------------------- ---------------------- On Stem Above Soil = 15.00 psf Add'1 Lateral Load = 0.0 plf ...height to stop = 0.00 ft ...height to start = 0.00 ft ------ ADDED VERTICAL LOADS -------- Axial DL on Stem = 0 plf Axial LL on Stem = 0 plf ..Ecc Left of Stem CL' = 0.00 in Surcharge over Toe = 0.0 psf Surcharge over Heel = 0.0 psf Using Surcharge to resist overturning @ Heel Yes @ Toe Yes - ADJACENT FOOTING Vertical load = ---------- 0 plf ...Ecc. (Toe side +) = 0.00 in Footing Width (perp) = 0.00 ft Face Top Stem to Ftg. CL= 0.00 ft* Ftg. Base Above/Below Soil ------- At Wall Face [+/-] = 0.00 ft Footing Type ;' Line Key Width WALL & FOOTING DATA Retained Height = 0.10 ft Toe Width = 0.75 ft Wall Ht. above soil = 4.90 ft Heel Width = 1.25 ft Total Wall Height = 5.00 ft ------- Key Depth = 0.00 in Total Width = 2.09 ft Key Width = 0.00 in Thickness = 12.00 in Key Dist. to Toe = 0.000 ft ------------------------------- ---------------------- SUMMARY -------------------------------- -------------------------------- Pressure @ Toe = 696 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning = 1.98 :1 Allowable Press. = 1,875 psf Sliding = 2.99 :1 Eccentricity = 6.06 in Allowable Shear = 76.03 psi Resultant Outside Middle Third 1 -Way Shear @ Toe 3.9 psi Note: "Pv: Used for Soil Pres. 1 -Way Shear @ Heel = 1.4 psi ------------=---------------- SLIDING CHECK ------------------------------ ---------- Ftg/Soil Friction = 0.250 .Tot Lateral Force*1.5= 110.3 # Soil @ Toe Not Used = 0.00 in (-)Passive Pressure = 90.8 # Factor of Safety = 2.99 (-)Friction = 129.1 # Add'1 Force Req'd = 0.0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors) ---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 974 0 psf Fy = 60,000 psi Mu - Upward = 300 5 ft-# Upward soil pres. used on heel Mu - Downward = 86 86 ft-# -------- Rebar Choices -------- Mu - Design = 213 81 ft-# Toe(bot) Heel(top) One -Way Shear: #4 @Not Reqd in Not Reqd in vu = 3.93 1.40 psi #5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85= 76.03 76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00 in #8 @Not Reqd in Not Reqd in Ru = Mu/bd-2 = 0.0 0.0 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio 0.0018 #10 @Not Reqd in,Not Reqd in Fitch Engineers Title: 5 ft CMU Yard Wall Descr: Page of -/ 'I Job #: By:KJB Date: 3/19/96' RetainPro 3.1(c)1993 File:YDWALL.RPF --------------------------------- STEM DESIGN ---------------------------------- (Values shown for concrete stems have been factored) Pg 2 of 2 I- Descending Stem Sections, Highest @ Left -� Stem Construction Data ------------------------------------------------------------------------- Highest (use columns from left to right) DESIGN HT. ABOVE FTG. = 0.00 ft WALL TYPE ABOVE HT. : Masonry Thickness (nominal) = 6.00 in Rebar Size = # 4 Rebar Spacing = 48.00 in Rebar Placed at Center DESIGNDATA .............. .......................................... fb/Fb + fa/Fa = 0.674 . Lateral Load @ Design Ht = 74 # MOMENT..... Actual = 187 ft-# Allowable = 278 ft-#. SHEAR...... Actual = 3.39 psi'; Allowable = 22.33 psi` Embedment Length Req'd = 6.97 Wall Weight = 40.0 psf Rebar Placed at Depth 'd'= 2.75 in MASONRYDATA............. ............................................... f'm = 1,500 psi Fs = .24,000 psi Grouting Part Special Inspection No n : Es / Em = 25.78 Short Term Increase = 1.33 CONCRETEDATA........................................ f'a _ ...... ........ ....psi Fy = ------------------------- SUMMARY OF FORCES & MOMENTS ---------------------- psi I- Overturning Moments Resisting Moments -� Origin of Force: # ft ft-# - # ft ft-# Heel Active Press. = -------�- 18 0.37 ------- -------------- Soil over Heel = 8 1.63 13 Toe Active Press. _ -18 0.37 -7 Soil over Toe = 8 0.38 3 .Sloped Soil @ Heel = 0 0.00 0 Adjacent Ftg. Load = 0 0.00 0 0 0.00 0 Surcharge @ Heel = 0 0.00 0 Surcharge @ Toe = 0 0.00 0 0 0.00 0 Axial Load on Wall = 0 0 0.00 0 Load @ Proj. Wall = 74 3.55 261 Averaged Stem Wts. = 200 1.00 200 Earth Behind Stem = 0 0.00 0 Added Lateral Load = 0 0.00 0 Footing Weight = 300 1.00 300 Key Weight = 0 0.00 0 Vert. Componant of = 0 0.00 0 Active Press. --------- --------- -------- ---------- i TOTALS = 74 261 516 516 Totals used for Soil Pressure, Pv Included = 516 - 516 Pp= 91 # EFP= is # 696 ps-fF 61, C.M.U. #4 @ 4811 Vert 0 CL"' #4 @ 24" Horiz I #4 HORIZ. AS SHOWN jV ESSIp�,q� Fitch Engi �PRVEY t� Title *C47 F.CMU Yard Wall Descr: Pageof �3 CLI IV�o. 1257 Job#: B :KJB Date: . y 19 96 / / .�7 RetainPro 3.1(c)1993 F'le.YDWALL.RPF --- INf N GRA I VERED RETAINING WALL DESIGN Pg 1 of 2 ------------ - - -- �?I ------------------------------------------------ -------- --� �'A�.O� ---------- ---- - ADDED VERTICAL LOADS - Allowable Bea = 1,875 psf Axial DL on Stem = 0 plf Active Lateral EFP = 30.0 psf Axial LL on Stem = 0 plf ....Slope Active = 0.0 psf ..Ecc Left of Stem CL = 0.00 in ..Active Press Limit = N/A psf Surcharge over Toe = 0.0 psf Bkfill Slope(0=level)= 0.0:1 Surcharge over Heel = 0.0 psf Passive Lateral = 150 pcf Using Surcharge to resist k Soil Density = 110.0 pcf overturning @ Heel Yes Soil Ht over Toe = 1.2 in @ Toe Yes ------ ADDED LATERAL LOADS------- -------- ADJACENT FOOTING---------- Lateral Load Acting Vertical load = 0 plf On Stem Above Soil = 15.00 psf ...Ecc. (Toe side +) = 0.00 in Footing Width (perp) = 0.00 ft Add'1 Lateral Load = 0.0 plf Face Top Stem to Ftg. CL= 0.00 ft ...height to stop = 0.00 ft Ftg. Base Above/Below Soil ...height to start = 0.00 ft At Wall Face [+/-] = 0.00 ft Footing Type Line ---------------------------- WALL & FOOTING DATA ------------------------- Retained Height = 0.10 ft Toe Width = 0.75 ft Wall Ht. above soil = 3.90 ft Heel Width = 1.25 ft Total Wall Height = 4.00 ft ------- Key Depth = 0.00 in Total Width = 2.00 ft Key Width = 0.00 in Thickness = 12.00 in Key Dist. to Toe = 0.000 ft ------------------------------- ------------------------------- SUMMARY -------------------------------- -------------------------------- Pressure @ Toe = 508 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning = 2.67 :1 Allowable Press. = 1,875 psf Sliding = 3.59 :1 Eccentricity = 4.49 in Allowable Shear = 76.03 psi Resultant Outside Middle Third 1-Way Shear @ Toe = 2.7 psi Note: "Pv: Used for Soil Pres. 1-Way Shear @ Heel = 0.9 psi ----------------------------- SLIDING --------------- CHECK ------------------------------ Ftg/Soil Friction = 0.250 ,Tot Lateral Force*1.5= 87.8 # Soil @ Toe Not Used 0.00 in (-)Passive Pressure = 90.8 # Factor of Safety = .3.59 (-)Friction = 119.1 # Add'1 Force Req'd = 0.0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors)---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 711 0 psf Fy = 60,000 psi Mu - Upward = 230 27 ft-# Upward soil pres. used on heel Mu - Downward = 86 86 ft-# -------- Rebar Choices -------- Mu - Design = 144 59 ft-# Toe(bot) Heel(top) One-Way Shear: #4 @Not Reqd in Not Reqd in vu = 2.68 0.88 psi #5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85= 76.03 76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00 in #8 @Not Reqd in Not Reqd in Ru = Mu/bd"2 = 0.0 0.0 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio = 0.0018 #10 @Not Reqd in Not Reqd in Soil over Toe = Sloped Soil @ Heel = Adjacent Ftg. Load = Surcharge @ Heel = Surcharge @ Toe = Axial Load on Wall = Load @ Proj. Wall Averaged Stem Wts. _ Earth Behind Stem Added Lateral Load = Footing Weight = Key Weight = Vert. Componant of = 8 0.38 3 Fitch Engineers Title: 4 ft. CMU Yard Wall 0 0.00 Descr: 0 0.00 Page ;� of 0.00 Job #: By:KJB Date: 3/19/96 RetainPro 3.1(c)1993 File:YDWALL.RPF 0 --------------------------------- STEM DESIGN----------------------------------- --------------------------------=(Values 0 (Valuesshown for concrete stems have been factored) Pg 2 of 2 0.00 I- Descending Stem Sections, Highest @ Left -� Stem Construction Data Highest (use columns from left to right) 0 ------------------------------------------------------------------------- DESIGN HT. ABOVE FTG. = 0.00 ft WALL TYPE ABOVE HT. Masonry Thickness (nominal) = 6.00 in a Rebar Size = # 4 5. Rebar Spacing = 48.00 in;; Rebar Placed at Center 0 DESIGNDATA.............. ................................................ fb/Fb + fa/Fa 0.00 0 Lateral Load @ Design Ht = 59 # MOMENT..... Actual = 120 ft-# Allowable = 278 ft - SHEAR...... Actual = 2.70 psi` Allowable = 22.33 psi: Embedment Length Req'd = 6.00 Wall Weight = 40.0, psf Rebar Placed at Depth 'd'= 2.75 in MASONRYDATA ............. f'm ............................ ................... , = 1,500 psi*' Fs = 24,000 psi; Grouting Part Special Inspection No n : Es / Em = 25.78 Short Term Increase = 1.33 CONCRETEDATA............ ..... ......................................... f' c = psi, Fy = psi" -------- SUMMARY OF FORCES & MOMENTS --------------------- I- Overturning Moments Resisting Moments Origin of Force: # ft ft-# # ft ft-# Heel Active Press. = 18 0.37 7 Soil over Heel 8 1.63 131' Toe Active Press. _ -18 0.37 -7 Soil over Toe = Sloped Soil @ Heel = Adjacent Ftg. Load = Surcharge @ Heel = Surcharge @ Toe = Axial Load on Wall = Load @ Proj. Wall Averaged Stem Wts. _ Earth Behind Stem Added Lateral Load = Footing Weight = Key Weight = Vert. Componant of = Active Press. --------- TOTALS = 59 Totals used for Soil Pressure, 300 1.00 300., 0 0.00 0". 0 0.00 0' 178 476 476 Pv Included = 476 476-: 8 0.38 3 0 0.00 0 0 0.00 0 0 0.00 0.' 0 0.00 0 0 0.00 0 0 0.00 0 3^ 0 0 0.00 0.. 59 3.05 178 160 1.00 160: 0 0.00 0 . 0 0.00 0 Active Press. --------- TOTALS = 59 Totals used for Soil Pressure, 300 1.00 300., 0 0.00 0". 0 0.00 0' 178 476 476 Pv Included = 476 476-: PD= 91 6" C.M.U. #4 @ 48" Vert @ CL" #4 @ 24" Horiz #4 HORIZ. AS SHOWN ............... .................. f 1. f� Nr o ........................... . '4 ................. ..................... .......................