RC (003180)54101 Madison St
003180
P.O. BOX 1504 N O .. 00318
Building 78-105 CALLE ESTADO
Address 54-101 ftillson LA_QUINTA; CALIFORNIA 92253 -
Owner -
' ' ' RTs•ea BUILDING:.TYPE CONST: OCC: GRP.
Mailing '
Address
P. 0• BOB 1000 A.P. Number 1)t4A ['Last
City Zip Te I.
A bites.. .... 92 a Sib-3o)ls4 Legal.Description
Contractor Project Description rsva a a. ilas4: I ae
Address. .. _
City_ Zip Tel: -
F
State Lic. City
& Classif. Lic. # Sq. Ft. No. No. Dw.
'
Size, Q.a50 i Stories --Units
Arch., Engr ..... _._ Y-
' ` Designer New.1S Add El Alter 0- Repair 0 s F 'Demolition 0
Address Tel.
City Zip State
Lic. #
--. LICENSED CONTRACTOR'S DECLARATION,
I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section « ,
700, of Division 3 of the Business and Professions Code, 'and my license is in full force and `
effe0)ct-......
-SIGNATURE* ' „-".f A$ DATE
"F
OWNER-BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for the following EStlmated Valuation y g r -
_reason: (Sec. 7031.5,8usiness and Professions Code:. Any city or. county :which requires .a,iZv.i 1.
permit• to construct, alter, improve, demolish, or repair any.structure, prior to,its issuance also
. requires the applicant. for such 'permit to file a. signed statement that he.islicensed pursuant to . ' PERMIT Q-AMOUNT
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) o/ ' - - •r
Division 3 -o! the Business and' Piofesslons Code, or that: he is exempt therelroin, and the' basis - - _ - • . ,
'!or the alleged exemption. Any violation of Section 7031.5' 'by 'any. applicant. for a -permit Plan Chk.. Dep. ..
subjects the appucantto-a'civil penalty of not more than five•hundied dollars ($500).Chk. Bal. 4
-
,
O I, as owner of the property, or my employees with wages.as their sole compensation, willPlan.
do the work, and the structure is not intended or-offered fovsale: (Sec.. 7044,, Buisness and c
^Profess
ions Code: The- Contractor's License Law does not :apply fo:an owner o/ property who COr1St.
builds or improves thereon and who does such work -himself or through his own employees,-
provided that such improvements are not intended or offered /or sale. 1/, however, •the building; Mech..'%- rSO
or improvement is sold within one year o/ completion, the owner-builder will have the burden
Electrical X4'4
of proving. that he did not build or improve for the purpose of sale.)
0 1, as owner of the property, am exclusively contracting with licensed contractors to con- Plumbingg-
struct the project: (Sec: -7044, Business and Professions Code: -The Contractor's-License Law -
does not apply to an owner of property who builds or improves thereon, and'who contracts for S.M,I, , All
such such projects with a,confractor(s) licensed pursuant to the Contractor's License Law.) -
Grading
❑ I am exempt under Sec. B: & P.C. for this reason
Driveway Enc.
Date owner Infrastructure LOO
r WORKERS' COMPENSATION DECLARATION
L'hereby affirm that'l have a certificate of.consent to self-insure, or a'certificate-of' '
Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)'
Policy No. ... - .Company _ .., ... ...
O Copy is filed with the.city. . 0 Certified copy is hereby. furnished... •:
I TOTAL
CERTIFICATE OF EXEMPTION FROM REMARKS'.
WORKERS' COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars (S100)- valuation-
or
.. - or less.) .. ... ... . _ _ ... '
1 certify that in the performance of thg work for which this permit is issued, I'shall not
employ any person in any mannerso'as to become subject to the Workers'-Compensation'
Laws of California. E,FtJFf f li i f3 31 i . c Fi
Date Owner _
NOTICE TO APPLICANT: If, after making this Certificate of Exemption oyou -should become ZONE: } BY:
'subject'to the, Workers— Compensatiori' provisions 'o! the Labor Code,' you mush forthwith MII'tlfllUm Setback Distances:
comply with such provisions or this permit shall be deemed revoked. - - - - - -
Front Setback from,Center Line
Rear, Setback from Rear Prop. Line
. , CONSTRUCTION LENDING AGENCY ,. = Side Street Setback from Center Line
I hereby affirm that there is a construction lending agency for the."performance: of the
work for which this permit is issued. (Sec. 3097, Civil Code.)-. - - - - Side Setback.from Property Line
Lender's Name
Lender's. Address
4 This is a building permit when properly filled out, signed and validated, and is'subject to FINAL DATE INSPECTOR '
expiration if work thereunder is suspended for 180 days.-
1 certify that I have read this application and stale that the above information is correct 1sSUed by: Date J;/?4/R7Permit
i_ I agree to comply with all city and county ordinances and state laws relating to building a
construction, and hereby authorize representatives of this city to enter the •above.
mentioned property for inspection purposes. . Validated by:`
B
Signature of applicant Date'
,Mailing Address Validation:
•City, State, Zip
HARD COPY , ' :' - • -
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
1ST FL. SQ. FT. ® $
2ND FL. SQ. FT. ®
POR. SQ. FT. ®
GAR. SO. FT, ®
CAR P. SD. FT.
WALL SQ. FT. ®
SQ. FT. ®
ESTIMATED CONSTRUCTION VALUATION $
UNITS
5
MOBILEHOME SVC.
POWER OUTLET
YARD SPKLR SYSTEM
BAR SINK
ROOF DRAINS
DRAINAGE PIPING
DRINKING FOUNTAIN
URINAL
WATER PIPING
NOTE: Not to be used as property tax valuation
BONDING
FLOOR DRAIN
MECHANICAL FEES
FORMS
WATER SOFTENER
VENT SYSTEM FAN EVAP.000L HOOD
SIGN
WASH ER(AUTO)(DISH)
APPLIANCE DRYER
GAS (ROUGH)
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
OTHER APPJEQUIP.
LAUNDRYTRAY
AIR HANDLING UNIT CFM
TEMP. POLE
KITCHEN SINK
ABSORPTION SYSTEM. B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET
COMPRESSOR HP
POLE, TEM/PERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER B.T.U.
SQ. FT. ® c
BATH TUB
SQ. FT. ® c
WATER HEATER
MAX. HEATER OUTPUT, B.T.U.
SQ. FT. RESID ® 11/4 c
SEWAGE DISPOSAL
/
SQ.FT.GAR ® 3/<c
HOUSE SEWER
VENTILATION
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FEE
DBL
TOTAL FEES
MICRO F7
MECH.FEE PL.CK.FEE
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR
SETBACK
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL. AREA
SLAB GRADE
ROUGH PLUMB.
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH)
METER LOOP
HEATING (FINAL)
OTHER APPJEQUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
FINAL INSP.
BOND BEAM
WATER SYSTEM
GRADING
cu. yd.
$ -Plus-X$-=$
LUMBER GR.
FINAL INSP.
FRAMING
FINAL INSP.
ROOFING
/
REMARKS:
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING
MESH
INSULATION/SOUND
FINISH GRADING
FINAL INSPECTION
CERT. OCC.
FENCE FINAL
INSPEG10H'5 51GNAIUHh511NIT1ALS.
GARDEN WALL FINAL
KA
JOe F'lA`hISoN ,ULF-
FACILITY'
ALEX OTT & ASSOCIATES
SHEET NO
of
. CONSULTING ENGINEERS
603 -Palm Avenue
CALCULATEDay
A O 7--r DATE
SEASIDE,' CALIFORNIA 93955
CHECKED BY,
DATE
(408) 394-5936
L
•
SCALE -
D. L.
L.L. T. L.
ROOF LOADS
Roof ing
0-'0 psf
Sheathing.
2.0
Framing
. Ceiling
Insulation
Misc.
1 6-U psf
16. U psf 0 psf
FLOOR LOADS
Finish
Psf
Sheathing
Framing
Insulation
Ceiling-
eiling
Misc..
Misc..
ps.f •
psf psf
Q of ESSIn
DE
c`
No.. C 38377
_
elf OF CAS
By.' .
. .......... Date .......•Subject.......... ..�. Pg. No.' Z
ChkdBy..... . Date
. Job No.. ...
.. ... .. ftp o f : F�Y4� j^^. �. h ....... • .......... .
Hdr. No.
w.= 16 [18 + 16] = 544 Lbs..,per.Ft.
Dist. Load w (LL) w (DL) w (TL).
w = 288 + 256 _ .544 Lbs. per Ft.
Length _. 14.25 'Ft.
L.D..F. 1.25
L. R. 3876 Lbs.
R. 11. = 3876 LBS.
Max. Moment _ 13808 Ft-. - Lbs.
Max. Shear = 3275 Lbs.
Allow. Total Load Deflec. = 14.25 x_12 / 240 = 0.71 in.
Allow: Live Load Deflec. = 14.25 `x 12 / 360 0..48 in.
Sreqd 13808`x'12./ 1875 = 88.4 in. 3
Depth Factor = (.12 / 13.25 ] "1/9 = 0.99..
Try 4. x 14 A =. 46.38 in. -2
S 102, 4.1 in,.. 3.
I = 67.8.48 in. "4
Fb _ 13808 x.12 / 102 1618 psi < 1854 psi
Fv = 3275 x 1.5 / -46.4.. 105.9 psi < 118.8.psi
Total Load'Deflection = 0.41 in. < 0.71 in.
Live Load Deflection- = 0.22 in <. 0.48 in.
USE
A e 4 X'
14..
By.+........... Date......*Subject..................'. Pg.
.. No.
.hkd By .. ... Date ... . .
Job No.. .......
Hdr. No. 2-
w
w = 16 (18 ,*+ 16 ] _ .54.4 -.Lbs. per Ft.
Dist. Load w (LL) w (DL) w (TL)
w = 288 + 256 = 544 Lbs per Ft
Length 3'. 25'- Ft.
L.D.F. = 1.25
L:R. = 884 Lbs.
R. R. = 884 LBS.
Max. Moment = 718 Ft. Lbs:
Max. Shear, - 725 Lbs
Allow. Total Load Deflec. 3.25 x12 / 240 0.16 in.
Allow. Live Load Deflec. 3.25 x 12 /.360 0.11 in.
Sreqd = 718 x 12 / 1875 4.6 in. 3
.:.Try. 4 x 4 A- 12.25 in. -2
S = 7.15 in. -3
112.51 in.' -4
Fb = 718 x 12 / 7 = 1206 psi < 18.7.5. psi
Fv = 725 x 1.5 / 12-.3 = 88.8 psi < 118.8 psi
Total Load Deflection _ 0.06 in. < 0.16 in.
Live -Load Deflection - .0.03 in. < 0.11 in.,
USE
A 4 x 4
ALEX OTT & AsSg&ATES. JOB
CONSULTING ENG RSA
603 Palm Avenue SHEET NO. OF
SEASIDE, CALIFORNIA 93955 CALCULATED BY DATE
(408) 394-5936
CHECKED BY DATE
SCALE Lat, ral
............ .............. ............. . ............. ............. .... ................
.................. .... . ......... . ............. ...... .... . ............. .............. ...... .......... ...........
.............. ............. .............. ............. ............ . .....
........ . ...
............ .
............................ . ............. ............. .............. .............. .............. ............. ............
.............. ............. . .............. ............. . . .............
.............. ............. ............. ..............
.............. . ............. . ............. . ............. ...... ............
............. .............. ..............
.............. .............. ............. ............ : ............... . ............. . ....... .... . .............
.............. .............. ............. ............. ....... .............. ............................. .............. .............. .............. ............. .......... ... .... . ...... ........ .... ....................
. .............. ... .......... ............ ............. ......... ....
Z.
............ ............. .............. ............. . ............. ...... ... ... .. ....... .... ...... .. ..... .............. ......................... ............. ....... ....... .............. .............
. ............... .............
............ .............. ............. .............. ............. ............. ............. % ...............
. .......... .......... .............. .............. .............. f .............
.............. ............. .......... .............. ............ .............. ........ . .... ............. .............. ... .......
............ ............
.......... ........ ...
............. .............. . ............ ...........................
............. ......... . ............. .. .......... . . ..... ...... ... .............. ..............
............... ............. .............
....... ... . ............ .............. ............. . . .... ........... ............ .............. ............. ............. ..............
............ ............. A I ..... ...... .. ............... .............. .......... Z'= ......... .
I .............
............. .... . ............ ........... i ....................... ...... ............. ............. ...
.............. .............. .............
..... . ..... ......... .. .............. .... .............
............ .............
............. .............. .............. ............. ............. ....... . ........... ..............
. ............. .............. ... .......... .............. . ... ....... ............. . ... ..
...... .......... . . .. ............ ...... .............. .............. .............. ........ .............. ... ... .... ....... ...
............. ............ .....................
............. ............ . . .......................................
. ...... ....... ....
....... . ..... .............. .............
............................. ..............
........ ... ....... . ...
.............
............ ............. .............. ............. . ............. ..............
... .......... ............. . ............. ............. ............. . .......... ............ . ...... ..... ............. ........... ............ ............ I .... ............. ... . ........................
............ ............ . ............... . .............. ............ .......... ........ ....... ............. .............. ............ .. .......... ............ ............. ............. ........... . ............. . ..............
.............. .............. ............. ............
. .............................. ............
.............. ............. .............
............. . ............ .............. .............. .. ........... ............. . ... ......... ............ . ............ . ............. ..... .. .. . .....
............... ...... .......
............ ............ .............. ................ ............. Ld . . ...... 2-6
. ........... ........... . ............. . . ........ ............... ........................... ............. .............
..................... ............ .............
............. .............. .............. .............. ............
•
............ . ....... ............ .............. . : .............. ............. i ............... ............
............ .......... . ............. ........... ............. ............ .............. .. .. ...... ............ ............... :
............. I .............. 8 f
............. ............. .............. . ............. ............. ............ ....... .......... ..
.............. ........................... ....... ..... .............
............. .............. ..............................
.............. ............. .......... ............. ............. ... ....... .............
............
..............
............. ............ ..... .............. .............. ............. ............. .............. .............
.............. .............. ............ .............. ..............
............. ...............
............ ............. ............ ............. I . ........
............ ............. ....... - ..........
13 ........ ..... ............. .......... . ...... .... ? ............. ..... ........ .............. i V ............. .. ......... ....... ............... ..........
........ ....... ... ..............
............. ............ .... ....... .............. ............
............. ............ ............. ..... ....... ............. .............. .............. .............. ......
........ .............. ..... . ..... ............. ............. . ........... . ............. ............ . ........... .......... ............. ............. . ............. .
. ............. .................................
............. ............. ............... V
. .... 12
........ ............ .......................... ..........•............... : ..................... ... ......
.......... . ........... . ............
............. .............
............ ............. ............. .............. ............. ........... .............. .............. ............. . 5 21
............. ............. ....... .... .. ........... .............. . ...... .......... .............. .............. .............. .......... ..
............. ............. ..............
c) x- 12 1
............ ............. ............. .............. ......0.7.. M 1 3! 6. 7 8 o 1=
................ ..... ........... ............. .............. ............... ........ . ...... ..... ....... ....... .............. .............................
............. ............. .......... ............
............. ............. ............. ..............
............. ............. ............. ............. ............. .............. .............. .... ........ ................... ......... ............. . ............. ............. ............. ............. ........... .............. ............. I ................ ............. .............. .............. ............... .............. . .............................
............. .................... ........ .... .............. ........... .. .......... T
............. ............ ............ ............. .............. ... ....... ............. ............. . .......... .............. .............. ............ . ............. . ............. ............. .............
............... ...... ...... . .............
............... ..... .........
............. ........... . ............................ ............. ........... .. ............. . ............ I ............. ............. .............. .............. ..............
z .......... ........... .............. ............. .............. .............. ............ ............. 4 .............
............. ............. . ............. ........... C'
............ ............. ............. .......... ... .......:..............:.............G.. ............. . ............. ............. ............ ..............
............. ..................... ...........................
.... .... ................. .......
............... ...........
............. .................................. ............. .............. ........... ...... ........... ... ............... ............. .............. :
....... ........... .. ............ ..........................
..........
............ . ............. : .............
.............. .......... .............
i
............. . .. ... .............
............ ............. .............. 2- A 0,
........ . ............ .......... .......... ... .........
. .... ............. .. ..............
...... ..... ............. ............. ............. .............. .............. ..............
..........
.............. ..........•........... .......
.............. ...... .............. .....
............. .............. . ............. .............
.......................... ............. ............ . ........................... ............. ..............:.............:.............ems
.......... ............. t .............. ............. .............
.............. . ............. ............. .............
............. ........................... ........... ............ •
............. .............. . ............ ........... ............................. .............
............. ............. ............. ...............
............ ............. ........ .............. ............. .............
...................... .....
.............
............ ............. ............ .........
...
.............. .............. ............. ............ : ............... . ............. . ....... .... . .............
............. ............. . ............. ............. ............. ............. .............. .............. .............. .............. ............. ............. ............. .............
............. ............. ............. ......... .......... .............. .............. ...... ............ .............. .... .......... ............
............ ............. .... ...... ......... ............. ............. ............. ............. ............. .......... .............
........................... ............................ ............................. .............. ............. ............. .............
............. ...... ..............
...................... ............ .............. ............. ............. . .......... .......... ..... .. .... ............. ............. .............
..........
.............. ............. ... ... ............. ........... ............. .............. .............. .............. . ..... ............. ..........
... ...... ............. ............. .............
GMbk MM 01471.
ALEX OTT & ASSATES
'CONSULTING ENG RS
603 Palm. Avenue
Y SEASIDE, CALIFORNIA 93955
(408) 394-5936
s _
JOB c/
SHEET NO.--- l - OF t
CALCULATED BY DATE
CHECKED BY DATE_
ALEX OTT & ASSgSATES
CONSULTING ENG RS -
603 Palm Avenue
SEASIDE, CALIFORNIA 93955
(408) 394-5936
JOB
SHEET NO. f OF
CALCULATED BY DATE
CHECKED BY DATE
Arm p
.0-jr-A-0-1
.............. ............. I .............
GmWm Mm 01471.
.y b4z :ik .pTE s.:..S4.i.•° :
MA(dDATORY MEASURES
MADLIN'S ENTERPRISES
' f- r` ENERGY BUDGET & MANAGEMENT CONSULTANTS
P. 0. BOX 1443 PALM SPRINGS, CA 92263
..
(619) -324-1731
RESPONSIBILITY FOR SIGNING DOCUMENTS SECTION 1403(a)l.
Each document described in Sections 1403(a)2 and 1403(a)3 shall be signed by the person
responsible 'for its preparation. The signer shall be licensed or registered -.,to practice by the
State of California or eligible under the Business and Professions Code to sign, such docu—
ments. if more than one person. has responsibility for building design or construction, each
person 'may prepare and sign the document or documents applicable to that portion fo the
design or construction for which the person was responsible; alternatively, or the person with
chief responsibility for design or construction may. prepare and sign the document for the
entire design or construction.
All new buildings designated to -allow.- conditioned - use of an 'occupancy group or type
regulated by these "s"tan"dards -shall - *record a ,"certificate- of, -com.pliance o6h: the -plans. The
individual with professional- responsibility ,for the design and the .owner shall sign the
certificate.- The owner of the building -shall. retain. a copy of this certificate of compliance
and .transmit it to a subsequent purchaser of the building.
•
yi.
r
et
a
Certificate of Compliance (Part 1 of 2)
PGA WEST MADISON GOLF MAINT: FACILITY FOR
Project Title
LANDMARK LAND CO..
Proact Architect/Engineer Building Permit Number
PMWEST
Project Location Ply Checked By
LA QUINTA
C, /Town climate one
MADLIN'S ENTERPRISES 06/17/87
CF -1.
For Enforcement Agency Use Only
Date
Field Checked y_ Date
Signature and
Documentation Author Date Registration Stamp Approved By Date
:JOB -NO. 11395
Prescriptive Approach/Performance
Approach Strategy -
General 1St
n
GEN. NON -
1
CEC Occupancy Type . . . . . .
RES
2
UBCOccupancy.Group/Division ... , ,
.
3*
Package Selected . . . . . . . . . NA_
Budget Table •." . . . . . . •.. . t
4
Gross Conditioned. Floor Area , , , , , 697
ft2
Roof and Floors
Calculated Annual Energy Consumptlon
5
Proposed Roof/Ceiling Rt (CF -2: CF -3) ",
hr -F-' t2/Btu
6
Required Roof/Ceiling Rt (CF -2) , ,
hr-F408tu
7
Proposed Exterior Floor Rt (CF -4 CF -3) ,. ,
hr-F-0/8tu
8 •
Required Exterior Floor Rt (CF -2)''.
hr-F-ft2/Btu
Walla .
Heating.. ..
9
.
Proposed Opaque Wall Rt (CF -2, CF -3),.
hr-F-ft2/8tu
10
Wall Heat Capacity (CF -3).. :
Btu/F-ft2
t 1
Required. Opaque Wall "Rt (CF -2) , ,
hr-F-ft2/81:u
Glazing In Walls
12
Ext • U0.11 Area CF -2)Q
14'
Performance Approach
Energy Budget
1
CEC Occupancy Type . . . . . . . . .
2
UBC Occupancy Group/Division , , , , ,
4
Conditioned Floor Area . . . . .
ft2
4
Budget Table •." . . . . . . •.. . t
5
Allowed Energy Budget (WS -1A) , , , ,
kBtutyr-ft2. .
Calculated Annual Energy Consumptlon
6
Approved Calculation Method , . . . . .
. .
7
CEC Designation . , . . . .
8
Multiplier . . . . . : .
Estimated Energy Use -
9:
Heating.. ..
kBttyyr_ft2 ,
`.
10
'Cooling .. . . . . . . . .
kBtu/yr ft2... .
11
Fans . . . . . . . . . .
k8tutyr-ft2'
12
Lights. :. ...
katuyr-ft2. .
13
• Miscellaneous Equipment, ,. , , ,
kBtu/yr-ft2
14'
Total ., . . . ...
k8tu/yr-ft2
`13 Total Glazing Area (CF -2).,.., ., •, .. • ft2 15 A0. Total Energy Use (line 8 x line 14) , kBtu/yr ft2
14 Proposed Total. Percent (Line 13 /Line 12) , % `
15 Average Total. SC•(CF-2) , , , :. Compliance Statement
16 Allowed Total Glazing Percent , , , , , %
17 West Exterior WaA Area CF•2 ft2. General: The proposed. building represented in this set- of compliance
( ) • • documentation is consistent with the other compliance fors and.
18' West Glazing:Area (CF -2) , ft2 worksheets, with the plans and specifications and with any other
19 Prosed. West, Permeant CF -2 .. q, calculations or. computer runs submitted with this permit application.
Po ( ) Performance Approach. (when applicable) The energy performance
20 Average West SC (CF -2) , estimate presented on this: for was calculated using the approved
21 Allowed West GlazingPercent . . . . % calculation method• indicated above and with the CEC established. fixed
and restricted engineering inputs for the applicable climate zone and
-Glazing In Roof (CF -6) Proposed Allowed occupancy type•
Prescriptive Approach. (when applicable) The proposed building has
22' Skylight 1 , ft2 been designed to meet the requirements of the Alternative Component
23 Skylight 2.. _ ft2 Package, indicated above for the appropriate occupancy type and. climate
24 Skylight 3 . ft2 zone
i 'Iliar
25 Skylight 4 . . . .... ft2 I
26 Skylight5... . . . . . ft2
27 Skylight 6 , ft2 Sign AR HI ECT
28 Skylight 7 . . . . . ft2
29 Skylight 8 . . . . . . . • . . ft2 Namel7itle
Lighting LANDMARK LAND CO. OF CALIF. , INC..
30 Proposed Adjusted LBS -(CF -5) . Watts/ft2 • Company.
P.O. BOX 1000
31 Allowed LPD (CF -5) . . , , . . . Watts/ft2
HVAC' .. Address
32 Performance Set Selected . ..... LA QUINTA , CA 92253
33 Proposed Fan Wattage Index (CF -4).. Watmitt2 City/State/Zip .(408)625-4060 #14006
1.; 34 Allowed Fan Wattage Index . . . . . Watts/ft2
ti
35 Proposed Cooling Power Index (CF -4) , Btuh/ft2 Telephone Calif. License Number
~`• P I B IVft2
36 Allowed Cooling ower ndex , to
37 Proposed Heating Power Index (CF -4) , Btuh/ft2
38 Allowed Heating Power IndeX , Btuh/ft2
Form Revised. September 1986
Page • of
Certificate of Compliance (Part 2 of 2) CF-
LANDMARK LAND .CO. / PGA WEST MADISON GOLF MAINT. FACILITY For Enforcement Agency Use Only
Project Tide
MADLIN'S ENTERPRISES 06/17/87-
Documentation
6/17/87Documentation Author/Firm Date Checked By Date
JOB NO. 11395
Both parts one and two of this Certificate of Compliance must be included with each building permit application for the above noted building and appear
on the plans submitted for approval.. The building features and requirements represented on the Certificate of Compliance are adequate to achieve.
compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are.
also adequate for any subsequent alterations, modifications or additions to the.building.
DeslgnerOne TITLE 24 DOCUMENTATION AUTHOR Designer Three
CATHY MADLIN
Name (Print)
MADLIN'S ENTERPRISE
Title/Company Name
P.O. BOX 1443, PALM SPRINGS, CA 92263
Address
06/17/87
Sign Date
En' en gency Sig re a
Name (Print)
Tide/Company Name
Address
Signature Date
orcement Agency Signature Date
Enforcement Agency Signature, Date ElUSIrce.ment Agency Signature Date
Owner
Co
=orrn Revised September 1986'
Enforcement Agency
Name (Print)
Tide/Agency
Address
M
Designer Two:.,A'RCHITECTURAL'
,ARCHITECTURAL
CONSULTANT .
Designer Four
GENE REIVER
Name (Print)
Name (Print)
MC CORD & - WALD
'rifle/Company Name
PALM SPRINGS ;TitleiCompany
Name
1555 S. PAL CANYON DR.
# D-201 CA 92264
Address
Address
6-17-87
Signature
Date
Signature Date
Enforcement Agency Signature, Date ElUSIrce.ment Agency Signature Date
Owner
Co
=orrn Revised September 1986'
Enforcement Agency
Name (Print)
Tide/Agency
Address
M
tiY.
Vandatory Measures Checklist MF -1
LANDMARK LAND CO. /.. PGA WEST .MAD I SON GOLF MAI NT . FACILITY For Enforcement Agency Use only,
Projectride
MADLIN'S ENTERPRISES 06/17/87
Documentation Author/Firm Date. Checked By Date,
` JOB NO: 11395.
Reference in Reference ir.
Construction Constiuctior
Documents Documents
[J, Photocell' sensors with a diffusing cover and ..
Envelope Measures no opaque cover per 2-5319(e)5 . .......... .
Certified insulation materials peat -5311(a) ... ET6 4 (1 Manufacturer's instructions provided for installation
(1. . . . and calibration per 2-5319(e)6.. . . . . . . . . .
[ ].. Insulation installed to meeYflame spread and smoke [. ] Proper installation of controls including sensor location,
density requirements of 2-5311(b) , . . . . . . . . . certification of initial calibration and controlof luminaires .
(] "
''Ursa* formaldehyde foam insulation is installedonly within daylit area per 2-5319(e)8., . . . . ..
per 2-5311(c) ... . . . . . [ ] Visible or audible malfunction alarms per. 2-5319(g) , ,
(] . Retrofit insulation specified as per 2-5313 , ,
(" ]
Occupancy g Sensin , Devices (when
Air infiltration is minimized by specification of
tested manufactured doors and windows and proper applicable):
sealing and weatherstripping as per 2-5317. .
Flicker. free operation and no premature lamp
Lighting. System .,Measures
failureper2-53,9ce>?-. '1
®tel ( ]. Time delays to prevent undesireable cycling
( ]. Certified luminaires/ballasts per 2-5314(b) ... A per 2-53.19(e),3 . •.... . . . . . . ... .• .
[ 1'> Independent,eontrol.w/ enclosed areas per 2c5319(a) . 4 A l [ j hVisible or. audible, malfunction alarms-per.2,5319(g) . .
Manual switching readily, accessible par Z5319(6) lr - Limits on emissions perex tions tot -5319 e
IT. • Reduction of lighting.load to at least one half per. mr
2=s3,s(c>. Occupancy:sensorscrpmgrammabtenmers.. HVAC` and Plumbing System :Measures
meeting CEC criteria may, substitute .
Separate switehin of 6t areas r2 -5319(d),. Piping insulated as,required.by 2-5312;,
I 1 g: ay per .
arate switchin of dims I and"valance fighting..(1' Certified HVAC equipment per 2-5314(a)..
] . Sep 9 Pay"
rn retail and wholesale stores per 2-5319(h) .[ j Certified plumbing;equipment per -2-5314(a),.. .
[ ] Automatic control of..display"lightin in retail Heatin and cooling equipment efficiency 2-'5314(b)..
g `[ 1 g g P cy per 2-5314
and wholesale stores per 2-5319.(hl"
(] " :Tandem wiring of one- and;lhree4amp uminaires.Pilotless ignition of. gas appliances per 2-5314(c).;... ,
per.2.5319(i).. : Automatic controls foroff=hours per Z5315(a)1 ,
Daylighting and Lumen Maintenance (] Thermostat set point requirements per 2-5315(a) ,
ControlS: (when applicable) [• ] Sequential control of heating and.,cooling per 2-5315(a)3 .
(j . Uniformly illumination reduction to one-half [ ] Automatic exhaust fan dampers per 2-5316(b) . .
per 2-5319(e)1 [j Thermostat controls for each zone per 2-5315(b) , ,
[.1 Flicker, free operation and no prematurelamp failure (j. Ventilation provided per 2-5316 and 2-5343,.
per 2-5319(e)2.. . . . . . .
[ ] Time decays to prevent undesirable cycling (] Heaters for domestic -hot water and/or pools per 2-5318
per 2-5319(e)3 . . . .
L] 'Step.switching.deviceswith separation between i
on/off settings per 2-S319(e)4 . ... . . . . .
Farm Revised September 1986 Page- ai
.1r
. MANDATORY MEASURES
MADLIN'S ENTERPRISES
ENERGY BUDGET & MANAGEMENT CONSULTANTS
P. 0. BOX 1443 • PALM SPRINGS. CA 92263
(619) 324-1731
NOTES TO BUILDER
The builder shall provide the building owner, manager, and original occupants a descript—
ion of the quantities of outdoor and recirculated air that the ventilation• systems are
designed to provide to each area. (Applicable to 1st do 2nd generation standards.) .
The builder shall provide the building owner, manager, and the original occupants a list of
*the heating, cooling, water heating, and lighting systems and features, materials, components,.
and mechanical devices, conservation or solar devices. installed in the building, and instruct—
ions on how to use them efficiently.
The builder shall rovide maintenance information to the. building owner, manager, and
original occupontes) for all features, materials, components, and manufactured devices that
require routine maintenance for efficient operation. Required routine maintenance actions
shall be clearly stated and incorporated on, a readily accessible label. The label may -'be
limited to identifying, the manual for that particular model or device.
If any characteristic of the building, materials, components, or manufactured device is,
changed , the change shall be indicated on amended plans and specifications and shall be
submitted to the enforcement agency... r
Before the' enforcement agency determines whether the building may be' occupied, the person
With overall responsibility for construction or the' person or persons responsible for the in—
stallation of regulated manufactured devices shall post, adjacent to the building permit(s)
issued for the building, installation certificates for manufactured devices regulated by the
appliance standards. These certificates shall:
ani,
1. identify the appliance or device;
2. include a statement and signature;
3. state the building permit number,
.. .'
MADLIN'S ENTERPRISES
P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263
(619) 324-1731
THIS PROPOSED NON-RESIDENTIAL PROJECT HAS' BEEN REVIEWED FOR
COMPLIANCE WITH 'TITLE 24, PART 6, DIVISION T-2( OF -THE STATE OF.
CALIFORNIA ENERGY CONSERVATION STANDARDS FOR NON-RESIDENTIAL
BUILDINGS BY MADLIN'S ENTERPRISES. THE BUILDING DESIGN DESCRIBED
IN THIS, COMPLIANCE PORTFOLIO IS IN SUBSTANTIAL CONFORMANCE WITH
THE STANDARDS.
JOB NUMBER: 11395 DATE: 06/16/87
PREPARED FOR: LANDMARK LAND COMPANY
OWNER: LANDMARK LAND COMPANY'
PROJECT TITLE: PGA WEST.- MADISON GOLF MAINTENANCE'
FACILITY EXPANSION
PROJ ECT LOCATION., LA QUINTA
PROJECT DESCRIPTION. SINGLE STORY WOOD FRAME -BUILDING
-F,IRST GENERATION STANDARDS
ILI
y '
Ilk
MADLIN'S -ENTERPRISES
P.O. BOX 1443 - PALM SPRINGS' CALIFORNIA 92263
(619) 324 1731 ,
PROJECT= PGA WEST MADISON GOLF MAINT. FACILITY EXPANSION.., -
PREPARED- FOR: LANDMARK LAND COMPANY `
JOB.NUMPER: 11395 DATE 06'/16/87
-------------
------------------------------------------
THE. FOLLOWING INSULATIONS, FEATURES, AND DEVICES WERE
.'INCLUDED; IN THE *ATTACHED TITLE: 4 COMPLIANCE ANALYSIS
-TO i DEMI iNSTRATE COMPLIANCE WITH THE 'STANDARDS.
'WALL INSULATION — FRAME ........, ..,,,,R=11
ROOF / CEILING INSULATION'............. . R=19 •
...
RAISED FLOOR OVER' 'UNCI=SND., -SPACE e. •.. , .. NA ,
SLAB INSULATION ....... ...... ..... ,, NONE REQ.
GLAZING U.VALUE ........„ . ,,, ,., 1.i.'SINGLE PANE
GLAZING•SHADE-COEFFICIENT .............. ,, 1.0 CLEAR*
GLAZING TREATMENT — SUNSCREENS .......NOT REQUIRED
GLAZING TREATMENT'— i OVERHANGS . , , , o , , . , , , AS SHOWN ON PLAN -
SKYLIGHTS.,,, ..,.,
. .. NONE
CONTINUOUS INFILTRATION BARRIER ......... NOT REQUIRED
VAPOR BARRIER >, . „ .,,,o, NOT REQUIRED
ELECTRICAL PLATE GASKETS.......,,,.,„ NOT REQUIRED
HVAC EQUIPMENT EFFICIENCY o ..,.,.0 7.5 EER COOLING
AIR TO AIR HEAT EXCHANGER-'..-._:.....,, NOT REQUIRED
THERMOSTAT ....... .,, ,.;. REQUIRED _
TIMECLOCK FOR HVAC EQUIPMENT .. , , , , , REQUIRED
ADDITIONAL NOTES
______________
*- SEE THE ADDENDUMS AND NOTES SECTIO= N OF THIS COMPLIANCE
P RTFOL I j
FOR R GENERAL REQUIREMENTS, u
GLAZING CONSIDERED TO BE CLEAR IN CALCULATIONS. OWNER MAY
INSTALL, AT.HIS OPTION, BRONZE-OR,GREY TINTED GLAZING WITHOUT
ADDITIONAL CALCULATIONS.
I
di
PREPARED BY:
JOB NUIZER: 11395
HADLINI S EI`]TI=RPRISES
BUILDING DATA FORTH
El-1EFGY BUDGE1' CONSULTAP:!TS
Lf;VELOPE COI]PLIANCE
TELEPHONE {61,9} 3i 4-1731
0{}/1;5/37 1EI:56:31
•
PR,_., E,KE i FOND ..'.........LAhJDf'IARK LAND CO{"iPAP.IY
Pf'OJ.ECT TITLE .. . ..PGA WEST — HADIS-0N GOLF. ;!'!',Ih.7T'. FAC.
LOCATION ........ ....... LA QUINTA
w.
** F 0 R f I 1— 13' U I L D I f! G E t d V E L O P E
C 0 [-1 P L I A C E
SITE DESCRIPTION: LOCATION CODE NUMBER
1 2
LATITUDE
_{ •u
DEG[ -,EE' DAYS. — HEATING
1232
SF,' SOLAR .FACTOR
1,"2'_3.1,'
DELTA Ti ASHRAE DESIGN TEHP — 7L
34
•
!BLDG DESCRIPTION: OCCUPANCY TYPE .CODE NUI*IBER
47
GROSS HEATED FLOOR AREA, SQ -FT.
697 ,
NUI'!l:3ER OF FLOORS
1
Gf OUND FLOOR PERIL"IETER, FT.
1,c7
LONGEST DIAGONAL DIMENSION
45
•
HEIGHT, FT.
10
WALL: SUI-'\JFACE AREAS AREA OPAQUE WALL
90
AREA WINDOW
40
AREA DOOR
60
TOTAL AREA OF WALL
31PO8-
COEFFICIENTS HTG U WALL
.0791476
HTG U WINDOW
1.1
HTG U DOOR
.59
CLG U WALL
-0791476'
CLG U WINDOW.
1.1
CLG U DOOR
.58
SHADING COEFFICIENT.OF GLASS
1
WEIG"HT OF WALL CONST., LB/FT2
15
MASS.CORRECTION FACTOR
1
EQUIVALENT TEMPERATURE DIFFERENCE
44
ROOF: SURFACE AREAS' AREA OPAQUE ROOF
697
AREA SKYLIGHT
0
AREA OVERALL ROOF
697
% SKYLIGHTS
0
DIFFERENCE BETWEEN AREA OF SKYLIGHTS
AND 5% OF AREA OF OVERALL ROOF. OR
ZERO 0
CONHEi?CIAL l~o;il
Ov,-E - PAGE TWO OF TW0
JOU PJO: 11395
NOOF COIJT.:
COEFFICIENTS HGT U ROOF
.049
HGT U VALUE SK.YLIG[iT
0
CLG U. ROOF
CLU U ;'KYLIGII'1
0
i
SHADIlIG COEFFICIENT OF SKYLIGHT
0
MASS "COEFFICIEI-JT
L
ACJ SOiPTANCE
1
FLOORS:
AREA OVER Ut-]HEATED SPACE ".
0
U VALUE OF FLOOR
0
HEATING DESIGN
CRITERION:
.
STANDARD U OVERALL WALL
.45
STANDARD U OVERALL ROOF
.1
STANDARD U OVERALL FLOOR
.3G5
HAXIf'i Ai ALLOWABLE U OVERALL
•3Oln92i
PROPOSED U OVERALL WALL•150OIL-
5`
•
PROPOSED U OVERALL ROOF
.04`i.
PROPOSED U OVERALL FLOOR
0
PROPOSED U OVERALL
•10875
COOLING DESIU]
CRITERION:
"
STA11DAF D OTTV WALLS
31.5
STANDARD OTTVROOF
1
STANDARD OTTV
20.4763
PROPOSED OTTV WALLS
9.54058',
PROPOSED OTTV ROOF
2.009
PROPOSED OTTV .
6.4616"9
PREPARED BY:
JOB NUNGEN' 11395'
f1ADLIN' S ENTERPRISES
HATEff;IALS DATA FOI:I'1
ENERGY BUDGET CONSULTANTS a' °'' ' r `',"•:,,
:
BUILDING ENVELOPE
TELEPHONE {619} 324-1731
06/15/67 11:00:14,
-
PREPARED FOR..............LANDMARK LAND COMPANY
-
PROJECT TITLE ............PGA !JEST — 11ADIS0N
GOLF. MAIhIT. FAC.
LOCATION .... ..•• .• ...LA OUINTA
'
** F O R N 2 — M A T E R I A L- 0 R
I E- N
T A T 1 0 iJ D A T A * #
"
**** ************* ** %*** K*:K******* :kik********* ** K** : :* K****# ******.**
• .
WALL':
WALL TYPE 1
WEIGHT OF WALL CONST., LD/FT2
15 f.
HEAT TRANSFER COEFFICIENT
•08 % :OU
SURFACE AREAS
NORTH
AREA 0
FEAST
AREA 1117
WEST
AREA : - 176
SOUTH
AREA 228
WALL- TYPE 2
WEIGHT OF WALL CONST., LB/FT2
15
HIEAT TRANSFER COEFFICIENT.
.075 / .07
SURFACE AREAS
NORTH
AREA 246
EAST
AREA 147
WEST
AREA p
SOUTH
AREA 0
GLAZING:
1
' GLASS TYPE- 1
SHADE COEFFICIENT
1; -
HEAT TRANSFER COEFFICIENT
SURFACE AREAS
NORTH
AREA p
EAST
0,
_AREA
WEST
AREA 28
SOUTH
AREA 12
ROOFS:.
.1
ROOF TYPE
r
WEIGHT OF ROOF CONST., LB/FT2
15 -
HEAT TRANSFER COEFFICIENT
.p4`I / .049
SURFACE AREAS
697,
SKYLIGHTS
SURFACE ..AREA
p
SHADE COEFFICIENT
p r '
•
HEAT TRANSFER COEFFICIENT
0
FLOORS:
-
FLOOR' TYPE 1
J .,
4 WEIGHT .OF FLOOR CONST. , •LB/FT2
U
HEAT TRANSFER COEFFICIENT
0 / 0
SURFACE. AREA
.; 0
Form,3
MAa1N'S'. \
• EN7ERDRISES T
\l
.
D.QD/bC•1143
•
ENEi sy
c
Q1LM"SCQINGS.
cAlIFORl1iL1 'HEAT TRANSFER COEFFICIENT
DIJD6IET
2zbZ PROPOSED
CONSTRUCTION
ASSEMBLY
R '
List of Construction Components
,i,, STUCCO
,18
VAPOR BARRIER
,O
1
2.
;
3 INSULATION 'v,IITH
RESISTANCE
_ 11`, 00
2
34
GYPSUM BOARD
,45
4
I
s.
6.
7.
8.
'
.68'
,68
Inside Surface Air Piim
:
r
cooling
heating
'
Sketch of Construction Assembly
Outside Surface "Air Film
.25
. 17
WEIGHT: 15-25
Ib/ft2
cooling
heating
Check one-12Total
Resistance Rt
, 6 2
12 .-54
X X
cooling
heating
Wall
.
Roof
U -Value (I/Rt)
.08
808
cooling
heating
Floor _
W-17
•
r" V r• `
•
MARLIN'S
+ `►`,
-
ENTEITPI?ISES
!n
VAI 0 DK U43
` a
NEs26Y
R11.M SMINGS,
c. LIFouNw HEAT TRANSFER COEFFICIENT
DUD6ET
s l
92262 -PROPOSED
CONSTRUCTION
ASSEMBLY -
List of Construction Components
R
•
GYPSUM BOARD
,45
INSULATION WITH
RESISTANCE
=t 11.00
z•
GYPSUM BOARD
, 45.
3.
3
a,
,
5. •
f
6.
7.
8• ' ' '
t
J Inside Surface Air `Piim •`
. 6 8
_, 8
•
cooling
heating
Sketch of Construction Assembly
f
Outside Surface Air Film 4
..2 5
-.17
WEIGHT:
•
0 -15 • W/O _
*t
- • r
, .
cooling
heating
Check one:.
Total Resistance Rt
12.83
12.7.5
X/
a
• cooling
heating
Wall —
Roof ._:...
_
U•Value (I/Rt)
.078,
.078
cooling
heating
Floor
•
,-
W-37
Form 3 {.
'
MAIxIN'S
, r'ri`
••
ENTERDRI4ES '
:\ •
°
D Ql3CA( W41.
'L LLM SCOIN6S,
''
» •
EIVED6
CALLIMIDM1 ' HEAT TRANSFER COEFFICIENT
92262 PROPOSED
CONSTRUCTION ASSEMBLY
. ' CONSULTANTS
. `
R
List of Construction Components
'`
1 2
INSULATION 'WITH
RES ISTA'N.CE
_ ' -19, 09-
1'.
2. GYPSUM BOARF OR
TILE
, 45
3
4.
'
IS
5.
6.
8.
•
. Inside Surface Air Pilm
692
61
cooling
heating '
Sketch of Construction Assembly
Outside'Surface Air. Film
. 2 5
.17
WEIGHT: 0-15
I6/ft2
cooling
heating
Check one:.
Total Resistance Rt
20 .62
20. 23
'
cooling
heating
' Wall
XX
,
• Roof G
LI-ValueAl/Rt)
.049
,049"
Floor ._
cooling
heating
+
4
•
Pf�EPAf?,ED BY. -
IiADLIII� S EI•J'fEI;Pi�.ISES
EINERGY BUDGET CONSULTANTS
TELEPIHONE =124-1731
JOB •I !U HE' ERI : 1131-95
DOCUI"iEivTATIOE'J FOl';I°i
HVAC SYSTEHS
OL./115/8-7 11:53:113
KEPARED FOR .......... LAINDM Rl: LAND .C'OI'lPAf:•.Y
PN'OJECT TITLE .........PGA WEST — HADISOP_, GOLF-
I"iA:I`I'f. FAC.
F 0 I<; .11 4 — 'L 0 A D C A L C & E Q, U "I . P ri E' I'l
T S U 11 I'1 A R Y'
**k�*:K*�:*:�*�:*:K����:*�*�*******�;K**�K�x:****:K�*:K�*•#�****�**:KKx:��*�*:K
:K�K�*�:k��k��::K*#�%K
DESIGN CONDITIOF!S: BUILDING OCCUPANCY TYPE
47
PROJECT LATITUDE
33.8
HEATING DEGREE DAYS
123r
TIME FOLLOIJIIIG LOAD SUMMARY IS FOR THE ENTIRE BUILDING. F0R;
INDIVIDUAL G01•aE
OR AREA REGIUIf-.;EIIENTS SEE ATTACHED ROOM BY ROOM PNINTOUT.,
CO `{PONETS LISTED
BELOW HAY INCLUDE MORE THAN ONE TYPE.
HEATING LOAD DOCUMENTATION — CALCULATIONS ATTACHED-ASHRAE
METHOD
OUTDOOR DES iGN TEh1PERATURE,. WINTER
31
INDOOR DESIGN TEMPERATURE
7� -
TRANSMISSION HEAT LOSSES
WALLS. — ALL TYPES
2`146.51
DOORS - ALL TYPES
1451:4
' GLAZING* u SKYLIGHTS
ITS
18, 4,
'. CEILINGS /.ROOFS
I.4DO.27
FLOORS.— ALL TYPES
5723.76
INFILTRATION AIR
49.6667
HEAT LOSS FROM INFILTRATION
22118.1
VENTILATION' AIR, -
SEE INFIL•
^HEAT .LOSS FROM VENTILATION
SEE INFIL-
OUTDOOR AIR FOR. SPECIAL PROCESS
NA
HEAT LOSS FROM PROCESS 'AIR
NA
DUCT HEAT LOSSES
1553.4
** TOTAL HEAT LOSSES
17067.4
COOLING LOAD DOCUMENTATION`— SEE -ATTACHED "CALCULATIONS —
ASHRAE METHOD
OUTDOOR DESIGN 'TEHP- DRY BULB
112
OUTDOOR DESIGN TEMP. WET BULB
78.
INDOOR, DESIGN `:TEMP --'DRY BULB.
78
INDOOR DESIGN TEMP. WET BULB
65
TRANSMISSION HEAT GAIN.
WALLS - ALL TYPES
3260.94
DOORS --ALL TYPES
1183.2
GLAZING & SKYLIGHTS
11112
FLOORS — ALL TYPES
G _
SOLAR JHEAT GAIN TI-IROUGH WINDOWS
3863.4
OUTDOOR AIR FOR SPECIAL PROCESS
IVA
HEAT GAIN FOR PROCESS AIR _
fIA
. CONTINUED'ON NEXT PAGE ,
•
COi'iiIENCIAL FORil 4 C011TI[JUED
PAGE 2
COOLING LOAD DOCUI]ENTATION- {COi•-ITINUED}
•
HEAT GAIN FROM, PEOPLE
50P_3 .4
HEAT GAIN F ,Ui1 LIGHTS
312'19 - 1, 8
HEAT.GAIN FIOil EQUIPi'iENT
"TEAT' GAIFI TO DUCT'10%
21U1;•2ca
OU'T'DOOR AIR
FIXED NINI11UH, TYPE SYST'Edl "
•
JyIU JEER OF PEOPLE
11
CFM VE113ILATIOiJ
155
HEAT GAIN Ft ON VENT. AIR
7U"97.56'
SYSTEI''i'UTILIZING USA FORCLG
CFM OSA UTILIZED
N A
HEAT GAIN FROMi OUTDOOR AIl'
VJA
* TOTAL COOLIi.JG LOAD t ._ ,
289l:, Li .7 '
T'EiiPEI ATLJF\E CONTr;"UL F,'EQ U IR E HE N T S
* CAPABILITY TO SEQUENCE HEATING AND COOLIVJG
PAGE I"IC,
* TEVIPERATUNE CONTROL DEVICE SET POINT LIMITS
PAGE skIIC
* SET POINT RANGE BETWEEPI FULL HGT &'FULL CLG
'CONTROLS
PAGE NlIC
* SETBACK OR SHUTOFF
PAGE N`IC ,
* CAPABILITY. TO TEkNINATE _HTG.. 70 F s& CLG- . 78 F
PAGE i'lIC
HVAC SYSTEf1 RESTRICTIONS AND SPECIAL REQUIRENEFITS
------------------ -- --- ----- -------------------
---
— --ALL
ALLHVAC SYSTEMS TO MEET REQUIREMENTS SET FORTH IN
THE 1-IVAC Al ;)E!lDUN
SEE ' ADDENDUNS - AlID NOTES' SECTION FOLLOWING ASI-tI\'EA
LOAD CALCULATION.
** NUMBER OF UNITS TO-BE INSTALLED 1
'
-SEE 'HVAC EQUIPMENT SCHEDULE' AND FORM 6 FOR MODEL
NO.-AND CAPACITIES.,
•
**"THERMOSTAT, DATA: SEE ATTACHED SPECIFICATIONS SHEET NIC
** FRESH AIR PLENUM IS TO BE INSTALLED FOR VENT: OSA'—
SEE MS-4
** 'EACH UNIT TO BE STARTED AND STOPPED BY A TI11ECLOCK
='SEE MS-16 .
•
TIME FOLLOWING TYPES OF SYSTEMS DO NOT- APPLY TO THE .ATTACHED PROPOSED BUILDIilJG
------------------------------
SIMULTANEOUS HEATING AND COOLING
HOT AND COLD DECK SYSTEMS
DUAL DUCT AND/OR MULTIZONE SYSTEMS
' CONTINUED ON NEXT PAGE
HECHANICAL Ai -1D G AVIT'Y VEI-:ITILA TTOrI SPECIALI;EQUIf E('iEr!"fS ,!!) RESTS I CTIO ;S
•
---------------------------------------------------------,-----------
-----
ALL VE11T'IL tTOI- ." 'I'O iiEET hE.: UIf:.l`iE.rdT'S SET FOi:'i'If UIi
PAGE -1 OF 'i'I"IL
HVAC ,,Dr;EF DWI Li; THE ' AP,DI=I;DUi'iS rai<D r•,!O'I'ES° SECTIO;'•,;.
•
i3ECNAIIICAL VENTILATION - DAhPEkS WHICH AliTOf1ATTCALLY• li:TEF;LOCI:
AND CLO`.;"a% 01; f=.^,1! SIILIT DO•,;;Pl.
GF,AVITY VL JTTLA,rot S - EITHEI' AU T OhATIC GI . READILY
i,CCESST :LE.
,NAr,lUi`,LL`( OF'E; ATED DA11PENS
POWER, 'COF;SU11PTION III FAl:;S
COfJSTAi 1T VOLUI IE SYSTEf'I .
•
TOTAL :;UPPLY Air QUAr• TITY = CFPi
rIA
TOTAL" PRE:SSUI E OF SUPPLY FAN
f
TOTAL ` PPLY AIR ADJUSTED FOR PROCESS — CFH
HA
TOTAL CI OSS FL001; AREA - S[]IFT
i' LT FAi'•! PEI;FOF:ilAr•,!CE INDEX •[FPI}
;d
VARIABLE VOLLlf`1E SYSTEM
TOTAL `UPPLY AIR QUANTITY HAX FL OU
TOTAL P'RESSL1FiE' OF SUPPLY FAN AT NAX
t• A
TOTAL GROSS FLOOR AREA SQ/FT
I,A
FAN I?EI;F01ihlArJCE INDEX AT MAX
NA
VARIAELE VOLUME ADJUSTMENT CONSTAfJT
WA
ADJUSTED FAr! PERFORMANCE INDEX
haA
PIPING A!',!D` DUCT hJSULATION Ar -.1D DUCT CONSTRUCTION
SEE INSULATION SPECIFICATION PAGE MS -3
•
lADLIidvS Ef-.1TEf; ,T,ES
JOB f!UfiEl1.'R: 11, 195
•
DIEI:GY.
F,UDrE*f CO.,Sl..ILTAf.!TS
16/1,'_;/c,7 1p:27:lb
TI LE-1;,1..10raE '71,111- 24-1731,
ALL TTEi
•
Pf Lh',, ED FOR ...
..:.LANDf1ARIC L4•1D
C011PA;IY
Pi.OJLCT TITLE ..........PGA
(!!EST —
f-IADIS01'1
GOLF.IIIT. FAC.
F 0 I' PI .. 5— A L
L O T T E D U
A T .T S
I' F, ' I Nl T O U, T * K
f:00il1
F11,001"i 1,.!,1^,i E
TASK AREAS
TACK
i.;0'f E 'SQ F"I' ,LLOTTEiJ
I IU
110.
APPL .IA.. TS
•
1,[1
LUNCH. 1',0011.
DIf
11
f 2L)12f
107'•F;f;e
COl`T OLS
EQUIP POOii''
'58 -0
72 :L U'
OFFICE
OFF/FAIR COPY
241
1, 41; 22!:,
NONITASK
4 75_
•'
TOTAL TASK a, f`Of•1TASK
11-119
LOCKER'S —
LOCKED; .ROOMS
21,8
0 Z 5` 1IL,3.
1110
UsOf1E 1I S Ili
TOILETS—LGUNGES,
354
G L?, 98
11.1
rib'] S 1,;R
TOILETS—LOUNGES
'.3S4
0 -11.:1 M,2
BUILDING TOTAL
ALLOTTED
. U A T TS 11,16 7
MADLIN' S Ei-JTERPRISES
J00
NU!"IBER: 113`15
ENERGY BUDGET CONSULTANTS
- 06/15/87-
13:27:32
714. 324-1731
}LDG
DATA
FORM
PREPARED FOR -
...LANDIiARK L0,!:D CO}1PArJY
PROJECT • TITLE.. • .....
• • • PGA VEST —'. NADISON GOLF-
MAR. -IT.
FAC. -
A L, L 0 W E.D` . A N D
P R O P O S E D D E- S'I•G
IN W
A 1' T S'
ROOM }JO ROOM NAME
ALLOWED IdATTS *
' DESIGN W, ATTS
106 LUNCH ROOM
242
280
107 IRR. COP,ITROLS
1011
140
108 OFFICE
301
1Lt0
109 LOCKERS
163
280
110 WOOENI S RR
98
40. ,
111 NEN I S RR
11_, 2
160
BUILDING TOTAL
1067
1,04E
* FORM 5 — L.IGHTI}JG
C0riPLIA_'P!CE
— WATTAGES
**
ROOM ROOM RCR TASK NO.
Y
NOTE SQ/FT NO. `'Q/FT •
TOTAL
WATTS
ALLOWED
NO. SQ/F1'
.
APPL. /OCC. , OCC /TASK
SC FT
-SQ/FT
WATTS
1,06 242 0-5 114
242
1.00
2L12:
107 72 5+ 58
72
1.40
101
•
108 96', 5+ 241
1 100 1 = 50
48
4.70
226
[1T
48
1.57
75
109 .125. 5+ , 218
125
.1,30
163
110 61, 5+ 354
61
1.60
98
111 '101 5+ 354
C]
162
i
('('L:P'-,!lI.17 Y: ..
JOII 1'!(I!"E", 1a1,-195 '
NIAitINI S EN, TERP RISS
VIVAC 1_QLlIPH[.'l,1 T
•
7I1+-3 24-]j131,COI'i'L
IA(.10E
F 0 f' H b— (-I V A C E Q U I. P it E 11 T R O C
U ('1 != (%d 'T r1 T 1 0 1.1
•
•. T:K:K:K C :*:Kx ta::K * * :% * :K :K ::K : c:K:K%f k ** :K*%:K c :*;YT :X :K#:}: :X%K KT, ::ex.;;: = :x:%} :
I`IMHUFAC.TURE 2' LE('JI'JO};. OR. EQUAL UGIT
ZOl,LS ONE ENTIRE CONDITIONED
AREA
•
----------------------------------------------------------------------------.
ELECT:NICALLY OPERATED COOLI(.JG SYSTEM EQUIPMENT
* 110DEL NJUMBER, HP18-31.1,V
S'I' N!DARD I-;ATI('•1G CAPACITY, LTU/I-IR';
21:111:!U
(il!II9Ufi EER {COP}
7• l
•
REFERENCE- PAGE.
SPECS
All SORPTION; (JATEN: CHILLING COOLIN.IG SYSTEM E(,lUIPNIENT
,
* I'IODEL NUN'iBEI c NA, 1
IIEAT SOURCE
N•A
•
IIINJIHUVI EER {COP}
P,EFEREINCE . — PAGE
klA
C011B.OSTION 41EATING EQUIPMENT - OIL OR GAS FIRED .
MODEL NUMBER NLA
INPUT CAPACITY ,. ..
111
.OUTPUT CAPACITY
N,IA. `
NIN!IMUf1 COMBUSTION EFFICIENCY AT
NIAXIMUNI RATED OUTPUT
!`vA
REFERENCE — PAGE.
!lA
ELECTRICALLY OPERATED HEATING — HEAT PUMPS
}
>K V10DEL 'NUMBER', : HP18-311V
-MINIMUM EER {COP}
1,.801.
REFERENCE — PAGE
SPECS
SUPPLEMENTARY HEATER CONTROL
NA
REFERENCE - PAGE
N!A :
'ELECTF;ICAL RESISTANCE SPACE HEATING EQUIPMENT
* MODEL NUMBER : NA
REFERENCE FOR FULL.LOAD ENERGY
•.
INPUT AND OUTPUT
11
REQUIREMENT FOR MAINTENANCE FOR MANUFACTURER'S MAINTENCE AN!D FULL AND
PARTIAL CAPACITY AND STAND—BY INVPUT{S} AND OUTPUT{S}
SPECIFICATION. '
'
REFERENCE - PAGE
'WITH UNIT
NADLIN' S ENTERPRISES JOB PJUNiEjER .1,1,395'
ENERGY BUDGET CONSULTANTS 06/1,5/87 11:35:37 -
P.O. BOX 1443 DATA SUf`HARY
PALH.SPRINGS, CALIFORNIA LOAD CALCULAT10N.
TELPI-1011JE 619-324-1731 ASHR.AE f'IETHOD
THE FOLLOtdING PAGES CONTAIN- A C6111- IERCIAL RO011 BY. ROOM HEAT LOAD CALCULATION
DETERMINED IN ACCOf DANCE I;ITH THE PROCEDURE DESCRIBED IN TIME 1977 ASHRAE }
HANDBOOK'OF FUNDAMIENTALS CHAPTERS 24 AND '25.
TEf-IPEI\ATUl?E DATA: r
WINTER TEVIPERATURES: INDOOR: 72. OUTDOOR= 31
SU ER TEf"IPERATUARES: INDOOR DRYBULB: 78 OUTDOOR DRYBULE: 112
•
`TNI)001-, WETBULD: 65 OUTDOOR IjETBULB.: 7L
DAILY F;Af'JGE: 3L DELTA W: • 2.5E-03 ;.
** SEE ATTACHED PSYCl-OMETRIC CHART FOR ENTHALPY, HUMIDITY RATIOS 'DELI POINT is
•
* OUTDOOR DESIGIJ TE11PERATURES OBTAIllED"FROM RECIONHENDED OUTDOOR DESIGt•1 TE11P—
ERATURES SOUTHERN CALIFORNIA PUBLISHED 'BY ASHRZAE 4TH EDI'I'IOfJ OCT. 1972
** INDOOR DESIGfl CONDITIONS FOR GENERAL COMFORT APPLICATIONS ARE IN ACCON'DAI-1 CE
WITH ASHNAE STAIJDARD 55•.74
** HEAT GAIN CALCULATED -AT,: DATE I, TIME. JULY 21 3,600 HOURS "
LATITUDE: 33.8-
3.8H0UF;S
H 0 U [,,'SOF-OPEF,ATION: .'VARIES WITH .SEASON
** HOURS PEI; DAY LIGI-ITS ARE ON: 12 HOURS PER DAY
* OCCUPANCY.DEGNEE OF ACTIVITY:. LIGHT. WORK _ SEATED AT REST,
* DESIGN CRITERIA FOR OCCUPANCY, TEMPERATURE AND VENTILATION" AIR BASED ON
TITLE 24 ENERGY CONSERVATION STANDARDS.
* GAIN {COOLINGI CREDITS NOT TAKEN FOR
f INTERIOR SHADING BY DRAPES OR BLINDS;
A •UNIT CONDUCTION. BETWEEN SPACE AIR AND`:SURROUNDINGS ti
*. LOSS {HEATING} CREDITS NOT TAKEN FOR:
•
A PEOPLE, LIGHTS, EQUIPIhENT — . EXACT SCHEDULES UNKNOWN Y
** THERMAL LAG CONSIDERED — {
** VENTILATION RATES - ESTABLISHED FOR SMOKING AND NON-SMOKING AREAS
SEE ATTACHED VENTILATION ADDENDUM
** SOL AIR TEMPERATURE USED FOR WALLS / ROOFS THAT ARE NEVER DIRECTLY
^' EXPOSED TO THE SUN'.
** ANY APPLIANCES / EQUIPMENT CONSIDERED.IN THIS LOAD WILL BE LISTED
'
IN ADDENDUMS AND NOTES
'
HADLI111
S ENTERPRISES ENEP,GY
BUDGET CONSULTANTS
POST OFFICE 130X 1.443
*** PALM SPRINGS, CALIFORNIA
92263 714-324-1731.
ENTIRE BUILDING
TOTALS FOR 'A. S. H. R. A. E.
COMMERCIAL LOAD CALCULATION
00fi OF; SPACE
COOLIPdG.LOAD
HEATIFJG LOAD
106
LUNCH R00f I
.11818 -
6410.11
107
IRR. CONTROLS
3429-17,
1237.85
108
OFFICE
5411.44
3773.65
ZCl9
LOCKERS
4214.1
'1894.22
1,10
Ill O1IEN S RR
2060.98
2156.28
111
VIEf-•IS R, R.
2030.93
1.61,5.34
e
HADL•IPJ' S ENTES;PRISE'S
JOB f-JU11C.Els': '11.395 .
EflEf;GY [BUDGET COHISULTAf1TS
06/15/87 11:39:33;
•
TELEPHONE {714} 324-1721
VEi•.lTILAT10f-J DATA,
PREPARED FOR ...........
LANMiARIN' LAtlD COf•iPA1-JY
'
PNOJLCT TITLE
PGA VEST -- HADIS01-1 GOLF.11A!HT . FAC
Z
LOCATION .............
.LA
QUINTA
** V. E N. T I L A T I 0 N.
C F
11 U S A t E Q U
I 'i c JI E tl T S
,-*:K*:K:K*% : x::K:K ::k:K ::K:KXc* :K***% k*:K t * Kx:**K%: **k:**% * *** *** *W*:K :T :h;•x. :*:K **:K:K k
SPACE
CFH PEI,
kJ.0. OF
CFH OSA-
PEf`OPJ
PEOPLE
l ECLMNEi1 a
'1116 LUNCH' ROW
15
5
7 S
1117 IRR. C0 J"fR0LS
15
1
15
108 OFFICE
15
>, : • .
,.
109 LOCKERS
15
2
30
•
110 U1011EPJ' S T --%N
10
1 -
10
111 HIEPJ-' S Rn
1CI
1
,10 I
TOTAL BUILDING CFP1 OSA _ 155
01-1T OE2
95°
T
NN S jNM TTT
(.1T OE2
95°
11`IT
5T 52E
95°
2
5,:13;b01 LillT
F, 'IF. 52E.
h5'°.
T
3)IJAO 913T
pl,T OE2
95°
T
s10 I. NOD °;1 1I Z(3T
TI 52E ,
95'
5
1J00f1 i-ix.in1 •91.]'(
•
r
Ii•13. V TIOMUS
31d03d
i-ini o ruvq iv31-(
A) .
J0 0i'J
3)Vds
:x :*:K*:k*:kY::K*x K** Y i k . K***** k k:k:k*:K k K k:k*** :* ***** k**: c* :*' : : ****:K* :* K C *** %
•
* 11 f1 [ . f l 3 Q Q V
-I A I I V
l..
iJ V i n D 0 **
VINI110 V1— ........
... 1.101 !,V)O-1
'UVJ 'I"AIVIA °J109 PJOSNV!•1
- Is3n V9d.........:
-.11 J,
)JlVd1]O) Qi`A'I
WA Q30r3; id
VlVR L.LTATIJV
-ChTZ}-IV.!OH(:1313..L
' CL Ili TT Ell /ST /` 0
si,rJtJ3.'..,uo) .1.3gqi1t]
S6ETT :'r!3(:I!.If1 J (]Or
s3` 12ic1d:31.1!j S hJI1Qv!,1
-lmo..SCW umag/► 1
mW
1N\I•►A■ 46Ii
A wow- "141101h;
no
IA■■► IA
1♦O■■■C
A ■■\'4■
wm■wllbm
SO
! ■■\'/►// ■■/. ■■`/■/rte■■/ '\ ■`// ■
all
all
No up.:WWWRAPAW" 1010041111A 1111,910low 41001%."m 011
go'.20=aLq Motown onwow Walloon mwxmu an w.1
SO
■\`I./\`/ / '_ \'// // /// ■lift SO/
OIL OVA
all
,P0.87 WWi mm9aa P ::-_; ■L?::
11ADLIf] S
ENTERPRISES
EfJEIRGY' ,UDGET' COiNISULTANTS
POST OFFICE, BOX 1.41.13
* PALM SPRINGS,
CALIFORPIIA 922L3 ***
619-324-1731..
A. S. H. f,- A. F. f JETHOD COHMERCIAL
RO0 ri
BY ROOHLOAD CALCUL.ATIOf•1
*
K 'Yr**:k :. 6%k** K7KV:%i %K %t%Y.* C :K:K%KIK%k% %K* *%K*%k%K*>k% *%K k*• .' %k* %K%* Ki'.* tX•z .**%K'X.Yna(x: %i: K <: %k*
t
* PROJECT: PGA 1:;EST -
f'iADISOP•! GOLF.
HAINT.
FAC. JOE;
H0: 1:1395
*gra SPACE 1,016 LUNCH
ROOM
*
FLOOR AREA
242
SQFT
>k
VOLUHIL
1931_-, CLIFT
'
COOLING
LOAD.
HEATING LOAD
AF;
iADLINS ENTERPRISES
ENERGY iBUDGET CONSULTANITS
"
-POST OFFICE BOX 1,443.
PALI'I SPRIidGS,
CALIFORilIA 92263;
61.9-724-1731
•
: c x *** Kk :*:K:k :: :Tx :X c**% * * * * z* :* k* * c****** K ::h : : : : :. : : K,: : : ::a::Kk:ac:K :*%::K:F.*..
A. S• H. R. A. E. I IETHOD
COHIHERCIAL
8001-i
BY 8.0011 LOAD CALCULATIOI!
*.
•
*%iso* * *** : % * . * **** ** F* ***%KFC%k** % ** ** **7K **%Kmy ***% * %K** '*** % %K
%k %
** PfiOJECT: PGA UIEST —
MADISON GOLF.
i•1AINT.
FAC. JOB
HO: 11395
** SPACE
• 1., 07 ,1NN'.
CONTROLS
'
**
FL, 001; AREA.,
, 72
SQFT
VOLUME
576
CUFT
"
COOLING
LOAD
1-IEATIIuG LOAD
AREA
SENSIBLE
LATENT`
SENSIBLE
{CTU/H} ..
{:E;TU/N}' ,;
'CTU /hi}
WALLS
170.24:
0
91.84
28
,DOORS
0 .,
la j_;..0
•
C i
GLASS CONDUCTION
202.4.
0
36Ci.1}
L' '
GLASS SOLAR
980.4
0
0
3
CEILINGS ',
130.536 '
0
144.643
72
FLOORS - SLAB
0
, ,
0
315.443.
; 7
FLOORS— OVER UI''JCOND SP
0
0
.0
0
OCCUPA11TS TO SPACE-
123.3
190
0
;1
LIGHT TO SPACE
536.52.
0
0
2pC.
EQUIPMENT TO SPACE
• 0 • ..
0
0
VEINTILATIOi':!
561.
203:23
212.51'14
DUCT. CORN'ECTTOl''•l
-275.99
0 :
112.532
.10%
SUBTOTAL
---------
3035.39
.-------
393.23.
-------
1237.55
-------
ROOK TOTAL CLG= • 3429.17'
_
HGT- 1237.85
NADLINI S
ENTERPkiSES ENERGY BUDGET
CONSULT"'ITS
POST OFFICE BOX 1443
* * .PALII SPRINGS; CALIFORNIA 92263 *
61.9-324-1731
* , A. S.1 -I. R. A.E. HETHOD CONHERCIAL ROOI1 .
BY . F 0,011 LOAD CALCULATION
*.
i.
** PROJECT: PGA UE -ST -
VIADISON GOLF. MAINT.
FAC. JOB
NO:., 11395
* * SPACE ,: 108 OFFICE
k
FL 001% AREA. 913
SOFT
*
VOLUPIE 768.
CUF.T
COOLING -LOAD
HEATING LOAD
AfREA
SENSIBLE LATENT
SENSIBLE
{ BTU/ H} { OTU/ H}
{ CTU/ 11}
F ALL S
1 540 .,96 .
313.76
117.
DOORS
.0
394.4 `0
483:8
211
}
GLASS CONDUCTION
506 0
q02:
20
GLASS, SOLAR
1412.4 0
0
20
;
CEILINGS
174.0L18 0
192.86L1-
96.
.
FLOORS - SL AB
0 0 ,
901:3 CS
20
'.
FLOORS- OVER UNCOND SP
0 0
D
U
OCCUPANTS TO . SPACE..
273: 315
0
1
LIGHT. TO SPACE
586.52 0
0.
200
EQUIPNEP;T TO SPACE
-0 . • D
D
VENTILATION
561 203.28
566-784
'
DUCT COh h;ECTION
'444.833 0
343.059
10%
----- - - -
--i- -
_ -
t=
SUBTOTAL
4893.16' 518.28
3773.65
*
,;
ROOM TOTAL -CLG= 5411.44
HGT= 3773.65
k
f1ADLIIN" S 'ENTERPRISES
ENERGY BUDGET CONSULTAf,,TS
POST OFFICE BUr, 1443
** PALN SPRINGS, CALIFORNIA 92263 ***
61.9-324-1?31.
z A. S. H. t . A. E. ' 11ETHOD CO1"lflEI:CIAL ROOM
BY R0011 LOAD CALCULATIO;••l
*
* PROJECT..: PGA (JEST -
MADISOfJ GOLF. NAIP-T,
FAC.. JOS
INO: 11395
** SPACE 109 LOCKERS
**
FL 0013 AREA
125
SQFT
**
VOLUHE
1.000 CUFT
COOLING
-----------.
LOAD
HEATING LOAD
------------
.,f EA
---
SECJSIBLE
LATENT
SENSIBLE
{BTU/ Hl
{ ETU/ HT
{ ETU/ H}
-------
-------,
-------
------UALLS
UAL L S
341:758
0-
356.12-6
110
DOORS
394.4
0
483.8
?Cl
GLASS CONDUCTION
p
p
0.
0
GLASS SOLAR
0
"0
0
CI
CEILINGS
226.625
,0
251.125
•
FLOORS - SLAB
0 :
0" •
630.966 -:
1,4 ,
FLOODS- OVER UfvCOiiD 'SP
0
0
0
11,
OCCUPANTS TO SPACE
364'
630
.0
2
LIGHT TO SPACE
439.89
0
0
150
EQUIPfiEPJT TO SPACE
0
0
0
VEf•ITILATION
1122 -
406:56
0'-
•
DUCT' CORRECTION
288.867
0
172.202
1[li
SUBTOTAL
3177.54
11136.86.
1894.22
ROOM TOTAL CLG= 4214.1'
HGT= • 1894.22
i
HADLINS
ENTERPRISES
ENERGY BUDGET CONSULTANTS
POST OFFICE BOX 1443
*** PALM SPRINGS, CALIFORNIA 92263 ***
6119-324-1731
** ' A.S.H. R.A.E. METHOD
COMMERCIAL ROOM
BY .R00f1 LOAD CALCULATION **
PROJECT: PGA WEST -
NADISON GOLF. 19AINT.
FAC. JOB
N0:' 11395
* SPACE
:.: 110 WOMENI S "RR
**
FLOOR AREA
61:
SQFT
*
VOLUME
-488
CUFT.
COOLING
-LOAD.'
-.HEATING LOAD
AREA
SENSIBLE
LATENT.
SENSIBLE
{ ETU/ H}
{ LTU/ III:
{BTU/Hl
FALLS "
349.954
0
407.L158
126
D00R'S
394.4
0
483.8
20
GLASS C01111>U.CTIOiN
D
D
0_,
D
GLASS SOLAi\
G
D "
0
0
CEILINGS
11[].593
0 -
122.549
61
FLOORS - SLAB
D
0
946.449
21
FLO01'S- OVER UNCOND SP
0
0
0
1)
OCCUPANITS TO SPACE
121.8
19D
0
1.
LIGHT 1*0 SPACE
219.945
0
0
75
ECUIPI-I-E1'IT TO SPACE
0
0
D
VEf-ITILATION
374
135.52
0
DUCT CORi;ECTT01!
157.769
0
196.026
10%
,,SUBTOTAL
1735.46
325.52
2156.28
ROOM TOTAL" CLG= 20LO.98
HGT= 21.56.26
•
i'IADLIi'V S ENTERPRISES
ENERGY BUDGET CONSULTANTS
POST OFFICE BOX 1443
* PALM SPRINGS, CALIFORNIA 92263 ***
619—.D24-1731,
A—S.H.R. A.E. HETHOD
COMMERCIAL, ROOM
BY ROOM LOAD CALCULATION
*
* PROJECT: PGA '•.;JEST —
MADISON GOLF. MAINT.
FAG JOE
NO: 11395
** SPLICE
:.111 MENS
RR
*
FLOOR' AREA
101
SQFT
**
VOLUME
308
CUFT
COOLING
LOAD
HEATING LOAD
AREA
SE11SIPLE
LATENT
SENSIBLE
{ DTU/ H}
I LTU/ H) —
{ E;TU/ h}
Id ALL
571.2''.
IJ
544-48
166
DOUi;S
0
U
0.
Ia
GLASS C01 --ID JCTION
0
Cl
0
CI
CLASS SOLA
0
0
0
U
CEILIidGS
183.113
[1
2U2.9C1`i
,L11
FL OOi',S — SL AI'
0 .
U
7 21.104
1(., .
FLUOr;l:— OVER UIICOND SP
0
U
0
U
OCCUPANTS TO EPACE
12i'i.0
1:11J
U
TO SP AC'E
.2L,
a
0
1i lU
6QUIPHEN"I" TO ``-'ACE=
E:
0
CI
VG'f•ITILA•i IO:
374-
131 j-52
0
DUCT COl°i;ECT 1_`ON
1S5-037
Cl.
146 •u4`J
7,1J%
SU!IOTAL
1705•41
325.52
7,615.31
1;001 iTU1'AL CLG= Ll -9]
1 IGT= ?,615.34
MOI 9NIIV3!-1
9-h.%'72. ,. _ IV.LO,L 9NI-1003 *
T' h LZF_2 _ 3bJ 0 L. 3-11 IS.fd3S 9^1I-100) **
NOIIIi3t- iv) QVO-1 -IVIX1314,109 43*V*,\I'H'S'V c10J SIV10i 9PIIQIino 31i.LN3
•
. ' T r.Z=1 -t '[Z * * Lrl?21 VII'.1llOJIIV) `S9f.dIzldS t.:l3dd * * ch.hT XO2 33IJJO ISOd
S.LP!ninSi'.j03 139ano A97_I3fi+3 S3SI,,d 13lil"I3 S 041I3CVtl
f,
MADLIN'S ENTERPRISES
P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263
(619) 324-1731
ADDENDUM: HVAC SYSTEM REQUIREMENTS
* FIRST GENERATION NON-RESIDENTIAL ENERGY CONSERVATION STANDARDS
TO COMPLY WITH DIVISIONS 5-6 OF TITLE 24 FOR NON-RESIDENTIAL BUILDINGS
THE FOLLOWING APPLICABLE ITEMS SHOULD BE INCORPORTATED IN YOUR -PLANS
BEFORE THEY ARE SUBMITTED FOR PERMIT.
GENERALOWES:
------------
INDICATE, CSN, DRAWINGS MANUFACTUREN; MODEL NO'. CAPACLTY, EFFI'IANCY,.,
EER' OR COPW FOR HVAC EOUIPMENT._ SEE. FORMS 4 & 6 FOR .DATA. (T-20-15150)
INDICATE ON DRAWINGS CUBIC FEET PER MINUTE OF OUTSIDE AND SUPPLY AIR
OROVIbED .BY EACH AIR COND I T ON I NG ,SYSTEM. ('T72@- J. "0 ., 150Q )
INDICATE ON DRAWINGS THAT A MAINTENANCE LABEL, SHALL BE: AFFIXED TO
MECHANICAL EQUIPMENT AND A MAINTENANCE MANUAL SHALL BE PROVIDED FOR
THE OWNER'S USE.
TIME CLOCK'
EACH HVAC SYSTEM SHALL BE EQUIPPED WITH A READILY ACCESSIBLE MANUALLY
ADJUSTABLE AUTOMATIC MEANS OF REDUCING THE ENERGY USED FOR HVAC DURING
PERIODS OF NON-USE OR ALTERNATIVE USES OF THE BUILDING SPACE SERVED BY
THE SYSTEM.
ALL EQUIPMENT SHALL BE STARTED OR STOPPEN FROM A TIME CLOCK. A 6 -HR
BY-PASS SWITCH SHALL. ALLOW OPERATION OF. ANY A.C. UNIT FOR NORMAL
SCHEDULED HOURS.
THERMOSTAT:
EACH HVAC UNIT SHALL. HAVE A SE:PERATE: THERMOSTAT READILY ACCESSIBLE TO
THE AREA IT SERVES.
ALL THERMOSTATS SHALL BE OF THE AUTOMATIC CHANGEOVER TYPE TO SEQUENCE
HEATING i R COOLING.- SET POINT RANGE: SHALT_.. BE 10 DEGREES BETWEEN FULL
HEATING AND COOLING. ADJUSTABLE TEMPERATURE DIFFERENTIAL SHALL . BE
1 -1Y'2 -F.
ALL THERMOSTAT CONTROL LIMITS SHALL BE FROM 55-F. TO 85-F.
CONTROLS SHALL HAVE THECAPABILITY OF TERMINATING ALL HEATING AT' A
TEMPERATURE: OF NU. MORE THAN 70° F AND OF TERM I NAT• I NG ' ALL COOLING At A
TEMPERATUR1= NO..i.. LESS THAN 7S° F.
bAMPER:
EACH 'HVAC SYST E.M SHALL: .BE EQUIPPED WITH 'A FRESH AIR DAMPER.
.i
MADLIN'S ENTERPRISES
P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263
(619) 324=1731
ADDENDUM:. HVAC - SYSTEM REQUIREMENTS
FIRST GENERATION NON—RESIDENTIAL ENERGY CONSERVATION STANDARDS
VENTILATION:
------------
A MINIMUM OF OUTSIDE VENTILATION"AIR (OSA) SHALL. BE ADDED Ti=p ALL HVAC
SYSTEMS. SEE "VENTIL_ATION ADDENDUM". (T:20 -1501--B-3)
DUCT:
ALL DUCT WORK SHALL BE CONSTRUCTED4 ERECTED, AND'TESTED IN ACCORDANCE
WITH THE MOST RESTRICTIVE OF LOCAL REGULATIONS, PROCEDURES DETAILED IN
THE ASHRAE HANDBOOK OF FUNDAMENTALS OR THE APPLICABLE STANDARDS
ADOPTED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL
ASSOCIATION. (T20-1509)
TRANSVERSE JOINTS ON ALL AIR SUPPLY' DUCTS, INSTALLED IN LOCATIONS
WHERE AIR LEAKAGE THROUGH • THE• JO I NTS WOULD BE NON—BEN I F I C I AL T THE
-OCCUPIED AREA TEMPERATURE REQUIREMENTS,, SHALL BE SEALED WITH MASTIC OR
TAPE. LONGITUDINAL. JOINTS- ON LOW PRESSURE SUPPLY DUCT WORK WITH
INTERNAL. STATIC PRESSURES IN EX(tESS 0F,0.75 INCHES OF WATER PRESSURE
SHALL BE SEALED WITH MASTIC OR TAPE.
DUCT LOCATION
ON ROOF OR EXTERIOR OF BL.DG....... 1 1/2" OF 1.5 LB DENSITY MINERAL
FIRER DUCT LINER OR: 3" OF 0.6 LB
DENSITY MINERAL FIBER BLANKET WITH
APPROVED VAPOR AND WEATHERPROOF
BARRIER
ALL OTHER LOCATIONS OUTSIDE
OF THE CONDITIONED SPACE...e...... 1/'2" OF 1.5 LB DENSITY MINERAL FIBER
DUCT" LINER OR: 1" OF 0.6 .LB DENSITY
MINERAL FIBER BLANKET
VENT I LAT I ORS:
EACH MECHANICAL 0R GRAV IT:Y :O
SYSTEM. ..R UNIT ,(SUPP.LY . ` AND/OR EXHAUST)
SHALL BE'EOUIPPED WITH -A: MEAN OF` ,PROVIDING..AIR' VOLUME REDUCTION. AND/OR
SHUT—OFF WHEN VENTILATION'IS NOT REQUIRED.
MECHANI CAL.:
ON MECHANICAL VENTIL.ATING SYSTEMS, AUTOMATIC DAMPERS INTERLOCKED
,.-AND CLOSED ON FAN SHUTDOWN SHALL.- BE PROVIDED..
GRAVITY.:
ON GRAVITY VENTILATING SYSTEMS, EITHER AUTOMATIC OR READILY
ACCESSIBLE MANUALLY OPERATED DAMPERS IN AL.L OPENINGS TO THE OUTSIDE
OTHER THAN.COMBUSTION.'AIR OPENINGS SHALL BE PROVIDED.
MADLIN'S ENTERPRISES
. PCO. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263
` (619)324-1731
ADDENDUM:-HVAC SYSTEM REQUIREMENTS
a
FIRST GENERATION . NON—RESIDENTIAL ENERGY CONSERVATION -STANDARDS
MAINTENANCE: "
EQUIPMENT WHICH REQUIRES PREVENTIVE MAINTENANCE FOR EFFICIENT'
OPERATION' SHALL BE''FURNISHED WITH 'COMPLETE NECESSARY MAINTENANCE
I NFA=>Rh1AT I CSN .
*REQUIRED ROUTINE MAINTENANCE' ACTIONS SHALL BE' CLEARLY
STATED AND INCORPORATED ON' AN ACCESSIBLE' LABEL, WF1IC1i MAY BE LIMITED
TO IDENTIFYING, BY TITLE AND/OR PUBLICATION, NUMBER, THE OPERATION AND
MAINTENANCE MANUAL" FOR THAT PARTICULAR MODEL AND TYPE OF PRODUCT.'
AT LEAST ONE COPY GF THIS I NFORMAT I t IN SHALL BE FURN T SHED BY : THE
MANUFACTURER FOR THF_ ORIGINAL .OWNER. UPi?N REQUEST.., .
y
t
♦ —. . , -. .. ._ '• ` - l stn ." t.:'r
MADLIN'S ENTERPRISES
P.O. BOX -1443 - PALM SPRINGS, CALIFORNIA 92263-
(619) 324-1731
ADDENDUM: AIR LEAKAGE REQUIREMENTS
FIRST GEIVERAT I ?N NOIR! REQ: I DENT I AL.::hli f?GY ::i: N ;E:F:'y' 11` :;. O"! 4;1. A .11)ARDS
TO COMPLY WITH DIVISION 4 SECTION T-20-1495, ALL. WINDOWS AND DOORS
MUST' MEET THE, FALLOWING:' STANDARDS. PLEASE. NOTE 'ON DRAWING. THE TEST
METHODAND RE60I REMENTS°.
T O-1495 • AIR LEAKAGE
THE REQUIREMENTS FOR 7 AIR` -LEAKAGE. ARE -LIMITED TO • THOSE . LOCATIONS
SEPF_RATING •EXTERIOR BUILDING AMBIENT CONDITIONS FROM INTERIOR BUILDING
CONDITIONED•AIR SPACE AND ARE NOT APPLICABLE TO THE SEPERATION OF
INTERIOR CONDITIONED SPACES FROM EACH OTHER.
AIR LEAKAGE REQUIREMENTS, WINDOW
AIR LEAKAGE -REQUIREMENTS FOR WINDOWS SHALL BE AS FOLLOWS:.
THE AIR :INFILTRATION RATE FOR MANUFACTURED OPENABLE EXTERIOR
WINDOWS SHALL NOT EXCEED 0.5 CFM.PER FOOT OF OPENABLE SASH CRACK.
ALL MANUFACTURED WINDOWS SHALL_ DE CERTIFIED AND LABELED AND • SHALL...'
COMPLY AS FOLLOWS: x
METAL. WINDOWS .......................... ANS I A134.I-197
WOiD WINDOWS ..........................NWMA IS -2
NOTE: REQUIRED STEEL FIRE: -RATED WINDOWS
ARE EXEMPTED FROM
THESE
---- REQUIREMENTS.
FIXED WINDOWS CONSTRUCTED ON SITE 'SHALL
BE SEALED JO LIMIT
AIR'
INFILTRATION.
AIR LEAKAGE REQUIREMENTS, DOORS
THE: AIR INFILTRATION RATE FOR. MANUFACTURED' EXTERIOR SLIDING
GLASS
DOORS' . SHALI... NOT . EXCEED 0.75 C: M PER
LINEAR FOOT (;,1F CRACK.
ALL
MANUFACTURED SLIDING.GLASS DOORS SHALL -BE
CE:RTIFIED•AND LABELED
AND
SHALL_ COMPLY TO THE FOLLOWING STANDARDS:
METAL' SLIDING.•GLASS DOORS ................. ANSI. A134.' -197. 2
WOOD SLIDING GI. -.ASS DOORS ................. NWMA IS -3
NOTE: REQUIRED:STEEL ..' FIRE=RATED DOORS
ARE EXEMPTED- FROM .THESE
-----. , REOU.IREMENTS..
ENTERPRISES
MADLIN'S
P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263
(619) 324-1731 .
ADDENQUM: AIR LEAKAGE -REQUIREMENTS.
*
FIRST' GENERATION NON -RES I DENT I AL... ENERGY CONSERVAT I C >N STANDARDS
ALL EXTERIOR DOORS, OTHER THAN FIRE -RATED DOORS, SHAI._L.. BE SO DESIGNED
TO LIMIT AIR LEAKAuE. AROUND THEIR PERIMETER WHEN IN A CLOSED POSITION.
**
ALL DOORS SHALL... BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE A'T
THE HEAD AND SILL.
*# DOORS MOUNTED ON EITHER THE INSIDE. OR (UTSIDE. OF AN EXTERIC WALL_
SHALL HAVE A MINIMUM ONE-INC.I-i LAP AT EACH JAMB.
* DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONT I NUQUS
MOUNTING ANGLE, SEALED IN ACCC)IRDANCE WITH SECTION T20 -1.495(E) AT
EACH JAMB.
** DOORS MOUNTED -BETWEEN THE JAMB SHALL_ HAVE: A CC)NT I NUt SUS SEAL
PAFFL^F_•,AT EACH . JAMB.
MEETING RAILS OF SECT'IC)NAL. DOORS AND MEET.T.N(i STI'L:.ES OR RAILS OF
p'r--PARTING DOORS SHALL_ n`:_ PROVIDED WITH A SEA!_:, ASTRAGAL, OR
BAFFLE,
a SWINGING AND REVOLV I NG DOORS SHALL BE WEA THE RS"I' R I PPIED Al" THE:: HEAD,
13"FILL._.5 AND JAMBS.
** DOUBLE DOOR'--,SHAL.I_.. BE' PROVIDED WI fF; A WEA1"HE:RT.rGH"f AS'T'RAGAL R
CI._.(SURE AT THE CENTE R CRACK.
CAULK T. NG AND SEALANTS
OPEN EXTEIRIOR. JOINTS AR iUND WiNbow, AND DOC) R'- F'RAMES, BETWEEN -WALL AND
F7OUNDATION, BETWEEN -WAC -L, " AND ` R()iiF," BET -WEEN W,0.OD PANELS., A'T' PENETRA•-
T I oNS OF' OT I L I TY SERV ICES 'THROUGH_WAL.I_.S, `FLOOR`S AND ROOFS, AND ALL
OTHER .-OPENINGS IN THE EXI"ERIOR ENV[ --LOPE SlIAI.J.- BE. SEAI._E:D, CAULKED,
GASKETED, . CSR WEAT'HERSTR I PPED' TO LIMIT AIR LEAKAGE n
MADLIN'S ENTERPRISES
P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263
- (619)•324-1731. `
ADDENDUM: LIGHT 'SWITCHING
'
FIRST GENERATION . I4ON--RES'C DEI\IT I AL` I_NEIRGY CONSERVATION* . STANDARDS
THE LIGHTING LOADS AS DETERMINED IN ACCORDANCE WITH SECTION - T20-1.54:?
SHALL BE CONTROI...LED AS FOL.Li AWS '
EACH AREA ENCLOSED BY CEIL..ING—HEIGF-I-I" PARTIONS SHAL.L. HAVE
INDEPENDEN•1' CONTROL OF LIGHTING WITHIN THAI' AREA.
AL...L. SWITCHING DEVICES USED TO CONTROL LIGHTING WITHIN AN AREA SHALL
BE READILY ACCE.SIBLE Tib PERSONNEL.. OCCUPING THAT AREA.,
FOR ALL AREAS LARGER THAN 1.00 SO UARE FEET, AND FoR• WHICH A MAXIMUM
CONNECTED 'LIGHTING' LOAD OF MORE THAN 1.0 WATT PER SWARF FOOT IS
ALLOWED, THE LIGHTING LOAD SHALL BE ABLE: TO BE REDUCED BY AT LEAST
ONE—HALF IN. A UNIFORM PATTERN. THE MAXIMUM AREA- THAT MAY BE
& )NTROLLEA BY'ANY TWO . SWITCHING DEVI CES . SHALL BE.. LIMITED • TO - THAI'
AREA,. .'WHI,CH • CAN BE.:'SERVED.. BY .TWO .20.. AMPERE, PULE. CIRCUITS,..
LOADED TO. NO, MORE THAN 80 PERC'.ENT. -
PLEASE. INCORPORATE THESE -.REoU I REMENTS : I NTS i Yo?UR P'LAIV
a MADLIN'S ENTERPRISES
P.O. BOX 1443 - PALM SPRINGS, .CALIFORNIA 92263 '
(619) 324-1731
ADDENDUM: SERVICE HOT .WATER
FIRST" GENERATION NON—RESIDENTIAL ENERGY.CONSERVATION STANDARDS
TO COMPLY WITH T O-1520 — 00-1525 FOR COMMERCIAL .EUkLDINGS THE.
FOLLOWING APPLICABLE ITEMS SHOULD BE INCORPOPATED IN -YOUR PLANS BEFORE
'THEY ARE SUBMITTED FOR PERMIT.
- I -
orr
GAS AND 61L FI RED AUTOMATIC, -STORAGE HEATERS' SHALL HAVE A RECOVERY
EFFICIENCY OF NOT LESS THAN 75%. TEST METHOD SHALL.BE DESCR'IPED 'IN
SECTION 2.8 OF ANSI 2 1.10.3.•
AUTOMATIC ELECTRIC 'STORAGE WATER HEATERS SHALL .HAVE A STANDBY LOSS
NOT EXCEEDT.NG '4 WATTS PER• SOUARE FOOT OF TANK SERVICE AREA. f METHOD
OF TESTING SHALL: P.F. Df=SCRIBED . IN SECTI04 4.3. 1. OF ANSI `C'72 -1-197'.x.
NOTE ON bRAWING' THAT THE WATER HEATER SHALL HAVE A L._AB'EL_, ` WHICH
STATES THAT. THE'.WATER.HEATER MEETS`THE REQUIREMENTS OF THE AMERICAN
SOCIETY & HEATING REFRIGERATI.ON AND AIR CONDITIONING ENGINEER
(ASHRAE).STANDARD 90-75. STANDARDS T20-1520 '.
ALL LAVATORY FAUCETS, SHOWERS AND SINK FAUCETS SHALL_ BE EQUIPPED
WITH . FLOW CONTROL_ DEVICES TO. LIMIT TOTAL_ VLOW' TOA MAXIMUM -OF THREE
GALLONS PER MINUTE.
PUMP OPERATION:
CIRCULATION'.•HOT WATER SYSTEMS SHALL BE ARRANGED ',SO THAT THE
'CIRCUL.ATION.•-PUMNS} CAN RE ,AUTOMATICALLY TURNED .OFF, WHEN. THE HOT WATER -
SYSTEM IS' NOT OPERATING.
MADLIN'S ENTERPRISES
P.O. BOX' 1443 —.PALM SPRINGS, CALIFORNIA 92263
(619) 324-1731
ADDENDUM: SERVICE HOT WATER'PIPE INSULATION REQUIREMENTS
FIRST GENERATION NON—RESIDENTIAL ENERGY CONSERVATION STANDARDS
TO COMPLY 'WITH T— 20-1521 .FOR COMMERCIAL* BUILDINGS THE FOLLOWING
APPLICABLE -ITEMS. SHOULD BE INCORPORATED 11\1 YOUR PLANS BEFORE THEY ARE
SUBMITTED FOR PERMIT.'
INSULATION — T-20-151 (C)
SERVICE HOT WATER SUPPLY AND RECIRCULATION PIPING (EX,CEPT FOR RUNOUTS
TO FIXTURE NOT LONGER THAN 12.f=EET IN LENGTH) SHALL BE INSULATED IN
ACCORDANCE.WITH THE FOLLOWING TABLE.
MINIMUM PIPE INSULATION
PIPE SYSTEM TYPES FLUID.TEMPERATURE INSULATION THICKNESS IN
RANGE, OF F INCHES FOR NORMAL PIPE
SIZES (IN INCHES)
_._.------_•---------..__.._.__.___.._ _ Rl•1Ni TUTS 1" R, LESS 1.25-2"
UP 'TO 2"
LOW PRESSURE/TEMP 201--250 DEGREES 1.0 1.0 .1.5
4 LOW TEMPERATURE 105-200 DEGREES 0.5 0.75 1.0
# RUNOUTS'TG INDIVIDUAL TERMINAL UNITS {NOT EXCEEDING 12 FEET IN
l...ENGTh{) INSULAT.l'ON TI-•IICI•.: 1C;: i I1'd T' IL; Ai :rVE:: l-r1:L?I... : ARE BASED oN
INSULATION HAVING . THERMAL... RES I STANCE IN THE RANG!.-' k`:rF:' R=4.0 "17C 4.6.
PER INC.{ OF THICKNESS ON A FLAT SURFACE AT' A MEAN TEMPERATURE OF
750 F. MINIMUM -INSULATION THICKNESS SHALL_ BE INCREASED P R<:rPc iRT I i rN—•
ATELY FOR MATERIALS HAV I.NG R . VAL.:UES GREATER THAN 4.6 PER -INCH OF
THICKNESS.
0■
ENGINEERING DATA K
M,, HP18 SERIES 'HEAT,PUNIPs
r.
MATCHMREMOTE
L G' • HEAT PUMP OUTDOOR UNITS irsTEly
•' s s.
*18;000 to 62,500 Btuh•Cooling Capacity P ee:5
*17,200 to 61,500 Btuh,Heating Capacity Mna7
*ARI standard 240 and DOE Certified Ratings "."Ia
. Supersedes;March 1985;
fLennox HP18 Series Heat Pump Systems Provide DENII'
• 'Low Cost Installation With Heating -Cooling Efficiency
The HP18 series outdoor units'with matching indoor units are - a •... : .'
designed for builder type applications in apartments, hotels, motels,
*CERWI T*N IVRLD.S ONIr
condominiums, new single family housing or retrofits. HP18 units .. `
—USED—wlORrn CERTDGTDN ♦PRL EB ONLY
fAIOONENTB IS LISTED •r YMEN USED WITI NIOPER
CDMIPONFNT9 R8 w"D
have SEER's of up to 9.40 with a cooling capacity range of 18,000
to 62,500 Btuh and a•COP rating of up to 2.94 with a heating.
capacity range of 17,200 to 61,500 Btuh. Matching blower -powered
• ' indoor units with optional supplemental electric heat -are available z
to provide selective sizing and installation versatility. See Selec-
tor table. For complete data on indoor units see individual bulletins
indexed in this section. A; :;ae►! f_ I "
Weather resistant cabinet is constructed of galvanized steel with
• a baked -on outdoor enamel paint finish for maximum protection E ..
from rust and corrosion. Extra large four sided wraparound coil -
with durable copper tubing and ripple -edged aluminum'fins pro-'
vides maximum efficiency. Powerful direct drive fan with totally '
enclosed motor draws air thru the entire coil and discharges it up .
` and away from shrubs and lawn. Rugged,'PVC coated steel wire I
•L^ condenser fan and coil guards are furnished. Compressor is pro-
tected from excessive current and temperatures. Electrical con-
trol box is located for easy access. Service valves and refrigerant
4'
line connections are externally located. Available as options to be n
ordered extra are; refrigerant line sets, unit mounting bases and .
Check and expansion valve kits. ., T
• Outdoor units are shipped completely factory assembled, piped
and wired. Each unit is test operated at the factory to ensure proper '
operation. The installer has only to set outdoor unit in the desired r
location, connect refrigerant lines and make electrical connections.
Typical Applications -
. ' , • ` -r,
NOTE — Specifications, Ratings and Dimensions subject to change without notice.
•
SELECTOR
Lennox
tARI Standard
240 Ratings
HP18-311V
HP18-411V
HP18,413V
HP78-461V
HP18-511V
HP18-513V
High
Low
Net face area (sq. ft.)
9.24
6.46
Total
9.24
11.39
Total
18.22
Outdoor Unit
c
3/8- 1
3/8-2
Model No.
Cooling
Temp.
Temp.
Total
SEER
EER
Unit
20
High
Unit
Low
w
Lennox
*Check and
,tARI Std.
Capacity
Htg.
Htg.
Unit
(Btuh/
(Btuh/
High
HSPF
Temp.
Low
Temp.
a
Indoor
Ex pension
2 SRN
IBtuh►
Cap.
Cep.
Cooling
Watt)
Watt)
Temp.
3800
Htg.
Temp.
Htg.
V
Unit
Valve
(Bels)
(
1060
IBtuhl
IBtuh)
Watts
Watts (factory setting)
Htg
250
C.O.P.
Htg.
C.O.P.
m
Used
Kit
4 lbs. 5 oz.
5 lbs. 9 oz.
6 lbs. 1 oz.
6 lbs. 15 oz.
9 lbs. 5 oz.
12 lbs.
15 lbs. 3 oz.
Watts
5/16
5/16
Watts
3/8
C
3/8
1/2
HP18-211V
18,000
17,200
10,000
2140
8.60
8.40
1825
6.25
2.76
1515
1.92
21 %
C818-21
LB-34792BE
Z76
tNumber of packages in shipment
2
2
2
2
2
2
2
CBS18-21
(7.8)
18,500
17,600
10,000
2215
8.60
8.35
1895
6.20
2.72
1575
1.86
22%
CP18-21/26V
ttFactory
/E16Q2
Installed
HP18 261V
24,200
24,600
13,700
2930
8.40
8.25
2670
6.00
2.70
2170
1.84
24%
CP18-21/26V
ttFactory
/E16Q2
Installed
(7.8)
24,600
24,800
14,000
2930
8.50
8.40
2680
6.10
2.70
2160
1.90
23%
CB18-26
LB -347928E
CBS18-26
HP18V
28,700
28,500
14,700
3679
8.00
7.80
3094
6.00
2.70
2393
1.80
27%
CP18-31/41V
ttFactory
/E16Q3
Installed
18..0)0)
400
29,800
16,500
3630
8.10
8.10
3100
6.20
2.82
2515
1.92
23%
CB1131
LB-34792BG
CBS18-31
HP18-411V
35,400
35,600
19,000
4355
8.40
8.15
3750
6.40
2.80
2820
1.94
21%
CB18-41
LB-34792BG
35,500
34,500
18,900
4494
8.20
7.90
3745
6.15
2.70
2994
1.84
24%
CP18-31/41V
ttFactory
HP18-413V
(8.0)
/E16Q3
Installed
36,000
36,000
19,400
4320
8.55
8.35
3750
6.50
2.80
2840
2.00 1
21%
CBS18-41
LB -3479
H P18-461 V
40,500
40,600
21,600
4793
8.60
8.45
4249
6.55
2.80
3278
1.90
24%
CP18-46/51V
ttFactory
/E1604.
Installed
(8.2►
41,500
41,500
23,000
5020
8.60
8.20
4380
6.45
2.80
3400
2.00
25%
CB18-51
LB-34792BG
CBS18-51
HP18-513V
(8.21
46,046,000CP18-46/51V
45,600
24,100
5412
8.80
8.50
4849
6.50
2.74
3881
1.82
26%
ttFactory
/E16Q4
Installed
HP18-511V
46,000
45,500
25,000
5412
8.80
8.50
4849
6.50
2.74
3802[2.2,0
2
26%
CP18-46/51V
ttFactory
HP18-513V
/E16Q4
Installed
46,500
48,500
27,000
5645
8.70
8.20
5035
6.60
2.80
39500
24%
CB18-51
LB -347928F
(8.2)
CBS18-51
HP18-651V
61,500
61,500
37,000
7243
9.40
8.50
6143
6.90
2.94
49130
24%
CB18-65
LB-34792BH
HP18-653V
CBS18-65
62,500
61,500
38,000
7538
9.40
8.40
6182
6.80
2.94
5060
23%
CP18-65V
ttFactory
(8.2)
/ E16Q5 I
Installed
tRated in accordance with ARI Standard 240 and DOE; At 450 cfm Imaximuml Indoor air volume per ton of cooling capacity with 25 ft. of connecting refrigerant lines.
Cooling Ratings - 95°F outdoor air temperature and 80°F db/67°F wb entering Indoor coil air.
• High Temperature Heating Ratings - 47°F db/430F wb outdoor air temperature and 70°F db entering indoor coil air.
Low Temperature Heating Ratings - 17°F db/15°F wb outdoor air temperature and 70°F db entering indoor coil air.
*Heating Seasonal Performance Factor.
*Kit must be ordered extra and field installed.
ttFurnished as standard with coil.
•
Ok
•owt
rIN
SPECIFICATIONS
Model No.
HP18-211V
HP18-261V
HP18-311V
HP18-411V
HP18,413V
HP78-461V
HP18-511V
HP18-513V
HP18-651V
HP18-653V
Outdoor
Net face area (sq. ft.)
9.24
6.46
7.39
9.24
11.39
13.67
18.22
Coit
Tube diameter (in.) & No. of rows
3/8- 1
3/8-2
3/8 -2
3/8-2
3/8 - 2
3/8 -2
3/8-2
Fins per inch
20
20
20
20
1 18
20
20
Diameter (in.)&No. of blades
18-4
18-4
18-4
18-4
22-4
22-4
22-4
Outdoor
Motor hp
1/6
1/6
1/6
1/6
1/3
1/3
1/3
Fan
Cfm (factory setting)
1900
2200
2400
2600
3800
3900
3970
Rpm (factory setting)
1170
1040
1040
1060
1060
1060
1090
Watts (factory setting)
150
250
250
260
400
395
385
Refrigerant -22 (charge furnished).
4 lbs. 5 oz.
5 lbs. 9 oz.
6 lbs. 1 oz.
6 lbs. 15 oz.
9 lbs. 5 oz.
12 lbs.
15 lbs. 3 oz.
Liquid line connection o.d. (in.) (sweat)
5/16
5/16
3/8
3/8
3/8
3/8
1/2
Vapor line connection o.d. (in.) (sweat)
5/8
5/8
3/4
1 3/4
7/8
7/8
1-1/8
Shipping weight (lbs.)
142
158
169
186
234
246
Z76
tNumber of packages in shipment
2
2
2
2
2
2
2
• - •• y •.•••..... v. v.r. .,.,r rrr• orrV VIOIIIIVJIOI Wllll iUpPeae.
-168-