Loading...
13-1641 (CSCS)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPARTMENT BUILDING PERMIT Application Number: 13-00001641 Property Address: 77985 AVENIDA MONTEZUMA APN: 773-104-036-24 -000000- Application description: NEW COMML - STORES & CUSTOMER SERVICE Property Zoning: VILLAGE COMMERCIAL Application valuation: 198103 Applicant: Architect or Engineer: LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class: B License No.: 377905 { Date4 se1 Contractor: {` O ER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to - construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)•: (_ 1 I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). I—) f am exempt under Sec. ', B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: _ Lender's Address: LQPERMIT Owner: TOWER ENERGY GROUP 1983 W 190TH ST TORRANCE, CA 90504 Contractor: MCI CONSTRUCTION COM 82746 KYLE DRIVE BERMUDA DUNES, CA 92 (760)799-5106 Lic. No.: 377905 VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 6/26/14 JUN 2 t 201,x+ WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for -which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier Ek Policy Number EXEMPT 1 certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor de, I shall forthwith comply with hose rovisions. Dall6 ` 6 11 Apptic WARNING: FAILURE T E WORKERS'MPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,0001• IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this county to enter upon the above-mentioned roperty for inspection purpose �-- Late /4 Signature (Applicant or Agent): Application Number . . . . . 13-00001641 Structure Information 4,728SF STORE/VB/M-OCC/112-OL/NON-SPRINK----- 1 Other struct info . . . . . CODE EDITION 2010 ' FIRE SPRINKLERS NA MIXED-USE OCCUPANCY M OCCUPANT LOAD 112.00 ---------------------------------------------------------------------------- 1ST FLOOR SQUARE FOOTAGE 4728.00 Permit . . . BUILDING 2013 Additional desc . . Permit Fee . . . . 572.80 Plan Check Fee 00 Issue Date . . . . Valuation . . . . 198103 Expiration Date . . 12/23/14 Qty Unit Charge Per Extension BASE FEE 431.86 174.00 - ---------------------------------------------------------------------------- .8100 THOU BLDG $25,001-$200,000 140.94 Permit . . . ELECTRICAL 2013 Additional desc . . Permit Fee . . . . 202.58 Plan Check Fee .00 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 12/23/14 Qty Unit Charge Per Extension 1.00 23.8300 EA ELEC TEMP POWER POLES 23.83 1.00 107.2500 LS ELEC NEW COMM, FIRST 2 KSF 107.25 2.00 --------------------------------------------------------------------------=- 35.7500 EA ELEC NEW COMM, ADD -L 2 KSF 71.50 Permit . . . MECHANICAL 2013 Additional desc . . Permit Fee . . . . 202.60 Plan Check Fee .00 Issue Date . . . . Valuation _ 0 Expiration Date . . 12/23/14 Qty Unit Charge Per Extension 4.00 35.7500 EA MECH CONDENSER/COMP 143.00 1.00 11.9200 EA MECH EVAP COOLER 11.92 3.00 11.9200 EA MECH VENT FAN 35.76 1.00 ---------------------------------------------------------------------------- 11.9200 EA MECH EXHAUST HOOD 11.92 Permit . . . PLUMBING 2013 Additional desc . . Permit Fee . . . . 381.44 Plan Check Fee .00 LQPERMIT Application Number Permit . . . . . . Issue Date . . . . Expiration Date . . . 13-00001641 PLUMBING 2013 12/23/14 Valuation . 0 Qty Unit Charge Per Extension 22.00 11.9200 EA PLBG FIXTURE/TRAP 262.24 1.00 11.9200 EA PLBG BUILDING SEWER 11.92 5.00 11.9200 EA PLBG ROOF DRAIN 59.60 1.00 11.9200 EA PLBG WATER HEATER/VENT 11.92 1.00 11.9200 EA PLBG WATER INST/ALT/REP 11.92 1.00 11.9200 EA PLBG BACKFLOW DEVICE 11.92 1.00 11.9200 LS PLBG GAS SYS, 174 OUTLETS 11.92 ----------------------------------- ---------------------------------------- Special Notes and Comments 4,728SF STORE/VB/M-OCC/112-OL/CLASS A-FR/NON-SPRINKLERED [TOWER MARKET] THIS PERMIT DOES .NOT INCLUDE ALTERATION TO THE GAS FACILITY, BUILDING SIGNAGE, TRASH ENCLOSURE OR DEMOLITION OF THE EXISTING BUILDING. 2010 CALIFORNIA BUILDING CODES. June 26, 2014 8:43:29 AM AORTEGA ---------------------------------------------------------------------------- Other Fees . . . . . . . . . ART IN PUBLIC PLACES -COM 990.52 BLDG STDS ADMIN (SB1473) 8.00 DIF CIVIC CENTER - COMM 1763.54 DIF FIRE PROTECTION -COMM 813.22 PLAN CHECK, ELECTRICAL 118.68 PLAN CHECK, MECHANICAL 138.24 PLAN CHECK, PLUMBING 381.43 BLDG PC 25001-200K 1213.59 STRONG MOTION (SMI) - COM 41.60 TUMF: MISC RETAIL SVCS 156944.94 DIF STREET MAINT FAC -COMM 1096.90 DIF TRANSPORTATION - COMM 26850.31 Fee summary Charged Paid Credited --------------------------------------------------------- Due Permit Fee Total 1359.42 .00 .00 1359.42 Plan Check Total .00 .00 .00 .00 Other Fee Total 190360.97 .00 .00 190360.97 Grand Total 191720.39 .00 .00 191720.39 LQPERMIT Bin # IE 0 p 09 Qty of La Qu►nta Building Safety Division 2013 &r P.O. Box 1504, 78-495 Calfe Tampico C 1 Z413 �� LA QUINTA La Quinta, CA 92253 - (760) 777-7012 � OF DEVELOPMiENT Building Permit Application and Tracking Sheet c A Pe it CITY IF / �M y. Project Address: 724jS Aft!iv 74 Wj-Ezknj;+ Owner's Name: 0��2 V M lF A. P. Number: Address: r Legal Description:'5'#&1.71 kY"At� r �� City, ST, Zip: - n 16t 22S Contractor: Telephone ���% 78 • �y >: ::<:>:>z:>:::»»::<::< «::»<:::s:<:: .................:......:..................:. Address: • r Project Description: rkejYkjOCL { ")'b rwv City, ST, Zip: /�/sT//v s'y✓.Vt�✓/CAJ I /2L� Telephone: :::.. <.;�:.>::s::?:«:>i�a»>, :•.:::>:#'>�: pve� ?Y� T71P� �,; State Lic. # : City Lic. #; Arch., Engr., Designer: /VF/4- VF/+Address: Address:P/2 0ox v City., ST, Zip: elf r fe ll v►i 1 59• / Telephone: X06 �3% -�$ O ::.....::•.:. :::::::::::.::::::;::;::.;::.;;:: Construction Type: Occupancy: State Lic. #: — Nr Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person: ICK Sq. Ft.: 7.253 1 # Stories: #Units: Telephone #,of Contact Person: IqO4 -b 3 -7 - f J, O Estimated Value of Project:41-0-49.,V00 APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req'd Rec'd TRACKING PERMIT FEES Plan Sets Plan Check submitted 14111241S Item Amount Structural Calcs. Reviewed, ready for correctionsA Plan Check Deposit Truss Calcs. Called Contact Person Plan Check Balance, itle 24 Calc,. Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2od Review, ready for rection ssu Electrical Subcontactor List gig Called Contact Person Plumbing Grant Decd Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- '^' Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees r' Date 2/25/14 No. 31993 Owner Tower Energy Group Address City Zip Tract # Type Commercial CERTIFICATE OF COMPLIANCE Desert Sands Unified School District 47950 Dune Palms Road La Quinta, CA 92253 (760) 771-8515 APN # Jurisdiction Permit # No. of Units Q BERMUDA DUNES C4 RANCHO MIRAGE d �J INDIAN WELLS PALM DESERT y LA QUINTA u%WNDIO SP 0 773-104-063-3 La Quinta 1 Lot # No. Street S.F. Lot # No. Street S.F. Unit 1 77985 Avenida Montezuma 4728 Unit 6 Unit 2 Unit 7 Unit 3 Unit 8 Unit 4 Unit 9 Unit 5 Unit 10 Comments At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patios/walkways, residential additions under 500 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooking, eating or sanitation) or replacement mobile homes. It has been determined that the above-named owner is exempt from paying school fees at this time due to the following reason: EXEMPTION NOT APPLICABLE This certifies that school facility fees imposed pursuant to Education Code Section 17620 and Government Code 65995 Et Seq. in the amount of $0.51 X 4,728 S.F. or $2,411.28 have been paid for the property listed above and that building permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued. Fees Paid By CC/1st Bank -John Olson Check No. 1119123 Bank Name/Recipient of Certificate Telephone 760-799-5106 Funding Commercial By Dr. Gary Rutherford Superintendent Fee collected /exempte y Sh r0 CQGI ,re Payment Recd . g0.0(— o $2,411.28 Over/Ur.-der Signature R "� NOTICE: Pursuant to Government Code Section 6 0 )(1), this will a to notify you that the 90 -day approval period in'which ymu .nay protest the fees or other payment identified above will begin to run from the date on which the building or installation permit for this project is issued, or from the date on which those amounts are paid to the District(s) or to another public entity authorized to collect them on the District('s) behalf, whichever is earlier. NOTICE: This Document NOT VALID without embossed seal Embossed Original - Building Department Applicant Copy - Applicant/Receipt Copy - Accounting 0 CITY OF LA QUINTA - PUBLIC WORKS DEPARTMENT GREEN SHEET PUBLIC WORKS CLEARANCE FOR RELEASE OF BUILDING PERMIT Form updated & effective 9/25/2009 Green Sheet approvals are forwarded to the Building & Safety Department directly by Public Works. Please DO NOT submit the Green Sheet (Public Works Clearance) Packet to the Public Works Department until ALL requirements listed below are complete. Incomplete applications or applications which cannot be processed will be returned to applicant. �'^ GT,�2yl/�Date:/ Developer: 70�✓6✓�r�y r T{7Gve, (a✓C�"� Tract No.: `Tract Name: V u( z%/Z`M .�'- Lot No.(s): '-- Address(s): � I r ! u AV�Ic& eta Phone Number: (qd) q37— The 3 / "The following are the requirements for Public Works Clearance to authorize issuance of a building permit from the Building & Safety Department: 0 CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4, #5 & #7 BELOW ❑ TRACT HOMES: PROVIDE ITEMS #1, #2, #3 & #5 BELOW ' ,B -'COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS #1, #2, #3, #5 & #7 BELOW ❑ WALLS, SIGNS, OTHER: PROVIDE ITEM #6 BELOW 1. ttach Pad Elevation Certificates in compliance with the approved design elevation for building pad (maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must be current (within 6 months of current date). If a precise grading plan creates the pad for approval, please withhold green sheet submittal until a Pad Elevation Certificate can be provided. 2. Attach geotechnical certification of grading plan compliance including compaction reports from a licensed Soils Engineer. Recently rough graded residential developments which have a previously approved geotechnical certification are exempt from this requirement. 3. Attach recorded final map or title information/grant deed showing proposed building locations are legal lots. 4. Complete the attached <1 acre per lot or infill project Fugitive Dust Control project information form, PM10 plan & agreement or provide alternative & valid City approved PM10 plan set reference number or hard copy plan. PM10 plans for commercial & residential developments (beyond 1 lot) are submitted separately with grading plans & are subject to additional requirements. A current PM10 certification number is required. 5. Attach a copy of the rough or precise grading plan to the Public Works Department showing building location(s) for pad elevation verification. AO flood zone developments will require an approved flood plain development plan. 6. Attach supporting documentation for wall plan, monument sign, grease trap or special facility installations. 7. Complete and sign the attached water quality management plan (WQMP) exemption form, if applicable. PW approved building construction projects require either a WQMP or a completed WQMP exemption form. Approved maps/plans may be viewed at the following link: http://www.la-guinta.org/PlanCheck/m search.aspx I have reviewed and confirmed the requirements listed above as presented and find the improvements to be sufficiently complete for construction of the proposed buildings/structures/walls/signs on the subject lot(s). Pursuant to my findings, the above project may be released for building permit issuance. This section completed by City staff. Recommended by: Date: 6 / -// L f n SG -hs �Rci,K Public Works Distribution: ( Green Sheet to Building &Safety l cel ( ) Green Sheet to Planning Department aG'40n l�o ct re Sv 6,0'�++,- � Declined for approval for reason(s) as follow(s), please correct and resubmit: —4-0 PtA-� -a' c9P✓< TAChecklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 10-02-12.doc CITY OF LA QUINTA - PUBLIC WORKS DEPARTMENT GREEN SHEET PUBLIC WORKS CLEARANCE FOR RELEASE OF BUILDING PERMIT Form updated & effective 9/25/2009 Green Sheet approvals are forwarded -to the Building & Safety_ Department directly by Public Works. Please DO NOT submit the Green Sheet (Public Works Clearance) Packet to the Public Works Department until ALL requirements listed below are complete. Incomplete applications or applications which cannot be processed will be returned to applicant. Date: 6 l l 4 Developer: Tract No.: Tract Name: Lot No.(s): Address(s): t9c�,AVir/¢ lry?FJL�ll)°11f� Phone Number: (7,62 The following are the requirements for Public Works Clearance to authorize issuance of a building permit from the Building & Safety Department: ❑ CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4, #5 & #7 BELOW ❑ TRACT HOMES: PROVIDE ITEMS #1, #2, #3 & #5 BELOW COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS #1, #2, #3, #5 & #7 BELOW ❑ WALLS, SIGNS, OTHER: PROVIDE ITEM #6 BELOW 1. Attach Pad Elevation Certificates in compliance with the approved design elevation for building pad (maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must be current (within 6 months of current date). If a precise grading plan creates the pad for approval, please withhold green sheet submittal until a Pad Elevation Certificate can be provided. 2. Attach geotechnical certification of grading plan compliance including compaction reports from a licensed Soils Engineer. Recently rough graded residential developments which have a previously approved geotechnical certification are exempt from this requirement. 3. Attach recorded final map or title information/grant deed showing proposed building locations are legal lots. 4. Complete the attached <1 acre per lot or infill project Fugitive Dust Control project information form, PM10 plan & agreement or provide alternative & valid City approved PM10 plan set reference number or hard copy plan. PM10 plans for commercial & residential developments (beyond 1 lot) are submitted separately with grading plans & are subject to additional requirements. A current PM10 certification number is required. 5. Attach a copy of the rough or precise grading plan to the Public Works Department showing building location(s) for pad elevation verification. AO flood zone developments will require an approved flood plain development plan. 6. Attach supporting documentation for wall plan, monument sign, grease trap or special facility installations. 7. Complete and sign the attached water quality management plan (WQMP) exemption form, if applicable. PW approved building construction projects require either a WQMP or a completed WQMP exemption form. Approved maps/plans may be viewed at the following link: http://www.la-ouinta.org/PIanCheck/m search.aspx I have reviewed and confirmed the requirements listed above as presented and find the improvements to be sufficiently complete for construction of the proposed buildings/structures/walls/signs on the subject lot(s). Pursuant to my findings, the above project may be released for building permit issuance. This section completgoy City staff Recommended by: Public Works Distribution: Declined for approval for reason(s) as Date: _ ? . /.a/* Green Sheet to Building & Safety Green Sheet to Planning Department correct and resubmit: AjdrV --773/c-#oJ6 p� TAChecklists - Farms & ApplicationslForms & Applications\GREEN SHEET cover & PM10less than 1 Acre Revised 10.02-12 doc City of La Quinta - PM10 Fugitive Dust Control Project Information Construction Phase PM10 Agreement (<1 acre/lot or Infill Project) Project Information Project Contractor: Project Phase (check one) ❑ Construction ❑ Demolition Project Name: _ Project Tract/Lot Numbers: Project Street Address: Total Acres in Active Construction (<1 acre per Lot): Anticipated Start Date: / / Anticipated Completion Date: PM10 Contact Information Please note: Dust control is required 24 hours a day, 7 days a week, regardless of construction status. Person listed below is responsible for dust control during business and non -business hours. Name: Title: Company Name: Mailing,Address: City,. State,_ZIP Code: P rimary Phone M Fax M 24 Hour Emergency Phone#: Cell Phone M Email Address: PM10 Certificate M The above stated property owner (or authorized representative): ❖ Shall act as his/her acknowledgement of dust control requirements and their enforceability, pursuant to SCAQMD Rules 403, 403.1, 401, 402, 201, 203 and PERP; ❖ Shall constitute an Agreement to comply with all project conditions as identified in the approved dust control plan. Acknowledges that dust control is required twenty-four (24) hours a day, seven (7) days a week, throughout the period of project performance, regardless of project size or status; ❖ Shall ensure that each and every contractor, subcontractor and all other persons associated with the project shall be in continuous compliance with all requirements of the approved dust control plan; Shall take all necessary precautions to minimize dust, even if additional measures beyond those listed in the dust control plan are necessary; ❖ Shall authorize representatives of City/County to enter the property for inspection and/or abatement purposes; 4- Shall hold harmless the City/County and its representatives from liability for any actions related to this dust control plan or any City/County initiated abatement activities. Signature of Property Owner or Authorized Representative Date Sladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0727 6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA 92543 (951) 766-8777 Fax (951)766-8778 August 18, 2014 Tower Energy Group 1983 West 1901h Street, Suite 100 Torrance, California 90504 Project: Tower Market & Gas Station Expansion SEC Avenida Navarro and Avenida Montezuma La Quinta, California Subject: Report of Observations and Testing During Rough Grading Project No. 522-13059 14-08-318 Ref:. Geotechnical Investigation report prepared by Sladden Engineering dated February 25, 2014; Project No. 544-13059, Report No. 14-02-066 This report provides a summary of our field observations along with the results of in-place density testing performed at the subject site during the rough grading of the building pad for the Tower Market and gas station expansion project. The site is located on the southeast corner of Avenida Navarro and Avenida Montezuma in the City of La Quinta, California. Rough grading included over -excavation and recompaction throughout the new building areas. All native low density near surface soil was removed to a depth of at least 4 feet below existing grade or 3 feet below the bottom of the footings, whichever was deeper. Remedial grading extended laterally, a minimum of five feet beyond the building perimeter. The exposed surface was then scarified, moisture conditioned and compacted to at least 90 percent relative compaction. The previously removed soil and import soil was placed in thin lifts at near optimum moisture content and compacted to at least 90 percent of maximum density. Field testing was performed on August 7, 2014 through August 13, 2014. Testing indicates that a minimum of 90 percent relative compaction was attained in the areas tested. The passing test results indicate compliance with the project specifications at the tested locations and depths but are no guarantee or warranty of the contractors work. Field Testing: In-place moisture/density tests were performed using a nuclear density gauge in accordance with ASTM Test Method D 6938-08. A total of 23 field density tests were performed. Test results are summarized on the attached data sheet. The approximate test locations are indicated on the attached plan. August 18, 2014 -2- Project No. 522-13059 14-08-318 Laboratory Testing: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with ASTM Test Method D 1557-91. All footings should have a minimum embedment depth of 12 inches measured from the lowest adjacent finished grade. Continuous and isolated footings should have minimum widths of 12 inches and 24 inches, respectively. Continuous and isolated footings may be designed using allowable (net) bearing pressures of 1800 and 2000 pounds per square foot (psf), respectively. The allowable bearing pressures apply to combined dead and sustained live loads and may be increased by 1/3 when considering wind and seismic loads. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted SLADDEN ENGINEERING '- SRETT L. Brett Anderson ' ANDERSON Principal Engineer s 9/30/14 CIVIL ENGINEERING Grading/gvm CA Copies 4 / Tower Energy Group Sadden Engineering Permit Number: CSCS-13-1641 Applied: 12/18/2013 Issued: Status: PLAN CHECK Parent Permit: Parent Project: Details: Description: 4,728SF STORE/VB/M-OCC/112-OL/NON-SPRINKLERED Approved: 5/8/2014 Site Address: 77985 AVENIDA MONTEZUMA Finaled: City, State Zip Code: LA QUINTA, CA 92253 Applicant: <NONE> Owner: <NONE> Contractor: <NONE> LIST OF • SCHEDULED DATE COMPLETED DATE TYPE STAFF 8/27/2014 COMPACTION REPORT AMYYU Notes: HAD TO ADD AS COMPACTION REPORT AS PM10 IS NOT IN THE DROP DOWN. 8/27/2014 8/27/2014 PLAN CHECK SUBMITTAL STEPHANIE KHATAMI Notes: ROUTED,PM10/COMPACTION REPORT TO AMY YU. S�'v,Ve -tom frac( &cc acert � la c0 otC Alcor Printed: Wednesday, 27 August, 2014 1 of 1 WSYSTFM$ TEST RESULTS Project Name: Tower Market PROJECT NO: 522-13059 Location: La Quinta, California REPORT NO: 14-08-318 Test No. Date Tested Location Elevation Dry Density in place % Moisture in place Relative Compaction Maximum Density Building Pad 1 08/07/14 Per Plan 5.5' BPG 102.9 10.3 90 114.0 2 08/07/14 Per Plan 5.5' BPG 103.6 11.6 91 114.0 3 08/07/14 Per Plan 3.5' BPG 110.7 11.1 97 114.0 4 08/07/14 Per Plan 3.5' BPG 113.4 10.9 99 114.0 5 08/08/14 Per Plan 2.0" BPG 110.6 10.9 97 114.0 6 08/08/14 Per Plan 2.0' BPG 112.3 11.6 99 114.0 7 08/08/14 Per Plan PG 107.6 10.7 94 114.0 8 08/08/14 Per Plan PG 105.9 12.4 93 114.0 9 08/08/14 Per Plan 4.5' BPG, 103.1 12.3 90 114.0 10 08/08/14 Per Plan 4.5' BPG 102.9 11.9 90 114.0 11 8/11/2014 Per Plan 2.0' BPG 104.5 12.3 92 114.0 12 8/11/2014 Per Plan 2.0' BPG 106.3 11.1 93 114.0 13 8/11/2014 Per Plan 4.5' BPG 102.9 12.5 90 114.0 14 8/11/2014 Per Plan 2.0' BPG 107.2 11.4 94 114.0 15 8/11/2014 Per Plan 2.0' BPG 105.3 13.6 92 114.0 16 8/12/2014 Per Plan 4.5' BPG 102.9 10.1 90 114.0 17 8/12/2014 Per Plan 4.5' BPG 104.3 10.9 91 114.0 18 8/12/2014 Per Plan 2.0' BPG 112.3 11.2 99 114.0 19 8/12/2014 Per Plan 2.0' BPG 109.6 10.5 96 114.0 20 8/13/2014 Per Plan PG 107.8 11.6 95 114.0 21 8/13/2014 Per Plan PG 110.6 12.1 97 114.0 22 8/13/2014 Per Plan PG 112.5 12.3 99 114.0 23 8/13/2014 Per Plan PG 110.9 11.9 97 114.0 BPG = Below Pad Grade PG = Pad Grade August 18, 2014 Sadden Engineering Ai • 7 3 � s � � E ASE_-�'V!a �T WV Lit _ , so lit qj ri „�.•,t`,'•..f{.. . Vie• .r. .. .. _Y�.y � B' 6• 4 _t..�-�•' ,= _ - •: fr'.� �'' �-` �"..: t �;' fit"' '�'' " `�;'< O Approximate Compaction Test Location #g COMPACTION TEST LOCATION PLAN Project Number: 522-13059 Report Number: 14-08-318 Sladden Engineering Date: August 18, 2014 FIGURE McGEE SURVEYING, INC. 45 -100 Golf Center Pkwyl, 'Blda' F, Ste.G, hidlo, CA 9220, 1 1 Phone (760) 342-21249:— Fax (760) 342-5044 August 29, 2014 City of La Quinta ., 7.8-405 Calle, Tampico La :Qwi'hta.. CA. 92253. Re` Pad. Certification — 1641 Tower. Pursuant to your request a field.,survey determine the vertical I location of the follows: 10T ADDRESS PC] "A" 77-98.5 Avern'da, Parcel Merger 12-515 .way e McGee L.S. 5479 conducted on ihe.aboNie r6f6rericied,project to ng pad. `The above mentioned' was found as,. 47.10' 47-V From: Stephanie Khatami RECEIVED Sent: Thursday, August 21, 2014 9:34 AM jo" n.o150 @ihZthe.-malci::D."-.M Subject: Tower Market AUG 2 7 2014 Attachments: GREEN SHEET.pdf <7VV�'4'Jr ?i3o 36Jt iii, CITY OF LA QUINTA COMMUNITY DEVELOPMENT I spoke to AJ then Amy, please provide the Pad Cert and just the first page of the attached application. That should take care of the Public Works submittal.. Stephanie IZhatami Permit Technician City of La Quinta 4 Community Development 1 1 1 1 1 (760)777-7019 direct (760)777-7011 fax skhatami@la-quinta.org City of 1A Quinta 78495 Calle Tampico La Quinta, CA 92253 www.la-auinta.org RECEIVED- FA AUG 2 7 2014 CITY OF LA QuiNTA ` COMMUNITY DEVELOPMENT ell ---s — —S — 7— na 1*9T :#ISri M/LZ/9 :31VO told UI nl W cm J= --— :. ` �,:: ; :1� ..� a� _ _! -r: '' �L: T ;, ��ri", g I.n o '00I, R 016 u Ag oa 8 AP�E J. Gi L6 k: r-77 7;; _4M • . 1'� SVO' tip L Aq ig�qji L r94 —.J—.-- 77N. A I Al �At. - RM. .• . . . . . . . . . . is 0 'J 8' rr. L l3iIN 13a E3 4 L is k ix Cl It'. t3 1 0): En >.......... . I PA -�6 SEER it I, . 3 . 7 I - 9 . . : 3M rT .4 k", VRA 'I'A' t9 N�7 K� It u < r -4 �- 41, 55gt'. tW J1 a b, ts e-, �4 J - r3 IN VM PAN M Rot' M V"' Cl1N3A V L N9 0 C3 CS 2 ; g I g .-AI S I ffenowl"01"ITAF� -0 COMMUNITY DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 FAX (760) 777-7011 To: Greg Butler, Building Official To PD: May 8, 2014 From: Les Johnson, CDD Director Due Date: Permit #: 13-1641 Status: 1 st Building; Plans Approval (This is an approval to issue a Building Permit) Planning has reviewed the Building Plans for the following project: Description: Tower Market Proiect — Demo Existing and'Reconstruct New Facility Address or General Location: 77-985 Avenida Montezuma Applicant Contact:. Nick Fullerton (408) 837-1550. Ago' mo*ui, rootGw rust' 0 Planning finds that- 5I1'3`tiot� ❑ ...these Build' g Plans do not require Plannirig approval. A.,qml ...these Bu ding Plans are approved by Planning. ❑` se g Plans require corrections. Please forward a copy of the attached corrections to the applicant. When the corrections are made please return them to Planning for review. Les Jokson, Po`Inmunity Development Department Director Date 77-682 Country Club Dr. Ste. B, Palm Desert, CA 92211 ph. (760) 772-5107 fax (760) 345-7620 Letter of Transmittal To: City of La Quinta Today's Date: 3-26-14 78-495 Calle Tampico City Due Date: 3-26-14 La Quinta, CA 92253 Project Address: 77-985 Avenida Montezuma Attn: Angelica Plan Check #: 13-1641 Submittal: ® 1St ❑ 4th ❑ 2nd ❑ 55th ❑ 3'd ❑ Other: We are forwarding: ® By Messenger ❑ By Mail (Fed Ex or UPS) ❑ Your Pickup Includes: # Of Descriptions: Includes: # Of Descriptions: Copies: Copies: ❑ Structural Plans ❑ 1 Revised Structural Plans ® 2 Structural Calculations ❑ Revised Struct. Calcs ® 2 Truss Calculations Floor ❑ Revised Truss and Roof ❑ Soils Report ❑ Revised Soils Report ® 1 Structural Comment List/ ❑ Approved Structural Plans Responses ® 1 Redlined Structural Plans ❑ Approved Structural Calcs ❑ Redlined Structural Calcs ❑ Approved Truss Calcs ❑ Redlined Truss Calcs ❑ Approved Soils Report ❑ Redlined Soils Reports ❑ 2 Other: Building Energy Analysis Report Comments: Structural content is approvable. If you have any questions, please call. Time = 1.5 HR This Material Sent for: ❑ Your Files El Yo S�i El 9 Other: ❑ Palm Desert Office: Other: ❑ 07 s ® Per Your Request ❑ Approval ❑ At the request of: RECOINAVA..— 1% a� COACHELLA VALLEY WATER DISTRICT APR AWIJ ASSESSOR'S PARCEL NUMBER 85-995 Avenue 52 82014 Coachella, California 92236 coft, C (760) 398-2651 N 1A Qilllyt APPLICATION FOR WASTEWATER INTERCEPTORISEPARATOR APPRftar APPLICANT Submit this form viith a copy of a SCALED plot plan (I" - 20' to I" -- 402 SCALE) drawn to District specifications. A notuefundable filing fee is required when the application is submitted Check must be made payable in the Coachella Valles Water District. Approval of this application shall remain valid for a period not to exceed one (1) year from date ofpayment NOTE: ALL BUSINESSES PRODUCING FAT, OIL, AND/OR GREASE, LOCATED IN A MULTI -SUITE BUILDLNG WILL REQUIRE A SEPERATE LATERAL OFF THE MAIN SEWER LLNE FOR GREASE INTERCEPTOR CONNECTION. Platt Check No. 13-1641 Agent, Contractor, Contact Person Address City State Zip Telephone l i Com. l �YJ 5! f? u �il�a r 9-� -?44 YAC'O! `,UI � Cf ?V-20? 760 OuTer Address ity State Zip Telephone ow -r— Z (,�/e!� 1 E2UttI6'> r1�3i ir10� �T S�lft — Pk0?l4dJtlr' LA. —S313 —'900 Job Propertl Address Cit Zip 7-995 11eN1m l�ta►�►T�f�vbl G�? �ul��r'" G� ^� .� 53 Legal Description C/;' { I_/ .'•, Y. DBA Sher" � 2rrr�Ll1'�'' ;-r" !0/?tom O✓ rar �L�•�'- ' 1 1�.. r ' �' P/. �a=f�.r�.!_ "••� PLEASE COMPLETE THIS Si TION FOR REVIEW OF FOOD ESTABLISHMENTS NOTE: PLANS WILL. NOT BE ACCEPTED UNLESS THIS APPLICATION IS COA4'LETE AND THE PLAN CHECK FEE IS PAID. GENERAL CONSTRUCTION: Type of Construction: New Food Facility _ Remodel of'Existing Food Establishment Hours of Operation ,., Sealing Capacity: Internal _ F.xtemat— External Seating with Misters or Heaters Bar with Food Service Bar Nonfood Service Water Softener Service: Multiservice (reusable)_ Single Service (disposable)_•_-._ OWNER;REPRESENT'ATLVE DFX.LARATION I certify that I have read the entire application and state that all information is correct 1 understand that the amount of fee pard is based on my declaration of inf6rmation on this form and that incorrect information is grounds for denial of the submitted plans I also understand that plans will be discarded if not picked up within sixty (60) days of approval or denial and that no inspection of my establishment will be conducted, or approval granted to operate, until all proper information retested hhjas been received and plans have been approved and returned. ` Signature � //!� T Date 7 `..!_. FOR DISTRICT USE ONLY No of Systems Type of systems) No. Dwelling Units ❑ Sand/Oil Grease Interceptor Waived Fixture Units [:]Grease Interceptor ❑ New ❑ Existing ❑ Lint Trap ❑ Replacement ❑ Addition ❑ Clarifier ❑ Connect to Sewer Oral REMARKS: CVwl' CIMS no% zlla'.z' -+r s. cVw�j rr vires tr'`�s� e ren.t�ve� �2f1s rv, . This application is Approved ❑ 17emed ❑ Conditional Approval* Fee 3 � / Check No 'See Remarks; Date Initial Signature Date z1 CVWD•921 Rev 6/11 4 COACHE LLA VALLEY WATER DISTRICT �p,TEq� CALIFORNIA 92236 (760) 398-2651 P.O. BOX 1058, COACHELLA, 4J�STRtG� �INVOICE Date: 212512014 SUBJECT- SANTA CARMELITA, 77985 AVEN IDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 393306 14-5266 Project: 212412014 TOWER ENERGY GROUP Project Date: $50.00 1983 W. 190TH ST., SUITE 100 Amount Due: 06-06-01-4 GEO: SARA LOPEZ TORRANCE, CA 90504 Planner: TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH . -.- r&wr.F AND INCLUDE THE PROJECT ON YOUR CHECK_-_�- SUBJECT: SANTA CARMELI I A, , 1 �. , -- - COACHELLA VALLEY WATER DISTRICT 398_2651 Pagel p,0. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) z COACHELLA VALLEY WATER DISTRICT P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 INVOICE Date: 3/12/2014 SUBJECT: SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 TOWER ENERGY GROUP Project: 14-5266 1983 W. 190TH ST., SUITE 100 Project Date: 2/24/2014 Amount Due: $9,702.00 TORRANCE, CA 90504 GEO: 06-06-01-4 Planner: SARA LOPEZ TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK 2.00 SCC -COLLECTION $2,415.00 $4,830.00 2.00 SCC -TREATMENT $2.436.001 $4,872.00 $9,702.00 SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 COACHELLA VALLEY WATER DISTRICT P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 Pagel F f � s JT COACHELLA VALLEY WATER DISTRICT `-�► -T,q P.O. Box .1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 INVOICE Date: 3/12/2014 SUBJECT: SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 TOWER ENERGY GROUP 1983 W. 190TH ST., SUITE 100 TORRANCE, CA 90504 Project: Project Date: Amount Due: GEO: Planner: TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK 14-5266 2/24/2014 $9,702.00 06-06-01-4 SARALOPEZ SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 COACHELLA VALLEY WATER DISTRICT P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 Page 1 2.00 SCC -COLLECTION $2,415.001 $4,830.00 2.00 SCC -TREATMENT $2,436.001 $4,872.00 $9,702.00 PAID $ c% 70 c2• 00 v Development Services Department MAR 2 6 2014 Coachella Valley Water District 75-515 Hovley Lane East Pairh Desert, CA 92211 SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 COACHELLA VALLEY WATER DISTRICT P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 Page 1 COACHELLA VALLEY WATER DISTRICT P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 INVOICE Date: 3/12/2014 SUBJECT: SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196. TOWER ENERGY GROUP 1983 W. 190TH ST., SUITE 100 TORRANCE, CA 90504 Project: Project Date: Amount Due: GEO: Planner: TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK 14-5266 2/24/2014 $9,702.00 06-06-01-4 SARA LOPEZ SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 COACHELLA VALLEY WATER DISTRICT P.O. Box 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 Page 1 2.00 SCC -COLLECTION $2,415.00 $4,830.00 2.00 SCC -TREATMENT $2,436.00 $4,872.00 $9,702.00 70 c2 Development Services Department MAR 2 6 2014 Coachella Valley Water District 75-515 Hovley Lane East Palm Desert, CA 92211 SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196 COACHELLA VALLEY WATER DISTRICT P.O. Box 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 Page 1 PROUDLY SERVING THE UNINCORPORATED AREAS OF RIVERSIDE COUNTY AND THE CITIES OF: BANNING BEAUMONT CALIMESA CANYON LAKE COACHELLA DESERT HOT SPRINGS EASTVALE INDIAN WELLS INDIO JURUPA VALLEY LAKE ELSINORE LA QUINTA MENIFEE MORENO VALLEY NORCO PALM DESERT PERRIS RANCHO MIRAGE RUBIDOUX CSD SAN JACINTO TEMECULA WILDOMAR BOARD OF SUPERVISORS: KEVIN JEFFRIES DISTRICT 1 JOHN TAVAGLIONE DISTRICT 2 JEFF STONE DISTRICT 3 JOHN BENOIT DISTRICT 4 MARION ASHLEY DISTRICT 5 RIVERSIDE COUNTY FIRE DEPARTMENT IN COOPERATION WITH THE CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION 77-933 Las Montanas Rd., Ste. #201, Palm Desert, CA 922114131 • Phone (760) 863-8886 • Fax (760) 863-7072 www.rvcfire.org March 14, 2014 RECEIVED John Olsen 86-030 Ave 62 APR 1.8 2014 Thermal, CA 92274 CITY OF LA QUINTA COMMUNITY DEVELOPMENT Re: Non -Structural Building Plan Review LAQ-I4-BP-003 Tower Market 77-985 Avenida Montezuma La Quinta, CA 92253 Fire Department personnel have reviewed and approved the plans you submitted for the above referenced project. Please be advised the following conditions apply as a part of the conditions for the issuance of a building permit. 1) Fire Department approval is based upon the 2013 CBC requirements for Group M occupancies. — -. -.. --It is-prohibited_to..use, . process or- store. any- -materials -in -the-occupancy that would classify it as a Group H occupancy. 2) Repair work and/or maintenance using open flame equipment, welding or the use of Class I, II, or III -A liquids are prohibited. 3) The Fire Department is required to set a minimum fire flow for the remodel or construction of all commercial buildings using the procedure established in the 2013 CFC. A fire flow of 1500 gpm for a 2 -hour duration at 20 psi residual operating pressure must be available before any combustible material is placed on the job site. `i ^ 4) The required fire flow shall be available from 1 Super hydrant(s) (6n x 4" x 2,'! 2 x 2'/2") spaced not more than'450 apart. All Fire Department Appliances such as hydrants, FSC and PIVs shall be located on the front access side of the building. If applicable, PTV and FDC appliances shall not less than 40' from the building or more than 200' from an approved hydrant. Buildings/facilities 5) Install Knox Key Lock box, mounted per recommended standard of the Knox Company. If the building/facility is protected with a fire alarm system or burglar alarm system, the lock boxes will require "tamper" monitoring. Special forms are available from this office for the ordering of the Key Switch. This form must be authorized and signed by this office for the correctly coded system to be purchased. . 6) Provide keys to the tenant space for inclusion in the main building Knox Box. Key(s) shall have durable and legible tags affixed for identification of the correlating tenant space. , Other requirements: 7) Install panic hardware and exit signs as per the 2013 CBC 8) Prior to final inspection of any building, the applicant shall prepare and submit to the Fire Department for approval, a site plan designating required fire lanes with appropriate lane painting and/or signs. 9) Certain designated areas will be required to be maintained as fire lanes and will require approved signs and/or stenciling in red with CVC 22500.1 conspicuously posted. 10) Install portable fire extinguishers per Title 19, but not less than 2AIOBC in rating. Contact a certified extinguisher company for proper placement and spacing of equipment. 11) This building has not been reviewed or approved for high pile/rack storage. Prior to such use, building(s) shall be approved for high -piled storage (materials in closely packed piles or on pallets, or in racks where the top of storage exceeds 12 feet in height, 6 feet for Group A plastics and certain other hazardous commodities) or aerosols products. High -piled and aerosol stock shall be approved by the Fire Department prior to materials being stored on site. A licensed Fire Protection Engineer or a Fire Department approved consultant must prepare plans for high -piled storage or aerosol storage in accordance with the 2010 CFC and NFPA 13. 12) Shelving, counters, etc., must be in place, however, no merchandise may be placed in the building prior to inspection. 13) Applicant/developer shall be responsible for obtaining aboveground tank permits from both the County Health and Fire Departments. 14) All fire sprinkler systems, fixed fire suppression systems and alarm plans must be submitted separately for approval .prior to construction. Contractors should contact the Planning & Engineering office for submittal requirements. 15) HOOD & DUCT EXTINGUISHING - A UL 300 hood/duct fire extinguishing system must be installed over the cooking equipment as required by the California Fire Code, California Mechanical Code and adopted standards. The extinguishing system must automatically shutdown gas and /or electricity to all cooking appliances upon activation. A C-16 licensed contractor must submit plans for review and approval prior to installation. (Alarm system supervision is only required if the building has an existing fire alarm system.) 16) Approved building address shall be placed in such a position as to be plainly visible and legible from the street and rear access if applicable. Building address numbers shall be a minimum of 12". All addressing must be legible and of a contrasting color with the background and adequately illuminated to be visible from the street at all hours. 17) Electrical room door shall be posted "ELECTRICAU ROOM" on the outside of door.. 18) Fire Sprinkler Riser door shall be posted "FIRE RISER" on the outside of door. 19) Fire Alarm Control Panel door shall be posted "FACP" on the outside of door. 20) Roof Access door shall be posted "ROOF ACCESS" on the outside of door. 21) A durable sign stating "This door to remain unlocked during business hours" shall be placed on or adjacent to the front exit doors. The sign shall be in letters not less than one inch high on a contrasting background. NOTE: "Red -lined" correction on page E2.0 SUBJECT TO FIELD INSPECTION - Nothing in our review shall be construed as encompassing structural integrity. Review of this plan does not authorize or approve any omission or deviation from all applicable regulations. Final approval is subject to field inspection. Please contact the Fire Department Planning & Engineering staff for final inspection prior to occupancy. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 72 hours in advance and may be arranged by calling (760) 863-8886. All questions regarding the meaning of these conditions should be referred to the Fire Department Planning & Engineering staff at (760) 863-8886. By , ," ,"&1 l Jason Stubble Fire Safety Specialist T4ht 4 4.Q" Planning Commission agendas and staff reports are now available on the City's web page: www.la-guinta.org PLANNING COMMISSION AGENDA CITY HALL COUNCIL CHAMBERS 78-495 Calle Tampico, La Quinta REGULAR MEETING on TUESDAY, APRIL 22, 2014 AT 7:00 P.M. Beginning Resolution No. 2014-007 CALL TO ORDER 1. Roll Call 2. Pledge of Allegiance PUBLIC COMMENT At this time members of the public may address- the Planning Commission on any matter not listed_ on the agenda. Please complete a "Request to Speak" form and limit your comments to three minutes. CONFIRMATION OF AGENDA APPROVAL OF MINUTES 1. Approval of the minutes of March 11, 2014. PUBLIC HEARINGS For all Public Hearings on the agenda, a completed "Request to Speak" form must be filed with the Executive Assistant prior to consideration of that item. A person may submit written comments to the Planning Commission before a public hearing or appear in support or opposition to the approval of a project(s). If you challenge.a project(s) in court, you may be limited to raising only those issues PLANNING COMMISSION AGENDA 1 APRIL 22, 2014 you or someone else raised at the public hearing or in written correspondence delivered to the City at, or prior to the public hearing. 1. Site Development Permit 2013-934 submitted by T. D. Desert Development LP for the construction of 39 new single-family homes on 1 1.21 acres and an amendment to Final Map 31681-3. Project: Andalusia at Almeria, within the existing Andalusia at Coral Mountain project. CEQA: reviewed under environmental Assessment 2003-483. Location: southeast corner of Madison Street and Avenue 58. 2. Conditional Use Permit 2014-157 submitted by Shadow Rock Church to establish a church in an existing 7,840 square -foot building. Project: Shadow Rock Church. CEQA: exempt from environmental review pursuant to Sections 15332 (Infill Development). Location: La Quinta Valley Plaza commercial center at the northwest corner of Dune Palms Road and Highway 1 1 1 (79-390 Highway 1 1 1). BUSINESS SESSION 1. Site Development Permit 2013-933 submitted by Nexus Palm Springs for the construction of 11 new single-family homes on 9.14 acres. Project: The Orchards (TR 36279). CEQA: reviewed under Environmental Assessment 2010-608. Location: southwest corner of Madison Street and Vista Bonita Trail (Avenue 51). CORRESPONDENCE AND WRITTEN MATERIAL COMMISSIONER ITEMS 1. Report on City Council meeting of March 18 and April 1 and 15, 2014. 2. Commissioner Weber is scheduled to attend the May 6, 2014 City Council meeting. DIRECTOR'S ITEMS ADJOURNMENT The next regular meeting of the Planning Commission will be held on May 13, 2014 commencing at 7:00 p.m. at the City Hall Council Chambers, 78-495 Calle Tampico, La Quinta, CA 92253. PLANNING COMMISSION AGENDA 2 APRIL 22, 2014 DECLARATION OF POSTING I, Monika Radeva, Executive Assistant of the City of La Quinta, do hereby declare that the.foregoing Agenda for the La Quinta Planning Commission meeting was posted on the inside of the north entry to the La Quinta Civic Center at 78-495 Calle Tampico, and the bulletin boards at 78-630 Highway 1 1 1, and the La Quinta Cove Post Office at 51-321 Avenida Bermudas, on April 18, 2014. DATED: April 18, 2014 MONIKA RADEVA, Executive Assistant City of La.Quinta, California PUBLIC NOTICES The La Quinta City Council Chamber is handicapped accessible. If special equipment is needed for the hearing impaired, please call the City Clerk's office at 777-7123, twenty-four (24) hours in advance of the meeting and accommodations will be made. If special electronic equipment is needed to make presentations to the Commission, arrangements should be made in advance by contacting the City Clerk's office at 777-7123. A one (1) week notice is required. If background material is to be presented to the Commission during a Planning Commission meeting, please be advised that eight (8) copies of all documents, exhibits, etc., must be supplied to the Executive Assistant for distribution. It is requested that this take place prior to the beginning of the meeting. Any writings or documents provided to a majority of the Commission regarding any item(s) on this agenda will be made available for public inspection at the Community Development Department's counter at City Hall located at 78-495 Calle Tampico, La Quinta, California, 92253, during normal business hours. PLANNING COMMISSION AGENDA 3 APRIL 22, 2014 Li ENVIRONMENTAL FOOD ESTABLISHMENT PLAN APPROVAL NOTICE SR# 30307 Project Name Tower Market Plans Submitted by John Olson Owner Tower Energy Group Date 2-16-14 Address 77-985 Avendia Montazuma, La Quints Phone 310-538-8000 Phone 760-799-5106 The plans are now approved subject to the conditions listed below and the attached compliance sheet. 1. Provide a certified air balance report for the exhaust and make up air. 2. Provide a grease interceptor letter from the sewer agency call John Riddle at 760-863-7570. 3. Contact Hazardous Material division for the resurfacing of the gas station area at 760-863-8976. 4. Provide lockers for the food service employees, one locker per employee per shift. 5. Provide air curtain at delivery door 1600fpm measured 3'above the ground. 6. Page A8.2 states you will be using sealed concrete for the finish. The sealer must be USDA approved for food use, save container for verification. 7. Provide an outside trash enclosure, the enclosure must have smooth epoxy sealed interior floor and walls. CONSTRUCTION INSPECTIONS: Contact the Plan Checker for a Preliminary Inspection when constriction is approximately 80% complete, with plumbing, rough ventilation, and rough equipment installed. Request for inspection should be made at least five (5) working days in advance. A FINAL INSPECTION MUST be made upon completion of ALL work including finished details. APPROVAL to operate shall not be granted, or remodeled areas approved to operate, until the facility has passed the FINAL INSPECTION, and "APPLICATION TO OPERATE" has been completed and PERMIT FEES have been paid. 'Request for inspection should be made at least five (5) working days in advance. PLANS CHECKED BY Tracey Ford, EHS III Phone (760) 863-8287 I acknowledge the corrections noted herein and as indicated on theylans and agree to incorporate them during construction: DEH -SAN -178 (Rev 2/06) Corona 2275 S. Main St Suite 204 (951) 273-9140 Fax (951) 520-8319 Signature-1494 ignature�_ �Date Company Name �(,c>�� �/V X121 y mOue Hemet 800 S. Sanderson (951) 766-2824 Fax(951)766- 7874 ax(951)766- 7874 Indio 47-950 Arabia St "A" (760)863-8287 Fax(760)863- 8303 ax(760)863- 8303 Murrieta 38740 Sky Canyon Dr (951) 461-0284 Fax (951) 461-0245 Department Web Site – www.rivcoeh.org Palm -Sp ,'ngs 554 S. Paseo'Dorotea (760) 3204048 Fax(760)320-1470 Riverside 4065 County Cir (951) 358-5172 Fax(951)358- 5017 ax(951)358- 5017 I COUNTY OF RIVERSIDE • COMMUNITY HEALTH AGENCY DEPARTMENT OF ENVIRONMENTAL HEALTH Application for Review of Food Establishment Construction/Remodel Plans Date /� Fee $ For Office Use Ck. #V 5 A Trans. # Kq7Dist. 6 a Area # I SR # Note: Plans will not be accepted unless this application is complete, and the plan check fee is paid. Establishment Name: u v-,t,� /t 1Nltle(_ T_ Job Address: %7-995f' AVI ot�a-j /Ilc�+irj"il7t-ctel/`! city: /..4. Zip: C Contact Person: c fia 1 Lh ;, Phone: 6v -799 - 1 U E-mail Address: Gl/,r�,. 0j.ScJo --Iv THt'Tli-cieF+Ittr, Coif 1 Fax: ,u )-C;a - :?/ 4?'7 Contact's Address: �, (, - U?f.; 14 tiL City: i p: •� �,� � it itt�ll Zi Owner/Operator Name: T() t,x t t!r t C Phone: _rJ?k- a Address: 603 l,•1. 60 1�7_ _ '4 -(,TE A City: Zip: A(2SO4 It A. General Construction (Additional operations may be subject to extra fees) New Food Facility Remodel or Existing Food Establishment Explain Retoo&6-`. 9 �'C11 l,)l l;; t *S$47 4c.39PPI Total Sq. Ft. (including all seating areas) !I Hours of 0peratio72-y* >_ - `�--TM .—­ - Seating Capacity for dining i Number of workers per Shift _� RIVERSID .�DIO FACILITY B. Service Indicate ALL methods o DEPT OF NVIRONMENTAI HEALTH ( offood service to the public): 47950 ARABIA ST. STE# A Menu: A menu of food and beverages sold at this facility is required to be submitted at tim On-site preparation (cooking, cutting, assembly, etc.): Yes No Soup or salad I Customer Self -Service Dispensers: Yes No Full Service Bar: Yes r 02/05/2014 00000 Type of customer utensils (cups, plates, forks, etc.) Multi -service (re -usable) or Singl. #6847 4:39PIt'.Y EMMA00 72ZO20 $1646.. 0 C. Utilities (Will -Serve Letters): CRD. CARD $1646-00 Water Service: _ Public Water System Name of Water Company: C JW j t Private Well (must be Environmental Health Land Use approved). ''d: f�vOnlirre Sewer Disposal: Public Sewer System Name of Sewer Company: 41' V tA) D co oC Septic System (must be Environmental Health Land Use approved). t Customer Cv Grease Interceptor: Provide from Sewer District a Grease Interceptor size requirement lets Owner/Representative Declaration: I certify that I have read the entire application and state that all information is correct. I understand that the amount of fee paid is based on my declaration of information on this form, and that incorrect information is grounds for denial of the submitted plans. I also understand that plans will be discarded if not picked up within sixty (60) days of approval or denial, and that no inspection of my establishment will be conducted, or approval granted to operate, until all proper information requested has been received and plans have been approved and returned. I have reviewed the Plan Construction Guide and my plans follow the guide. Signature . DEH -SAN -002 (Rev. 2/08) Date 2 Distribution: White — Office • Yellow - Customer DEPARTMENT OF ENVIRONMENTAL HEALTH TO: PLAN CHECK CUSTOMER FROM: RIVERSIDE COUNTY DEPT. OF ENVIRONMENTAL HEALTH FOOD AND POOL CONSTRUCTION PROGRAM SUBJECT: WILL -SERVE REQUIREMENTS Please be advised that utility clearance letter(s) are required from the Water District, Sewer District, and Industrial Waste Section/Source Control Division (Grease Interceptor), for your food facility. It is your responsibility to ensure that these clearances are secured. The utility clearances correspond with Section C, "Utilities" on the Application for Review of Food Establishment Construction/Remodel Plans form which you signed and submitted with your plans. Even if your project does not require a grease interceptor, an exemption letter from the Industrial Waste Section/Source Control Division is still required. It is your responsibility to secure the utilities for your project and provide this Department with the correct information for plan check processing. ** PLANS WILL NOT BE RELEASED UNTIL THESE CLEARANCE LETTERS ARE RECEIVED AND APPROVED BY THIS DEPARTMENT ** It is imperative that the timely receipt of these clearance letters occurs so as to not impede the ultimate release of your plans to you. Individuals submitting plans to this Department for the "Remodel of an Existing Food Establishment" need only to submit the clearance letter from the Industrial Waste District (Grease Interceptor). Facility Name �O w 4e5Z, Mt--1r2-i4el— Facility Address -77--98S -19VA0v/ Oi1 Client's Name(s) (Please Print) _ Corona 2275 Main St Suite 204 (951) 273-9140 Fax (951) 520-8319 Rev. 11/07 Client Signature Hemet Indio 800 S. Sanderson 47-950 Arabia St (951) 766-2824 (760) 863-8287 Fax (951) 766-7874 Fax (760) 863-8303 Murrieta 38740 Sky Canyon Dr (951) 461-0284 Fax (951) 461-0245 -J Date Palm Springs Riverside 554 Paseo Dorotea, Ste.1 4065 County Circle Dr (760) 320-1048 (951) 358-5172 Fax (760) 320-1470 Fax (951) 358-5017 Department Web Site — www.rivcoeh.org Prepared 5/08/14,15:54:50 Application Inquiry-(BPN200I001) Page 1 Program HTDFTAL Screen detail for Program: BP BPN200I, Fees User ID AJ Application 13-00001641 ------------------------------------------------------------------------------------------------------------------------------------ Property Information Address: 77985 AVENIDA MONTEZUMA LA QUINTA, CA 92253 Location ID: 17396 - Owner name: LADOUCEUR JACKIE G APN: 773-104-036-24 -000000- Alternate ID: Zoning: - VC VILLAGE COMMERCIAL Subdivision: Application Information Application desc: 4,728SF STORE/VB/M-OCC/112-OL/NON-SPRINKLERED Application status: IN PLAN CHECK Status Date: 12/18/2013 Application type: NEW COMML - STORES & CUSTOMER SERVICE Application date: 12/18/2013 Valuation: 198103 Square footage: 4728 Public building: NO Reviewed by: Pin number: 287709 - Entered by: AZARCO Contractor Information Contractor Name: * OWNER Contractor Number: Type: Status: Contractor Requirements Doc Number Exp Date ------------------------------ --------------- ---------- Work Comp Carrier INSURANCE STATE LICENSE REGISTRATION LICENSE CLASSIFICATIONS Outstanding Inspections Insp Schedule Confirmation Permit Pmt Type ID Date Number Description Seq Min Max --------------- ------ ---------- ------------ --------------- --- ----- ----- SETBACKS 00 10 FOOTINGS 00 10 BOND BEAM 00 10 GRADE BEAM 00 10 SLAB 00 10 UNDERGROUND ELE 00 10 UNDERGROUND PLU 00 10 ROOF NAIL 00 20 OKAY TO WRAP 00 20 FRAMING 00 20 ROUGH ELECTRICA 00 20 ROUGH MECHANICA 00 20 ROUGH PLUMBING - 00 20 INSULATION 00 20 ROOF DRAIN 00 20 130 DRYWALL NAIL 00 20 Prepared 5/08/14,15:54:50 Application Inquiry-(BPN200I001) Page 2 Program HTDFTAL Screen detail for Program: BP BPN200I, Fees User ID AJ ------------------------------------------------------------------------------------------------------------------------------------ Application 13-00001641 ' (Continued) LATH 00 20 GAS LINE / GAS 00 30 T -BAR 00 30 TEMP USE OF PER 00 30 ELECTRICAL FINA 00- 40 MECHANICAL FINA 00 40 PLUMBING FINAL 00 40 FINAL 00 40 SEWER CONNECTIO 00 999 TEMPORARY POWER 00 999 Work Description Code Description Quantity ------ ------------------------- -------- CO Information CO Issue Str/seq Date Status Description ------- ---------- ------ -------------------- Class Type Description Transaction amount Amount due Amount billed Struct Permit Insp Custom District A A2 ART IN PUBLIC PLACES -COM 990.52 990.52 .00 Y A BA BLDG STDS ADMIN (SB1473) 8.00 8.00 .00 A C2 DIF CIVIC CENTER - COMM 1763.54 1763.54 _00 Y A F2 DIF FIRE PROTECTION -COMM 813.22 813.22 .00 Y A PE PLAN CHECK, ELECTRICAL 118.68 118.68 .00 P PF PERMIT FEES 572.80 572.80 .00 000000 B13 00 P PF PERMIT FEES 202.58 202.58 .00 000000 E13 00 P PF PERMIT FEES 202.60 202.60 .00 000000 M13 00 P PF PERMIT FEES 381.44 381.44 .00 000000 P13 00 A PM PLAN CHECK, MECHANICAL 138.24 138.24 .00 A PP PLAN CHECK, PLUMBING 381.43 381.43 .00 A P5 BLDG PC 25001-200K 1213.59 1213.59 .00 A S2 STRONG MOTION (SMI) - COM 41.60 41.60 .00 Y A TE TUMF: MISC RETAIL SVCS 156944.94 156944.94 .00 A T2 DIF STREET MAINT FAC -COMM 1096.90 1096.90 .00 Y A 2 DIF TRANSPORTATION - COMM 26850.31 26850.31 .00 Y Prepared 5/08/14,15:54:50 Application Inquiry-(BPN200I001) Page 3 Program HTDFTAL Screen detail for Program: BP BPN200I, Fees User ID AJ Application 13-00001641 ------------------------------------------------------------------------------------------------------------------------------------ Class Type Description Transaction amount Amount due Amount billed Struct Permit Insp Custom District (Continued) Totals 191720.39 191720.39 .00 Tom Tisdale Fire Chief Proudly serving the unincorporated areas of Riverside County and the Cities of: Banning Beaumont Cahmesa Canyon Lake Coachella Desert Hot Springs Indian Wells Indio Lake Elsinore La Quinta Moreno Valley Palm Desert Perris Rancho Mirage San Jacinto Temecula Board of Supervisors Bob Buster, District 1 John Tavaglione, District 2 Jim Venable, District 3 Roy Wilson, RIVERSIDE COUNTY FIRE DEPARTMENT In cooperation with the California Department of Forestry and Fire Protection 210 West San Jacinto Avenue • Perris, California 92570 • (909) 940-6900 • Fax (909) 940-6910 January 6, 2005 To: La Quinta Building Department Re: Final fire Clearance The Riverside County Fire Department is granting a fire life safety clearance for # LAQ-04-BP-064/La_Quinta_V_illage Gas Station 77-4"Avenita Montezuma. 995 If you have any questions contact me at 760-345-6954 Respectfully, Neal Stephenson Fire Systems Inspector RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS 1 PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE JOBDATE ADDRESS: r7 " l 6 "Y, PERMIT# : �� ISSUED: '3 DESCRIPTION: CONTRACTOR: '` HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre -pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final EF Deluge/pre-action SPRINKLER U.G. Final EF Thrust block pre -pour USTIAST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off y- IC- IS 'T. C. Final EF Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves 164-1& - 15 T - Overhead rough piping Final E F L-1- I - , S 7 C' Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drainfinspectors' test Hood/duct extinguishing High pile storage High pile rack storage In -rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Finale F HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system y . Q� .1 S C. Function test y _ _(d, _C, Gaslelectrical shut-off T -C, Nozzle model/placement _ _r Fire alarm connection -!d T -C Final EF 4-g_ -T-C SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final e F FIRE ALARM KNOX SYSTEM Rough -wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Ll -it is, Sprinkler monitoring Shell final Final E F Final for occupancyi y- ►6- S T_ e. FINAL INSPECTION DATE: INSPECTORS SIGNATURE: *WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE" 2300 Market Street, Ste 150 • Riverside, CA 92501 • (951) 9554777 • Fax (951) 955-4886 77-933 Las Montanas Rd., Ste 201 9 Palm Desert, CA 92211 . (760) 863-8886 9 Fax (760) 863-7072 `~' RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS 1 PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON RFvFRSF sim JOB ADDRESS: PERMIT#: 3 DATE - ISSUED: { DESCRIPTION: CONTRACTOR: H' HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre -pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final EF Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre -pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final EF Primary piping -FIRE SPRINKLER Secondary piping Weld inspection 1 t / Z �� / Dispensers & shear valves Overhead rough piping /!t / - Yid Final E F Overhead hydro Zam'Amw �, �-( L� MISC. INSPECTIONS UG Rush / OK to connect 2 - . � S IT . C Spray booths Main drain/inspectors' test Hood/duct extinguishing High pile storage High pile rack storage In -rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final EF '-{- -T - C - HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air Row test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough -wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: 'WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE" 2300 Market Street, Ste 150 • Riverside, CA 92501 • (951) 9554777 . Fax (951) 9554886 77-933 Las Montanas Rd., Ste 201 . Palm Desert, CA 92211 . (760) 863-8886 • Fax (760) 863-7072 COUNTY OF RIVERSIDE DEPARTMENT OF ENVIRONMENTAL HEALTH SUPPLEMENTAL REPORT TO SAN. FORM # SUBJECT .w h�A ��c i'� ADDRESS "� 11 `t �^ �! �n , a bi1c i REMARKS: DATE PERMIT NO. �� e v.�\.,,. �._� DISTRICT INSPECTOR t Q t L, r rA0"N\.\_ tA 1}(,✓\� t`aN. \e��1� �.�C. �'i`Z�'I� �aut O(tr� [011ejtk. / O Q 1P ANQ t C f ` CA T A lr ��t - �C r O,,J t (� I cA'�-':h kne4�1�5 `1rA ����CI�G �to .� :nc r� t, Ce nol� \ 1 �a c •. 10 (A C1 r—"f C, .r vc<�' CNS L- -0 R S OCA \ e-A� RECEIVED / DEH -SAN -118 (Rev 03/13) ' v — v v Distribution: WHITE -Office; CANARY -Owner I BUILDING ENERGY ANALYSIS REPORT I PROJECT: Tower Market 77-985 Avenida Montezuma La Quinta, CA 92253 Project Designer: Fullerton Architects, PC P.O. Box 2770 Bigfork, MO 59911-2770 (406) 837-1550 Report Prepared by: of Tim Scott Scott Design and Title 24, Inc, 77-085 Michigan Drive Palm Desert, Ca 92211 (760) 200-4780 CITY orrA QUINTA BUILDING & SAFETY DEPT. Job Number: RECEIVED APPROVED FOR CONSTRUCTION MAR 1.2 2014 Date: 2/17/2014 CITY OF LA QUINT,4 DATE ��, BY COMMUNITY DEVELOPMENT The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC—www.energysoft.com. User Number. 6712 Run Code: 201402-17716:56:06 ID: 4 4 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 C Project Name Date ower Market 2/17/2014 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 77-985 Avenida Montezuma La Quinta CA Climate Zone 15 3.686 n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: m New Construction ❑ Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name 14m, ��� Tim Scott Signature Company Scott Design and Title 24, Inc, Date 2172014 Address 77-085 Michigan Drive Phone (760) 200-4780 City/State/Zip Palm Desert, Ca 92211 CEPE #NR08-09-3706 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Nick Fullerton Signature Company Fullerton Architects, PC Date Address P.O. Box 2770 License # City/State/Zip Bigfork, MO 59911-2770 Phone (406) 837-1550 Principal Mechanical Designer Name Tim Scott _ Signature Company Scott Design and Title 24, Inc. Date 2/17/14 Address 77085 Michigan Drive License # City/State/Zip Palm Desert, CA 92211 Phone (760) 200-4780 Principal Lighting Designer Name Nick Fullerton Signature Company Fullerton Architects, PC Date Address P.O. Box 2770 License # City/State/Zip Bigfork, MO 59911-2770 Phone (406) 837-1550 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) m ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. m LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. 0 LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 /D: Page 3 of 37 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 C Project NameDate Tower Market -72/17/2014 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance Energy Component Design Design Mar in Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 0.79 0.24 0.55 256.13 253.60 2.53 45.56 64.64 -19.08 0.00 0.00 0.00 0.00 0.00 0.00 70.18 71.13 -0.95 184.10 106.78 77.32 91.38 91.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 648.14 587.77 60.37 Heating Cooling Fans ' Heat Rej Pumps DHW-� Lighting - Receptacle ' Process Process Ltg Percent better than Standard 9.3% 9.3 % excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (S) 180 deg Conditioned Floor Area 3,686 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 4 Conditioned Footprint Area 3,686 sqft. Number of Zones 1 Natural Gas Available On Site Yes Orientation Gross Area Glazino Area Glazino Ratio Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof (S) 928 (w) 1,008 (N) 928 (E) 1,008 3,872 3,686 sqft. sqft. sqft. sqft. sqft. sqft. 0 19 46 278 343 0 sqft. sqft. sqft. sqft. sqft. sqft. 0.0% 1.9 4.9 27.6 8.9 0.0 Standard Proposed Prescriptive Values for Prescriptive Lighting Power Density 1.60o W/sgft. 0.928 W/sqft. Comparison only. See Prescriptive Envelope TDV Energy 112,625 119,373 LTG -1 C for allowed LPD. Remarks: EnemyPro 5.1 by EneMySoft User Number: 6712 Run Code: 2014-02-17T16:56:06 /D: Pa e 4 of 37 4 4 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C Project Name Tower Market Date 2/17/2014 ZONE INFORMATION Floor Inst. Area LPD System Name Zone Name Occu anc T e s ft. W/sf' Ctrl. Allowed LPD Proc. Credits Area Tailored Loads W/sf 2 W/sf 3 W/sf ° W/sf HVAC Tower Market Retail Sales, Wholesale 3,686 0.997 0.069 Notes: t. See LTG-lC 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk see LTG- 1-C by others) (by others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 5 of 37 W • • CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Tower Market Date 2/17/2014 Project AddressClimate 77-985 Avenida Montezuma La Quinta Zone 15 Total Cond. Floor Area 3,686 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1180 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType Q ° 3 C N W Oz o V M d r U M ¢ '� y K LU >'o tm � C w 7 of g y > O C < <i K G a o O 6 U N y aL LL 1 Roof 3,686 (N) 0.023 R-381 7.0 None 4.2.2-A 19 New ❑ ❑ 2 Wall 882 (N) 0.069 R-21 4.3.1-A6 New ❑ ❑ 3 Wall 730 (E) 0.069 R-21 4.3.1-A6 New ❑ ❑ 4 Wall 928 (S) 0.069 R-21 4.3.1-A6 New ❑ ❑ 5 Wall 989 (W) 0.069 R-21 4.3.1-A6 New ❑ ❑ 6 Slab 3,686 (N) 0.730 None 4.4.7-A1 New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type a c3 O Z V ALL 2> y V `.+ 4 'o > N U C7 �- m = o' U)u> rn c=o > O c N o Urn a a 1 Window 46 (N) 0.510 NFRC 0.280 NFRC ❑ New ❑ ❑ 2 Window 138 (E) 0.510 NFRC 0.280 NFRC ® New ❑ ❑ 3 Window 140 (E) 0.510 NFRC 0.280 NFRC ❑ New ❑ ❑ 4 Window 19 (WM 0.510 NFRC 0.280 NFRC ❑ New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 6 of 37 C CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name Tower Market Date 2/17/2014 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. 13 13 13SRI ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ ❑ ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/ ❑ ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from Cool Roof criteria below. 13 13 13the ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are ted from the low -sloped roofingcriteria. 13 13 13exem 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 51b/ft' a 51b/ft' Product Type 2 Aged Solar Reflectance Thermal Emmitance SRI' Pass Fail6 ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ 1313❑ 4 13 13 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.org/r)roducts/search.r)hr) 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p;,,;,;a, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at htta://www.enerov.ca.aov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessarv. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnemvPro 5.1 by Enem YSoft User Number: 6712 RunCode: 20 14 02-1 7 71 6:56:06 /D: Page 7 of 37 W • CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Tower Market Date 2/17/2014 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test Laminated Metal Tinted 343 a a EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 2014 02-1 7 71 6:56:06 /D: Page 8 of 37 -4 4 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C Project Name Tower Market Date 2/17/2014 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate LTG -1- INST Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A and LTG -3A Retain a copy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE ❑ UNCONDITIONED SPACE 0 The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the 0 calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F G H None or Item Ta Complete Luminaire Description' (i.e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts act A= J How wattage Was determined ° d Z5 '(0 > j Z J LL X p Q) c m 3: Field Ins ectorz m O c o CEC %5 Default 6 w, From Q o NA8 Q ~ M d U- L -1/L-2 L -11L-2 (2) 4 It Fluorescent T8 59.0 0 ❑ 151 885 ❑ ❑ L -3/L-4 (2) 4 It Fluorescent T8 59.0 ® ❑ 5 295 ❑ ❑ L-5 (2) 4 ft Fluorescent T8 59.0 ® ❑ 4 236 ❑ ❑ L-6 LED Rope Light 1.0 ® ❑ 80 80 ❑ ❑ L-7 1OW LED 12.0 ❑ 0 13 156 ❑ ❑ L-8 1OW LED 12.0 ❑ 0 22 264 ❑ ❑ L-9 15w per It Track Light (with Current Limiter) 80.0 0 ❑ 16 1,280 ❑ ❑ L-9 27W LED 30.0 ❑ ® 16 480 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Installed Watts Page Total: 3,676 Building total number of pages: Installed Watts Building Total Sum of all a es 3,676 Enter into LTG -1 C Page 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2014-02-17T16:56:06 /D: Page 9 of 37 E. • CERTIFICATE OF COMPLIANCE Part 2 of 3 LTG -1 C Project Name Tower Market Date 2/17/2014 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2, automatic daylighting controls for daylit areas > 2,500 n2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ft2, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST Field Inspector Number Special Type/ Description of Units Location in Building Features Pass Fail 7 DAY TIMF ('.I OCK SYSTEM ONE UTILITY AREA ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 /D: Pae 10 of 37 • • CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1C Project Name Date Tower Market 2/17/2014 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 3676 Installed Lighting from Conditioned LTG -1C, Page 2 , from Unconditioned LTG -1C, Page 2 0 Lighting Control Credit 255 Lighting Control Credit Conditioned Spaces from LTG -2C Unconditioned Spaces from LTG -2C o Adjusted Installed 3 421 Adjusted Installed 0 Lighting Power Lighting Power Complies if Installed 5 Allowed Complies if Installed 5 Allowed Allowed Lighting Power Allowed Lighting Power Conditioned Spaces from LTG -3C or PERF -1 3,421 Unconditioned Spaces from LTG -3C 0 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Luminaires Controlled LTG -2A and LTG-3A Controls and Sensors and Number of Automatic Luminaires Daylighting Controls Equipment Re uirin Testing Description controlled Location Acceptance Occ Sensor - Multi -Level (2) 4 R Fluorescent T8 15 Tower Market m Occ Sensor - Multi -Level (2) 4 R Fluorescent T8 4 Tower Market m Occ Sensor - Multi -Level 10W LED 13 Tower Market p EnergyPro 5.1 by EnemySoh User Number: 6712 RunCode: 2014-02-17716:56:06 /D: Pae 11 of 37 W • r: CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Tower Market Date 2/17/2014 Project Address 77-985 Avenida Montezuma La Quinta Climate Zone 15 Total Cond. Floor Area 3,686 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 1 180 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC -1 RTU -1 HP -1 DHWHeater 13 13i.e. Equipment T e3 Electric Res DHW Boiler ❑ ❑ Number of Systems 2 ❑ ❑ Max Allowed Heating Capacity' 5,120 Btu/hr ❑ ❑ Minimum Heating Efficiency' 0.95 EF ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit & MECH-4-HERS n/a 11 11MECH-4A Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 HVAC 13 ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 4 ❑ ❑ Max Allowed Heating Capacity' 69,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 3.40 COP ❑ ❑ Max Allowed Cooling Capacity' 71,000 Btu/hr ❑ ❑ Cooling Efficiency' 12.0 EER ❑ ❑ Duct Location/ R -Value Conditioned / 4.2 ❑ ❑ When duct testing is required, submit & MECH-4-HERS No 11 13MECH-4A Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Pae 12 of 37 0 11 w CERTIFICATE OF COMPLIANCE and Project Name Tower Market (Part 2 of 4) MECH-1 C Date 2/17/2014 1 arturgyrru o. i ay =nervy,)orr user rvumDer. b172 Hun Code: 201402-17776:56:06 ID: Page 13 of 37 1 0 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Date Tower Market 2/17/2014 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Qty. VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control Carrier 50HJQ007 4 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ m ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Cl ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnemyPro5.1 by EnergySoft User Number- 6712 Run Code: 2014-02-17716:56:06 ID: Pae 14 of 37 • • • CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1C Project Name Tower Market Date 1 2/17/2014 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Fault Detection & Diagnostics Ot . for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: Carrier50HJQ007 4 ❑ ❑ ❑ ❑ HVAC CONTRACTOR ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number., 6712 Run Code: 2014-02-17716:56:06 ID: Pae 15 of 37 C 1� LIGHTING CONTROLS CREDIT WORKSHEET Part 1 of 2 LTG -2C Project Name Tower Market Date 211712014 POWER ADJUSTMENT FACTORS PAF FOR NON -DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: m CONDITIONED SPACES 0 UNCONDITIONED SPACES A B C D E F G Wafts of Power Room # Zone ID Plan Room Area Control Adjustments Areas Lighting Control Description' Reference(ft) Lighting Factor' Control Credit Watts E x F Tower Market Occ Sensor- Multi -Level L -1/L-2 3,686 885 0.20 177 Tower Market Occ Sensor- Multi -Level L-5 3,686 236 0.20 47 Tower Market Occ Sensor- Multi -Level L-7 3,686 156 0.20 31 PAGE TOTAL 255 Note: Conditioned and Unconditioned Building total of non -daylight control credit watts for all pages of LTG -2C Pae 1 of 2 Enter building total of all daylight controls credit watts from LTG -2C Page 2 of 2 0 Space shall be separately totaled BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON -DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG -1 C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces 255 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 /D: Pae 16 of 37 0 • AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Tower Market 2/17/2014 Indicate Air Systems Type Central, Single Zone, Packa e, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 HVAC Number of Systems 4 Indicate Palle Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112 a 3.40 COP Cooling Equipment Efficiency 112 a 12.0 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Furnace Controls/Thermostat 112(c), 115(a) n/a Natural Ventilation 121 b Yes Mechanical Ventilation 121 b 1,032 cfm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c No Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Location/ R -value 124 Conditioned /4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 274,772 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 166,042 Btu/hr Fan Control 144(c) Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (bDC only) 144(c) Yes Simultaneous Heat/Cool 144(d) No Economizer 144(e) No Economizer Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Pae 17 of 37 • C WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C Project Name Date Tower Market 2/17/2014 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags (i.e. AC -1, RTU -1, HP -1)' Number of Systems Indicate Page Reference on Plans or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b Cooling Tower Flow Controls 144(h) Variable Flow System Design 144(h) Chiller and Boiler Isolation 144(j) CHW and HHW Reset Controls 144(j) WLHP Isolation Valves 144(i) VSD on CHW, CW & WLHP Pumps>5HP 144 DP Sensor Location 144(l) 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating Item or System Tags (i.e. WH -1, WHP, DHW, etc...)' DHW Heater Number of Systems 2 Indicate Page Reference on Plans or Schedule MANDATORY MEASURES I T-24 Sections SERVICE HOT WATER Certified Water Heater 111, 113(a) AO SMITH ELJF-06' Water Heater Efficiency 113(b) 0.95 EF Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 123 Required POOL AND SPA Pool and Spa Efficiency and Control 114(a) n/a Pool and Spa Installation 114(b) n/a Pool Heater — No Pilot Light 115(c) n/a Spa Heater— No Pilot Light 115(d) n/a Pipe Insulation 123 n/a 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17716:56:06 /D: Pae 18 of 37 n MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Tower Market Date 1 2/17/2014 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area (ft) CFM per ft2 Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Tower Market 3,686 0.25 922 1 922 1,032 HVAC Total 922 1,032 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. Ene yPro 5.1 by EnergySoft User Number: 6712 Run Code: 2014 02-1 7 71 6:56:06 /D: Pae 19 of37 .7 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Tower Market Date 2/17/2014 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Qt Eff iciency Tons Pump City. GPM BHP Control DHW / BOILER SUMMARY System Name Type Vol. Distribution Qt . Rated Input (Gals). Energy Factor or RE Standby Loss Tank Ext. or Pilot R -Value Status AO SMITH ELJF-06' Small Elec. Point of Use 2 5,120 6 0.95 n/a n/a New MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length(ft) Control Qty. HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Qty. Output Aux. kW Eff iciency Output Eff iciency Status Carrier 50HJQ007 Packaged DX 4 69,000 7.5 3.40 COP 71,000 12.0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP Carrier 50HJQ007 Constant Volume No Economizer 2,400 0.50 none EnergyPro 5.1 by EnergySoft User Number. 6712 Run Code: 201402-17716:56:06 ID: Page 20 of 37 • • ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Tower Market Date 2/17/2014 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.z of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swingingand sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). EnemvPro 5.1 by EnemySoft User Number.' 6712 RunCode: 201402-17716:56:06 /D: Page 21 of 37 • • • LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date Tower Market 2/17/2014 Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the ad'acent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 20 14 02-1 7 71 6:56:06 ID: Page 22 of 37 0 1�1 • CERTIFICATE OF COMPLIANCE Part 1 of 4 OLTG-1 C Project Name Date Tower Market 2/17/2014 Project Address Total Illuminated Area 77-985 Avenida Montezuma La Quinta, CA 92253 1,086 GENERAL INFORMATION Phase of Construction: m New Construction ❑ Addition ❑ Alteration Documentation Author's Declaration Statement certify that this Certificate of Compliance documentation is accurate and complete. ------ r Signature laly Name Tim Scott Company Date Scott Design and Title 24, Inc, 211712014 Address CEA # 77-085 Michigan Drive CEPE # NR 8-09-3706 City/State/Zip Phone Palm Desert, Ca 92211 (760) 200-4780 Principal Lighting Designer's Declaration Statement • 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Signature Nick Fullerton Company Phone Fullerton Architects, PC (406) 837-1550 Address License # P.O. Box 2770 City/State/Zip Date Bigfork, MO 59911-2770 Principal Lighting Designer's Declaration m 1 certify that this Certificate of Compliance documentation is accurate and complete, and accounts for all outdoor lighting power, including building mounted, pole mounted, as well as all other lighting designed for the site, and that Additional Lighting Power Allowances for Specific Applications or Additional Lighting Power Allowances for Ordinance Requirements have not been counted more than one time for the same area, in accordance with Section 147 of the Standards. Outdoor Lighting Mandatory Measures Indicate location on building plans of Mandatory Measures Note Block: LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheets is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published by the California Energy Commission. ❑ OLTG-1 C Certificate of Compliance. All 4 pages required on plans for all submittals. ❑ OLTG-2C (Pages 1 of 3) Lighting Wattage Allowances for General Hardscape, Sales Frontage, or Ornamental Lighting. Optional on tans. ❑ OLTG-2C (Pages 2 of 3) Lighting Wattage Allowance for Per Application or Per Area. Optional on plans. ❑ OLTG-2C (Pages 3 of 3) Additional Lighting Power Allowance for Ordinance Requirements. Optional on plans. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17716:56:06 ID: Page 23 of 37 1�1 • CERTIFICATE OF COMPLIANCE Part 2 of 4 OLTG-1 C Project Name Tower Market Date 2/17/2014 COMPLIANCE FIXTURE / LIGHTING CONTROL SCHEDULE and FIELD INSPECTION CHECKLIST INSTALLATION CERTIFICATE, OLTG-11NST (Retain a copy and verify form is completed and signed.) I Field inspection ❑ CERTIFICATE OF ACCEPTANCE OLTG-2A Retain a coy and verify form is completed and signed. ,Field Inspection ❑ Luminaire Schedule Installed Watts A B C D E F G H I Name or Item Ta Luminaire Description See footnote below i.e.: 1 lam ole -to shoe -box 400 watt metal halide O m o 2) ami U o N d o W e = � j lL ° a cn How wattage was determined O N c > j z � N co 0 c� 2 X Field Ins ectorz E `O tm 5 CO D o w a)¢ $r'o o z Q co)_ co � a U_ L10/L11 (1) 26w Compact Fluorescent 28.0 ❑ 0 ❑ 3 84 ❑ ❑ L-12 (1) 26w Compact Fluorescent 28.0 ❑ m j] 8 224 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Enter total into OLTG-1 C; Page 4 of 4: Row H; Total Installed Watts: 308 1. Type of luminaire (i.e.: post top, wall pack, surface, shoe box); for non -incandescent luminaires, indicate nominal lamp wattage and lamp type (i.e.: fluorescent, incandescent, HID); ballast type (i.e.: electronic or magnetic); number of lamps and number of ballasts per luminaire. For incandescent luminaires, the luminaire wattage listed in column D shall be the maximum relamping rated wattage on a permanent factory -installed label on the luminaire, NOT the wattage of the lamp (bulb) used, in accordance with Section 130(d or e). 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EXEMPT LUMINAIRES I Field inspection ❑ Name or Symbol Description of exempt luminaires in accordance with §147 MANDATORY CONTROLS Field Ins ection ❑ # Description Location # Description Location SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of OLTG-1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Filed Inspector Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17T16:56:06 /D: Page 24 of 37 • CERTIFICATE OF COMPLIANCE Part 3 of 4 OLTG-1 C Project Name Tower Market Date 2/17/2014 A. OUTDOOR LIGHTING ZONE OUTDOOR LIGHTING ZONE: ❑ OLZ 1 ❑ OLZ 2 10 OLZ 3 ❑ OLZ 4 Is the Outdoor Lighting Zone: m Default in accordance with §10-114, or ❑ Amended by JHA Complete the information below if the default Outdoor Lighting Zone has been amended by the local jurisdiction having authority (JHA): ❑ The site is a government designated park, recreational area, wildlife preserve, or portion thereof, and has been designated as LZ2 or LZ3, in accordance with Table 10-114-A, because the site is contained within such a zone. ❑ The local jurisdiction having authority has officially adopted a change to the State Default Lighting Zone and has notified the Energy Commission by providing the materials required in §10-114(d) to the Executive Director. ❑ The adopted change is posted on the Energy Commission website. B. ADDITIONAL LIGHTING POWER ALLOWANCE FOR ORDINANCE REQUIREMENTS Are additional lighting ower allowances for ordinance in Table 147-C used? ❑ Yes m No Complete the information below if additional lighting power allowances for ordinance requirements are used: ❑ The local jurisdiction having authority has officially adopted specific outdoor light levels, which are expressed as average or minimum footcandle levels, by following a public process that allowed for formal public notification, review, and comment about the proposed change. ❑ The local jurisdiction having authority which adopted specific outdoor light levels and has notified the Commission by providing the following materials required §10-114(f) to the Executive Director. C. ACCEPTANCE FORMS Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, OLTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The OLTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the OLTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Certificate of Acceptance Luminaires Controlled OLTG-2A' Qty. of Equipment Re uirin Testing Description Like Controls Location Outdoor Lighting Acceptance Tests 1. Insert: OMS for Outdoor Motion Sensor; OLSC for Outdoor Lighting Shutoff Controls; OP for Outdoor Photocontrol; ATS for Astronomical Time Switch; and, STS for Standard non -astronomical Time Switch acceptance. Energ Pro 5.1 by Energ Soft User Number: 6712 Run Code: 201402-17T16:56:06 /D: Page 25 of 37 s �J • CERTIFICATE OF COMPLIANCE Part 4 of 4 OLTG-1 C Project Name Tower Market Date 2/17/2014 ALLOWED AND INSTALLED OUTDOOR LIGHTING POWER Lighting Wattage Power Allowance A Lighting power allowance for general hardscape (from OLTG-2C Page 1 of 3) 848 B Specific application lighting wattage allowance per unit length (from OLTG-2C Page 1 of 3) 0 C Specific application lighting wattage allowance for ornamental lighting (from OLTG-2C Page 1 of 3) 0 D Specific application lighting wattage allowance per application (from OLTG-2C Page 2 of 3) 28 E Specific application lighting wattage allowance per area (from OLTG-2C Page 2 of 3) 196 F Specific application lighting wattage allowance for ordinance requirements (from OLTG-2C Page 3 of 3) 0 G Total Allowed Wattage = Sum of rows A through F: 1,072 H Total installed watts (from Compliance Fixture Schedule, (from OLTG-2C Page 1 of 3) 308 Complies if wattage in row H is less than or equal to the wattages in row G m Yes ❑ No EnemyPro 5.1 by EnemySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 26 of 37 • OUTDOOR LIGHTING WORKSHEET Part 1 of 3 OLTG-2C Project Name Tower Market Date 1 2/17/2014 A. LIGHTING POWER ALLOWANCE FOR GENERAL HARDSCAPE AREA WATTAGE ALLOWANCE AWA LINEAR WATTAGE ALLOWANCE LWA INITIAL WATTAGE ALLOWANCE TOTAL GENERAL HARDSCAPE LIGHTING ALLOWANCE A B C D E F G H Illuminated Hardscape Area AWA Per Square Foot AWA A X B Perimeter Length of General Hardscape LWA Per Linear Foot LWA D X E IWA Watts C+ F+ G 195 0.092 18 65 0.920 60 770 848 Enter total into OLTG-1 C; Page 4 of 4; Row A; Lighting Power Allowance for General Hardsca a 848 m Yes AWA, LWA, and IWA from Table 147-A was used as appropriate for the Outdoor Lighting Zone B. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER UNIT LENGTH Available only for sales fronts e DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A B C D E F G H I J Specific Lighting Application Linear Foot of Frontage Sales Frontage Allowance for OLZ alts per LF Wattage Allowance B X C Name or Symbol Luminaire Type Lumin QTY Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I Enter total into OLTG-1 C; Page 4 of 4; Row B; Specific Application Lighting Wattage Allowance Per Unit Length 0 C. SPECIFIC APPLICATION WATTAGE ALLOWANCE FOR ORNAMENTAL LIGHTING DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A B C D E F G H I J Specific Lighting Application Square feet of Harsca a Ornamental Lighting Allowance for OLZ Watts per ftZ Wattage Allowance B X C Name or Symbol Luminaire Type Lumin QTY Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I Enter total into OLTG-1 C; Page 4 of 4; Row C; Specific Application Wattage for Ornamental Lighting 0 EnergyPro, 5.1 by EnergySoft User Number. 6712 RunCode: 201402-17T16:56:06 ID: Page 27 of 37 ;7 OUTDOOR LIGHTING WORKSHEET Part 2 of 3 OLTG-2C Project Name Tower Market Date 1 2/17/2014 D. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER APPLICATION DETERMINE WATTAGE ALLOWANCE DESIGN WATTS ALLOWANCE A B C D E F G H I J Specific Lighting Application Number of Applications Specific Application Allowance watts Wattage Allowance B X C Luminaire Symbol Luminaire Type Lumin QTY Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I Entry 1 100 100 L-12 (1) 26w Compact Fluorescent 1 28.0 28 28 Enter total into OLTG-1 C; Page 4 of 4; Row D; Specific Application Wattage Allowance Per Application 28 E. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER AREA DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A B C D E F G H I J Specific Lighting Application Illuminated Area of Application Specific Application Allowance watts per ftZ Wattage Allowance B X C Code for Luminaire Type Luminaire Type Lumin QTY Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I Building Fasade 325 0.350 114 L-12 (1) 26w Compact Fluorescent 2 28.0 56 56 Building Fasade 566 0.350 198 L-12 (1) 26w Compact Fluorescent 5 28.0 140 140 Enter total into OLTG-1 C; Page 4 of 4; Row E; Specific Application Lighting Wattage Allowance Per Area 196 EnergyPro 5.1 by EnergySoft User Number.' 6712 RunCode: 201402-17716:56:06 /D: Page 28 of 37 • • • MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Tower Market 2/17/2014 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time settinq for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8): square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 ID: Page 29 of 37 4 4 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Tower Market System Name HVAC Date 2/17/2014 Floor Area 3,686 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 4 COIL CFM Total Room Loads 8,712 Return Vented Lighting Return Air Ducts Return Fan Ventilation F 1,032 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 69,000 103,883 44,232 1,284 29,915 Total Output Btuh 276,000 0 Output Btuh/s ft 74.9 5,194 1,496 Cooling System 01 0 Output DerSystem 71,000 41,179 2,118 1,032 48,167 Total Output Btuh 284,000 0 5,194 1 155,451 46,350 0 Total Output ons 23.7 1,496 Total Output Btuh/s ft 77.0 Total Output s ft/Ton 155.7 1 81,073 Air System CFM perSystem 2,400 HVAC EQUIPMENT SELECTION Airflow cfm 9,600 Carrier 50HJQ007 166,042 100,202 172,382 Airflow cfm/s ft 2.60 7.5 kW Supplemental Electric 102,390 Airflow cfm/Ton 405.6 Outside Air % 10.8 % Total Adjusted System Output 166,042 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 100,202 Jul 3 PM 274,772 I Jan 1 AM Outside Air cfm/s ft 0.28 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 65 OF Q Outside Air 1,032 cfm Supply Fan 9,600 cfm 70 OF 65 OF 82 OF 92 OF Heating Coil Aux. Heat Coil 92 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 112/78°F 79/68°F 79/68°F 62/61 OF Outside Air c 1,032 cfm Supply Fan Cooling Coil 63 / 62 OF 9,600 cfm 69.0% ( ROOM 75/67°F 74/67°F EnergyPro 5.1 by EnergySofi User Number: 6712 RunCode: 2014-02-17716:56:06 /D: Page 30 of 37 • 0 • ZONE LOAD SUMMARY Project Name Tower Market Date 2/17/2014 System Name HVAC Floor Area 3,686 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM Sensible Tower Market 1.0 1, 032 Jul 3 PM 8,712 145,621 63,613 1,284 78,243 TOTALS 01 0 0 1,032 Ju13PM 145,621 63,613 78,243 BLOCK LOAD EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2014-02-17716:56:06 /D: Page 31 of 37 • • ROOM LOAD SUMMARY Project Name Date Tower Market 2/17/2014 System Name Floor Area HVAC 3,686 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible I Latent CFM I Sensible I Latent CFM I Sensible Tower Market Tower Market 1 1 8,7121 103,8831 44,232 8,7121 103,8831 44,232 1,2841 29,915 Total includes ventilation EnerqvPro 5.1 by Ene PAGE TOTAL TOTAL• 8,7121 103, 883 44, 232 1,2841 29, 915 8, 712 103, 883 44, 232 1, 284 29, 915 • • • ROOM HEATING PEAK LOADS Project Name Tower Market Date 2/17/2014 ROOM INFORMATION DESIGN CONDITIONS Room Name Tower Market Floor Area 3,686.0 ft2 Indoor Dry Bulb Temperature 70 OF Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling U -Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT *F = = = = 44 Btu/hr R-38 Roof(R.38.2x14.16) rafter 3,686.0 0.0234 44 3,797 R-21 Wall (W 21.2x6.16) 3,529.1 0.0690 44 10,714 Laminated Metal Tinted 342.9 0.5100 44 7,695 Slab -On -Grade perim = 240.0 0.7300 44 7,709 Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 3,686 X Area another room 16.00 X 0.000 Height ACH Page Total /60] X AT 29,915 = 0 TOTAL HOURLY HEAT LOSS FOR ROOM 29,915 EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 33 of 37 • • • ROOM COOLING PEAK LOADS Project Name7211712014 Tower Market ate ROOM INFORMATION DESIGN CONDITIONS Room Name Tower Market Floor Area 3,686. 0 ft' Indoor Dry Bulb Temperature 74 OF Time of Peak Jul 3 PM Outdoor Dry Bulb Temperature 112 OF Outdoor Wet Bulb Temperature 78 OF Conduction Area X X X X X X X X X U -Value X X X X X X X X X DETD' = = = = = = = = = Btu/hr R-38 Roof(R.38.2x14.16) rafter 3,686.0 0.0234 70.7 6,098 R-21 Wall (W.21.2x6.16) 882.4 0.0690 37.1 2,259 Laminated Metal Tinted 324.0 0.5100 28.0 4,631 R-21 Wall (W.21.2x6.16) 729.6 0.0690 39.3 1,981 R-21 Wall (W.21.2x6.16) 928.0 0.0690 40.2 2,575 R-21 Wall (W..21.2x6.16) 989.1 0.0690 56.7 3,873 Laminated Metal Tinted 18.9 0.5100 28.0 270 41 X 0.312 X 1.879 = 22.8 X 41 X 0.312 Page Total 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Snlar Gain Window Window Window Window Window Window Window Window Window Orientatinn (N) (N) (E) (E) (E) (E) (E) (E) (E) Page Total 6881 Btu/hr 246 246 335 1,525 251 580 551 551 551 4,835 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 BtufWatt X 0.999 = 12,534 Occupants 1.00 X 3,686 X 300 Btu/OCC. / 25 Sgft/OCc. X 1.000 = 44,232 Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0 Process Lighting 1.00 X 1 3,686 X 1 0.000 Watts/Sgft X 3.413 Btu[Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 60 ] X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sgft/OCC. = 44,232 Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232 EnergyPry 5.1 by EnemySoft User Number: 6712 Run Code: 2014-02-17716:56:06 ID: Page 34 of 37 Weighting Area SGF SC Factor 22.81 X 41 X 0.312 X 0.838 = 22.8 X 41 X 0.312 X 0.838 = 24.0 X 41 X 0.312 X 1.084 = 96.0 X 41 X 0.312 X 1.236 = 18.0 X 41 X 0.312 X 1.084 = 24.01 X 41 X 0.312 X 1.879 = 22.8 X 41 X 0.312 X 1.879 = 22.8 X 41 X 0.312 X 1.879 = 22.8 X 41 X 0.312 X 1.879 = Page Total 6881 Btu/hr 246 246 335 1,525 251 580 551 551 551 4,835 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 BtufWatt X 0.999 = 12,534 Occupants 1.00 X 3,686 X 300 Btu/OCC. / 25 Sgft/OCc. X 1.000 = 44,232 Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0 Process Lighting 1.00 X 1 3,686 X 1 0.000 Watts/Sgft X 3.413 Btu[Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 60 ] X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sgft/OCC. = 44,232 Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232 EnergyPry 5.1 by EnemySoft User Number: 6712 Run Code: 2014-02-17716:56:06 ID: Page 34 of 37 • • ROOM COOLING PEAK LOADS Project NameDate Tower Market 2/17/2014 ROOM INFORMATION DESIGN CONDITIONS Room Name Tower Market Time of Peak Jul 3 PM Floor Area 3,686. 0 ft' Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 74 IF Outdoor Wet Bulb Temperature 78 OF Conduction Area U -Value DETD' Btu/hr X X = X X = X X = X X = X X = X X = X X = X X = X X = Page Total 1 0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr Window (E) 24.01 X 41 X 0.312 X 1.879 = 580 Window (E) 24.0 X 41 X 0.312 X 1.879 = 580 Window 6.3 X 244 X 0.312 X 0.392 = 188 Window (lM 6.3 X 244 X 0.312 X 0.392 = 188 Window (WAS 6.3 X 244 X 0.312 X 0.392 = 188 X X X = X X X = X X X = X X X = Page Total 1,724 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Li hts 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 12,534 Occupants 1.00 X 3,686 X 300 Btu/occ. / 25 Sgft/occ. X 1.000 = 44,232 Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 3,686 X 0.0001 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 60 � X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sgft/occ. = 44,232 Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X .4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232 EnergyPro 5.1 by EnergySoft User Number., 6712 RunCode: 2014-02-17716:56:06 ID: Page 35 of 37 • • ROOM COOLING COIL LOADS Project NameDate Tower Market 2/17/2014 ROOM INFORMATION DESIGN CONDITIONS Room Name Tower Market Floor Area 3,686. 0 ft' Indoor Dry Bulb Temperature 74 OF Time of Peak Jul 3 PM Outdoor Dry Bulb Temperature 112 OF Outdoor Wet Bulb Temperature 78 OF Conduction 41 Area X X X X X X X X X U -Value X X X X X X X X X DETD' Btu/hr R-38 Roof(R.38.2x14.16) rafter 3,686.0 0.0234 70.7 = 6,098 R-21 Wall (W.21.2x6.16) 882.4 0.0690 37.1 = 2,259 Laminated Metal Tinted 324.0 0.5100 28.0 = 4,631 R-21 Wall (W.21.2x6.16) 729.6 0.0690 39.3 = 1,981 R-21 Wall (W.21.2x6.16) 928.0 0.0690 40.2 = 2,575 R-21 Wall (W.21.2x6.16) 989.1 0.0690 56.7 = 3,873 Laminated Metal Tinted 18.9 0.5100 28.0 = 270 = = Page Total 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Window Window Window Window Window Window Window Window Window Orientation (N) (N) (E) (E) (E) (E) (E) (E) (E) Area X X X X X X X X X SGF X X X X X X X X X SC 0.312 X 0.312 X 0.312 X 0.312 X 0.312 X 0.312 X 0.312 X 0.312 X 0.3121 X Weighting Factor = = = = = = = = = 22.81 41 0.838 22.8 41 0.838 24.0 41 1.084 96.0 41 1.236 18.0 41 1.084 24.01 41 1.879 22.8 41 1.879 22.8 41 1.879 22.8 41 1.879 Page Total 21 Btu/hr 246 246 335 1,525 251 580 551 551 551 4, 835 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 12,534 Occupants 1.00 X 3,686 X 300 Btu/OCC. / 25 Sqf /occ. X 1.000 = 44,232 Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 0.00 / 60 ] X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sqf /occ. = 44,232 Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232 EnergyPro 5.1 by EnemySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 36 of 37 • C, • ROOM COOLING COIL LOADS Project Name Date Tower Market 2/17/2014 ROOM INFORMATION DESIGN CONDITIONS Room Name Tower Market Time of Peak Jul 3 PM Floor Area 3,686. 0 ft' Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 74 IF Outdoor Wet Bulb Temperature 78 OF Conduction Area U -Value DETD' Btu/hr X X = X X = X X = X X = X X = X X = X X = X X = X X = Page Total o 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr Window (E) 24.01 X 41 X 0.312 X 1.879 = 580 Window (E) 24.0 X 41 X 0.312 X 1.879 = 580 Window (M 6.3 X 244 X 0.312 X 0.392 = 188 Window (W) 6.3 X 244 X 0.312 X 0.392 = 188 Window (W) 6.3 X 244 X 0.312 X 0.392 = 188 X X X = X X X = X X X = X J X X = Page Total 1,724 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Li hts 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 12,534 Occupants 1.00 X 3,686 X 300 Btu/occ. / 25 Sqft/occ. X 1.000 = 44,232 Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0. 000J = 0 Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 0.00 / 60 X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 3,686 X 300 Btuh/OCC. / 25 SgfUOCc. = 44,232 Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232 EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 2014-02-17716:56:06 /D: Pa a 37 of 37