13-1641 (CSCS)P.O. BOX 1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
BUILDING & SAFETY DEPARTMENT
BUILDING PERMIT
Application Number: 13-00001641
Property Address: 77985 AVENIDA MONTEZUMA
APN: 773-104-036-24 -000000-
Application description: NEW COMML - STORES & CUSTOMER SERVICE
Property Zoning: VILLAGE COMMERCIAL
Application valuation: 198103
Applicant:
Architect or Engineer:
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect.
License Class: B License No.: 377905
{ Date4
se1 Contractor:
{` O ER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the
following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to -
construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State
License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or
that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by
any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)•:
(_ 1 I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and
the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The
Contractors' State License Law does not apply to an owner of property who builds or improves thereon,
and who does the work himself or herself through his or her own employees, provided that the
improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner -builder will have the burden of proving that he or she did not build or
improve for the purpose of sale.).
(_ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.
7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of
property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed
pursuant to the Contractors' State License Law.).
I—) f am exempt under Sec. ', B.&P.C. for this reason
Date:
Owner:
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the
work for which this permit is issued (Sec. 3097, Civ. C.).
Lender's Name: _
Lender's Address:
LQPERMIT
Owner:
TOWER ENERGY GROUP
1983 W 190TH ST
TORRANCE, CA 90504
Contractor:
MCI CONSTRUCTION COM
82746 KYLE DRIVE
BERMUDA DUNES, CA 92
(760)799-5106
Lic. No.: 377905
VOICE (760) 777-7012
FAX (760) 777-7011
INSPECTIONS (760) 777-7153
Date: 6/26/14
JUN 2 t 201,x+
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided
for by Section 3700 of the Labor Code, for the performance of the work for -which this permit is
issued.
I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor
Code, for the performance of the work for which this permit is issued. My workers' compensation
insurance carrier and policy number are:
Carrier
Ek
Policy Number EXEMPT
1 certify that, in the performance of the work for which this permit is issued, I shall not employ any
person in any manner so as to become subject to the workers' compensation laws of California,
and agree that, if I should become subject to the workers' compensation provisions of Section
3700 of the Labor de, I shall forthwith comply with hose rovisions.
Dall6 ` 6 11 Apptic
WARNING: FAILURE T E WORKERS'MPENSATION COVERAGE IS UNLAWFUL, AND SHALL
SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND
DOLLARS ($100,0001• IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
APPLICANT ACKNOWLEDGEMENT
IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the
conditions and restrictions set forth on this application.
1. Each person upon whose behalf this application is made, each person at whose request and for
whose benefit work is performed under or pursuant to any permit issued as a result of this application,
the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City
of La Quinta, its officers, agents and employees for any act or omission related to the work being
performed under or following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is not commenced
within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject
permit to cancellation.
I certify that I have read this application and state that the above information is correct. I agree to comply with all
city and county ordinances and state laws relating to building construction, and hereby authorize representatives
of this county to enter upon the above-mentioned roperty for inspection purpose �--
Late /4 Signature (Applicant or Agent):
Application Number . . . . . 13-00001641
Structure Information 4,728SF STORE/VB/M-OCC/112-OL/NON-SPRINK-----
1 Other struct info . .
. . . CODE EDITION
2010
'
FIRE SPRINKLERS
NA
MIXED-USE OCCUPANCY
M
OCCUPANT LOAD
112.00
----------------------------------------------------------------------------
1ST FLOOR SQUARE FOOTAGE
4728.00
Permit
. . .
BUILDING 2013
Additional
desc . .
Permit Fee
. . . .
572.80 Plan Check
Fee
00
Issue Date
. . . .
Valuation
. .
. . 198103
Expiration
Date . .
12/23/14
Qty Unit Charge
Per
Extension
BASE FEE
431.86
174.00
- ----------------------------------------------------------------------------
.8100
THOU BLDG $25,001-$200,000
140.94
Permit
. . .
ELECTRICAL 2013
Additional
desc . .
Permit Fee
. . . .
202.58 Plan Check
Fee
.00
Issue Date
. . . .
Valuation
. .
. . 0
Expiration
Date . .
12/23/14
Qty Unit Charge
Per
Extension
1.00
23.8300
EA ELEC TEMP POWER POLES
23.83
1.00
107.2500
LS ELEC NEW COMM, FIRST 2
KSF
107.25
2.00
--------------------------------------------------------------------------=-
35.7500
EA ELEC NEW COMM, ADD -L 2
KSF
71.50
Permit
. . . MECHANICAL 2013
Additional
desc . .
Permit Fee
. . . .
202.60 Plan Check
Fee
.00
Issue Date
. . . .
Valuation
_ 0
Expiration
Date . .
12/23/14
Qty Unit Charge
Per
Extension
4.00
35.7500
EA MECH CONDENSER/COMP
143.00
1.00
11.9200
EA MECH EVAP COOLER
11.92
3.00
11.9200
EA MECH VENT FAN
35.76
1.00
----------------------------------------------------------------------------
11.9200
EA MECH EXHAUST HOOD
11.92
Permit
. . . PLUMBING 2013
Additional
desc . .
Permit Fee
. . . .
381.44 Plan Check
Fee
.00
LQPERMIT
Application Number
Permit . . . . . .
Issue Date . . . .
Expiration Date . .
. 13-00001641
PLUMBING 2013
12/23/14
Valuation .
0
Qty Unit Charge Per
Extension
22.00 11.9200 EA PLBG FIXTURE/TRAP
262.24
1.00 11.9200 EA PLBG BUILDING SEWER
11.92
5.00 11.9200 EA PLBG ROOF DRAIN
59.60
1.00 11.9200 EA PLBG WATER HEATER/VENT
11.92
1.00 11.9200 EA PLBG WATER INST/ALT/REP
11.92
1.00 11.9200 EA PLBG BACKFLOW DEVICE
11.92
1.00 11.9200 LS PLBG GAS SYS, 174 OUTLETS
11.92
----------------------------------- ----------------------------------------
Special Notes and Comments
4,728SF STORE/VB/M-OCC/112-OL/CLASS
A-FR/NON-SPRINKLERED [TOWER MARKET] THIS
PERMIT DOES .NOT INCLUDE ALTERATION TO
THE GAS FACILITY, BUILDING SIGNAGE,
TRASH ENCLOSURE OR DEMOLITION OF THE
EXISTING BUILDING. 2010 CALIFORNIA
BUILDING CODES.
June 26, 2014 8:43:29 AM AORTEGA
----------------------------------------------------------------------------
Other Fees . . . . . . . . . ART IN PUBLIC PLACES -COM
990.52
BLDG STDS ADMIN (SB1473)
8.00
DIF CIVIC CENTER - COMM
1763.54
DIF FIRE PROTECTION -COMM
813.22
PLAN CHECK, ELECTRICAL
118.68
PLAN CHECK, MECHANICAL
138.24
PLAN CHECK, PLUMBING
381.43
BLDG PC 25001-200K
1213.59
STRONG MOTION (SMI) - COM
41.60
TUMF: MISC RETAIL SVCS
156944.94
DIF STREET MAINT FAC -COMM
1096.90
DIF TRANSPORTATION - COMM
26850.31
Fee summary Charged Paid Credited
---------------------------------------------------------
Due
Permit Fee Total 1359.42 .00 .00
1359.42
Plan Check Total .00 .00 .00
.00
Other Fee Total 190360.97 .00 .00
190360.97
Grand Total 191720.39 .00 .00
191720.39
LQPERMIT
Bin #
IE 0 p 09
Qty of La Qu►nta
Building Safety Division
2013 &r
P.O. Box 1504, 78-495 Calfe Tampico C 1 Z413 ��
LA QUINTA La Quinta, CA 92253 - (760) 777-7012 �
OF
DEVELOPMiENT Building Permit Application and Tracking Sheet c A
Pe it
CITY IF
/ �M
y.
Project Address: 724jS Aft!iv 74
Wj-Ezknj;+
Owner's Name: 0��2 V M lF
A. P. Number:
Address: r
Legal Description:'5'#&1.71 kY"At�
r ��
City, ST, Zip: - n 16t 22S
Contractor:
Telephone ���% 78 • �y
>: ::<:>:>z:>:::»»::<::< «::»<:::s:<::
.................:......:..................:.
Address:
• r
Project Description: rkejYkjOCL { ")'b rwv
City, ST, Zip:
/�/sT//v s'y✓.Vt�✓/CAJ I /2L�
Telephone:
:::..
<.;�:.>::s::?:«:>i�a»>, :•.:::>:#'>�:
pve� ?Y� T71P� �,;
State Lic. # :
City Lic. #;
Arch., Engr., Designer: /VF/4-
VF/+Address:
Address:P/2 0ox v
City., ST, Zip: elf r fe ll v►i 1
59• /
Telephone: X06 �3% -�$ O
::.....::•.:.
:::::::::::.::::::;::;::.;::.;;::
Construction Type: Occupancy:
State Lic. #: — Nr
Project type (circle one): New Add'n Alter Repair Demo
Name of Contact Person: ICK
Sq. Ft.: 7.253
1 # Stories:
#Units:
Telephone #,of Contact Person: IqO4 -b 3 -7 - f J, O
Estimated Value of Project:41-0-49.,V00
APPLICANT: DO NOT WRITE BELOW THIS LINE
#
Submittal
Req'd
Rec'd
TRACKING
PERMIT FEES
Plan Sets
Plan Check submitted 14111241S
Item
Amount
Structural Calcs.
Reviewed, ready for correctionsA
Plan Check Deposit
Truss Calcs.
Called Contact Person
Plan Check Balance,
itle 24 Calc,.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2od Review, ready for rection ssu
Electrical
Subcontactor List
gig
Called Contact Person
Plumbing
Grant Decd
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
'^' Review, ready for corrections/issue
Developer Impact Fee
Planning Approval
Called Contact Person
A.I.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees
r'
Date
2/25/14
No.
31993
Owner
Tower Energy Group
Address
City
Zip
Tract #
Type
Commercial
CERTIFICATE OF COMPLIANCE
Desert Sands Unified School District
47950 Dune Palms Road
La Quinta, CA 92253
(760) 771-8515
APN #
Jurisdiction
Permit #
No. of Units
Q BERMUDA DUNES
C4 RANCHO MIRAGE d
�J INDIAN WELLS
PALM DESERT y
LA QUINTA
u%WNDIO SP
0
773-104-063-3
La Quinta
1
Lot # No. Street S.F. Lot # No. Street S.F.
Unit 1 77985 Avenida Montezuma 4728 Unit 6
Unit 2 Unit 7
Unit 3 Unit 8
Unit 4 Unit 9
Unit 5 Unit 10
Comments
At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patios/walkways, residential additions under
500 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooking, eating or sanitation) or replacement mobile
homes. It has been determined that the above-named owner is exempt from paying school fees at this time due to the following reason:
EXEMPTION NOT APPLICABLE
This certifies that school facility fees imposed pursuant to
Education Code Section 17620 and Government Code 65995 Et Seq.
in the amount of $0.51 X 4,728 S.F. or $2,411.28 have been paid for the property listed above and that
building permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued.
Fees Paid By CC/1st Bank -John Olson
Check No. 1119123
Bank Name/Recipient of Certificate Telephone 760-799-5106
Funding Commercial
By Dr. Gary Rutherford
Superintendent
Fee collected /exempte y Sh r0 CQGI ,re Payment Recd . g0.0(— o
$2,411.28 Over/Ur.-der
Signature R "�
NOTICE: Pursuant to Government Code Section 6 0 )(1), this will a to notify you that the 90 -day approval period in'which ymu .nay protest the fees
or other payment identified above will begin to run from the date on which the building or installation permit for this project is issued, or from the date on
which those amounts are paid to the District(s) or to another public entity authorized to collect them on the District('s) behalf, whichever is earlier.
NOTICE: This Document NOT VALID without embossed seal
Embossed Original - Building Department Applicant Copy - Applicant/Receipt Copy - Accounting
0
CITY OF LA QUINTA - PUBLIC WORKS DEPARTMENT GREEN SHEET
PUBLIC WORKS CLEARANCE FOR RELEASE OF BUILDING PERMIT
Form updated & effective 9/25/2009
Green Sheet approvals are forwarded to the Building & Safety Department directly by Public Works. Please DO
NOT submit the Green Sheet (Public Works Clearance) Packet to the Public Works Department until ALL
requirements listed below are complete. Incomplete applications or applications which cannot be processed will be
returned to applicant. �'^ GT,�2yl/�Date:/ Developer: 70�✓6✓�r�y r T{7Gve, (a✓C�"�
Tract No.: `Tract Name: V u( z%/Z`M .�'- Lot No.(s): '--
Address(s): �
I r ! u AV�Ic& eta Phone Number: (qd) q37—
The
3 / "The following are the requirements for Public Works Clearance to authorize issuance of a building permit from the
Building & Safety Department:
0 CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4, #5 & #7 BELOW
❑ TRACT HOMES: PROVIDE ITEMS #1, #2, #3 & #5 BELOW '
,B -'COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS #1, #2, #3, #5 & #7 BELOW
❑ WALLS, SIGNS, OTHER: PROVIDE ITEM #6 BELOW
1. ttach Pad Elevation Certificates in compliance with the approved design elevation for building pad
(maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must be current (within 6
months of current date). If a precise grading plan creates the pad for approval, please withhold green sheet
submittal until a Pad Elevation Certificate can be provided.
2. Attach geotechnical certification of grading plan compliance including compaction reports from a licensed
Soils Engineer. Recently rough graded residential developments which have a previously approved
geotechnical certification are exempt from this requirement.
3. Attach recorded final map or title information/grant deed showing proposed building locations are legal lots.
4. Complete the attached <1 acre per lot or infill project Fugitive Dust Control project information form, PM10
plan & agreement or provide alternative & valid City approved PM10 plan set reference number or hard copy
plan. PM10 plans for commercial & residential developments (beyond 1 lot) are submitted separately with
grading plans & are subject to additional requirements. A current PM10 certification number is required.
5. Attach a copy of the rough or precise grading plan to the Public Works Department showing building
location(s) for pad elevation verification. AO flood zone developments will require an approved flood plain
development plan.
6. Attach supporting documentation for wall plan, monument sign, grease trap or special facility installations.
7. Complete and sign the attached water quality management plan (WQMP) exemption form, if applicable. PW
approved building construction projects require either a WQMP or a completed WQMP exemption form.
Approved maps/plans may be viewed at the following link: http://www.la-guinta.org/PlanCheck/m search.aspx
I have reviewed and confirmed the requirements listed above as presented and find the improvements to be
sufficiently complete for construction of the proposed buildings/structures/walls/signs on the subject lot(s).
Pursuant to my findings, the above project may be released for building permit issuance.
This section completed by City staff.
Recommended by: Date: 6 / -// L f n SG -hs
�Rci,K
Public Works Distribution: ( Green Sheet to Building &Safety l cel
( ) Green Sheet to Planning Department aG'40n l�o
ct re Sv 6,0'�++,- �
Declined for approval for reason(s) as follow(s), please correct and resubmit: —4-0 PtA-� -a' c9P✓<
TAChecklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 10-02-12.doc
CITY OF LA QUINTA - PUBLIC WORKS DEPARTMENT GREEN SHEET
PUBLIC WORKS CLEARANCE FOR RELEASE OF BUILDING PERMIT
Form updated & effective 9/25/2009
Green Sheet approvals are forwarded -to the Building & Safety_ Department directly by Public Works. Please DO NOT
submit the Green Sheet (Public Works Clearance) Packet to the Public Works Department until ALL requirements listed
below are complete. Incomplete applications or applications which cannot be processed will be returned to applicant.
Date: 6 l l 4 Developer:
Tract No.: Tract Name:
Lot No.(s):
Address(s): t9c�,AVir/¢ lry?FJL�ll)°11f� Phone Number: (7,62
The following are the requirements for Public Works Clearance to authorize issuance of a building permit from the
Building & Safety Department:
❑ CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4, #5 & #7 BELOW
❑ TRACT HOMES: PROVIDE ITEMS #1, #2, #3 & #5 BELOW
COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS #1, #2, #3, #5 & #7 BELOW
❑ WALLS, SIGNS, OTHER: PROVIDE ITEM #6 BELOW
1. Attach Pad Elevation Certificates in compliance with the approved design elevation for building pad (maximum
allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must be current (within 6 months of current date).
If a precise grading plan creates the pad for approval, please withhold green sheet submittal until a Pad Elevation
Certificate can be provided.
2. Attach geotechnical certification of grading plan compliance including compaction reports from a licensed Soils
Engineer. Recently rough graded residential developments which have a previously approved geotechnical
certification are exempt from this requirement.
3. Attach recorded final map or title information/grant deed showing proposed building locations are legal lots.
4. Complete the attached <1 acre per lot or infill project Fugitive Dust Control project information form, PM10 plan &
agreement or provide alternative & valid City approved PM10 plan set reference number or hard copy plan.
PM10 plans for commercial & residential developments (beyond 1 lot) are submitted separately with grading plans
& are subject to additional requirements. A current PM10 certification number is required.
5. Attach a copy of the rough or precise grading plan to the Public Works Department showing building location(s)
for pad elevation verification. AO flood zone developments will require an approved flood plain development plan.
6. Attach supporting documentation for wall plan, monument sign, grease trap or special facility installations.
7. Complete and sign the attached water quality management plan (WQMP) exemption form, if applicable. PW
approved building construction projects require either a WQMP or a completed WQMP exemption form.
Approved maps/plans may be viewed at the following link: http://www.la-ouinta.org/PIanCheck/m search.aspx
I have reviewed and confirmed the requirements listed above as presented and find the improvements to be sufficiently
complete for construction of the proposed buildings/structures/walls/signs on the subject lot(s). Pursuant to my findings,
the above project may be released for building permit issuance.
This section completgoy City staff
Recommended by:
Public Works Distribution:
Declined for approval for reason(s) as
Date: _ ? . /.a/*
Green Sheet to Building & Safety
Green Sheet to Planning Department
correct and resubmit:
AjdrV --773/c-#oJ6 p�
TAChecklists - Farms & ApplicationslForms & Applications\GREEN SHEET cover & PM10less than 1 Acre Revised 10.02-12 doc
City of La Quinta - PM10 Fugitive Dust Control Project Information
Construction Phase PM10 Agreement (<1 acre/lot or Infill Project)
Project Information
Project Contractor:
Project Phase
(check one)
❑ Construction
❑ Demolition
Project Name: _
Project Tract/Lot Numbers:
Project Street Address:
Total Acres in Active
Construction (<1 acre per
Lot):
Anticipated Start Date: / / Anticipated Completion Date:
PM10 Contact
Information
Please note: Dust control is required 24 hours a day, 7 days a week, regardless of
construction status. Person listed below is responsible for dust control during business and
non -business hours.
Name:
Title:
Company Name:
Mailing,Address:
City,. State,_ZIP Code:
P rimary Phone M
Fax M
24 Hour Emergency
Phone#:
Cell Phone M
Email Address:
PM10 Certificate M
The above stated property owner (or authorized representative):
❖ Shall act as his/her acknowledgement of dust control requirements and their enforceability, pursuant to SCAQMD
Rules 403, 403.1, 401, 402, 201, 203 and PERP;
❖ Shall constitute an Agreement to comply with all project conditions as identified in the approved dust control plan.
Acknowledges that dust control is required twenty-four (24) hours a day, seven (7) days a week, throughout the
period of project performance, regardless of project size or status;
❖ Shall ensure that each and every contractor, subcontractor and all other persons associated with the project shall
be in continuous compliance with all requirements of the approved dust control plan;
Shall take all necessary precautions to minimize dust, even if additional measures beyond those listed in the dust
control plan are necessary;
❖ Shall authorize representatives of City/County to enter the property for inspection and/or abatement purposes;
4- Shall hold harmless the City/County and its representatives from liability for any actions related to this dust control
plan or any City/County initiated abatement activities.
Signature of Property Owner or Authorized Representative Date
Sladden Engineering
45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0727
6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863
800 E. Florida Avenue, Hemet, CA 92543 (951) 766-8777 Fax (951)766-8778
August 18, 2014
Tower Energy Group
1983 West 1901h Street, Suite 100
Torrance, California 90504
Project: Tower Market & Gas Station Expansion
SEC Avenida Navarro and Avenida Montezuma
La Quinta, California
Subject: Report of Observations and Testing During Rough Grading
Project No. 522-13059
14-08-318
Ref:. Geotechnical Investigation report prepared by Sladden Engineering dated February
25, 2014; Project No. 544-13059, Report No. 14-02-066
This report provides a summary of our field observations along with the results of in-place
density testing performed at the subject site during the rough grading of the building pad for the
Tower Market and gas station expansion project. The site is located on the southeast corner of
Avenida Navarro and Avenida Montezuma in the City of La Quinta, California.
Rough grading included over -excavation and recompaction throughout the new building areas.
All native low density near surface soil was removed to a depth of at least 4 feet below existing
grade or 3 feet below the bottom of the footings, whichever was deeper. Remedial grading
extended laterally, a minimum of five feet beyond the building perimeter. The exposed surface
was then scarified, moisture conditioned and compacted to at least 90 percent relative
compaction. The previously removed soil and import soil was placed in thin lifts at near
optimum moisture content and compacted to at least 90 percent of maximum density.
Field testing was performed on August 7, 2014 through August 13, 2014. Testing indicates that a
minimum of 90 percent relative compaction was attained in the areas tested. The passing test
results indicate compliance with the project specifications at the tested locations and depths but
are no guarantee or warranty of the contractors work.
Field Testing: In-place moisture/density tests were performed using a nuclear density gauge in
accordance with ASTM Test Method D 6938-08. A total of 23 field density tests were performed.
Test results are summarized on the attached data sheet. The approximate test locations are
indicated on the attached plan.
August 18, 2014 -2- Project No. 522-13059
14-08-318
Laboratory Testing: The moisture -density relationships for the tested materials were determined
in the laboratory in accordance with ASTM Test Method D 1557-91.
All footings should have a minimum embedment depth of 12 inches measured from the lowest
adjacent finished grade. Continuous and isolated footings should have minimum widths of 12
inches and 24 inches, respectively. Continuous and isolated footings may be designed using
allowable (net) bearing pressures of 1800 and 2000 pounds per square foot (psf), respectively.
The allowable bearing pressures apply to combined dead and sustained live loads and may be
increased by 1/3 when considering wind and seismic loads.
If there are any questions regarding this report or the testing summarized herein, please contact
the undersigned.
Respectfully submitted
SLADDEN ENGINEERING
'- SRETT L.
Brett Anderson
' ANDERSON
Principal Engineer s 9/30/14
CIVIL
ENGINEERING
Grading/gvm CA
Copies 4 / Tower Energy Group
Sadden Engineering
Permit Number: CSCS-13-1641
Applied: 12/18/2013
Issued:
Status: PLAN CHECK
Parent Permit:
Parent Project:
Details:
Description: 4,728SF STORE/VB/M-OCC/112-OL/NON-SPRINKLERED
Approved: 5/8/2014 Site Address: 77985 AVENIDA MONTEZUMA
Finaled: City, State Zip Code: LA QUINTA, CA 92253
Applicant: <NONE>
Owner: <NONE>
Contractor: <NONE>
LIST OF •
SCHEDULED DATE COMPLETED DATE TYPE
STAFF
8/27/2014 COMPACTION REPORT
AMYYU
Notes:
HAD TO ADD AS COMPACTION REPORT AS PM10 IS NOT IN THE DROP DOWN.
8/27/2014
8/27/2014
PLAN CHECK SUBMITTAL
STEPHANIE KHATAMI
Notes:
ROUTED,PM10/COMPACTION REPORT TO AMY YU.
S�'v,Ve -tom
frac( &cc acert
� la c0 otC Alcor
Printed: Wednesday, 27 August, 2014 1 of 1
WSYSTFM$
TEST RESULTS
Project Name: Tower Market PROJECT NO: 522-13059
Location: La Quinta, California REPORT NO: 14-08-318
Test No.
Date Tested
Location
Elevation
Dry Density
in place
% Moisture
in place
Relative
Compaction
Maximum
Density
Building Pad
1
08/07/14
Per Plan
5.5' BPG
102.9
10.3
90
114.0
2
08/07/14
Per Plan
5.5' BPG
103.6
11.6
91
114.0
3
08/07/14
Per Plan
3.5' BPG
110.7
11.1
97
114.0
4
08/07/14
Per Plan
3.5' BPG
113.4
10.9
99
114.0
5
08/08/14
Per Plan
2.0" BPG
110.6
10.9
97
114.0
6
08/08/14
Per Plan
2.0' BPG
112.3
11.6
99
114.0
7
08/08/14
Per Plan
PG
107.6
10.7
94
114.0
8
08/08/14
Per Plan
PG
105.9
12.4
93
114.0
9
08/08/14
Per Plan
4.5' BPG,
103.1
12.3
90
114.0
10
08/08/14
Per Plan
4.5' BPG
102.9
11.9
90
114.0
11
8/11/2014
Per Plan
2.0' BPG
104.5
12.3
92
114.0
12
8/11/2014
Per Plan
2.0' BPG
106.3
11.1
93
114.0
13
8/11/2014
Per Plan
4.5' BPG
102.9
12.5
90
114.0
14
8/11/2014
Per Plan
2.0' BPG
107.2
11.4
94
114.0
15
8/11/2014
Per Plan
2.0' BPG
105.3
13.6
92
114.0
16
8/12/2014
Per Plan
4.5' BPG
102.9
10.1
90
114.0
17
8/12/2014
Per Plan
4.5' BPG
104.3
10.9
91
114.0
18
8/12/2014
Per Plan
2.0' BPG
112.3
11.2
99
114.0
19
8/12/2014
Per Plan
2.0' BPG
109.6
10.5
96
114.0
20
8/13/2014
Per Plan
PG
107.8
11.6
95
114.0
21
8/13/2014
Per Plan
PG
110.6
12.1
97
114.0
22
8/13/2014
Per Plan
PG
112.5
12.3
99
114.0
23
8/13/2014
Per Plan
PG
110.9
11.9
97
114.0
BPG = Below Pad Grade
PG = Pad Grade
August 18, 2014 Sadden Engineering
Ai
•
7
3
� s
� � E ASE_-�'V!a
�T
WV
Lit
_
,
so lit qj
ri
„�.•,t`,'•..f{.. . Vie• .r. .. .. _Y�.y
� B' 6• 4 _t..�-�•' ,= _ - •: fr'.� �'' �-` �"..: t �;' fit"' '�'' " `�;'<
O Approximate Compaction Test Location
#g
COMPACTION TEST LOCATION PLAN
Project Number: 522-13059
Report Number: 14-08-318
Sladden Engineering Date: August 18, 2014
FIGURE
McGEE SURVEYING, INC.
45 -100 Golf Center Pkwyl, 'Blda' F, Ste.G, hidlo, CA 9220, 1 1
Phone (760) 342-21249:— Fax (760) 342-5044
August 29, 2014
City of La Quinta
.,
7.8-405 Calle, Tampico
La :Qwi'hta.. CA. 92253.
Re` Pad. Certification — 1641 Tower.
Pursuant to your request a field.,survey
determine the vertical I location of the
follows:
10T ADDRESS
PC] "A" 77-98.5 Avern'da,
Parcel Merger
12-515
.way e McGee
L.S. 5479
conducted on ihe.aboNie r6f6rericied,project to
ng pad. `The above mentioned' was found as,.
47.10'
47-V
From: Stephanie Khatami RECEIVED
Sent: Thursday, August 21, 2014 9:34 AM
jo" n.o150 @ihZthe.-malci::D."-.M
Subject: Tower Market AUG 2 7 2014
Attachments: GREEN SHEET.pdf
<7VV�'4'Jr ?i3o 36Jt iii,
CITY OF LA QUINTA
COMMUNITY DEVELOPMENT
I spoke to AJ then Amy, please provide the Pad Cert and just the first page of the attached application. That should take
care of the Public Works submittal..
Stephanie IZhatami
Permit Technician
City of La Quinta 4
Community Development
1 1 1 1 1
(760)777-7019 direct
(760)777-7011 fax
skhatami@la-quinta.org
City of 1A Quinta
78495 Calle Tampico
La Quinta, CA 92253
www.la-auinta.org
RECEIVED-
FA
AUG
2 7 2014
CITY OF LA QuiNTA `
COMMUNITY DEVELOPMENT
ell
---s — —S —
7—
na
1*9T :#ISri M/LZ/9 :31VO told
UI nl W
cm J=
--— :. ` �,:: ; :1� ..� a� _ _! -r: '' �L: T ;, ��ri", g
I.n
o
'00I,
R
016
u
Ag
oa 8
AP�E
J.
Gi L6
k:
r-77 7;;
_4M •
. 1'�
SVO'
tip
L
Aq
ig�qji L
r94 —.J—.--
77N.
A I
Al
�At. -
RM. .•
. . . .
. . . . . . is
0
'J 8'
rr.
L
l3iIN 13a
E3
4
L is k ix Cl It'.
t3
1 0):
En
>.......... .
I PA
-�6
SEER
it
I, .
3 .
7 I - 9 . . :
3M
rT
.4 k", VRA
'I'A' t9
N�7
K�
It u
<
r
-4
�- 41,
55gt'. tW
J1
a b,
ts
e-,
�4 J -
r3
IN
VM
PAN
M
Rot' M
V"' Cl1N3A V
L
N9
0
C3
CS
2 ; g I g
.-AI
S I
ffenowl"01"ITAF� -0
COMMUNITY DEVELOPMENT DEPARTMENT
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
(760) 777-7125 FAX (760) 777-7011
To: Greg Butler, Building Official To PD: May 8, 2014
From: Les Johnson, CDD Director Due Date:
Permit #: 13-1641 Status: 1 st
Building; Plans Approval
(This is an approval to issue a Building Permit)
Planning has reviewed the Building Plans for the following project:
Description: Tower Market Proiect — Demo Existing and'Reconstruct New Facility
Address or General Location: 77-985 Avenida Montezuma
Applicant Contact:. Nick Fullerton (408) 837-1550.
Ago' mo*ui, rootGw rust' 0
Planning finds that- 5I1'3`tiot�
❑ ...these Build' g Plans do not require Plannirig approval. A.,qml
...these Bu ding Plans are approved by Planning.
❑` se g Plans require corrections. Please forward a copy of the
attached corrections to the applicant. When the corrections are made
please return them to Planning for review.
Les Jokson, Po`Inmunity Development Department Director
Date
77-682 Country Club Dr. Ste. B, Palm Desert, CA 92211 ph. (760) 772-5107 fax (760) 345-7620
Letter of Transmittal
To:
City of La Quinta Today's Date:
3-26-14
78-495 Calle Tampico City Due Date:
3-26-14
La Quinta, CA 92253 Project Address:
77-985 Avenida Montezuma
Attn:
Angelica
Plan Check #:
13-1641
Submittal: ® 1St
❑
4th
❑ 2nd
❑
55th
❑ 3'd
❑
Other:
We are forwarding:
® By Messenger ❑ By Mail (Fed Ex or UPS)
❑ Your Pickup
Includes: # Of
Descriptions: Includes:
# Of
Descriptions:
Copies:
Copies:
❑
Structural Plans
❑
1
Revised Structural Plans
®
2
Structural Calculations
❑
Revised Struct. Calcs
®
2
Truss Calculations Floor
❑
Revised Truss
and Roof
❑
Soils Report
❑
Revised Soils Report
®
1
Structural Comment List/
❑
Approved Structural Plans
Responses
®
1
Redlined Structural Plans
❑
Approved Structural Calcs
❑
Redlined Structural Calcs
❑
Approved Truss Calcs
❑
Redlined Truss Calcs
❑
Approved Soils Report
❑
Redlined Soils Reports
❑
2
Other: Building Energy
Analysis Report
Comments: Structural content is approvable.
If you have any questions, please call.
Time = 1.5 HR
This Material Sent for:
❑ Your Files
El Yo
S�i
El 9
Other: ❑
Palm Desert Office:
Other: ❑
07
s
® Per Your Request
❑ Approval
❑ At the request of:
RECOINAVA..— 1%
a�
COACHELLA VALLEY WATER DISTRICT APR AWIJ ASSESSOR'S PARCEL NUMBER
85-995 Avenue 52 82014
Coachella, California 92236
coft, C
(760) 398-2651 N 1A Qilllyt
APPLICATION FOR WASTEWATER INTERCEPTORISEPARATOR APPRftar
APPLICANT Submit this form viith a copy of a SCALED plot plan (I" - 20' to I" -- 402 SCALE) drawn to District specifications. A notuefundable filing fee is required
when the application is submitted Check must be made payable in the Coachella Valles Water District. Approval of this application shall remain valid for a period not to
exceed one (1) year from date ofpayment NOTE: ALL BUSINESSES PRODUCING FAT, OIL, AND/OR GREASE, LOCATED IN A MULTI -SUITE BUILDLNG
WILL REQUIRE A SEPERATE LATERAL OFF THE MAIN SEWER LLNE FOR GREASE INTERCEPTOR CONNECTION.
Platt Check No. 13-1641
Agent, Contractor, Contact Person
Address City State Zip
Telephone
l i Com. l �YJ 5! f? u �il�a r
9-� -?44 YAC'O! `,UI � Cf ?V-20?
760
OuTer
Address ity State Zip
Telephone
ow -r— Z (,�/e!� 1 E2UttI6'>
r1�3i ir10� �T S�lft — Pk0?l4dJtlr' LA.
—S313 —'900
Job Propertl Address Cit Zip
7-995 11eN1m l�ta►�►T�f�vbl G�? �ul��r'" G� ^� .� 53
Legal Description C/;' { I_/ .'•, Y.
DBA
Sher" � 2rrr�Ll1'�'' ;-r" !0/?tom O✓ rar �L�•�'- ' 1 1�..
r ' �' P/. �a=f�.r�.!_ "••�
PLEASE COMPLETE THIS Si TION FOR REVIEW OF FOOD ESTABLISHMENTS
NOTE: PLANS WILL. NOT BE ACCEPTED UNLESS THIS APPLICATION IS COA4'LETE AND THE PLAN CHECK FEE IS PAID.
GENERAL CONSTRUCTION:
Type of Construction:
New Food Facility _ Remodel of'Existing Food Establishment Hours of Operation ,., Sealing Capacity: Internal _ F.xtemat—
External Seating with Misters or Heaters Bar with Food Service Bar Nonfood Service Water Softener
Service:
Multiservice (reusable)_ Single Service (disposable)_•_-._
OWNER;REPRESENT'ATLVE DFX.LARATION I certify that I have read the entire application and state that all information is correct 1 understand that the amount of fee
pard is based on my declaration of inf6rmation on this form and that incorrect information is grounds for denial of the submitted plans I also understand that plans will be
discarded if not picked up within sixty (60) days of approval or denial and that no inspection of my establishment will be conducted, or approval granted to operate, until all
proper information retested hhjas been received and plans have been approved and returned.
`
Signature � //!� T Date 7 `..!_.
FOR DISTRICT USE ONLY
No of Systems
Type of systems)
No. Dwelling Units
❑ Sand/Oil Grease Interceptor Waived
Fixture Units
[:]Grease Interceptor
❑ New ❑ Existing
❑ Lint Trap
❑ Replacement ❑ Addition
❑ Clarifier
❑ Connect to Sewer
Oral
REMARKS:
CVwl' CIMS no% zlla'.z' -+r s. cVw�j rr vires tr'`�s� e ren.t�ve�
�2f1s
rv, .
This application is
Approved ❑ 17emed ❑ Conditional Approval*
Fee 3 � / Check No
'See Remarks;
Date Initial
Signature
Date z1
CVWD•921
Rev 6/11
4
COACHE LLA VALLEY WATER DISTRICT
�p,TEq� CALIFORNIA 92236 (760) 398-2651
P.O. BOX 1058, COACHELLA,
4J�STRtG�
�INVOICE Date: 212512014
SUBJECT- SANTA CARMELITA, 77985 AVEN IDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 393306
14-5266
Project: 212412014
TOWER ENERGY GROUP Project Date: $50.00
1983 W. 190TH ST., SUITE 100
Amount Due: 06-06-01-4
GEO: SARA LOPEZ
TORRANCE, CA 90504 Planner:
TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH
. -.- r&wr.F AND INCLUDE THE PROJECT ON YOUR CHECK_-_�-
SUBJECT: SANTA CARMELI I A, , 1 �. , -- -
COACHELLA VALLEY WATER DISTRICT 398_2651 Pagel
p,0. BOX 1058, COACHELLA, CALIFORNIA 92236 (760)
z
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
INVOICE Date: 3/12/2014
SUBJECT: SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
TOWER ENERGY GROUP Project:
14-5266
1983 W. 190TH ST., SUITE 100 Project Date:
2/24/2014
Amount Due:
$9,702.00
TORRANCE, CA 90504 GEO:
06-06-01-4
Planner:
SARA LOPEZ
TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH
REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK
2.00 SCC -COLLECTION $2,415.00 $4,830.00
2.00 SCC -TREATMENT $2.436.001 $4,872.00
$9,702.00
SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651 Pagel
F
f �
s JT COACHELLA VALLEY WATER DISTRICT
`-�► -T,q P.O. Box .1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
INVOICE Date: 3/12/2014
SUBJECT: SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
TOWER ENERGY GROUP
1983 W. 190TH ST., SUITE 100
TORRANCE, CA 90504
Project:
Project Date:
Amount Due:
GEO:
Planner:
TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH
REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK
14-5266
2/24/2014
$9,702.00
06-06-01-4
SARALOPEZ
SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
Page 1
2.00 SCC -COLLECTION
$2,415.001 $4,830.00
2.00 SCC -TREATMENT
$2,436.001 $4,872.00
$9,702.00
PAID $ c% 70 c2• 00 v
Development Services Department
MAR 2 6 2014
Coachella Valley Water District
75-515 Hovley Lane East
Pairh Desert, CA 92211
SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
Page 1
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
INVOICE Date: 3/12/2014
SUBJECT: SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196.
TOWER ENERGY GROUP
1983 W. 190TH ST., SUITE 100
TORRANCE, CA 90504
Project:
Project Date:
Amount Due:
GEO:
Planner:
TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH
REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK
14-5266
2/24/2014
$9,702.00
06-06-01-4
SARA LOPEZ
SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
COACHELLA VALLEY WATER DISTRICT
P.O. Box 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
Page 1
2.00 SCC -COLLECTION
$2,415.00 $4,830.00
2.00 SCC -TREATMENT
$2,436.00 $4,872.00
$9,702.00
70 c2
Development Services Department
MAR 2 6 2014
Coachella Valley Water District
75-515 Hovley Lane East
Palm Desert, CA 92211
SUBJECT:SANTA CARMELITA, 77985 AVENIDA MONTEZUMA, LA QUINTA "TOWER MARKET" LID'S 681198 & 681196
COACHELLA VALLEY WATER DISTRICT
P.O. Box 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
Page 1
PROUDLY SERVING THE
UNINCORPORATED AREAS
OF RIVERSIDE COUNTY
AND THE CITIES OF:
BANNING
BEAUMONT
CALIMESA
CANYON LAKE
COACHELLA
DESERT HOT SPRINGS
EASTVALE
INDIAN WELLS
INDIO
JURUPA VALLEY
LAKE ELSINORE
LA QUINTA
MENIFEE
MORENO VALLEY
NORCO
PALM DESERT
PERRIS
RANCHO MIRAGE
RUBIDOUX CSD
SAN JACINTO
TEMECULA
WILDOMAR
BOARD OF
SUPERVISORS:
KEVIN JEFFRIES
DISTRICT 1
JOHN TAVAGLIONE
DISTRICT 2
JEFF STONE
DISTRICT 3
JOHN BENOIT
DISTRICT 4
MARION ASHLEY
DISTRICT 5
RIVERSIDE COUNTY FIRE DEPARTMENT
IN COOPERATION WITH
THE CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION
77-933 Las Montanas Rd., Ste. #201, Palm Desert, CA 922114131 • Phone (760) 863-8886
• Fax (760) 863-7072
www.rvcfire.org
March 14, 2014
RECEIVED
John Olsen
86-030 Ave 62 APR 1.8 2014
Thermal, CA 92274
CITY OF LA QUINTA
COMMUNITY DEVELOPMENT
Re: Non -Structural Building Plan Review
LAQ-I4-BP-003 Tower Market 77-985 Avenida Montezuma La Quinta, CA 92253
Fire Department personnel have reviewed and approved the plans you submitted for the above
referenced project. Please be advised the following conditions apply as a part of the conditions for
the issuance of a building permit.
1) Fire Department approval is based upon the 2013 CBC requirements for Group M occupancies.
— -. -.. --It is-prohibited_to..use, . process or- store. any- -materials -in -the-occupancy that would classify it as a
Group H occupancy.
2) Repair work and/or maintenance using open flame equipment, welding or the use of Class I, II,
or III -A liquids are prohibited.
3) The Fire Department is required to set a minimum fire flow for the remodel or construction of all
commercial buildings using the procedure established in the 2013 CFC. A fire flow of 1500
gpm for a 2 -hour duration at 20 psi residual operating pressure must be available before any
combustible material is placed on the job site.
`i ^
4) The required fire flow shall be available from 1 Super hydrant(s) (6n x 4" x 2,'!
2 x 2'/2") spaced
not more than'450 apart. All Fire Department Appliances such as hydrants, FSC and PIVs shall
be located on the front access side of the building. If applicable, PTV and FDC appliances shall
not less than 40' from the building or more than 200' from an approved hydrant.
Buildings/facilities
5) Install Knox Key Lock box, mounted per recommended standard of the Knox Company. If the
building/facility is protected with a fire alarm system or burglar alarm system, the lock boxes
will require "tamper" monitoring. Special forms are available from this office for the ordering of
the Key Switch. This form must be authorized and signed by this office for the correctly coded
system to be purchased. .
6) Provide keys to the tenant space for inclusion in the main building Knox Box. Key(s) shall have
durable and legible tags affixed for identification of the correlating tenant space.
,
Other requirements:
7) Install panic hardware and exit signs as per the 2013 CBC
8) Prior to final inspection of any building, the applicant shall prepare and submit to the Fire
Department for approval, a site plan designating required fire lanes with appropriate lane
painting and/or signs.
9) Certain designated areas will be required to be maintained as fire lanes and will require approved
signs and/or stenciling in red with CVC 22500.1 conspicuously posted.
10) Install portable fire extinguishers per Title 19, but not less than 2AIOBC in rating. Contact a
certified extinguisher company for proper placement and spacing of equipment.
11) This building has not been reviewed or approved for high pile/rack storage. Prior to such use,
building(s) shall be approved for high -piled storage (materials in closely packed piles or on
pallets, or in racks where the top of storage exceeds 12 feet in height, 6 feet for Group A plastics
and certain other hazardous commodities) or aerosols products. High -piled and aerosol stock
shall be approved by the Fire Department prior to materials being stored on site. A licensed Fire
Protection Engineer or a Fire Department approved consultant must prepare plans for high -piled
storage or aerosol storage in accordance with the 2010 CFC and NFPA 13.
12) Shelving, counters, etc., must be in place, however, no merchandise may be placed in the
building prior to inspection.
13) Applicant/developer shall be responsible for obtaining aboveground tank permits from both the
County Health and Fire Departments.
14) All fire sprinkler systems, fixed fire suppression systems and alarm plans must be submitted
separately for approval .prior to construction. Contractors should contact the Planning &
Engineering office for submittal requirements.
15) HOOD & DUCT EXTINGUISHING - A UL 300 hood/duct fire extinguishing system must be
installed over the cooking equipment as required by the California Fire Code, California
Mechanical Code and adopted standards. The extinguishing system must automatically
shutdown gas and /or electricity to all cooking appliances upon activation. A C-16 licensed
contractor must submit plans for review and approval prior to installation. (Alarm system
supervision is only required if the building has an existing fire alarm system.)
16) Approved building address shall be placed in such a position as to be plainly visible and legible
from the street and rear access if applicable. Building address numbers shall be a minimum of
12". All addressing must be legible and of a contrasting color with the background and
adequately illuminated to be visible from the street at all hours.
17) Electrical room door shall be posted "ELECTRICAU ROOM" on the outside of door..
18) Fire Sprinkler Riser door shall be posted "FIRE RISER" on the outside of door.
19) Fire Alarm Control Panel door shall be posted "FACP" on the outside of door.
20) Roof Access door shall be posted "ROOF ACCESS" on the outside of door.
21) A durable sign stating "This door to remain unlocked during business hours" shall be placed on
or adjacent to the front exit doors. The sign shall be in letters not less than one inch high on a
contrasting background.
NOTE: "Red -lined" correction on page E2.0
SUBJECT TO FIELD INSPECTION - Nothing in our review shall be construed as encompassing
structural integrity. Review of this plan does not authorize or approve any omission or deviation
from all applicable regulations. Final approval is subject to field inspection.
Please contact the Fire Department Planning & Engineering staff for final inspection prior to
occupancy.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections.
Requests for inspections are to be made at least 72 hours in advance and may be arranged by calling
(760) 863-8886.
All questions regarding the meaning of these conditions should be referred to the Fire Department
Planning & Engineering staff at (760) 863-8886.
By , ," ,"&1 l
Jason Stubble
Fire Safety Specialist
T4ht 4 4.Q"
Planning Commission agendas and staff
reports are now available on the City's
web page: www.la-guinta.org
PLANNING COMMISSION
AGENDA
CITY HALL COUNCIL CHAMBERS
78-495 Calle Tampico, La Quinta
REGULAR MEETING on TUESDAY, APRIL 22, 2014 AT 7:00 P.M.
Beginning Resolution No. 2014-007
CALL TO ORDER
1. Roll Call
2. Pledge of Allegiance
PUBLIC COMMENT
At this time members of the public may address- the Planning Commission on any
matter not listed_ on the agenda. Please complete a "Request to Speak" form and
limit your comments to three minutes.
CONFIRMATION OF AGENDA
APPROVAL OF MINUTES
1. Approval of the minutes of March 11, 2014.
PUBLIC HEARINGS
For all Public Hearings on the agenda, a completed "Request to Speak" form must
be filed with the Executive Assistant prior to consideration of that item.
A person may submit written comments to the Planning Commission before a
public hearing or appear in support or opposition to the approval of a project(s). If
you challenge.a project(s) in court, you may be limited to raising only those issues
PLANNING COMMISSION AGENDA 1 APRIL 22, 2014
you or someone else raised at the public hearing or in written correspondence
delivered to the City at, or prior to the public hearing.
1. Site Development Permit 2013-934 submitted by T. D. Desert Development
LP for the construction of 39 new single-family homes on 1 1.21 acres and
an amendment to Final Map 31681-3. Project: Andalusia at Almeria, within
the existing Andalusia at Coral Mountain project. CEQA: reviewed under
environmental Assessment 2003-483. Location: southeast corner of
Madison Street and Avenue 58.
2. Conditional Use Permit 2014-157 submitted by Shadow Rock Church to
establish a church in an existing 7,840 square -foot building. Project:
Shadow Rock Church. CEQA: exempt from environmental review pursuant
to Sections 15332 (Infill Development). Location: La Quinta Valley Plaza
commercial center at the northwest corner of Dune Palms Road and Highway
1 1 1 (79-390 Highway 1 1 1).
BUSINESS SESSION
1. Site Development Permit 2013-933 submitted by Nexus Palm Springs for the
construction of 11 new single-family homes on 9.14 acres. Project: The
Orchards (TR 36279). CEQA: reviewed under Environmental Assessment
2010-608. Location: southwest corner of Madison Street and Vista Bonita
Trail (Avenue 51).
CORRESPONDENCE AND WRITTEN MATERIAL
COMMISSIONER ITEMS
1. Report on City Council meeting of March 18 and April 1 and 15, 2014.
2. Commissioner Weber is scheduled to attend the May 6, 2014 City Council
meeting.
DIRECTOR'S ITEMS
ADJOURNMENT
The next regular meeting of the Planning Commission will be held on May 13,
2014 commencing at 7:00 p.m. at the City Hall Council Chambers, 78-495 Calle
Tampico, La Quinta, CA 92253.
PLANNING COMMISSION AGENDA 2 APRIL 22, 2014
DECLARATION OF POSTING
I, Monika Radeva, Executive Assistant of the City of La Quinta, do hereby declare
that the.foregoing Agenda for the La Quinta Planning Commission meeting was
posted on the inside of the north entry to the La Quinta Civic Center at 78-495
Calle Tampico, and the bulletin boards at 78-630 Highway 1 1 1, and the La Quinta
Cove Post Office at 51-321 Avenida Bermudas, on April 18, 2014.
DATED: April 18, 2014
MONIKA RADEVA, Executive Assistant
City of La.Quinta, California
PUBLIC NOTICES
The La Quinta City Council Chamber is handicapped accessible. If special equipment is needed
for the hearing impaired, please call the City Clerk's office at 777-7123, twenty-four (24) hours in
advance of the meeting and accommodations will be made.
If special electronic equipment is needed to make presentations to the Commission, arrangements
should be made in advance by contacting the City Clerk's office at 777-7123. A one (1) week
notice is required.
If background material is to be presented to the Commission during a Planning Commission
meeting, please be advised that eight (8) copies of all documents, exhibits, etc., must be supplied
to the Executive Assistant for distribution. It is requested that this take place prior to the
beginning of the meeting.
Any writings or documents provided to a majority of the Commission regarding any item(s) on this
agenda will be made available for public inspection at the Community Development Department's
counter at City Hall located at 78-495 Calle Tampico, La Quinta, California, 92253, during normal
business hours.
PLANNING COMMISSION AGENDA 3 APRIL 22, 2014
Li
ENVIRONMENTAL
FOOD ESTABLISHMENT PLAN APPROVAL NOTICE
SR# 30307
Project Name Tower Market
Plans Submitted by John Olson
Owner Tower Energy Group
Date 2-16-14
Address 77-985 Avendia Montazuma, La Quints
Phone 310-538-8000
Phone 760-799-5106
The plans are now approved subject to the conditions listed below and the attached compliance sheet.
1. Provide a certified air balance report for the exhaust and make up air.
2. Provide a grease interceptor letter from the sewer agency call John Riddle at 760-863-7570.
3. Contact Hazardous Material division for the resurfacing of the gas station area at 760-863-8976.
4. Provide lockers for the food service employees, one locker per employee per shift.
5. Provide air curtain at delivery door 1600fpm measured 3'above the ground.
6. Page A8.2 states you will be using sealed concrete for the finish. The sealer must be USDA approved for
food use, save container for verification.
7. Provide an outside trash enclosure, the enclosure must have smooth epoxy sealed interior floor and walls.
CONSTRUCTION INSPECTIONS: Contact the Plan Checker for a Preliminary Inspection when constriction is
approximately 80% complete, with plumbing, rough ventilation, and rough equipment installed. Request for inspection should
be made at least five (5) working days in advance.
A FINAL INSPECTION MUST be made upon completion of ALL work including finished details. APPROVAL to operate
shall not be granted, or remodeled areas approved to operate, until the facility has passed the FINAL INSPECTION, and
"APPLICATION TO OPERATE" has been completed and PERMIT FEES have been paid.
'Request for inspection should be made at least five (5) working days in advance.
PLANS CHECKED BY Tracey Ford, EHS III Phone (760) 863-8287
I acknowledge the corrections noted herein and as indicated on theylans and agree to incorporate them during construction:
DEH -SAN -178 (Rev 2/06)
Corona
2275 S. Main St
Suite 204
(951) 273-9140
Fax (951) 520-8319
Signature-1494
ignature�_ �Date
Company Name �(,c>�� �/V X121 y mOue
Hemet
800 S. Sanderson
(951) 766-2824
Fax(951)766-
7874
ax(951)766-
7874
Indio
47-950 Arabia St
"A"
(760)863-8287
Fax(760)863-
8303
ax(760)863-
8303
Murrieta
38740 Sky Canyon
Dr
(951) 461-0284
Fax (951) 461-0245
Department Web Site – www.rivcoeh.org
Palm -Sp ,'ngs
554 S. Paseo'Dorotea
(760) 3204048
Fax(760)320-1470
Riverside
4065 County
Cir
(951) 358-5172
Fax(951)358-
5017
ax(951)358-
5017
I
COUNTY OF RIVERSIDE • COMMUNITY HEALTH AGENCY
DEPARTMENT OF ENVIRONMENTAL HEALTH
Application for Review of Food Establishment Construction/Remodel Plans
Date /� Fee $
For Office Use
Ck. #V 5 A Trans. # Kq7Dist. 6 a Area # I SR #
Note: Plans will not be accepted unless this application is complete, and the plan check fee is paid.
Establishment Name: u v-,t,� /t 1Nltle(_ T_
Job Address: %7-995f' AVI ot�a-j /Ilc�+irj"il7t-ctel/`! city: /..4. Zip: C
Contact Person: c fia 1 Lh ;, Phone: 6v -799 - 1 U
E-mail Address: Gl/,r�,. 0j.ScJo --Iv THt'Tli-cieF+Ittr, Coif 1 Fax: ,u )-C;a - :?/ 4?'7
Contact's Address: �, (, - U?f.; 14 tiL City: i p:
•� �,� � it itt�ll Zi
Owner/Operator Name: T() t,x t t!r t C Phone: _rJ?k- a
Address: 603 l,•1. 60 1�7_ _ '4 -(,TE A City: Zip: A(2SO4
It A. General Construction (Additional operations may be subject to extra fees)
New Food Facility Remodel or Existing Food Establishment Explain Retoo&6-`. 9 �'C11 l,)l l;; t
*S$47 4c.39PPI
Total Sq. Ft. (including all seating areas) !I Hours of 0peratio72-y* >_ - `�--TM .— -
Seating Capacity for dining i Number of workers per Shift _�
RIVERSID .�DIO FACILITY
B. Service Indicate ALL methods o DEPT OF NVIRONMENTAI HEALTH
( offood service to the public):
47950 ARABIA ST. STE# A
Menu: A menu of food and beverages sold at this facility is required to be submitted at tim
On-site preparation (cooking, cutting, assembly, etc.): Yes No Soup or salad I
Customer Self -Service Dispensers: Yes No Full Service Bar: Yes r 02/05/2014 00000
Type of customer utensils (cups, plates, forks, etc.) Multi -service (re -usable) or Singl. #6847 4:39PIt'.Y EMMA00
72ZO20 $1646.. 0
C. Utilities (Will -Serve Letters):
CRD. CARD $1646-00
Water Service: _ Public Water System Name of Water Company: C JW j t
Private Well (must be Environmental Health Land Use approved). ''d:
f�vOnlirre
Sewer Disposal: Public Sewer System Name of Sewer Company: 41' V tA) D
co
oC
Septic System (must be Environmental Health Land Use approved). t Customer Cv
Grease Interceptor: Provide from Sewer District a Grease Interceptor size requirement lets
Owner/Representative Declaration: I certify that I have read the entire application and state that all information is correct. I understand that the
amount of fee paid is based on my declaration of information on this form, and that incorrect information is grounds for denial of the submitted plans.
I also understand that plans will be discarded if not picked up within sixty (60) days of approval or denial, and that no inspection of my establishment
will be conducted, or approval granted to operate, until all proper information requested has been received and plans have been approved and
returned. I have reviewed the Plan Construction Guide and my plans follow the guide.
Signature .
DEH -SAN -002 (Rev. 2/08)
Date 2
Distribution: White — Office • Yellow - Customer
DEPARTMENT OF ENVIRONMENTAL HEALTH
TO: PLAN CHECK CUSTOMER
FROM: RIVERSIDE COUNTY DEPT. OF ENVIRONMENTAL HEALTH
FOOD AND POOL CONSTRUCTION PROGRAM
SUBJECT: WILL -SERVE REQUIREMENTS
Please be advised that utility clearance letter(s) are required from the Water
District, Sewer District, and Industrial Waste Section/Source Control Division
(Grease Interceptor), for your food facility. It is your responsibility to ensure that
these clearances are secured. The utility clearances correspond with Section C,
"Utilities" on the Application for Review of Food Establishment
Construction/Remodel Plans form which you signed and submitted with your plans.
Even if your project does not require a grease interceptor, an exemption letter from
the Industrial Waste Section/Source Control Division is still required. It is your
responsibility to secure the utilities for your project and provide this Department
with the correct information for plan check processing.
** PLANS WILL NOT BE RELEASED UNTIL THESE CLEARANCE LETTERS
ARE RECEIVED AND APPROVED BY THIS DEPARTMENT **
It is imperative that the timely receipt of these clearance letters occurs so as to not
impede the ultimate release of your plans to you.
Individuals submitting plans to this Department for the "Remodel of an Existing
Food Establishment" need only to submit the clearance letter from the Industrial
Waste District (Grease Interceptor).
Facility Name �O w 4e5Z, Mt--1r2-i4el—
Facility Address -77--98S -19VA0v/ Oi1
Client's Name(s) (Please Print) _
Corona
2275 Main St Suite 204
(951) 273-9140
Fax (951) 520-8319
Rev. 11/07
Client Signature
Hemet Indio
800 S. Sanderson 47-950 Arabia St
(951) 766-2824 (760) 863-8287
Fax (951) 766-7874 Fax (760) 863-8303
Murrieta
38740 Sky Canyon Dr
(951) 461-0284
Fax (951) 461-0245
-J
Date
Palm Springs Riverside
554 Paseo Dorotea, Ste.1 4065 County Circle Dr
(760) 320-1048 (951) 358-5172
Fax (760) 320-1470 Fax (951) 358-5017
Department Web Site — www.rivcoeh.org
Prepared 5/08/14,15:54:50 Application Inquiry-(BPN200I001) Page 1
Program HTDFTAL Screen detail for Program: BP BPN200I, Fees
User ID AJ Application 13-00001641
------------------------------------------------------------------------------------------------------------------------------------
Property Information
Address: 77985 AVENIDA MONTEZUMA
LA QUINTA, CA 92253
Location ID: 17396 -
Owner name: LADOUCEUR JACKIE G
APN: 773-104-036-24 -000000-
Alternate ID:
Zoning: - VC VILLAGE COMMERCIAL
Subdivision:
Application Information
Application desc: 4,728SF STORE/VB/M-OCC/112-OL/NON-SPRINKLERED
Application status: IN PLAN CHECK
Status Date: 12/18/2013
Application type: NEW COMML - STORES & CUSTOMER SERVICE
Application date: 12/18/2013
Valuation: 198103
Square footage: 4728
Public building: NO
Reviewed by:
Pin number: 287709 -
Entered by: AZARCO
Contractor Information
Contractor Name: * OWNER
Contractor Number:
Type:
Status:
Contractor Requirements Doc Number Exp Date
------------------------------ --------------- ----------
Work Comp Carrier
INSURANCE
STATE LICENSE REGISTRATION
LICENSE CLASSIFICATIONS
Outstanding Inspections
Insp Schedule Confirmation Permit Pmt
Type ID Date Number Description Seq Min Max
--------------- ------ ---------- ------------ --------------- --- ----- -----
SETBACKS 00 10
FOOTINGS 00 10
BOND BEAM 00 10
GRADE BEAM 00 10
SLAB 00 10
UNDERGROUND ELE 00 10
UNDERGROUND PLU 00 10
ROOF NAIL 00 20
OKAY TO WRAP 00 20
FRAMING 00 20
ROUGH ELECTRICA 00 20
ROUGH MECHANICA 00 20
ROUGH PLUMBING - 00 20
INSULATION 00 20
ROOF DRAIN 00 20 130
DRYWALL NAIL 00 20
Prepared 5/08/14,15:54:50
Application Inquiry-(BPN200I001)
Page 2
Program HTDFTAL
Screen detail
for Program: BP BPN200I,
Fees
User ID AJ
------------------------------------------------------------------------------------------------------------------------------------
Application 13-00001641
'
(Continued)
LATH
00
20
GAS LINE / GAS
00
30
T -BAR
00
30
TEMP USE OF PER
00
30
ELECTRICAL FINA
00-
40
MECHANICAL FINA
00
40
PLUMBING FINAL
00
40
FINAL
00
40
SEWER CONNECTIO
00
999
TEMPORARY POWER
00
999
Work Description
Code Description Quantity
------ ------------------------- --------
CO Information
CO Issue
Str/seq Date Status Description
------- ---------- ------ --------------------
Class Type Description Transaction
amount
Amount due
Amount
billed
Struct Permit Insp Custom
District
A A2 ART IN PUBLIC PLACES -COM
990.52
990.52
.00
Y
A BA BLDG STDS ADMIN (SB1473)
8.00
8.00
.00
A C2 DIF CIVIC CENTER - COMM
1763.54
1763.54
_00
Y
A F2 DIF FIRE PROTECTION -COMM
813.22
813.22
.00
Y
A PE PLAN CHECK, ELECTRICAL
118.68
118.68
.00
P PF PERMIT FEES
572.80
572.80
.00
000000 B13 00
P PF PERMIT FEES
202.58
202.58
.00
000000 E13 00
P PF PERMIT FEES
202.60
202.60
.00
000000 M13 00
P PF PERMIT FEES
381.44
381.44
.00
000000 P13 00
A PM PLAN CHECK, MECHANICAL
138.24
138.24
.00
A PP PLAN CHECK, PLUMBING
381.43
381.43
.00
A P5 BLDG PC 25001-200K
1213.59
1213.59
.00
A S2 STRONG MOTION (SMI) - COM
41.60
41.60
.00
Y
A TE TUMF: MISC RETAIL SVCS
156944.94
156944.94
.00
A T2 DIF STREET MAINT FAC -COMM
1096.90
1096.90
.00
Y
A 2 DIF TRANSPORTATION - COMM
26850.31
26850.31
.00
Y
Prepared 5/08/14,15:54:50 Application Inquiry-(BPN200I001) Page 3
Program HTDFTAL Screen detail for Program: BP BPN200I, Fees
User ID AJ Application 13-00001641
------------------------------------------------------------------------------------------------------------------------------------
Class Type Description Transaction amount Amount due Amount billed Struct Permit Insp Custom
District
(Continued)
Totals 191720.39 191720.39 .00
Tom Tisdale
Fire Chief
Proudly serving the
unincorporated
areas of Riverside
County and the
Cities of:
Banning
Beaumont
Cahmesa
Canyon Lake
Coachella
Desert Hot Springs
Indian Wells
Indio
Lake Elsinore
La Quinta
Moreno Valley
Palm Desert
Perris
Rancho Mirage
San Jacinto
Temecula
Board of Supervisors
Bob Buster,
District 1
John Tavaglione,
District 2
Jim Venable,
District 3
Roy Wilson,
RIVERSIDE COUNTY
FIRE DEPARTMENT
In cooperation with the
California Department of Forestry and Fire Protection
210 West San Jacinto Avenue • Perris, California 92570 • (909) 940-6900 • Fax (909) 940-6910
January 6, 2005
To: La Quinta Building Department
Re: Final fire Clearance
The Riverside County Fire Department is granting a fire life safety clearance for
# LAQ-04-BP-064/La_Quinta_V_illage Gas Station 77-4"Avenita Montezuma.
995
If you have any questions contact me at 760-345-6954
Respectfully,
Neal Stephenson
Fire Systems Inspector
RIVERSIDE COUNTY FIRE PROTECTION PLANNING
RECORD OF INSPECTIONS 1 PERMIT CARD
THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.
INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE
JOBDATE
ADDRESS:
r7 " l 6
"Y,
PERMIT# :
��
ISSUED:
'3
DESCRIPTION:
CONTRACTOR:
'`
HYDRANT SYSTEM
DATE INITIALS
SPECIAL SUPPRESSION
DATE INITIALS
Thrust block pre -pour
Door fan test
UG rough piping
Abort test
UG hydro
Mechanical shutdown
Flush
Detector test
Final EF
Deluge/pre-action
SPRINKLER U.G.
Final EF
Thrust block pre -pour
USTIAST TANK
UG rough piping
Installation
UG hydro
Removal
Flush
Emergency shut off
y- IC- IS 'T. C.
Final EF
Primary piping
FIRE SPRINKLER
Secondary piping
Weld inspection
Dispensers & shear valves
164-1& - 15 T -
Overhead rough piping
Final E F
L-1- I - , S 7 C'
Overhead hydro
MISC. INSPECTIONS
UG flush / OK to connect
Spray booths
Main drainfinspectors' test
Hood/duct extinguishing
High pile storage
High pile rack storage
In -rack sprinklers
H.P. vents/access/corridors
Hose racks
Tract access/hydrant verification
Finale F
HOOD EXTINGUISHING
OTHER CONST. PERMIT
Detection system
y . Q� .1 S C.
Function test
y _ _(d, _C,
Gaslelectrical shut-off
T -C,
Nozzle model/placement
_ _r
Fire alarm connection
-!d T -C
Final EF
4-g_ -T-C
SPRAY BOOTHS
FIRE CODE PERMIT(S)
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final e F
FIRE ALARM
KNOX SYSTEM
Rough -wire inspection
Building Knox box
Function test
Gate access Knox box/padlock
Duct detectors/velocity
BUILDING INSPECTIONS
24 hr. battery test
T/I final
Ll -it is,
Sprinkler monitoring
Shell final
Final E F
Final for occupancyi
y- ►6- S T_ e.
FINAL INSPECTION DATE: INSPECTORS SIGNATURE:
*WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE"
2300 Market Street, Ste 150 • Riverside, CA 92501 • (951) 9554777 • Fax (951) 955-4886
77-933 Las Montanas Rd., Ste 201 9 Palm Desert, CA 92211 . (760) 863-8886 9 Fax (760) 863-7072
`~' RIVERSIDE COUNTY FIRE PROTECTION PLANNING
RECORD OF INSPECTIONS 1 PERMIT CARD
THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.
INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON RFvFRSF sim
JOB
ADDRESS:
PERMIT#:
3
DATE -
ISSUED:
{
DESCRIPTION:
CONTRACTOR:
H'
HYDRANT SYSTEM
DATE INITIALS
SPECIAL SUPPRESSION DATE INITIALS
Thrust block pre -pour
Door fan test
UG rough piping
Abort test
UG hydro
Mechanical shutdown
Flush
Detector test
Final EF
Deluge/pre-action
SPRINKLER U.G.
Final E F
Thrust block pre -pour
UST/AST TANK
UG rough piping
Installation
UG hydro
Removal
Flush
Emergency shut off
Final EF
Primary piping
-FIRE SPRINKLER
Secondary piping
Weld inspection
1 t / Z �� /
Dispensers & shear valves
Overhead rough piping
/!t / - Yid
Final E F
Overhead hydro
Zam'Amw �, �-( L�
MISC. INSPECTIONS
UG Rush / OK to connect
2 - . � S IT . C
Spray booths
Main drain/inspectors' test
Hood/duct extinguishing
High pile storage
High pile rack storage
In -rack sprinklers
H.P. vents/access/corridors
Hose racks
Tract access/hydrant verification
Final EF
'-{- -T - C -
HOOD EXTINGUISHING
OTHER CONST. PERMIT
Detection system
Function test
Gas/electrical shut-off
Nozzle model/placement
Fire alarm connection
Final E F
SPRAY BOOTHS
FIRE CODE PERMIT(S)
Installation
Air Row test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final E F
FIRE ALARM
KNOX SYSTEM
Rough -wire inspection
Building Knox box
Function test
Gate access Knox box/padlock
Duct detectors/velocity
BUILDING INSPECTIONS
24 hr. battery test
T/I final
Sprinkler monitoring
Shell final
Final E F
Final for occupancy
FINAL INSPECTION DATE: INSPECTORS SIGNATURE:
'WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE"
2300 Market Street, Ste 150 • Riverside, CA 92501 • (951) 9554777 . Fax (951) 9554886
77-933 Las Montanas Rd., Ste 201 . Palm Desert, CA 92211 . (760) 863-8886 • Fax (760) 863-7072
COUNTY OF RIVERSIDE
DEPARTMENT OF ENVIRONMENTAL HEALTH
SUPPLEMENTAL REPORT TO SAN. FORM #
SUBJECT .w h�A ��c i'�
ADDRESS "� 11 `t �^ �! �n , a bi1c
i
REMARKS:
DATE
PERMIT NO.
�� e v.�\.,,. �._� DISTRICT
INSPECTOR t Q t L,
r
rA0"N\.\_
tA 1}(,✓\�
t`aN. \e��1� �.�C. �'i`Z�'I� �aut O(tr� [011ejtk.
/
O
Q 1P
ANQ t C f
`
CA T A lr ��t - �C r O,,J
t
(� I cA'�-':h kne4�1�5
`1rA
����CI�G
�to .� :nc r� t, Ce nol�
\ 1 �a c •. 10
(A
C1 r—"f C,
.r vc<�' CNS L- -0 R S
OCA \ e-A�
RECEIVED
/
DEH -SAN -118 (Rev 03/13) ' v — v v Distribution: WHITE -Office; CANARY -Owner
I BUILDING ENERGY ANALYSIS REPORT I
PROJECT:
Tower Market
77-985 Avenida Montezuma
La Quinta, CA 92253
Project Designer:
Fullerton Architects, PC
P.O. Box 2770
Bigfork, MO 59911-2770
(406) 837-1550
Report Prepared by:
of Tim Scott
Scott Design and Title 24, Inc,
77-085 Michigan Drive
Palm Desert, Ca 92211
(760) 200-4780
CITY orrA QUINTA
BUILDING & SAFETY DEPT. Job Number: RECEIVED
APPROVED
FOR CONSTRUCTION MAR 1.2 2014
Date: 2/17/2014 CITY OF LA QUINT,4
DATE ��, BY COMMUNITY DEVELOPMENT
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC—www.energysoft.com.
User Number. 6712 Run Code: 201402-17716:56:06 ID:
4
4
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 C
Project Name
Date
ower Market
2/17/2014
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
77-985 Avenida Montezuma La Quinta
CA Climate Zone 15
3.686
n/a
GENERAL INFORMATION
Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: m New Construction ❑ Addition ❑ Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
Name
14m, ���
Tim Scott
Signature
Company Scott Design and Title 24, Inc,
Date 2172014
Address 77-085 Michigan Drive
Phone (760) 200-4780
City/State/Zip Palm Desert, Ca 92211 CEPE #NR08-09-3706
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name Nick Fullerton
Signature
Company Fullerton Architects, PC Date
Address P.O. Box 2770 License #
City/State/Zip Bigfork, MO 59911-2770 Phone (406) 837-1550
Principal Mechanical Designer
Name Tim Scott
_
Signature
Company Scott Design and Title 24, Inc. Date 2/17/14
Address 77085 Michigan Drive License #
City/State/Zip Palm Desert, CA 92211 Phone (760) 200-4780
Principal Lighting Designer
Name Nick Fullerton
Signature
Company Fullerton Architects, PC Date
Address P.O. Box 2770 License #
City/State/Zip Bigfork, MO 59911-2770 Phone (406) 837-1550
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
m ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans.
m LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
0 LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 /D: Page 3 of 37
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 C
Project NameDate
Tower Market -72/17/2014
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard Proposed Compliance
Energy Component Design Design Mar in
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
0.79
0.24
0.55
256.13
253.60
2.53
45.56
64.64
-19.08
0.00
0.00
0.00
0.00
0.00
0.00
70.18
71.13
-0.95
184.10
106.78
77.32
91.38
91.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
648.14
587.77
60.37
Heating
Cooling
Fans '
Heat Rej
Pumps
DHW-�
Lighting -
Receptacle '
Process
Process Ltg
Percent better than Standard 9.3% 9.3 % excluding process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation (S) 180 deg Conditioned Floor Area 3,686 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 4 Conditioned Footprint Area 3,686 sqft.
Number of Zones 1 Natural Gas Available On Site Yes
Orientation Gross Area Glazino Area Glazino Ratio
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
(S)
928
(w)
1,008
(N)
928
(E)
1,008
3,872
3,686
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
0
19
46
278
343
0
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
0.0%
1.9
4.9
27.6
8.9
0.0
Standard Proposed Prescriptive Values for
Prescriptive Lighting Power Density 1.60o W/sgft. 0.928 W/sqft. Comparison only. See
Prescriptive Envelope TDV Energy 112,625 119,373 LTG -1 C for allowed LPD.
Remarks:
EnemyPro 5.1 by EneMySoft User Number: 6712 Run Code: 2014-02-17T16:56:06 /D: Pa e 4 of 37
4
4
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C
Project Name
Tower Market
Date
2/17/2014
ZONE INFORMATION
Floor Inst.
Area LPD
System Name Zone Name Occu anc T e s ft. W/sf'
Ctrl. Allowed LPD Proc.
Credits Area Tailored Loads
W/sf 2 W/sf 3 W/sf ° W/sf
HVAC Tower Market Retail Sales, Wholesale 3,686 0.997
0.069
Notes: t. See LTG-lC 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C
items marked with asterisk see LTG- 1-C by others) (by others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 5 of 37
W
•
•
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Tower Market
Date
2/17/2014
Project AddressClimate
77-985 Avenida Montezuma La Quinta
Zone
15
Total Cond. Floor Area
3,686
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces 13Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: m New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
1180 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID
AssemblyType
Q
° 3
C N
W
Oz
o
V
M
d
r
U M
¢
'� y
K
LU >'o
tm
� C
w 7
of
g y
>
O C
< <i
K
G
a
o
O 6
U N
y
aL
LL
1
Roof
3,686
(N)
0.023
R-381
7.0
None
4.2.2-A 19
New
❑
❑
2
Wall
882
(N)
0.069
R-21
4.3.1-A6
New
❑
❑
3
Wall
730
(E)
0.069
R-21
4.3.1-A6
New
❑
❑
4
Wall
928
(S)
0.069
R-21
4.3.1-A6
New
❑
❑
5
Wall
989
(W)
0.069
R-21
4.3.1-A6
New
❑
❑
6
Slab
3,686
(N)
0.730
None
4.4.7-A1
New
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
a
c3
O Z
V
ALL
2>
y
V `.+
4 'o
> N
U
C7
�-
m
= o'
U)u>
rn
c=o
>
O
c
N
o
Urn
a
a
1
Window
46
(N)
0.510
NFRC
0.280
NFRC
❑
New
❑
❑
2
Window
138
(E)
0.510
NFRC
0.280
NFRC
®
New
❑
❑
3
Window
140
(E)
0.510
NFRC
0.280
NFRC
❑
New
❑
❑
4
Window
19
(WM
0.510
NFRC
0.280
NFRC
❑
New
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 6 of 37
C
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV -1 C
Project Name
Tower Market
Date
2/17/2014
ROOFING PRODUCT COOL ROOFS
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C.
13
13
13SRI
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C.
❑
❑
❑
❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/
❑
❑
❑
❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from
Cool Roof criteria below.
13
13
13the
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
ted from the low -sloped roofingcriteria.
13
13
13exem
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
s 2:12 > 2:12
Product Weight
< 51b/ft' a 51b/ft'
Product
Type 2
Aged Solar
Reflectance
Thermal
Emmitance
SRI'
Pass
Fail6
❑ ❑
❑ ❑
❑4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
1313❑
4
13
13
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.org/r)roducts/search.r)hr)
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(p;,,;,;a, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at htta://www.enerov.ca.aov/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessarv.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
EnemvPro 5.1 by Enem YSoft User Number: 6712 RunCode: 20 14 02-1 7 71 6:56:06 /D:
Page 7 of 37
W
•
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Tower Market
Date
2/17/2014
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description ENV -2A Test Performed By:
Fenestration Products Name or ID Area of like Building Envelope
Requiring Testing or Verification Products Acceptance Test
Laminated Metal Tinted 343
a
a
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 2014 02-1 7 71 6:56:06 /D: Page 8 of 37
-4
4
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C
Project Name
Tower Market
Date
2/17/2014
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate LTG -1- INST Retain a copy and verify form is completed and signed.)
Field Inspector ❑
Certificate of Acceptance, LTG -2A and LTG -3A Retain a copy and verify form is completed and signed.)
Field Inspector ❑
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for:
0 CONDITIONED SPACE ❑ UNCONDITIONED SPACE
0 The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with §146(a).
Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
0 calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
0.2 watts per square foot is totaled below.
Luminaire (Type, Lamps, Ballasts
Installed Watts
A
B
C
D
E
F
G
H
None
or
Item
Ta
Complete Luminaire Description'
(i.e, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballasts
act
A=
J
How wattage
Was determined
° d
Z5 '(0
> j
Z J
LL
X
p
Q)
c m
3:
Field
Ins ectorz
m
O
c o
CEC %5
Default 6 w,
From Q o
NA8 Q ~
M
d U-
L -1/L-2
L -11L-2
(2) 4 It Fluorescent T8
59.0
0 ❑
151
885
❑ ❑
L -3/L-4
(2) 4 It Fluorescent T8
59.0
® ❑
5
295
❑ ❑
L-5
(2) 4 ft Fluorescent T8
59.0
® ❑
4
236
❑ ❑
L-6
LED Rope Light
1.0
® ❑
80
80
❑ ❑
L-7
1OW LED
12.0
❑ 0
13
156
❑ ❑
L-8
1OW LED
12.0
❑ 0
22
264
❑ ❑
L-9
15w per It Track Light (with Current Limiter)
80.0
0 ❑
16
1,280
❑ ❑
L-9
27W LED
30.0
❑ ®
16
480
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
Installed Watts Page Total:
3,676
Building total number of pages:
Installed Watts Building Total
Sum of all a es
3,676
Enter into LTG -1 C Page 4 of 4
1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2014-02-17T16:56:06 /D: Page 9 of 37
E.
•
CERTIFICATE OF COMPLIANCE Part 2 of 3
LTG -1 C
Project Name
Tower Market
Date
2/17/2014
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2,
automatic daylighting controls for daylit areas > 2,500 n2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls —
general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic
controls for retail stores > 50,000 ft2, in accordance with Section 131.
MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST
Field
Inspector
Number Special
Type/ Description of Units Location in Building Features
Pass
Fail
7 DAY TIMF ('.I OCK SYSTEM ONE UTILITY AREA ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification,
and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
Field Inspector's Notes or Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 /D:
Pae 10 of 37
•
•
CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1C
Project Name
Date
Tower Market
2/17/2014
CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST
NOT BE COMBINED FOR COMPLIANCE
Indoor Lighting Power for Conditioned S aces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting
3676
Installed Lighting
from Conditioned LTG -1C, Page 2
,
from Unconditioned LTG -1C, Page 2
0
Lighting Control Credit
255
Lighting Control Credit
Conditioned Spaces from LTG -2C
Unconditioned Spaces from LTG -2C
o
Adjusted Installed
3 421
Adjusted Installed
0
Lighting Power
Lighting Power
Complies if Installed 5 Allowed
Complies if Installed 5 Allowed
Allowed Lighting Power
Allowed Lighting Power
Conditioned Spaces from LTG -3C or PERF -1
3,421
Unconditioned Spaces from LTG -3C
0
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space
shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type
requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential
Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the
responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless
the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement
agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements
of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can
receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the
owner of the building for their records.
Luminaires Controlled
LTG -2A and
LTG-3A
Controls and
Sensors and
Number of
Automatic
Luminaires
Daylighting Controls
Equipment Re uirin Testing
Description
controlled
Location
Acceptance
Occ Sensor - Multi -Level
(2) 4 R Fluorescent T8
15
Tower Market
m
Occ Sensor - Multi -Level
(2) 4 R Fluorescent T8
4
Tower Market
m
Occ Sensor - Multi -Level
10W LED
13
Tower Market
p
EnergyPro 5.1 by EnemySoh User Number: 6712 RunCode: 2014-02-17716:56:06 /D: Pae 11 of 37
W
•
r:
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Tower Market
Date
2/17/2014
Project Address
77-985 Avenida Montezuma La Quinta
Climate Zone
15
Total Cond. Floor Area
3,686
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
1 180 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
AC -1 RTU -1 HP -1
DHWHeater
13
13i.e.
Equipment T e3
Electric Res DHW Boiler
❑
❑
Number of Systems
2
❑
❑
Max Allowed Heating Capacity'
5,120 Btu/hr
❑
❑
Minimum Heating Efficiency'
0.95 EF
❑
❑
Max Allowed Cooling Capacity'
n/a
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R -Value
n/a
❑
❑
When duct testing is required, submit
& MECH-4-HERS
n/a
11
11MECH-4A
Economizer
n/a
❑
❑
Thermostat
n/a
❑
❑
Fan Control
n/a
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
HVAC
13
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
4
❑
❑
Max Allowed Heating Capacity'
69,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
3.40 COP
❑
❑
Max Allowed Cooling Capacity'
71,000 Btu/hr
❑
❑
Cooling Efficiency'
12.0 EER
❑
❑
Duct Location/ R -Value
Conditioned / 4.2
❑
❑
When duct testing is required, submit
& MECH-4-HERS
No
11
13MECH-4A
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Pae 12 of 37
0
11
w
CERTIFICATE OF COMPLIANCE and
Project Name
Tower Market
(Part 2 of 4) MECH-1 C
Date
2/17/2014
1 arturgyrru o. i ay =nervy,)orr user rvumDer. b172 Hun Code: 201402-17776:56:06 ID: Page 13 of 37 1
0
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C
Project Name
Date
Tower Market
2/17/2014
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air
Control
Supply
Valve
Water
Variable
Demand
For
Single -Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Re uirin Testing or Verification Qty.
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
Carrier 50HJQ007 4
❑
®
❑
❑
❑
❑
❑
❑
❑
m
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Cl
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnemyPro5.1 by EnergySoft User Number- 6712 Run Code: 2014-02-17716:56:06
ID: Pae 14 of 37
• • •
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4)
MECH-1C
Project Name
Tower Market
Date
1 2/17/2014
TEST DESCRIPTION
MECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Re uirin Testing
Fault
Detection &
Diagnostics
Ot . for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems Test Performed By:
Carrier50HJQ007
4 ❑
❑
❑
❑ HVAC CONTRACTOR
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft
User Number., 6712
Run Code: 2014-02-17716:56:06 ID:
Pae 15 of 37
C
1�
LIGHTING CONTROLS CREDIT WORKSHEET Part 1 of 2 LTG -2C
Project Name
Tower Market
Date
211712014
POWER ADJUSTMENT FACTORS PAF FOR NON -DAYLIGHT CONTROLS
A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this
schedule are only for:
m CONDITIONED SPACES 0 UNCONDITIONED SPACES
A B C D E F
G
Wafts of Power
Room # Zone ID Plan Room Area Control Adjustments
Areas Lighting Control Description' Reference(ft) Lighting Factor'
Control
Credit Watts
E x F
Tower Market Occ Sensor- Multi -Level L -1/L-2 3,686 885 0.20
177
Tower Market Occ Sensor- Multi -Level L-5 3,686 236 0.20
47
Tower Market Occ Sensor- Multi -Level L-7 3,686 156 0.20
31
PAGE TOTAL
255
Note:
Conditioned and
Unconditioned
Building total of non -daylight control credit watts for all pages of LTG -2C Pae 1 of 2
Enter building total of all daylight controls credit watts from LTG -2C Page 2 of 2
0
Space shall be
separately
totaled
BUILDING TOTAL OF ALL CONTROL CREDIT WATTS
(FOR BOTH NON -DAYLIGHT AND DAYLIGHT CONTROL CREDITS)
Enter in LTG -1 C; Page 4: Lighting Control Credit as appropriate for CONDITIONED
or UNCONDITIONED Spaces
255
1. Description shall be consistent with Type of Control defined in Table 146-C
2. Power Adjustment Factor taken from Table 146-C
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 /D: Pae 16 of 37
0
•
AIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2C
Project Name
Date
Tower Market
2/17/2014
Indicate
Air Systems Type Central, Single Zone, Packa e, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP -1
HVAC
Number of Systems
4
Indicate Palle Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112 a
3.40 COP
Cooling Equipment Efficiency
112 a
12.0 EER
HVAC Heat Pump Thermostat
112(b), 112(c)
Yes
Furnace Controls/Thermostat
112(c), 115(a)
n/a
Natural Ventilation
121 b
Yes
Mechanical Ventilation
121 b
1,032 cfm
VAV Minimum Position Control
121 c
No
Demand Control Ventilation
121 c
No
Time Control
122(e)
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Outdoor Damper Control
122(f)
Auto
Isolation Zones
122
n/a
Pipe Insulation
123
Duct Location/ R -value
124
Conditioned /4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
n/a
Proposed Heating Capacity
144(a & b
274,772 Btu/hr
Calculated Design Cooling Load
144(a & b
n/a
Proposed Cooling Capacity
144(a & b
166,042 Btu/hr
Fan Control
144(c)
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (bDC only)
144(c)
Yes
Simultaneous Heat/Cool
144(d)
No
Economizer
144(e)
No Economizer
Heat Air Supply Reset
144(f)
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(k)
No
1. Total installed capacity (MBtu/hr) of all electric heat
on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 6712
Run Code: 201402-17716:56:06 /D: Pae 17 of 37
•
C
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C
Project Name
Date
Tower Market
2/17/2014
WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
Item or System Tags
(i.e. AC -1, RTU -1, HP -1)'
Number of Systems
Indicate Page Reference on Plans or Specification 2
MANDATORY MEASURES T-24 Sections
Equipment Efficiency 112(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls 144(a & b
Cooling Tower Flow Controls 144(h)
Variable Flow System Design 144(h)
Chiller and Boiler Isolation 144(j)
CHW and HHW Reset Controls 144(j)
WLHP Isolation Valves 144(i)
VSD on CHW, CW & WLHP Pumps>5HP 144
DP Sensor Location 144(l)
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification
section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to
applicable section.
Service Hot Water, Pool Heating
Item or System Tags
(i.e. WH -1, WHP, DHW, etc...)' DHW Heater
Number of Systems 2
Indicate Page Reference on Plans or Schedule
MANDATORY MEASURES I T-24 Sections
SERVICE HOT WATER
Certified Water Heater 111, 113(a) AO SMITH ELJF-06'
Water Heater Efficiency 113(b) 0.95 EF
Service Water Heating Installation 113(c) Controls Req.
Pipe Insulation 123 Required
POOL AND SPA
Pool and Spa Efficiency and Control 114(a) n/a
Pool and Spa Installation 114(b) n/a
Pool Heater — No Pilot Light 115(c) n/a
Spa Heater— No Pilot Light 115(d) n/a
Pipe Insulation 123 n/a
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the
column.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17716:56:06 /D: Pae 18 of 37
n
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
Tower Market
Date
1 2/17/2014
MECHANICAL VENTILATION 121 b 2
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System
Condition
Area
(ft)
CFM
per
ft2
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
Tower Market
3,686
0.25
922
1
922
1,032
HVAC
Total
922
1,032
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section 121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K Condition area ft2 x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
Ene yPro 5.1 by EnergySoft User Number: 6712 Run Code: 2014 02-1 7 71 6:56:06 /D: Pae 19 of37
.7
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5C
Project Name
Tower Market
Date
2/17/2014
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type
Qt Eff iciency Tons
Pump
City. GPM BHP Control
DHW / BOILER SUMMARY
System Name Type
Vol.
Distribution Qt . Rated Input (Gals).
Energy Factor
or RE
Standby Loss Tank Ext.
or Pilot R -Value Status
AO SMITH ELJF-06' Small Elec.
Point of Use 2 5,120 6
0.95
n/a n/a New
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water Piping Length(ft)
Control Qty. HP
Type
In Plenum
Outside Buried Add 1/2" Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
Qty. Output Aux. kW Eff iciency
Output
Eff iciency Status
Carrier 50HJQ007 Packaged DX
4 69,000 7.5 3.40 COP 71,000
12.0 EER New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name Fan Type
Economizer Type
CFM
BHP CFM BHP
Carrier 50HJQ007 Constant Volume
No Economizer
2,400
0.50 none
EnergyPro 5.1 by EnergySoft User Number. 6712
Run Code: 201402-17716:56:06
ID:
Page 20 of 37
•
•
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Tower Market
Date
2/17/2014
DESCRIPTION
Building Envelope Measures:
§118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.z of
§116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swingingand sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
§116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
EnemvPro 5.1 by EnemySoft User Number.' 6712 RunCode: 201402-17716:56:06 /D: Page 21 of 37
•
•
•
LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM
Project Name
Date
Tower Market
2/17/2014
Indoor Lighting
Measures:
§131(d): Shut-off Controls
For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting.
1.
This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time
switch or other device capable of automatically shutting off the lighting.
2
Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible
override switch in sight of the lights. The area of override is not to exceed 5,000 square feet.
§119(h):
Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall
be certified and installed as directed by the manufacturer.
§111:
Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the
Directory. All installed fixtures shall be certified.
§131(a):
Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy
sensor device for each area with floor -to -ceiling walls.
Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts
§131(b):
per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the
room.
Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for
§131(c):
the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch;
or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on
the ad'acent lot. Diagram of shading during different times of the year is included on plans.
§131(c):
Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6.
Outdoor Lighting Measures:
§130(c)1:
Mandatory lighting power determination for medium base sockets without permanently installed ballasts
§132(a):
All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens
per Watt or are controlled by a motion sensor.
§132(b):
All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances,
canopies, and all outdoor sales areas meet the Cutoff Requirements.
§132(c)1:
All permanently installed outdoor lighting meets the control requirements listed.
§132(c):
Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements
listed.
EnergyPro 5.1 by
EnergySoft User Number: 6712 Run Code: 20 14 02-1 7 71 6:56:06 ID: Page 22 of 37
0
1�1
•
CERTIFICATE OF COMPLIANCE Part 1 of 4 OLTG-1 C
Project Name
Date
Tower Market
2/17/2014
Project Address
Total Illuminated Area
77-985 Avenida Montezuma La Quinta, CA 92253
1,086
GENERAL INFORMATION
Phase of Construction: m New Construction ❑ Addition ❑ Alteration
Documentation Author's Declaration Statement
certify that this Certificate of Compliance documentation is accurate and complete.
------ r
Signature laly
Name
Tim Scott
Company
Date
Scott Design and Title 24, Inc,
211712014
Address
CEA #
77-085 Michigan Drive
CEPE # NR 8-09-3706
City/State/Zip
Phone
Palm Desert, Ca 92211
(760) 200-4780
Principal Lighting Designer's Declaration Statement
• 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the
lighting design.
• This Certificate of Compliance identifies the lighting features and performance specifications required for
compliance with Title 24, Pages 1 and 6 of the California Code of Regulations.
• The design features represented on this Certificate of Compliance are consistent with the information provided
to document this design on the other applicable compliance forms, worksheets, calculations, plans and
specifications submitted to the enforcement agency for approval with this building permit application.
Name
Signature
Nick Fullerton
Company
Phone
Fullerton Architects, PC
(406) 837-1550
Address
License #
P.O. Box 2770
City/State/Zip
Date
Bigfork, MO 59911-2770
Principal Lighting Designer's Declaration
m 1 certify that this Certificate of Compliance documentation is accurate and complete, and accounts for all outdoor
lighting power, including building mounted, pole mounted, as well as all other lighting designed for the site, and that
Additional Lighting Power Allowances for Specific Applications or Additional Lighting Power Allowances for Ordinance
Requirements have not been counted more than one time for the same area, in accordance with Section 147 of the
Standards.
Outdoor Lighting Mandatory Measures
Indicate location on building plans of Mandatory Measures Note Block:
LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheets is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published
by the California Energy Commission.
❑ OLTG-1 C Certificate of Compliance. All 4 pages required on plans for all submittals.
❑ OLTG-2C (Pages 1 of 3) Lighting Wattage Allowances for General Hardscape, Sales Frontage, or Ornamental Lighting. Optional on
tans.
❑ OLTG-2C (Pages 2 of 3) Lighting Wattage Allowance for Per Application or Per Area. Optional on plans.
❑ OLTG-2C (Pages 3 of 3) Additional Lighting Power Allowance for Ordinance Requirements. Optional on plans.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 201402-17716:56:06 ID: Page 23 of 37
1�1
•
CERTIFICATE OF COMPLIANCE Part 2 of 4 OLTG-1 C
Project Name
Tower Market
Date
2/17/2014
COMPLIANCE FIXTURE / LIGHTING CONTROL SCHEDULE and FIELD INSPECTION CHECKLIST
INSTALLATION CERTIFICATE, OLTG-11NST (Retain a copy and verify form is completed and signed.) I Field inspection ❑
CERTIFICATE OF ACCEPTANCE OLTG-2A Retain a coy and verify form is completed and signed. ,Field Inspection ❑
Luminaire Schedule
Installed
Watts
A
B
C
D
E
F
G
H
I
Name or
Item
Ta
Luminaire Description
See footnote below
i.e.: 1 lam ole -to shoe -box 400 watt metal halide
O
m
o 2)
ami
U o
N d
o
W e
=
�
j
lL
°
a
cn
How wattage
was determined
O N
c
> j
z �
N
co
0
c� 2 X
Field
Ins ectorz
E
`O tm
5
CO D o w
a)¢ $r'o
o z Q co)_
co
�
a
U_
L10/L11
(1) 26w Compact Fluorescent
28.0
❑
0 ❑
3
84
❑
❑
L-12
(1) 26w Compact Fluorescent
28.0
❑
m j]
8
224
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
Enter total into OLTG-1 C; Page 4 of 4: Row H; Total Installed Watts:
308
1. Type of luminaire (i.e.: post top, wall pack, surface, shoe box); for non -incandescent luminaires, indicate nominal lamp wattage and lamp type (i.e.:
fluorescent, incandescent, HID); ballast type (i.e.: electronic or magnetic); number of lamps and number of ballasts per luminaire. For incandescent
luminaires, the luminaire wattage listed in column D shall be the maximum relamping rated wattage on a permanent factory -installed label on the
luminaire, NOT the wattage of the lamp (bulb) used, in accordance with Section 130(d or e).
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EXEMPT LUMINAIRES I Field inspection ❑
Name or Symbol Description of exempt luminaires in accordance with §147
MANDATORY CONTROLS Field Ins ection ❑
# Description Location
# Description Location
SPECIAL FEATURES INSPECTION CHECKLIST See Page
2 of 4 of OLTG-1C
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and
documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or
design that otherwise complies based on the adequacy of the special justification and documentation submitted.
Filed Inspector Notes or Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17T16:56:06 /D: Page 24 of 37
•
CERTIFICATE OF COMPLIANCE Part 3 of 4 OLTG-1 C
Project Name
Tower Market
Date
2/17/2014
A. OUTDOOR LIGHTING ZONE
OUTDOOR LIGHTING ZONE: ❑ OLZ 1 ❑ OLZ 2 10 OLZ 3 ❑ OLZ 4
Is the Outdoor Lighting Zone: m Default in accordance with §10-114, or ❑ Amended by JHA
Complete the information below if the default Outdoor Lighting Zone has been amended by the local jurisdiction having authority
(JHA):
❑ The site is a government designated park, recreational area, wildlife preserve, or portion thereof, and has been designated as
LZ2 or LZ3, in accordance with Table 10-114-A, because the site is contained within such a zone.
❑ The local jurisdiction having authority has officially adopted a change to the State Default Lighting Zone and has notified the
Energy Commission by providing the materials required in §10-114(d) to the Executive Director.
❑ The adopted change is posted on the Energy Commission website.
B. ADDITIONAL LIGHTING POWER ALLOWANCE FOR ORDINANCE REQUIREMENTS
Are additional lighting ower allowances for ordinance in Table 147-C used? ❑ Yes m No
Complete the information below if additional lighting power allowances for ordinance requirements are used:
❑ The local jurisdiction having authority has officially adopted specific outdoor light levels, which are expressed as average or
minimum footcandle levels, by following a public process that allowed for formal public notification, review, and comment about
the proposed change.
❑ The local jurisdiction having authority which adopted specific outdoor light levels and has notified the Commission by providing
the following materials required §10-114(f) to the Executive Director.
C. ACCEPTANCE FORMS
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
OLTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be
certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires
a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference
Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The OLTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are
checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that
certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of
§10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive
final occupancy. A copy of the OLTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building
for their records.
Certificate of Acceptance
Luminaires Controlled
OLTG-2A'
Qty. of
Equipment Re uirin Testing
Description
Like
Controls
Location
Outdoor Lighting
Acceptance Tests
1. Insert: OMS for Outdoor Motion Sensor; OLSC for Outdoor Lighting Shutoff Controls; OP for Outdoor Photocontrol; ATS for
Astronomical Time Switch; and, STS for Standard non -astronomical Time Switch acceptance.
Energ Pro 5.1 by Energ Soft User Number: 6712 Run Code: 201402-17T16:56:06 /D: Page 25 of 37
s
�J
•
CERTIFICATE OF COMPLIANCE Part 4 of 4
OLTG-1 C
Project Name
Tower Market
Date
2/17/2014
ALLOWED AND INSTALLED OUTDOOR LIGHTING POWER
Lighting Wattage
Power Allowance
A
Lighting power allowance for general hardscape
(from OLTG-2C Page 1 of 3)
848
B
Specific application lighting wattage allowance per unit length
(from OLTG-2C Page 1 of 3)
0
C
Specific application lighting wattage allowance for ornamental lighting
(from OLTG-2C Page 1 of 3)
0
D
Specific application lighting wattage allowance per application
(from OLTG-2C Page 2 of 3)
28
E
Specific application lighting wattage allowance per area
(from OLTG-2C Page 2 of 3)
196
F
Specific application lighting wattage allowance for ordinance requirements
(from OLTG-2C Page 3 of 3)
0
G
Total Allowed Wattage = Sum of rows A through F:
1,072
H
Total installed watts (from Compliance Fixture Schedule,
(from OLTG-2C Page 1 of 3)
308
Complies if wattage in row H is less than or equal to the wattages in row G
m Yes
❑ No
EnemyPro 5.1 by EnemySoft
User Number: 6712 Run Code: 201402-17716:56:06 /D:
Page 26 of 37
•
OUTDOOR LIGHTING WORKSHEET Part 1 of 3 OLTG-2C
Project Name
Tower Market
Date
1 2/17/2014
A. LIGHTING POWER ALLOWANCE FOR GENERAL HARDSCAPE
AREA WATTAGE ALLOWANCE AWA
LINEAR WATTAGE ALLOWANCE LWA
INITIAL
WATTAGE
ALLOWANCE
TOTAL GENERAL
HARDSCAPE LIGHTING
ALLOWANCE
A
B
C
D
E
F
G
H
Illuminated
Hardscape
Area
AWA Per Square
Foot
AWA
A X B
Perimeter Length of
General
Hardscape
LWA Per
Linear Foot
LWA
D X E
IWA
Watts
C+ F+ G
195
0.092
18
65
0.920
60
770
848
Enter total into OLTG-1 C; Page 4 of 4; Row A; Lighting Power Allowance for General Hardsca a
848
m Yes AWA, LWA, and IWA from Table 147-A was used as appropriate for the Outdoor Lighting Zone
B. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER UNIT LENGTH Available only for sales fronts e
DETERMINE WATTAGE ALLOWANCE
LUMINAIRE TYPE
DESIGN WATTS
A
B
C
D
E
F
G
H
I
J
Specific Lighting
Application
Linear
Foot of
Frontage
Sales Frontage
Allowance for OLZ
alts per LF
Wattage
Allowance
B X C
Name or
Symbol
Luminaire Type
Lumin
QTY
Watts Per
Luminaire
Design Watts
G X H
Allowed Watts
Minimum of D or I
Enter total into OLTG-1 C; Page 4 of 4; Row B; Specific Application Lighting Wattage Allowance Per Unit Length
0
C. SPECIFIC APPLICATION WATTAGE ALLOWANCE FOR ORNAMENTAL LIGHTING
DETERMINE WATTAGE ALLOWANCE
LUMINAIRE TYPE
DESIGN WATTS
A
B
C
D
E
F
G
H
I
J
Specific Lighting
Application
Square
feet of
Harsca a
Ornamental Lighting
Allowance for OLZ
Watts per ftZ
Wattage
Allowance
B X C
Name or
Symbol
Luminaire Type
Lumin
QTY
Watts Per
Luminaire
Design Watts
G X H
Allowed Watts
Minimum of D or I
Enter total into OLTG-1 C; Page 4 of 4; Row C; Specific Application Wattage for Ornamental Lighting
0
EnergyPro, 5.1 by EnergySoft User Number. 6712 RunCode: 201402-17T16:56:06 ID: Page 27 of 37
;7
OUTDOOR LIGHTING WORKSHEET Part 2 of 3 OLTG-2C
Project Name
Tower Market
Date
1 2/17/2014
D. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE
PER APPLICATION
DETERMINE WATTAGE ALLOWANCE
DESIGN WATTS
ALLOWANCE
A
B
C
D
E
F
G
H
I
J
Specific Lighting
Application
Number of
Applications
Specific
Application
Allowance
watts
Wattage
Allowance
B X C
Luminaire
Symbol
Luminaire Type
Lumin
QTY
Watts Per
Luminaire
Design
Watts
G X H
Allowed Watts
Minimum of D or I
Entry
1
100
100
L-12
(1) 26w Compact Fluorescent
1
28.0
28
28
Enter total into OLTG-1 C; Page 4 of 4; Row D; Specific Application Wattage Allowance Per Application
28
E. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE
PER AREA
DETERMINE WATTAGE ALLOWANCE
LUMINAIRE TYPE
DESIGN WATTS
A
B
C
D
E
F
G
H
I
J
Specific Lighting Application
Illuminated
Area of
Application
Specific
Application
Allowance
watts per ftZ
Wattage
Allowance
B X C
Code for
Luminaire
Type
Luminaire Type
Lumin
QTY
Watts Per
Luminaire
Design
Watts
G X H
Allowed Watts
Minimum of D or I
Building Fasade
325
0.350
114
L-12
(1) 26w Compact Fluorescent
2
28.0
56
56
Building Fasade
566
0.350
198
L-12
(1) 26w Compact Fluorescent
5
28.0
140
140
Enter total into OLTG-1 C; Page 4 of 4; Row E; Specific Application Lighting Wattage Allowance Per Area
196
EnergyPro 5.1 by EnergySoft User Number.' 6712 RunCode: 201402-17716:56:06 /D: Page 28 of 37
•
•
•
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
Tower Market
2/17/2014
Equipment and System Efficiencies
§111:
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
§123:
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124:
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time settinq for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1 C.
A 4 -hour timer that can be manually operated to control the operating period of the system.
2
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(8):
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c):
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b):
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e):
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f):
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5.1 by
EnergySoft User Number: 6712 RunCode: 201402-17T16:56:06 ID: Page 29 of 37
4
4
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Tower Market
System Name
HVAC
Date
2/17/2014
Floor Area
3,686
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
4
COIL
CFM
Total Room Loads 8,712
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation F 1,032
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output perSystem 69,000
103,883
44,232 1,284
29,915
Total Output Btuh 276,000
0
Output Btuh/s ft 74.9
5,194
1,496
Cooling System
01
0
Output DerSystem 71,000
41,179
2,118 1,032
48,167
Total Output Btuh 284,000
0
5,194
1 155,451
46,350
0
Total Output ons 23.7
1,496
Total Output Btuh/s ft 77.0
Total Output s ft/Ton 155.7
1 81,073
Air System
CFM perSystem
2,400
HVAC EQUIPMENT SELECTION
Airflow cfm
9,600
Carrier 50HJQ007 166,042
100,202
172,382
Airflow cfm/s ft
2.60
7.5 kW Supplemental Electric
102,390
Airflow cfm/Ton
405.6
Outside Air %
10.8 %
Total Adjusted System Output 166,042
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
100,202
Jul 3 PM
274,772
I Jan 1 AM
Outside Air cfm/s ft 0.28
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF 65 OF
Q
Outside Air
1,032 cfm Supply Fan
9,600 cfm
70 OF
65 OF 82 OF 92 OF
Heating Coil Aux. Heat Coil
92 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
112/78°F 79/68°F 79/68°F 62/61 OF
Outside Air c
1,032 cfm Supply Fan Cooling Coil 63 / 62 OF
9,600 cfm
69.0% ( ROOM
75/67°F 74/67°F
EnergyPro 5.1 by EnergySofi User Number: 6712 RunCode: 2014-02-17716:56:06 /D:
Page 30 of 37
• 0
•
ZONE LOAD SUMMARY
Project Name
Tower Market
Date
2/17/2014
System Name
HVAC
Floor Area
3,686
ZONE LOAD SUMMARY
ZONAL SYSTEM
COOLING PEAK
HEATING PEAK
ZONE NAME SYSTEM NAME
Mult. CFM Sensible Latent Heating OA CFM
Peak Hr CFM Sensible
Latent CFM Sensible
Tower Market
1.0 1, 032
Jul 3 PM 8,712 145,621
63,613 1,284 78,243
TOTALS 01 0 0 1,032
Ju13PM 145,621
63,613 78,243
BLOCK LOAD
EnergyPro 5.1 by EnergySoft User Number: 6712
RunCode: 2014-02-17716:56:06
/D:
Page 31 of 37
•
•
ROOM LOAD SUMMARY
Project Name Date
Tower Market 2/17/2014
System Name Floor Area
HVAC 3,686
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name Mult. CFM Sensible I Latent CFM I Sensible I Latent CFM I Sensible
Tower Market Tower Market 1 1 8,7121 103,8831 44,232 8,7121 103,8831 44,232 1,2841 29,915
Total includes ventilation
EnerqvPro 5.1 by Ene
PAGE TOTAL
TOTAL•
8,7121
103, 883
44, 232
1,2841
29, 915
8, 712
103, 883
44, 232
1, 284
29, 915
•
•
•
ROOM HEATING PEAK LOADS
Project Name
Tower Market
Date
2/17/2014
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tower Market
Floor Area 3,686.0 ft2
Indoor Dry Bulb Temperature 70 OF
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U -Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT *F
=
=
=
=
44
Btu/hr
R-38 Roof(R.38.2x14.16) rafter
3,686.0
0.0234
44
3,797
R-21 Wall (W 21.2x6.16)
3,529.1
0.0690
44
10,714
Laminated Metal Tinted
342.9
0.5100
44
7,695
Slab -On -Grade
perim = 240.0
0.7300
44
7,709
Items shown with an asterisk (') denote conduction
Infiltration:[ 1.00 X 1.064
Schedule Air Sensible
Fraction
through an interior surface
X 3,686 X
Area
another room
16.00 X 0.000
Height ACH
Page Total
/60] X
AT
29,915
= 0
TOTAL HOURLY HEAT LOSS FOR ROOM 29,915
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 33 of 37
•
•
•
ROOM COOLING PEAK LOADS
Project Name7211712014
Tower Market
ate
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tower Market
Floor Area 3,686. 0 ft'
Indoor Dry Bulb Temperature 74 OF
Time of Peak Jul 3 PM
Outdoor Dry Bulb Temperature 112 OF
Outdoor Wet Bulb Temperature 78 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
U -Value
X
X
X
X
X
X
X
X
X
DETD'
=
=
=
=
=
=
=
=
=
Btu/hr
R-38 Roof(R.38.2x14.16) rafter
3,686.0
0.0234
70.7
6,098
R-21 Wall (W.21.2x6.16)
882.4
0.0690
37.1
2,259
Laminated Metal Tinted
324.0
0.5100
28.0
4,631
R-21 Wall (W.21.2x6.16)
729.6
0.0690
39.3
1,981
R-21 Wall (W.21.2x6.16)
928.0
0.0690
40.2
2,575
R-21 Wall (W..21.2x6.16)
989.1
0.0690
56.7
3,873
Laminated Metal Tinted
18.9
0.5100
28.0
270
41
X
0.312
X
1.879 =
22.8
X
41
X
0.312
Page Total
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Snlar Gain
Window
Window
Window
Window
Window
Window
Window
Window
Window
Orientatinn
(N)
(N)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
Page Total
6881
Btu/hr
246
246
335
1,525
251
580
551
551
551
4,835
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor Btu/hr
Lights 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 BtufWatt X 0.999 = 12,534
Occupants 1.00 X 3,686 X 300 Btu/OCC. / 25 Sgft/OCc. X 1.000 = 44,232
Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0
Process Lighting 1.00 X 1 3,686 X 1 0.000 Watts/Sgft X 3.413 Btu[Watt X 0.000 = 0
Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 60 ] X 38 = 0
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sgft/OCC. = 44,232
Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232
EnergyPry 5.1 by EnemySoft User Number: 6712 Run Code: 2014-02-17716:56:06 ID: Page 34 of 37
Weighting
Area
SGF
SC
Factor
22.81
X
41
X
0.312
X
0.838 =
22.8
X
41
X
0.312
X
0.838 =
24.0
X
41
X
0.312
X
1.084 =
96.0
X
41
X
0.312
X
1.236 =
18.0
X
41
X
0.312
X
1.084 =
24.01
X
41
X
0.312
X
1.879 =
22.8
X
41
X
0.312
X
1.879 =
22.8
X
41
X
0.312
X
1.879 =
22.8
X
41
X
0.312
X
1.879 =
Page Total
6881
Btu/hr
246
246
335
1,525
251
580
551
551
551
4,835
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor Btu/hr
Lights 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 BtufWatt X 0.999 = 12,534
Occupants 1.00 X 3,686 X 300 Btu/OCC. / 25 Sgft/OCc. X 1.000 = 44,232
Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0
Process Lighting 1.00 X 1 3,686 X 1 0.000 Watts/Sgft X 3.413 Btu[Watt X 0.000 = 0
Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 60 ] X 38 = 0
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sgft/OCC. = 44,232
Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232
EnergyPry 5.1 by EnemySoft User Number: 6712 Run Code: 2014-02-17716:56:06 ID: Page 34 of 37
•
•
ROOM COOLING PEAK LOADS
Project NameDate
Tower Market
2/17/2014
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tower Market
Time of Peak
Jul 3 PM
Floor Area 3,686. 0 ft'
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature 74 IF
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U -Value DETD'
Btu/hr
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
Page
Total 1
0
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
Window (E) 24.01 X 41 X 0.312 X
1.879 =
580
Window (E) 24.0 X 41 X 0.312 X
1.879 =
580
Window 6.3 X 244 X 0.312 X
0.392 =
188
Window (lM 6.3 X 244 X 0.312 X
0.392 =
188
Window (WAS 6.3 X 244 X 0.312 X
0.392 =
188
X X X
=
X X X
=
X X X
=
X X X
=
Page Total
1,724
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Li hts 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 Btu/Watt
X 0.999
= 12,534
Occupants 1.00 X 3,686 X 300 Btu/occ. / 25 Sgft/occ.
X 1.000
= 44,232
Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 18,870
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 0
Process Lighting 1.00 X 3,686 X 0.0001 Watts/Sgft X 3.413 Btu/Watt
X 0.000
= 0
Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 60 �
X 38
= 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
103,883
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25
Sgft/occ.
= 44,232
Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.00 X .4,771 X 3,686 X 16.00 X 0.00 /60]
X 0.00000
= 0
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
44,232
EnergyPro 5.1 by EnergySoft User Number., 6712 RunCode: 2014-02-17716:56:06 ID:
Page 35 of 37
•
•
ROOM COOLING COIL LOADS
Project NameDate
Tower Market
2/17/2014
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tower Market
Floor Area 3,686. 0 ft'
Indoor Dry Bulb Temperature 74 OF
Time of Peak Jul 3 PM
Outdoor Dry Bulb Temperature 112 OF
Outdoor Wet Bulb Temperature 78 OF
Conduction
41
Area
X
X
X
X
X
X
X
X
X
U -Value
X
X
X
X
X
X
X
X
X
DETD'
Btu/hr
R-38 Roof(R.38.2x14.16) rafter
3,686.0
0.0234
70.7
=
6,098
R-21 Wall (W.21.2x6.16)
882.4
0.0690
37.1
=
2,259
Laminated Metal Tinted
324.0
0.5100
28.0
=
4,631
R-21 Wall (W.21.2x6.16)
729.6
0.0690
39.3
=
1,981
R-21 Wall (W.21.2x6.16)
928.0
0.0690
40.2
=
2,575
R-21 Wall (W.21.2x6.16)
989.1
0.0690
56.7
=
3,873
Laminated Metal Tinted
18.9
0.5100
28.0
=
270
=
=
Page Total
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Solar Gain
Window
Window
Window
Window
Window
Window
Window
Window
Window
Orientation
(N)
(N)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
Area
X
X
X
X
X
X
X
X
X
SGF
X
X
X
X
X
X
X
X
X
SC
0.312 X
0.312 X
0.312 X
0.312 X
0.312 X
0.312 X
0.312 X
0.312 X
0.3121 X
Weighting
Factor
=
=
=
=
=
=
=
=
=
22.81
41
0.838
22.8
41
0.838
24.0
41
1.084
96.0
41
1.236
18.0
41
1.084
24.01
41
1.879
22.8
41
1.879
22.8
41
1.879
22.8
41
1.879
Page Total
21
Btu/hr
246
246
335
1,525
251
580
551
551
551
4, 835
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor Btu/hr
Lights 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 12,534
Occupants 1.00 X 3,686 X 300 Btu/OCC. / 25 Sqf /occ. X 1.000 = 44,232
Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 18,870
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0
Process Lighting 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0
Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 0.00 / 60 ] X 38 = 0
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 103,883
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 3,686 X 300 Btuh/occ. / 25 Sqf /occ. = 44,232
Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60] X 0.00000 = 0
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 44,232
EnergyPro 5.1 by EnemySoft User Number: 6712 Run Code: 201402-17716:56:06 /D: Page 36 of 37
•
C,
•
ROOM COOLING COIL LOADS
Project Name
Date
Tower Market
2/17/2014
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tower Market
Time of Peak
Jul 3 PM
Floor Area 3,686. 0 ft'
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature 74 IF
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U -Value DETD'
Btu/hr
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
Page Total
o
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
Window (E) 24.01 X 41 X 0.312 X
1.879 =
580
Window (E) 24.0 X 41 X 0.312 X
1.879 =
580
Window (M 6.3 X 244 X 0.312 X
0.392 =
188
Window (W) 6.3 X 244 X 0.312 X
0.392 =
188
Window (W) 6.3 X 244 X 0.312 X
0.392 =
188
X X X
=
X X X
=
X X X
=
X J X X
=
Page Total
1,724
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Li hts 1.00 X 3,686 X 0.997 Watts/Sgft X 3.413 Btu/Watt
X 0.999
= 12,534
Occupants 1.00 X 3,686 X 300 Btu/occ. / 25 Sqft/occ.
X 1.000
= 44,232
Receptacle 1.00 X 3,686 X 1.500 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 18,870
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 0
Process Lighting 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0. 000J
= 0
Infiltration:[ 1.00 X 1.064 X 3,686 X 16.00 X 0.00 / 60
X 38
= 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
103,883
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 3,686 X 300 Btuh/OCC. / 25
SgfUOCc.
= 44,232
Receptacle 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 3,686 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.00 X 4,771 X 3,686 X 16.00 X 0.00 /60]
X 0.00000
= 0
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
44,232
EnergyPro 5.1 by EnergySoft User Number: 6712 Run Code: 2014-02-17716:56:06 /D:
Pa a 37 of 37