9703-0030 (AR)54755 Avenida Alvarado
619-777-7153
rLICENSED CONTRACTOR DECLARATION
E> here . 'Affirni u r der penalty of perjury that I am licensed under provisions of
Chapter 9 (commencing with Sectibn 7000) of Division 3 of the Business and
Professionals Code, and my License is in full force and effect. -
License #
.595321)
Signature of Contractor
Lic. Class Exp. Date
B 6/3010g
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's
License Law for the following reason:
( ) I, as owner of the property, or,my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered' for
sale (Sec. 7044, Business & Professionals Code).
• ( ) I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec. 7044, Business & Professionals
Code). .
() I am exempt under Section •, B&P.C. for this reason
Date Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
( ) I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
( ) I have and will maintain workers' compensation insurance; as required by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued. My workers' compensation insurance carrier & policy no. are:
Carver Policy No.
f. IIIPT1ON ON 1I'S'C:Ey
(This section need not be completed if the permit valuation is for $100.00 or less).
( I certify that in the performance of the work for which this permit is issued,
I hall not employ any person in any manner so as to become subject to the
workers' compensation laws of California, and agree that if I should become
subject to the workers' compensation provisions of Section 3700 of the Labor
Code, I shall forthwith comply with thoseprovisio s.
Date: ' . 1 °'t -i. i Applicant " \
Warning: Failure to secure Workers' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000,1n
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorneys fees: -
IMPORTANT Application is hereby made to the Director of Building and Safety
for a permit subject to the conditions and restrictions set forth on his
application.
1. Each person upon whose behalf this application is made & each person at
whose request and for whose benefit work is performed under or pursuant to
any permit issued as a result of this applicaton agrees to, & shall, indemnify
& hold harmless the City of La Quinta, its officers, agents and employees:
2. Any permit issued as a result of this application becomes null and void if
work is not commenced within 180 days from date of issuance of such
. permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
coJtstruction, and hereby authorize, representatives of this City to enter upon
the above-mentioned property for inspection purposes.
/signature (Owner/Agent) ` Date Z-17,47
BUILDING PERMIT., PERMIT# • CONTROL# •
9703-030 4792
DATE • VALUATION LOT : TRACT
3/10/97 • 5302.09 .
JOB SITE - •
ADDRESS 54475 AVENIDA .ALVA RAl
APN
OWNER
SW1T?'-1' LOC K:AI-J •
75235 'PANTE') SE•IU
INDIAN WELLS CA 922W
CONTRACTOR / DESIGNER / ENGINEER
REX AI.'IAPLt3ATF, INC.
31659 SIIADOW" MM. LN.
THOUSAND PALMS CA 92276
(619)343- I 211 . - CT3L
} .
USE OF PERMIT
ENCLOSE USE XT:1trfia,cA.ti-pORT, ADbi'NO48 S,F,,
INTO GARAGE
VALUATION 302.90 LS
. MA' (fT OF c ON;S I' WCTION
. PERMIT FEE SUMMA Y BEST J) : a.
'rte
PLAN CHECK FIFE 10,1 -000 - *?,4i8 ♦
C `f ;iN:? TR..t 1 f'•"11(1'nt 1'' F, I t11-000418-400 °
• .14.,11411:1C4 Ulf 101.:VO0-:42O-OOO •
cf,Mk:)'I
f roN.it:) NN i.f~i:--101-000-241-040101.000-141-
•
St tl TO1 _A:1, CO+NSTRt1CG I1ON `AND PIAN. CHECK. h
• - CESS P1.E-P.AJD
TOTAI..i'PIKMIT t'tilES 0VIII NOW
-
(111101111111111111111111
•
l .4A1..X "7 -
.
S9.15 x
$15.80
$1S:I16
S. 50
=,{:
•
PEEI
. , - 392.09
:K+`Yi. a, ..
c -
0 92 0
Q
,,. 0
1pN
' ' Sii 1,2 t '
. $0.0o
$4:.21
a 26
IE M
RECEIPT
DATE
BY j. ' —
DATE FINALED
INSPECTOR
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
.
Forms & Footings
Ducts
•
Slab Grade
Retum Air
Steel
.
Combustion Air
Root Deck
Exhaust Fans
O.K to Wrap
.
F.A.U.
Framing
4-315 - ell
A e
Compressor
Insulation•
Vents
Fireplace P.L.
Grills
•
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall ,
Exterior Lath
5-1-- x11
Ms
Drywall - iat, Lath
1.
Final
Final .
POOLS - SPAS
BLOCKWALL APPROVALS
steel
Set Backs
Electric Bond
•
•
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
..-
Underground Electric
Underground Plbg. Test
,
Final
Gas Piping
• PLUMBING APPROVALS
Gas Test•
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure- :
Shower Pans ,
O.K. for Finish Plaster
Sewer Lateral
Pool Cover
Sewer Connection
Encapsulation
Gas Piping
Gas Test
Appliances
Final •
COMMENTS: ' .
C LUM
• AAA, 1007
.'
.
•
•
•
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I. •
;'Smoke Detectors
Temp: Use of Power
1
. Final
i Utility Notice (Perm)
- CITY OF LA QUINTA
SUB -LIST
CONTRACTOR - Aa2e6c-re
OWNER LoA4A4e�
ADDRESS 31(051 51 -1A -Do -to (A-03. WOO 7ALMs.-
JOB ADDRESS_ '4 --775 A�via 4ba
This form shall be posted on the job with the Building Inspection Card`at all times in a conspicuous place.
It is the responsibility of the General Contractor or the Owner/Builder to monitor the sub -contractors that
are on this list are the same persons performing the work. Any changes to this list must be approved the
City of La Quinta Department of Building & Safety prior to work being performed by a changed sub-
contractor. Failure to comply will result in a stoppage of work and/or the voidance of building permit.
.........................
.........................
.........................
.........................
.........................
.........................
;PIPELINE$
.........................
AMINi
..............
...............
..............
...............
..............
......................
MASO.NI
......................
......................
......................
......................
......................
MBI
STERI
...............
...............
...............
...............
14, Elda-
err C0 i@
.....::...:.:.............
FLOORING
INSULATI:OI
WAGE'DIS
...........................
..........................
...........................
..........................
PAINTI
.................
................. .
<DEC:ORATI
.........................
............................
...........................
CABINET.
..................... .
........................
.....................
......................
INSTALL.
NCINZ
>LANDSC'APING
..................................
.................................
OTHER.
A/C -12
C-34
C-8
A
B
C-51
C-29
C-36
C-26
C-9
C-36
C-20
C-1.0
97c46.4 . 6/'34' 1
C-43
C-15
C-17
C-2
C-42
C-33
VrATe Fv00
046 -11 - aoo3'r'4B
%lthe
3•Ci Lis 7
f 1 X 4
I
3 12`S�-`{"j-0U0 121 1
aq tz-r
/5,2_
C-54
C-6
C-13
C-27
C-53
RICHARD
I:.
LIES NELSON • ARCHITECT • A •1I •A
mmx•s:<z
78565 YAVAPA • INDIAN WELLS, CALIFORNIA 92210 • (619) 345-3500 .
1 Srwa Gi'7
S
Mtn t 'C a ; -- G N.
- VL L .-
I.. . Q u ,.- lay t L- Ca , G7e(;:;
1Z - L. 2Ce C' 'r', 4. P P LA C. I 1
4,1,2 l.piie-ca 'r2b . 5 4lFr
cN4c.¢. Grea, -4_,
4 77 4. A- Lvr> rg /se C)
W fLc.U L C:, L 1.14E 'Tb '2e4k-ot °T' e yC' N.k 5 t<
tG eF 14 t E°t 7 I a. . zit. r.. t ,e
l N 1.>0. ie,C4 17P•`15, t P C '1 ►. .
714- t tt..► v u G- `i% rt T kt-,c=" 1-4 { .,a..rz °L.:0
t r- laJa.t , -r at- 13'4. Deter. P
APPROV "i e Y P NNING & DEVELOPMENT DEPARTMENt
64 DATE 2:2-1:12----
.BY
EXHIBIT —
CASE NO.
(%)953aa
•-•City of. La Quinta IIIIIIIIIIIIIIIIIIIIIIIII
IE
Building 8i Safety Division'. -..-
P.O. Box 1504
78-495 Calle Tampico
La Quinta, CA 92253
Building Permit Application and Tracking Sheet
Project Address: 4 77 �L.vA.Qkcir,
Owner's Name:
32
Address:
City,ST, Zip: L1_ Qu
�ZZ53
Cl i E lz' 44 -AL
vAwc (5 ,q((o x 51i,3 -�-
Nance of Contact Person: jz(G)4p,-f'o'p 'i�-4
Telephone # of Contact Person: 3 4,4-- "'Qa
Sq. Ft J p # Stories:
' Estimated Value of Project: A
f e Rte,
utcy: \
Iter. Repair. Demo i
# Units: `
CONSTRUCTION ESTIMATE
NO.
ELECTRICAL FEES
NO.
PLUMBING FEES
1ST FL.
SO FT
SO FT
SO. FT
SO FT
Sp FT
SO FT
SO
VALUATION
i
$
STORAGE TANK
FORMS
UNITS
ROUGH WIRING
DUCT WORK
ROCK STORAGE
c
GAS (ROUGH
2ND FL.
•$
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
YARD SPKLR SYSTEM
a
POR.
.&
GRADING
- cu. yd.
.f
MOBILEHOME SVC.
FINAL INSP.
f plus 4
BAP SINK
FINAL INSP.
GAR
,y
REMARK&
VENTILATION
POWER OUTLET
FIRE ZONE ROOFING
FIREPLACE
ROOF DRAINS
SPARK ARRESTOR
,
CARP
,i
LATHING
MESH
-,-
INSULATION/SOUND
DRAINAGE PIPING
1
WALL
It
CERT. OCC.
FENCE FINAL
DRINKING FOUNTAIN
T.
URINAL
ESTIMA'ED CONSTRUCTION
S
WATER PIPING
NOTE: Not to Pe ;sea as property :ax +auauon
FLOOR DRAIN
MECHANICAL FEES
WATER SOFTENER
VENT SYSTEM FAN EVAP.COOL HOOD
SIGN
WASHER(AUTO$OISHt
APPLIANCE DRYER
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
LAUNDRY TRAY •
AIR HANDLING UNIT CFM
KITCHEN SINK
ABSORPTION SYSTEM B.T.0
TEMP USE PERMIT SVC
WATER CLOSET
COMPRESSOR HP
POLE. TEM/PERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER B.T.U.
SO. FT. . FT. 4 c
BATH TUB
'
SO. FT. 0 c
WATER HEATER
MAX. HEATER OUTPUT. B.T.U.
SO. FT. RESID @ 11/4 c
SEWAGE DISPOSAL
••
SO.FT.GAR @ 34c
HOUSE SEWER :
GAS PIPING
PERMIT FEE
PERMIT FEE
Y
PERMIT FEE
DBL
TOTAL FEES
MICRO FEE
MECH.FEE
PL.CK.FEE
CONST. FEE
ELECT. FEE
SMI FEE
PLUMB. FEE
•
STRUCTURE
PLUMBING
ELECTRICAL
HEATING & AIR COND.
SOLAR
SETBACK
GROUND PLUMBING'
UNDERGROUND
A.C. UNIT
COLL AREA
SLAB GRADE
ROUGH PLUMB.
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH
METER LOOP
HEATING (FINAL.).
OTHER APPJEOUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
FINAL INSP.
BOND BEAM
WATER SYSTEM
GRADING
- cu. yd.
.f
LUMBER GR.
FINAL INSP.
f plus 4
FRAMING
FINAL INSP.
ROOFING
-
REMARK&
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING
MESH
INSULATION/SOUND
FINISH GRADING
FINAL INSPECTION
CERT. OCC.
FENCE FINAL
GARDEN WALL FINAL
INSPECTOR'S S1GNATURESiIMI'TIALS
Notice:
Document Cannot Be Duplicated
Date 12/30/97
No. 16449
Desert Sands Unified School District
82-879 Highway 111
Indio, CA 92201
619-775-3500
CERTIFICATE OF COMPLIANCE
Owner NameT. Swift & Blanche G. Lockard
APN # 774-292-030
Jurisdiction La Quinta
Permit #
No. 54-775 StreetAvenida Alvarado Log #
Zip 92253 Study Area
City La Quinta
Tract #
Lot #
Type of Development Residential Addition
Comments
Square Footage 411
No. of Units
Addition of entry hall and master closet
At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered
patios/walkways, residential additions under 500 square feet, detached accessory structures or replacement mobilehomes.
It has been determined the above-named owner is exempt from paying school fees at this time due to the following
reason:
Residential Addition 500 Sq Feet or Less
EXEMPT
This certifies that school facility fees imposed pursuant to Government Code 53080
0.00 X 411 or $ 0.00
in the amount of
the property listed above and that building
permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued
Fees Paid By N/A
Name on the check
By Dr. Doris Wilson
Superintendent
Fee collected /exempted by Ellen Patino
Signature
Exempt
+•It"
Telephone '343-'12;1 1
n ..
Check No. N/A
$0.00'
NOTICE: Pursuant of Assembly Bill 3081 (CHAP 549, STATS. 1996) this will serve to notify you that the 90 -day approval period in which you may protest the fees or other payment identified
above will begin to run from the date on which the building or installation permit for this project is sssued or on which they are paid to the District(s) or to another public entity authorized to
collect them on the District('s)(s') behalf, whichever is earlier.
Collector: Attach a copy of county or city plan check application form to district copy for all waivers.
Embossed Original- Building Dept./Applicant Copy - Applicant/Receipt Copy - Accounting
••
f
§.w: . .• .
B tIS S.1 NSE L:S 0 N L• -A CHI
78565 YAYAPA }Nm\N WELLS, CALIFORNIA 92210 • (619) 3 58500
.r
111111111jilIIIIIIIII
STRUCTURAL CALCULATIONS
FOR:
Lockard
JOB # 97011
CLIENT
Richard Bliss Nelson Architect
78565 Yavapa
Indian Wells, CA.
92210
THOM HUME CONSULTING ENGINEERING
P.O. Box 15238 San Luis Obispo, CA. 93406
NOTE: This package of Structural calculations, notes, plans, details and other information,
is not a complete Structural Analysis of the entire structure under review. The
above signing engineer is only responsible for systems designed directly by him,
as outlined within this package.
Lockard Addtion
Job No. 97011 Pape 1 of
Beam over Entry
floor beam $1
7.5 SPAN (ft.)
1.25 LDF or Cd
def critera
240 360
POINT LOADS
DIST
DeadL
LiveL
X(ft)
(K)
(K)
3.75
0.28
0.63
Left Connection
Right Connedton
Dist ft.
OMENTc, center
DEAD (PLF)
LIVE (PLF)
Beam wt = pif
`Total =
DL (K)
LL (K)
0.49
SHEAR
0.18
0.32
0.49
Total (K)
Max /Uplift (K)
0.0
0.0
11.2 Of
11.2 Of
0.18
0.32
0.49
0.49
Deflection @ 3.75 feet -0.04 in. down
20 -Dec -98
12:58
= Dist ft.
M=1.78 Kat
Sx=49.91n"3
fb=427psi <Pb=1375psi
31.08% (stressed)
Fb=(Fb)(Cd)(CF)
Fb'=1000(1.25)(1.10)=1375 psi
V=0.49 - 0.01 = 0.49 K
A=32.4 in"2
Pv=95 x (Cd=1.25) = 119 psi
fv=23 psi <119 psi
18.97% (stressed)
I =230.8 in"4 E =1800000 psi
TLdef=-0.04"<L/240.38"
LLdef=-0.02"<LI360=0.25"
TL = 9.34 % stressed
DL= -0.01 in
4x10 #1
Left Post 2-2x4 stud @ 8 ft. ht. (max bad =4.00K > 0.49K)
Right Post 2-2x4 stud @ 8 ft. ht. (max Toad =4.00K > 0.49K)
Beam at balcony
floor beam #2
8.0 SPAN (ft.)
1.00 LDF or Cd
def critera
240 360
POINT LOADS
DIST
,X (ft)
DeadL
(K)
LiveL
(K)
4.00
0.09
0.48
Left Connection
Right Connedton
MOMENT@ center
M=2.36 K -ft
Sx=49.9 in"3
fb=568psi <Fb=1100psi
51.62%(stressed)
Pb=(Fb)(CF)
Fb'=1000(1.10)=1100 psi
Dist ft. =
DEAD (PLF)
LIVE (PLF)
Beam wt = plf
Total
0.18
0.72
0.90
DL (K)
LL (K)
22.0
120.0
11.2
153.2
0.18
0.72
pff
p8
Total (K) 0.90
0.90 Max /Uplift (K) 0.90
SHEAR Deflection @ 4.00 feet -0.06 in. down
V41.90 - 0.12 = 0.78 K I =230.8 in"4 E =1800000 psi
A=32.4In"2 TLdef=-0.06"<U240 0.40"
F'v=95 psi LLdef=-0.05"<U360=0.27"
fv=36 psi <95 psi TL = 14.80 % stressed
37.98% (stressed) DL= -0.01 in
4x10 #1
20 -Deo -98
12:58
= Dist ft.
Left Post 2-2x4 stud @ 8 ft. ht. (max Toad =4.00K > 0.90K)
Right Post 2-2x4 stud @ 8 ft. ht. (max load =4.00K > 0.90K)
15 -Jan -98 Thom Hume Consulting Engineers
Beam at balcony
floor beam t3
4.0 SPAN (ft.)
1.00 LDF or Cd
def critera
240 360
POINT LOADS
DIST
IX (ft)
-3.75
DeadL
(K)
LiveL
(K)
0.22
0.90
Lockard Addtion
Job No. 97011 Page 2 of
Left Cantilever Dist ft. = 3.75
Unbraced member
Vmax=1.16-0.01=1.15K
fv=53<FV 95=95psi
Mmax=4.28 Kft, ftr=1030psi
Fb'=1000(CL=0.995)(CF=1.10)=1095psi
Fb'=1095>fb=1030 psi 0.26
TLdef=-0.17 "<(/240=0.28 0.90
LLdefm-0.14 ">L/360=0.19
DLdef=-0.04 In
MOMENT@ center
Beam wt = plf
Total =
0.25
0.84
1.16 1.09
2.26
SHEAR
DL (K)
LL (K)
Total (K) -1.05
Max /Uplift (K) 1.05 -1.0
Deflection @ 2.00 feet 0.00 in. down
11.2
11.2
-0.20
-0.84
Pff
Pff
20 -Dec -98
12:58
= Dist ft.
Unbraced member
M=4.28 K -ft
Sx=49.9in"3
fb1030psi <F'b=1100psi
93.83% (stressed)
F'b=(Fb)(CF)
Unbraced Member Fb'=1000(1.10)=1100 psi
V=1.09 - 0.01 = 1.08 K
A=32.4 in"2
Fw=95 psi
fv=50 psi <95 psi
52.90% (stressed)
I =230.8 in"4 E =1800000 psi
TLdef=0.03"<U240=0.20"
LLdet-0.01"<U360=0.13"
TL = 15.26 % stressed
DL= 0.00 in
4x10 #1
Left Span; Iu = 3.75 x 1.87 = 7.01, Rb= 7.97, Fbe=12408, CI=0.995
Left Connection Left Post 2-2x4 stud @ 8 ft. ht. (max Toad =4.00K > 2.26K)
Right Conneciton Right Post 2-2x4 stud @ 8 ft. ht. (max Toad 4.00K > 1.05K)
15 -Jan -98
Thom Hume Consulting Engineers
Lockard Addtion Job No. 97011 Page 3 of
Closet at height of 10.0 ft above ground
SEISMIC LOAD WIND LOAD
GRID seismic dead diaph number lateral ht wind
LINE factor Toad depth # Toad grd factor ht Toad
Closet 10.0
0 W J roof 0.183 x 9 x x 1 = 0 ridge 20.0 18.51 x 4.07 = 75
floor 0.183 x 13 x 11.0 x 1 = 26 gable 10.0 17.36 x 1.00 = 17
wall 0.183 x 18 x 3.5 x 2 = 23 slope 10.0 17.36 x 3.50 = 61
misc 0.183 x 12 x x 2 = 0 10.0 17.36 x 0.00
total 49 plf 153 plf
ON
El roof 0.183 x 9 x x 1 = 0 ridge 20.0 18.51 x 4.07 = 75
floor 0.183 x 13 x 22.0 x 1 = 52 gable 10.0 17.36 x 1.00 = 17
wall 0.183 x 18 x 3.5 x 2 = 23 slope 10.0 17.36 x 3.50 = 81
misc 0.183 x 12 x x 2 = 0 10.0 17.36 x 0.00
total 76 Of 153 Of
15 -Jan -98
Thom Hume Consulting Engineers
Lockard Addtion
Entry at height of 10.0 ft above ground
SEISMIC LOAD WIND LOAD
GRID seismic dead diaph number lateral ht wind
LINE factor bad depth 0 load grd factor ht load
Entry 10.0
0 Q roof 0.183 x 9 x 8.0 x 1 = 13 ridge 20.0 18.51 x 1.00 = 19
floor 0.183 x 13 x x 1 = 0 gable 10.0 17.36 x
wall 0.183 x 18 x 4.0 x 2 = 26 slope 10.0 17.36 x 4.00 = 69
misc 0.183 x 12 x x 2 = 0 10.0 17.36 x 0.00
total 39 plf 88 pif
EN []roof 0.183 x 9 x 25.0 x 1 = 40 ridge 20.0 18.51 x 1.00 = 19
floor 0.183 x 13 x x 1 = 0 gable 10.0 17.36 x
wall 0.183 x 18 x 4.0 x 2 = 26 slope 10.0 17.36 x 4.00 = 69
misc 0.183 x 12 x x 2 = 0 10.0 17.36 x 0.00
total 67 plf 88 ptf
Job No. 97011 Page 4 of
15 -Jan -98 Thom Hume Consulting Engineers
Lockard Addtion Job No. 97011 Page 5 of
Porch at height of 10.0 ft above ground
SEISMIC LOAD WIND LOAD
GRID seismic dead diaph number lateral ht wind
LINE factor load depth # load grd factor ht load
Porch 10.0
0 El roof 0.183 x 9 x 24.0 x 1 = 39 ridge 20.0 18.51 x 0.50 = 9
floor 0.183 x 13 x x 1 = 0 gable 10.0 17.36 x
wall 0.183 x 18 x 8.5 x 2 = 56 slope 10.0 17.36 x 8.50 = 148
misc 0.183 x 12 x x 2 = 0 10.0 17.36 x 0.00
total 95 pH 157 pH
Q []roof 0.183 x 9 • x 12.0 x 1 = 19 ridge 20.0 '.1J 18.51 x 0.50 = 9
floor 0.183 x 13 x x 1 = 0 gable 10.0 17.38 x
wall 0.183 x 18 x 8.5 x 2 = 56 slope 10.0 17.36 x 8.50 = 148
misc 0.183 x 12 x x 2 = 0 10.0 17.38 x 0.00
total • 75 pH
15 -Jan -98
157 pH
Thom Hume Consulting Engineers
•
GRIDLINE EAST
Closet
Lockard Addtion
DIAPHRAGM
Closet
E -W
Entry
E -W
Wall Force lbs
2744
LOAD TYPE
wind
wind
7
LOAD (pfl)
153
18
88
DL floor/roof/misc (off)
WIDTH (ft)
22.00
22.00
24.00
total D.L. (PLF)
0.00
FORCE (K)
(above) (K)
1.69
0.00
1.06
LENGTH (ft)
10.00
10.00
10.00
0.00
1.09
DIA. SHEAR (plf)
169
0
106
'
REQUIREMENT
(1)
(1)
Uplift above (K)
RIM SHEAR (pfl)
WIND FORCE =2.74k
274 Of
16d USE 16d (814" o.c.
A35F OR USE A35F @ 19" o.c.
SHEARWALL TOTAL FORCE = 2.74 WIND GOVERNS
TOTAL LENGTH = 9.00
WALL SHEAR = 305 pH
WALL TYPE A OK 310 > 305 pH 98.3% stressed
USE 1/2" C -D STRUCT 1 one side
w/ 10d nails at 6 o.c. edge 12"o.c. field
2x sill plate w/ 5/8" die A.B. @ 35" oc max. spacing or 3 - 5/8" dia A.B.
2x sill plate w/ 16d @ 4" o.c. maximum spacing
A35F 17" o.c.
Note (1) typical roof or floor sheathing will be adequate for the loads
GRID UNE WEST
Closet
DIAPHRAGM
closet
E -W
Wall Force lbs
2744
LOAD TYPE
wind
wall Height (ft)
7
LOAD (plf)
153
18
DL floor/roof/misc (off)
WIDTH (ft)
22.00
22.00
total D.L. (PLF)
0.00
FORCE (K)
(above) (K)
1.69
0.00
9.36
LENGTH (ft)
10.00
10.00
0.00
1.09
DIA. SHEAR (ptf)
169
0
Res. Uplift (K)
'
REQUIREMENT
(1)
Uplift above (K)
RIM SHEAR (plf)
WIND FORCE = 1.69 k
169 pH
16d USE 18d @ 6" o.c.
A35F OR USE A35F 31" o.c.
SHEARWALL TOTAL FORCE = 1.69 WIND GOVERNS
TOTAL LENGTH = 9.00
WALL SHEAR =188 pH
WALL TYPE A OK 310 > 188 ptf 60.5% stressed
USE 1/2" C -D STRUCT I one side
w/ 10d nails at 6"o.c. edge 12"o.c. field
2x sill plate w/ 518" dia A.B. @ 56" oc max. spacing or 2 - 5/8" dia A.B.
2x sill plate w/ 16d @ 7" o.c. maximum spacing
A35F 65l 28" o.c.
Note (1) typical roof or floor sheathing will be adequate for the loads
GRID UNE NORTH
C
DIAPHRAGM
Closet
NS
Wall Force lbs
2744
LOAD TYPE
wind
wall Height (ft)
7
LOAD (p8)
153
18
DL floor/roof/misc (off)
WIDTH (ft)
11.00
total D.L. (PLF)
0.00
FORCE (K)
(above) (K)
0.84
Mom. Res. (K -ft)
9.36
LENGTH (ft)
22.00
0.00
1.09
DIA. SHEAR (p8)
38
Res. Uplift (K)
'
REQUIREMENT
(1)
Uplift above (K)
RIM SHEAR (plf)
WIND FORCE = 0.84 k
38 pH
16d USE 16d @ 26" o.c.
A35F OR USE A35F @ 138" o.c.
SHEARWALL TOTAL FORCE = 0.84 WIND GOVERNS
TOTAL LENGTH = 4.50
WALL SHEAR = 188 Of
WALL TYPE A OK 310 > 188 Of 60.5% stressed
USE 1/2" C -D STRUCT 1 one side
w! 10d nails at 6"o.c. edge 12-o.c. field
2x sill plate w/ 5/8" die A.B. @ 56" oc max. spacing or 1 - 5/8" dia A.B.
2x sill plate w/ 16d @ 7" o.c. maximum spacing
A35F ek 28" o.c.
Note (1) typical roof or floor sheathing will be adequate for the bads
WALL ANALYSIS
LOAD TYPE = WIND GOVERNS
Job No. 97011 Page 6 of
Lengths of Walls (ft)
9.00
Wall Force lbs
2744
wall Height (ft)
7
wall D.L. (psf)
18
DL floor/roof/misc (off)
105
total D.L. (PLF)
231
Mom. Res. (K -ft)
9.36
Mom.O.T. (K -ft)
19.2
Uplift (K)
1.09
Res. Uplift (K)
'
Uplift above (K)
Total Compression (K)
3.17
Bearing 625
dbl 2x4 min
Total Uplift (K)
1.1
Holdown Req.
PHD2
Post req
4x post
Connection Req'd (min.'
1oSOS1/4X3 ws
Maximum Load (K)
3.285
Stressed
33.32%
WALL ANALYSIS
LOAD TYPE = WIND GOVERNS
Lengths of Walls (ft)
10.00
Wall Force lbs
1876
wail Height (ft)
8
wall D.L. (psf)
18
DL floor/roof/misc (plf)
26
total D.L. (PLF)
170
Mom. Res. (K -ft)
8.51
Mom. 0.T. (Kat)
15.0
Uplift (K)
0.65
Res. Uplift (K)
0.75
Uplift above (K)
Total Compression (K)
2.35
Bearing 625
dbl 2x4 min
Total Uplift (K)
-0.1 k NO HD
Holdown Req:
PHD2
Post req
4x post
Connection Req'd (mina
ws
Maximum Load (K )
3.285
Stressed
32.83%
WALL ANALYSIS
LOAD TYPE = WIND GOVERNS
(Lengths of Walls (ft)
4.50
Wall Force lbs
844
wall Height (ft)
8
wall D.L. (psf)
18
DL floodroof/misc (plf)
44
total D.L. (PLF)
188
Mom. Res. (K -ft)
1.90
Mom. O.T. (K -ft)
6.8
Uplift (K)
1.08
Res. Uplift (K)
Uplift above (K)
Total Compression (K)
1.92
Bearing 625
dbl 2x4 min
Total Uplift (K)
1.1
Holdown Req.
PHD2
Post req
4x post
Connection Req'd (min.;10-SDSSv4X3
ws
Maximum Load (K)
3.285
Stressed
32.83%
15 -Jan -98
Thom Hume Consulting Engineers
GRID UNE SOUTH
Closet
Lockard Adddon
DIAPHRAGM
closet
NS
Wall Force Ibs
844
LOAD TYPE
wind
wall Height (ft)
8
LOAD (pti)
153
18
DL f oor/roof/misc (pif)
WIDTH (rt)
11.00
total D.L. (PLF)
188
FORCE (K)
(above) (K)
0.84
Mom. Res. (K -ft)
45.44
LENGTH (ft)
22.00
Uplift (K)
-1.76
DIA. SHEAR (pff)
38
Res. Uplift (K)
REQUIREMENT
(1)
Uplift above (K)
RIM SHEAR (ptf
WIND FORCE = 0.84 k
16d USE 16d @ 26" o.c.
A35F OR USE A35F @ 138" o.c.
SHEARWALL TOTAL FORCE = 0.84 WIND GOVERNS
TOTAL LENGTH = 22.00
WALL SHEAR = 38 pif
WALL TYPE DRYWALL OK 50 > 38 plf 76.7% stressed
USE 1/2"or 5/8" Gyp.Bd. both sides
w/5d (cooler) @ 4" o.c. @ 4" o.c.
2x sill plate w/ 5/8" dia A.B. @ 275" oc max. spacing or 1 - 5/8" dia A.B.
2x sill plate w/ 16d @ 34" o.c. maximum spacing
A35F 138" o.c.
Note (1) typical roof or floor sheathing wit be adequate for the loads
YSIS
LOAD TYPE = WIND GOVERNS
Job No. 97011 Page 7 of
Lengths of Walls (ft)
22.00
Wall Force Ibs
844
wall Height (ft)
8
wall D.L. (psf)
18
DL f oor/roof/misc (pif)
44
total D.L. (PLF)
188
Mom. Res. (K -ft)
45.44
Mom. O.T. (K -ft)
6.8
Uplift (K)
-1.76
Res. Uplift (K)
Uplift above (K)
Total Compression (K)
2.37
Bearing 625
dbl 2x4 min
Total Uplift (K)
-1.8 k NO HD
Holdown Req.
Post req
Connection Req'd (mina
Maximum Load (K )
Stressed
15 -Jan -98 Thom Hume Consulting Engineers
Lockard Addtion
GRID. UNE NORTH & SOU E
DIAPHRAGM
Entry
NS
Wall Force lbs
352
LOAD TYPE
wind
wall Height (ft)
8
LOAD (ptf)
88
18
DL floor/roof/misc (pif)
WIDTH (ft)
8.00
total D.L. (PLF)
188
FORCE pc)
(above) (K)
0.35
Mom. Res. (K -ft)
4.60
LENGTH (It)
7.00
Uplift (K)
-0.26
DIA. SHEAR (ptf)
50
Res. Uplift (K)
REQUIREMENT
(1)
Uplift above (K)
ERR
WIND FORCE = 0.35 k
16d
A35F
ERR
ERR
SHEARWALL TOTAL FORCE = 0.35 WIND GOVERNS
TOTAL LENGTH a 7.00
WALL SHEAR = 50 pH
WALL TYPE DRYWALL OK 63 > 50 Of 80.4% stressed
USE 1/Tor 5/8' Gyp.Bd. both sides
w/5d (cooler) @ 4' o.c. 4' o.c.
2x sill plate w/ 5/8" dia A.B. @ 210" oc max. spacing or 0 - 5/8" dia A.B.
2x sill plate w/ 16d @ 26" o.c. maximum spacing
A35F 105" o.c.
Note (1) typical roof or floor sheathing will be adequate for the loads
WALL ANALYSIS
LOAD TYPE = WIND GOVERNS
Job No. 97011 Page 8 of
Lengths of Walls (ft)
7.00
Wall Force lbs
352
wall Height (ft)
8
wall D.L. (psf)
18
DL floor/roof/misc (pif)
44
total D.L. (PLF)
188
Mom. Res. (K -ft)
4.60
Mom. O.T. (K -ft)
2.8
Uplift (K)
-0.26
Res. Uplift (K)
Uplift above (K)
Total Compression (K)
1.06
Bearing 625
dbl 2x4 min
Total Uplift (K)
-0.9 k NO HD
Holdown Req.
Post req
Connection Req'd (mina
Maximum Load (K )
Stressed
15 -Jan -98 Thom Hume Consulting Engineers
GRID EINE EAST
Porch
Lockard Addtion
DIAPHRAGM
Porch
E -W
4.00
Wall Force lbs
941
LOAD TYPE
wind
wall Height (ft)
16
16
LOAD (pif)
157
18
18
DL floor/roof/misc (plf)
WIDTH (ft)
24.00
total D.L. (PLF)
0.00
393
FORCE (K)
(abs) PQ
1.88
Morn. Res. (K -ft)
3.14
3.14
LENGTH (ft)
11.00
15.1
0.00
2.98
DIA. SHEAR (Of)
171
Res. Uplift (K)
REQUIREMENT
(1)
Uplift above (K)
RIM SHEAR (plf)
WIND FORCE = 1.88 k
171 plf
16d USE 18d 6" o.c.
A35F OR USE A35F @ 31" o.c.
SHEARWALL TOTAL FORCE = 1.88 WIND GOVERNS
TOTAL LENGTH = 8.00
WALL SHEAR = 235 plf
WALL TYPE A OK 310 > 235 plf 75.9% stressed
USE 1/2" C -D STRUCT I one side
w/ 10d nails at 6"o.c. edge 12"o.c. field
2x sill plate w/ 5/8" dia A.B. @ 45" oc max. spacing or 2 - 5/8" dia A.B.
2x sill plate w/ 16d @ 6" o.c. maximum spacing
A35F 22" o.c.
Note (1) typical roof or floor sheathing will be adequate for the bads
GRID UNE NORTH
Porch
DIAPHRAGM
Porch
NS
4.00
Wall Force lbs
941
LOAD TYPE
wind
wall Height (ft)
16
16
LOAD (p4)
157
18
18
DL floor/roof/misc (plf)
WIDTH (ft)
12.00
total D.L. (PLF)
0.00
393
FORCE (K)
(above) (fQ
0.94
Morn. Res. (K -ft)
3.14
3.14
LENGTH (ft)
24.00
15.1
0.00
2.98
DIA. SHEAR (pt)
39
Res. Uplift (K)
REQUIREMENT
(1)
Uplift above (K)
RIM SHEAR (pt)
WIND FORCE = 0.94 k
86 plf 16d USE 16d @I 12" o.c.
A35F OR USE A35F @ 62" o.c.
SHEARWALL TOTAL FORCE = 0.94 WIND GOVERNS
TOTAL LENGTH = 8.00
WALL SHEAR = 118 p1f
WALL TYPE DRYWALL OK 125 > 118 Of 94.1% stressed
USE 1/2"or 5/8" Gyp.Bd. both sides
w/5d (cooler) 4" o.c. 4" o.c.
2x silt plate w/ 5/8" dia A.B. @ 90" oc max. spacing or 1 - 5/8" dia A.B.
2x sill plate w/ 16d @ 11" o.c. maximum spacing
A35F 45" o.c.
Note (1) typical roof or floor sheathing will be adequate for the loads
WALL ANALYSIS
LOAD TYPE = WIND GOVERNS
Job No. 97011 Page 9 of
Lengths of Walls (ft)
4.00
4.00
Wall Force lbs
941
941
wall Height (ft)
16
16
wail D.L. (psf)
18
18
DL floor/roof/misc (plf)
105
105
total D.L. (PLF)
393
393
Morn. Res. (K -ft)
3.14
3.14
Mom.O.T. (K -ft)
15.1
15.1
Uplift (K)
2.98
2.98
Res. Uplift (K)
Uplift above (K)
Total Compression (K)
4.55
4.55
Bearing 625
dbl 2x4 min
dbl 2x4 min
Total Uplift (K)
3.0
3.0
Holdown Req.
'1•hles-
1'L9i'(a'D
Post req
-4x1:00*
Connection Req'd (mina
1" s„su.xamoo
Maximum Load (K)
'rlI+
Stressed
66.48%
WALL ANALYSIS
LOAD TYPE = WIND GOVERNS
Lengths of Walls (ft)
4.00
4.00
Wall Force lbs
471
471
wall Height (ft)
16
16
wall D.L. (psf)
18
18
DL floor/roof/misc (plf)
26
26
total D.L. (PLF)
314
314
Mom. Res. (K -ft)
2.51
2.51
Mom. O.T. (K -ft)
7.5
7.5
Uplift (K)
1.25
1.25
Res. Uplift (K)
Uplift above (K)
Total Compression (K)
2.51
2.51
Bearing 625
dbl 2x4 min
dbl 2x4 min
Total Uplift (K)
1.3
1.3
Holdown Req.
14489`•
rigrig
Post req
4xpost--
Connection Req'd (mina
10SDS1/4X3ws
Maximum Load (K)
3.285
Stressed
38.16%
15 -Jan -98 Thom Hume Consulting Engineers
r• Imbed Addtion
Job No. 97011 Pepe 10of
Horizontal support beam In Porch
foundation beam 11
18.0 SPAN (R.)
1.33 LDF or Cd
def critera
240 360
POINT LOADS
01ST
X (ft)
DeadL
(K)
llvel
(K)
Dist R. _
17psfx9plf 147.8
0.0
Beam wt = pit 0.0 plf
Total 147.8 plf
1.18 DL (K) 1.18
0.00 LL (K) 0.00
1.18 Total (IQ 1.18
1.18 Max /Uplift (K) 1.18
MOMENTG center SHEAR Deflection ® 8.00 feet -1.03 in. down
M=4.72 Kot V=1.18 - 0.09 = 1.09 K I =111.1 inM E =1900000 psi
Sx-30.7 in"3 A-25.4 in"2 ` . ' TLdef=-1.03"3.1/240=0.80"
tb=18480 <F'b=2194psi Fb=95 x (Cd=1.33) = 128 psi ' LLdef=0.00'<LP380=0.53'
84.24% (stressed) fv=85 psi <128 psi 11. = 128.81 % stressed
20.Oec6e
12:58
= Dist ft.
Fb=(Fb)(Cd)(CLXCF) 51.07% (stressed) DL= -1.03 In
Unbraced Member Fb'=1450(1.33)(0.948)(1.20)=2194 psi
Center Span; lu = 16.00 x 1.63+3d = 27.89, Rb= 14.07, Fbe=4201, CI=0.9
Left Connection
Right Conneciton
f (2) Z. ,c/4
3:•�
;o L 36 .01.33=2.13.72�=s�
e-•
Post supporting metal Angels
foundation beam 12
16.0 SPAN.0.)•
1.33 LDF.orCd
def afters•. •
240 '.360
POINT LOADS .
DIST LIreL
(K)
X(R)
DeadL
(K)
9.00
1.18
ENT center
Dist R.
Beam wt = plf 0.0 plf
Total = 0.0 plf
0.52 DL (K) 0.66
0.00 LL (IQ 0.00
0.52 Total (K) 0.66
0.52 Max /Upfdt (K) 0.68
SHEAR Deflection a 8.00 feet -1.39 in. down
20 -Dec -Oe
1258.
Left Connection
Right Conneciton
M=4.65 Kat
Sxa27.7 In"3
fba2012psi >Fb=1995psi
100.84% (stressed)
V=0.68 -0.00=0.86K
'A=30.3 MI
F'85 x•(Cd=1.33) = 113 psi
fv=33 psi <113 psi
I =78.3 InM E =1600000 psi
TLdef=-1.39">L/240=0.80" NG
LLdef=-0.00'<L/360=0.53"
TL = 174.38 % stressed
Fb=(FbXCd) 29.13% (stressed) DL= -1.38 in
Fle=1500(1.33)=1995 psi 1 8X6 Select Structural . 1
Deck joist over Closet
floor beam #4
10.5 SPAN (ft.)
1.25 LDF or Cd
def critera
240 360
POINT LOADS
DIST
X (ft)
DeadL
(K)
LiveL
(K)
Lockard Addtlon
Job No. 97011 Page 1(of
MOMENT _ center
M=1.03 K -ft
Sx=13.1 in"3
fb=937psi <F'b=1509psi
Repetative Member Cr :62.07% (stressed)
F'b=(Fb)(Cd)(CF)(Cr)
Fb'=875(1.25)(1.20)(1.15)=1509 psi
Dist ft. =
Left Connection
Right Conneciton
20 -Dec -98
12.58
= Dist ft.
DEAD (PLF) 17.3
LIVE (PLF) 53.3
Beam wt = plf 3.8 pif
Total = 74.4 ptf
0.11 DL (K) 0.11
0.28 LL (K) 0.28
0.39 Total (K) 0.39
0.39 Max /Uplift (K) 0.39
SHEAR Deflection r_, 5.25 feet -0.27 in. down
V=0.39 - 0.04 = 0.35 K I =47.6 inA4 E =1600000 psi
A=10.9 in"2 TLdef=-0.27"<L/240=0.53"
Pv=95 x (Cd=1.25) = 119 psi LLdef=-0.19"<IJ360=0.35"
fv=48 psi <119 psi TL = 50.88 % stressed
40.17% (stressed) DL= -0.08 in
2x8#2 16 o �.
Left Post 2-2x4 stud @ 8 ft. ht. (max load =4.00K > 0.39K)
• Right Post 2-2x4 stud @ 8 ft. ht. (max load =4.00K > 0.391K)
•
15 -Jan -98 Thom Hume Consulting Engineers
STRUCTURAL CALCULATIONS
FOR:
Lockard Addtion
54775 Avenido Alvacado
La Quinta, Calif.
JOB # 97011
CLIENT
Richard Bliss Nelson Architect
78565 Yavapa
Indian Wells, Calif.
. 92210
THOM HUME CONSULTING ENGINEERING
P.O. Box 15238 San Luis Obispo, Cal. 93406
NOTE: This package of Structural calculations, notes, plans, details and other information,
is not a complete Structural Analysisof the entire structure under review. The
above signing engineer is only responsible for systems designed directly by him,
as outlined within this package.
I --"f)
= 2_p / 74vQ5
seri: 4041 '!
(1
/1
(%o' G.l) 77 E
z
the
h (co.)? 6)5171
►
(1)(52''1 ) (gsr G) i(1)(-;zili
-i-
it
z'z))t(56Zl"4- (��) sz'7) :J
rrL
(1)(5-2,, (s 7:z,)(1..0)2
d-
(s'*$L)(2(sq
�.� 6,07/ / =
qvn
JSG
Z
hE
V
S Z'r
6-7C> x v J VI
)(0)21)(c7) -2Q).
g 9-2
1-17,sQ a Nor'