Loading...
0303-0313 (DEMO)44555 Adams St LICENSED CONTRACTOR DECLARATION I hereby affirm underipenalty of perjury that I am licensed under provisions of `gt)hapter 9 (comrnencfng with Section 7000) of Division 3 of the Business and '• Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date 733196 AD ' 0 131/2C spate - - • Signature of Contractor OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ,O I as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section B&P.C. for•this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: (w)-1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carrier S3'la.T4, FVMT) Policy No. 46079410-2003 (This section need not be completed if the permit valuation is for $100.00 or less). ( ) I certify that in the performance of the work for which this permit is issued, •1 shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I shpuld become subject to the workers' compensation provisions of Section 37Uof the Labor Code, I shall forthwith comply with those provisions. .,Date: +.,e ; , v+ Applicant Warning: Failure to secure Workers' Compensat(on coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety fora permit subject to the conditions and restrictions set forth on his application. .-,,., 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will,subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon the above-mentioned property for inspectio / purposes. e 'r ;,Signature (Owner/Agent) Date Ll .I BUILDING PERMIT PERMIT# DATE VALUATION f` LOT TRACT JOB SITEry. ADDRESS 'rJJi a l•L APN LE •S } OWNER ¢ :, CONTRACTOR / DESIGNER / ENGINEER s`:m OF T .K Qi1W-b. Mal COWRA :I" M, 78-495 CAUX TPOW 9321TVWE DL?m LAgLM-V A CAI 237 1RNqh: CA92618 SLA (949)SO-5-8080 C USE OF PERMIT SOWSd.YIAL LA Qi.ff3+3'iA FILL K, S1`,&Tf0N 09+ n N,k't-`6 CtJPA:PdCY, `f'Y"A:'!, l 0P RI149LIMED, 7605 f'k f. (2001 C13C) OCCUPANT d OA5 111 POet0l PATIO til+:... cO1vlA vl il, 7,691m SY. CONTRACTAMOUNT ' 45544.00 ,LS En MAD cob- 'ONSTRUanoix OF c 51U.14?24.110 T'EW&Tk?"...'nro Mk1ARY O0143'i'RUCTION Mit 10) -000-4184100 g; duo :'PLAN' C g1ECK FZZ 3 0 3 -6443-4 9- ✓ "i £ 41,4609.40 1 :G'!•TAW WAL FU 161-t;ai- 1-0430 $60.50 ixL=fRICAL PER 101. -000-4V-000 $24190 PLIUMBTNG YZE 101 1000- 9.000 $29430 STROddf~41 iOTJON VIM,, COMM 100-000.24' 1-000 MID." 7 rJ am-To7A T, cowmumiA Aim Pr kv amck $4,644.77 ()T..A_. Pr 3q , Iry y'sg. '('yg+[I trio Vr q IIIIII III I I I I III 07 IE RECEIPT DATE . , BY DATE FI LED INSPECT R .. D D 4i INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS '' 'MECHANICAL APPROVALS Set Backs A Undergrouhd Ducts Forms & Footings Ducts I Slab Grade ' Return Air Steel Combustion Air Roof DeckExhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents - Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Line's'- ine's - Party Party Wall Firewall Exterior Lath Drywall - Int. Lath . Final 1 1124116 Final BLOCKWALL APPROVA S POOLS. -SPAS steel Set Backs Electric Bond " Footings Main Drain - Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final ' Plumbing Top Out Equipment Enclosure Shower Pans _ O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection ��/3 Encapsulation Gas Piping _. Gas Test Appliances w Final COMMENTS: r r w✓� L'J ' t C'�wolo �rS Yj—!`�-03 62G� 4-7 f /Ld"t/ �`' 5 76 kWh` -V `N�/JfysfjffQ/(� Final Utility Notice (Gas) ELECTRICAL A - P OVAL Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power . Final Utility Notice (Perm) �4 Daily Inspection Log Permit #0303-313 Daniel P. Crawford Jr. Building Inspector II La Quinta Fire Station 93 44-555 Adams Street Date Inspection 4/21/03 Temporary Power 4/29/03 Ground Plumbing — Partial ground waste stub at apparatus bay observed Stand Pipe — 200 psi observed for 2 hours @ fire station stand pipe 4/30/03 Footing — apparatus bay footing's and stem wall construction observed. Pour started late 11:00 am. Afternoon observation noted 90+ yards poured and contractor would not complete pour today. RFI and cold joint detail was faxed from project engineer for compliance. 5/1/03 Footing — apparatus bay footing cold joint observed prior to footing pour completion scheduled for 9:30 am. Prior to pour RC was directed to clean loose concrete debris and chip footing for key way compliance. Results were rough. 5/2/03 Temporary Power — temporary power pole relocated, re -inspected and IID called for meter release. 5/14/03 Wall Footing — Detail S-4 addendum #3 schedule `b' observed at west property line garden block wall construction. Detail S-4 addendum #3 schedule `c' observed at North West property line garden block wall construction. Storm Drain — storm drain construction observed per section b -b sheet C4 & C5. Perforation detail RFI (3/8" holes @ 8" o.c.) observed. 5/15/03' Ground Plumbing — partial ground waste lines observed at living quarters. 5/20/03 Underground TV & Telephone conduit. Observed 2" schedule 80 television conduits and 3" schedule 40 telephone underground conduits @ communication room. Branch circuit 3/4" underground conduit constructed is in question for approved schedule. Schedule 40 constructed and schedule 80 is noted in specification booklet (16000 section 3.46) and building Plan Electrical Design Criteria sheet E-1.0 5/21/03 Ground Plumbing — Partial ground waste observed at office bathroom. Building ground waste system completed. 5/29/03 On-site Sewer — partial on-site sewer lines observed, 6" SDR 35 PVC 5/30/03 Ground Plumbing — observed apparatus floor drain & vent system. On-site Sewer — partial on-site sewer lines observed, 6" SDR 35 PVC 6/3/03 Underground TV & Tel conduit observed by Steve Traxel. 6/10/03 Bond Beam — partial north and west property garden block wall bond beam observed: 6/17/03 Footing —+footings observed at living quarters and administration building areas. Hold down RFI pending for SSTB HD's vs. all thread hold downs called out. 2pm inspection scheduled to observe all hold downs prior to Thursday pour scheduled. 6/18/03 Hold down inspection observed, ok to pour footings. 6/24/03 Slab — slab grade and re -enforcement observed at living quarters and - administration building areas. Pour scheduled for 6/25/03. Deputy inspector scheduled to sample and observed pour. 6/25/03 Footing inspection observed at north property line for garden block wall. Details S-1 & S-4 addendums were observed with pending corrections required to be addressed prior to pour. Re -inspection scheduled for. 6/26/03. 6/26/03 Footing inspection observed corrections addressed 6/25 at detail S-4, ok to pour. Deputy inspector on site reviewing footings. Pour scheduled for 6/27/03. 6/30/03 Partial bond beam observed. Deputy inspector on site for CMU placement. Observed first portion of high lift at approx 5' for horizontal and vertical reinforcement. Progress continues. 7/21/03 Bond Beam observed at high lift's (8" CMU @ 12' & 12" CMU @ 14') for grout. Ok to grout. 8/4/03 CMU site wall footing inspection observed at north property and well site south, east & west combination retaining/garden block walls. (2701f) 8/8/03 Bond beam top out at apparatus bay observed by Senior Inspector Kirk Kirkland. 8/14/03 Canopy footing observed by Senior Inspector Kirk Kirkland. 8/26/03 Site (partial) CMU combination wall bond beam observed @ north property line. 8/27/03 Site (partial) CMU combination wall bond beam observed @ well site, ok to grout. 9/8/03 Site (partial) `French Drain System' and CMU water proofing observed at north/west retaining wall corner for =/- 401£ An approved detail for French Drain installation is pending. Sub -contractor was advised to install the French Drain, drainage holes face -down vs. as installed face -up. position. Architect, Jerrin, on site to confirm proper installation during bi- weekly site visit. 9/9/03 Partial French drain system observed (1801f, including water proofing system) at the north and east well site retaining wall. The south east return was constructed for 12 lf. It is•my understanding that 20 if has been contracted for per a prior RFI, this area was instructed to remain open until resolved. 9/10/03 Partial French drain system observed. French drainage system and waterproofing is complete for the well site, east planter and north property line. 9/23/03 Partial CMU site wall inspection observed. RFI from architect requested to verify revised faxed 8" x 11" omitting transformer enclosure. Footing's. observed were addendum #3 detail S-4 for site wall and detail 21 sheet 58.3 for generator enclosure area. 9/26/03 Footing inspection observed at trash enclosure detail addendum 3, S-2, correction noted to add two (2) continuous #4's at the top of footing per detail. BBQ & wall footing per 11/A1.2 & 4/57.1 observed at two locations. Hose reel footing addendum 3, S-3 observed, correction noted to add two (2) continuous #4's at the top of footing per detail. Ok to pour concrete. 9/30/03 Sand-Oil Interceptor inspection observed. Correction notice issued for clarification of construction specifications for sand-oil interceptor (SI-1). Detail 4/P-3.1 refers to cast iron clean out riser with sewer pipe (typical). Fire Station specification section 02530 Sanitary Sewerage notes PVC pipe as typical sewer pipe. Notice included an RFI for CVWD sample box, noted by CVWD as a requirement prior to approval. RFI for relocated interceptor received. Signature pending clarification/specification approval and CVWD approval. 10/3/03 Sewer inspection observed, 6" SDR 35 PVC constructed to street tie in. Sewer clean-outs to be observed at structure final. 10/8/03 Sand-Oil Interceptor inspection observed. CVWD corrections observed i.e. sample box, trap and clean-out. Interceptor vent reconstructed of 2" schedule 40 PVC, RFI from Jerrin in process per superintendent. Bond Beam observed at; hose reel, BBQ's, trash enclosure and CVWD well site T.O. 10/16/03 Structural observation walk with Engineer of Record performed. Structure has not been scheduled for inspection to date to observed roof, wrap or frame. French drain system observed at hose reel block wall. 10/28/03 Waste vent and roof drain.top out water test observed on south building wing. 10/29/03 Partial roof nail observed at south lower and upper-roof. Anchor bolt inspection performed, areas were noted and identified for correction. 10/31/03 Partial water service & storm drain inspection observed. Water service at 90 lbs to be re-tested at completion of installation. 11/3/03 Anchor bolt epoxy, Hilti 150's with a minimum 2.5" embedment, observed through out structure. 11/7/03 Partial roof nail observed at north lower and upper roof. 11/13/03 Roof vent water top-out observed at north structure wing. Progressive frame combination inspection observed at south structure wing. Ok to insulate with noted corrections to address prior to covering up. Progressive ok to wrap inspection observed at south structure wing. Ok to wrap south wing structure with noted correction to address prior to covering up. 11/14/03 Partial underground gas line and test observed at north BBQ to main. Partial underground water service observed through out on-site. Partial Storm Drain with catch basin observed on-site north end. 11/20/03 Ok to Wrap.re-inspection performed on north structure wing. Corrections were partially addressed. Ok to wrap bottom portion of structure for veneer construction. A re-inspection is required for Ok to Wrap signature. 11/21/03 Roof drains test observed at north structure low roof area. Insulation pre- lim observed at laundry double shear wall.' 12/1/03 Frame combination inspection observed by Senior Inspector Kirkland. Additionally epoxy observation was conducted for wall hanger. 12/2/03 Veneer 24" o.c. horizontal with #2 steel w/heavy ties shot into walls observed by Inspector Traxel. 12/8/03 Insulation (R-19 wall, R-30 ceiling) inspection observed at south structure wing. Ok to hang drywall. 12/12/03 Drywall Nail inspection observed at south structure wing. Ok to tape. 12/24/03 Roof Nail inspection observed at apparatus bay. 1/6/04 Partial framing inspection at apparatus bay observed by Inspector Steve Traxel. 1/7/04 Framing re -inspection at structure north wing observed by Inspector Steve Traxel. Plumbing under test and approved, electrical completed. Ok to insulate north wing walls. 1/9/04 Steve Traxel reported, gates locked no one on site to facilitate requested inspection (PM). 1/14/04 RFI 89 correction observed. 5/8" dia. lag bolts @ 16" o.c. constructed at 6 x 10 skylight curb. 1/16/04 Wall and ceiling insulation observed at south building structure. Water pressure for building is under test at 150 psi. 1/21/04 Fire Department Inspector Terry DeSoucy observed rough fire sprinkler and hydro inspection for south building structure. 1/26/04 Underground electrical conduit observed at two locations onsite, underground electrical conduit from generator to electrical room and underground electrical conduit at apparatus bay. Ok to back fill. 1/27/04 Drywall nail inspection observed at north building, ok to tape. Lath inspection observed. Corrections noted: 1) fix edge metal reveals at all windows for flush consistence. 2) remove hilti pin plastic heads and drive all hilti pins for full penetration. Partial lath approved for scratch with above corrections pending inspection signature. 1/28/04 Lath inspection observed. Corrections noted 1/27 have been addressed. Ok to plaster. 2/2/04 Partial inspection performed, six (6) flag pole footing's observed for covered parking structure. Templates were incomplete at time of inspection. Deputy inspector noted for 3000 PSI footing foundation. 2/3/04 Interior Lath inspection observed at three (3) bathroom shower compartments. Ok to scratch. 2/5/04 Fire Department Inspector Niel Stephens observed rough fire sprinkler and hydro inspection apparatus bay. Corrections were note, hydro only approved. 2/6/04 Apparatus bay rough electrical and rough plumbing observed. Noting 1/6/04 framing inspection by Steve Traxel, ok to insulate apparatus bay. 2/10/04 Partial hose reel stem wall inspection observed. Drainage not in place at time of inspection. Conditional approval to pour with approved hose reel drainage construction and deputy inspection sampling for 3000 psi concrete. 2/18/04 Drywall nail inspection observed at apparatus bay. Ok to tape. 2/19/04 Electrical meter released. -Switch gear was locked out with a master lock at the main breaker. Electrical room is locked with key custody limited to Electrician, Site Superintendent'and Project Building Inspector. Mary at IID was notified to release meter. 2/20/04 Seven (7) light standard footing and electrical conduit/ground inspection observed. Ok to pour concrete. 2/27/04 T -Bar inspection called in, arrived on site and no foreman was found and T -Bar not completed for inspection. 3/17/04 Final gas test observed. Meter release faxed to Gas Company. Fire Department notified to make application for service, info given to Chief Dorian. 3/19/04 Preliminary apparatus bay slab inspection observed. Corrections noted to be addressed prior to approval to pour. 3/23/04 Apparatus bay slab (partial) inspection observed. Corrections noted 3/19/04 were observed. Epoxy fix for CMU wall & slab reinforcement observed. 3/26/04 Apparatus bay slab (partial) inspection observed. 3/31/04 T -Bar inspection observed at north building. Correction notice issued to construct two t-bar.struts not to exceed 12'-0" o.c. at kitchen hallway prior to installing ceiling tile. 4/1/04 Carport metal roof deck screw inspection observed. 4/5/04 Dry pack inspection observed at steel post columns at parking structure. A portion of driveway concrete slab was observed -with revised construction joint detail prior to the placement of concrete. 4/6/04 Progressive site concrete driveway observations performed. 4/7/04 Progressive site concrete driveway observations performed. 4/8/04 Progressive site concrete driveway observations performed. 4/12/04 Progressive site concrete driveway observations performed. 4/14/04 Progressive site concrete driveway observations performed. Gate & wrought iron fencing footings observed at north building. 4/16/04 Progressive site concrete driveway observed at CVWD well site. Monument sign footing observed. 4/23/04 Monument sign poured in place concrete stem wall observed. 5/4/04 Final building inspection walk performed with correction's issued. The building was not ready for final inspection, however the inspection was performed to align with the owner walk for punch list pick up items. 5/7/04 Temporary Certificate of Occupancy issued. 9/9/04 Quake Guard seismic warning system installation and test observed. 9/14/04 Final Building re -inspection performed for final project acceptance. Corrections issued 5/4/04 were observed as incomplete. Correction list revised. to reflect work pending.to approve project. 9/16/04 Final Building inspection meeting. Correction notice delivered to DKS. 10/28/04 Notice of Completion Recorded. Respectfully Submitted, Daniel P. Crawford Jr. Building Inspector II 44555 Adams St 1111111111111111111111103 Certificate of Occupancy Building & Safety Department This Certificate is issued pursuant to the requirements of Section 109 of the California Building Code, certifying that, at the time of issuance, this structure was in compliance with the provisions of the Building Code and the various ordinances of the City regulating building construction and/or use. Temporary Certificate of Occupancy BUILDING ADDRESS: 44-555 Adams Street Use classification: Commercial (La Quinta Fire Station #93) Occupancy Group: B Owner of Building: City of La Quinta Type of Construction: VN Sprinkled Building Permit No.: 0303-313 Land Use Zone: RL Address: 78-495 Calle Tampico 30 Day Temporary Occupancy, refer to attached Correction Notice City, ST, ZIP: La Quinta, CA 92253 By: Daniel P. Crawford Jr. Date: Expires 6/8/04 Building Official COPY POST IN A CONSPIC Final Building Inspection Permit #0303-313 .Daniel P. Crawford Jr. .Building Inspector II La QU'inta Fire Station 93 Final Building Inspection Correction Notice 44-555 Adams Street EZ Contractor Ll Construction Manager R1 Architect DKS Const.& Eng. David Evans & Assoc. WLC Architects, INC. 9321 Irvine Boulevard 77-682 Country Club Dr. 10470 Foothill Blvd. Irvine, CA 92618 Palm Desert, CA 92211 Rancho Cucamonga, CA On 5/4/04 a final building inspection was performed with the following corrections noted for Building Final and the issuance of Certificate of Occupancy. Please note that this correction list may be correlated with the Owner/Architect project acceptance punch list, however this document stands as an official Building Department correction notice to obtain minimum building code compliance issued by the Project Inspector of record. It is the responsibility of the General Contractor, DKS Construction & Engineering, to correct and schedule the building f nal re -inspections with the Project Inspector of record prior to the issuance of the Certificate of Occupancy. and should not to infer the Certificate of Occupancy issuance as final project acceptance. 1. Mansard ridge improperly counter flashed on both south and north mansard roofs. Mansard ridge condition is not consistent with details 12 & 16 sheet A8.2. Obtain RFI from architect to correctly constructed counter flashing at the mansard ridge. Properly construct counter flashed mansard ridge. 2. Complete mansard ridge tile cap at both south and north building lower roofs. Ridge cap file was found to be unsecured in many locations. 3. Label all mechanical equipment and it's associated disconnect on north and south mansard roofs. All equipment. shall be coordinated with sub -panel breakers. 4. Exhaust fan shrouds were found to be damaged from construction use as ladders. Replace fan shrouds on both north and south mansard equipment roofs. .5. Properly construct electrical connections to exhaust fans on both north and south mansard roofs. Metallic liquid tight was observed constructed under exhaust fan shrouds, with the exhaust fan shrouds bent and crunched to allow metallic liquid tight installations. Do not bend, -crunch or alter listed appliances for electrical connections unless listed and approved by the manufacture. 6. Properly flash roof jack and mechanical refrigeration line sets at south equipment installation. The roof jack and line sets were found incomplete, roof improperly flashed. 7. South mansard roof drains are improperly constructed. The main drain is not constructed at the lowest point of the roof and the roof is not constructed to direct the drainage to the main drain. The roof as observed will accumulate ponding water. Reconstruct roof to drain to main drain. Provide a hose to flood roof to test roof drains at re -inspection. 8: Secure exhaust fan installation to curb. Fan is sitting on curb with out fasteners at the fan base on the south mansard roof. 9. Cut rebar at south roof access and construct access panel door per plans and specifications. Access panel was not identified by contractor prior to final inspection. 10. Replace damaged air conditioning unit constructed on south mansard roof. No. damaged mechanical equipment installations are acceptable. 11. Construct fixed ladder to mechanical•roof mounted equipment at south roof in custodial room 115 per approved plans and specifications. 12. Properly seal all.future conduit. termination on south mansard roof. 13. North mansard roof drains are improperly constructed. Secondary drain- is not constructed for minimum 2" height above the lowest point of the roof. Both drains are constructed as� main drains. Test the roof for proper fall to identify main drain. Provide a hose io flood roof to test roof drains at re -inspection. 14. Two (2) swamp coolers were found to be improperly installed on north mansard roof. Both units are not securely fastened to its platform. One swamp cooler is sitting on untreated 4x4's. One swamp cooler is incomplete in,components required by the fire station specifications. Units are not identified to provide specific unit identification for this correction. 15. Construct fixed ladder to mechanical roof mounted equipment at north roof in apparatus bay per approved plans and specifications. 16. Mechanical equipment and/or duct work shall not be visible to the public. Request an RFI from WLC to identify method of screening, i.e. painting and color at duct work constructed above the north mansard roof. 17. Properly construct range exhaust hood termination at north mansard roof to terminate 10' away from air intake or construct termination 3' above air intake within 10'. 18. Properly seal all future conduit termination on north mansard roof. 19. Construct building address. Monument sign is incomplete. 20. Construct accessible site entrance signage. 21. Construct accessible entrance door signage at room 100 door # 1. 22. Construct accessible door and wall mounted uni-sex toilet facility signage at room 104 door #2 per approved plans and specifications. 23. Construct approved long neck wrap at sink waste line in room 104 uni=sex toilet facilities. 24. Properly construct finish plate under sink at the waste line in uni-sex toilet facility room 104. 25. Construct .light fixture in closet room 106. If light fixture is not available, wire nut electrical wires and construct a plate cover at the electrical box. 26. Construct proper fire riser door signage at door # 16 Room 110. 27. Complete wire flow switch and install a plate at the flow switch junction box in room 110. 28. Complete floor drain construction in room 110. 29. Complete drywall repair at ceiling in room 110. 30. Complete floor sink in room 111. Remove all construction debris. 31. Construct attic access panel at apparatus bay exterior soffit. (reported missing) 32. Construct apparatus bay fixed ladder and landing at storage room 135 per approved plans and specifications. 33. Strap all armor cable conduit at apparatus bay garage door opener sensors constructed in room 112. 34. Construct accessible threshold at apparatus bay room 112 door #3. . 35. Address over sized CMU cut outs for electrical receptacles constructed in apparatus bay room 112. Properly correct in a good workmanship like manner. 36. Tighten epoxyed bolt nuts at post cap in storage�room 135, apparatus attic storage. ...37. Complete drywall repairs at electrical in storage room 135, apparatus attic storage. 38. Construct electrical plate cover at ceiling junction box room 135; apparatus attic storage. 39. Complete counter tops in shop room 122. Construct power strip per plans and specifications to complete electrical at shop counter. 40. Construct approved shower enclosure at room 114. Shower walls shall have a smooth, hard non-absorbent surface of Portland cement, concrete, ceramic tile or other smooth, hard nonabsorbent surface to a height of 70 inches above the drain inlet. Submit a RFI request to WLC prior to any construction. to correct shower. Green board alone constructed in this area does not satisfy the minimum building code requirements. 41. Screens shall not be installed at clothes dryers duct terminations (CMC 504.3.1). Architect identified the duct termination was not consistent with approved Plans and specification. Reconstruct approved dryer vent termination. 42. Exercise room 118 egress hardware incomplete at exterior door #8 43. Construct door hardware in exercise room 118 at interior door #29. 44. Complete glass panelconstruction in exercise room 118. Missing screws and glass panel edge plates. 45. Construct water heater. low combustion air within 12" of the floor in custodial .room 115. Properly construct the low combustion air as discussed behind door #115 so it clears the door. hardware and allows door to fully open. 46. Construct hardware at egress door #35 in dormitory room 130. 47. Construct hardware at egress door #36 in dormitory room 131. 48. Construct hardware at egress door #37 in dormitory room 132. 49. Construct hardware at egress door #38 in dormitory room 133. 50. Complete door hardware at door #11 in hallway room 121. 5.1. Kitchen island circuit was not operational to test GFI circuits in room 127. 52. Garbage disposal at island sink had no power to test in room 127. $3. Garbage disposal at.kitchen sink (second disposal) had no power to test in room 127. Additionally sink was found to be damaged with a dent in the front right corner. 54. Island electrical receptacle has been relocated due to the proximity of the island sink constructed. Properly correct cabinet at abandoned receptacle opening. .55. Construct approved long neck wrap at sink waste line in room 124 accessible toilet facilities. 56. Complete grab bar construction on compartment side wall at toilet in room 124. Ensure grab bar is constructed so it extends 24" beyond the face of toilet. 57. Two (2) exterior receptacles at the exterior kitchen pass thru window/BBQ area were tested and found to not be GFI protected. GFI protect receptacles and properly weather proof outlet boxes constructed in CMU wall. 58. Complete light standard fixture at BBQ. 59. Install BBQ patio ceiling Fan. Coordinate fixture specifications with WLC prior to installation. If fixture is not identified for installation, wire nut wires and install water proof plate cover at receptacle. 60. Complete parking lot stripping. This includes accessible parking, aisle and signage per the approved plans and specifications. 61. Construct Quake Guard System per approved Plans and specifications. 62. Complete site fence and gate construction including the proper removal of rust, priming and painting. 63. Electrical room was incomplete. Complete electrical work and remove construction debris. Properly identify and label electrical room door #2 at room 109. Complete permanent sub-panef labeling. 64. Landscaping was incomplete. Complete fire station site and Adams Street landscaping. 65. Finish Grade is not established. Adams street finish grade behind side walk is not established. Fire Stations site incomplete with landscaping in progress to evaluate. 66. Park landscaping has not been repaired from the accident reported during RG concrete's excavation of north property CMU retaining wall. 67. Compete church.property parking lot repairs. Repairs were identified and reported to Toureef Nashashibi, DKS Project Manager. It is highly suggested after repairs are complete to walk- site with the Church representative and receive written evidence of acceptance for permanent file should any claim or request for corrections be made in the future. 68. Provide written evidence for the sealing of the graded church retention basin and associated property identified in the approved plans and specifications. Provide a receipt from the contractor sealing the sight. The receipt shall include the type of chemical sealant and quantity used. 69. Provide written evidence of Community Development Department final approval for this Project. Contact Community Development Department directly at (760) 777-7125 to schedule a final inspection. Community Development Department' sign off will be found at the. bottom of the fire station job card issued by the Building Department. 70. Provide written evidence of Public Works Department approval for this Project. Contact the Public Works Department directly at (760) 777-7075 to schedule a final inspection. Public Works Department sign off will be found at the bottom of the fire station job card issued by the. Building Department. .71. Provide written evidence of Riverside County Fire Department life safety and occupancy approval for this project. Contact Riverside County Fire Department : directly at (760) 863-8886. A letter from the Riverside County Fire Department approving the building life safety and occupancy shall be required prior to the issuance of building final and certificate of occupancy. Daily Inspection Log Permit #0303-313 Daniel P. Crawford Jr. Building Inspector II La Quinta FireStation 93 44-555 Adams Street Date Inspection 4/21%03 Temporary Power 4/29/03 Ground Plumbing — Partial ground waste stub at apparatus bay observed Stand Pipe — 200 psi observed for 2 hours @ fire station stand pipe 4/30/03 Footing — apparatus bay footing's and stem wall construction observed. Pour started late 11:00 am. Afternoon observation noted 90+ yards poured and contractor would not complete pour today. RFI and cold joint detail was faxed from project engineer for compliance. 5/1/03 .Footing — apparatus bay footing cold joint observed prior to footing pour completion scheduled for 9:30 am. -Prior to pour RC.was directed to clean loose concrete debris and chip footing for key way compliance: Results Were rough. 5/2/03 Temporary Power — temporary power pole relocated, re -inspected and IID called for meter release. 5/14/03 Wall Footing = Detail S-4 addendum #3 schedule `b' observed at west property line garden block wall construction. Detail S-4 addendum #3 schedule `c' observed at North West property line garden block wall construction. Storm Drain — storm drain construction observed per section b -b sheet C4 & C5. Perforation detail RFI (3/8" holes @ 8" o.c.) observed. 5/15/03 Ground Plumbing -partial ground waste lines observed at'living quarters. 5/20/03. Underground TV & Telephone conduit. Observed 2" schedule 80 television conduits and 3" schedule 40 telephone underground conduits @ communication room. Branch circuit %" underground conduit'constructed is in question for approved schedule. Schedule 40 constructed and schedule 80 is noted in specification booklet (16000 section 3.46) and building Plan Electrical Design Criteria sheet E-1.0 5/21/03 Ground Plumbing — Partial ground waste observed at office bathroom. Building ground waste system .completed. 5/29/03 On-site Sewer — partial on-site sewer lines observed, 6" SDR 35 PVC 5/30/03 Ground Plumbing — observed apparatus floor drain & vent system. On-site Sewer — partial on-site sewer lines observed, 6" SDR 35 PVC . 6/3/03 Underground TV.& Tel conduit observed by Steve Traxel. 6/10/03 Bond Beam — partial north and west property garden block wall bond beam observed. . '6/17/03 Footing — footings observed at living quarters and administration building -areas. Hold down RFI pending for SSTB HD's vs. all thread hold downs called out. 2pm inspection scheduled to observe all hold downs prior to Thursday pour scheduled. 6/18/03. Hold down inspection observed, ok to pour footings. L 6/24/03 Slab — slab grade and re' -enforcement observed at living quarters and administration building areas. Pour scheduled for 6/25/03. Deputy inspector scheduled to sample and observed pour. 6/25/03 Footing inspection observed at north property line for garden block wall. Details S-1 & S-4 addendums were observed with pending corrections required to be addressed prior to pour. Re -inspection scheduled for 6/26/03. 6/26/03 Footing inspection observed corrections addressed 6/25 at detail S-4, ok to pour. Deputy inspector on site reviewing footings. Pour scheduled for 6/27/03. 6/30/03 Partial bond beam observed. Deputy inspector on site for CMU placement. Observed first portion of high lift at approx 5' for horizontal and vertical reinforcement. Progress continues. 7/21/03 Bond Beam observed at high lift's (8" CMU @ 12' & 12" CMU @ 14') for grout. Ok to grout. 8/4/03 CMU site wall footing inspection observed at north property and well site south, east &. west combination retaining/garden block walls. (2701f) 8/8/03 Bond beam top out at apparatus bay observed by Senior Inspector Kirk Kirkland.. 8/14/03 Canopy footing observed by Senior Inspector Kirk Kirkland. 8/26/03 Site (partial) CMU combination wall bond beam obseryed @ north T property line. 8/27/03 Site (partial) CMU combination wall bond beam observed @ well site, ok to grout. 9/8/03 Site (partial) `French Drain System' and CMU water proofing observed at north/west retaining wall corner for =/- 40 If. An approved detail for French Drain installation is pending. Sub -contractor was advised to install the. French Drain, drainage holes face -down vs. as installed face -up position. Architect, Jerrin, on site to confirm proper installation during bi- weekly site visit. 9/9/03 Partial French drain system observed (1801f, including water proofing system) at the north and east well site retaining wall. The south east return was constructed for 121f. It is my understanding that 201f has been contracted for per a prior RFI, this area was instructed to remain open until resolved.. 9/10/03 Partial French drain system observed. French drainage system and waterproofing is complete for the well site, east planter and north property line. 9/23/03 Partial CMU site wall inspection observed. RFI from architect requested to verify revised faxed 8" x 11 omitting transformer enclosure. Footing's observed were addendum #3 detail S-4 for site wall and detail 21 sheet 58.3 for generator enclosure area. 9/26/03 Footing inspection observed at trash enclosure detail addendum 3, S-2, correction noted to add two (2). continuous #4's at the top of footing per detail. BBQ & wall footing per I I/A1.2 &.4/S7.1 observed at two T., locations. Hose reel footing addendum 3, S-3 observed,'correction noted to add two (2) continuous #4's at the top of footing per detail.- Ok to pour concrete. 9/30/03 Sand -Oil Interceptor inspection observed. Correction notice issued for clarification of construction specifications for sand -oil interceptor (SI -1). Detail 4/P-3.1 refers to cast iron clean out riser with sewer pipe (typical). Fire Station specification section 02530 Sanitary Sewerage notes PVC pipe as typical sewer pipe. Notice included an RFI for CVWD sample box, noted by CVWD as a requirement prior to approval. RFI for relocated interceptor received. .Signature pending clarification/specification approval and CVWD approval. 10/3/03 Sewer inspection observed, 6" SDR 35 PVC constructed to street tie in. Sewer clean -outs to be observed at structure final. 10/8/03 Sand -Oil Interceptor inspection observed. CV WD corrections observed i.e. sample box, trap and clean-out. Interceptor vent reconstructed of 2" schedule 40 PVC, RFI. from Jerrin in process per superintendent. Bond Beam observed at; hose reel,'BBQ's, trash enclosure and CVWD well site T.O. 10/16/03 Structural observation walk with Engineer of Record performed. Structure . has notbeen scheduled for inspection to date to observed roof, wrap or frame. French drain system observed at hose reel block wall. .10/28/03 Waste vent and roof drain top out water test observed on south building wing. 10/29/03 Partial roof nail observed at south lower and upper roof. Anchor bolt inspection performed, areas were noted and identified for correction. 10/31/03 Partial water service & storm drain inspection observed. Water service at 90 lbs to be re -tested at completion of installation. 11/3/03 Anchor bolt epoxy, Hilti 150's with a minimum 2.5" embedment, observed through out structure. 11/7/03 Partial roof nail observed at north lower and upper roof. 11/13/03 Roof vent water top -out observed. at north structure wing. Progressive frame combination inspection observed at south structure wing. Ok to insulate with noted corrections to address prior to covering.up. Progressive ok to wrap inspection observed at south structure wing. Ok to wrap south' wing structure with noted correction to address prior to covering up. 11/14/03 Partial underground gas line and test observed at north BBQ to main. Partial underground water service observed through out on-site. Partial Storm Drain with catch basin observed on-site north end. 11/20/03 Ok to Wrap re -inspection performed on north structure wing. Corrections Were partially addressed. Ok to wrap bottom portion of structure for veneer construction. A re -inspection is required for Ok to Wrap signature. 11/21/03 Roof drains test observed at north structure low roof area. Insulation pre- lim observed at laundry double shear wall.' 12/1/03 Frame combination inspection observed by Senior Inspector Kirkland. Additionally epoxy observation was conducted for wall hanger. T: 12/2/03 Veneer 24" o.c. horizontal with #2 steel w/heavy ties shot into walls observed by Inspector Traxel. 12/8/03 Insulation (R-19 wall, R-30 ceiling) inspection observed at south structure wing. Ok to hang drywall. 12/12/03 Drywall Nail inspection observed at south structure wing. Ok to tape. 12/24/03 Roof Nail inspection observed at apparatus bay.. 1/6/04. Partial framing inspection at apparatus bay observed by Inspector Steve Traxel. 1/7/04 Framing re -inspection at structure north wing observed by Inspector Steve Traxel. Plumbing under test and approved, electrical completed. Ok to insulate north wing walls. 1/9/04 Steve.Traxel reported, gates locked no one onsite to facilitate requested inspection (PM). 1/14/04 RFI 89 correction observed. 5/8" dia. lag bolts @ 16" o.c. constructed at 6 x 10 skylight curb. 1/16/04 Wall and ceiling insulation observed at south building structure. Water pressure for building is under test at 150 psi. 1/21/04 Fire Department Inspector Terry DeSoucy observed rough fire sprinkler and hydro inspection for south building structure. 1/26/04 Underground electrical conduit observed at two locations onsite, underground electrical conduit from generator to electrical room and underground electrical conduit at apparatus bay. Ok to back fill. 1/27/04 Drywall nail inspection observed at north building, ok to tape. Lath inspection observed.. Corrections noted: 1) fix edge metal reveals at all windows for flush consistence: 2) remove hilti pin plastic heads and drive all hilti pins for full penetration. Partial lath approved for scratch with above corrections pending inspection signature. 1/28/04 Lath. inspection observed. Corrections noted 1/27 have been addressed. Ok to plaster. 2/2/04 Partial inspection performed, six (6) flag pole footing's observed for covered parking structure.. Templates were incomplete at time of inspection. Deputy inspector noted for 3000 PSI footing foundation. 2/3/04 Interior Lath inspection observed at three (3)'bathroom shower compartments. Ok to scratch. 2/5/04 Fire Department Inspector Niel Stephens observed rough fire sprinkler and hydro inspection apparatus bay. Corrections were note, hydro only- approved. nlyapproved. 2/6/04 Apparatus bay rough electrical and rough plumbing observed. Noting _ 1/6/04 framing inspection by Steve Traxel, ok to insulate apparatus bay. 2/10/04 Partial hose reel stem wall inspection observed. Drainage not in place at - time of inspection. Conditional approval to pour with approved hose reel drainage construction and deputy inspection sampling for 3000 psi concrete. 2/18/04 Drywall nail inspection observed at apparatus bay. Ok to tape. 2/19/04 Electrical meter released. Switch gear was locked out with a master lock at the main breaker. Electrical room is. locked with key custody limited to Iq .Electrician, Site Superintendent and Project Building Inspector. Mary at IID was notified to release meter. 2/20/04 Seven (7) light standard footing and electrical conduit/ground inspection observed. Ok to pour concrete. 2/27/04 T -Bar inspection called in, arrived on site and no foreman was found and T -Bar not completed for inspection. 3/17/04 Final gas test observed. Meter release faxed to Gas Company. Fire Department notified to make application for service, info given ,to Chief Dorian. 3/19/04 Preliminary apparatus bay slab inspection observed. Corrections noted to be addressed prior to approval to pour. 3/23/04 Apparatus bay slab (partial) inspection observed. Corrections noted 3/19/04 were observed. Epoxy fix for CMU wall & slab reinforcement observed. 3/26/04 Apparatus bay slab (partial) inspection observed. 3/31/04 T -Bar inspection observed at north building. Correction notice issued to construct two t -bar struts not to exceed 12'-0" o. c. at kitchen hallway prior to installing ceiling tile. 4/1/04 Carport metal roof deck screw inspection observed. 4/5/04 Dry pack inspection observed at steel post columns at parking structure. A portion of driveway concrete slab was observed with revised construction' joint detail prior to the placement of concrete. 4/6/04 Progressive site concrete driveway observations performed. 4/7/04 Progressive site concrete driveway observations performed. 4/8/04 Progressive site concrete driveway observations performed. 4/1.2/04 Progressive site concrete. driveway observations performed. 4/14/04 Progressive site concrete driveway observations performed.. Gate & wrought iron fencing footings observed at north building. 4/16/04 Progressive site concrete driveway observed at CVWD well site. Monument sign footing observed. 4/23/04 Monument sign poured in place concrete stem wall observed. 5/4/04 Final building inspection walk performed with correction's issued. The building was not ready for final inspection,. however the inspection was performed to align with the owner walk for punch list pickup items. 5/7/04 Temporary Certificate of Occupancy issued. P.O. Box 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 March 6, 2003 Mr. Greg M. Chandra SOUTHLAND GEOTECHNICAL 79-607 Country Club Dr., #5 Bermuda Dunes, CA 92201 Dear Mr. Chandra: 04 1E (7 6 0) 777-7000 FAX (760) 777-7101 Please find enclosed a fully executed Agreement by and between the City of La Quinta. and Southland Geotechnical for Professional Testing and Inspection for the City of La Quinta Third Fire Station, Project No. 2001-14. Should you have any questions, please contact Tom Hartung at (760) 777-7013. Sincerely, JUNE S. GREEK, CMC, City Clerk City of La Quinta, California enclosure xc: Tom Hartung, Building & Safety Director mro, M 19 • 9. PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT FOR CONTRACT SERVICES (the "Agreement") is made and entered into by and between the CITY OF LA QUINTA, ("City"), a California municipal corporation, and Southland Geotechnical ("Consultant"). The parties hereto agree as follows: 1.0 SERVICES OF CONSULTANT 1.1 ScoRP of Services. In compliance with all terms and conditions of this Agreement, Consultant shall provide those services related to Professional Testing and Inspection Services for the City of La Quinta Third Fire Station, Project 2001-14 as specified in the "Scope of Services" attached hereto as Exhibit "A" and incorporated herein by this reference (the "services" or "work"). Consultant warrants that all services will be performed in a competent, professional and satisfactory manner in accordance with the standards prevalent in the industry for such services. 1.2 Compliance with Law. All services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, regulations and laws of the City of La Quinta and any Federal, State or local governmental agency of competent jurisdiction. 1.3 Licenses, Permits. Fees and Assessments. Except as otherwise specified herein, Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the performance of the services required by this Agreement. 1.4 Familiarity with Work. By executing this Agreement, Consultant warrants that (a) it has thoroughly investigated and considered the work to be performed, (b) it has investigated the site of the work and fully acquainted itself with the conditions there existing, (c) it has carefully considered how the work should be performed, and (d) it fully understands the. facilities, difficulties and restrictions attending performance of the work under this Agreement. Should Consultant discover any latent or unknown conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City of such fact and shall not proceed except at Consultant's risk until written instructions are received from the Contract Officer (as defined in Section 4.2 hereof). 1.5 Care of Work. Consultant shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work performed by Consultant, and the equipment, materials, papers and other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City's own negligence. The performance of services by Consultant shall not relieve Consultant from -any obligation to correct any incomplete, inaccurate or defective work at no further cost to City, when,such inaccuracies are due to the negligence of Consultant. 1.6 Additional Services. In accordance with the terms and conditions of this Agreement, Consultant shall perform services in addition to those specified in the Scope of Services when directed to do so by the Contract Officer, provided that Consultant shall not be required to perform any additional services without compensation. Any addition in compensation not exceeding five percent (5%) of the Contract Sum may be approved by the Contract Officer. Any greater increase must be approved by the City Council. G:\FireTSAfirestationtesting. wpd 1. 1.7 Soecial Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in Exhibit "D" (the "Special Requirements"). In the event of a conflict between the provisions of the Special Requirements and any other provisions of this Agreement, the provisions of the Special Requirements shall govern. 2.0 COMPENSATION 2.1 Contract Sum. For the services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with Exhibit "B" (the "Schedule of Compensation") in a total amount not to exceed Twenty Six thousand, eight hundred and eighteen Dollars ($26,818.00 1 (the "Contract Sum"), except as provided in Section 1.6. The method of compensation set forth in the Schedule of Compensation may include a lump sum payment upon completion, payment in accordance with the percentage of completion of the services, payment for time and materials based upon Consultant's rate schedule, but not exceeding the Contract Sum, or such other methods as may be specified in the Schedule of Compensation. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, transportation expense, telephone expense, and similar costs and expenses when and if specified in the Schedule of Compensation. 2.2 Method of Payment. Any month in which Consultant wishes to receive payment, Consultant shall submit to City no later than the tenth (10th) working day of such month, in the form approved by City's Finance Director, an invoice for services rendered prior to the date of the invoice. Such invoice shall (1) describe in detail the services provided, including time and materials, and (2) specify each staff member who has provided services and the number of hours assigned to each such staff member. Such invoice shall contain a certification by a principal member of Consultant specifying that the payment requested is for work performed in accordance with the terms of this Agreement. City will pay Consultant for all expenses stated thereon which are approved by City pursuant to this Agreement no later than the last working day of the month. 3.0 PERFORMANCE SCHEDULE 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. 3.2 Schedule of Performance. All services rendered pursuant to this Agreement shall be performed diligently and within the time period established in Exhibit "C" (the "Schedule of Performance"). Extensions to the time period specified in the Schedule of Performance may be approved in writing by the Contract Officer. 3.3 Force Majeure. The time period specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Consultant, including, but not restricted to, acts of God or of the public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, acts of any governmental agency other than City, and unusually severe weather, if Consultant shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the forced delay when and if in his or her judgement such delay is justified, and the Contract Officer's determination shall be final and conclusive upon the parties to this Agreement. 3.4 Term. Unless earlier terminated in accordance with Sections 7.7 or 7.8 of this Agreement, this Agreement shall continue in full force and effect until completion of the services, except as otherwise provided in the Schedule of Performance. G:\Fire\PSAfirestationtesting.wpd 2 4.0 COORDINATION OF WORK 4.1 Representative of Consultant. The following principals of Consultant are hereby designated as being the principals and representatives of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith: a. Greg M. Chandra, P.E. b. Anthony Colarossi, RCE It is expressly understood that the experience, knowledge, capability, and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. The foregoing principals may not be changed by Consultant and no other personnel may be assigned to perform the service required hereunder without the express written approval of City. 4.2 Contract Officer. The Contract Officer shall be Tom Hartung, Director of Building Safety, or such other person as may be designated by the City Manager of City. It shall be Consultant's responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. 4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for City to enter into this Agreement. Except as set forth in this Agreement, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of City. In addition, neither this Agreement nor any interest herein may be assigned or transferred, voluntarily or by operation of law, without the prior written approval of City. 4.4 Independent Contractor. Neither City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees, perform the services required herein, except as otherwise set forth. Consultant shall perform all services required herein as an independent 'contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. 4.5 City Cooperation. City shall provide Consultant with any plans, publications, reports, statistics, records or other data or information pertinent to services to be performed hereunder which are reasonably available to Consultant only from or through action by City. 5.0 INSURANCE, INDEMNIFICATION AND BONDS. 5.1 Insurance. Consultant shall procure and maintain, at its cost, and submit concurrently with its execution of this Agreement, personal and public liability and property damage insurance against all claims for injuries against persons or damages to property resulting from Consultant's acts or omissions rising out of or related to Consultant's performance under this Agreement. The insurance policy shall contain a severability of interest clause providing that the coverage shall be primary for losses arising out of Consultant's performance hereunder and neither City nor its . G:\Fire\PSAfirestationtesting.wpd 3 insurers shall be required to contribute to any such loss. A certificate evidencing the foregoing and naming City and its officers and employees as additional insured shall be delivered to and approved by City prior to commencement of the services hereunder. The amount of insurance required hereunder shall be determined by the Contract Sum in accordance with the following table: Contract Sum Personal Injury/Property Damage Coverage Less than $50,000 $100,000 per individual; $300,000 per occurrence $50,000 - $300,000 $250,000 per individual; $500,000 per occurrence Over $300,000 $500,000 per individual; $1,000,000 per occurrence Consultant shall carry automobile liability insurance of $1,000,000 per accident against all claims for injuries against persons or damages to property arising out of the use of any automobile by Consultant, its officers, any person directly or indirectly employed by Consultant, any subcontractor or agent, or anyone for whose acts any of them may be liable, arising directly or indirectly out of or related to Consultant's performance under this Agreement. The term "automobile" includes, but is not limited to, a land motor vehicle, trailer or semi -trailer designed for travel on public roads. The automobile insurance policy shall contain a severability of interest clause providing that coverage shall be primary for losses arising out of Consultant's performance hereunder and neither City nor its insurers shall be required to contribute to such loss. A certificate evidencing the foregoing and naming City and its officers and employees as additional insured shall be delivered to and approved by City prior to. commencement of the services hereunder. Consultant shall carry Workers' Compensation Insurance in accordance with State Worker's Compensation laws. Consultant shall procure professional errors and omissions liability insurance in an amount acceptable to City. All insurance required by this Section shall be kept in effect during the term of this Agreement and shall not be cancelable without thirty (30) days written notice to City of proposed cancellation. The procuring of such insurance or the delivery of policies or certificates evidencing the same shall not be construed as a limitation of Consultant's obligation to indemnify City, its officers, employees, contractors, subcontractors, or agents. 5.2 Indemnification. The Consultant shall defend, indemnify and hold harmless the City, its officers, officials, employees, representatives and agents, "City indemnitees," from and against any and all actions, suits, proceedings, claims, demands, losses, costs, and expenses, including legal costs and attorneys' fees, for injury to or death of person(s), for damage to property (including property owned by the City) ("claims") and for errors and omissions committed by Consultant, its officers, anyone directly or indirectly employed by Consultant, any subcontractor, and agents or anyone for whose acts any of them may be liable, arising directly or indirectly out of or related to Consultant's performance under this Agreement, except to the extent of such loss as may be caused by City's own active negligence, sole negligence or willful misconduct, or that of its officers or employees. In the event the City indemnitees are made a party to any action, lawsuit, or other adversarial proceeding in any way involving such Claims, Consultant shall provide a defense to the City indemnitees, or at the City's option, reimburse the City indemnitees their costs of defense, including reasonable attorney's fees, incurred in defense of such claim. In addition consultant shall be obligated to promptly pay any final judgment or portion thereof rendered against the City indemnitees. G:\Fire\PSAfirestationtesting.wpd 4 5.3m i . In addition to any other remedies City may have if' Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: a. Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under this Agreement. b. Order Consultant to stop work under this Agreement and/or withhold any payment(s) which become due to Consultant hereunder until Consultant demonstrates compliance with the requirements hereof. C. Terminate this Agreement. Exercise of any of the above remedies, however, is an alternative to any other remedies City may have. The above remedies are not the exclusive remedies.for Consultant's failure to maintain or secure appropriate policies or endorsements. Nothing herein contained shall be construed as limiting in any way the extent to which Consultant may be held responsible for payments of damages to persons or property resulting from Consultant's or its subcontractors' performance of work under this Agreement. 6.0 RECORDS AND REPORTS. 6.1 Rem. Consultant shall periodically prepare and submit to the Contract Officer such reports concerning Consultant's performance of the services required by this Agreement as the Contract Officer shall require. 6.2 Records. Consultant shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the cost and the performance of such services. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principals. The Contract Officer shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records. 6.3 Ownership of Documents. Originals of all drawings, specifications, reports, records, documents and other materials, whether in hard copy or electronic form, which are prepared by Consultant, its employees, subcontractors and agents in the performance of this Agreement, shall be the property of City and shall be delivered to City upon termination of this Agreement.or upon the earlier request of the Contract Officer, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Consultant shall cause all subcontractors to assign to City any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages suffered thereby. In the event City or any person, firm or corporation authorized by City reuses said documents and materials without written verification. or adaptation by Consultant for the specific purpose intended and causes to be made or makes any changes or alterations in said documents and materials, City hereby releases, discharges, and exonerates Consultant from liability resulting from said change: The provisions of this clause shall survive the completion of this Contract and shall thereafter remain in full force and effect. 6.4 Release of Documents. The drawings, specifications, reports, records, documents and other materials prepared by Consultant in the performance of services under this Agreement shall not be released publicly without the prior written approval of the Contract Officer or as required G:\Fire\PSAfirestationtesting.wpd fl - 5 by law. Consultant shall not disclose to any other entity or person (any information regarding the activities of City, except as required by law or as authorized by City. 7.0 ENFORCEMENT OF AGREEMENT. 7.1 California Law. This Agreement shall be construed and interpreted both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Riverside, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. 7.2 Dislutes. In the event of any dispute arising under this Agreement, the injured party shall notify .the injuring party in writing of its contentions by submitting a claim therefor. The injured party shall continue performing its obligations hereunder so long as the injuring party commences to cure such default within ten (10) days of service of such notice and completes the cure of such default within forty-five (45) days after service of the notice, or such longer period as may be permitted by the Contract Officer; provided that if the default is an immediate danger to the health, safety and general welfare, City may take such immediate action as City deems warranted. Compliance with the provisions of this section shall be a condition precedent to termination of this Agreement for cause and to any legal action, and such compliance shall not be a waiver of any party's right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City's right to terminate this Agreement without cause pursuant to Section 7.8. 7.3 Retention of Funds. City may withhold from any monies payable to Consultant sufficient funds to compensate City for any losses, costs, liabilities, or damages it reasonably believes were suffered by City due to the default of Consultant in the performance of the services required by this Agreement. 7.4 Waive r. No delay or omission in the exercise of any right or remedy of a non defaulting party on any default shall impair such right or remedy or be construed as a waiver. City's consent or approval of any act by Consultant requiring City's consent or approval shall not be deemed to waive or render unnecessary City's consent to or approval of any subsequent act of Consultant. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 7.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, at law or at equity, to cure, correct or remedy any default, to recover damages for any default, to compel. specific performance of this Agreement, to obtain injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. 7.7 Termination Prior To Expiration Of Term. This section shall govern any termination of this Agreement, except as specifically provided in the following Section 7.8 for termination for cause. City reserves the right to terminate this Agreement at any time, with or without cause, upon thirty (30) days' written notice to Consultant. Upon receipt of any notice of termination, Consultant shall immediately cease all services hereunder except such as may be specifically G:\Fire\PSAfirestationtesting.wpd M • 0 approved by the Contract Officer. Consultant shall be entitled to compensation for all services rendered prior to receipt of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. 7.8 Termination For Default of Consultant. If termination is due to the failure of Consultant to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over work. and prosecute the same to completion by contract or otherwise, and Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to Consultant for the purpose of setoff or partial payment of the amounts owed City as previously stated in Section 7.3. 7.9 Attorneys Fees. If either party commences an action against the other party arising out of or in connection with this Agreement, the prevailing party shall be entitled to recover reasonable attorneys' fees and costs of suit from the losing party. 8.0 CITY OFFICERS AND EMPLOYEES: NONDISCRIMINATION. 8.1 Non -liability of City Officers and Employees. No officer or employee of City shall be personally liable to Consultant, or any successor in interest, in the event or any default or breach by City or for any amount which may become due to Consultant or to its successor, or for breach of any obligation of the terms of this Agreement. 8.2 Conflict of Interest. No officer or employee of City shall have any personal interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects his or her personal interest or the interest of any corporation, partnership or association in which she or he is, directly or indirectly, interested, in violation of any State statute or regulation. Consultant warrants that'it has not paid or given and will not pay or give any third party any money or general consideration for obtaining this Agreement. 8.3 Covenant against Discrimination. Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin or ancestry in the performance of this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, national origin or ancestry. 9.0 MISCELLANEOUS PROVISIONS 9.1 Notice. Any notice, demand, request, consent, approval, communication either party desires or is required to give the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail to the address set forth below. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated forty-eight (48) hours from the time of mailing if mailed as provided in this section. To City: CITY OF LA QUINTA Attention: Tom Hartung 78-495 Calle Tampico G:\Fire\PSAfirestationtesting.wpd To Consultant: Southland Geotechnical Attention: Greg M. Chandra 79-607 Country Club Dr. #5 7 La Quinta, California 92253 Bermuda Dunes, California 92201 9.2 Integrated Agreement. This Agreement contains all of the agreements of the parties and all previous understanding, negotiations and agreements are integrated into and superseded by this Agreement. 9.3 Amendment. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing signed by both parties. 9.4 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgement or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder. 9.5 Authority. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below. CITY OF LA QUINTA a California municipal corporation Thomas P. Genovese, City Manager Date ATTEST: 0 Jun reek, City Clerk APPROVED AS TO FORM: Katherine Jenson, Cit Attorney CONSULTANT: South a d Geotechnical By: r �— Name: Title: W -A K—A?-j/O�L Date: SLLt 10 3 G:\Fire\PSAfirestationtesting.wpd 6 Exhibit A Scope of Services City of La Quinta Third Fire Station Testing and Inspection Project No. 2001-14 Services and products to be rendered in performing all work associated with the project shall be in accordance with the Southland Geotechnical Scope of Services attached and made a part of this agreement. 0 Citv of A Ouinta = A&GI Proposal NO: PO 002T SCOPE OF SERVICES Task 1 — Preconstruction Meeting Southland Geotechnical. Inc. project manager will attend the preconstruction conference to review the project schedule and testineAnspection guidelines. We have budgeted for one meeting at the site. Task 2 — Earthwork and Trench Backfill Observation Testing We will provide full time observation and compaction testing during the preparation of the building footprint area. We will also perform part time observation and testing during the preparation of pavement subgrades, placement of aggregate base, asphalt and concrete pavements, and utility trench backfill operations outside the building footprint. Compaction testing will generally be performed as required by the project specifications. Our personnel will sample on-site and imported materials for transportation to our laboratory for appropriate testing. Tack 3 — Concrete Observation and Testing We will provide an ICBO-certified inspector to observe and sample concrete during placement. Our field services will include observation and verification of reinforcing steel placement, monitoring of slump, temperature, mixing time and casting of concrete cylinders for compression testing of structural concrete delivered to the site. We will pick up and deliver concrete cylinders to our laboratory for the appropriate testing. During concrete placement, we will also provide batch plant inspection. Task 4 — MasonryNeneer Observation & Testing We, will provide ICBO-certified inspector to monitor the placement of expansion bolt, masonry/veneer units, including grout/mortar placement and sampling, preparation of masonry prisms and verifying the reinforcing steel placement within the wall. We will pick up and deliver the material samples to our laboratory for the appropriate testing. Sampling and testing of the materials will be performed as stated in the structural notes and code requirements. Task 5 — Structural Steel and Welding Observation We will provide ICBO-certified inspector to observe field welding operations during structural steel erection and HS bolt installation. This will be done on both a continuous and part-time basis and includes the observation of welder certifications. metal deck and steel joist welding and compliance of structural steel construction to the project requirements. Southland Geotechnical, Inc. Citv of La Ouinta AIL iGI Proposal No: PO 002T 4W 14W Task 6 — Glued Laminated Structural Lumber and Roof Truss Observation and Testing. We will provide a ICBO approved inspector to observe a fabrication of glu-lams and wood/bar joist trusses process in the factors- during the assembling process. Services ,gill be conducted by our subcontractor. Forest Products Inspections, Inc. Task 7 — Laboratory Testing We anticipate that compliance testing of soils, masonry prisms. grout. mortar and concrete will be required: the anticipated testing is summarized on our attached budget. Task 8 — Technical Management & Reports Our Project Manager will review the daily progress reports during construction. Items found in non-compliance with the project requirements will be brought to the immediate attention of the construction superintendent, designated design professionals, and your designated responsible representative. FEE For budgetary purposes, we have provided cost estimate (in separate envelope) for the services described above. The services described above will are performed on a time and expense basis utilizing our standard fee schedule, which has been attached. Any additional testing can be performed upon your written authorization at the time those services are requested. We have attempted to be realistic in developing our estimate for this project: please keep in mind that our services are directly dependent upon the contractors schedule and events which occur during the duration of the project which cannot always be predicted in advance. Any change in the contractor's schedule will impact our budget. We will attempt to coordinate our services with the contractor's site superintendent to efficiently service the project. In the event that construction activities result in projected additional fees beyond those described herein, we will contact you for additional written buow increase, if necessary. Southland Geotechnical, Inc. 11 Exhibit B Schedule of Compensation Payment shall be in full .at the rates listed in the Estimate Worksheet attached herewith for the actual hours submitted in conformance with Section 2.2 of the Agreement. Total compensation for all work under this contract shall not exceed Twenty Six Thousand, Eight Hundred and Eighteen Dollars ($26,818) except as specified in Section 1.6 - Additional Services of the Agreement. 12 ESTIMATE WORKSHEET PROJECT: Fire Station - Project No: 2001-14 CLIENT: City of La Quints LOCATION: 44-555 Adams Street, La Quints FIELD Hrs. Rate Total Soil Technician - Grading So" Technician - Compaction 40 (a $ 63.OU $ .520.00 ICBOInspector: 60 g $ 63.00 $ 3.780.00 Concrete Masonry '32 @ $ 65.00 $ 2.080.00 Expansion Bolt 160 16 `' (a $ 65.00 $ 10.400.00 Field Welding 16 r @ $ 65.00 $ $ 1,040.00 HS Bolt Installation 16 65.00 $ 1.040.00 Glulam Fabrication 16 Ca- 65.00 $ 1,040.00 Concrete Batch Plant Q $ 70.00 $ 1.120.00 Sample Pick-up 24 @ $ 63.00 $ 1,512.00 Coring 8 (a $ 63.00 $ 504.00 upervisor Ins / S P Operation Manager I @ $ 500.00 $ 500.00 24 n $ 72.50 $ 1.740.00 Subtotal: $ 20,976.00 LABORATORY Soil Compaction Curve Aggregate Compaction Curve 3 a $125.00 $ 375.00 Siei,e Anah•sis I $155.00 $ 155.00 Concrete Compression Test 4 r: $ 70.00 $ 280.00 GrouVMortar Compression Test 24 ;a $ 18.00 43.00 Masonry Prisms Compression Test 16 $ 20.00 $ 320.00 Compression Test f or Cored Specimen 62' $110.00 $ 660.00 Bond Test for grout/masonry interface g 8 $ 50.00 $ 400.00 Rebar Tensio.Bend Test ,a $ 80.00 $ 640.00 Mix Design Review 6 @ $110.00 $ 660.00 2 (a� $.185.00 $ 370.00 Subtotal: $ 33,482.00 PROJECT MANAGEMENT _ REPORTS Principal Engineer Staff Engineer 4 $140.00 $ 560.00 Technical Ty P�Adzninishative 8 24 r $ 90.00 $ 720.00 C $ 45.00 $1.080.00 Subtotal: $ 2,360.00 TOTAL: $ 26.818.00 Southland Geotechnical, Inc. Proposal No. P03002T 13 City of La Ouinta •SGI Proposal �o PO �OO�T 2003 Fee Schedule Southland Geotechnical, Inc. 14 OUTuLANC EOTEC�INI FOUNDATION ENGEN==qs Atic M��==:a�c L.�� 2003 PROFESSIONAL. FEE SCHEDULE Southland Geotechnical, Inc. is a consulting firm which provides services in Soils and Materials Engineering, Fault and Seismic Studies, and Construction Materials Testing. The firm's objective has been providing engineering services for public utilities, public works infrastructure, residential, commercial, and industrial projects in the Southern California areas. OFFICES AND LABORATORIES Phone Fax El Centro, California (760) 370-3000 337-8900 Bermuda Dunes, California (760) 360-0665 360-0521 BASIS OF CHARGES Listed herein are typical prices for services most frequently performed by Southland Geotechnical. Prices for other services not listed will be given upon request, as well as special quotations for projects involving volume or special provisions. Invoices will be issued on a bi-monthly basis, or upon completion of a project, whichever is sooner. Invoices are payable when received unless otherwise agreed. A late payment service charge will be computed at the periodic rate of 1.5% per month, which is an annual percentage rate of 18 % and will be applied to any. unpaid balance commencing 30 days after date of the original invoice. A two (2) hour minimum will be charged for all field testing and thereafter in 2 hour increments. An overtime premium of 1.5 times the standard rate will be charged for all personnel service or laboratory test periods in excess of eight hours per day or Saturday, and 2 times the standard rate 'for work in excess of 12 hours per week day, in excess of 8 hours on Saturdays and all day on Sundays or holidays. A four (4) hour minimum will be charged for all special inspection services. Per diem will be charged at a rate of $65 per day per person or expenses + 10%, whichever is greater. Outside services will be charged at cost + 10% unless otherwise noted. All samples of soil or rock will be destroyed 30 days after submission of final report unless prior arrangements are made. Our liability to Client for injury or damage to persons or property arising our work performed for Client and for which legal liability may be found to rest upon us rather than for professional errors and omissions, will be limited to our general liability insurance coverage, which we maintain in limits of $2,000,000. For any damage on account of any error, omission, or other negligence, our liability will be limited to a sum of not to exceed $50,000 or our fee less direct third -party costs, whichever is greater, unless specifically negotiated otherwise. 780 NORTH FOURTH STREET • EL CENTRO, CALIFORNIA 92243 • (760) 370-3000 FAX (760) 337-8900 79-607 COUNTRY CLUB DRIVE, SUITE 5 - BERMUDA DUNES. CALIFORNIA 92201 • (760) 360-0665 • FAX (760) 360-0521 5725 KEARNY VILLA ROAD, SUITE L • SAN DIEGO, CALIFORNIA 92123 - (858) 467-4900 - FAX (858) 467-4909 1 10 Southland Geotechnim Inc. 2003 Standard Fee Schedule PROFESSIONAL RATES (HOURLY) PrincipalEngineer.........................................................$140.00 Senior Engineer.............................................................$125.00 $170.00/Hr. StaffEngineer................................................................. S90.00 Assistant Engineer...........................................................$80.00 $210.00/Hr. Operations Manager ........................................................$72.50 $160.00/day SeniorGeologist............................................................ S125.00 Project Geologist...........................................................$105.00 Resistivity, Piezocone Testing ...................................... StaffGeologist................................................................$90.00 Seismic Piezocone Testing .......................................... * $30.00 will be added for all investigative work with legal (court) cases. Grouting........................................................................ * $100.00 will be added for all depositions and court appearances with a 4 -hr. minimum charge Strata Probe (Environmental Sampling) ............. TECII ICAL RATES (*) Senior Geotechnical Technician......................................$60.00 Testing Technician (Soils) With Nuclear Gauge.............$65.00 Testing Technician (Concrete/Masonry/Soils/Asphalt) ..$55.00 Special Inspector (Masonry, Steel, Welding & Bolt) ...... $65.00 Laboratory Personnel ......................................................$55.00 TechnicalTypist..............................................................$45.00 Drafting........................................................................... $60.00 Copies of Reports (Min)..................................................S30.00 Blueprints.....................................................................: $2.25ea. EQUIPMENT/MATERL4,L CHARGES 2 & 4WD Vehicle .................................................... S0.50/Mile Truck Mounted Drilling (Flight Auger) ................. $170.00/Hr. Truck Mounted Drilling (Prevailing Wage and Sieve Analysis, Fine Including Wash ......................... Environmental)....................................................... $210.00/Hr. Per Diem Drillers ................................................... $160.00/day Cone Penetrometer Travel Time ............................ $235.00/1-1r. Piezocone and Stratigraphic Plots ................................. $9.20/ft Resistivity, Piezocone Testing ...................................... S9.30/ft Seismic Piezocone Testing .......................................... $19.20/ft Per Diem (CPT) ..................................................... $230.00/day Grouting........................................................................ $3.40/ft Mobile Laboratory (On site Analysis) ................ $2,100.00/day Strata Probe (Environmental Sampling) ............. $2,500.00/day Dozers, Backhoe, Portable Auger, etc ..................... SCost+10% Ring Sampler Liners (6" length) Use Charge ............. $2.00 ea. 2" diameter slotted PVC Piezometer $45.0( (w/filter sock & gravel pack) ...................................... $7.10/ft 8" diameter cast-iron Piezometer cover 16 (set in concrete)....................................................... $88.00 ea. (*) A $10.00 per hour premium shall be added for all prevailing wage work (Field Services Only). MATERIALS TESTING EQUIPMENT -FIELD (DAILY RATES) Swiss Hammer (Concrete) ................................................ $50.0. Masonry Mortar Penetrometer .......................................... S50.0 Vibrating Probe (Concrete) .............................................. $60.0k Generator.......................................................................... $47.5k Coring Machine................................................................ $47.5k Diamond Bit Core Barrel .................................................. $40.0, Rebar Locator (R -Meter) .................................................. $50.0. CORING CHARGES (Alin. Charge-2/Trip) 2" Diameter.............................................................. S 100.00 e: 3" Diameter.............................................................. $110.00 e. 4" Diameter.............................................................. $125.00 e: 6" Diameter.............................................................. $13 5.00 e: Horizontal (Walls) .................................................... $155.00 e; COMPACTION CUR«S Standard 4" Mold, Method A ................................... $115.00 e Standard 6" Mold, Method B,C,D ............................ $150.00 e Modified 4" Mold, Method A ................................... $125.00 e Modified 6" Mold, Method B,C,D ........................... $155.00 e Relative Density....................................................... $290.00 e Relative Compaction ................................................ $165.00 e SOIL & AGGREGATE STABILITY R -Value, Untreated Material or Field Sample .......... $200.00 c CBR 100% Compaction ........................................... S275.00( Soil Cement, CTB, Mix Design ................................ $650.00 CTB Compression Test .............................................. $50.00 Lime Treated Compression Test (Includes Preparation)................................................... $420 BASIC SOIL & AGGREGATE PROPERTIES Sieve Analysis, Coarse & Fine Including Wash......... $70.00 Sieve Analysis, Coarse ............................................... $55.00 Sieve Analysis, Fine Including Wash ......................... $50.00 Sieve Analysis, Wash (% Finer than No. 200 Sieve) . $45.00 Specific Gravity/Absorption....................................... $85.00 Sand Equivalent -Average of 3 .................................... $60.00 Plasticity Index........................................................... $85.00 Expansion Index ....................................................... $100.00 Moisture Determination and Unit Weight ..................$25.0( Moisture Determination Only ..................................... $20.0( Permeability Test (Undisturbed Samples) ................ $320.0( Permeability Test (Remolded Samples) ................... $350.0( Resistively of Soil (CAL 643) .................................... $75.0( PH Test (Lab Measurement) ....................................... $30.0( Hydrometer (Without Specific Gravity) ................... $105.0( Sulfates....................................................................... $45.0( Chlorides..................................................................... $45.0' 16 10 Southland Geotechnici , Inc. 2003 Standard Fee Schedule SHEAR STRENGTH & CONSOLIDATIN TEST Unconfined Compression..............................................S60.00 ea. Direct Shear (3pt. Staged Test)....................................S200.00 ea. Consolidation, Per load Increment w/ Time Rate....... S63.00 load Consolidation.............................................................S150.00 test AGGREGATE QUALITY Organic Impurities.........................................................$45.00 ea. Absorption, Coarse Aggregate ......................................$60.00 ea. Absorption, Fine Aggregate ..........................................$75.00 ea. Unit Weight (Average of 3) ...........................................$50.00 ea. Los Angeles Rattler Test -500 Revs .............................S 170.00 ea. Los Angeles Rattler Test -1000 Revs...........................$200.00 ea. Sulfate Soundness (5 cycles).........................................$90.00 ea. Mortar Making Properties of Sand..............................S345.00 ea. Potential Reactivity Test .............................................$325.00 ea. Cleanness Test (Referee Test).....................................$155.00 ea. Crushed Particles on Sieved Sample ...........................$150.00 ea. Flat & Elongated Particles on Sieved Sample .............$110.00 ea. Clay Lumps and Friable Particles................................$100.00 ea. Lightweight Pieces in Aggregate.................................$220.00 ea. Durability Index -Coarse or Fine..................................$150.00 ea. MASONRY Compression Test, Grout Prisms...................................S20.00 ea. Compression Test, Mortar Cube/Cylinder .....................S20.00 ea. Compression Test, Masonry Units ................................565.00 ea. Compression Test, Solid Grouted Masonry Prisms ..... S 110.00 ea. Absorption and Received Moisture, Masonry Units .....$58.00 ea. (Unit weight, masonry unit 3 required) .........................$40.00 ea. Grout or Mortar Specimen, Handled & Cured But Not Tested..................................................................$15.00 ea. Bond Test (Shear) for grout/masonry interface.............S80.00 ea. CONCRETE Concrete Mix Design or Review S 110.00 ea. (Not Including Lab Test)...........................................$185.00 ea. Laboratory Trial Batch, Incl. Compression Testing of 6 Specimens .............................................$325.00 ea. Compression Test, Concrete Cylinder ...........................S 18.00 ea. Concrete Cylinder Handled and Cured Marshall Stability & Flow Set of 4 ButNot Tested............................................................S 14.00 ea. Unit Weight of Concrete Cylinders...............................$29.50 ea. Flexural Strength, Concrete Beam................................S55.00 ea. Compression Test, Gunite .............................................$37.00 ea. Compression Test on Cored Specimens ........................$50.00 ea. CylinderMolds................................................................$2.75 Drying Shrinkage Test, Set of 3 ..................................$325.00 ea. ea. Modulus of Elasticity of 6"x12" Concrete Cylinder ...$160.00 ea. Splitting Tensile Strength..............................................$53.00 ea. Chloride Ion Determination (Water Soluble) ..............$210.00 ea. ASPHALT Extraction, % Bitumen ............................................. S 110.00 ea. Extraction%Graduation.............................................. S 1 X0.00 ea Complete Design of Wearing Surface for a Given Asphalt,'Aggregate, Hveem or Marshall Method......... S3,000.00 Marshall Stability & Flow Set of 3 (without mixing)......................................................5290.00 se; Marshall Stability & Flow Set of 4 (Lab Mix).................................................................S380.00 se; Unit Weight of Asphalt Core or Compacted Sample.. 538.00 ea Maximum Density of Mix by Marshall Method Set 3 (Without Mixing).....................................................S 150.00 se: Maximum Theoretical Specific Gravity (Rice Method)...............................................:......... S120.00 ea Index of Retained Strength ....................................... $600.00 ea Tensile Stress Ratio .................................................. S500.00 ea Stripping ............................................... :................... $110.00 ea METALS Tensile, Up to',:" (Not Including Machining Cost) ... $60.00 ez Grater than'/.............................................................. $70.00 e; Bend............................................................................ $40.00 e: IvVELDING QUALIFICATIONS - STRUCTURAL STEEL (PHYSICAL TEST METHOD - ASTM, AVS API, RISC) • Visual Inspection ....................................................... $65.00 1 • Magnetic Particle.R.Jltrasonic Testing ........................$75.00 1 Operator Performance & Procedure Tests ....................$75.001 Machining & Material Costs ..................................... $55.00 m: Qualification Tests on Machined Coupons ................. $85.00 e When prevailing Wage rates apply, an additional $10.00 per hour premium will be charged 17 0 Exhibit C Schedule of Performance Consultant shall complete all services in a timely manner and in accordance with the approved construction schedule provided by the Contractor. Consultant will have the opportunity to review the schedule when completed, and adjust the scope and budget but only if approved by the City. The general time frame for the Project is February 2003 through November 2003. 18 Exhibit D Special Requirements None. 05 IE OUTULgND EOTECNNICgL= FOUNDATION ENGINEERS AND MATERIALS LABS May 12, 2003 Mr.Tom Hartung City of La Quinta Building & Safety Department 78-495 Calle Tampico La Quinta, CA 92253 Subject: Special Inspection Report — Structural Concrete Fire Station No.: 93 La Quinta, California SGI Project No.: P03010 Dear Mr. Hartung: Attached are special inspection reports for the period of April 28 and May 1, 2003 for the subject project. The special inspection was performed by our Inspectors, Anthony Calarossi (ICBO 1062736-49) and Kenneth Baker (ICBG 5048128-49). The inspection have been made in conformance to Uniform Building Code standards. Thank you for the opportunity to provide inspection services. Please do not hesitate to call if you have any questions or require additional information. Sincere' Yours, South n Geo chnical, Inc. Greg Cha 'dr E. Princ'pal E ineer Encl: Inspector's Daily Reports cc: David Evans and Associates — Mr. Ruben E. Ramirez 780 NORTH FOURTH STREET - EL CENTRO, CALIFORNIA 92243 - (760) 370-3000 • FAX (760) 337-8900 79-607 COUNTRY CLUB DRIVE, SUITE 5 - BERMUDA DUNES, CALIFORNIA 92201 - (760) 360-0665 - FAX (760) 360-0521 (4OUNLA EDTMW%� REGISTERED INSPECTOR'S DAILY REPORT \ / �� BUILDING PERMIT NUMBER PLAN FILE NUMBER Fa�onnoa Ewooaw AMo IA�neuu Liw o3oy. �O �� . COVERING :".CORK PERFORMED REINFORCED CONCRETE 13 STRUCT. STEEL ASSEMBLY 13 GLUE. LAM. FABRICATION WHICH REQUIRED APPROVAL BY THE SPECIAL INSPECTOR OF ❑ PRESTRESSED CONCRETE ❑REINFORCED GYPSUM ❑ POST -TENSIONED CONC. ❑ REINFORCED MASONRY ❑ PILE DRIVING ❑ OTHER JOB ADDRESS `fit/ -,SSS Ada, It PROJECT NUMBER DATE P03.10 L1 -a3 OWNER OR PROJECT NAME 20 -P -2 - ARCHITECT CONSTR. MAT'L. (TYPE GRADE, ETC.) DESIGN STRENGTH SOURCE OR MFGR. ENGINEER i4STi+r 6 D �o, oeo �,s I /%ISL � DESCRIBE MAT'L. (MIX DESIGN, RE -BAR GRADE & MFGR., WELDING, ETC.) o GENERAL CONTRACTOR CONTR. DOING REPORTED WORK LAB. RECEIVING & TESTING CONSTR., MAT'L. SAMPLES ITEM LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. NO. INCLUDES INFORMATION ABOUT: AMOUNT OF MATERIAL PLACED OR WORK PERFORMED; NUMBER, TYPE & IDENT. NO'S OF TEST SAMPLES TAKEN; STRUCT. CONNECTIONS, WELDS MADE, H.T. BOLTS TORQUED, CHECKED, ETC. All e•Z. Z /✓ Ti / nC-c�7 o�.6w / �N99, gaTi�� ra Kr a ayx3o., 1 CAt7 ti, 1 eo* o n K f r e t24 it qo P PdPv /w� , h AC O ' e - g C i I 1 / w G/Of R I 11 /o✓e a C L/ r c„�i a %.vrvruriMS to. DSA Approved Documents O DOES NOT CONFORM to DSA Approved Documents O PROGRESS REPORT ONLY SIGNATURE OF REGISTERED INSPECTOR NAME OF REGISTERED INSPECTOR (PRINT) DATE 'S.' y_f-12-.0=V-7 REGISTRATION NUMBER LEA NUMBER OUTUTAND = EDTMWNC40W Fouo�now Ewauaaa ANa IA=TMw Lw COVERING WORK PERFORMED QS REINFORCED CONCRETE WHICH REQUIRED APPROVAL BY C3PRE-STRESSED CONCRETE THE SPECIAL INSPECTOR OF C3 REINFORCED MASONRY JOB ADDRESS 4/-/- OWNER ?y- OWNER OR PRO SPECIAL INSPECTION • • • • • REGISTERED INSPECTOR'S DAILY REPORT BUILDING PERMIT NUMBER PLAN FILE NUMBER 830 1-460 Cl STRUCT. STEEL ASSEMBLY ❑ GLUE. LAM. FABRICATION ❑ REINFORCED GYPSUM ❑ POST -TENSIONED CONC. ❑ PILE DRIVING ❑ OTHER PROJECT NUMBER DATE f 030/& 1 qL'0_ 1 zo r" UUNSTR. MAT'L. (TYPE GRADE, ETC.) DESIGN STRENGTH I SOURCE OR MFGR. ENGINEER tt AST p 40, coo 'or, t ASS oG i ea �GGt DESCRIBE MAT'L. (MIX DESIGN, RE -BAR GRADE & MFGR., WELDING, ETC.) GENERAL CONTRACTOR CONTR. DOING REPORTED WORK LAB. RECEIVING & TESTING CONSTR., MAT'L. SAMPLES LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, TEM INCLUDES I INO. I TAKEN; STRUCT CONI ECTIONS, WELDS MADE, H TMATON ABOUT: AMOUNT OF E BIO TS TORQUED, CHECKED, ETC ERAL PLACED OR WORK MBER, TYPE & DENTRNO' OF TEST SAMPLES ED CONFORMS to DSA Approved Documents ❑ DOES NOT CONFORM to DSA Approved Documents O PROGRESS REPORT ONLY P- a., -- e.--- -.,-- FA f�i �SIGNATURE OF REGISTERED INSPECTOR 41; NAME OF REGISTERED REGISTRATION NUMBER �• INSPECTOR (PRINT) DATE LEA NUMBER ovrut.�rvo-- EDTECuMC4L • .x9l I Lei 0 124111 REGISTERED INSPECTOR'S DAILY REPORT u %_uNFOHMS to DSA Approved Documents ❑ DOES NOT CONFORM to DSA Approved Documents O PROGRESS REPORT ONLY Folin No. 2180 • PinnPar Printinn / G 6� 8 A., SIGNATURE OF REGISTERED INSPECTOR NAME OF REGISTERED INSPECTOR (PRINT) DATE REGISTRATION NUMBER LEA NUMBER BUILDING PERMIT NUMBER PLAN FILE NUMBER Fawo►noN EwonaeM AMo tiA�,Riwu L�q o3a�-/6e COVERING WORK PERFORMED .REINFORCED CONCRETE ❑ STRUCT. STEEL ASSEMBLY ❑ GLUE. LAM. FABRICATION WHICH REQUIRED APPROVAL BY THE SPECIAL INSPECTOR OF 13 PRE -STRESSED CONCRETE O REINFORCED GYPSUM 13 POST -TENSIONED CONC. ❑REINFORCED MASONRY 13 PILE DRIVING E3 OTHER JOB ADDRESS PROJECT NUMBER DATE 20__T3 OWNER OR PROJECT NAME ARCHITECT CONSTR. MAT'L. (TYPE GRADE, ETC.) DESIGN STRENGTH SOURCE OR MFGR. ENGINEER DESCRIBE MA L. (MIX DESIGN, RE -BAR GRADE & MFGR., W LDING, ETC.) GENERAL CONTRACTOR CONTR. DOING REPORTED WORK eery LAB. RECEIVING & TESTING CONSTR., MAT'L. SAMPLES ITEM LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. NO. INCLUDES INFORMATION ABOUT: AMOUNT OF MATERIAL PLACED OR WORK PERFORMED; NUMBER, TYPE & IDENT. NO'S OF TEST SAMPLES TAKEN; STRUCT. CONNECTIONS, WELDS MADE, H.T. BOLTS TORQUED, CHECKED, ETC. �^ o 10, v ` - -03 z/ -2 _c A14' 7e to ,M 10, ' AA_x odo 9 ZS 7,! s 3. //-f �.! �s 3 as Z. o 0.73 A9000 /Z 001 2 et�u 3 ,a G G 71yc Qp • ' 1061.1. u %_uNFOHMS to DSA Approved Documents ❑ DOES NOT CONFORM to DSA Approved Documents O PROGRESS REPORT ONLY Folin No. 2180 • PinnPar Printinn / G 6� 8 A., SIGNATURE OF REGISTERED INSPECTOR NAME OF REGISTERED INSPECTOR (PRINT) DATE REGISTRATION NUMBER LEA NUMBER (94 ouTUL4ND- F(lTP"iJNIr'lAI SPECIAL INSPECTION O. REGISTERED INSPECTOR'S DAILY REPORT � FowitonnoH ENmweena Awn I�b►Tuw�e u� BUILDING PERMIT NUMBER PLAN FILE NUMBER COVERING WORK PERFORMED WHICH REQUIRED APPROVAL BY THE SPECIAL INSPECTOR OF ❑ REINFORCED CONCRETE ❑ STRUCT. STEEL ASSEMBLY ❑ GLUE. LAM. FABRICATION ❑ PRE -STRESSED CONCRETE ❑ REINFORCED GYPSUM ❑ POST -TENSIONED CONC. ❑ REINFORCED MASONRY ❑ PILE DRIVING ❑ OTHER JOB ADDRESS ` 4- 555 okr,St L CL j ����. PROJECT NUMBER P 0 3 0 0 DATE 5- i 20D OWNER OR PROJECT NAME ARCHITECT CONSTR. MAT'L. (TYPE GRADE, ETC.) DESIGN STRENGTH SOURCE OR MFGR. ENGINEER DESCRIBE MAT'L. (MIX DESIGN, RE -BAR GRADE & MFGR., WELDING, ETC.) GENERAL CONTRACTOR CONTR. DOING REPORTED WORK R .G, Ca,.,C�m LAB. RECEIVING & TESTING CONSTR., MAT'L. SAMPLES ITEM NO. LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT: AMOUNT OF MATERIAL PLACED OR WORK PERFORMED; NUMBER, TYPE & ]DENT. NO'S OF TEST SAMPLES TAKEN; STRUiCT. CONNECTIONS, WELDS MADE, H.T. BOLTS TORQUED, CHECKED, ETC. Q f 2-f- e 5 eon ✓ e C� \` ,r cc_ 1�� e��-�� oc,C-r o �. N ev-s c cge a nn st-ar'�- �OUI �0 e t v5- v. LC .-,,.,-J c e cc.V eA On C4 ^�! 7ec�� 0. Doi/UiAQ����JbHdC CONFORMS tol2SA Documents is0)-cK ❑ DOES NOT CONFORM to DSA Documents ❑ PROGRESS REPORT ONLY Form No. 2180 • Pioneer Printing &&'_ x4lv.�� - - SIGNATURE OF REGISTERED INSPECTOR An�..o�� G`�D55; ja6Z736-y� NAME OF REGISTERED REGISTRATION NUMBER INSPECTOR (PRINT) .5-x_3 IL? DATE LEA NUMBER