Loading...
09-1122 (SOTB)P.O. BOX 1504, 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253. Application Number: '0'9==0:0,..0_0,11.2,2__r Property Address: 54005-MADISON ST APN: 775-100-004- - - Application description: STRUCTURES OTHER THAN BUILDINGS Property Zoning: MAJOR :COMMUNITY FACILITY Application valuation: 31450 Applicant: Architect or Engirt er: BUILDING & SAFETY DEPARTMENT BUILDING PERMIT Owner: CITY OF LA QUINTA P 0 BOX 1504 LA QUINTA, CA 92253 ___--Contractor: Contractor: WESTERN TEL-COM DEVELOI 41715 CHERRY STREET MURRIETA, CA 92562 (951)304-1002 Lic. No.: 515503 VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 7/08/10 .._....;.U.�._ . ; t CITY r;r• ;_Ae,`jlsNWTA LICENSED CONTRACTOR'S DECLARATION WORKER'S COMPENSATION DECLARATION hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with I hereby affirm under penalty of perjury one of the following declarations: Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full .force and effect. _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided License Class: B C7 C10 License No.: 515503- for by Section 3700 of the Labor Code, for the performance of. the work for which this permit is issued. '- yfe i.. '� wzs . � Tel o w, Date• r Contractor: I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation• OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also.requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State - License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (•_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the • improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not.build or improve for the purpose of sale.). 1 ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractorls) licensed pursuant to the Contractors' State License Law.). 1 _ 1 I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY , I hereby affirm under penalty of perjury that there, is a construction lending agency for the performance of the _ work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: - - - Lender's Address: insurance carrier and policy number are: Carrier CA CONTR NETWRK Policy Number 4503-024 I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject the workers' compensation provisions of Section r , &700 of the Labor Cod I shall orthwit ly. with those provisions. '' `Date;-? -Applicant:- WARNING: FAILURE TO SECUR WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the. conditions and restrictions'set forth on this application. 1 .. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is parectI agree to comply with all city and county ordinances and state laws relating to building construction, ere uthorize representatives of•this^�cfo pity to enter upon the above -mentioned property for i pec ' osos - Date:" ` o /0- • Signature (Applicant -or Agent): LQPERMIT Application Number . . . . 09-00001122 Permit . . . BUILDING PERMIT' Additional desc . Permit .Fee 297.50 Plan Check Fee .. 193.38 Issue Date- Valuation . . . . 31450 Expiration Date 1/04/11 Qty Unit Charge Per Extension BASE FEE 252.00 - 7.00 6.5000 THOU BLDG 25,001-50,000 45.50 . Permit ELEC-MISCELLANEOUS -- -- ----- -- Addit'ionaa1 desc - ----_ -- - - _.__...._.__.._ ...... ..........:.. __..._..�_.. Permit Fee 35.75 Plan Check Fee 8.94 Issue Date . . . . Valuation 0 ;- Expiration Date 1/04/11 - - Qty Unit Charge Per Extension BASE FEE 15.00 In 3.00 .7500.PER ELEC DEVICE/FIXTURE 1ST 20 2.25 =n ;:1 . 00 18 .5000 ' EA . ELEC SVC <=600V/<=200A 18.50 ------------------------------------------------------ Special Notes and Comments - VERIZON WIRELESS 60 FT HGT. WIRELESS COMMUNICATION MONOPALM, 77 LIN FT 7FT HGT BLOCK ENCLOSURE FOR "STATE APPROVED," EQUIPMENT COACH (11.5x16FT).2007 CODES. 7 ------------------------------------------------------------------- Other Fees . . . . . BLDG STDS ADMIN (SB1473) 2.00 ENERGY REVIEW FEE 19.34 STRONG MOTION (SMI) - COM 6.60 Fee summary Charged_. Paid Credited Due -- - -- - - - -- -- -- - - - - ------ - - - - -- -- Permit Fee Total 333.25 .00 .00 333.25 Plan Check Total 202.32 .00 .00 202.32 - Other Fee Total 27.94 .00 .00 27.94 Grand Total 563.51 .00 .00 563.51 LQPERMIT R # , City of La Quinta Building 8r Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit # I�1 j 0 Pro,jec Owner's Name: G atA w)+A P. Number: 7 _ 0® _�y Address: «e C IC D 6()7 •5 City, ST, Zip: c A Qui�4 A, CA 9 22� � Contractor: i N�a Telephone: -7 (Od - O 3 S Address: Project Description: 1 r3f,jNA- A --1 i W City, ST, Zip: fL t J �1 �lzl ZpIJ' . W i rzeCiE55 CeAl Telephone: <:, : <v:>i7%z:`'• `:.}:: W l S fife ?1i l 5%� State Lie. # : City Lie. #: M:uI PW E70U CpAC ¢/ Awn-) N E7u% . FKAN K Arch., Engr., Designer: 'DePia �eS!!eN 6eNr.Ates f��Np-p�Ll�/! . Address: u, CgNU No Ize tq 2I City., ST, Zip: -T0S4jt,3 C,, t=Ay t Telephone _IIy �30-0(00l0 •�������: ,. {, ?' "::`.. �•::..��. ..:•::�.� `:: '•<''� � �rf ; .: p :.; ,�.:.: •:: Construction T o YPe' Occupancy. State Lic. #: - Q( (0 34 Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person: >3ft'L ape/ NS Sq. Ft.: — # Stories: # Uni Telephone # of Contact Person:.) (t-() -73 0 - o Estimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req'd Rec'd TRACKING PERMIT FEES Plan Sets 3 Plan Check submitted qtem Amount Structural Cates. a Reviewed, ready for corrections Plan Check Deposit Truss Cates. Called Contact Person // Plan Check Balance Title 24 Calcs. Plans picked up - i Y • - j Z Construction Flood plain plan Plans resubmitted Mechanical Grading plan ' d 2°" Review, ready for orrections ue Electrical \ Subcontactor List Called Contact Person le 1 Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- ''" Review, ready for correctio issue 1 Developer Impact Fee Planning Approval Called Contact Person I' A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees 4 , i f' Io1,30 . �C ,�o .tam John R. Hawkins Fire Chief Proudly serving the unincorporated areas of Riverside County and the Cities of: Banning Beaumont 4. Calimesa Canyon Lake Coachella Desert Hot Springs Indian Wells ❖ Indio 4- Lake Elsinore 4. La Quinta 4. Moreno Valley Palm Desert 4. Perris e• Rancho Mirage Rubidoux CSD 4. San Jacinto 4. . Temecula Board of Supervisors Bob Buster, District 1 John Tavaglione, District 2 Jeff Stone, District 3 Roy Wilson, District 4 Marion Ashley,. District 5 RIVERSIDE COUNTY FIR.EDEPARTMENT In cooperation with the California Department -of Forestry and Fire Protection 210 West San Jacinto Avenue Perris, California 92570 (951) 940-6900 • Fax (961) 940-6910 May 14, 2009 RE: Building PLAN CHECK LAQ-09-BP-040 Verizon Wireless 54001 Madison St. La Quinta, CA Fire Department personnel have reviewed and approved the plans you submitted for the above referenced project. Please be advised the following conditions apply as a part of the conditions for the issuance of a building permit. THIS IS NOT AN OCCUPANCY PERMIT. It is prohibited to use/process or store any materials in this occupancy that would classify it as an "H" occupancy per 2007 UBC. THE FOLLOWING CONDITIONS MUST BE MET PRIOR TO INSPECTION: A minimum 2AI08C Fire Extinguisher, (State Fire Marshal Approved) must be mounted in a visible location within 75' walking distance from any point in your building or suite. Fire extinguishers can be installed by a licensed extinguisher. company with a State Fire Marshal service tag attached to the extinguisher, or purchased from a retail store with a sales receipt attached. A licensed fire extinguisher company must service extinguisher, yearly. Install Knox Key Lock box, mounted per recommended standard of the Knox Company. Special forms are available from this office for the ordering of the Key Switch. This form must be authorized and signed by this office for the correctly coded system to be purchased. Provided information indicating who to contact in the event of an emergency. Post information on the gate leading to the wireless facility. Ensure that the materials used for posting are weather proof/resistant. Applicant/installer shall be responsible. to contact the Fire Department to schedule inspections: Requests for inspections are to be made at least 72 hours in advance and may be arranged by calling (760) 863-8886. All questions regarding the meaning of these conditions should be referred to the.Fire Department Planning & Engineering Staff at (760) 863-8886. P.O. BOX 1504 BUILDING & SAFETY DEPARTMENT 78-495 CALVE TAMPICO o (760) 77,7-7012 LA QUINTA, CAL'IFORNIA 92253 FAX (760) 777-7011 To: Greg,Butler, Building & Safety Manager To CDD: From: Les Johnson, Director -Planning . Due Date: Permit #: Status: Rullding Plans Approval (This, is an approval to .issue a Building Permit) The Planning Department has reviewed the Building Plans for the following project: Description: ee ez V- Address or General Location: _ p0/ Applicant Contact: 3_4QZ 73d p6o The Planning Department finds that: ❑ ...these Building Plans do not require Planning Department approval. . ...these Building Plans are approved by the Planning Department. ❑ ...these Building . Plans require corrections. Please forward a copy of the attached corrections to the applicant. When the corrections are made please return them to the Planning Department for review. r z Les Johns , Director -Planning ate 0 � � r :SHUCRI "CHUCK", I. YAGHI Consulting Engineers. - Residential &.Commercial 1.12 E. Chapman Ave, Suite:D, Orange, CA 92866 TEL 714/997,-.9120 ,FAX 714/744=3676 LA Q Millen CITY CQ F U I NiA STRUCTURAL CALCULATfONS BUILDI;N.G_..,& SAFETY DEFT. DESIGNED BY: S APPROVED . :.. FORI CONSTRUCTION.. JOB NUMBER: �J OA TE /ze BY DATE.:, _..._ Pk OJECT: VZ,�/'i - l CLIENT:.,,�) BUILDING -CODE: INTERNATIONAL BUILDING CODE 2006.EDITION, C.B.C. 2007 EDITION & L.A.C. CODE'LATEST EDITION MATERIALS: Except as otherwise specified herein: O @ O SSIO JGRI ►, y� 4� Concrete 2,500 PS1 at.28 days. Concrete Block ��. Grade N' : Light Weight Units; ASTM,C-90 U? Brick Masonry Grade MW, 2,500 PSI Units ASTM -62 No. �.43205 �p Reinforced'Steel 20,000. PSI :(ASTM A615, Grade 40 iL+ ,.. 3/31/10 �' Structural Steel ) . 24,000 PSI ..(Compact) (ASTM A572 Grade 50) sA r. Structural Pipe 22,000 PSI (ASTM A-53) Cl (IL ��P f Plywood Sheathing D.F.P.A., Structural II, INTR., P.S.1-95 OP OAOV. '� Glu=Laminated Beams. 2,400 PS.I (D.F.- Larch Comb."A" or Comb. Lumber Grade Marked D.F:-Larch, W.C.L.B. PSL 2.0 E Soils Bearing Pressure 1500' PSF m DATE SIGNED: in, unless specified in soils report. DESIGN. REFERENCE: (Including Charts .& Tables from): Lumber &Timber Wood Structural Design Data (Volumel ) D a National Lumber Manufacturers Association OCT 2 3 2009 Steel Manual.of Steel Construction, AISC Concrete Reinforced Concrete Design Handbook, gy ACI: Ultimate Strength Design Handbook, ACI Concrete Block & MasonryDesign Manual, by Masonry Brick Masonry Industry rnr> Title .:New... Page: ,. Shucrn Yaghi Consultin En meerin g 9 g Job # :...New... Description.... Dsgnr: Date: NOV 25;2008 A1i2 E, Chapman Ave., Suite D . Orange CA 92866 ,(714) 997.=9120 Retain; o 2007., 24-Jul-2008, (c) 1989-2008 This WalLin'File: c:10rogram fileM'rp20071brewe.rpS www-Mtainpro.com/support for latest release `.. Cantlli'Vered..Retahr1111 R Istratlon#:.RP=1157865 ':.RF201)7-N. g WaII.Desigrl COde:IBC,20O6 Criteria - - - - - -- - - - - -- - ;- _ -- SOJI Data . - Footing Dimensions 8 Stren Retained Heighf ' = A.50 ft Wall height above soil = 6.50 ft Allow Soil Beanng - 9;995.0 psf Equivalent Fluid Pressure Method. -'-Toe Width 1 04 ft Slope Behind Wall - 0.00 : 1 Heel Active Pressure = 35 0 psf/ft Heel Width :Total Footing Width - 1.71 _ -' 2.75 Height of Soil over Toe . 6.00 in Toe Active Pressure = 35.0 psf/ft Passive Pressure - Footing Thickness ; .' - 12.00 in . Waferheight over heel 0.0 ft . 200.0 psf/ft. Soil Density Heel _ 110.00 pcf Key Width - _ 0.00 in Wind on Stem - 18.2 psf Soil be sity, Toe n 0:00 pcf • _ Footin Soif Friction' :: ' ' 9 II 0:300' Key Depth Key. Distance from -Toe _ . i 0 :00 n .. ...... ft _Vertical component of active lateral soil pressure options: Soil height to ignore for passive pressure = 0.00 in fc = 2,500 psi . . Fy. = 60;000 psi Footing Concrete Density = 150:00 pcf USED.for Soil Pressure. Min. As % _ , . 0.0018 NOT USED for Sliding Resistance. Cover @ Top = 2.00 in @ Btm:= 3.60 in USED for'Overturning Resistance. Surcharge Loads -, Surcharge. ----- --- ----- ..- :. ;Lateral Load Applied to Stem' . -- ---- -- .....� - - Adjacent Footing Load. -Over Heel - O.O psf . . Used To, Resist Sliding 8 Overturning_ Lateral Load. b o #/ft Adjacent Footing Load =. 0.0 Ibs' Surcharge Over Toe = 0.0 psf P ..."eight to.Top _ .0.00 ft Footing Width = . -. 0.00 ft Used.for Sliding8 Overturnin �. g- . `. -••Height to Bottom = 0.00 ft Eccentricity = 0.00 in �AXlal Load Applied to'Stem - -, Wallao Ftg CL Dist ` = 0.00 ft �. Axial Dead Load . . = - 0,0 Ibs Footing Type Base Above/Below Soil Line Load - Axial Live. Load = 0.0 Ibs Axial Load Eccentricity = 0.0 at Back of Wall = 0.0 ft in Poisson's Ratio" 0.300 Earth Pressure Seismic Load ; Kae for seismic earth pressure = 0.418 Design Kh = 0.200 g NNOMM Ka for static earth pressure = ' 0.277 Added seismic base force 12.4 Ibs Using Mononobe-Okabe / Seed -Whitman procedure Difference:. Kae - Ka 0.141 St@Rl Weight Seismic Load. Fp , Design Summary / Wp Weight Multiplier. = 0:200 g ---- ----- ---- ---- - Added .seism ic base force 77.5 Ibs Stem Construction :'. Top Stem 2nd Wall Stability Ratios Overturning = Design Height Above Ftc 'n = Stem OK 2.67 Stem OK - 1.62 OK Sliding . 2.62 OK . Wall Material Above "Ht" = Masonry 0.00 Masonry Thickness = 8.00 8.00 Total bearingLoad = ..:resultant ecc. 19.89 ibs Rebar Size = # 4 RebarSpacing _ 32.00 # 5 _ : 9 89 in .: Rebar Placed at Center 16.00 Center Soil Pressure @ Toe = 1,248 psf OK Design Data ---------_.-______ Soil Pressure @.Heel = 0 sf OK . P fb/FB + fa/Fa = 0.649 0.945 Allowable _ 1,995 Psf . Total Force @.Section Ibs = .126.6 197.0 :. Soil Pressure Less Than Allowable Moment .... Actual . - ft #= 274.2 714.7 ACI Factored@ Toe = 1,475 psf ACI Factored@ Heel = Moment..... Allowable ft-#= 499.7 756.1 0 psf Footing Shear @Toe = 7.6 psi OK Shear..... Actual psi 2.9 Shear.....Allowable psi = 25.8 4.7 Footing Shear @Heel = 2.5 psi OK WaII Weight psf = 78.0 25.8 78.0 Allowable = 75.0 psi Rebar Depth 'd' in = 3.75 3.75 i Sliding Calcs (Vertical. Component NOT Used) LAP SPLICE IF ABOVE in = 24.00 30.00 Lateral Sliding Force = 208:0 Ibs LAP SPLICE IF BELOW in = 24.00 less 100% Passive Force = - 225.0 Ibs less ,100% Friction HOOK EMBED INTO FTG in = 7.00 Force = - 304.8 Ibs Masonry Data Added ForceReq'd = 0.0Ibs OK •fin Psi=--1,500 1,500 -�- -- ....for 1.5 r 1 Stability = 0.0 Ibs OK Fs Psi = 20,000 Solid Grouting = 20,000 Load Factors ______.,__ ________ Yes Use Full Stresses - No Yes Building Code IBC 2006 Dead Load Modular Ratio 'n' - 21.48 No 21.48 1:200 Live Load Short Term Factor - 1.330 1.330 1.600 Earth, H Equiv. Solid Thick. in= 7.60 7.60' . 1.600 Wind, W Masonry Block Type = Medium Weight 1,600 Seismic, E Masonry Design Method = -ASD 1.000 Concrete Data. = fc psi psi - ..__.-.------- -- . Fy psi = ' Title .New... Pager ._. Shucri Yaghi Consulting Engineering Job ft New... Description::.: Dsgnr: Date: NOV 25,2008 . 112E Chapman Ave. suite Orange CA' 92866 (Z 14) 997-9120 Retain Pro 2007 24-Jul-2008, (c) 1989-2008., . This Wall in Filei c:lprogram files1rp20071breinre:rp5: . www.retalnprocom/supportforlatestelease lrantl�gVered R@t8lnln Wall �1351 n Re I§tratlon # : RP,1157865 g 9 ..:RP2007-N' . Code:.IBC -2006 F Footing Deslgn:Results. . 1 Factored ,Pressure = . 1,475 Heel 0 psf Mu`: Upward-. qq = 815 Oft# Mu'.: Downward : = 180 206 ft # ' .. Mu::` Design :' _ :635 206 ft-# Actual 1=Way Shear. '= q. . 7.58 ' . Allow.l Way Shear = 2.47 psi . 75.00 Toe Reinforcing 75.00 psi .. Other Acceptable Size Spacings = None, Spec'd Heel Reinforcin _ 9 _ None Spec'd :. Toe: ..:Not req'd,.Mu cS.-"•Fr Key Reinforcing _ '.None Speed Heel: Not �eq'd, Mu < S ' Fr Key: No key defined . .Sufiima of OVerturnin .& Resisting -Ford e*s & Moments.: ' ----- —� OVERTURNING..... Force Item : ' Distance .. ft Moment .... ..... ' .... .. Force...RESID stance .. Moment ' _— .Ibs- Heel Active Pressure 39A : — 0.5.0 ft# - — — 19.7 Soil Over'Heel '. - Ibs -- Toe Active Pressure = -39.4 Surcharge Over Toe = 0.50 . -19.7 Sloped Soil Over Heel 57.3 2.23 127.7 Adjacent Footing Load =. Surcharge Over Heel _ Added, Lateral Load - Adjacent Footing Load = Load @ Stem'Above Soil = 118A 4.75 Axial Dead Load on Stem = - 0.00 Seismic Earth Load = 12.4 0.90 561.0 Soil Over Toe 0.52 Seismic Stem Self Wt = 77.5 11.2 Surcharge Over Toe .4.50 348.9 Stem Weight(s) _ Total = 208.0 O.T.M. _ Earth @Stem Transitions -- 921.0 546:0 1.38 750.8 Resisting%Overturning Ratio = .1.62 Footing Weighl _ Key Weight 412.6 1.38 . 567.3 Vertical Loads used for Soil Pressure = 1,031.7 Ibs Vert. Component _ _-_ Vertical component of active pressure used for soil pressure �. Total1.031.7 15:8 2.75 43.6 Ibs R.M.= 1,489.5 DESIGNER NOTES: Structural Calcula' dol 60-t Palm Tree Mon CITY Ut- LA UUIN I A BUILDING & SAFETY DEPT., APPROVED FOR CONSTRUCTION S.. j DATE " P BY E , _ -- For Verizon Wireless Site ation:$OT Madison St. La.Quinta, CA Site Name: Spanish Bay: Designed According to: ANSUTIA-222-G 2005 Meets the Requirements of: 2007 California Building Code Calculations Prepared by: Aj . w �sr PxVinci Zniinae-rini, Inc. c•�., iy,< y5 •��' Job # 1508225-216 December 16, 2009 Revision # 1 . seao7 0 �xp.9-30-2011 srgr C I V 1\- ��,• F.aF kF° C Il DEC 2 2 2009 Table of Contents Cell Trees, Inc. Job# 08-175 RISA Tower Monopole Design Summary and Sketch Monopole Design Calculations Monopole Base Plate and Anchor Bolt Design Calculations Caisson Foundation Design Calculations Anchor Bolt Embedment Calculations Seismic Shear Calculations DaVinci Engineering, hic. Cell Trees, Inc. PO Box 1966 5401 S. Canada Place Santa Maria, CA 93456 Tuscon, AZ 85706 (805)922-5221 (520)663-1330 www.davinci-engineerin2.com www.ceiltreesinc.com PageE-1 Page 1-5 Page 6 Page 7 Page 8 Page 9 O O p i A O O N O N m O O Q N 0 0 of m ee m G O h m N N 9 IA N yvy �p •1p — C ,� � � E m n DESIGNED APPURTENANCE LOADING MATERIAL STRENGTH GRADE ! Fy I Fu GRADE I Fy Fu A572.65 165 ksi - 160 ksi • - TOWER DESIGN NOTES 1. Tower is located in Riverside County, California. 2. Tower designed for Exposure C to the TIA-222-G Standard. 3. Tower designed for a 90 mph basic wind in accordance with the TIA-222-G Standard. 4. Deflections are based upon a 60 mph wind. 5. TOWER RATING: 90.3% R • 1 - • , AXIAL 711916 MOMENT 494 kip-k REACTIONS -'90 mph WIND - ' n1 a .. f • •. PO Box 1966 Da Vinci Engineering, Inc.[Pa Santa Maria, CA 93456 ' Phone: (805) 922-5221 FAX: 805 880-0402 1508225-216 ect 60-ff Palm Tree Mono ole nt Verizon Wireless, Spanish Ba Drawn by: Simon Leland, P.E. ApPd e: TIA-222-G Date: 12/16/09 iscale: NTS ''M,s „ s e,a.nexel,wrs�iowe FdMCMiee 1S]WCOdt$SIIBM DNgNU E-1 RI►SATO'WeY Job Page 1508225-216 1 of 9 Da Vinci Engineering, Inc. Project Date PO Box 1966 60-ft Palm Tree Monopole 13:33:06 12/16/09 _ Santa Maria, CA 93456 Client Designed by Phone: (805) 922-5221 FAX: (805) 880-0402 Verizon Wireless, Spanish Bay Simon Leland, P.E. Tower In ,ut Data p • This tower is designed using the TIA-222-G standard The following design criteria apply: Tower is located in Riverside County, California. Basic wind speed of 90 mph. Structure Class II. Exposure Category C. Topographic Category 1. Crest Height 0.00 ft. Deflections calculated using a wind speed of 60 mph. A non -linear (P-delta) analysis was used. Pressures are calculated at each section. Stress ratio used in pole design is 1. Local bending stresses due to climbing loads, feedline supports, and appurtenance mounts are not considered. Tapered Pole.Secti.on G.eometr Y Section Elevation Section Splice Number Top Bottom Wall Bend Pole Grade Length Length of Diameter Diameter Thickness Radius ft ft t Sides in in in in LI 57.00-17.00 40.00 3.00 18 18.0000 23.9820 0.1875 0.7500 A572-65 (65 ksi) L2 17.00-1.00 I9.00 18 23.1583 26.0000 0.2188 0.8750 A572-65 -- (65 ksi) Ta: ere°d P.ole:P`ro p ernes Section Tip Dia. Area I r C I/C J 11/0 it, iv/1 in in' in' in in in, in' illy ill LI 18.2777 10.6007 424.9328 6.3234 9.1440 46.4712 850.4248 5.3013 2.8380 15.136 24.3520 14.1607 1012.9206 8.4470 12.1829 83.1431 2027.1740 7.0817 3.8908 20.751 L2 23.9712 15.9273 1058.8878 8.1436 11.7644 90.0075 2119.1690 7.9651 3.6909 16.873 26.4011 17.9002 1503.1570 9.1523 13.2080 113.8066 3008.2919 8.9518 4.1910 19.159 Feed: Line%Linear Appurfenances - Entered, As Area, Description Face Allow Component Placement Total C,A;l Weight or Shield Type Number Leg ft 1'/fr Ar 7/8" C No Inside Pole 57.00 - 2.00 12 No Ice 0.00 0.33 Tower Pressures,.- No ice G., _ i- ton Section = Kz q; AG F AH All Alps Leg C.1A.4 CIAa Elevation a % In Out c Face Face ftr s e r' 1' 12 L157.00-17.00 36.63 1.024 20 71.049 A 0.000 71.049 71.049 100.00 0.000 0.000 B 0.000 71.049 100.00 0.000 0.000 C 0.000 71.049 100.00 0.000 0.000 L217.00-1.00 8.87 0.85 17 33.582 A 0.000 33.582 33.582 100.00 0.000 0.000 B 0.000 33.582 100.00 0.000 0.000 C 1 0.000 1 33.582 1 1 100.001 0.0001 0.000 RISATo, wer Job Page 1508225-216 2 of 9 Da Vinci Engineering, Inc. Project I I Date PO Box 1966 60-ft Palm Tree Monopole 13:33:06 12/16/09 Santa Maria, CA 93456 Client Designed by Phone: (805) 922-5221 Verizon Wireless, Spanish Bay Simon Leland, P.E. FA t:• (805) 880-0402 Discrete' Tower Loads Description Face or Leg Offset Tjwe Offsets: Hor= Lateral Vert It A=inmth Adjustment o Placement ft C.,A:, Front f12 C.4A,4 Side hVeight lb Lightning Rod (optional) C None 0.0000 57.00 No Ice 0.25 0.00 75.00 (6) 52" x 13" x 7" Panel A From Face 2.50 0.0000 55.00 No Ice 6.57 3.58 50.00 0.00 0.00 (6) 52" x 13" x 7" Panel B From Face 2.50 0.0000 55.00 No Ice 6.57 3.58 50.00 0.00 0.00 (6) 52" x 13" x 7" Panel C From Face 2.50 0.0000 55.00 No Ice 6.57 3.58 50.00 0.00 0.00 Std. 10-ft T-Arm Mount C None 0.0000 55.00 No Ice 8.37 8.37 915.00 (80) Palm Tree Fronds C None 0.0000 57.00 No Ice 97.60 0.00 1046.00 Discrete A urten.ance Pressures,'- No, Ice; Description Aiming A_inadh ° 6Veight lb Offset, r Offset, t = r K, q; s C,,Ac Front t' CAAc Side � Lightning Rod (optional) 0.0000 75.00 0.00 0.00 57.00 1.124 22 0.25 0.00 52" x 13" x 7" Panel 300.0000 300.00 -2.83 -1.63 55.00 1.116 22 39.43 21.45 52" x 13" x 7" Panel 60.0000 300.00 2.83 -1.63 55.00 1.116 22 39.43 21.45 52" x 13" x 7" Panel 180.0000 300.00 0.00 3.26 55.00 1.116 22 39.43 21.45 Std. 10-11 T-Ann Mount 0.0000 915.00 0.00 0.00 55.00 1.116 22 8.37 8.37 (80) Palm Tree Fronds 0.0000 1046.00 0.00 0.00 57.00 1.124 22 97.60 0.00 Sum 2936.00 Load.C.ombinati:ons Comb. Description No. l Dead Only 2 1.2 Dead+1.6 Wind 0 deg - No Ice 3 0.9 Dead+1.6 Wind 0 deg - No Ice c 4 1.2 Dead+1.6 Wind 90 deg - No Ice 5 0.9 Dead+1.6 Wind 90 deg - No Ice 6 1.2 Dead+1.6 Wind 180 deg - No Ice 7 0.9 Dead+1.6 Wind 180 deg - No Ice 8 Dead+Wind 0 deg- Service 9 Dead+Wind 90 deg - Service 10 Dead+Wind 180 deg - Service Maximum Member Forces Section Elevation Component Condition Gov. Axial Major Axis Minor Axis No. fr Type Load Moment Moment Comb. lb kip ft kip ft LI 57 - 17 Pole Max Tension 1 0.00 0.00 0.00 Max. Compression 4 -5279.90 -310.89 0.00 Max. Mx 4 -5279.90 •-310.89 0.00 Max. My 2 -5279.90 0.00 310.89 Max. Vy 4 9325.70 -310.89 0.00 RISATower Job Page 1508225-216 3 of 9 Da Kiwi Engineering, Inc.Project Date PO Box 1966 60-ft Palm Tree Monopole 13:33:06 12/16/09 Santa Maria, CA 93456 Client Designed by Phone: (805) 922-5221 FAA': Verizon Wireless, Spanish Bay Simon Leland, P.E. (805) 880-0402 Section Elevation Component Condition Gov. Axial Major Axis Minor Axis No. ft Type Load Moment Moment Comb. lb kip ft kip ft Max. Vx 2 -9325.70 0.00 310.89 L2 17 - 1 Pole Max Tension 1 0.00 0.00 0.00 Max. Compression 4 -7110.84 -494.11 0.00 Max. Mx 4 -7110.84 -494.11 0.00 Max. My 2 -7110.84 0.00 494.11 Max. Vy 4 9944.98 -494.11 0.00 Max. Vx 2 -9944.98 0.00 494.11 :Maximum Reactions Location Condition Gov. Vertical Horizontal, X Horizontal, Z Load lb lb lb Comb. Pole Max. Vert 2 7118.97 0.00 9939.16 Max. H, 10 5932.48 0.00 -2470.17 Max. H, 2 7118.97 0.00 9939.16 Max. M, 2 494.11 0.00 9939.16 Max. M, 4 494.11 -9939.16 0.00 Max. Torsion 5 0.00 -9938.87 0.00 Min. Vert 5 5339.22 -9938.87 0.00 Min. H, 4 7118.97 -9939.16 0.00 Min. H, 6 7118.97 0.00 -9939.16 Min. M, 6 -494.11 0.00 -9939.16 Min. M, 1 0.00 0.00 0.00 Min. Torsion 1 0.00 0.00 0.00 Tower Mast.Reaction Summar Load Vertical Shear, Shear, Overturning Overturning Torque Combination Momenl,'M Moment, M, lb lb lb kip- t kipft kip ft Dead Only 5932.48 0.00 0.00 0.00 0.00 0.00 1.2 Dead+1.6 Wind 0 deg - No 7118.97 0.00 -9939.16 -494.11 0.00 0.00 Ice 0.9 Dead+1.6 Wind 0 deg - No 5339.22 0.00 -9938.87 491.63 0.00 0.00 Ice 1.2 Dead+1.6 Wind 90 deg - No 7118.97 §939.16 0.00 0.00 -494.11 0.00 Ice 0.9 Dead+1.6 Wind 90 deg - No . 5339.22 9938.87 0.00 0.00 -491.63 0.00 Ice ' 1.2 Dead+1.6 Wind 180 deg - 7118.97 0.00 9939.16 494.11 0.00 0.00 No Ice 0.9 Dead+1.6 Wind 180 deg - 5339.22 0.00 . 9938.87 491.63 0.00 0.00 No Ice Dead+Wind 0 deg - Service 5932.48 0.00 -2470.17 -122.49 0.00 0.00 Dead+Wind 90 deg - Service 5932.48 2470.17 0.00 0.00 -122.49 0.00 Dead+Wind 180 deg - Service 5932.48 0.00 2470.17 122.49 0.00 0.00 RISA Tower Job 1508225-216 Page 4 of 9 DaVhii i Engineering, Inc. Po Box 1966 Project 60-ft Palm Tree Monopole Date 13:33:06 12/16/09 Santa Maria, CA 93456 Phone: (805) 922-5221 FAX: (805) 880-0402 Client Verizon Wireless, Spanish Bay Designed by Simon Leland, P.E. Solution Summary Sum of Applied Forces Slim of Reactions Load Ply' PY PZ P,Y Pl' PZ %Error_ Comb. lb lb lb lb lb lb 1 0.00 -5932.48 0.00 0.00 5932.48 0.00 0.000% 2 0.00 -7118.98 -9939.26 0.00 7118.97 9939.16 0.001% 3 0.00 -5339.23 -9939.26 0.00 5339.22 9938.'0 _ 0.004% 4 9939.26 -7118.98 0.00 -9939.16 7118.97 0.00 0.001% 5 9939.26 -5339.23 0.00 -9938.87 5339.22 0.00 0.004% 6 0.00 -7118.98 9939.26 0.00 7118.97 -9939.16 0.001% 7 0.00 -5339.23 9939.26 0.00 5339.22 -9938.87 0.004% 8 0.00 -5932.48 -2470.28 0.00 5932.48 2470.17 0.002% 9 2470.28 -5932.48 0.00 -2470.17 5932.48 0.00 0.0020/. 10 0.00 -5932.48 2470.28 0.00 5932.48 -2470.17 0.002% y Critical Deflections, and Radius of Curvatur:;e Service Wind Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Load Curvature _ It Conrb. in o o t 57.00 Lightning Rod (optional) 8 6.444 0.9116 0.0000 38788 55.00 (6) 52" x 13" x 7" Panel 8 6.071 0.8742 0.0000 38788 >< Maxim:um Tower Deflections Design Wind:: ; { Section Elevation Hors. Gov. Tilt Twist No. Deflection Load ft . in Comb. o° Ll 57 - 17 25.994 2 3.6789 0.0000 L2 20 - 1 3.408 2 1.5798 0.0000 Com ression ;Checks. Pofe Desi n Data 9 Section Elevation Size L L„ Kl/r A P„ �P„ Ratio Ara. p" ft ft ft in lb Ib gyp" Ll 57 - 17 (1) TP23.982xl8x0.1875 40.00 56.00 81.1 13.8937 -5279.90 435085.00 0.012 L2 17 - 1 (2) TP26x23.1584x0.2188 19.00 56.00 73.4 17.9002 -7110.84 627289.00 0.011 P.oie..Bend:i'ng Design Data Section Elevation Size M, �M,, Ratio M., ¢M,. Ratio No. M. M ,,. P kip ft kip ft OM kip-ft kip-Jt �M LI 57 - 17 (1) TP23.982xl8x0.1875 310.89 390.12 0.797 0.00 390.12 0.000 L2 17- 1 (2) TP26x23.1584x0.2188 494.11 554.81 0.891 0.00 554.81 0.000 RISATawer Job Page 1508225-216 5.of 9 Da Vinci Engineering, Inc. Project' Date Po Box 1966 60-ft Palm Tree Monopole 13:33:06 12/16/09 Santa Maria, CA 93456 Client Designed by Phone: (805) 922-5221 Verizon Wireless, Spanish Bay Simon Leland, P.E. FAX. (805) 880-0402 Pole Shear Design Data - Section Elevation Size Actual 1;, Ratio Actual �T„ Ratio No. ► ;, r„ T. T. ft lb lb �1 ki p ft kip ft dT Ll 57 - 17 (1) TP23.982xl8x0.1875 9325.70 243881.00 0.038 0.00 799.62 0.000 L2 17 - 1 (2) TP26x23.1584x0.2188 9944.98 314209.00 0.032 0.00 1137.68 0.000 - Pole; Interaction Design. Data a Section Elevation Ratio Ratio Ratio Ratio Ratio Comb. Allow. Criteria No. P M. M„v V. T. Stress Stress ft ¢P ¢M,. r M„ r V �T Ratio Ratio L1 57 - 17 (1) 0.012 0.797 0.000 0.038 0.000 0.810 1.000 V 4.10-la L2 17 - 1 (2) 0.011 0.891 0.000 0.032 0.000 0.903 1.000 ✓+ 4.10-la S°ection C:a`pacatY Table Section Elevation Component Size Critical P OP„." % Pass No. ft Type Element lb lb Capacity Fail Ll 57 - 17 Pole TP23.982x1.8x0.1875 1-5279.90 435085.00 81.0 Pass L2 17 - 1 Pole TP26x23.1584x0.2188 2-7110.84 627289.00 90.3 Pass Summary Pole (L2) 90.3 Pass RATING = 90.3 Pass V. �GLVit1 Givf �ivi eerivc9, Ivi G. Job 1508225=216 Page • �^ ' 6 of 9 PO Box 1966 ' CA Project 60-Ft. Palm Tree Monopole Date 12/16/2009 • Santa Maria, 93456 . Phone: (805) 922-5221 Client •' Verizon Wireless: Spanish Bay Designed by 'Fax: (805) 880-0402 Simon Leland, P.E. Monopole, Anchor pod and Pa5e Pl ale Calculation' *. 33.6. AN51/ 11A-222-G ZOOS Factored Pa5e Veactlons: Pole Shape, Anchor Fod5: t : `. _ Pa5e Plate: Moment: 550 ft-kips 16-5ided C 4) 2,25 in. A619 GP.. 75 - 135 in. x 51 in, Square.: Shear; 12 kips Tole lila. C 1%f) :, Anchor Pods in Oua�rai*5 fy - 60 k5i z . Axial: 9 kips 26.00 in On a 55 in Bolt Circle . y ; 112 - 20.8 in anchor Pod Caleulaf Ion ,�,�22-c sect on a 9 9 • the followinq Interatlon Equation Shall fie 5atlsfied.: 0,80 VA 4.9.9 (bolts _ 544b in2Momalelwrtla u , PI,- 200.0 kips ferewnForce u <' 1.0 Vu - 5,00 kips 5iear Force P,�, - 525.0 klp5 N6a it al fereile Strero h F , rl - 0.50 0,792 <1. MOMENT Base plate Calculation Mdwy 1IA-222-G ,AXIAL I COMPRESSION 'j 0.90 11A 4.7 TENSION 1 1 ' MFL = 701.9 In -kip Pie, Momv SHEAR L 17,84 In Sectwn tergth �( • - °�a � e . ' " Z a 15.66 Plastic 5ectwn Modulus • f • Nip- 819.E In -kip Flastw Momert ~BOLT CIRCLE—� • y Mn- 751.6 in -kip - • Calculated Moment v5 Factored �e5i5tance t 708 in -kip < 758 in -kip - PXV1.nd Zn1t'neerin.1, Inc. Job 1508225-216 Page 7 of 9 PO Box 1966 Santa Nlaria, CA 93456 Project 60-Ft. Palm Tree Monopole Date 12/16/2009 _ Phone: (805) 922-5221 Fax: (805) 880-0402 Client Verizon Wireless: Spanish Bay Designed by Simon Leland, P.E. Mon0e01e Ca15son Ca'Culatlon5 AN51/11A-222-62005 1. FOUNDATION OVERTURNING RESISTANCE CALCULATED WITH "PLS Caisson" (VERSION 9.00), BASED ON BROM'S METHOD FOR RIDGED PILES. THE SOIL LAYERS ARE MODELED AFTER RECOMMENDATIONS FROM THE GEOTECHNICAL REPORT. - 2. COHESION STRENGTH IN PLS Caisson ASSUMES FULL COHESION AT THE GROUND LEVEL,' THEREFORE THE COHESION VALUES IN THE CALCULATIONS HAVE BEEN REDUCED BY 50%TO A DEPTH OF 3X THE CAISSON DIAMETER. 3. IN LIEU OF A SOIL RESISTANCE FACTOR 0, = 0.75 (TIA-9.4.1) AN ADDITIONAL SAFETY FACTOR AGAINST SOIL FAILURE OF 1.33. HAS BEEN APPLIED. 4. WITH RESPECT TO APPLIED LOADS AND ULTIMATE SOIL RESISTANCE, THE FOUNDATION IS DESIGNED WITH A MINIMUM -SAFETY FACTOR RESISTING OVERTURNING OF 2.0 5. FOUNDATION LOADS HAVE BEEN FACTORED PER ANSI/TIA-222-G 6. GEOTECHNICAL REPORT INDICATES GROUNDWATER WAS NOT ENCOUNTERED WITHIN THE DEPTH OF THE CAISSON. *** PIER PROPERTIES CONCRETE STRENGTH (ksi) = 4.00 STEEL STRENGTH (ksi) = 60.00. DIAMETER (ft) = 5.000 DISTANCE FROM TOP OF PIER TO GROUND LEVEL (ft) 0.50 *** SOIL PROPERTIES LAYER TYPE THICKNESS DEPTH AT TOP OF LAYER .DENSITY CU KP PHI (ft) (ft) (pcf) (psf) - (degrees) ' 1 C 4.00 0.00 0.0 0.0 2 S 6.00 4.00 100.0 3.000 30.00' 3 S 5.00 10.00 100.0 3.000 30.00 4 S 16.50 15.00 100.0 3.000 30.00 *** DESIGN (FACTORED) LOADS AT TOP OF PIER MOMENT (ft-k) = 550.0 VERTICAL (k) = 9.0 SHEAR (k) 12.0 ADDITIONAL SAFETY FACTOR AGAINST SOIL FAILURE = 1.33 *** CALCULATED PIER LENGTH (ft) = 17.500 r *** CHECK OF SOILS PROPERTIES AND ULTIMATE RESISTING FORCES ALONG PIER TYPE TOP OF LAYER BELOW TOP,OF PIER THICKNESS DENSITY CU (ft) (ft) (pcf) (psf) C 0.50, 4.00 0.0 0.0 S 4.50 6.00 100.0 S 10.50 3.39 .100.0 S 13.89 1.61 100.0 S 15.50 2.00 100.0 *}* SHEAR AND MOMENTS ALONG PIER WITH -THE ADDITIONAL SAFETY FACTOR DISTANCE BELOW TOP OF.PIER (ft) - SHEAR (k) MOMENT (ft-k). 0.00 16.6 736.6 1.75 16.6 765.6 3.50 16.6 794.6 5.25 15.3 823.3 7.00 '2.5 840.9 8.75 -24.1 824.1 10.50 -64.4 748.7 12.25 -118.6 590.6 14.00 -177.2 326.2 15.75 -95.5 85.6 17.50 0.0 0.0 *** TOTAL REINFORCEMENT PCT = 0.40 REINFORCEMENT AREA.(in,^2) = 11.31 " ***USABLE AXIAL CAP. (k) = 9.0 USABLE MOMENT CAP. (ft-k) = 1252.4 *** WEIGHT OF CAISSON s (ki p_ *** PRESSURE UNDER CAISSON DUE TO INPUT DESIGN AXIAL LOAD (psf) KP .FORCE ARM (k) (ft) 0.00 2.50 3.000 81.00 8.50 3.000 117.41 12.32 3.000 -73.84 14.72 3.000-108.00 16.53 WITHOUT ADDITIONAL SAFETY. FACTOR SHEAR (k) MOMENT (ft-k) 12.5 553.8 12.'5 575.6 12.5 597.5 11.5 619.0 1.9 632.3 -18.1 619.6 -48.4 562.9 -89.1 444.0 -133.2 245.2 -71.8 64.3 n n n n CAISSON DESIGN SUMMARY: 5-ft DIAMETER CAISSON x 20.5-ft LONG (20-ft BELOW GRADE 6.0.5-ft ABOVE GRADE) W/(12) #10 REINFORCING BARS,EQUALLY SPACED AND 0 5) CIRCULAR TIES @ 6" O/C FOR THE UPPER 8-ft AND @ 12" FOR THE REMAINING LENGTH. CONCRETE STRENGTH=4000', PSI @ 28 DAYS WITH. TYPE II CEMENT AND A MAX. W/CRATIO OF 0.46. VOLUME OF CONCRETE 14.9 CUBIC YARDS. . CAISSON DESIGN SUMMARY: 5-ft DIAMETER CAISSON x 20.5-ft LONG (20-ft BELOW GRADE 6.0.5-ft ABOVE GRADE) W/(12) #10 REINFORCING BARS,EQUALLY SPACED AND 0 5) CIRCULAR TIES @ 6" O/C FOR THE UPPER 8-ft AND @ 12" FOR THE REMAINING LENGTH. CONCRETE STRENGTH=4000', PSI @ 28 DAYS WITH. TYPE II CEMENT AND A MAX. W/CRATIO OF 0.46. VOLUME OF CONCRETE 14.9 CUBIC YARDS. . �aVivtcivt9istieeristi9, InG. Job 1508225-216 Page 8 of Po sox 1966 Santa Maria, CA 93456 Project 60-Ft. Palm Tree Monopole Date 12/16/2009 Phone: (805) 922-5221 Fax: (805) 880-0402 Client Verizon Wireless: Spanish Bay Designed by Simon Leland, P.E. Anchor Bolt Development Length in Concrete - Calculation per ACI 318-05 The anchor bolts are mechanically anchored with nuts POLE SHAFT z J and template at the bottom of the bolts: The cone of 2 1-0 g,aJ ASTM A615 Z failure is assumed to start at the top of the top nut and 'DGR2" PROJ C ON'W� taken at a 35 deg. cone (per ACI). The cones from HEAVr. HEX LOCK NUTS AND - LEVELING NUTS W/ WASHERS theindividual anchor bolts will overlap and also come rl out of the sides of the caisson. Therefore, we z" CLEAR conservatively assume that the concrete cracks and f ___ If there is no strength provided from the concrete and, HORIZO that the vertical reinforcement has to be developed to ensure that the anchor bolts stay attached to the restof 4TIIES the caisson. Below is the calculations showing theminimum anchor bolts embedment length required to o° ' fully transfer the load into vertical bars of the caisson.Uj #10 Rebar Min. Development Length Z • ' . d (Per. ACI318-05 12.2.2; Eq. 12'1). w m I d z w m 0 VERTICA REAR-° 3 ` f 0 �'t.* ed = 36.14" m y W �° d • _ Id f (2.5) db °d c � - la CONCRE TL FAILUiW, F 35' 9 Anchor Bolt Length = 7-ft Concrete Strength 4000 psi L Minimum Required Anchor Bolt Embedment Depth ° ' - • 3/8e THK.° A36 ANCHORd T T PLATE ° emin.= Id +2"+6"+[(Caisson Dia. - 2*Clear Cover)-BC]/2 emin = 50.80" (min. Depth Req'd.) • ° Anchor Bolt Embedment Provided = 66.00" (from top of nut) Strength Comparrison of Anchor Bolts to Caisson Reinforcement - AB Moment of Inertia = 544.50 iri2 - AB Fy = 75 ksi Equivalent Strength = 40837:5 kips Rebar Moment of Inertia = ' 4056.00 in' Rebar Fy = 60 ksi Equivalent Strength = 243360.0 kips PA,VinciZniineerini, Inc. Job, 1508225=216 Page 9 of 9 PO Box 1966 Project 60-Ft. Palm Tree Monopole Date 12/16/2009 Santa Maria, CA 93456 Phone: (805) 922-5221 Client '-Verizon Wireless: Spanish Bay Designed by Fax: (805) 880-0402 Simon Leland, P.E. Seismic Analysis per: 2007 California Building Code Reference Occupancy Category 2007 CBC Table 1604.5 Importance Factor ASCE 7-05 Table 11.5-1 = 1 Site Classification 2007 CBC Table 1613.5.2 Site Class D Site Coefficients 2007 CBC Section 1613.5.1 Ss 1.5 Mapped Spectral Accelerations for short periods Sl . 0.6 Mapped Spectral Accelerations for a 1 sec period Design Spectral Response Acceleration Parameters 2007 CBC Section 1613.5.4 Sos 1.000 5% damped Spectral Accl. for short periods 2007 CBC Eq: 16-39 Sol 0.600 5% damped Spectral Accl for a 1 sec. period 2007 CBC Eq: 16-40 Equivalent Lateral Force Procedure ASCE 7-05 Section 12.8 Ct= 0.02 Period Parameters ASCE 7-05 Table 12.8-2 X= 0.75 Period Parameters ASCE 7-05 Table 12.8-2 h„ = 60-ft Height.of Structure T = Cthnx = 0.431 Fundamental Period ASCE 7-05 Eq: 12.8-7 R = 1.5 Response Modification Factor ASCE 7-05 Tabel 12.2-1 CS = SDS/[R/1] = 0.67 Seismic Response Coefficient ASCE 7-05 Eq: 12.8-2 W Group I kips Total Axial. Weight of Pole V = CsW = 4.733 kips Max. Equivalent Seismic Base Shear ASCE 7-05 Eq: 12.8-1 4.733 kips < 9.9 kips Seismic < Wind Load from Design The wind controls the design of this monopole F B R E OF L.A Q U I NTA ;;BUILDING & SAFETY DEPT. ?. APPROVE® ":`;`,FOR CONSTRUCTION t.:, DBY DATE 6 O.N D State,'of California Plan ADDroval - Model: -D-7454 11'6" x 16'0" x 9'0" Equipment Shelter D P P R Br,:y G Gal Tip,: ".^i'."U'PZ FELTS CIF TITLE 25 CALIFORNIA CODE OF REGULATIONS C!! ts'';'_rt 3 t;ti:tL;➢i R 2 CJt,/i!c+ RCIAL COACHES 1 FIECFVIIC9 VE-MCLES S EP .17 2008 DEC 3 1 2009 APPRC,` A(- ii PFC3 U 2 0 8 0 6 22 FROVA,L P:^:Y As3MORQP 01; APPROVE AW 91ISSION OR DEVIATION TI" RifiOU; AL ITS OF STATE LAWS CA APPLICABLE LOCAL ORDIMMIM f S CURPORni{ON e , Los AI�o€Ls:s; CA1Ir-0RNIA Fibrebond Corporation 1300 Davenport Drive Minden, Louisiana 71055 (Voice) 318-377-1030/800-824-261 (Fax) 318-371-6391 www.fibrebond.com DEC 2 2 2009 gy - — — j -L1Q� od DESIGN CRITERIA: ❑ Non ,Fire -rated 1 Hour' Fire -rated �X 2 Hour Fire -rated 1991 UBC { 1997 UBC 2001 CBC. Root Live 4 Psf Load`(RLL).= 100 P Floor Live Load (FLU) = 150 Psf Basic Wind Speed (Fastest Mile) LLj = 100 mph Wind Exposure = (C) • Wind Importance Factor (lw - 1.15 * Seismic. Zone = 4 Seismic Importance Factor' -(le) = 1.5 Soil Profile Type = SO t e Near Source Factor (Na . = 1.5 Seismic Coefficient (Ga� 0:44 No = 0.66 Basic Structural System =► Bearing wall system w/ordinary ' nforced concrete shearwalls. Analysis Procedure -+ Simplified Base Shear Procedure • F.. r { Response Modification Foctor' R) r 4.5 Ground Snow Load P) 80 _ Psf Snow Importance Factor ((s = 1.2 - Snow Exposure Factor''(Ce = 1.3 - Thermal Factor;;(Ct = 1.0 Flat Roof Snow Lood'(Pf) 87.A psf • S Construction fiype =- V INDEX OF SHEETS Occuponcy/Use soup = S-2 SHEET REV. SHEET SHEET i REV. SHEET These plans ore designed to be used ifr the'construction of commercial modular No. NO. DESCRIPTION 'NO. NO. DESCRIPTION units, in accordance 7 with; CA HEALTH AND SAFETY CODE1BO28, 1991. 1997 UBC, • 0-0 2 BUILDING CONFIGURATION SHEET 7-1 3 HALO GROUND - CEILING VIEW 2001 CBC, 1993 NEC, 1991 UMC, �1989 ; MODEL• ENERGY CODE AND • 1-0 13 MANUFACTURED BUILDING DATA SHEET 7-2 5 HALO GROUND ELEVATIONS - "A" & "B" ANSI A117.1-1986, ADA ;E • 1-1 8 FLOOR PLAN 7-3 4 HALO GROUND ELEVATIONS - "C" & V • 1-1.1 2 FLOOR PLAN: 7-4 1 HALO GROUND DETAIL SHEET ' `. • 1-2 7 EXTERIOR ELEVATIONS - "A" &''D"-- ' i 8 - 2 FOUNDATION PLAN • 1-3 5 E)(TERIOR.ELEVATIONS - "8' &:C" 9-1 0 MISC. INTERIOR DETAILS' a 2-1 4 INTERIOR CEILING VIEW • 9-2 0 LIFTING, STORAGE AND TRANSPORTATION DIAGRAM 2-2 ie5 INTERIOR ELEVATIONS - 'A' & 'B" S1 3 STRUCTURAL LAYOUT - ROOF 2-3 6 INTERIOR ELEVATIONS - "C" & "D" S2 6 STRUCTURAL LAYOUT - FLOOR • 3-1 2 ELECTRICAL .SCHEMATIC #1 53 6 STRUCTURAL LAYOUT -SIDE PANEL "A" • 3-2 - 4 ELECTRICAL SCHEMATIC #2 53.1 2 STRUCTURAL LAYOUT'- SIDE PANEL "A" 4 4 ALARM'WIRING S4 .5 STRUCTURAL LAYOUT - END PANEL "B"• 5 6 ITEM UST 54.1 0 STRUCTURAL LAYOUT - END PANEL 6 2 CABLE RACK - CEILING VIEW S5 4 STRUCTURAL LAYOUT - SIDE PANEL "C" 55.1 1 STRUCTURAL LAYOUT'.- SIDE PANEL "C" s : _ SIS 6 STRUCTURAL LAYOUT - END PANEL "0" 1 P,i •� + S6.1 2 STRUCTURAL LAYOUT - END PANEL "D" t s r 4:: i. S7 3 MISC. DETAILS #_ DENOTES.• DRAWINGS WHICH HAVE WORK TO 'BE COMPLETED IN THE FIELD. . r �• " ` '. REFERENCED STANDARD DRAWINGS ' SHEET REV.' SHEET • DRAWING. NO. NO. NO. DESCRIPTION'-• r r • ? EXEC-0007 1 OF 1 2 LEAD/LAG WIRING DIAGRAM • (BARD CONTROLLER MC3000) r MECH-OD05 1 OF 1 0 STANDARD CABLE RACK. MOUNTING DETAILS • :� _ •• A P R 0 E Ew J% EA'Sp ON niE i,EQUlREP4DiTS OF TITLE 25 CALIFORNIA CORE OF REG.0 Cs'APIL.R 3 SUZCHAPT R 2 Coil YZRCIAL COACHES RECREAncw W S E P 17 2008 D EC 3 12009 O208 os 2� APPAIN°AL 00B WOT AIJ7409171 OR APPrIVE My thu?ISSIC;d OR 1K fit) :4 I , K-MUPAEVIi N'T8 OF STATE IAWG 06 APPLII=- LE LOCAL ORO`11'�4''' � S ' Co voFtAnoN - Los Anr-LEs;.C4oil THIS APPROVAL IS LIMITED TO THE FACTORY -BUILT P.O.R' I10Nk ALX FOR STATE USE ONLY ' GENERAL DESIGN NOTES 1. This is an unmanned storage and equipment shelter only. 2. Shelter Vc = 5000psi ® 28 days. 3. Building shall be placed according to -state and local code from ony propery line, interior lot line or any other building. 4. All items noted as "FIELDWORK" sholl be installed and tested at the factory and then removed for transport and reinstalled at the final site., 5.. Model may be built as "mirror image ' 6. Door swing and waveguide location may change due to site -requirements. 7. Building sholl be placed on a foundation supplied by others. 8. Building not designed for installation in a flood prone area. 9. This unit is approved for placement in Ohio only when: (1) the building official has determined that plumbing fixtures are to be installed at the site,, or (2) the provisions of OBC are otherwise met, or (3) a variance from the provisions of OBC has been granted by the appropriate agency. 10. Fire extinguisher installed by others when not supplied by Fibrebond. 11. Electrical components shown per customer's design requirements. r ^' ��SEo Pr�ti/� - i 0 k- ; ' 24633 0 AR ONLY QROFESSIp,E,� �• ••JOMN D. A • ANDEA ; n, -' Exp 12/31/08 '-,,STRUCTURAL sl'l�oF FTE: % FOR ENGINEER USE ONLY FOR THIRD PARTY USE ONLY . PSI, Inc. 1748 33rd -Street T ' Orlando, Florida 32839 407-304-5560 ' , N PFS 1507'Matt Pass ' " ° - `} . h • l , Cottage Grove; WI 53527 608-8 9 13 7 r. y PF$.+G mo t- 4 ♦ h _ - 1 Tftese plans are deslgnedto Le used for construction of 9sso,skiumonstreet sane s154• • - y. �' • Dallas,' TX 75243 0mtnercial Modular Units, in accordance.wlth aa214-221=558s .. , r u �F i, C/~.Health and Safety Cope (p (1 /1[X • a e4 , ; : , • . U S?Ct1011 �1 2g N UMC, UPC • "4 Y'; THIRD PARTY AGENCIES ,1993 EC) -ANSI A117.I=1906 Concrete Unit Weght=161.Spcf Rev' • . �-'f• � �- •A..E:.. •',••1T .� i.-i"s •kx +1' � 'lr•! ,a : <Y ' 1hr. and 2hr. Construction built in compliance with: ' 1997 UBC Table 7-8, item 7-1.1 and section 1914.3.2 t ,. and-1914.3.3, table 7-C, item 4-1.1. _ Type 5 2hr. construction with - 2 hr. fire -rated Roof and Walls. 1997 SBC Section 709, table 709.2.1.1 r, 1996 BOCA •'ASTM,El19 c ` 2000 IBC Section 719, table 719.1(2),' ITEM 4- ,1.1' 2003/2006 IBC Section 720, table 720.1(2), ITEM 4-1:1 13 12 11 10 9. 8 7 6 5 4 REV. EJM GN LW LW PTB DL MST IN CC MST BY O6/16/08 05/12/98 04/30/08 D4/23/08 4/11/08 04/07/08 01/02/06 10/18/07 08/22/07 06 11 07 DATE UPDATED RED!>LEVELS,S'' UPDATED.,REV IEVEIs UPDATED.REY'sLEVELS I� .. UPDATED REV ,LEVELS '�' UPDATED REV LEVELS2 `^.1. j4, �' ` UPDATED DATA ItJFORM4,TI0N ,r r T y,- UPDT RV LVLS ADD .:HEFTS FOR`;GONFG,2,RMVD 7-2 UPDATE REV• :LEVELS ADDED SHEET10 0 ,,:, - UPDATE REV. LEVELS r.-"' REVISED INDEX;aOFs SHEETS � "REVISION , : r . T >•: 1 JH GN IN DW 'IN DW - IN IN IN APP. 07/14/08 OS/11/OS D4/30/08 O4/23/OB 4/11/08 04/07/08 Ot/16 08 10/18/07 O6 11 07 DATE _ GS F GS • CP_ BOM 07/14/08 o4/23/08 01/28/os _DATE. THESE PLANS ARE -THE CONFIDENTIAL PROPERTY AND TRADE SECRETS Of FlBREBOND CORPORATION. ANY USE OF THESE DRAWINGS OR THE INFWTION CONTAINED HERON FOR ANY REASON OTHER THAN AS EXPRESSLY AuwdzED of F18fiEHOND CORPORATION 6 sTraCILY PROHIBITED. THESE ORVYdIGS HIVE BEEN DtSTRIBUIFD WTH TIRE UNDER owG nwT AWN RECEMNG OR OTHERWISE OTfr0W POSSTSSION OF THIN WU. BE EXPRESSLY NODT$D OF THEIR CONFIDENTIAL NATURE. 1300 DAVENPORT DRIVE MINDEN LA.'71055 Ph. (800) 824 2614�wwnv Hbrcebond cam, ��• t VERIZON WIRELESS 11 -6" X 16'-.0, EQUIPMENT. SHELTER', MANUFACTURED BUILDING DATA. -SHEET .' * - -' • --� pRN g,; CC DATE 09/27/04 A8 ; RVV D41E 09/26/04 -, CNK' DATE 4 A , SMP, , DATE _ 09/28/04. ,F_, i esa: FIBR!EB0ND SC&E: + • SHMT No.: NONE -1-0 B ,�,D;-.745'4 G • �. ; CITY OF LA QLIINTA BUILDING & `SAFETY DEPT. APP OVE f ' FOR CONS TR!,,;T ON DATE 4.d, Geotechnical Solutions, Inc. '= Geotechnical & Environmental Engineering 'r. GEOTECHNICAL ENGINEERING REPORT VER.IZON CELLULAR" FACILITY SPANISH BAY AT 54001 MADISON STREET LA QUINTA, CALIFOR-NIA FOR r . VERIZON WIRELESS • DER -RA DESIGN 606 E. CHAPMAN AVENUE, SUITE 203 ORANGE, CALIFORNIA 92866 • PROJECT NO: VD-3720-01 NOVEMBER- 20, 2008 GEOTECHNICAL SOLUTIONS, INC. • GEOTECHNICAL & ENVIRONMENTAL ENGINEERING - GeotechnicalSolutions;�`In't-r. Geotechnical, Structural & Environmental Engineering _ .September 20, 2008 ` Project No: `.VD-3720-01 _ # Verizon Wireless Derra Design '� 606 E.:Chapman Avenue,,- Suite .203 o Orange, California 92866 Attention: Mr. Jeff -Roebuck ". Re: .. rVZWSpanish Bay r 54001• Madison Street :. La Qunita, California 92253 k ' :V'Gentlemen: ` } Submitted herewith' is the report ,of the Geotechnical Engineering study conducted .by this =' office at the proposed Verizon Wireless Cell site, which includes 67-foot high monopalm' •3 .with aritennas,at-6.5 feet cenierline,- equipment shelter, generator .pad, and -enclosure walls. The ~project site is located southwest of the -intersection between Madison, Street and •', _ ,,Avenue 54;in the City of•La Quinta;:California as shown on the Vicinity -Map (Plate A). - , tBased on the -investigation findings, it .is. concluded that<'development. of the .project is = T = feasible from a geotechnical point of view and acast-in place drill' dp caisson foundation _ will be the.most suitable foundation support -for the proposed 67-foot high monopalm and - the equipment shelter• with Wall, enclosure can be supported on conventional continuous - t and on "footings. generator pad concrete.slab on grade. A. - .. Phone: '(949),453-0406 27 Mauchly, Suite 210, Irvine, CA 92618 Fax: (949) 453-0409 _ -. pq Project No VD-3720-01 Verizon Spanish Bay The closest known active fault capable of producing a major earthquake is the San _ '! Andreas — Whole M-'la Fault, which is located about 7.0 miles (11.2 km) away from the site. The site does not lie within or near an Alquist-Priolo Earthquake Fault Zone as designated • by the California Geological Survey (CGS). The potential for direct surface fault rupture at the site is considered unlikely. The investigation was made in accordance with generally accepted geotechnicaII engineering principles and procedures and included such field and laboratory tests considered necessary under the circumstances. In the opinion of the undersigned, the accompanying report has been substantiated by mathematical and other data and presents fairly the design information requested by your organization. Respectfully submitted, • Geotechnical Solutions, Inc. ? p p F E S S/ pN R. m w GE 2773 r^ • Dharma Shakya, PhD, PE, GE Exp. �; r l►p Principal Geotechnical Engineer` ,•ice ; -- ��� • Abraham S. Baha, P.E. eRO F ESS/O Sr. Principal 9 No. CO53067 rrn m • F Exp.06130109 oACIVIL } '.saL1�0 Distribution: (3+pdf) Addressee 2 Project No VD-3720-01 Verizon Spanish Bay TABLE OF CONTENTS Introduction 1 Proposed Construction 1 • Site Description 1 Faulting and Seismicity 2 Exploration 3 Soils Condition 3 • Laboratory Testing 4 Moisture and Density 4 Mechanical Analysis 4 • Direct Shear 4 Expansion 4 Consolidation 5 Chemical Analysis 5 Design Values 5 Liquefaction 6 • Conclusions and Recommendations 7 Equipment Shelter Support 7 • Drilled Pier Foundation 8 �J Project No VD-3720-01 Verizon Spanish Bay Lateral Passive Pressure 9 • Floor Slab for Equipment Shelter 9 Seismic Factors 9 • Field Resistivity y 10 Corroslvlty 10, • Grading Procedures - 11 Recommendations for Construction 12 • Limitations 12 Appendix A - Plates 14 Appendix B -Seismic Data 15 Appendix C - Field Resistivity Test16 ti ' t ii - � J Project No VD-3720-01 Verizon Spanish Bay - Introduction The primary objectives of this study were to explore subsurface conditions beneath the project site and evaluate the existing earth materials relative to foundation support and lateral pressure design factors. • In general, the study objectives were met , by a visual 'reconnaissance of the site and vicinity, review of available tentative development plans, exploratory drilling, -seismic evaluations, and engineering analysis. The general scope and objectives of the study:were established in collaboration with the client. 4 Proposed Construction • The project will consist of constructing a 67-foot high monopalm, extending to 72 feet at the top of palm fronds with antennas at 65 feet centerline, equipment shelter 11'-6" X 16'-0" and generator pad 5' by 8' in sizes at the subject -leased area of 827 square feet • (40' by 20'-8"). A 6.5-foot high CMU concrete block wall with cement plaster finish to match with the existing wall will surround the property. The design vertical load of the pole will not exceed 60 kips, and horizontal shear force • will vary in relation to the height of the pole and transient loads. ,Site Description The project site is located southwest of the intersection between Madison Street and Avenue 54, in the City of La Quinta, California as shown on the Vicinity Map (Plate A). The facility is in grass area of a property, northeast of the existing Sprint7Nextel Cellular, facility. No hilly terrain or drainage problems exist. No protected plants or other vegetation will be disturbed. The site access is from Madison'Street through a driveway.. 1 • C7 • • • Project No VD-3720-01 Verizon Spanish Bay Faulting and Seismicity No faults have been mapped projecting towards or through the site area. The site does not lie within an Alquist-Priolo Earthquake Fault. Zone as designated by the California Geological Survey (CGS). The potential for direct surface fault rupture are considered unlikely. -. EQ-Fault version 3.00 a computer program shows that San Andreas.— Whole M-la Fault to be the closest fault to the site. The tabular data for EQ-Fault indicates that the ~San Andreas — Whole M-1 a Fault to be 7.0 miles (11.2 km) away from the site. The San Andreas — Whole M-la Fault has been assigned a maximum earthquake magnitude of 8.0, has a slip rate of 24 mm per year, and the largest maximum -earthquake site acceleration of 0.48g. Probabilistic risk analyses were performed using the computer program FRISKSP, 2000 • Edition (revised 2004), by Blake. The fault database was provided from the California Geological Survey (CGS). FRISKSP models ' earthquake sources as three dimensional planes and computes site specific probabilities of exceedance of given acceleration levels • or pseudo -relative velocity levels for each earthquake source. The cumulative effects from all modeled earthquake sources are tabulated and graphically plotted. The program offers a choice of attenuation relationships by various persons to evaluate the attenuation • of earthquake energy with source distance. For this study the attenuation relationship developed by Campbell & Bozorgnia (1997) was used for the alluvial soil type. The calculated peak ground acceleration using the attenuation relationship for a ten percent chance of exceedance in 50-years or a return period of 475-years was 0.56g. • In addition to possible very high ground motions at the site from local large earthquakes, other secondary effects were considered which include: induced liquefaction, induced • flooding, subsidence and landsliding. Due to the geographic/topographic•position; lack of: • 2 l J Project No VD-3720-01 Verizon Spanish Bay near surface groundwater, the potential for any of the secondary effects mentioned above • are low at the subject property. Exploration • The field investigation consisted of subsurface exploration by means of one test boring to a depth of 31.5 feet made with an eight -inch hollow stem drill rig. Approximate boring location is shown on Plate B. A continuous record of the soils encountered during • exploratory drilling was made by the field engineer and is presented on Plate C, log of Test Hole. It should be noted that lines designating interfaces between soil strata on the boring log • represent approximate boundaries since the actual transition between materials is somewhat gradual. Limited undisturbed samples were secured at frequent depth intervals for laboratory examination and testing. Disturbed bulk samples representative of the • surficial subgrade materials were also obtained. The relative sampler penetration resistance exhibited by the deposit's .sample is tabulated in the Blow per Foot column of the pertinent boring logs. Recorded blow counts for 112- • inches of sampler penetration was medium to high. Ground water was not encountered at the full depth of exploration and no caving occurred during the exploratory drilling operation, but it is possible. • Soils Condition Artificial fill was not encountered at the boring location during the exploratory drilling. • The upper and underlying natural soils are generally. very fine to fine and coarse, medium dense to dense, pebbly and gravelly sand. A more detailed soil profile is shown on Plate C, Log of Test Hole. 3 • Project No VD-3720-01° r Verizon Spanish Bay Laboratory Testing Laboratory testing was programmed following a review of field investigation data and after considering the various foundations, floor slabs, and grading elements to be evaluated. In general, this includes physical testing to establish foundation -bearing characteristics, and classification tests. - A. Moisture and Density In situ moisture content and density were determined for all the undisturbed core samples obtained during test boring drilling operations. Test results are tabulated on Plates C, Log of Test Hole. B. Mechanical Analysis The texture composition of a selected typical sample determined by,the hydrometer test method was as follows: Boring Depth Percent Percent . Percent No. (Feet) Sand. Silt Clay , 1 1-3 90 g 2 C. Direct Shear Direct shear tests were performed on undisturbed natural samples of soil encountered within the full depth explored, and were considered most pertinent in the design of mat/ spread footings, and moderately deep pier. Tests- were performed in the saturated condition at the field density. Individual test results are shown on Plate D. A Expansion Expansion characteristics were determined by the Expansion Index test of a typical bulk. sample considered to be generally representative of the near subgrade soils. Test results are as follows: _ 4 , Project No VD-3720-01 Verizon Spanish Bay Boring Moisture Dry Density Expansion Index No. % (P-CD ' 1 9.9 109.6 0 The soil underneath the project site is classified as very low expansive. • E. Consolidation Consolidation (load deformation) tests were performed on undisturbed samples at selected depths. Plotted test results are presented on Plates E through G. F. Chemical Analysis - Chemical sulfate analysis was performed on, a representative sample by the CAL 417-A method. A soluble sulfate of 195 parts per million was indicated, which is negligible, however we recommend to use Type II Portland cement for the foundation elements in contact with the underlying soil. Design Values Representative values were selected from the test data and other sources for design and is • tabulated below: Field Density 115 pcf Expansion Index 0 Angle of Internal Friction- 30 &-33 deg Cohesion 100 & 150 psf Modulus of Subgrade Reaction (K) 4100 pci l J Project No VD-3720-01 Verizon Spanish Bay Liquefaction Earthquake -induced vibrations can be the cause of several significant phenomena, including liquefaction in fine silt and sands. Liquefaction results in a complete loss of strength and can cause structures to settle or even overturn, if it occurs in the bearing • zone. If liquefaction occurs beneath sloping ground, a phenomenon known as Lateral Spreading can occur. Liquefaction is typically limited to, the upper fifty (50) feet of the subsurface of the soils. = Four items are generally considered to have the most significance in liquefaction: 1. Poorly graded fine and silty sands are the types of soils most susceptible to ' • liquefaction. Soils that contain a wide range of soil particle sizes and coarse soils . that drain freely, are not generally susceptible to liquefaction. 2. The water table perched or otherwise usually must be within the upper fifty (50) • feet of soils, for liquefaction to occur. Soils above the water table do not liquefy. 3. Liquefaction has been shown to be unlikely where the relative density of the soils' is greater than 70%. A soil that has relative density of less than 70% may liquefy • depending on a number of factors. The two most important of which are the strength and duration of the seismic shaking , and the percentage of the soil particles that are silt and clay sized. - 4. If the clay content (determined by the ' percent finer than 0.005 mm) is greater - than (15%) percent, the soil is usually considered non -liquefiable, unless `it is • extremely sensitive. The site will be susceptible to liquefaction, if all four items discussed above meet the criteria. An examination of the existing conditions at the site, in relation to • the criteria listed above, indicates the following:. • Project No VD-3720-01 t 4. Verizon Spanish Bay 1. Determination of soil gradation shows that the underlying soil particle sizes are °. fine -to -coarse. 2. Groundwater was not encountered at the full depth of exploration. • 3. Penetration test using California Sampler indicates that the soil within the depth range study is in low to dense state, with a relative density of over 70 percent. 4. The soil generally contains less than 15% of clay constituent. Based upon the evaluation of above criteria, it is our opinion that conditions indicate that potential for liquefaction is very low at this site. In addition, any liquefaction potential 'is not considered to be a concern for this development, since it is unmanned and not for • human habitation. Conclusions and Recommendations • It is concluded that the site will be suitable for the proposed construction described in this report, provided that the design and construction are properly executed. Our recommendations are based on site conditions encountered , during the exploration, • laboratory tests, and experience with similar sites, and are' in accordance with generally accepted geotechnical engineering practices. It is noted that development of this unmanned wireless facility at the subject property will • not be prone to geologic hazards like landslide, ' subsidence and liquefaction. Furthermore proposed development will not have an adverse affect on adjoining properties and vice versa. Followings are specific recommendations. Equipment Shelter Support Proposed equipment shelter may be supported by a minimum of ' 12-inch deep and 12 ' • inches wide continuous footings bearing into the newly compacted subgrade soil. A 12- inch deep continuous footing resting on newly compacted subgrade' soil may be designed , Project No VD-3720-01 _ Verizon Spanish Bay for an allowable bearing value of 1,500 pounds per square foot. The 'estimated total settlement will be less than one-half of an inch and differential. settlement will be negligible. Recommended bearing values are for dead plus live loads and may be increased one-third • for combined dead, live, and seismic forces. All continuous footings shall be incorporated with 2#4 bars at the top and 2#4 bars at the bottom. It is recommended to over excavate and re -compact the equipments pad area to a • depth of 18 inches below finish subgrade and recompact. Drilled Pier Foundation A cast in place concrete caisson may be used for supportof-the monopalm. The lateral forces will be` the controlling element in this case depending on the height of the pole and wind load. Therefore, it is recommended that the minimum pier diameter should be 48 inches and should be extended to a minimum depth of 20 feet into firm, sandy and gravelly soil. The pier may be designed for an allowable end bearing of 3,500 pounds per square foot.or for an average frictional resistance of 200 pounds per square foot. Either skin resistance or end bearing will provide adequate foundation support for the tower. For lateral support a passive capacity of 350 pounds per square foot per foot may be used. It is noted that caving is very likely to happen due to dry sandy material, either casing or presoaking of the area will help preventing severe caving. It is also noted that scattered • boulders is possible to be found in a large diameter hole, therefore some difficult drilling is also possible. • It is recommended that concrete be placed immediately after drilling. The concrete for the pier should be placed through tremmie or other directional devices. Pier drilling-, 8 • 4 • Project No VD-3720-01 Verizon Spanish Bay - operations should be subject to observation by this office to confirm the conditions • encountered are consistent with the conclusions and recommendations of this report and/or to make any appropriate modifications, if necessary: Lateral Passive Pressure Horizontal forces of shallow footings (mat and continuous) may be resisted by the combined effect of friction resistance of 0.4 times the dead load and a passive pressure of 300 pounds per square foot per foot of depth. The weight of the pier may be neglected. If • combining friction and passive resistance, the friction component shall be reduced by 1/3. The allowable bearing capacity and the allowable resistance of horizontal forces may be increased 1/3 for earthquakes and other transient forces. Floor Slab for Equipment Shelter Based on test results, the underlying surface soils are very low expansive; therefore, special measures will not be required for expansion potential. The subgrade for slab on grade should be kept moist (optimum moisture) at top 12 inches and be incorporated with reinforcement of #3 bars 18 inches center to center each way. The slab thickness should • be 4 inches minimum and shall be placed over approved subgrade. - - Seismic Factors • The following are the geotechnical parameters for earthquake design data in accordance with California Building Code (CBC), 2007: • • NO.. PARAMETERS VALUES . REFERENCE. _ _. 1 0.2-Second Mapped Spectral Response 1.500g USGS eghazmaps Accelerations, Ss for Site Class B 2 1-Second Mapped Spectral Response 0.600g . USGS eghazmaps Accelerations, Sl for Site Class B U U 9 • Project No VD-3720-01 Verizon Spanish Bay • • • • 3 Site Class D Table 1613.5.2 4 Site Coefficient, F. 1.0. Table 1613.5.3 (1) 5 Site Coefficient, F,, 1.5 Table 1613.5.3 (2) 6 Maximum Considered Earthquake Spectral 1.500g Equation 16-37 Acceleration for Short Period, SMs 7 Maximum Considered Earthquake Spectral 0.900g Equation 16-38 Acceleration for 1-Second Period, SMi 8 5 % Damped Design Spectral Response 1.00Og Equation 16-39 Accelerations at Short Period, SDs 9 5 % Damped Design Spectral Response 0.600g Equation 16- 40 Accelerations at 1-Second Period, SDl Field Resistivity Resistivity tests were performed at the field using NILSSON Model 400 Soil Resistance Meter by driving 4 test rods 12 inches deep into the ground in a straight line with a uniform distance of 5 and 10 feet in the same line. Test results and the field engineer's report are enclosed in Appendix C. Corrosivity • A major factor in determining soil corrosive j g ty is electrical Resistivity. The electrical resistivity of a soil is a measure of its resistance to the flow of electrical current. Corrosion of buried metal is an electrochemical process in which the amount of metal loss • due to corrosion is directly proportional to the flow of electrical current (DC) from the metal into the soil. Corrosion currents, following Ohm's Law, are inversely proportional to soil resistivity. Lower. electrical resistivity result from higher moisture and chemical, • contents and indicate corrosive soil. Other soil characteristics that can influence corrosivity toward metals are pH, chemical content, soil types and site drainage. • 10 r f _ A Project No VD-3720-01 Verizon Spanish Bay t Based on the test results the soils are classified as moderately to mildly corrosive to • ferrous metals and non -corrosive to Portland cement concrete. nevertheless,it is recommended to use Type II Portland cement for all concrete elements in contact with - soil. Ferrous metals and pipes. shall be properly coated. or wrapped. Grading Procedures In view of loose and dry soil condition of the underlying material, minor grading will be • required for proposed development. Followings are the general recommendations related. to the grading, if any. _ a. After the site clearing, the -equipment shelter area should be excavated 18 inches - below grade; moisture conditioned and compacted, subject to inspection. b. On -site material is acceptable for backfill if moisture conditioned and over size rocks over 6-inches are removed. If required, import fill should consist of clean, granular, non -expansive soils free from vegetation, • debris or rocks larger than three inches in size. The Expansion Index value should not exceed a maximum of 20. c. All recompacted native and import soil should be spread, watered or aerated; mixed and compacted by mechanical means of approximately six-inch thick lifts. • d. The minimum degree of compaction obtained should be at least 90 percent of the ASTM D-1557 Laboratory test standard. e. Backfill placed in narrow, restricted areas such as along utility trenches, may be • placed in 12 to 18 inch thick -lifts, provided; the minimum required degree of s compaction is obtained. q Project No VD-3720-01 Verizon Spanish Bay ' f. Observation and testing of all compaction should be under the direction of the • Geotechnical Engineer. The Engineer should be notified at least two days in, advance of the start of the grading. - Recommendations for Construction . Surveying. The contractor shall set necessary stakes to verify lines and grades as shown on the plan. The owner or his representative shall monitor the work to verify that the ' depth of footing embedment is correct. Caisson Drilling. Drilling operation of the pier and footing excavations, should be observed by a representative of Geotechnical Solutions, Inc. • Footing and Utility Excavations: All footing trenches for the proposed structure should be observed by a representative of this firm to verify that they were excavated into competent bearing soils per the recommendations of this report as well as to the minimum • depths recommended. These observations should be performed prior to the placement of forms or reinforcement. The excavations should be trimmed neat, level and square. All loose, sloughed or moisture softened soil should be removed prior to placing concrete. Site Drainage: The site should be sloped to direct water away from all structures. All roof and pad drainage shall be conducted to appropriate drainage systems via non -erosive devices. All drainage. systems should be maintained in good working condition. Limitations c This report is issued with the understanding that it is the responsibility of the owner or his • representative to see that the information and recommendations contained herein are called to the attention of the other members of the design team for the project and that the applicable information is incorporated into the plans, and that the necessary steps are taken to see that the contractors and the subcontractors carry out such recommendations: .The findings of this report are valid as of.the present date.. However, changes in the 12 ,, f P, Project No VD-3720-01 Verizon Spanish Bay conditions of a property can occur with the passage of time, whether due to natural 19 processes or due to the works of man, on this or adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening of knowledge. Accordingly, the findings of this report may be invalidated, ! wholly or in part, by changes outside of our control. The validity of the recommendations of this report assumes that Geotechnical Solutions, Inc. will be retained to provide these services. Geotechnical Solutions, Inc. ' • 13 Project No VD-3720-01 Verizon Spanish Bay w • Ol w 0 14 • -. - e x• Tom' _ . R- AL CREEK JEFF o�4 a K�'gUS / r NE R, ROAD x . CD Fes'' u r - , a'. ' ` ,• ♦I - - ►�� .r T �, - Y i a y Z c Ot17'}-fE!►11i1LLS f= y BRAE B NGE 1 ��...i �' �{: �`.`.. ., - � - i � w+.B' �;` Iwe � » �.. '.9Ft �1 � �-. Jf' ;N � 1' • , 12. CD s S •� O � _ f PLOT PLAN AND TEST BORING LOCATION RELOCATED OCOTILLO PLANTS (TTP. OP 41 PER LArIDSCAPE PLANS PROVIDE 9/4• CRUSHED &RAVEL ROAD SA5E (9' DP1 WITHIN HEW EQUIPMENT ENCLOSURE (TYP) PROPOSED VERIZON WIRELESS 6'-6' H. —� C.V WALL W/ CFNENT PLASTER FINISH. COLOR a TEXTURE TO MATCH EXISTING PROPOSED VERIZON WIRELESS EMERGENCY 6EPERATOR N/ CONCRETE SPILL CORTAINFENT PAD r' s L: //-EXISTIN6 PARKING, — I� IPROPOSED VERIZON WIRELESS PREFABRICATED • I • • e ® = — q ME I SATE TO 5PRINT/NEXTEL LEASE AREA .50'-O'(PXIST. CARRIER r:W-LO5URZJ NEW) VZW - Spanish Bay 54001 Madison Street, La Quinta, California Geotechnical Solutions, Inc. PROPOSED VERJZON WIRELESS PANEL ANTENNA ". OP 161 AT HEN MONOPALM PAINTED TO MATCH FRONDS, SEE ELEVATIONS —PROPOSED VERIZON WIRELESS yI 4060 METAL ACCESS GATE TO MATCH EXISTING —PROPOSED VERIZON WIRELESS CONCRETE STOOP — EXISTING OCOTILLO PLANT TO BE s RELOCATED PER PLAN (TYP. OP 4) —PROTECT-IN-PLACE EXISTING O IRRI&ATION CONTROL VALVE c - HAND HOLE —PROTECT-IN-PLACE EASTIN& RANT TO REMAIN (D NORTH Scale: I" = 10' Project No. VD-3720-01 Plate: . B 0 S - i J a u 0 Project: VZW - Spanish Bay - Borehole.No. B-1 Project Location : 64001 Madison Street, La Quinta, California LOG OF TEST HOLE Plate No. C Project Number: VD-3720-01 Page 1 of 1 Date(s) Drilled : November 18. 2008 Logged BY: Sal/AS - Checked By: A. Baha Drilling Method : - Drill Bit Size / -. 8-inch-OD rock bit Total Depth of 31.5 Type : - Borehole, feet: Drill Rig Type: Little Beaver Drilling - - Approx Surface 10 feet MSL ' Contractor: - Elevation, feet: Groundwater Level and None Sampling California (ring), bulk Method : - Hammer Data: Downhole wire 140 lbs / 304nch droporeole �,Dlate,Measuned: Backfill : Drill cuttings Comments: Refer to site plan for location SAMPLES m 3 in z ? MATERIAL DESCRIPTION c L v OTHER TESTS AND o v REMARKS ti o d m n E C O w a 1--z' liof z m o a.z 10 0 Bag #1 Grass @0'-3': Bag Sample, SAND very fine to fine, dry HD: 90:8:2 (sa:si:cl) 2 R-1 13-20-25 45 @2': Light gray, medium dense, SAND very fine to fine, dry 2 112 5 5 R-2 12-23-25 48 @6: Light gray, Sand, medium dense, very fine to fine, dry 3 114 0 10 R-3 15-27-30 57 @19: Light gray, Sand, dense, very fine to medium, dry 4 11.2 -5 15 S-1 8-15-17 32 @15: Gray, Sand, dense, medium to coarse, dry, pebbles 5 115 -10 20 @20': Brownish Gray, Sand, dense, medium to coarse, moist S-2 8-19-17 36 some gravel and pebbles 8 116 -15 25 S-3 8-15-17 38 @25': Gray, Sand, dense, medium to coarse, moist 7 115 " -20 30 S-4 12-20-27 47 @15': Gray, Sand, dense, coarse grained, moist, pebbles 6 117 End of Boring 31.5 -ft No groundwater was encountered -25 35 Caving possible " Backfilled w/cuttings -30 40 -35 45 GEOTECHNICAL SOLUTIONS, INC. 0 0 0 0 0 0 a DIRECT SHEAR • I , 4 _ 3 d O B a 2 0 0 1 2 3 4 5 NORMAL LOAD (KSF) DEPTH COHESION FRICTION SYMBOL LOCATION (FT) TEST CONDITION (PSF) , (DEG) A Boring 1 2 Saturated - Drained Peak 100 30 A Boring 1 5 Saturated - Drained - Peak 150 . 33 VZW - Spanish Bay Project No: VD-3720-01 54001 Madison Street, La Quinta, California Plater D Geotechnical Solutions, Inc. 15 _. I IVV 1000 900 800 700 600 500 400 S 300 200 100 0 -100 A * * * E Q F A U L T * * * Version 3.00 * • * DETERMINISTIC ESTIMATION OF PEAK ACCELERATION FROM DIGITIZED FAULTS JOB NUMBER: VD-3720-01 DATE: 11=19-2008• JOB NAME: VZW Spanish Bay CALCULATION NAME: Fault Analysis FAULT -DATA -FILE NAME: C:\Program Files\EQFAULTI\CGSFLTE.DAT SITE COORDINATES: SITE LATITUDE: 33.6559 SITE LONGITUDE: 116.2516 SEARCH RADIUS: 100 mi ATTENUATION RELATION: 14) Campbell & Bozorgnia (1997.Rev.) - Alluvium UNCERTAINTY (M=Median, S=Sigma): M Number of Sigmas: 0.0 DISTANCE MEASURE: cdist SCOND: 0 Basement Depth: 5.00 km Campbell SSR: 0 Campbell SHR: 0 COMPUTE PEAK HORIZONTAL ACCELERATION FAULT -DATA FILE USED: C:\Program Files\EQFAULTI\CGSFLTE.DAT MINIMUM DEPTH VALUE (km):. 3.0 49 FAULTS FOUND WITHIN THE SPECIFIED SEARCH RADIUS. THE SAN ANDREAS - Whole M-la FAULT IS CLOSEST TO THE SITE. IT IS ABOUT 7.0 MILES (11.2 km) AWAY. LARGEST MAXIMUM -EARTHQUAKE SITE ACCELERATION: 0.4792 9 --------------- ,. EQFAULT SUMMARY • --------------- ----------------------------- DETERMINISTIC ----------------------------- SITE PARAMETERS • VZW Spanish Bay, Page 2 ------------------------------------------------------------------------------- I (ESTIMATED MAX. EARTHQUAKE EVENT I APPROXIMATE I ------------------------------- ABBREVIATED I DISTANCE I MAXIMUM I PEAK JEST. SITE FAULT NAME I mi (km) JEARTHQUAKEI SITE JINTENSITY 1 I MAG.(MW) I ACCEL. g JMOD.MERC. SAN ANDREAS - Whole M-la 1 7..0( 11.2)1 8.0 1 0.479 1 X SAN ANDREAS - Coachella M-lc-S 1 7.0( 11.2)1 7.2 1 0.393 1 X SAN ANDREAS - SB-Coach. M-lb-2 1 7.0( 11.2)1 7.7 1 0.451 J X SAN ANDREAS - SB-Coach. M-2b 1 7.0( 11.2)1 7.7 1 0.451 1 X • SAN JACINTO-ANZA 1 19.3( 31.0)1 7.2 - 1 0.180 I VIII SAN JACINTO-COYOTE CREEK 1 20.2( 32.5)1 6.6 1 0.107 J VII BURNT MTN. 1 20.9( 33.7)1 6.5 1 0.094 1 VII EUREKA PEAK 1 21.7( 35.0)1 6.4 1 0.083 I VII SAN ANDREAS - San Bernardino M-11 22.7( 36.5)1 7.5 1 0.188 1 VIII SAN JACINTO - BORREGO I 31.8( 51.1)1 6.6 1 0.061 1 VI PINTO MOUNTAIN 1 33.8( 54.4)1 7.2 1 0.094 1 VII EMERSON So. - COPPER MTN. 1 35.0( 56.3)1 7_0 1 0.076 1 VII PISGAH-BULLION MTN.-MESQUITE LK 1 36.2( 58.3)1 7.3 1 0.094 1 VII LANDERS 1 36.2( 58.3)1 7.3 1 0.094 1 VII EARTHQUAKE VALLEY 1 37.9( 61.0)1 6.5 1 0.044 1 VI , BRAWLEY SEISMIC ZONE 1 38.0( 61.1)1 6.4 1 0.041 1 V SAN JACINTO-SAN JACINTO VALLEY 1 38.8( 62.4)1 6.9 1 0.061 I VI ELSINORE (JULIAN) 1 41.9( 67.4)1 7.1 I 0.066 1 VI NORTH FRONTAL FAULT ZONE (East) 1 41.9( 67.5)1 6.7. I 0.047 1 VI ELMORE RANCH 1 45.2( 72.7)1 6.6 1 0.039 J V JOHNSON VALLEY (Northern) 1 47.0(' 75.6)1 6.7 1 0.040 I V ELSINORE (TEMECULA) 1 47.9( 77.1)1 6.8 1 0.043 I VI ELSINORE (COYOTE MOUNTAIN) 1 48.2( 77.6)1 6.8 1 0.042 1 VI • CALICO - HIDALGO 1 48.5( 78.1)1 7.3 1 0.065 1 VI SUPERSTITION MTN. (San Jacinto) 1 49.6( 79.8)1 6.6 1 0.034 1 V SUPERSTITION HILLS (San Jacinto)1 50.4( 81.1)1 6.6 1 0.034 1 V LENWOOD-LOCKHART-OLD WOMAN SPRGSI 53.1( 85.4)1 7.5 1 0.069 1 VIl NORTH FRONTAL FAULT ZONE (West) 1 54.0( 86.9)1 7.2 1 0.049 1 VI HELENDALE - S. LOCKHARDT 1 60.9( 98.0)1 7.3 1 0.049 1 VI SAN JACINTO-SAN BERNARDINO_ 1 62.0( 99.7 )1 6.7 1 0.028 1 V • ELSINORE (GLEN IVY) 1 63.1( 101.5)1 6.8 1 0.030 1 V IMPERIAL I, 64.7( 104.1)1 7.0 1 0.035 J V LAGUNA SALADA 1 67.8( 109.1)1 7.0 1 0.033 1 V CLEGHORN 1 69.8( 112.4)1 6.5 1 0.020 1 IV ROSE CANYON 1 75.7( 121.9)1 7.2 1 0.034 1 V NEWPORT-INGLEWOOD (Offshore) 1 76..l( 122:4)1 7.1 1 0.031 J V CHINO -CENTRAL AVE. (Elsinore) 1 77.3( 124.4)1 6.7 1 0.020 1 IV CUCAMONGA 1 78.9( 127.0)1 6.9 1 0.023 I IV WHITTIER 1 80.7( 129.9)1 6.8 1 - 0.022 I IV SAN JOAQUIN HILLS 1 83.0( 133.6)1 6.6 1 0.016 I IV • Lm Lm Lm 0 �m 0 DETERMINISTIC ----------------------------- SITE PARAMETERS VZW Spanish Bay, Page 3 I (ESTIMATED MAX. EARTHQUAKE EVENT I APPROXIMATE I------------------------------- ABBREVIATED I DISTANCE I MAXIMUM I PEAK JEST. SITE FAULT NAME I mi (km) 1EARTHQUAKEI SITE 11NTENSITY I I MAG.(Mw) I ACCEL. g IMOD.MERC. SAN ANDREAS - Cho-Moj M-lb-1 1 84.0( 135.2)1 7.8 1 0.050 1 VI SAN ANDREAS - Mojave M-lc-3 1 84.0( 135.2)1'- 7.4 1 0.035 1 V SAN ANDREAS - 1857 Rupture M-2a 1 84.0( 135.2)1 7.8_ 1 0.050 1 VI SAN JOSE 1 89.0( 143.3)1 6.4 1 0.013 1 III CORONADO BANK 1 90.7( 145.9)1 7.6 1 0.038 1 V SIERRA MADRE 1 91.5( 147.3)1 7.2 1 0.023 1 IV GRAVEL HILLS - HARPER LAKE 1 .92.4( 148.7)1 7.1-. 1 0.024 1. IV PUENTE HILLS BLIND THRUST 1 94.8( 152.6)1 7.1 1 0.020 1 IV NEWPORT-INGLEWOOD (L.A.Basin) I, 96.3( 155.0)1 7.1 1 0.022 1 IV -END OF SEARCH- � � V • 190 Lm VZW SPANISH BAY FRISKSP ANALYSIS VD-3720-01 ------------------------------------------------- CLOSEST DISTANCES BETWEEN SITE AND FAULT RUPTURES NO. FAULT NAME CD 1DRP CD_2DRP CDIST CLODIS' CD EPI CD•HYPO 1 SAN ANDREAS - Whole M-la -------------------------------------------= 10.8 10.8 11.2 10.8 10:8 '12.9 km 2 SAN ANDREAS - Coachella M-lc-5 10.8 10.8 11.2 10_8 10:8 11.0 km 3 SAN ANDREAS - SB-Coach. M-lb-2 10.8 10.8 11.2 10.8 10.8 10.9 km 4 SAN ANDREAS - SB-Coach. M-2b 10.8 10.8 .11.2 10.8 10.8 ' 10.9 km 5 SAN JACINTO-ANZA 30.8 30.8 31.0 30.8 30.8 30.9 km 6-SAN JACINTO-COYOTE CREEK 32.4 32.4 32.5 32.4 32.4 32.4 km 7 BURNT MTN. 33.6 33.6 33.7 33.6 34.6 34.6,km 8 EUREKA PEAK 34.9 34A 35.0 34.9 36.0 36.0 km 9 SAN ANDREAS - San Bernardino M-1 36.4 36.4 36.5 36.4 37.2 37.2 km 10 SAN JACINTO - BORREGO, 51.0 51.0, 51.1 51A 51.8 51.8 km 11 PINTO MOUNTAIN 54.3 54.3 54.4 54.3 54.3 54.3 km 12 EMERSON So. - COPPER MTN. 56.2 56.2 56.3 56.2 56.7 56_7 km 13 PISGAH-BULLION MTN.-MESQUITE LK 58.2 58.2 58.3 58.2 58.5 58.5 km 14 LANDERS 58.2 58.2 58.3 58.2 59.3 59.3 km 15 EARTHQUAKE VALLEY 60.9 60.9 61.0 60.9 61.2 61.2 km 16 BRAWLEY SEISMIC ZONE 61.0 61.0 61.1 61.1 61.9 62.0 km 17 SAN JACINTO-SAN JACINTO,VALLEY 62.3 62.3 62.4 62.3 63.2 63.2 km 18 ELSINORE (JULIAN) 67.3 67.3 67.4 67:3 67_3 67.4 km 19 ELMORE RANCH 72.6 72.6 72.7 72.6 72.7 72.7 km 20 JOHNSON VALLEY (Northern) 75.5 75.5 75.6 75.5 76.6 76.6 km 21 NORTH FRONTAL FAULT ZONE (East) 77.1 66.2 67.5 67.5 67.4 68.5 km 22 ELSINORE (TEMECULA) 77.0 77.0 77.1 77.0 77.4 77.4 km 23 ELSINORE (COYOTE MOUNTAIN) 77.5 77.5 77.6 77.5 78.0 78.0 km- 24 CALICO - HIDALGO 78.1 78.1 78.1 78.1 79.0 179.0 km 25 SUPERSTITION MTN. (San Jacinto) 79.8 79.8 79.8 79.8 80.6 80.6 km 26 SUPERSTITION HILLS (San Jacinto) 81.1' 81.1 81.1 81A 82.1 82.1 km 27 LENWOOD-LOCKHART-OLD WOMAN SPRGS 85.3 85.3 85.9 '85.3 86.4 86.4 km 28 NORTH FRONTAL FAULT ZONE (West) 96.9 85.9 86.9 86.9 87.2 88.0 km 29 HELENDALE - S. LOCKHARDT 97.9 , 97.9 •98.0 97.9. 99.0 99.0 km 30 SAN JACINTO-SAN BERNARDINO 99.7 .99.7 99.7 99.7 •100 J 100.7 km EXPLANATION CD_1DRP = Closest distance to projection of rupture area along fault trace. CD'2DRP = Closest distance to surface projection of the rupture area. CDIST = Closest distance to seismogenic rupture. CLODIS = Closest distance to subsurface rupture. - CD EPI = Closest epicentral distance. CD HYPO = Closest hypocentral distance. RETURN PERIOD vs. ACCELERATION CAMP. & BOZ. (1997 Rev.) AL 1; VD-3720-01; 100000 C 10000 L . 0 .L a� a- 1000 L LL. 100 0.00 0.25 0.50 0.75 1.00 1.25 1.50 Acceleration (q) PROBABILITY OF EXCEEDANCE CAMP. & BOZ. (1997 'Rev.) AL 1; VD-3720-01; 25 yrs 50 yrs • 100 75 yrs 100 rs 90 • 80 X O `. 70 60 c� 0 50 • ID U 40 - 30 X20 W 10. 0.00 0.25 0.50 0.75 1.00 1.25• . 1.50 • Acceleration (g) A Project Name = VZW Spanish Bay Date Wed Nov 19 08:07:37 PST 2008 Conterminous 48 States • 2003 NEHRP Seismic Design Provisions' Latitude 33.6559 Longitude =-116.2516 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - 'Fa = 1.0 ,Fv = 1.0 , Data are based on a 0.01 deg grid spacing Period- Sa . • (sec) (g) 0.2 1.500 (Ss, Site Class B) 1.0 0.600 (S1, Site Class B) Conterminous 48 States - 2003 NEHRP Seismic Design Provisions Latitude = 33.6559 ' • Longitude =-116.2516 Spectral Response Accelerations SMs and-SM1 SMs = Fa x Ss and SM1 = Fv x S1 Site Class D - Fa =,1.0 ,Fv = 1.5 Period Sa (sec) (g) 0.2 1.500 (SMs, Site Class D) 1.0 0.900 (SM1, Site Class D) Conterminous 48 States 2003 NEHRP Seismic Design Provisions • Latitude = 33.6559. Longitude =-116.2516 Design Spectral Response Accelerations SDs and`SD1 SDs = 2/3 x SMs and SD1 = 2/3 x SM1 Site Class D - Fa = 1.0 ,Fv = 1.5 Period Sa (sec) (g) 0.2 1.000 (SDs, Site Class D) 1.0 0.1600 (SD1, Site Class D) ; • Project No VD-3720-01 • Verizon Spanish Bay F Test Report ^ • Site Name: VZW Spanish Bay " Site Address: 54001 Madison Street, La Quinta, California. • Report Prepared by: Geotechnical Solutions, Inc. Give two or three sentences description of the soil as seen at the site: Very fine to fine sand, with some pebbles Soil Condition: ❑ Wet ❑ Damp ® Dry Choose one and only one of the following descriptions that best describe the earth conditions: ` ❑ Good clay earth ®Sandy soil ❑ Solid rock ❑ High -Rise site • If high-rise site was checked, verify the location of the main water line entering the building and give the following information:_ ❑ The line was located and verified as copper and is inches in circumference. The line was located and verified as iron and is inches in circumference. ❑ I was unable to locate the water main and recommend further engineering study for the grounding of this site. Provide the following information: Date of Resistivity test: 1'l-18-08 • Weather for the seven days preceding the test: Sunny and moderately warm (The last three days must have been clear and sunny.) Model number .of test instrument: NILSON MODEL 400 • Serial number of test instrument: 4-7368 17 Project No VD-3720-01 Verizon Spanish Bay Project Ndme: Spanish Bay • Date: 11-18-08 Project No: VD-3720-01 • Site Address: 54001 Madison Street, La Quinta, California. RESISTIVITY DATA 0304 'Formula 957.5*R 1915*R 3830*R 5745*R 7660*R' ;Measured R 2.1 1.6 ; Area lj. 4-, 2,394 3,064 (a Ohm -cm Ohm -cm Area ure Me,:� a' Area:, ,measure, 7T77d' Meig&iol -1 Area'r."4. :(�al C. 0 0 • Bin # 5 ? City of ' La Quinta. Building &r Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 - Building Permit Application and Tracking Sheet Permit p. f�Ir Project Address: 41,0V /-ro el Owner's Name: A. P. Number: -7r7r, a Z Address: Legal Description: City, ST, Zip: Contractor: telephone: 1E Address: Project Description: ft City, ST, Zip: ? 54 005 Telephone: K State Lie. # City Lie. #, Arch., Engr., Designer. Address; ,X City., ST, Zip: r Telephone: State Lie. #: Construction Type: Occupancy: Project type (circle one): Now Add'n Alter Repair Demo Name of Contact Person Sq.Ft: # Stories: # Units: Telephone # of Contact Person: Estimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Reqld Rec1d' TRACKING PERMIT FEES Plan Sets o? Plan Check submitted Item Amount' Structural Cales. Reviewed, ready for corrections Plan Check Deposit Truss Cales. Called Contact Person (ima tj Plan Check Balance Tide 24 Cales. Plans picked up Construction Flood plain plan Plans resubmitted !St Mechanical Grading plan Review, ready for correcti3�e All 11 I Electrical Elect Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.MX H.O.A. Approval Plans resubmitted Grading IN HOUSE:- 3a Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person WA.I.P.P Pub. Wks. Appr Date of permit issue LIDS .L—* School Fees Total Permit Fees 2��29� - (� l s �- ( OW., So �,�) 1z r P.O. BOX 1504 BUILDING & SAFETY DEPARTMENT 78-495 CALLS TAMPIC0 (760) 777-7012 LA QUINTA, CALIFORNIA 92253 FAX (760) 777-7011 To: Greg Butler, Building & Safety Manager To PD: 08-2340 From: Les Johnson, Director-PDD Due Date: ASAP Permit #: Status: 1ST Building Plans Approval (This is an approval to issue a Building Permit) The Planning Department has reviewed the Building Plans for the following project: Description.: REVISION CELL TOWER Address or General Location: 54-005 MADISON Applicant Contact: JEFF ROEBUCK 714 730-0606 The Planning Development Department finds that: . ❑ ...these Building Plans do not require Planning. Department approval. E ...these,Building Plans are approved by the Planning Department. ❑ ' ...these Building Plans require corrections. Please forward a copy of the attached corrections to the applicant. When the corrections are made please return them to.the Planning Department for review. Les Johnson, imc or=PD Date . t recewe AUG 2 3 2010 City of La Qdrda Ptarming Department