Loading...
RER (9911-184) (Plans)- G O UVIS ENGINEERING • C A L I F O R, N I A • cA ember 9, 1999 E-MAIL TO • SUPPORT@GOUVISGROUP.COM SALES@GOUVISGROUP.COM T.D. Desert Development C/o Sparks Construction P.O. Box 1716 La Quinta, CA 92253 CITY OF LA Q U i N Al Attn: Nolan Sparks BUILDING & SAFETY DEPT.; APPROVED Re: Montanas. Plan # 2 FOR CONSTRUCTION GEC Job No.: 20505 DATE BY Dear'Mr. Sparks: Pursuant to your request regarding the above captioned project, per our phone conversation on 11/9/99, we submit the following: .See the attached partial framing, and foundation plan and detail "A" for the added 8090 door between the dining room and the family room. Note: Please verify the above with the building department prior to construction. If you have any questions, please do not hesitate to contact this office. Sincerely, ore _ GOUVIS G Rl�`T�Q�IFORNIA 1�l0: 038276 $ era X c Exp. 3/31 /00 Saeed J. Bek am ®�- R o d rangie "President ��� CIVIL ��`� " Projec manager. SB:cb 20505 i attachments: (6) _ GOUVISENGINEERING GROUPOF COMPANIES, WITH OFFICES IN. WEB -SITE: WWW.GOUVISGROUP.COM 4400 CAMPUSDRIVE, SuiTEA • NEWPORTBEACH, CAL/FORMA 92660 • (949) 752-1612 • FAX (949) 752-5321 2150 EAST TAHQUITZ CANYON, SUITE 9 PALM SPRINGS, CALIFORNIA 92262 • (760) 323-5090 FAX (760) 325-2863 5465 MoREHousEDRIVE, SUITE 100 • SANDIEGO, CALIFORNIA 92121 • (858) 623-9941 FAX (858) 623-0278 FIELD OFFICES: LAS VEGAS (702) 597-2005 • FAX (702) 597-0905 • FREMONT (510) 252-9195 FAX (510) 252-9196 k • _ �rlli/ v Iv ►,�:•�i�t.i.i*i;�+.r �:,yk.AvVl�iv,�:s .,t,,.. .. Job No : 20505 . Client : TD Plan No : 2 Wind 3768 Date :04110/98 seta<ni� also '.gSdy'���L Engineer: STEVEN(Ver3.00) + , � •_ . � 1. 14.0" e.o , 2.6 9.0 0INP6RJOR HOLDDOWN ' 6=6 Iry 1532 S . A. B D A 0.0 12.8 7,0 37.7 , 50,5 } 33.0 IS77 Drag Force Analysis A: SIMPSON ST22 (1150 LB) ALT (12) # 16d'sinke3^ per top plate splice B: SIMPSON ST6224(2116:LB) ALT (18) #,16d sinker per top plate splice, 16 AT RIGHT'OF DINING INTERIOR WALL STORY': FIRST FLOOR TWO'POUR FOUNDATION 94"UBC TOTAL WALL LENGTH = 50'.5(FT). TOTAL PANEL LENGTH = �0.0(17T) SHEAR DIAPHRAM = 4550/ 50.5 90(PLF) SHEAR • 4550/ 9. 0- $8S56(PLF) MAXIMUM DRAG FORCE '1577 (LB) USE TYPE 1 w/ 1/2" DIAMETER x10'-' LONG ANCHOR BOLT MAX. (S-) A" o/c DEAD LOADS: Wall. 140 _ 10 * 14' ; a Roof -P 38.0 19 *'4.0/2 FROM 0.0' TO 50.5' OVERT ANALYSISd PANEL AW LEFT SIDE UPLIFT =r1/�bq% a (LA) USE I► 84/4x�o. RIGHT-SIDE- UPLIFT =6C��Y (LB) USE �►j4xo • . , . r ' UT,