2004 05 04 RDAe a
4 4 #40A
Redevelopment Agency Agendas are
Available on the City's Web Page
@ www.la-quinta.org
REDEVELOPMENT AGENCY
AGENDA
CITY COUNCIL CHAMBERS
78-495 Calle Tampico
La Quinta, California 92253
Regular Meeting
Tuesday, May 4, 2004 - 2:00 P.M.
Beginning Resolution No. RA 2004-007
CALL TO ORDER
Roll Call:
Agency Board Members: Adolph, Osborne, Perkins, Sniff,. and Chairperson Henderson
PUBLIC COMMENT
At this time, members of the public may address the Redevelopment Agency on any
matter not listed on the agenda. Please complete a "request to speak" form and limit your
comments to three minutes. Please watch the timing device on the podium.
CLOSED SESSION - NONE
NOTE: Time permitting, the Redevelopment Agency Board may conduct Closed Session
discussions during the dinner recess. In addition, persons identified as negotiating parties
are not invited into the Closed Session meeting when the Agency is considering acquisition
of real property.
RECONVENE AT 3:00 P.M.
Redevelopment Agency Agenda 1 May 4, 2004
PUBLIC COMMENT
At this time members of the public may address the Agency Board on items that appear
within the Consent Calendar or matters that are not listed on the agenda. Please complete
a "request to speak" form and limit your comments to three minutes. When you are called
to speak, please come forward and state your name for the record. Please watch the
timing device on the podium.
For all Agency Business Session matters or Public Hearings on the agenda, a completed
"request to speak" form should be filed with the City Clerk prior to the Agency beginning
consideration of that item.
CONFIRMATION OF AGENDA
APPROVAL OF MINUTES
1. APPROVAL OF MINUTES OF APRIL 20, 2004
CONSENT CALENDAR
NOTE: Consent Calendar items are considered to be routine in nature and will be approved
by one motion.
1. APPROVAL OF DEMAND REGISTER DATED MAY 4, 2004.
2. APPROVAL OF PLANS, SPECIFICATIONS AND ENGINEER'S ESTIMATE AND
AUTHORIZATION TO ADVERTISE FOR BID FOR SILVERROCK RESORT
MAINTENANCE BUILDING, COMFORT STATIONS AND PUMP HOUSE.
3. APPROVAL OF THE PLANS, SPECIFICATIONS, AND ENGINEER'S ESTIMATE OF
PROBABLE CONSTRUCTION COSTS AND AUTHORIZATION TO RECEIVE BIDS FOR
SILVERROCK RESORT GOLF CART BRIDGES, PROJECT NO. 2002-07E.
BUSINESS SESSION
1. CONSIDERATION OF PERIMETER, TEMPORARY CLUBHOUSE, AND MAINTENANCE
FACILITY LANDSCAPE DESIGN FOR SILVERROCK RESORT
A. MINUTE ORDER ACTION
Redevelopment Agency Agenda 2 May 4, 2004
2. CONSIDERATION OF ADOPTION OF A RESOLUTION APPROVING THE
REPLACEMENT HOUSING PLAN FOR THE VISTA DUNES AFFORDABLE FAMILY
HOUSING PROJECT.
A. RESOLUTION ACTION
STUDY SESSION — NONE
CHAIR AND BOARD MEMBERS' ITEMS — NONE
PUBLIC HEARINGS — NONE
ADJOURNMENT
Adjourn to a regularly scheduled meeting of the Redevelopment Agency to be held on May
18, 2004 commencing with closed session at 2:00 p.m. and open session at 3:00 p.m. in
the City Council Chambers, 78-495 Calle Tampico, La Quinta, CA 92253.
DECLARATION OF POSTING
I, Phyllis Manley, Deputy Agency Secretary of the La Quinta Redevelopment Agency, do
hereby declare that the foregoing agenda for the La Quinta Redevelopment Agency
meeting of Tuesday, May 4, 2004, was posted on the outside entry to the Council
Chamber, 78-495 Calle Tampico and on the bulletin board at the La Quinta Chamber of
Commerce and at Stater Bros. 78-630 Highway 111, on Friday, April 30, 2004.
DATED: April 30, 2004
oLn
PHYLLIS MANLEY, Deputy Agency Secretary
La Quinta Redevelopment Agency
Redevelopment Agency Agenda 3 May 4, 2004
COUNCIL/RDA MEETING DATE: MAY 4, 2004
ITEM TITLE:
Demand Register Dated May 4, 2004
RECOMMENDATION:
It is recommended the Redevelopment Agency Board:
AGENDA CATEGORY:
BUSINESS SESSION
CONSENT CALENDAR
STUDY SESSION
PUBLIC HEARING
Receive and File the Demand Register Dated May 4, 2004 of which $4,028,598.48
represents Redevelopment Agency Expenditures.
PLEASE SEE CONSENT CALENDAR ITEM NUMBER 1 ON CITY COUNCIL AGENDA
Cii!?
'iet
It 4 40"
COUNCIL/RDA MEETING DATE: May 4, 2004
Approval of Plans, Specifications and
Engineer's Estimate and Authorization
to Advertise for Bid for SilverRock Resort
Maintenance Building, Comfort Stations
and Pump House
RECOMMENDATION:
AGENDA CATEGORY:
BUSINESS SESSION:
CONSENT CALENDAR: 4:1 �
STUDY SESSION:
PUBLIC HEARING:
Approve the Plans, Specifications, and Engineer's Estimate (PS&E) of probable
construction costs and authorize staff to advertise for bids for the maintenance building,
comfort stations and pump house for the SilverRock Resort, Project No. 2002-07D.
FISCAL IMPLICATIONS:
The SilverRock Resort improvements are included within the Fiscal Year 2003/2004
Capital Improvement Program (CIP). Based upon the Engineer's estimate of probable
construction costs in the amount of $1,310,000, the following represents the anticipated
project budget:
Activity
Construction
Inspection/Testing/Survey
Contingency @ 5%
CHARTER CITY IMPLICATIONS:
None.
BACKGROUND AND OVERVIEW:
Budget
$17310, 000
$5,000
65 500
TOTAL: $11380, 500
On November 18, 2003 the Redevelopment Agency approved a contract with the
Dahlin Group for the design of the maintenance building, comfort stations and pump
house for the SilverRock Resort project. The contract also included design of the
temporary clubhouse which will be brought before the Agency at a later date.
GALIBRARYTSE MAINTENANCE.DOC
At the February 17, 2004 Study Session, the Agency gave the project architect
direction with regards to the preferred architectural themes for the future buildings at
the Resort.
On April 7, 2004, the maintenance building was approved by the Architecture and
Landscape Review Committee.
On April 13, 2004, the maintenance building was approved by the Planning
Commission.
The PS&E are now substantially complete and will be available in the Building and
Safety Department for review.
Assuming the City Council approves the authorization to receive bids for the
aforementioned buildings on May 4, 2004, the following represents the anticipated
project schedule:
Approve PS&E and authorize to receive bids
Bid Opening
Award Construction Contract
Construction Period
Accept Improvements
FINDINGS AND ALTERNATIVES:
Alternatives available to the Agency Board include:
May 4, 2004
May 27, 2004
June 1, 2004
June 2004-October 2004
October 2004
1. Approve the Plans, Specifications, and Engineer's Estimate (PS&E) of probable
construction costs and authorize staff to advertise for bids for the maintenance
building, comfort stations and pump house for the SilverRock Resort, Project No.
2002-07D; or
2. Do not approve the Plans, Specifications, and Engineer's Estimate (PS&E) and
do not authorize staff to advertise for bids for the aforementioned buildings; or
3. Provide staff with alternative direction.
Respectfully submitted,
Tom Hartung
Director of Building and Safety
C-6 PSE MAINTENANCEAOC
2
Approved for submission by:
Thomas P. Genovese, Executive Director
C-6 PSE MAINTENANCEMOC
Ou
c� OF
COUNCIL/RDA MEETING DATE: May 4, 2004
ITEM TITLE: Approval of the Plans, Specifications,
and Engineer's Estimate of Probable Construction
Costs and Authorization to Receive Bids for the
SilverRock Resort Golf Cart Bridges, Project No.
2002-07E
RECOMMENDATION:
AGENDA CATEGORY:
BUSINESS SESSION:.
CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
Approve the plans, specifications, and engineer's estimate (PS&E) and authorize
staff to advertise the bid of the SilverRock Resort Golf Cart Bridges, Project No.
2002-07E.
FISCAL IMPLICATIONS:
The Capital Improvement Program (CIP) 2003/2004 budget included funds for
construction of the SilverRock Resort project.
On October 7, 2003, the project budget was revised to include $150,000 for three
(3) golf cart bridges to cross the Coachella Valley Water District (CVWD) Canal that
bisects the project site.
Originally, the three (3) golf cart bridges were to be designed at a load rating of
five (5) tons. However, both Palmer Course Design Company and Landmark Golf
Management recommended that one bridge be rated at ten (10) tons to
accommodate heavier maintenance equipment as well as any emergency vehicles
that may need to cross the canal. This increased the estimated cost of this,bridge _
by $21,000. Additionally, City Council requested that end pillars be included,
which added approximately $3,700 to the cost of each bridge.
The engineer's estimate for the construction of three (3) golf cart bridges is
$206,500 including a 5% contingency. With the Agency's approval, this $66,500
increase in the cost could be funded from the $5,463,000 contingency approved
for the entire project, if necessary, after bids are opened. Inspection for these
improvements is included with Heinbuch Golf's construction administration
contract.
S:\CityMgr\STAFF REPORTS ONLY\5-4-04\C 10 SRR Bridge.doc
Since this project will be constructed with Agency funds, the contractor will be
required to pay prevailing wages.
RACKOROUND AND OVERVIEW:
The City Council approved the Fiscal Year 2003/2004 CIP on May 20, 2003. This
year's CIP includes the construction of the SilverRock Resort Phase I
Improvements.
This project consists of constructing three (3) golf cart bridges across the CVWD
All American Canal, which bisects the project site. Two of the bridges will be
rated at five (5) tons to carry normal golf cart traffic and one bridge will be
designed to a ten (10) ton capacity for heavier maintenance equipment and any
emergency vehicles that may need to cross the canal.
On February 3, 2004,
the Agency considered the design of the three (3) bridges as
presented by T.Y. Lin
International,
bridge consultant for the
civil engineer of the
project. At that time, the Agency
approved Design Concept
#1 (Attachment '2)
with metal pillars at each corner (Attachment 3), which have
been included in the
design of the bridge.
Although not
specifically addressed at
the meeting, Design
Concept #1 depicted
a bridge with
camber. For bridges this
short (32 feet to 46
feet) the designer
recommends
a flat bridge with no
noticeable camber
(Attachment 4) .
The PS&E are now complete and available for review within the Public
Works/Engineering Department. Contingent upon Agency approval of the PS&E,
the following is the project schedule:
Approval of PS&E
Bid Period
Construction Award
Construction Period
FINDINGS AND ALTERNATIVES:
May 4, 2004 .
May 5, 2004 through May 28, 2004
June 1, 2004
June — September 2004
The alternatives available to the Agency include:
1. Approve the plans, specifications, and engineer's estimate and authorize
staff to advertise the bid of the SilverRock Resort Golf Cart Bridges, Project
No. 2002-07E; or
2. Do not approve the plans, specifications, and engineer's estimate and do not
authorize staff to advertise the bid of the SilverRock Resort Golf Cart
Bridges, Project No. 2002-07E; or
2
S:\CityMgr\STAFF REPORTS ONLY\5-4-04\C 10 SRR Bridge.doc
3. Provide staff with alternative direction.
Respectfully submitted,
1`►
4i�2motothy R J nas o , P. E.
Public Works Director/City Engineer
Approved for submission by:
Thomas P. Genovese, Executive Director
Attachment: 1. Site Plan with Golf Cart Bridge Locations
2. Design Concept No. 1
3. End Post Detail
4. Non -Cambered Bridge Elevation
3
S:\CityMgr\STAFF REPORTS ONLY\5-4-04\C 10 SRR Bridge.doc
ATTACHMENT 1
w 4 -'t ,
l
ATTACHMENT 3
L
O
-c
O
3
o
U
Q
w
U
�
U
0
O
+
D
L.
(�
L
T
a
O
>
cv
to
p
C
U
112
w
I
I
Q
Ld
0
Q
V
ATTACHMENT 4
�a�01W
c� OF T9
COUNCIL/RDA MEETING DATE: May 4, 2004
ITEM TITLE: Consideration of Perimeter, Temporary
Clubhouse, and Maintenance Facility Landscape Design
for SilverRock Resort
RECOMMENDATION:
AGENDA CATEGORY:
BUSINESS SESSION:
CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
Approve the SilverRock Resort perimeter (Avenue 52, Avenue 54, and Jefferson
Street), entry road, temporary clubhouse, and maintenance facility landscape design
for Phase I of SilverRock Resort.
FISCAL IMPLICATIONS:
None for this action. A budget of $4,975,900 is available for perimeter and entry
street improvements. A budget of $2,400,000 is available for the temporary
clubhouse and maintenance facility. Included within these budget items are funds for
landscape improvements. Upon completion of the plans and specifications for these
improvements and prior to requesting Agency Board authorization to bid, a detailed
cost estimate will be submitted with the bid package.
BACKGROUND AND OVERVIEW:
In December 2003, the Agency Board approved the conceptual perimeter and entry
concept plans for SilverRock Resort, prepared by GMA International. In February
2004, the Agency Board approved a Professional Services Agreement with Pinnacle
Design Company to prepare construction plans, specifications, and cost estimates for
perimeter, entry road, temporary clubhouse, and maintenance facility landscape
improvements in conformance with the GMA International concept plan. Pinnacle has
completed the preliminary design phase of their assignment and seeks Agency Board
approval prior to preparation of the final bid documents.
Pinnacle will be presenting the preliminary design, including exterior berm geometrics,
multi -purpose trail locations, entry signage locations and the proposed plant palette for
the Avenue 52 Entry, Avenue 52, Jefferson Street, and Avenue 54 (Attachment 1).
Pinnacle is also the landscape architect, as a sub -consultant to Palmer Course Design
Company, and as such, has attempted to create a seamless transition from the golf
course to external landscape improvements.
Preliminary landscape plans for the temporary clubhouse (Attachment 2) and
maintenance facility (Attachment 3) were considered and approved by the Architecture
and Landscape Review Committee on April 7, 2004, and subsequently approved by
the Planning Commission at its April 13, 2004 meeting.
Pinnacle's presentation at the RDA meeting will include color display boards and
renderings of their landscape designs, as well as options for perimeter fencing.
FINDINGS AND ALTERNATIVES:
The alternatives available to the Agency Board include:
1. Approve the SilverRock Resort perimeter, entry road, temporary clubhouse, and
maintenance facility landscape design for Phase I of SilverRock Resort; or
2. Do not approve the SilverRock Resort perimeter, entry road, temporary
clubhouse, and maintenance facility landscape design for Phase I of SilverRock
Resort; or
3. Provide staff with alternative direction.
Respectfully submitted,
�ae_ 0_11-�
Mark Weiss, Assistant Executive Director
Approved for submission by:
10`002L-0:1.� /41_-�01000
Thomas P. Genovese, Executive Director
Attachments: 1. Perimeter Typical Landscape Design
2. Temporary Clubhouse Landscape Design
3. Maintenance Facility Landscape Design
2
Poo:
3
i���i�i�aao�i�oi�ov000vvvvvoaoov0000c000��ooiioa00000�
IT
,� 1�1 II III�IIIIIIIIIIIIIIII_III a, '",.,,"
J'� it �1 I�lilillll�Ililll��l�ll iMorr■
�I ill�lil
L-
11 q
f,
{, `
--
SILVER
r
1!
I
i
0
r f .
f�
L
ROCK
• • .
■LA MWA, CA
11�i;ll�i
j I I j 11 1 I
I I11111 �
1 11111+
Of
11111+
1 1 ` 11 \+
1 ,+ I t l 1`
;i11,
1I,j111111 1
j 1j11111
/ I t I IIIII
I t+ 1 11 1 I
I I 1 1 1
j1 j11111
II II11II
I I 1 1 1
I I I I l l l l
1 1 1 I l l l I
J j IIIIII I
IIIII/II
I t I 111 \ +
11\1 1
11\\
111
IIIII
111111
I llllt
/IIIII
111111
111116
IIIII
1111t1
IIIII
IIIII
IIIII
IIIII
IIIII
IIIII
IIIII
I1111
IIIII
IIIII
I1111
IIIII
IIIII
III11
IIIII,
IIIII
\IIII
IIIII
IIIII
I I111
IIIII
IIIII
Ri; ii;Il; I.+}1 `R Iiil;iili Iil
ii1;1 rl
1 1 1 1 1 �Mtff��,„�II 1 1
• ' 1' ; I I'It ii'ee; ;11It +i ;i;;i+ 1 i 1
I11 ,11 1 , \ .W® , IIII ,1\, IIIII+ ,/)h
It1 IIII • , 1\, Ih1 ,11 ;,1+` I1111;
I I l l t 1 1;; 1 I tl 1 11
� , 1 I I 1 � \ 1 1 1 1,, 1, 1 1 , I I I.NI ti �<1ZDI D ,; II 1 1 1 . I ,1111,11 , 1 D
E.II I II;111 f- 1 I 1 �`,11111,1,1 11 ,1,II
I I It'll ,I 1
1 I1�vtIt111 1 /e,,,I IIIII 11/1 II
D � �I � `
11 II, I, 1 IIIII Ill U
I/1'1 I I I ;; IIIII Iat
i'• _7 , 1 1 / {r' "`' �r� ����I; ; ii
IIII;p 1I I 11
+
111111
D + 1 11 Itil I' � Ilt�l � �i iiii;i�,i � iiiii �tl�i I
` b ; 'ii;;; y .�...IIi',b';;;;i�;i�� iiiii[�'1�/yi•�il p�l1l
_, 1 1 , �I 1 „ 1 1 11 \ '\ 1 11 11 ; 11 l 1711 '•'1( {7 Ij1'11
� � 1 I
it ,1,II II111I �I/�pC�(II � 1
�1 / /I�1 11111,11 IIIII;®/ I I
• , I11
,� I;,ii; \ :I��1j I1�• iiii�;il iiiii; IV
sS / /IIIII IIII-1 1�
�t i� i i I ) 1 it I iiiii/ iiiii"4'' /•I•ri
1
. II I; 1 I I 1 /III /Iii IIIII; y1,am�, .
Q• ' i_ I+i I; ; ; I :I i1I14 I I , iiiii���1 I I
_r� 1 1
-• I' II t; i i �, l� ;ii;i;�ii iiiiiIt t1 i
• 1 \IIII II IIIII
I ' i � 1 i i i i I It , ; ;;;;i;; ;; iiii;/ +;11 •
111,,;
iiiii;
t 1 I i; 1 •I,I I; 1` 1 tl;ll i; i;;Il,
1 1 1 I..I I I I® \ 11 11 11 I, 1
I 11; I IIt I 111 Il ltl l I (IIIII tIl l
1 I I I 1 + 11 1 1 1/ 1
�w qme \ �; ;1 ; 1 , 1 �+ t ,; ;; 1;111 (IIIII I111
,, y 11 1 11 1,1 11
'v! m€ h 1I I II;; ; ���\Ng1I ; Ilttilti i � iiiiilt '
I 1 1 1 IIII II 11 11
I Np I I 1 1 I, 1 1 1 1 , , 1 1,111, I I I •' I I I I II I I , I
I � II't♦II I'i i i I I �. 1 ,, ;ill it ; ,
D .I 1 I t , 1 „III,II I IIIII I dIl 1
1 i ,• 1. ;� ; ;; ;;;;i;;'t iiiii;; , '
PFF
N 1 ,t,XjII
� � �;t• � .f i i I l i 1 1 ;;;;'+� iiiii I I ii i ' I
i
j
`\+� ,� to I
t i t i
® ~ JIM"
D D D D D D D '!'""' PRELIMINARY PLANTING PLAN n 0 -v
PAfICWAYB Igo
�`!
— SILVER ROCK RESORT13 LA OMTA, CA
a.
6
D D . -Wens
—
FRBJMNARY FL,ANTNG PLAN
SILVER ROCK RESORT TELVORARY CLUBHOUSE
LA OtWA, CA
ATTACHMENT 3
4
COUNCIL/RDA MEETING DATE: May 4, 2004
Consideration of Adoption of a Resolution
Approving the Replacement Housing Plan for
the Vista Dunes Affordable Family Housing
Project
RECOMMENDATION:
AGENDA CATEGORY:
BUSINESS SESSION:
CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
Adopt a Resolution of the Redevelopment Agency approving the Replacement
Housing Plan for the Vista Dunes Affordable Family Housing Project.
FISCAL IMPACT:
None. The Replacement Housing Plan describes how the Agency will replace
affordable housing units as a result of the Vista Dunes redevelopment project. The
costs related to replacing these housing units, as described in the Replacement
Housing Plan, were discussed and approved when the Vista Dunes redevelopment
project and the Hammer property purchase activities were authorized by the
Agency Board.
BACKGROUND AND OVERVIEW:
The La Quinta Redevelopment Agency has been actively implementing affordable
housing projects and programs that rehabilitate existing, and produce new,
affordable housing units. Since 1993, the Agency has secured 894 dwellings that
will remain affordable to very low-, low- and moderate -income households for 30 to
55 years. Per the Redevelopment Law, the Agency has the obligation to secure an
additional 1,033 affordable dwellings by 2040. To assist in this endeavor, in
November 2003, the Agency Board authorized staff to acquire the Vista Dunes
Mobile Home Park in order to redevelop the property with 82 new single-family
dwellings that would be affordable to very low- and low-income family households
for 55 years. This effort will result in the displacement of dwellings that are
affordable to very low-, low- and moderate -income households. The California
Community Redevelopment Law requires the Agency to prepare and adopt a
replacement housing plan that identifies how the Agency will replace these units
within four years following their removal.
G:\WPDOCS\CC Stf Rpts\VDMHP\SR Replacement Plan5-04.doc 1
Attachment 1 contains the Replacement Housing Plan for the Vista Dunes
Affordable Housing Project. The Replacement Housing Plan presents the:
• legal requirements for preparing a Replacement Housing Plan
• replacement housing obligations generated by the Vista Dunes Affordable Family
Housing Project
• new housing opportunities the Agency will facilitate to generate dwellings that
satisfy the Agency's replacement housing obligations
• timetable for meeting the replacement housing obligations
• means of financing the replacement housing obligations, and
• impact Article 34 of the California Constitution may have on the Agency's
ability to generate replacement housing dwellings.
TI
9:
ar
e Vista Dunes Affordable Family Housing Project will generate a need to replace
dwellings that are affordable to very low-income households. These dwellings
configured as follows:
Bedrooms
Units
Travel trailers/1 bedroom mobile homes 20
1 bedroom mobile homes 46
3 bedroom mobile homes 23
4 bedroom mobile homes 3
Pe r the Redevelopment Law, the Agency may apply either of two methods to meet
it replacement housing obligations. Under the first option, the Agency replaces,
b income category (the same or lower income category as the persons displaced
from the removed units), number of units, and bedrooms in an amount equal to
those removed. The second option provides that the Agency may satisfy its
re lacement housing obligation with a fewer number of units if the replacement
pr gram meets both of the following criteria: (1) the total number of bedrooms in
th replacement units equals or exceeds the number of bedrooms in the destroyed
or removed units, and (2) the replacement units are affordable to, and occupied by
th same income level of households as the units being eliminated by the project.
To satisfy the replacement housing obligation generated by the Vista Dunes
Affordable Family Housing Project, the Replacement Housing Plan provides that the
Agency will be implementing the first option. This is because it is a more
conservative approach, and the Agency has the opportunity to do so through both
the Vista Dunes Affordable Family Housing Project and the residential development
slated for the Hammer property. Thus, the Agency will meet this replacement
housing obligation by generating replacement units and bedrooms in an amount
ec ual to those removed. The Vista Dunes Affordable Family Housing Project will
generate 82 of the required 92 units, with the remaining 10 replacement housing
u its to be located in the Hammer property development.
GAPDOCS\CC Stf Rpts\VDMHP\SR Replacement Plan5-04.doc 2
The Replacement Housing Plan identifies the replacement housing development
time table and financing strategy. The replacement dwelling timetables entail
occupancy of the Vista Dunes Affordable Family Housing Project by the fourth
quarter of 2005, and occupancy of the Hammer property development by the first
quarter of 2007. Both of these timeframes meet the 4-year replacement dwelling
time period outlined in the Redevelopment Law. The means of financing the
replacement dwellings are identified as Housing Fund tax increment revenue, and
proceeds from the Agency's upcoming tax allocation housing bond issue. There
will be sufficient funds available to meet the replacement housing obligations.
Article 34 of the California State Constitution requires voter approval when a city,
redevelopment agency or housing authority develops housing where more than
49% of the units are affordable to very low- and low-income households, and the
public entity intends to own, or provide permanent financing. Agency legal counsel
has reviewed the funding and ownership structures proposed for both the Vista
Dunes Affordable Family Housing Project and the Hammer property development.
They have concluded that the structures do not require an Article 34 election in
order for the Agency to implement the replacement housing projects identified in
the Replacement Housing Plan.
FINDINGS AND ALTERNATIVES:
Alternatives available to the Agency Board include:
1. Adopt a Resolution of the Redevelopment Agency approving the
Replacement Housing Plan for the Vista Dunes Affordable Family Housing
Project; or
2. Do not adopt a Resolution of the Redevelopment Agency approving the
Replacement Housing Plan for the Vista Dunes Affordable Family Housing
Project; or
3. Provide staff with alternative direction.
Respectfully submitted,
Herman,
munity Development Director
G:\WPDOCS\CC Stf Rpts\VDMHP\SR Replacement Plan5-04.doc 3
Approved for submission by:
Thomas P. Genovese, Executive Director
Attachment: 1. Replacement Housing Plan
G:\WPDOCS\CC Stf Rpts\VDMHP\SR Replacement Plan5-04.doc
RESOLUTION NO. RA -
A RESOLUTION OF THE LA QUINTA REDEVELOPMENT
AGENCY APPROVING AND ADOPTING A REPLACEMENT
HOUSING PLAN PURSUANT TO HEALTH AND SAFETY
CODE SECTION 33413.5 PERTAINING TO THE
PROPOSED VISTA DUNES AFFORDABLE FAMILY
HOUSING PROJECT
WHEREAS, the La Quinta Redevelopment Agency ('Agency") is a
public body, corporate and politic, organized and existing under the California
Community Redevelopment Law (Health & Safety code § 33000 et seq.) (the
"Law"); and
WHEREAS, the Agency is engaged in redevelopment activities within
the La Quinta Redevelopment Project Area No. 2 ("Project Area No. 2"); and
WHEREAS, the Agency is engaged in redevelopment of that certain
approximate 9.7 acre parcel located on Miles Avenue, west of Adams Street, in
north La Quinta, commonly known as the Vista Dunes Mobilehome Park ("Site");
and
WHEREAS, the Agency has proposed for the Site an affordable family
housing project consisting of 82-units to be rented to persons and families of very
low income (the "Vista Dunes Affordable Family Rental Project"); and
WHEREAS, the Site currently has a total of 92 units consisting of a
variety of travel trailers and mobile homes; and
WHEREAS, all of the current units on the Site will be removed to
facilitate the redevelopment of the Site with the Vista Dunes Affordable Family
Housing Project; and
WHEREAS, because the existing residential uses within the Site are
occupied by persons of very low, low, or moderate income, the Agency is required
to prepare, and has prepared, a replacement housing plan in accordance with
Health and Safety Code Section 33414.5 that addresses generally how the Agency
intends to replace such very low, low, or moderate income housing that will be
removed if the Vista Dunes Affordable Family Housing Project occurs (the
"Replacement Housing Plan"); and
05
Resolution No. RA 2004-
VDMHP Replacement Housing Plan
Adopted: May 4, 2004
WHEREAS, under the Law, the purpose of the Replacement Housing
Plan required by Health and Safety Code Section 33413.5 is not to address specific
dwelling units, relocation of specific occupants, or the Agency's overall
replacement housing obligations, but rather to set forth generally how the Agency
proposes to replace the number of low and moderate income units, if any, that are
removed as a result of the Vista Dunes Affordable Family Housing Project; and
WHEREAS, a draft of the Replacement Housing Plan was available for
public review and inspection at City Hall in accordance with applicable law; and
WHEREAS, all actions required to be taken by the Agency precedent
to consideration by the Agency of the Replacement Housing Plan were taken in
accordance with applicable law; and
WHEREAS, the Agency has considered the draft Replacement Housing
Plan prepared by Agency staff and any and all public comments received
concerning the Replacement Housing Plan;
NOW, THEREFORE, THE LA QUINTA REDEVELOPMENT AGENCY
DOES HEREBY RESOLVE, ORDER, AND DETERMINE AS FOLLOWS:
1. The foregoing Recitals are true and correct and incorporated herein and made
a part hereof.
2. The Replacement Housing Plan for the Vista Dunes Affordable Family
Housing Project, a copy of which is on file with the Agency Secretary, (a)
effectuates the purposes of the Community Redevelopment Law and of the
Redevelopment Plan for the La Quinta Redevelopment Project Area No. 2; (b)
is in conformity with the requirements of Health and Safety Code Section
33413.5, including setting forth the finding of the Agency restated herein
that the replacement housing identified in the Replacement Housing Plan
does not require the approval of the voters of the City of La Quinta pursuant
to Article XXXIV of the California Constitution; and (c) is hereby approved
and adopted.
PASSED, APPROVED and ADOPTED this 5th day of May, 2004, by
the following vote:
Mall
Resolution No. RA 2004-
VDMHP Replacement Housing Plan
Adopted: May 4, 2004
AYES:
NOES:
ABSENT:
ABSTAIN:
TERRY HENDERSON, Chairperson
La Quinta Redevelopment Agency
ATTEST:
JUNE S. GREEK, CMC, Agency Secretary
La Quinta Redevelopment Agency
APPROVED AS TO FORM:
M. KATHERINE JENSON, Agency Counsel
La Quinta Redevelopment Agency
07
La Quinta Redevelopment Agency
F 0 'm , I M r I I I T ,
- - ' r . I '_
Amww
• • •I L-
ApO 23, 2004,
La Quinta Redevelopmul Agency
7&495 Calle Tampico
L.a Quinta, • • r cO
Prepared By;
Rosenow Spevacek Group, Inc.
217 North Main Street, Suite 300
Santa Ana, California 92701-4822
Phone: 760.765.3070
E-Mail: info@webrsg.com
Section
The La Quinta Redevelopment Agency ("Agency") is purchasing the existing
Vista Dunes Mobile Home Park site (the "Site") to redevelop the Site with 82
single family dwellings, which will be rented to very low income households
("Vista Dunes Affordable Family Housing Project"). The Vista Dunes Mobile
Home Park was established in 1968 and contains 92 travel trailers, and single
and double wide mobile homes that are from 12 to 36 years old. Given the age of
both the Vista Dunes Mobile Home Park and the trailers/mobile homes, the
Agency elected to undertake the Vista Dunes Affordable Family Housing Project
in order to:
• redevelop this property with new structures in a neighborhood designed in
accordance with the City of La Quinta's development standards to ensure
better compatibility with adjoining uses;
• facilitate construction of new dwellings that feature one, two and three
bedroom configurations, offer larger living areas, and incorporate energy
efficiency measures to reduce operations costs;
• reduce density so that more open space, outdoor play areas, covered off-
street parking, and individual yards could be incorporated into this
neighborhood; and
• secure long term covenants to insure that the new homes will remain
affordable to very low income households for at least 55 years.
Replacement Housing Plan Requirements
Since the Agency will be removing 92 dwellings that are affordable to very low,
low and moderate income households, the California Community Redevelopment
Law ("Law"), which guides Agency redevelopment activities, requires the Agency
to prepare a replacement housing plan that details how the Agency will replace
ROSENOW SPEVACEK GROUP, INC. LA QUINTA REDEVELOPMENT AGENCY 9
April 23, 2004 REPLACEMENT HOUSING PLAN
INTRODUCTION
PAGE 2
92 dwellings with affordable housing units within a four year period. Section
33413.5 of the Law provides that the replacement housing plan address the
following:
• the general location of housing to be rehabilitated, developed, or constructed
pursuant to Section 33413 of the Law,
• the number of dwelling units housing persons and families of very -low, low or
moderate income planned for construction or rehabilitation,
• the timetable for meeting the replacement housing plan's relocation,
rehabilitation and replacement housing objectives,
• a description of the adequate means of financing such rehabilitation,
development or construction, and
• a finding that the replacement housing does or will not require the approval of
voters pursuant to Section XXXIV of the California Constitution, or that such
approval has been obtained.
Replacement Housing Plan
This document is the Replacement Housing Plan ("Plan") for the Vista Dunes
Affordable Family Housing Project. In addition to addressing the above items as
required by the Law, this Plan also documents the existing conditions at the Site
in order to establish the replacement housing obligations this redevelopment
project will generate. This tabulation serves as the baseline for compliance with
Sections 33413(a) and Section 33413(f) of the Law (these sections generally
require the Agency to replace, within four years, residential dwellings that are
affordable to low and moderate income households which are removed from the
housing market as a consequence of a redevelopment project). Replacement
housing obligations are tied to formulas for matching lost units according to
income category and total bedroom count on either a one -for -one basis or an
aggregate basis. Countable replacement housing units must be within the
Agency's territorial jurisdiction, in standard condition, and designed to remain
affordable to low and moderate income households for at least the remaining life
of the land use controls of the Redevelopment Plan for La Quinta Redevelopment
Project No. 2 ("Redevelopment Plan"). The land use controls contained in the
Redevelopment Plan remain in effect until 2030.
ROSENOW SPEVACEK GROUP, INC. LA QUINTA REDEVELOPMENT AGENCY
April 23, 2004 REPLACEMENT HOUSING PLAN
Section
•. Housing -Vista wn
Affordable Family Housing Project
This section presents the background data that was used in developing this Plan.
It details the type of units that will be removed when the Vista Dunes Affordable
Family Housing Project is undertaken, the household income levels the existing
mobile home units serve, and includes a summary of the Vista Dunes Affordable
Family Housing Project.
Units on the Site
The Site occupies an approximately 9.7 acre parcel located on Miles Avenue,
west of Adams Street, in north La Quinta. The Site is also within La Quinta
Redevelopment Project Area No. 2. Built in 1968, the Vista Dunes Mobile
Home Park currently has a total of 92 travel trailers and single and double
wide mobile homes that range in age from 12 to 36 years old. In January
2004 the Agency's relocation consultant conducted a door to door survey to
document the housing requirements for each resident, and to identify the
number of bedroom in each unit. The current mobile home space rent and
housing costs show that all units are affordable to very low income
households, per the income limits and affordable housing cost parameters
established by the U.S. Department of Housing and Urban Development
(HUD). The number of units by bedroom count is as follows:
Bedrooms Units
Travel trailers/1 bedroom mobile homes
20
1 bedroom mobile homes
46
3 bedroom mobile homes
23
4 bedroom mobile homes
3
1'
ROSENOW SPEVACEK GROUP INC. LA QUINTA REDEVELOPMENT AGENCY
April 23, 2004 REPLACEMENT HOUSING PLAN
EXISTING CONDITIONS AND THE REDEVEVLOPEMT PROJECT
PAGE 4
The Redevelopment Project
The Agency is in the process of acquiring the Site for the purpose of redeveloping
the Site with 82 single family dwellings. After the new dwellings are built, the land
and improvements will be sold to a non-profit organization that will be responsible
for operations and maintenance. As part of the sale, the Agency will stipulate that
all of the newly developed single family homes will be rented, at affordable
housing costs, to very low income households for a 55 year period. In addition,
the Agency will stipulate occupancy and maintenance standards that must remain
in place for the 55 year term.
The site planning process that is defining the Vista Dunes Affordable Family
Housing Project indicates that the redevelopment project will yield 82 dwellings
featuring the following bedroom mix:
Unit Size Number
1 bedroom 26
2 bedrooms 24
3 bedrooms 32
12
ROSENOW SPEVACEK GROUP, INC. LA QUINTA REDEVELOPMENT AGENCY
April 23, 2004 REPLACEMENT HOUSING PLAN
Section
3
R1 L I a I Lia, A L
The Agency has been aggressively implementing the affordable housing
mandates prescribed by the Law. To date, the Agency has facilitated the
development of 894 affordable dwellings that feature affordability covenants in
compliance with the Law. Through the Vista Dunes Affordable Family Housing
Project and one other housing development that is underway, the Agency will
more than meet its replacement housing obligations. Further, the Agency is
concurrently completing activities related to the sale of Housing Bonds that will
generate up to $60.0 million in working capital to meet these and other affordable
housing needs.
Replacement HOusing Options
Per the Law the Agency may apply either of two methods to meet its replacement
housing obligations. Under the first option, the Agency replaces, by income
category (the same or lower income category as the persons displaced from the
removed units), number of units, and bedrooms in an amount equal to those
removed. The second option provides that the Agency may satisfy its
replacement housing obligation with a fewer number of units if the .replacement
program meets both of .the following criteria: (1) the total number of bedrooms in
the replacement units equals or exceeds the number of bedrooms in the
destroyed or removed units, and (2) the replacement units are affordable to, and
occupied by the same income level of households as the units being eliminated
by the project.
To satisfy the replacement housing obligation generated by the Vista Dunes
Affordable Family Housing Project, the Agency will be implementing the first
option.
Replacement Housing Development
The Agency intends to satisfy the replacement housing obligations through two
housing developments that will be under construction in Project Area No. 2. They
are as follows:
ROSENOW SPEVACEK GROUP, INC. LA QUINTA REDEVELOPMENT AGENCY 13
April 23, 2004 REPLACEMENT HOUSING PLAN
LOCATION, TIMING $ FINANCING
PAGE 6
Vista Dunes Single Family Affordable Housing Project
As described earlier, the Agency will be redeveloping the Site with 82 single
family dwellings that will be one, two and three bedroom configurations. All of the
new dwellings will be at rents affordable to very low income households. The
Vista Dunes Affordable Family Housing Project will satisfy a majority of the
replacement housing needs in that it will generate 82 of the required 92 units that
will be removed from the housing stock. The chart below presents that
replacement housing obligations and the number of units, and bedroom count,
the Affordable Family Housing Project will generate.
Type of Units Removed
20 Travel trailers/1 bedroom mobile homes
46 two bedroom mobile homes
23 three bedroom mobile homes
3 four bedroom mobile homes
Replacement Units
26 one -bedroom units
24 two bedroom units
32 three bedroom units
0 four bedroom units
The Affordable Family Housing Project will generate a 6 unit surplus of one
bedroom units, a 22 unit deficit of 2 bedroom units, a 9 unit surplus of 3
bedroom units, and a 3 unit deficit of 4 bedroom units. The deficits will be
eliminated through the multi -family project described below.
Hammer Property Multi -Family Development
The Agency is in escrow to purchase an approximate 27.75 acre parcel
located west of Dune Palms Road, north of Avenue 48 for housing and retail
development. Given the site location (contiguous to the Highway 11
commercial corridor), approximately 11 acres may be developed for
commercial uses leaving approximately 16.75 acres for housing and open
space uses. The existing General Plan land use controls permit medium
density residential uses on the remaining 16.75 acres which may
accommodate up to 250 multi -family dwellings. The Agency intends to
require that at least 49% or 122 of the units be affordable to low and very low
income households. Since this proposal is in the planning stages, the Agency
will require that two and four bedroom units be included so that the deficit
generated by the Vista Dunes Affordable Family Housing Project will be
addressed.
Timetable for Replacement Housing Development
The Agency is actively implementing the two developments that will generate the
required replacement units. Construction of the Vista Dunes Affordable Family
Housing Project development is slated to commence in the first quarter of 2005,
with an anticipated move -in date occurring in the third quarter of 2005. All of the
82 units should be occupied by the fourth quarter 2005.
ROSENOW SPEVACEK GROUP, INC. LA QUINTA REDEVELOPMENT AGENCY "
April 23, 2004 REPLACEMENT HOUSING PLAN
LOCATION, TIMING & FINANCING
PAGE 7
Regarding the Hammer property development, the Agency's property acquisition
escrow will close during the summer of 2004. Site planning activities are
underway and should be complete by November 2004. The Agency will then
conduct a request for proposals process during the first quarter of 2005, with
developer selection occurring in the second quarter of 2005. Following the
planning and entitlement process time frames employed by the City of La Quinta,
final project approvals should occur by the end of 2005 with construction of the
multi -family units commencing during the first quarter of 2006.
Means of Financing the Replacement Housing Obligations
The replacement housing obligations identified in this Plan will be funded through
a combination of available tax increment revenue and proceeds from a tax
allocation housing bond the Agency is currently structuring. Both of these
revenue resources are derived from the housing set -side funds for La Quinta
Redevelopment Projects No. 1 and No. 2. Housing fund tax increment revenue
not appropriated for other Agency housing initiatives is being reserved, and the
Agency is in the final stages of selling up to $60.0 million of tax allocation bonds.
Bond proceeds should be in hand by July 1, 2004 or within a reasonable time
thereafter.
Section XX30V of the Califomia Constitution Requirements
By approval and adoption of this Replacement Housing Plan, the La Quinta
Redevelopment Agency finds that the replacement housing to be developed and
constructed pursuant to this Plan does not require approval of the voters of the
City of La Quinta pursuant to Article XXXIV of the California Constitution.
The rental housing slated for the Vista Dunes Affordable Family Housing Project
is replacing existing rental housing that was occupied by persons and families of
low income or very low income. Moreover, upon completion the Vista Dunes
Affordable Family Housing Project will be sold to and thus owned and operated
by a non-profit entity, and the Agency will not be providing direct long-term
financing. As such the project is exempt from Article XXXIV pursuant to the
Public Housing Election Implementation Law, Health and Safety Code Section
37000 et seq., including without limitation Health and Safety Code Sections
37001(b), 37001(f), and 37001.5(b).
The Hammer property development will not have greater than 49% of the units
occupied by low income households, and the Agency will implement this
development through a private development entity that will be providing the long-
term financing. As such the project slated for the Hammer property is exempt
from Article XXXIV pursuant to the Public Housing Election Implementation Law,
Health and Safety Code Section 37000 et seq., including without limitation Health
and Safety Code Sections 37001(a), 37001(b), 37001.3, 37001.5(b), and
37001(e).
'5
ROSENOW SPEVACEK GROUP, INC. LA QUINTA REDEVELOPMENT AGENCY
April 23, 2004 REPLACEMENT HOUSING PLAN