06969 (SATT)T4hf 4 Qub&
P.O. BOX 1504 No. 06969
Building 78-105 CALLE ESTADO
Address 55-646 Riviera LA QUINTA, CALIFORNIA 92253
S>3st>r . e Casty r
BUILDING: TYPE CONST:
OCC: GRP. -
Mailing
Address 42-600 Wok St., Suite 230 _
A.P. Number . PSA
Nast "' Tract 21846-4
CityZip
Tel. �,
Page .De"rt
gg26�
7�g.Zg�g
Legal Description
Project, Description
Phase 35A " Plan 3M
Contractor
Rational mo taa4'e
Address ~
Sates
City
Zip
Tela
State Lic.
& Classif. 288130
City
Lic. # 328. _ _ _
Sq. Ft. 1627
No. �. No. Dw.
Size -
Stories Units
Arch.; Engr.,
Designer
New ❑ Add ❑
Alter ❑ Repair ❑ Demolition ❑
Address
Tel.
City
Zip
State
Lic. #
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm that 1 am licensed under Provisions of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions code, and my license is in full force and
effect. ( _
SIGNATURE DATE
OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractors License Law for the following
reason: (Sec. 7031.5,8usiness and Professions Code: Any city or county which requires a
Permit to construct, after, improve, demolish, or repair any structure, prior to its issuance also
requires the applicant for such permit to rile a signed statement that he is licensed pursuant to
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of
Division' 3'of the Business and Professions Code, or that. he is exempt therefrom, and the basis
for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit
subjects the applicant to a civil penalty of not more than rive hundred dollars ($500).
❑ 1, as owner of the property, or my employees with wages as their sole compensation, will
do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and
Professions Code: The Contractor's License Law does not apply to an owner of property who
Estimated Valuation
113,727
PERMIT
AMOUNT
Plan Chk. Dep.
Plan Chk. Bal.
$ 563.06
Const.
688 SQ
•
M@CII.
51.00
builds or Improves thereon and who does such work himself or through his own employees,
provided that such improvements are not intended or offered for sale. If, however, the building
or improvement is sold within one year of completion, the owner -builder will have the burden
of proving that he did not build or inprove for the purpose of sale.)
Electrical
1€31• 12
Plumbing
131.j
❑ 1, as owner of the property, am exclusively contracting with licensed contractors to con-
struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law
does not apply to an owner of property who builds or improves thereon, and who contracts for
such projects with a contractor(s) 8censed pursuant to the Contractor's License Law.)
❑ I am exempt under Sec B. 8 P.C. for this reason
S.M.I.
7.98
Grading
Driveway Enc.
Date owner
Infrastructure
2.558..86 1,279.43
Leas Ctdddt
1,279.43
WORKERS' COMPENSATION DECLARATION
I hereby affirm that I have a certificate of consent to self -insure, or a certificate of
Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)
Policy No Company
❑ Copy is filed with the city. ❑ Certified copy is hereby furnished.
TOTAL
1$2.822.0 -�` .=.. �.. +} . f
CERTIFICATE OF EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section need not 6e completed ifthe permit is for one hundred dollars (8100) valuation
or less.)
1 certify that in the performance of the work for which this permit is issued, 1 shall not
employ any person in any manner so as to become subject to the Workers' Compensation .
Laws of California
REMARKS
nryrtt rt _�;� � h—1I-,.Q6 , ,.., r, , # 11
.. ".. ir'h++s}�1 iC "
A.affYtvAi-
Date Owner
NOTICE TO APPLICANT: N, after making this Certificate of Exemption you should become
subject to the Workers' Compensation provisions of the Labor Code, you must forthwith
Comply with such provisions or this permit shall be deemed revoked.
ZONE: BY:
Minimum Setback Distances:
Front Setback from Center Line
Rear Setback from Rear Prop. Line
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the
work for which this permit is issued. (Sec. 3097, Civil Code.)
Lender's Name
FINAL DATE
Issued by:
Validated by:
Side Street Setback from Center Line
Side Setback from Property Line
INSPECTOR
/A^ity
��*
Date L 9i Permit
Lenders Address
This is a building permit alien properly filled out, signed and validated, and is subject to
expiration if work thereunder is suspended for 180 days. '
I certthat I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives of this city to enter the above-.
mentioned property for inspection purposes.
Signature of applicant Date
Mailing Address
Validation:
City, State, Zip
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
IST FL SQ. FT. ® $
UNITS
SLAB GRADE
2ND FL SQ. FT.
BONDING
YARD SPKLR SYSTEM
POR. SQ. FT. ®
MOBILEHOME SVC.
BAR SINK
GAR. SQ, FT, ®
I IPOWER OUTLET
ROOF DRAINS
CAR P. I SQ. FT.
GAS (ROUGH)
DRAINAGE PIPING
WALL SQ. FT.
OTHER APPJEQUIP.
DRINKING FOUNTAIN.
SQ FT ®
TEMP. POLE
URINAL
ESTIMATED CONSTRUCTION VALUATION $
GROUT
WATER PIPING
NOTE: Not to be used as property tax valuation
FINAL INSP.
FLOOR DRAIN
MECHANICAL FEES
WATER SYSTEM
WATER SOFTENER
VENT SYSTEM FAN EVAP.COOL HOOD
SIGN
WASHER(AUTO)(DISH)
APPLIANCE DRYER
FINAL INSP.
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
LAUNDRYTRAY
AIR HANDLING UNIT CFM
KITCHEN SINK
ABSORPTION SYSTEM B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET'
COMPRESSOR HP
POLE,TEMIPERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER. B.T.U.
SQ. FT. ® c
BATH TUB
SQ. FT. ® c
WATER HEATER
MAX. HEATER OUTPUT, B.T.U.
SO. FT. RESID ® 1% c
SEWAGE DISPOSAL
GAR. FIREWALL
SQ.FT.GAR ® V4c
HOUSE SEWER
LATHING
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FEE
DBL
TOTAL FEES
MICRO FEE
MECH.FEE PL.CK.FEE
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR -
SETBACK
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL. AREA
SLAB GRADE
ROUGH PLUMB.
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING,
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH)
METER LOOP
HEATING (FINAL)
OTHER APPJEQUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
FINAL INSP.
BOND BEAM
WATER SYSTEM
GRADING
cu. yd.
$ plus x$
=$
LUMBER GR.
FINAL INSP.
FRAMING
FINAL INSP.
ROOFING
REMARKS:
VENTILATION
FIRE ZONE ROOFING:
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING
MESH
INSULATIONISOUND
FINISH GRADING
FINAL INSPECTION•
CERT. OCC.
FENCE FINAL
INSPECTOR'S SIGNATURESIINITIALS
t
GARDEN WALL FINAL
,
a
CITY OF LA OUINTA
a ~ DEPARTMENT OF PLANNING & DEVELOPMENT
BUILDING DIVISION
564-2246
24-HOUR NOTICE FOR INSPECTIONS
Owner Sunrise Comnan
Contractor National Mortgage
Permit Number 6269
POST ON JOB IN CONSPICUOUS PLACE
INSPECTOR MUST SIGN ALL APPLICABLE SPACES
JOB ADDRESS 55-646 Riyi Pra
SFD - Plan 3MR
TYPE OF INSPECTION DATE INSP.
FOUNDATION & SETBACK
FOOTING STEEL
MAIN GROUND SYSTEM
GROUND PLUMBING 7 ✓ C=��
DO NOT POUR CONCRETE UNTIL ALL-ABOVEBAB_@E_EN SIGNED_
CONCRETE SLAB
JOISTS & GIRDERS
ELECTRICAL GROUND WORK
DO NOT POUR CONCRETE UNTIL ALL ABOVE HAS BEEN SIGNED
ROUGH ELECTRIC
ROUGH PLUMBING
ROUGH GAS & GAS TEST
HEATING & VENT -A/C
FIREPLACE
BOND BEAM
O.K. TO WRAP
GROUT ❑ 4' ❑ 8'
FRAMING
INSULATION 61 t
PRE -ROOF
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED
DRYWALL INTERIOR
EXTERIOR LATH
POOL PRE PLASTER
POOL FENCE & GATE
SEWER SEPTIC TANK /,,77
ABOVE APPROVALS DO NOT INCLUDE RIGHT TO
TURN ON UTILITIES OR OCCUPY BUILDING
d.0.G
r.
,55-(-4& v
SCOPE OF WORK
Furnish all labor, materials, equipment and services necessary for completion of all roofing and related work as specified in
this document.
POLYURETgANF FOAM ROOFINGWITH ACRYLIC AND GRANULES
1) All loose gravel, dust and residue shall be removed using Power vacuum equipment, .power sweeper,
air blowing or other suitable means.
2) Grind all loose paint from Z -bar metal, solvent wipe and prime with metal primer -before application of
foam roofing. Install new Z -bar metal (will be identified at job walk) as needed and solvent wipe and
prime with metal primer before application of foam roofing.
3) Remove two (2) courses of tile and cut 3" water block's where slope meets flat roo.'areas. .
4) All surfaces shall be primed with neoprime primer at the rate of not less than %gallon. per 100 square
feet prior to foam application.
5) Urethane foam shall be sprayed – applied to a minim. thickness of 1.5". Addidonal foam shall be
applied in'ponding areas to help disperse the standing water.
6) Coating shall be applied in a minimum of two (2) separate coats. Acrylic coating b be 55% solids.
a) The base coat shall be applied at a rate of 2.0 gallons per 100 square feet.
b) The topcoat shall l applied at the rate of 2.0 gallons per 100 square f=t, with a combined
thinness of t. total dry mils, Ceramic granules shall be embedded into the final coat while the
coating is wet.
PGA WEST Residential Association, I..
2012 Foam Roofing RFp
REQUEST FOR PROPOSAL
INSTALLPOL
s.. YURETHANE FOAM ROOF SYSTEM
"
8 BUILDINGS (30 UMTS)
is-8sZ
LOCATIONS- /Listed in priori
(4 S " 1
Numbers..
55-4$5,467,449,431
Street
Southern Hills
Phase
Units
Bldg Type
(0 O" 2�
80-575, 587, 599, 611
Cherry Hills
17B
4
SM
54-6.55,639,623,607
Riviera
1 IB
4
17M
55-682,670,.6.58, 646.
Riviera
31B
4
5M
Ss -070, 060.
Riviera.
35A
q
9M
55-270, 258' "246,.234
Shoal Creek
37A
14A
2
27M
7
54-732, 720, 708, 696
.
Shoal -Creek
18A
4
—9M
54=516, 504, 492, 480
Shoal Creek
20A
4
9M
4
10M
SCOPE OF WORK
Furnish all labor, materials, equipment and services necessary for completion of all roofing and related work as specified in
this document.
POLYURETgANF FOAM ROOFINGWITH ACRYLIC AND GRANULES
1) All loose gravel, dust and residue shall be removed using Power vacuum equipment, .power sweeper,
air blowing or other suitable means.
2) Grind all loose paint from Z -bar metal, solvent wipe and prime with metal primer -before application of
foam roofing. Install new Z -bar metal (will be identified at job walk) as needed and solvent wipe and
prime with metal primer before application of foam roofing.
3) Remove two (2) courses of tile and cut 3" water block's where slope meets flat roo.'areas. .
4) All surfaces shall be primed with neoprime primer at the rate of not less than %gallon. per 100 square
feet prior to foam application.
5) Urethane foam shall be sprayed – applied to a minim. thickness of 1.5". Addidonal foam shall be
applied in'ponding areas to help disperse the standing water.
6) Coating shall be applied in a minimum of two (2) separate coats. Acrylic coating b be 55% solids.
a) The base coat shall be applied at a rate of 2.0 gallons per 100 square feet.
b) The topcoat shall l applied at the rate of 2.0 gallons per 100 square f=t, with a combined
thinness of t. total dry mils, Ceramic granules shall be embedded into the final coat while the
coating is wet.
PGA WEST Residential Association, I..
2012 Foam Roofing RFp