AGE N D A
COMMUNITY SERVICES COMMISSION - CITY OF LA QUINTA
An adjourned regular meeting of the
Community Services Commission to be
held at City Hall, 78-105 Calle Estado,
la Quinta, California.
November 14, 1985
7:00 p.m.
1. CALL TO ORDER
2. ROLL CALL
3. COMMUNICATIONS
4. PUBLIC COMMENT
5. COMMITTEE REPORTS
6. OLD BUSINESS
7. NEW BUSINESS
A. Presentation of the Avenue 50 Park Plan.
8. ADJOURNMENT
.
e
e
JrrU~"".
-r-r"H..... J.AN~
r__ ,.4_)
/'
>
"
~~~'_I-/I
~!I_"" .,ra
"
'. ~ ... ...
\'
., ,
\
,," '\
~."',...-~
.",.""",.,./'1 _
"'",-",,-u_. as.P.,.
f"#.r_"".
'J
- -- .....
'.
"'lIP ..
.,' ,.... W'.
".'(_101'_)
-------,
. I
r U -. - -- .'-~' --PPL"'''.~~';;;:''' -..:-~ - r
-r '-""~~-6~. .,. -':f- -f ~a wr-: ~'''''''''''.''''r
MAsrrElt PLAN S~rUI)Y B
City of La Quinta Park Study
TIlE
CHOVE
I.. (,llliIlH'l, lAhf..n1:1
...~ ., .
A J)(.\'t'~.1II11'11I hy TilE (au)\'!-: ASSO(',^TI,:S
ROBERT LAMIl IIART n r--1 l'
rlnlltltu. ArchilnlS .nd I L-...J I
L.nd~c.pe Archilcclt. Lid .1' to. 100 .
Oc.."., II. "II
(
-
e
ROBERT LAMB HART
Planner. and ArchUecI., Lid.
New York · SaD PraDcf.co
October 28, 1985
CITY OP LA OUINTA PARK KASTER PLAN
PHASING SUMMARY
180 California SIr.el
SaDl'r&llcl.co, c&. 86111
611888-6180
PHASE I
1) Entrance drive,
temp. parking
lot
$93,800
2) Minimal development
of park area south
of entrance drive
$96,980
3) Restrooms
5) Arch./Engineering fees
and contingency
TOTAL PHASE I
$18,000
$160,600
$85,750
4) Lighted ballfield
.
'455,130
PHASE II
1) Permanent parking Area $26,750
2) Development of park area $318,620
south of entrance drive,
planting, tot lot, tennis,
volleyball, picnic shelters.
3) Ave 50 R.O.W. $27,350
4) parking and Entrance $30,000
Drive Lighting
5) Arch/Engineering fees
and contingency
TOTAL PHASE II
$93,450
'..
'496,17b
PHASE III
1) Swim complex and
upper picnic area
$655,900
2) Arch./Engineering fees
and contingency
TOTAL PHASE III
TOTAL ALL PHASES
$152,200
'808,100
'1,759,400
~.
e
October 25, 1985
CIn or LA QUINTA PARI KASTBR PLAR - PHASB I COST BSTIKATB
i,
VII. LIGHTED BASEBALL rIELD - to be coordinated with elementary achool
A. Baseball field
(includes rough and fine grading, backatop
sod infield, aeeded outfield)
B. Lighting (20 poles)
C. Irrigation (to aupplement achool ayatem)
D. Furniture
1. Athletic bench- 12', backless
galvanized pipe frame, embedded.
2. Bleachers- permanent,S tier, 50
each; steel frame.
3. Drinking fountain
QTY.
I. SITE PREPARATION
A. Grading, road preparation
28,000CY
II. 8ARDSCAPE
A. Entrance Drive
B. Concrete curb , Entrance Drive
23,800SF
1,550LF
C. Temporary Parking area 2,300SY
(crushed granite paving, 2-, compacted
on compacted subgrade)
III. PLARTING
A. Picnic area/play areaa
aouth of entrance drive,
lawn graa. aeed cover.
12,OOOSY
IV. IRRIGATION -Area aouth of drive
l67,600SF
V. SITE STRUCTURES
A. Picnlc Shelters- flat, built-up 2-800SF
mineral roof, embedded posts on alab,
(20'x 20' typical size).
B. Restrooms- flat roof, stucco 300SF
aiding, acreens, 2 atalls, 2
sinks each.
C. Sewer access allowance
VI. PURNITORB- SITE AMENITIES
A. Tables- ateel pedestal,
embedded, 6' long.
B. Trash receptacles- 22 gal.,
embedded, ptd. metal basket.
aeata 4
VIII.ARCHITECTURE AND IRGINEERING
12' of site development total
TOTAL PROJBCT COSTS - PHASB I
VIIII.CONTINGENCY
10' of project c~sts
e
ROBERT tAu BART
UNIT COST
TOTAL
'1.20CY
'33,600
'1.75SF
'6.00LF
Entrance Drive subtotal
'41,700
'9,300
51,000
.' '9,200
'4.00SY
BARDSCAPE SUBTOTAL
.'60,200
'.40BY.
'4,800
.45SF '75,420
$12.505F '10,000
'60.00SF 18,000
\. 2,000
SITB STRUC'l'ORES SUBTOTAL '30,000
8
4
'500
$190
4,000
760
PURNITURE SUBTOTAL'
'4,760
$38,000
'100,000
'15,000
2
$400.00
'800
'6,000
'1500.00
1
'800.00 $800
FURNITURE SUBTOTAL '.. '7,600
LIGHTED BALL PIELD TOTAL '160,600
PHASE I TOTAL *369,380
$44,350
*413,730
$41,400
TOTAL PROJBCT COST-PHASE I
'455,130
e __
October 25, 1985 ROBERT LAMB BART
crn OF LA QUIHTA PARIt MASTER PLAN - PBASE II COST BSTIMATB
I. SITE PREPARATION allowance
Q'1'Y .
10,000CY
II.BARDSCAPE
A. Parking Area -asphalt 20,700SF
B. Asphalt curb , Parking 750LF
C. Park Sidewalks(5'-0.,concrete) 5,750SF
D. Ave.50 sidewalks (6'-0.,concrete) 375081
E. Tennis Courts(incl. light8,10'fence, 2
and screen)
P. Tot Lot
1) Sand, excavation 4,000SF
2)Play structures allowance
G. Volleyball- (inc. posts embedded
net, grass surface)
B. Chain link fence, Ave.50
4'-0. high(optional)
II I . PLANTING
A. Common area (south of
entrance drive, turf, trees,
B. East property line treatment
(high shrub and trees)
C. Ave. 50 R.O.W.
450LF
145,600SF
shrubs)
7500SF
11,100SF
IV. 8ITE STRuCTuRES
A. Picnic Shelters- flat, built-up 2-800SF
mineral roof, embedded posts on alab,
(20'x 20' typical size).
V. LIGHTING
A. Entrance drive (low level
BPS, 400 watt)
B. Parking area (low level)
VI. FURNITURE- SITE AMENITIES
A. Benches- 8teel pedestal
emdedded, 6' long.
B. Tables- ateel pedestal,
embedded, 6' long.
C. Barbeques- 8ingle 8tandard,
embedded.
D. Bicycle racks- double 8ided,
metal, 10 each.
E. Trash receptacles- 22 gal.,
embedded, ptd. metal basket.
F. Drinking fountains- 8tone,
embedded.
VIII.ARCHITECTURE AND ENGINEERING
12' of site development total
TOTAL PROJBCT COSTS 8UBTOTAL
VIIII.CONTINGENCY
10' of project costs
UNIT COST
$1.20 CY
$1.20SF
'2.50LF
$2.50SF
'2.50SF
'30,000.00ea
1
. 5,000
$10,000
'15,000
$lOOOea
TOTAL
12,000
'24,850
. 1,900
'14,380
'9,400
'60,000
'15,000
1,000
'4,050
'130,580
'182,000
11,300
13,900
'207,200
'10,000
'20,000
10,000
'30,000
'4,800
4,000
800
600
1,140
1,600
'12,940
. ,
"~02,720
'48,350
'451,070
'45,100
TOTAL PROJECT COST-PHASE II
$9.00LF
BARDSCAPB SUBTOTAL
$1. 25SF
$1. 50SF
. $1. 25S1
PLAHTIRG SUBTOTAL
'12.50SF
20
10
$1000 ea
$1000 ea
LIGHTING SUBTOTAL
16 '300
8 '500
.. '200
2 '300-
6 '190
2 $800
FURNITURE SUBTOTAL
,
PBASE II TOTAL
'496,170
i
..
Ie
.
e
October 24, 1985 ROBERT LAMB BART
CITY OP LA QOIN'lA PARK KASTER PLAN - PBASB III (to be developed with Middle School)
OTY. UNIT COST !'O'lAL
15,000CY 1. 20CY '18,000
4850SP '35.00SP '169,750
250LP 'lOO.OOLP 25,000
6800SP '12.00SP 81,600
POOL SUBTOTAL '276,350
19,200SP 4.50 SP '86,400
1800SP '60.00SP 108,000
I. SITE PREPARATION allowance
II.BARDCOSTS - SWIM COMPLEX
A. pool
1. Gutters
2. Tile
B.WKool Deckw
C. Lockers' Shower Bldg.
(unconditioned, 30'x 60')
D. Locker' Shower P.P.' E. allow.
(benches, basket lockers, office furn.)
B. Snack bar bldg.
(lockable ahell, 8'x 10.)
P. Snack Bar F.F.'E (no cooked food)
1. Tables/umbrellas/4 chairs
2. Trash receptacles
G. Fence- (8' high chain link)
H. Multi-use building
I. Pront walk .
J. Volleyball
K. Kiddie pool (12' D.)
III.PLANTING
A. Sod (adjacent to pool)
B. Area north of Entrance drive
(turf and trees)
"
IV. IRRIGATION -Area north of drive
and Swim Complex
V. PURMITORE- SITB AMENITIES
A. Benches- steel pedestal
emdedded, 6' long. (swim complex)
B. Tables- steel pedestal,
embedded, 6' long.
C. Barbeques- single standard,
embedded.
D. Bicycle racks- double aided,
aetal, 10 each.
VI. LIGHTING
A. Lighting (low voltage landscape
At Swim complex)
10,000
LOCKER' SHOWER SUBTOTAL '118,000
800SP
'25.00SF
5 '890.00
2 '250.00
SNACK BAR SUBTOTAL
800LF '13.00LF
800SP '50.00SP
600SP '2.50SF
1 $lOOOea
115SF 12.50SP
BARDSCAPE SDB!'O'lAL
4800SF .40SP
41,OOOSP $1.25SP
PLANTING SOB'lOTAL
45,000SP .45SF
25 '250.00
4 '500
2 '200
2 '300
rORRlTORB SUBTOTAL
20
$600.00
PRASB III 'I'O'1'AL
VII.ARCBITECTURE AND ENGINEERIRG (12' of total)
TOTAL PROJECT COSTS - PBASE III
VIII.CONTINGENCY (10' of subtotal)
2,000
1,500
4,450
500
.1";'i!'O
10,000
40,000
1,500
1000
1,450
'543,150
2000
51,250
'53,250
'20,250
.6,250
2~000
400
600
_ '9,250
12,000
'''S,900
'7~,700
'734,600
173,500
'tOTAL PROJECT COST- PBASE III
TOTAL ALL PBASES
*Amphitheater not included in estimate
'808,100
'1,759,400