Loading...
0009-127 (SPIN)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date 674645 C36 0?/31Au Date Signature of Contractor OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). Y) as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). I ay ,exempt under Section , B&P.0 ,for this r a,Aen ,...-- Date Signature of Owne O WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Cartier CLARENDON NA.T'L Policy No. 02KR001302 (This section need not be completed if the permit valuation is for $100.00 or less). Q0 I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Grede, shall forthwith comply withthose pro .i 'Grr . ✓Date. •7"1'•01% INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings, Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall, Exterior Lath Drywall - Int. Lath Final Final POOLS - SPAS BL' OCKWALL APPROVALS Steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric ' Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final COMMENTS: Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring. Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm)': 78-495 CALLS TAMPICO — LA QUINTA, CALIFORNIA 92253 - (760) 777-7000 FAX (760)'777-7101 TDD (760) 777-1227 9/26/2000. Nir. & Mrs. Storey 54-940 Riviera La Quinta, CA. 92253 ,i i RE: Pennit #0009-.127 Special Inspection Dear Mr. & Mrs. Storey; The following is an inspection: summary. On 9/26/2000 a special inspection was at performed youi residence to investigate,the un,permitted,shower installation as requested Itis confirmed :,.that a slower was, constructed in :themaster batliroom ° 'he"shower.additi6 was;performed-",; ,.. without pen -nit and without the.required inspections to:~approve the shower installation:,z• '- - u An interview with Mr. Joe Palomino III, President of Palomino Plumbing,JInc.','on"9/26/2000 at your residence provided the following verbal construction information. The shower was wet', vented with a 2" ABS waste and "P" trap, from an existing 3" ABS toilet waste linea The water supply, hot and cold, is supplied from the master lay. Mr. Palomino was advised of the permit and inspections required to approve the master bath shower construction. As an inspector I am unable to approve or justify the existence of your master bath shower construction without observing the required inspections. In conclusion: provide a means for us to inspect the shower for compliance; or remove the shower, and restore the bathroom to its former' . state:'or'disclose the shower -to the buyei'and'let the buyer decide if they want in -inherit the un= permitted shower installation. If you have any questions please call me at 777-7027, thank you.► Singly, cc: 54-940 Riviera File Greg Butler, Building Department Manager dpc { A hWLING ADDRESS - P.O. BOX 1504 - LA QUINTA, CP11FORNIA 92253 '�. i t�. MEMORANDUM"7'" To: Danny Crawford From: Greg Butler Subject: .Permit #0009-127 Date: September 21, 2000 Mr. & Mrs. Storey came in on Thursday morning to tell us that they were selling their home in PGA West (54-940 Riviera). Unfortunately, they had -a shower installed and didn't know that a permit was required. Now they want to resolve the issue so their house can sell. I explained their options: provide a means for us to inspect for compliance; remove the shower and restore the bathroom to its former state; or disclose it to the buyer and let the buyer decide if he wants to inherit the problem. At Tom Hartung's direction, we issued a special inspection permit so that you could visit the site to determine if you could verify compliance with the bathroom in its current condition. If you're unable to verify compliance, please let the customer know what documentation and/or demolition would be required for us to approve this installation. Since you were gone, I asked Mr. Storey if he could wait until Tuesday the 26`h to have you go out to inspect. Please contact Mr. Storey on Monday at 771-5458 to arrange a time to meet him that is mutually convenient for you. He plans to arrange to have his plumbing contractor, Palomino Plumbing, attend the meeting as well. I made no promises for you to keep regarding acceptance of this unpermitted shower. See me if you have questions. Thanks, 0ot� IS