06-3131WMuite 9ns ec�zan ServicesIE
B PMB 190 Desert Hot Springs, CA 92240 (760) 427-7796
PROTO IITM WALL SYSTEMS
SPECIAL DEPUTY INSPECTION FORM
Direct Tension Indicator (DTI, compressible washer) method of inspection
And/or Torque Method of Inspection
Date of Deputy Inspection November 7, 2006
As an accredited and certified Special Deputy Inspector.of Proto-IITM Wall Systems,
I, Tim Young, hereby witnessed and certified the torquing of the post -tension rods to
6,000 lbs. via visual inspection of the DTI verifying collapse of the tabs (no light leaks
between DTI tabs and bottom of t/2" nut) OR by witnessing and certifying the torquing of
the rods to 6,000 lbs. via a calibrated torque wrench set to 55 ft/lbs.
A. Installer: John Barajas Masonry Builder/Owner: T.D. Desert Development
B. Project Name: Andalusia at Coral Mountain Tract No: 31681
Lot inspected: 3 Street: Aracena Permit No. 06-3131
��8=oto
Wall locations: Walls in front of-L-ot'3.
C. Wall system description: All walls constructed using 6" wide block
Wall heights include 3'-4"
D. Visual inspection of mortar integrity.
Acceptable N Yes ONO
E.
Height: 3'-4" Length: 59 LF Rods @ 8'-0"
O.C.
Height: Length: LF Rods @
O.C.
Height: Length: LF Rods @
O.C.
Height: Length: LF Rods @
O.C.
Is rod spacing and location per the PDS for this project? NYes
❑ No
F. Are threads, plates lubricated and plates bearing on three block surfaces?
NYes
❑ No
Wall approved by Special Deputy Inspector
Ti Yo
CC 5047-84