Loading...
1985 11 14 CSC e e AGE N D A COMMUNITY SERVICES COMMISSION - CITY OF LA QUINTA An adjourned regular meeting of the Community Services Commission to be held at City Hall, 78-105 Calle Estado, la Quinta, California. November 14, 1985 7:00 p.m. 1. CALL TO ORDER 2. ROLL CALL 3. COMMUNICATIONS 4. PUBLIC COMMENT 5. COMMITTEE REPORTS 6. OLD BUSINESS 7. NEW BUSINESS A. Presentation of the Avenue 50 Park Plan. 8. ADJOURNMENT . e e JrrU~"". -r-r"H..... J.AN~ r__ ,.4_) /' > " ~~~'_I-/I ~!I_"" .,ra " '. ~ ... ... \' ., , \ ,," '\ ~."',...-~ .",.""",.,./'1 _ "'",-",,-u_. as.P.,. f"#.r_"". 'J - -- ..... '. "'lIP .. .,' ,.... W'. ".'(_101'_) -------, . I r U -. - -- .'-~' --PPL"'''.~~';;;:''' -..:-~ - r -r '-""~~-6~. .,. -':f- -f ~a wr-: ~'''''''''''.''''r MAsrrElt PLAN S~rUI)Y B City of La Quinta Park Study TIlE CHOVE I.. (,llliIlH'l, lAhf..n1:1 ...~ ., . A J)(.\'t'~.1II11'11I hy TilE (au)\'!-: ASSO(',^TI,:S ROBERT LAMIl IIART n r--1 l' rlnlltltu. ArchilnlS .nd I L-...J I L.nd~c.pe Archilcclt. Lid .1' to. 100 . Oc.."., II. "II ( - e ROBERT LAMB HART Planner. and ArchUecI., Lid. New York · SaD PraDcf.co October 28, 1985 CITY OP LA OUINTA PARK KASTER PLAN PHASING SUMMARY 180 California SIr.el SaDl'r&llcl.co, c&. 86111 611888-6180 PHASE I 1) Entrance drive, temp. parking lot $93,800 2) Minimal development of park area south of entrance drive $96,980 3) Restrooms 5) Arch./Engineering fees and contingency TOTAL PHASE I $18,000 $160,600 $85,750 4) Lighted ballfield . '455,130 PHASE II 1) Permanent parking Area $26,750 2) Development of park area $318,620 south of entrance drive, planting, tot lot, tennis, volleyball, picnic shelters. 3) Ave 50 R.O.W. $27,350 4) parking and Entrance $30,000 Drive Lighting 5) Arch/Engineering fees and contingency TOTAL PHASE II $93,450 '.. '496,17b PHASE III 1) Swim complex and upper picnic area $655,900 2) Arch./Engineering fees and contingency TOTAL PHASE III TOTAL ALL PHASES $152,200 '808,100 '1,759,400 ~. e October 25, 1985 CIn or LA QUINTA PARI KASTBR PLAR - PHASB I COST BSTIKATB i, VII. LIGHTED BASEBALL rIELD - to be coordinated with elementary achool A. Baseball field (includes rough and fine grading, backatop sod infield, aeeded outfield) B. Lighting (20 poles) C. Irrigation (to aupplement achool ayatem) D. Furniture 1. Athletic bench- 12', backless galvanized pipe frame, embedded. 2. Bleachers- permanent,S tier, 50 each; steel frame. 3. Drinking fountain QTY. I. SITE PREPARATION A. Grading, road preparation 28,000CY II. 8ARDSCAPE A. Entrance Drive B. Concrete curb , Entrance Drive 23,800SF 1,550LF C. Temporary Parking area 2,300SY (crushed granite paving, 2-, compacted on compacted subgrade) III. PLARTING A. Picnic area/play areaa aouth of entrance drive, lawn graa. aeed cover. 12,OOOSY IV. IRRIGATION -Area aouth of drive l67,600SF V. SITE STRUCTURES A. Picnlc Shelters- flat, built-up 2-800SF mineral roof, embedded posts on alab, (20'x 20' typical size). B. Restrooms- flat roof, stucco 300SF aiding, acreens, 2 atalls, 2 sinks each. C. Sewer access allowance VI. PURNITORB- SITE AMENITIES A. Tables- ateel pedestal, embedded, 6' long. B. Trash receptacles- 22 gal., embedded, ptd. metal basket. aeata 4 VIII.ARCHITECTURE AND IRGINEERING 12' of site development total TOTAL PROJBCT COSTS - PHASB I VIIII.CONTINGENCY 10' of project c~sts e ROBERT tAu BART UNIT COST TOTAL '1.20CY '33,600 '1.75SF '6.00LF Entrance Drive subtotal '41,700 '9,300 51,000 .' '9,200 '4.00SY BARDSCAPE SUBTOTAL .'60,200 '.40BY. '4,800 .45SF '75,420 $12.505F '10,000 '60.00SF 18,000 \. 2,000 SITB STRUC'l'ORES SUBTOTAL '30,000 8 4 '500 $190 4,000 760 PURNITURE SUBTOTAL' '4,760 $38,000 '100,000 '15,000 2 $400.00 '800 '6,000 '1500.00 1 '800.00 $800 FURNITURE SUBTOTAL '.. '7,600 LIGHTED BALL PIELD TOTAL '160,600 PHASE I TOTAL *369,380 $44,350 *413,730 $41,400 TOTAL PROJBCT COST-PHASE I '455,130 e __ October 25, 1985 ROBERT LAMB BART crn OF LA QUIHTA PARIt MASTER PLAN - PBASE II COST BSTIMATB I. SITE PREPARATION allowance Q'1'Y . 10,000CY II.BARDSCAPE A. Parking Area -asphalt 20,700SF B. Asphalt curb , Parking 750LF C. Park Sidewalks(5'-0.,concrete) 5,750SF D. Ave.50 sidewalks (6'-0.,concrete) 375081 E. Tennis Courts(incl. light8,10'fence, 2 and screen) P. Tot Lot 1) Sand, excavation 4,000SF 2)Play structures allowance G. Volleyball- (inc. posts embedded net, grass surface) B. Chain link fence, Ave.50 4'-0. high(optional) II I . PLANTING A. Common area (south of entrance drive, turf, trees, B. East property line treatment (high shrub and trees) C. Ave. 50 R.O.W. 450LF 145,600SF shrubs) 7500SF 11,100SF IV. 8ITE STRuCTuRES A. Picnic Shelters- flat, built-up 2-800SF mineral roof, embedded posts on alab, (20'x 20' typical size). V. LIGHTING A. Entrance drive (low level BPS, 400 watt) B. Parking area (low level) VI. FURNITURE- SITE AMENITIES A. Benches- 8teel pedestal emdedded, 6' long. B. Tables- ateel pedestal, embedded, 6' long. C. Barbeques- 8ingle 8tandard, embedded. D. Bicycle racks- double 8ided, metal, 10 each. E. Trash receptacles- 22 gal., embedded, ptd. metal basket. F. Drinking fountains- 8tone, embedded. VIII.ARCHITECTURE AND ENGINEERING 12' of site development total TOTAL PROJBCT COSTS 8UBTOTAL VIIII.CONTINGENCY 10' of project costs UNIT COST $1.20 CY $1.20SF '2.50LF $2.50SF '2.50SF '30,000.00ea 1 . 5,000 $10,000 '15,000 $lOOOea TOTAL 12,000 '24,850 . 1,900 '14,380 '9,400 '60,000 '15,000 1,000 '4,050 '130,580 '182,000 11,300 13,900 '207,200 '10,000 '20,000 10,000 '30,000 '4,800 4,000 800 600 1,140 1,600 '12,940 . , "~02,720 '48,350 '451,070 '45,100 TOTAL PROJECT COST-PHASE II $9.00LF BARDSCAPB SUBTOTAL $1. 25SF $1. 50SF . $1. 25S1 PLAHTIRG SUBTOTAL '12.50SF 20 10 $1000 ea $1000 ea LIGHTING SUBTOTAL 16 '300 8 '500 .. '200 2 '300- 6 '190 2 $800 FURNITURE SUBTOTAL , PBASE II TOTAL '496,170 i .. Ie . e October 24, 1985 ROBERT LAMB BART CITY OP LA QOIN'lA PARK KASTER PLAN - PBASB III (to be developed with Middle School) OTY. UNIT COST !'O'lAL 15,000CY 1. 20CY '18,000 4850SP '35.00SP '169,750 250LP 'lOO.OOLP 25,000 6800SP '12.00SP 81,600 POOL SUBTOTAL '276,350 19,200SP 4.50 SP '86,400 1800SP '60.00SP 108,000 I. SITE PREPARATION allowance II.BARDCOSTS - SWIM COMPLEX A. pool 1. Gutters 2. Tile B.WKool Deckw C. Lockers' Shower Bldg. (unconditioned, 30'x 60') D. Locker' Shower P.P.' E. allow. (benches, basket lockers, office furn.) B. Snack bar bldg. (lockable ahell, 8'x 10.) P. Snack Bar F.F.'E (no cooked food) 1. Tables/umbrellas/4 chairs 2. Trash receptacles G. Fence- (8' high chain link) H. Multi-use building I. Pront walk . J. Volleyball K. Kiddie pool (12' D.) III.PLANTING A. Sod (adjacent to pool) B. Area north of Entrance drive (turf and trees) " IV. IRRIGATION -Area north of drive and Swim Complex V. PURMITORE- SITB AMENITIES A. Benches- steel pedestal emdedded, 6' long. (swim complex) B. Tables- steel pedestal, embedded, 6' long. C. Barbeques- single standard, embedded. D. Bicycle racks- double aided, aetal, 10 each. VI. LIGHTING A. Lighting (low voltage landscape At Swim complex) 10,000 LOCKER' SHOWER SUBTOTAL '118,000 800SP '25.00SF 5 '890.00 2 '250.00 SNACK BAR SUBTOTAL 800LF '13.00LF 800SP '50.00SP 600SP '2.50SF 1 $lOOOea 115SF 12.50SP BARDSCAPE SDB!'O'lAL 4800SF .40SP 41,OOOSP $1.25SP PLANTING SOB'lOTAL 45,000SP .45SF 25 '250.00 4 '500 2 '200 2 '300 rORRlTORB SUBTOTAL 20 $600.00 PRASB III 'I'O'1'AL VII.ARCBITECTURE AND ENGINEERIRG (12' of total) TOTAL PROJECT COSTS - PBASE III VIII.CONTINGENCY (10' of subtotal) 2,000 1,500 4,450 500 .1";'i!'O 10,000 40,000 1,500 1000 1,450 '543,150 2000 51,250 '53,250 '20,250 .6,250 2~000 400 600 _ '9,250 12,000 '''S,900 '7~,700 '734,600 173,500 'tOTAL PROJECT COST- PBASE III TOTAL ALL PBASES *Amphitheater not included in estimate '808,100 '1,759,400