Loading...
04-6299 (SFD)60222 Angora Ct Property., Address APN: Application description Property Zoning . . . . . Application valuation CO' NIA 92253 UILDING PERMIT 1111111111111111111111111 49 BUILDING & SAFETY DEPARTMENT (760).777-7012 FAX (760) 777-7011 INSPECTION REQUESTS (760) 777-7153 C04=0-0.006299 Date 9/14/04 6O-21-2 CT 764 -270 -999 -117 -300233 - DWELLING - SINGLE FAMILY DETACHED MEDIUM HIGH DENSITY RES 140949 Owner Contractor SHEA LA QUINTA SHEA HOMES, INC. C/O JEFF MCQUEEN' 81260 AVENUE 62 8800 N GAINEY CENTER 350 LA QUINTA y CA 92253 SCOTTSDALE AZ 85258 (760) 777-6005 ------ Structure Information PLAN 4510A LOT 117 ----- Construction Type . . . . . TYPE V - NON RATED Occupancy Type . . . . . . DWELLG/LODGING/LONG <=10 Other struct info . . . . . CODE EDITION 2001 # BEDROOMS 3.00 FIRE SPRINKLERS NO GARAGE SQ FTG 479.00 PATIO SQ FTG 457.00 NUMBER OF UNITS 1.00 FIRST FLOOR SQ FTG 15530.00 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT Additional desc . . Permit Fee . . . . 783.00 Plan Check Fee 508.95 Issue Date . . Valuation . . . . 140949 Qty Unit Charge Per Extension BASE FEE 639.50 41.00 3.5000 THOU BLDG 100,001-500,000 143.50 --------------------------- Permit . . . . . . ------------------------------------------------ MECHANICAL Additional desc . . Permit Fee . . . . 77.00 Plan Check Fee .19.25 Issue Date . . . . Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 2.00 9.0000 EA MECH FURNACE <=100K 18.00 2.00 9.0000 EA MECH B/C <=3HP/100K BTU 18.00 3.00 6.5000 EA MECH VENT FAN 19.50 4,. P.O. Box 1504 • VOICE (760) 777-7012 78-495 CALLE TAMPICO FAX (760) 777-7011 LA QUINTA, CALIFORNIA 92253 INSPECTIONS (760) 777-7153 ""�� BUILDING &i: SAFETY DEPARTMENT Application Number: Y'� �Do�9 Date: /0. V.0 Applicant:c ecl.o�rEn eel: �y Applicant's Mailing Address:—Architect or Engineer's Address: ic. No.: CLC Z4 LJ a 1 BUILDING PERMIT DECLARATIONS LICENSED CONTRACTOR'S DECLARATION I hereby afrirm under enalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals ode, and my Lice s is in full force and effect. ( _ �^� G V License Classy C icense No. �Q r 0 a Date ` ractor_ V� OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).): U I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself or through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). U I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). U I am exempt under Sec. , BA P.C. for this reason Date WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. have an ill maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is sued. yvorkers' cgpnpensation in rence came and iIV �rier - �• olicy Number � ' � N I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those p visions. _ ^ 1T /Gate WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name Lenders Address APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall, defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this co ty to�nter upon bove-mentioned property for inspection purposes. �e �� �+ Signature (Applicant or Ager i' <a. Application Number 0 C Page 2 . . . . . 04-00006299 Date 9/14/04 Qtyv Unit Charge Per Extension 1.00 6.5000 EA MECH EXHAUST HOOD 6.50 ----------------------------------------------------------------------------- Permit . . . . . . ELEC-NEW RESIDENTIAL Additional desc Permit Fee . . . 78.94 Plan Check Fee 19.74 Issue Date . . . . Valuation 0 Qty Unit�Charge Per Extension BASE FEE 15.00 1553.00 .0350 ELEC NEW RES - 1 OR 2 FAMILY 54.36 479.00 .0200 ELEC GARAGE OR NON-RESIDENTIAL 9.58 ----------------------------------------- Permit . . . . . . PLUMBING ------------------------------------- Additional desc Permit Fee . . . . 123.00 Plan Check Fee 30.75 Issue Date . . . . Valuation . . . . 0 Qty Unit Charge Per Extension BASE FEE 15.00 9.00 6.0000 EA PLB FIXTURE 54.00 1.00 15.0000 EA PLB BUILDING SEWER 15.00 1.00 7.5000 EA PLB WATER HEATER/VENT 7.50 1.00 3.0000 EA, PLB WATER INST/ALT/REP 3.00 1.00 9.0000 EA PLB LAWN SPRINKLER SYSTEM 9.00 6.00 .7500 EA PLB GAS PIPE >=5 4.50 1.00 15.0000 EA PLB GAS METER 15.00 ----------------------------------------------------------------------7------ Permit . . . . . . GRADING PERMIT Additional desc .Permit Fee 15.00 Plan Check Fee .00 Issue Date . . . . Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 ---------------------------'------------------------------------------------- Special Notes and Comments SFD - Lot 117, Plan 4510A (1553 sqft) w/MBR Bay (23sf) & Patio Ext. (120sf-) , -----------------------------------------------------------------=---------- Other Fees . . . . . . . . . ART IN PUBLIC PLACES -RES .00 Page 3 Application Number . . . . . 04-00006299 Date 9/14/04 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . DIF COMMUNITY CENTERS -RES 97.00 DIF CIVIC CENTER - RES 366.00 ENERGY REVIEW FEE 50.90 DIF -FIRE PROTECTION -RES 97.00 GRADING PLAN CHECK FEE .00 DIF LIBRARIES - RES 225.00 DIF PARK MAINT FAC - RES 5.00 DIF PARKS/REC - RES 502.00 STRONG MOTION (SMI) - RES 14.09 DIF STREET MAINT FAC -RES 15.00 DIF TRANSPORTATION - RES 1098.00 Fee summary ----------------- Charged Paid Credited Due Permit Fee Total ---------- 1076.94 ------------------------------ .00 .00 1076.94 Plan Check Total 578.69 .00 .00 578.69 Other Fee Total 2469.99 .00 00 2469.99 Grand Total 4125.62 .00 .00 4125.62 Installation Certificate: Residential CF -6R AIR CONDITIONING INC. Site Address 60-222 ANGORA COURT 40t f 1. BUILDER INFORMATION SHEA TRILOGY LA QUINTA 81260 AVE 62 LA QUINTA, CA 92253 INSTALLING CONTRACTOR: 2. PROJECT INFORMATION DISTRIBUTION TYPE Flexible Ductwork in Attic and Between Floors PERMIT # SUBDIVISION: Trilogy La Qunita CITY: LA QUINTA COUNTY: RIVERSIDE WESTPAC AIR CONDITIONING DICT OR PIPING R -VALUE Flexible Duciwork Will have a R -Value of 6.00 or Better I, the undersigned, verify that the equipment listed in the category above my signature is the equipment installed and that the equipment mee or exceeds the requirements of the Appliance Efficiency Standards. In addition, I have verified that the equipment is equivalent to or more efficient than the equipment specified on the Certificate of Compliance submitted to demonstrate complience with the Energy Efficiency Standards for residential buildings. 3. HEATING INFORMATION HEATING MANUFACT HEATING UNIT ACTUAL EFF. HEATING EQUIl' HEATING EQUIP. MAKE MODEL # AFUE CAPACITY LOAD 4. COOLING INFORMATION CING MANUFACT COMPRESSOR ACTUAL EFF. COOLING EQUIP HEATING IP. MAKE MODEL # SEER CAPACITY LOAD COOLING The building design heat loss and design heat gain rate have been determined using a method specified in Section 150(h) of the Energy Efficiency Standards, and are two of the criteria used for equipment sizing and selection. 5. THERMOSTATIC EXPANSION VALVE (TXV): Thermostatic Expansion Valve (or Comrnision approved equivalent) is installed and access is provided for inspection. YES 0 NO 0 N/AF7 6. SUBMITTED BY: F'cw� /V -A4 112-5-05 Sigdature Installing HVAC Contractor Date Alexis\CrystalReports\Purcbasing\CF6R Report.rpt M,ft• dild T m- 1117 - IIIIIII I I I III VIII IIII 50 IE SUBDIVISION: Trilogy La Qunita CITY: LA QUINTA COUNTY: RIVERSIDE WESTPAC AIR CONDITIONING DICT OR PIPING R -VALUE Flexible Duciwork Will have a R -Value of 6.00 or Better I, the undersigned, verify that the equipment listed in the category above my signature is the equipment installed and that the equipment mee or exceeds the requirements of the Appliance Efficiency Standards. In addition, I have verified that the equipment is equivalent to or more efficient than the equipment specified on the Certificate of Compliance submitted to demonstrate complience with the Energy Efficiency Standards for residential buildings. 3. HEATING INFORMATION HEATING MANUFACT HEATING UNIT ACTUAL EFF. HEATING EQUIl' HEATING EQUIP. MAKE MODEL # AFUE CAPACITY LOAD 4. COOLING INFORMATION CING MANUFACT COMPRESSOR ACTUAL EFF. COOLING EQUIP HEATING IP. MAKE MODEL # SEER CAPACITY LOAD COOLING The building design heat loss and design heat gain rate have been determined using a method specified in Section 150(h) of the Energy Efficiency Standards, and are two of the criteria used for equipment sizing and selection. 5. THERMOSTATIC EXPANSION VALVE (TXV): Thermostatic Expansion Valve (or Comrnision approved equivalent) is installed and access is provided for inspection. YES 0 NO 0 N/AF7 6. SUBMITTED BY: F'cw� /V -A4 112-5-05 Sigdature Installing HVAC Contractor Date Alexis\CrystalReports\Purcbasing\CF6R Report.rpt M,ft• dild T m- 1117 - 02/04/2005 04:05 17603401819 IIIIIIIII IIIIIIIIIIIIIII 51 INSULATION CERTIFICATE This is to certify that insulation' has been installed in conformance with the current energy regulation, California Administrative Code, Title 24, State of California, in the building at 60-222 ANGORA CT, LOT -3117, PHASE 8A, LA QUINTA CA CEILINGS: TYPE: BLOW MANUFACTURER: Certainteed THICKNESS: R-38 WALLS: TYPE: BLOW MANUFACTURER: Certainteed THICKNESS: R-13 GENERAL. CONTRACTOR: SHEA HOMES LICENSE # BY:. TITLE: PAGE 17/21 PARAGON SCHMID BUILDING PRODUCTS A MASCO Company LICENSE # 221517 z BY: ' TITLE: ACCOUNT REPRESENTIVE DATE: a • /.wr,� ••r/rv.v v/r.r.���,r;r;i/r i/r.•r.%r.'r:r/i/r.,•�//�i/r.^f.'r!I/l:rirr.: %//.•r.:.. •i %%.vfi .ry/.r •r y.v;/:i :.N✓•i/r.r ...i .i .- r r..... .,.i� ._. .. _ . _ -.,. T �.-..-.--�.. ....na«. F,. ...r . �.-.. :,, �_i; x'et!nnr; ay....,,.�'ji...- i'�4^"%'V-._• , `c^.:R'"^tw <. . ...j.cy..-.v, .. ::L IIIIIIIIIIIIIIIIIIIIIIIII 52 BORM ASSOCIATES, INC. I - _, Structural Engineers STRUCTURAL JOB SITE OBSERVATION FINDINGS ` Project Name: �4 �� ' ( �•' % 1 `" "1 i r`I ` Project M I `%`�f o i-/ .rr"C Observer:1, •' j : G ,;' j'; , Lot/Bldg. # i Plan Type: ( Lf Elevation: Foundation / Floor Framing / Roof Framing / Alt Foundation / Alt Framing /Foundation Option /Framing Option Foundation A: Provide AB per detail per plan. B , Provide: nut & washer @ sill plate connection to foundation. C !Provide tightened connection of existing nut and washer @ sill plate to foundation. D HD and HD anchorage to foundation have not been installed as indicated on foundation plans. Refer to repair procedures from BAI. E. Provide concrete patching or repair procedures at damaged concrete for completion of slab or foundation application per --Framing----- - - F. Provide shim, post or solid blocking for bearing condition @ framing member. G. Provide sole plate connection to framing below as called for in shear wall schedule. H Provide beam or header as indicated on plans. Provide, (verify, complete) nailing for strap as indicated on plans. J. Provide A-35 connection (or H1 connector at roof level) with spacing per plan. K. Provide plywood sheathing or full depth blocking @ heeled truss to top plate connection per detail. L. Provide blocking and/or straps per details 9/SD3 or 10/SD3. M. Provide top plate splice at breaks in uppermost top plate with nails or strap per detail per plan. N. Provide full nailed attachment of A -35's to framing after the roof is fully loaded with tilt roofing material. O. Provide additional studs at trusses per detailand/or verify the stud grade. P. Provide minimum 3X per shear wall schedule. Q. Provide connection or shear transfer per detail per plan. R. Provide, (verify, nail) connector hardware between header and post. S.' Provide completion of nailing of shear material to framing at boundaries and at adjacent panel edges as called for in shear wall schedule. T. Provide shear material (at ceiling lid) per plan as construction sequence allows. G- Install diagonal brace to top plate per plan detail 2/SD3. V. Provide bracing blocks with boundary nailing at the floor sheathing at 48" o.c. for parallel framed floor joists per detail 2/SD4. W. Provide blocked diaphram per X. Provide truss hangers at truss to girder truss or at beam to truss connection as per manufacturer's specifications. Y. Provide full depth blocking with boundary nailing per detail at drag line. Z. Provide edge nailing at post with holdown or strapdown location. Field Superintendent (third copy): Framing Foreman (second copy): . Field Engineer (first copy): Date: Time: Date: Time: Date: / I jf '/ Time: r / T , ' BORM ASSOCIATES, INC. - Structural Engineers — STRUCTURAL JOB SITE OBSERVATION ir Project Name: E 1 `_ i Observer. A visit to the project site was made on the above date to: toy 3/ % ❑ Address specific elements of the work ❑ Assist the field personnel with complying with the intent of the construction documents. A Project Number. r Date of Observation r''-`/< A EL_ Assist the field personnel with complying with the findings from a previous structural job site observation. cl At the time of our visit, work had progressed to the point of : Phase: Address: Bldg. / Lot Number. 5 1 _7 i' f to Bldg. / Plan Type & Elevation: L/ f t i.4 7.1-) .2 C. P, Foundation Trenched ❑� 0' 0� �0' f0 Foundation-Poured�3` f(7` p ,❑ ,!7 Roof Sheathing Covered Roofing Material Stacked and Loaded 0` ,❑: [f Exterior Walls Covered �Of 11 Interior Wall Covered ❑ 0 ❑ ❑ 0 Insulation Installed 0 ❑ ❑ ❑ ❑ Electrical, Mechanical, Plumbing Complete 0 01. ❑ ❑ 0 Final Framing Pick-ups Completed 0 0 0 ❑ 0 Building Complete 0 ❑ 0 ❑ ❑ Based upon our visit: ❑ Refer to the attached field notes to be addressed by the construction personnel. ❑ Additional information will be sent from our office which will need to be addressed by the construction personnel. P It is our opinion that this building is being constructed in general conformance with the intent of the construction documents prepared by F our office. ❑ Site Observation ceased, framing was not at a stage of completion in which site observation could be performed. ❑ Concerns brought to the attention of field personnel based on previous site observation made on have yet to be addressed. Comments: Please note: Our findings and recommendations may have other than structural ramifications which we have not addressed. Be advised that changes to the construction documents need approval of the building official. Our firm is not authorized to act as the Owner's agent. Our findings shall not be construed as authorizing the expenditure of additional funds. Site Observation was made only to determine general conformance with the intent of the construction documents. Observation was made of those portions of the work which would best represent the intent of the construction documents, not each and every element of the work Site observation did not include review, approval or observation of, among other items: 1. The contractors safety precautions, procedures, designs, methods or techniques. 2. Any shoring, scaffolding, underpinning, temporary retaining of excavations, or any other erection methods or temporary bracing. 3. Any soils at the site, their adequacy to support the building, expansiveness; or any other soil related conditions. 4. Any drainage courses or devises of a temporary nature or as a permanent part of the structure, including roof and floor slopes, drains and pipes. The findings of this observation are understood to be an information and belief. As such, it consists of neither a& Field Superintendent (third copy) Client (second copy via mail) Field Engineer (first copy) If you have any questions please c COSTA MESA, CALIFORNIA ROSEVILLE, CALIFORNIA SAN RAMON, CALIFORNIA LAS VEGAS, NEVADA PHOENDC ARIZONA Phone: 714-513-7500 Phone: 916-774-7597 Phone: 925-242-2577 Phone: 702-740-5427 Phone: 623-869-0607 of professional opinion by the engineer based on his or her best knowledge, a warrantee expressed or implied. Date: Date•' r ! %� `t Fax: 714-513-7555 Fax: 916-774-7599 Fax: 925-242-2961 Fax: 702-740-5431 Fax:623-869-0609