Loading...
RC (003180)54101 Madison St 003180 P.O. BOX 1504 N O .. 00318 Building 78-105 CALLE ESTADO Address 54-101 ftillson LA_QUINTA; CALIFORNIA 92253 - Owner - ' ' ' RTs•ea BUILDING:.TYPE CONST: OCC: GRP. Mailing ' Address P. 0• BOB 1000 A.P. Number 1)t4A ['Last City Zip Te I. A bites.. .... 92 a Sib-3o)ls4 Legal.Description Contractor Project Description rsva a a. ilas4: I ae Address. .. _ City_ Zip Tel: - F State Lic. City & Classif. Lic. # Sq. Ft. No. No. Dw. ' Size, Q.a50 i Stories --Units Arch., Engr ..... _._ Y- ' ` Designer New.1S Add El Alter 0- Repair 0 s F 'Demolition 0 Address Tel. City Zip State Lic. # --. LICENSED CONTRACTOR'S DECLARATION, I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section « , 700, of Division 3 of the Business and Professions Code, 'and my license is in full force and ` effe0)ct-...... -SIGNATURE* ' „-".f A$ DATE "F OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for the following EStlmated Valuation y g r - _reason: (Sec. 7031.5,8usiness and Professions Code:. Any city or. county :which requires .a,iZv.i 1. permit• to construct, alter, improve, demolish, or repair any.structure, prior to,its issuance also . requires the applicant. for such 'permit to file a. signed statement that he.islicensed pursuant to . ' PERMIT Q-AMOUNT the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) o/ ' - - •r Division 3 -o! the Business and' Piofesslons Code, or that: he is exempt therelroin, and the' basis - - _ - • . , '!or the alleged exemption. Any violation of Section 7031.5' 'by 'any. applicant. for a -permit Plan Chk.. Dep. .. subjects the appucantto-a'civil penalty of not more than five•hundied dollars ($500).Chk. Bal. 4 - , O I, as owner of the property, or my employees with wages.as their sole compensation, willPlan. do the work, and the structure is not intended or-offered fovsale: (Sec.. 7044,, Buisness and c ^Profess ions Code: The- Contractor's License Law does not :apply fo:an owner o/ property who COr1St. builds or improves thereon and who does such work -himself or through his own employees,- provided that such improvements are not intended or offered /or sale. 1/, however, •the building; Mech..'%- rSO or improvement is sold within one year o/ completion, the owner-builder will have the burden Electrical X4'4 of proving. that he did not build or improve for the purpose of sale.) 0 1, as owner of the property, am exclusively contracting with licensed contractors to con- Plumbingg- struct the project: (Sec: -7044, Business and Professions Code: -The Contractor's-License Law - does not apply to an owner of property who builds or improves thereon, and'who contracts for S.M,I, , All such such projects with a,confractor(s) licensed pursuant to the Contractor's License Law.) - Grading ❑ I am exempt under Sec. B: & P.C. for this reason Driveway Enc. Date owner Infrastructure LOO r WORKERS' COMPENSATION DECLARATION L'hereby affirm that'l have a certificate of.consent to self-insure, or a'certificate-of' ' Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)' Policy No. ... - .Company _ .., ... ... O Copy is filed with the.city. . 0 Certified copy is hereby. furnished... •: I TOTAL CERTIFICATE OF EXEMPTION FROM REMARKS'. WORKERS' COMPENSATION INSURANCE (This section need not be completed if the permit is for one hundred dollars (S100)- valuation- or .. - or less.) .. ... ... . _ _ ... ' 1 certify that in the performance of thg work for which this permit is issued, I'shall not employ any person in any mannerso'as to become subject to the Workers'-Compensation' Laws of California. E,FtJFf f li i f3 31 i . c Fi Date Owner _ NOTICE TO APPLICANT: If, after making this Certificate of Exemption oyou -should become ZONE: } BY: 'subject'to the, Workers— Compensatiori' provisions 'o! the Labor Code,' you mush forthwith MII'tlfllUm Setback Distances: comply with such provisions or this permit shall be deemed revoked. - - - - - - Front Setback from,Center Line Rear, Setback from Rear Prop. Line . , CONSTRUCTION LENDING AGENCY ,. = Side Street Setback from Center Line I hereby affirm that there is a construction lending agency for the."performance: of the work for which this permit is issued. (Sec. 3097, Civil Code.)-. - - - - Side Setback.from Property Line Lender's Name Lender's. Address 4 This is a building permit when properly filled out, signed and validated, and is'subject to FINAL DATE INSPECTOR ' expiration if work thereunder is suspended for 180 days.- 1 certify that I have read this application and stale that the above information is correct 1sSUed by: Date J;/?4/R7Permit i_ I agree to comply with all city and county ordinances and state laws relating to building a construction, and hereby authorize representatives of this city to enter the •above. mentioned property for inspection purposes. . Validated by:` B Signature of applicant Date' ,Mailing Address Validation: •City, State, Zip HARD COPY , ' :' - • - CONSTRUCTION ESTIMATE NO. ELECTRICAL FEES NO. PLUMBING FEES 1ST FL. SQ. FT. ® $ 2ND FL. SQ. FT. ® POR. SQ. FT. ® GAR. SO. FT, ® CAR P. SD. FT. WALL SQ. FT. ® SQ. FT. ® ESTIMATED CONSTRUCTION VALUATION $ UNITS 5 MOBILEHOME SVC. POWER OUTLET YARD SPKLR SYSTEM BAR SINK ROOF DRAINS DRAINAGE PIPING DRINKING FOUNTAIN URINAL WATER PIPING NOTE: Not to be used as property tax valuation BONDING FLOOR DRAIN MECHANICAL FEES FORMS WATER SOFTENER VENT SYSTEM FAN EVAP.000L HOOD SIGN WASH ER(AUTO)(DISH) APPLIANCE DRYER GAS (ROUGH) GARBAGE DISPOSAL FURNACE UNIT WALL FLOOR SUSPENDED OTHER APPJEQUIP. LAUNDRYTRAY AIR HANDLING UNIT CFM TEMP. POLE KITCHEN SINK ABSORPTION SYSTEM. B.T.U. TEMP USE PERMIT SVC WATER CLOSET COMPRESSOR HP POLE, TEM/PERM LAVATORY HEATING SYSTEM FORCED GRAVITY AMPERES SERV ENT SHOWER BOILER B.T.U. SQ. FT. ® c BATH TUB SQ. FT. ® c WATER HEATER MAX. HEATER OUTPUT, B.T.U. SQ. FT. RESID ® 11/4 c SEWAGE DISPOSAL / SQ.FT.GAR ® 3/<c HOUSE SEWER VENTILATION GAS PIPING PERMIT FEE PERMIT FEE PERMIT FEE DBL TOTAL FEES MICRO F7 MECH.FEE PL.CK.FEE CONST. FEE ELECT. FEE SMI FEE PLUMB. FEE STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR SETBACK GROUND PLUMBING UNDERGROUND A.C. UNIT COLL. AREA SLAB GRADE ROUGH PLUMB. BONDING HEATING (ROUGH) STORAGE TANK FORMS SEWER OR SEPTIC TANK ROUGH WIRING DUCT WORK ROCK STORAGE FOUND. REINF. GAS (ROUGH) METER LOOP HEATING (FINAL) OTHER APPJEQUIP. REINF. STEEL GAS (FINAL) TEMP. POLE GROUT WATER HEATER SERVICE FINAL INSP. BOND BEAM WATER SYSTEM GRADING cu. yd. $ -Plus-X$-=$ LUMBER GR. FINAL INSP. FRAMING FINAL INSP. ROOFING / REMARKS: VENTILATION FIRE ZONE ROOFING FIREPLACE SPARK ARRESTOR GAR. FIREWALL LATHING MESH INSULATION/SOUND FINISH GRADING FINAL INSPECTION CERT. OCC. FENCE FINAL INSPEG10H'5 51GNAIUHh511NIT1ALS. GARDEN WALL FINAL KA JOe F'lA`hISoN ,ULF- FACILITY' ALEX OTT & ASSOCIATES SHEET NO of . CONSULTING ENGINEERS 603 -Palm Avenue CALCULATEDay A O 7--r DATE SEASIDE,' CALIFORNIA 93955 CHECKED BY, DATE (408) 394-5936 L • SCALE - D. L. L.L. T. L. ROOF LOADS Roof ing 0-'0 psf Sheathing. 2.0 Framing . Ceiling Insulation Misc. 1 6-U psf 16. U psf 0 psf FLOOR LOADS Finish Psf Sheathing Framing Insulation Ceiling- eiling Misc.. Misc.. ps.f • psf psf Q of ESSIn DE c` No.. C 38377 _ elf OF CAS By.' . . .......... Date .......•Subject.......... ..�. Pg. No.' Z ChkdBy..... . Date . Job No.. ... .. ... .. ftp o f : F�Y4� j^^. �. h ....... • .......... . Hdr. No. w.= 16 [18 + 16] = 544 Lbs..,per.Ft. Dist. Load w (LL) w (DL) w (TL). w = 288 + 256 _ .544 Lbs. per Ft. Length _. 14.25 'Ft. L.D..F. 1.25 L. R. 3876 Lbs. R. 11. = 3876 LBS. Max. Moment _ 13808 Ft-. - Lbs. Max. Shear = 3275 Lbs. Allow. Total Load Deflec. = 14.25 x_12 / 240 = 0.71 in. Allow: Live Load Deflec. = 14.25 `x 12 / 360 0..48 in. Sreqd 13808`x'12./ 1875 = 88.4 in. 3 Depth Factor = (.12 / 13.25 ] "1/9 = 0.99.. Try 4. x 14 A =. 46.38 in. -2 S 102, 4.1 in,.. 3. I = 67.8.48 in. "4 Fb _ 13808 x.12 / 102 1618 psi < 1854 psi Fv = 3275 x 1.5 / -46.4.. 105.9 psi < 118.8.psi Total Load'Deflection = 0.41 in. < 0.71 in. Live Load Deflection- = 0.22 in <. 0.48 in. USE A e 4 X' 14.. By.+........... Date......*Subject..................'. Pg. .. No. .hkd By .. ... Date ... . . Job No.. ....... Hdr. No. 2- w w = 16 (18 ,*+ 16 ] _ .54.4 -.Lbs. per Ft. Dist. Load w (LL) w (DL) w (TL) w = 288 + 256 = 544 Lbs per Ft Length 3'. 25'- Ft. L.D.F. = 1.25 L:R. = 884 Lbs. R. R. = 884 LBS. Max. Moment = 718 Ft. Lbs: Max. Shear, - 725 Lbs Allow. Total Load Deflec. 3.25 x12 / 240 0.16 in. Allow. Live Load Deflec. 3.25 x 12 /.360 0.11 in. Sreqd = 718 x 12 / 1875 4.6 in. 3 .:.Try. 4 x 4 A- 12.25 in. -2 S = 7.15 in. -3 112.51 in.' -4 Fb = 718 x 12 / 7 = 1206 psi < 18.7.5. psi Fv = 725 x 1.5 / 12-.3 = 88.8 psi < 118.8 psi Total Load Deflection _ 0.06 in. < 0.16 in. Live -Load Deflection - .0.03 in. < 0.11 in., USE A 4 x 4 ALEX OTT & AsSg&ATES. JOB CONSULTING ENG RSA 603 Palm Avenue SHEET NO. OF SEASIDE, CALIFORNIA 93955 CALCULATED BY DATE (408) 394-5936 CHECKED BY DATE SCALE Lat, ral ............ .............. ............. . ............. ............. .... ................ .................. .... . ......... . ............. ...... .... . ............. .............. ...... .......... ........... .............. ............. .............. ............. ............ . ..... ........ . ... ............ . ............................ . ............. ............. .............. .............. .............. ............. ............ .............. ............. . .............. ............. . . ............. .............. ............. ............. .............. .............. . ............. . ............. . ............. ...... ............ ............. .............. .............. .............. .............. ............. ............ : ............... . ............. . ....... .... . ............. .............. .............. ............. ............. ....... .............. ............................. .............. .............. .............. ............. .......... ... .... . ...... ........ .... .................... . .............. ... .......... ............ ............. ......... .... Z. ............ ............. .............. ............. . ............. ...... ... ... .. ....... .... ...... .. ..... .............. ......................... ............. ....... ....... .............. ............. . ............... ............. ............ .............. ............. .............. ............. ............. ............. % ............... . .......... .......... .............. .............. .............. f ............. .............. ............. .......... .............. ............ .............. ........ . .... ............. .............. ... ....... ............ ............ .......... ........ ... ............. .............. . ............ ........................... ............. ......... . ............. .. .......... . . ..... ...... ... .............. .............. ............... ............. ............. ....... ... . ............ .............. ............. . . .... ........... ............ .............. ............. ............. .............. ............ ............. A I ..... ...... .. ............... .............. .......... Z'= ......... . I ............. ............. .... . ............ ........... i ....................... ...... ............. ............. ... .............. .............. ............. ..... . ..... ......... .. .............. .... ............. ............ ............. ............. .............. .............. ............. ............. ....... . ........... .............. . ............. .............. ... .......... .............. . ... ....... ............. . ... .. ...... .......... . . .. ............ ...... .............. .............. .............. ........ .............. ... ... .... ....... ... ............. ............ ..................... ............. ............ . . ....................................... . ...... ....... .... ....... . ..... .............. ............. ............................. .............. ........ ... ....... . ... ............. ............ ............. .............. ............. . ............. .............. ... .......... ............. . ............. ............. ............. . .......... ............ . ...... ..... ............. ........... ............ ............ I .... ............. ... . ........................ ............ ............ . ............... . .............. ............ .......... ........ ....... ............. .............. ............ .. .......... ............ ............. ............. ........... . ............. . .............. .............. .............. ............. ............ . .............................. ............ .............. ............. ............. ............. . ............ .............. .............. .. ........... ............. . ... ......... ............ . ............ . ............. ..... .. .. . ..... ............... ...... ....... ............ ............ .............. ................ ............. Ld . . ...... 2-6 . ........... ........... . ............. . . ........ ............... ........................... ............. ............. ..................... ............ ............. ............. .............. .............. .............. ............ • ............ . ....... ............ .............. . : .............. ............. i ............... ............ ............ .......... . ............. ........... ............. ............ .............. .. .. ...... ............ ............... : ............. I .............. 8 f ............. ............. .............. . ............. ............. ............ ....... .......... .. .............. ........................... ....... ..... ............. ............. .............. .............................. .............. ............. .......... ............. ............. ... ....... ............. ............ .............. ............. ............ ..... .............. .............. ............. ............. .............. ............. .............. .............. ............ .............. .............. ............. ............... ............ ............. ............ ............. I . ........ ............ ............. ....... - .......... 13 ........ ..... ............. .......... . ...... .... ? ............. ..... ........ .............. i V ............. .. ......... ....... ............... .......... ........ ....... ... .............. ............. ............ .... ....... .............. ............ ............. ............ ............. ..... ....... ............. .............. .............. .............. ...... ........ .............. ..... . ..... ............. ............. . ........... . ............. ............ . ........... .......... ............. ............. . ............. . . ............. ................................. ............. ............. ............... V . .... 12 ........ ............ .......................... ..........•............... : ..................... ... ...... .......... . ........... . ............ ............. ............. ............ ............. ............. .............. ............. ........... .............. .............. ............. . 5 21 ............. ............. ....... .... .. ........... .............. . ...... .......... .............. .............. .............. .......... .. ............. ............. .............. c) x- 12 1 ............ ............. ............. .............. ......0.7.. M 1 3! 6. 7 8 o 1= ................ ..... ........... ............. .............. ............... ........ . ...... ..... ....... ....... .............. ............................. ............. ............. .......... ............ ............. ............. ............. .............. ............. ............. ............. ............. ............. .............. .............. .... ........ ................... ......... ............. . ............. ............. ............. ............. ........... .............. ............. I ................ ............. .............. .............. ............... .............. . ............................. ............. .................... ........ .... .............. ........... .. .......... T ............. ............ ............ ............. .............. ... ....... ............. ............. . .......... .............. .............. ............ . ............. . ............. ............. ............. ............... ...... ...... . ............. ............... ..... ......... ............. ........... . ............................ ............. ........... .. ............. . ............ I ............. ............. .............. .............. .............. z .......... ........... .............. ............. .............. .............. ............ ............. 4 ............. ............. ............. . ............. ........... C' ............ ............. ............. .......... ... .......:..............:.............G.. ............. . ............. ............. ............ .............. ............. ..................... ........................... .... .... ................. ....... ............... ........... ............. .................................. ............. .............. ........... ...... ........... ... ............... ............. .............. : ....... ........... .. ............ .......................... .......... ............ . ............. : ............. .............. .......... ............. i ............. . .. ... ............. ............ ............. .............. 2- A 0, ........ . ............ .......... .......... ... ......... . .... ............. .. .............. ...... ..... ............. ............. ............. .............. .............. .............. .......... .............. ..........•........... ....... .............. ...... .............. ..... ............. .............. . ............. ............. .......................... ............. ............ . ........................... ............. ..............:.............:.............ems .......... ............. t .............. ............. ............. .............. . ............. ............. ............. ............. ........................... ........... ............ • ............. .............. . ............ ........... ............................. ............. ............. ............. ............. ............... ............ ............. ........ .............. ............. ............. ...................... ..... ............. ............ ............. ............ ......... ... .............. .............. ............. ............ : ............... . ............. . ....... .... . ............. ............. ............. . ............. ............. ............. ............. .............. .............. .............. .............. ............. ............. ............. ............. ............. ............. ............. ......... .......... .............. .............. ...... ............ .............. .... .......... ............ ............ ............. .... ...... ......... ............. ............. ............. ............. ............. .......... ............. ........................... ............................ ............................. .............. ............. ............. ............. ............. ...... .............. ...................... ............ .............. ............. ............. . .......... .......... ..... .. .... ............. ............. ............. .......... .............. ............. ... ... ............. ........... ............. .............. .............. .............. . ..... ............. .......... ... ...... ............. ............. ............. GMbk MM 01471. ALEX OTT & ASSATES 'CONSULTING ENG RS 603 Palm. Avenue Y SEASIDE, CALIFORNIA 93955 (408) 394-5936 s _ JOB c/ SHEET NO.--- l - OF t CALCULATED BY DATE CHECKED BY DATE_ ALEX OTT & ASSgSATES CONSULTING ENG RS - 603 Palm Avenue SEASIDE, CALIFORNIA 93955 (408) 394-5936 JOB SHEET NO. f OF CALCULATED BY DATE CHECKED BY DATE Arm p .0-jr-A-0-1 .............. ............. I ............. GmWm Mm 01471. .y b4z :ik .pTE s.:..S4.i.•° : MA(dDATORY MEASURES MADLIN'S ENTERPRISES ' f- r` ENERGY BUDGET & MANAGEMENT CONSULTANTS P. 0. BOX 1443 PALM SPRINGS, CA 92263 .. (619) -324-1731 RESPONSIBILITY FOR SIGNING DOCUMENTS SECTION 1403(a)l. Each document described in Sections 1403(a)2 and 1403(a)3 shall be signed by the person responsible 'for its preparation. The signer shall be licensed or registered -.,to practice by the State of California or eligible under the Business and Professions Code to sign, such docu— ments. if more than one person. has responsibility for building design or construction, each person 'may prepare and sign the document or documents applicable to that portion fo the design or construction for which the person was responsible; alternatively, or the person with chief responsibility for design or construction may. prepare and sign the document for the entire design or construction. All new buildings designated to -allow.- conditioned - use of an 'occupancy group or type regulated by these "s"tan"dards -shall - *record a ,"certificate- of, -com.pliance o6h: the -plans. The individual with professional- responsibility ,for the design and the .owner shall sign the certificate.- The owner of the building -shall. retain. a copy of this certificate of compliance and .transmit it to a subsequent purchaser of the building. • yi. r et a Certificate of Compliance (Part 1 of 2) PGA WEST MADISON GOLF MAINT: FACILITY FOR Project Title LANDMARK LAND CO.. Proact Architect/Engineer Building Permit Number PMWEST Project Location Ply Checked By LA QUINTA C, /Town climate one MADLIN'S ENTERPRISES 06/17/87 CF -1. For Enforcement Agency Use Only Date Field Checked y_ Date Signature and Documentation Author Date Registration Stamp Approved By Date :JOB -NO. 11395 Prescriptive Approach/Performance Approach Strategy - General 1St n GEN. NON - 1 CEC Occupancy Type . . . . . . RES 2 UBCOccupancy.Group/Division ... , , . 3* Package Selected . . . . . . . . . NA_ Budget Table •." . . . . . . •.. . t 4 Gross Conditioned. Floor Area , , , , , 697 ft2 Roof and Floors Calculated Annual Energy Consumptlon 5 Proposed Roof/Ceiling Rt (CF -2: CF -3) ", hr -F-' t2/Btu 6 Required Roof/Ceiling Rt (CF -2) , , hr-F408tu 7 Proposed Exterior Floor Rt (CF -4 CF -3) ,. , hr-F-0/8tu 8 • Required Exterior Floor Rt (CF -2)''. hr-F-ft2/Btu Walla . Heating.. .. 9 . Proposed Opaque Wall Rt (CF -2, CF -3),. hr-F-ft2/8tu 10 Wall Heat Capacity (CF -3).. : Btu/F-ft2 t 1 Required. Opaque Wall "Rt (CF -2) , , hr-F-ft2/81:u Glazing In Walls 12 Ext • U0.11 Area CF -2)Q 14' Performance Approach Energy Budget 1 CEC Occupancy Type . . . . . . . . . 2 UBC Occupancy Group/Division , , , , , 4 Conditioned Floor Area . . . . . ft2 4 Budget Table •." . . . . . . •.. . t 5 Allowed Energy Budget (WS -1A) , , , , kBtutyr-ft2. . Calculated Annual Energy Consumptlon 6 Approved Calculation Method , . . . . . . . 7 CEC Designation . , . . . . 8 Multiplier . . . . . : . Estimated Energy Use - 9: Heating.. .. kBttyyr_ft2 , `. 10 'Cooling .. . . . . . . . . kBtu/yr ft2... . 11 Fans . . . . . . . . . . k8tutyr-ft2' 12 Lights. :. ... katuyr-ft2. . 13 • Miscellaneous Equipment, ,. , , , kBtu/yr-ft2 14' Total ., . . . ... k8tu/yr-ft2 `13 Total Glazing Area (CF -2).,.., ., •, .. • ft2 15 A0. Total Energy Use (line 8 x line 14) , kBtu/yr ft2 14 Proposed Total. Percent (Line 13 /Line 12) , % ` 15 Average Total. SC•(CF-2) , , , :. Compliance Statement 16 Allowed Total Glazing Percent , , , , , % 17 West Exterior WaA Area CF•2 ft2. General: The proposed. building represented in this set- of compliance ( ) • • documentation is consistent with the other compliance fors and. 18' West Glazing:Area (CF -2) , ft2 worksheets, with the plans and specifications and with any other 19 Prosed. West, Permeant CF -2 .. q, calculations or. computer runs submitted with this permit application. Po ( ) Performance Approach. (when applicable) The energy performance 20 Average West SC (CF -2) , estimate presented on this: for was calculated using the approved 21 Allowed West GlazingPercent . . . . % calculation method• indicated above and with the CEC established. fixed and restricted engineering inputs for the applicable climate zone and -Glazing In Roof (CF -6) Proposed Allowed occupancy type• Prescriptive Approach. (when applicable) The proposed building has 22' Skylight 1 , ft2 been designed to meet the requirements of the Alternative Component 23 Skylight 2.. _ ft2 Package, indicated above for the appropriate occupancy type and. climate 24 Skylight 3 . ft2 zone i 'Iliar 25 Skylight 4 . . . .... ft2 I 26 Skylight5... . . . . . ft2 27 Skylight 6 , ft2 Sign AR HI ECT 28 Skylight 7 . . . . . ft2 29 Skylight 8 . . . . . . . • . . ft2 Namel7itle Lighting LANDMARK LAND CO. OF CALIF. , INC.. 30 Proposed Adjusted LBS -(CF -5) . Watts/ft2 • Company. P.O. BOX 1000 31 Allowed LPD (CF -5) . . , , . . . Watts/ft2 HVAC' .. Address 32 Performance Set Selected . ..... LA QUINTA , CA 92253 33 Proposed Fan Wattage Index (CF -4).. Watmitt2 City/State/Zip .(408)625-4060 #14006 1.; 34 Allowed Fan Wattage Index . . . . . Watts/ft2 ti 35 Proposed Cooling Power Index (CF -4) , Btuh/ft2 Telephone Calif. License Number ~`• P I B IVft2 36 Allowed Cooling ower ndex , to 37 Proposed Heating Power Index (CF -4) , Btuh/ft2 38 Allowed Heating Power IndeX , Btuh/ft2 Form Revised. September 1986 Page • of Certificate of Compliance (Part 2 of 2) CF- LANDMARK LAND .CO. / PGA WEST MADISON GOLF MAINT. FACILITY For Enforcement Agency Use Only Project Tide MADLIN'S ENTERPRISES 06/17/87- Documentation 6/17/87Documentation Author/Firm Date Checked By Date JOB NO. 11395 Both parts one and two of this Certificate of Compliance must be included with each building permit application for the above noted building and appear on the plans submitted for approval.. The building features and requirements represented on the Certificate of Compliance are adequate to achieve. compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are. also adequate for any subsequent alterations, modifications or additions to the.building. DeslgnerOne TITLE 24 DOCUMENTATION AUTHOR Designer Three CATHY MADLIN Name (Print) MADLIN'S ENTERPRISE Title/Company Name P.O. BOX 1443, PALM SPRINGS, CA 92263 Address 06/17/87 Sign Date En' en gency Sig re a Name (Print) Tide/Company Name Address Signature Date orcement Agency Signature Date Enforcement Agency Signature, Date ElUSIrce.ment Agency Signature Date Owner Co =orrn Revised September 1986' Enforcement Agency Name (Print) Tide/Agency Address M Designer Two:.,A'RCHITECTURAL' ,ARCHITECTURAL CONSULTANT . Designer Four GENE REIVER Name (Print) Name (Print) MC CORD & - WALD 'rifle/Company Name PALM SPRINGS ;TitleiCompany Name 1555 S. PAL CANYON DR. # D-201 CA 92264 Address Address 6-17-87 Signature Date Signature Date Enforcement Agency Signature, Date ElUSIrce.ment Agency Signature Date Owner Co =orrn Revised September 1986' Enforcement Agency Name (Print) Tide/Agency Address M tiY. Vandatory Measures Checklist MF -1 LANDMARK LAND CO. /.. PGA WEST .MAD I SON GOLF MAI NT . FACILITY For Enforcement Agency Use only, Projectride MADLIN'S ENTERPRISES 06/17/87 Documentation Author/Firm Date. Checked By Date, ` JOB NO: 11395. Reference in Reference ir. Construction Constiuctior Documents Documents [J, Photocell' sensors with a diffusing cover and .. Envelope Measures no opaque cover per 2-5319(e)5 . .......... . Certified insulation materials peat -5311(a) ... ET6 4 (1 Manufacturer's instructions provided for installation (1. . . . and calibration per 2-5319(e)6.. . . . . . . . . . [ ].. Insulation installed to meeYflame spread and smoke [. ] Proper installation of controls including sensor location, density requirements of 2-5311(b) , . . . . . . . . . certification of initial calibration and controlof luminaires . (] " ''Ursa* formaldehyde foam insulation is installedonly within daylit area per 2-5319(e)8., . . . . .. per 2-5311(c) ... . . . . . [ ] Visible or audible malfunction alarms per. 2-5319(g) , , (] . Retrofit insulation specified as per 2-5313 , , (" ] Occupancy g Sensin , Devices (when Air infiltration is minimized by specification of tested manufactured doors and windows and proper applicable): sealing and weatherstripping as per 2-5317. . Flicker. free operation and no premature lamp Lighting. System .,Measures failureper2-53,9ce>?-. '1 ®tel ( ]. Time delays to prevent undesireable cycling ( ]. Certified luminaires/ballasts per 2-5314(b) ... A per 2-53.19(e),3 . •.... . . . . . . ... .• . [ 1'> Independent,eontrol.w/ enclosed areas per 2c5319(a) . 4 A l [ j hVisible or. audible, malfunction alarms-per.2,5319(g) . . Manual switching readily, accessible par Z5319(6) lr - Limits on emissions perex tions tot -5319 e IT. • Reduction of lighting.load to at least one half per. mr 2=s3,s(c>. Occupancy:sensorscrpmgrammabtenmers.. HVAC` and Plumbing System :Measures meeting CEC criteria may, substitute . Separate switehin of 6t areas r2 -5319(d),. Piping insulated as,required.by 2-5312;, I 1 g: ay per . arate switchin of dims I and"valance fighting..(1' Certified HVAC equipment per 2-5314(a).. ] . Sep 9 Pay" rn retail and wholesale stores per 2-5319(h) .[ j Certified plumbing;equipment per -2-5314(a),.. . [ ] Automatic control of..display"lightin in retail Heatin and cooling equipment efficiency 2-'5314(b).. g `[ 1 g g P cy per 2-5314 and wholesale stores per 2-5319.(hl" (] " :Tandem wiring of one- and;lhree4amp uminaires.Pilotless ignition of. gas appliances per 2-5314(c).;... , per.2.5319(i).. : Automatic controls foroff=hours per Z5315(a)1 , Daylighting and Lumen Maintenance (] Thermostat set point requirements per 2-5315(a) , ControlS: (when applicable) [• ] Sequential control of heating and.,cooling per 2-5315(a)3 . (j . Uniformly illumination reduction to one-half [ ] Automatic exhaust fan dampers per 2-5316(b) . . per 2-5319(e)1 [j Thermostat controls for each zone per 2-5315(b) , , [.1 Flicker, free operation and no prematurelamp failure (j. Ventilation provided per 2-5316 and 2-5343,. per 2-5319(e)2.. . . . . . . [ ] Time decays to prevent undesirable cycling (] Heaters for domestic -hot water and/or pools per 2-5318 per 2-5319(e)3 . . . . L] 'Step.switching.deviceswith separation between i on/off settings per 2-S319(e)4 . ... . . . . . Farm Revised September 1986 Page- ai .1r . MANDATORY MEASURES MADLIN'S ENTERPRISES ENERGY BUDGET & MANAGEMENT CONSULTANTS P. 0. BOX 1443 • PALM SPRINGS. CA 92263 (619) 324-1731 NOTES TO BUILDER The builder shall provide the building owner, manager, and original occupants a descript— ion of the quantities of outdoor and recirculated air that the ventilation• systems are designed to provide to each area. (Applicable to 1st do 2nd generation standards.) . The builder shall provide the building owner, manager, and the original occupants a list of *the heating, cooling, water heating, and lighting systems and features, materials, components,. and mechanical devices, conservation or solar devices. installed in the building, and instruct— ions on how to use them efficiently. The builder shall rovide maintenance information to the. building owner, manager, and original occupontes) for all features, materials, components, and manufactured devices that require routine maintenance for efficient operation. Required routine maintenance actions shall be clearly stated and incorporated on, a readily accessible label. The label may -'be limited to identifying, the manual for that particular model or device. If any characteristic of the building, materials, components, or manufactured device is, changed , the change shall be indicated on amended plans and specifications and shall be submitted to the enforcement agency... r Before the' enforcement agency determines whether the building may be' occupied, the person With overall responsibility for construction or the' person or persons responsible for the in— stallation of regulated manufactured devices shall post, adjacent to the building permit(s) issued for the building, installation certificates for manufactured devices regulated by the appliance standards. These certificates shall: ani, 1. identify the appliance or device; 2. include a statement and signature; 3. state the building permit number, .. .' MADLIN'S ENTERPRISES P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263 (619) 324-1731 THIS PROPOSED NON-RESIDENTIAL PROJECT HAS' BEEN REVIEWED FOR COMPLIANCE WITH 'TITLE 24, PART 6, DIVISION T-2( OF -THE STATE OF. CALIFORNIA ENERGY CONSERVATION STANDARDS FOR NON-RESIDENTIAL BUILDINGS BY MADLIN'S ENTERPRISES. THE BUILDING DESIGN DESCRIBED IN THIS, COMPLIANCE PORTFOLIO IS IN SUBSTANTIAL CONFORMANCE WITH THE STANDARDS. JOB NUMBER: 11395 DATE: 06/16/87 PREPARED FOR: LANDMARK LAND COMPANY OWNER: LANDMARK LAND COMPANY' PROJECT TITLE: PGA WEST.- MADISON GOLF MAINTENANCE' FACILITY EXPANSION PROJ ECT LOCATION., LA QUINTA PROJECT DESCRIPTION. SINGLE STORY WOOD FRAME -BUILDING -F,IRST GENERATION STANDARDS ILI y ' Ilk MADLIN'S -ENTERPRISES P.O. BOX 1443 - PALM SPRINGS' CALIFORNIA 92263 (619) 324 1731 , PROJECT= PGA WEST MADISON GOLF MAINT. FACILITY EXPANSION.., - PREPARED- FOR: LANDMARK LAND COMPANY ` JOB.NUMPER: 11395 DATE 06'/16/87 ------------- ------------------------------------------ THE. FOLLOWING INSULATIONS, FEATURES, AND DEVICES WERE .'INCLUDED; IN THE *ATTACHED TITLE: 4 COMPLIANCE ANALYSIS -TO i DEMI iNSTRATE COMPLIANCE WITH THE 'STANDARDS. 'WALL INSULATION — FRAME ........, ..,,,,R=11 ROOF / CEILING INSULATION'............. . R=19 • ... RAISED FLOOR OVER' 'UNCI=SND., -SPACE e. •.. , .. NA , SLAB INSULATION ....... ...... ..... ,, NONE REQ. GLAZING U.VALUE ........„ . ,,, ,., 1.i.'SINGLE PANE GLAZING•SHADE-COEFFICIENT .............. ,, 1.0 CLEAR* GLAZING TREATMENT — SUNSCREENS .......NOT REQUIRED GLAZING TREATMENT'— i OVERHANGS . , , , o , , . , , , AS SHOWN ON PLAN - SKYLIGHTS.,,, ..,., . .. NONE CONTINUOUS INFILTRATION BARRIER ......... NOT REQUIRED VAPOR BARRIER >, . „ .,,,o, NOT REQUIRED ELECTRICAL PLATE GASKETS.......,,,.,„ NOT REQUIRED HVAC EQUIPMENT EFFICIENCY o ..,.,.0 7.5 EER COOLING AIR TO AIR HEAT EXCHANGER-'..-._:.....,, NOT REQUIRED THERMOSTAT ....... .,, ,.;. REQUIRED _ TIMECLOCK FOR HVAC EQUIPMENT .. , , , , , REQUIRED ADDITIONAL NOTES ______________ *- SEE THE ADDENDUMS AND NOTES SECTIO= N OF THIS COMPLIANCE P RTFOL I j FOR R GENERAL REQUIREMENTS, u GLAZING CONSIDERED TO BE CLEAR IN CALCULATIONS. OWNER MAY INSTALL, AT.HIS OPTION, BRONZE-OR,GREY TINTED GLAZING WITHOUT ADDITIONAL CALCULATIONS. I di PREPARED BY: JOB NUIZER: 11395 HADLINI S EI`]TI=RPRISES BUILDING DATA FORTH El-1EFGY BUDGE1' CONSULTAP:!TS Lf;VELOPE COI]PLIANCE TELEPHONE {61,9} 3i 4-1731 0{}/1;5/37 1EI:56:31 • PR,_., E,KE i FOND ..'.........LAhJDf'IARK LAND CO{"iPAP.IY Pf'OJ.ECT TITLE .. . ..PGA WEST — HADIS-0N GOLF. ;!'!',Ih.7T'. FAC. LOCATION ........ ....... LA QUINTA w. ** F 0 R f I 1— 13' U I L D I f! G E t d V E L O P E C 0 [-1 P L I A C E SITE DESCRIPTION: LOCATION CODE NUMBER 1 2 LATITUDE _{ •u DEG[ -,EE' DAYS. — HEATING 1232 SF,' SOLAR .FACTOR 1,"2'_3.1,' DELTA Ti ASHRAE DESIGN TEHP — 7L 34 • !BLDG DESCRIPTION: OCCUPANCY TYPE .CODE NUI*IBER 47 GROSS HEATED FLOOR AREA, SQ -FT. 697 , NUI'!l:3ER OF FLOORS 1 Gf OUND FLOOR PERIL"IETER, FT. 1,c7 LONGEST DIAGONAL DIMENSION 45 • HEIGHT, FT. 10 WALL: SUI-'\JFACE AREAS AREA OPAQUE WALL 90 AREA WINDOW 40 AREA DOOR 60 TOTAL AREA OF WALL 31PO8- COEFFICIENTS HTG U WALL .0791476 HTG U WINDOW 1.1 HTG U DOOR .59 CLG U WALL -0791476' CLG U WINDOW. 1.1 CLG U DOOR .58 SHADING COEFFICIENT.OF GLASS 1 WEIG"HT OF WALL CONST., LB/FT2 15 MASS.CORRECTION FACTOR 1 EQUIVALENT TEMPERATURE DIFFERENCE 44 ROOF: SURFACE AREAS' AREA OPAQUE ROOF 697 AREA SKYLIGHT 0 AREA OVERALL ROOF 697 % SKYLIGHTS 0 DIFFERENCE BETWEEN AREA OF SKYLIGHTS AND 5% OF AREA OF OVERALL ROOF. OR ZERO 0 CONHEi?CIAL l~o;il Ov,-E - PAGE TWO OF TW0 JOU PJO: 11395 NOOF COIJT.: COEFFICIENTS HGT U ROOF .049 HGT U VALUE SK.YLIG[iT 0 CLG U. ROOF CLU U ;'KYLIGII'1 0 i SHADIlIG COEFFICIENT OF SKYLIGHT 0 MASS "COEFFICIEI-JT L ACJ SOiPTANCE 1 FLOORS: AREA OVER Ut-]HEATED SPACE ". 0 U VALUE OF FLOOR 0 HEATING DESIGN CRITERION: . STANDARD U OVERALL WALL .45 STANDARD U OVERALL ROOF .1 STANDARD U OVERALL FLOOR .3G5 HAXIf'i Ai ALLOWABLE U OVERALL •3Oln92i PROPOSED U OVERALL WALL•150OIL- 5` • PROPOSED U OVERALL ROOF .04`i. PROPOSED U OVERALL FLOOR 0 PROPOSED U OVERALL •10875 COOLING DESIU] CRITERION: " STA11DAF D OTTV WALLS 31.5 STANDARD OTTVROOF 1 STANDARD OTTV 20.4763 PROPOSED OTTV WALLS 9.54058', PROPOSED OTTV ROOF 2.009 PROPOSED OTTV . 6.4616"9 PREPARED BY: JOB NUNGEN' 11395' f1ADLIN' S ENTERPRISES HATEff;IALS DATA FOI:I'1 ENERGY BUDGET CONSULTANTS a' °'' ' r `',"•:,, : BUILDING ENVELOPE TELEPHONE {619} 324-1731 06/15/67 11:00:14, - PREPARED FOR..............LANDMARK LAND COMPANY - PROJECT TITLE ............PGA !JEST — 11ADIS0N GOLF. MAIhIT. FAC. LOCATION .... ..•• .• ...LA OUINTA ' ** F O R N 2 — M A T E R I A L- 0 R I E- N T A T 1 0 iJ D A T A * # " **** ************* ** %*** K*:K******* :kik********* ** K** : :* K****# ******.** • . WALL': WALL TYPE 1 WEIGHT OF WALL CONST., LD/FT2 15 f. HEAT TRANSFER COEFFICIENT •08 % :OU SURFACE AREAS NORTH AREA 0 FEAST AREA 1117 WEST AREA : - 176 SOUTH AREA 228 WALL- TYPE 2 WEIGHT OF WALL CONST., LB/FT2 15 HIEAT TRANSFER COEFFICIENT. .075 / .07 SURFACE AREAS NORTH AREA 246 EAST AREA 147 WEST AREA p SOUTH AREA 0 GLAZING: 1 ' GLASS TYPE- 1 SHADE COEFFICIENT 1; - HEAT TRANSFER COEFFICIENT SURFACE AREAS NORTH AREA p EAST 0, _AREA WEST AREA 28 SOUTH AREA 12 ROOFS:. .1 ROOF TYPE r WEIGHT OF ROOF CONST., LB/FT2 15 - HEAT TRANSFER COEFFICIENT .p4`I / .049 SURFACE AREAS 697, SKYLIGHTS SURFACE ..AREA p SHADE COEFFICIENT p r ' • HEAT TRANSFER COEFFICIENT 0 FLOORS: - FLOOR' TYPE 1 J ., 4 WEIGHT .OF FLOOR CONST. , •LB/FT2 U HEAT TRANSFER COEFFICIENT 0 / 0 SURFACE. AREA .; 0 Form,3 MAa1N'S'. \ • EN7ERDRISES T \l . D.QD/bC•1143 • ENEi sy c Q1LM"SCQINGS. cAlIFORl1iL1 'HEAT TRANSFER COEFFICIENT DIJD6IET 2zbZ PROPOSED CONSTRUCTION ASSEMBLY R ' List of Construction Components ,i,, STUCCO ,18 VAPOR BARRIER ,O 1 2. ; 3 INSULATION 'v,IITH RESISTANCE _ 11`, 00 2 34 GYPSUM BOARD ,45 4 I s. 6. 7. 8. ' .68' ,68 Inside Surface Air Piim : r cooling heating ' Sketch of Construction Assembly Outside Surface "Air Film .25 . 17 WEIGHT: 15-25 Ib/ft2 cooling heating Check one-12Total Resistance Rt , 6 2 12 .-54 X X cooling heating Wall . Roof U -Value (I/Rt) .08 808 cooling heating Floor _ W-17 • r" V r• ` • MARLIN'S + `►`, - ENTEITPI?ISES !n VAI 0 DK U43 ` a NEs26Y R11.M SMINGS, c. LIFouNw HEAT TRANSFER COEFFICIENT DUD6ET s l 92262 -PROPOSED CONSTRUCTION ASSEMBLY - List of Construction Components R • GYPSUM BOARD ,45 INSULATION WITH RESISTANCE =t 11.00 z• GYPSUM BOARD , 45. 3. 3 a, , 5. • f 6. 7. 8• ' ' ' t J Inside Surface Air `Piim •` . 6 8 _, 8 • cooling heating Sketch of Construction Assembly f Outside Surface Air Film 4 ..2 5 -.17 WEIGHT: • 0 -15 • W/O _ *t - • r , . cooling heating Check one:. Total Resistance Rt 12.83 12.7.5 X/ a • cooling heating Wall — Roof ._:... _ U•Value (I/Rt) .078, .078 cooling heating Floor • ,- W-37 Form 3 {. ' MAIxIN'S , r'ri` •• ENTERDRI4ES ' :\ • ° D Ql3CA( W41. 'L LLM SCOIN6S, '' » • EIVED6 CALLIMIDM1 ' HEAT TRANSFER COEFFICIENT 92262 PROPOSED CONSTRUCTION ASSEMBLY . ' CONSULTANTS . ` R List of Construction Components '` 1 2 INSULATION 'WITH RES ISTA'N.CE _ ' -19, 09- 1'. 2. GYPSUM BOARF OR TILE , 45 3 4. ' IS 5. 6. 8. • . Inside Surface Air Pilm 692 61 cooling heating ' Sketch of Construction Assembly Outside'Surface Air. Film . 2 5 .17 WEIGHT: 0-15 I6/ft2 cooling heating Check one:. Total Resistance Rt 20 .62 20. 23 ' cooling heating ' Wall XX , • Roof G LI-ValueAl/Rt) .049 ,049" Floor ._ cooling heating + 4 • Pf�EPAf?,ED BY. - IiADLIII� S EI•J'fEI;Pi�.ISES EINERGY BUDGET CONSULTANTS TELEPIHONE =124-1731 JOB •I !U HE' ERI : 1131-95 DOCUI"iEivTATIOE'J FOl';I°i HVAC SYSTEHS OL./115/8-7 11:53:113 KEPARED FOR .......... LAINDM Rl: LAND .C'OI'lPAf:•.Y PN'OJECT TITLE .........PGA WEST — HADISOP_, GOLF- I"iA:I`I'f. FAC. F 0 I<; .11 4 — 'L 0 A D C A L C & E Q, U "I . P ri E' I'l T S U 11 I'1 A R Y' **k�*:K*�:*:�*�:*:K����:*�*�*******�;K**�K�x:****:K�*:K�*•#�****�**:KKx:��*�*:K :K�K�*�:k��k��::K*#�%K DESIGN CONDITIOF!S: BUILDING OCCUPANCY TYPE 47 PROJECT LATITUDE 33.8 HEATING DEGREE DAYS 123r TIME FOLLOIJIIIG LOAD SUMMARY IS FOR THE ENTIRE BUILDING. F0R; INDIVIDUAL G01•aE OR AREA REGIUIf-.;EIIENTS SEE ATTACHED ROOM BY ROOM PNINTOUT., CO `{PONETS LISTED BELOW HAY INCLUDE MORE THAN ONE TYPE. HEATING LOAD DOCUMENTATION — CALCULATIONS ATTACHED-ASHRAE METHOD OUTDOOR DES iGN TEh1PERATURE,. WINTER 31 INDOOR DESIGN TEMPERATURE 7� - TRANSMISSION HEAT LOSSES WALLS. — ALL TYPES 2`146.51 DOORS - ALL TYPES 1451:4 ' GLAZING* u SKYLIGHTS ITS 18, 4, '. CEILINGS /.ROOFS I.4DO.27 FLOORS.— ALL TYPES 5723.76 INFILTRATION AIR 49.6667 HEAT LOSS FROM INFILTRATION 22118.1 VENTILATION' AIR, - SEE INFIL• ^HEAT .LOSS FROM VENTILATION SEE INFIL- OUTDOOR AIR FOR. SPECIAL PROCESS NA HEAT LOSS FROM PROCESS 'AIR NA DUCT HEAT LOSSES 1553.4 ** TOTAL HEAT LOSSES 17067.4 COOLING LOAD DOCUMENTATION`— SEE -ATTACHED "CALCULATIONS — ASHRAE METHOD OUTDOOR DESIGN 'TEHP- DRY BULB 112 OUTDOOR DESIGN TEMP. WET BULB 78. INDOOR, DESIGN `:TEMP --'DRY BULB. 78 INDOOR DESIGN TEMP. WET BULB 65 TRANSMISSION HEAT GAIN. WALLS - ALL TYPES 3260.94 DOORS --ALL TYPES 1183.2 GLAZING & SKYLIGHTS 11112 FLOORS — ALL TYPES G _ SOLAR JHEAT GAIN TI-IROUGH WINDOWS 3863.4 OUTDOOR AIR FOR SPECIAL PROCESS IVA HEAT GAIN FOR PROCESS AIR _ fIA . CONTINUED'ON NEXT PAGE , • COi'iiIENCIAL FORil 4 C011TI[JUED PAGE 2 COOLING LOAD DOCUI]ENTATION- {COi•-ITINUED} • HEAT GAIN FROM, PEOPLE 50P_3 .4 HEAT GAIN F ,Ui1 LIGHTS 312'19 - 1, 8 HEAT.GAIN FIOil EQUIPi'iENT "TEAT' GAIFI TO DUCT'10% 21U1;•2ca OU'T'DOOR AIR FIXED NINI11UH, TYPE SYST'Edl " • JyIU JEER OF PEOPLE 11 CFM VE113ILATIOiJ 155 HEAT GAIN Ft ON VENT. AIR 7U"97.56' SYSTEI''i'UTILIZING USA FORCLG CFM OSA UTILIZED N A HEAT GAIN FROMi OUTDOOR AIl' VJA * TOTAL COOLIi.JG LOAD t ._ , 289l:, Li .7 ' T'EiiPEI ATLJF\E CONTr;"UL F,'EQ U IR E HE N T S * CAPABILITY TO SEQUENCE HEATING AND COOLIVJG PAGE I"IC, * TEVIPERATUNE CONTROL DEVICE SET POINT LIMITS PAGE skIIC * SET POINT RANGE BETWEEPI FULL HGT &'FULL CLG 'CONTROLS PAGE NlIC * SETBACK OR SHUTOFF PAGE N`IC , * CAPABILITY. TO TEkNINATE _HTG.. 70 F s& CLG- . 78 F PAGE i'lIC HVAC SYSTEf1 RESTRICTIONS AND SPECIAL REQUIRENEFITS ------------------ -- --- ----- ------------------- --- — --ALL ALLHVAC SYSTEMS TO MEET REQUIREMENTS SET FORTH IN THE 1-IVAC Al ;)E!lDUN SEE ' ADDENDUNS - AlID NOTES' SECTION FOLLOWING ASI-tI\'EA LOAD CALCULATION. ** NUMBER OF UNITS TO-BE INSTALLED 1 ' -SEE 'HVAC EQUIPMENT SCHEDULE' AND FORM 6 FOR MODEL NO.-AND CAPACITIES., • **"THERMOSTAT, DATA: SEE ATTACHED SPECIFICATIONS SHEET NIC ** FRESH AIR PLENUM IS TO BE INSTALLED FOR VENT: OSA'— SEE MS-4 ** 'EACH UNIT TO BE STARTED AND STOPPED BY A TI11ECLOCK ='SEE MS-16 . • TIME FOLLOWING TYPES OF SYSTEMS DO NOT- APPLY TO THE .ATTACHED PROPOSED BUILDIilJG ------------------------------ SIMULTANEOUS HEATING AND COOLING HOT AND COLD DECK SYSTEMS DUAL DUCT AND/OR MULTIZONE SYSTEMS ' CONTINUED ON NEXT PAGE HECHANICAL Ai -1D G AVIT'Y VEI-:ITILA TTOrI SPECIALI;EQUIf E('iEr!"fS ,!!) RESTS I CTIO ;S • ---------------------------------------------------------,----------- ----- ALL VE11T'IL tTOI- ." 'I'O iiEET hE.: UIf:.l`iE.rdT'S SET FOi:'i'If UIi PAGE -1 OF 'i'I"IL HVAC ,,Dr;EF DWI Li; THE ' AP,DI=I;DUi'iS rai<D r•,!O'I'ES° SECTIO;'•,;. • i3ECNAIIICAL VENTILATION - DAhPEkS WHICH AliTOf1ATTCALLY• li:TEF;LOCI: AND CLO`.;"a% 01; f=.^,1! SIILIT DO•,;;Pl. GF,AVITY VL JTTLA,rot S - EITHEI' AU T OhATIC GI . READILY i,CCESST :LE. ,NAr,lUi`,LL`( OF'E; ATED DA11PENS POWER, 'COF;SU11PTION III FAl:;S COfJSTAi 1T VOLUI IE SYSTEf'I . • TOTAL :;UPPLY Air QUAr• TITY = CFPi rIA TOTAL" PRE:SSUI E OF SUPPLY FAN f TOTAL ` PPLY AIR ADJUSTED FOR PROCESS — CFH HA TOTAL CI OSS FL001; AREA - S[]IFT i' LT FAi'•! PEI;FOF:ilAr•,!CE INDEX •[FPI} ;d VARIABLE VOLLlf`1E SYSTEM TOTAL `UPPLY AIR QUANTITY HAX FL OU TOTAL P'RESSL1FiE' OF SUPPLY FAN AT NAX t• A TOTAL GROSS FLOOR AREA SQ/FT I,A FAN I?EI;F01ihlArJCE INDEX AT MAX NA VARIAELE VOLUME ADJUSTMENT CONSTAfJT WA ADJUSTED FAr! PERFORMANCE INDEX haA PIPING A!',!D` DUCT hJSULATION Ar -.1D DUCT CONSTRUCTION SEE INSULATION SPECIFICATION PAGE MS -3 • lADLIidvS Ef-.1TEf; ,T,ES JOB f!UfiEl1.'R: 11, 195 • DIEI:GY. F,UDrE*f CO.,Sl..ILTAf.!TS 16/1,'_;/c,7 1p:27:lb TI LE-1;,1..10raE '71,111- 24-1731, ALL TTEi • Pf Lh',, ED FOR ... ..:.LANDf1ARIC L4•1D C011PA;IY Pi.OJLCT TITLE ..........PGA (!!EST — f-IADIS01'1 GOLF.IIIT. FAC. F 0 I' PI .. 5— A L L O T T E D U A T .T S I' F, ' I Nl T O U, T * K f:00il1 F11,001"i 1,.!,1^,i E TASK AREAS TACK i.;0'f E 'SQ F"I' ,LLOTTEiJ I IU 110. APPL .IA.. TS • 1,[1 LUNCH. 1',0011. DIf 11 f 2L)12f 107'•F;f;e COl`T OLS EQUIP POOii'' '58 -0 72 :L U' OFFICE OFF/FAIR COPY 241 1, 41; 22!:, NONITASK 4 75_ •' TOTAL TASK a, f`Of•1TASK 11-119 LOCKER'S — LOCKED; .ROOMS 21,8 0 Z 5` 1IL,3. 1110 UsOf1E 1I S Ili TOILETS—LGUNGES, 354 G L?, 98 11.1 rib'] S 1,;R TOILETS—LOUNGES '.3S4 0 -11.:1 M,2 BUILDING TOTAL ALLOTTED . U A T TS 11,16 7 MADLIN' S Ei-JTERPRISES J00 NU!"IBER: 113`15 ENERGY BUDGET CONSULTANTS - 06/15/87- 13:27:32 714. 324-1731 }LDG DATA FORM PREPARED FOR - ...LANDIiARK L0,!:D CO}1PArJY PROJECT • TITLE.. • ..... • • • PGA VEST —'. NADISON GOLF- MAR. -IT. FAC. - A L, L 0 W E.D` . A N D P R O P O S E D D E- S'I•G IN W A 1' T S' ROOM }JO ROOM NAME ALLOWED IdATTS * ' DESIGN W, ATTS 106 LUNCH ROOM 242 280 107 IRR. COP,ITROLS 1011 140 108 OFFICE 301 1Lt0 109 LOCKERS 163 280 110 WOOENI S RR 98 40. , 111 NEN I S RR 11_, 2 160 BUILDING TOTAL 1067 1,04E * FORM 5 — L.IGHTI}JG C0riPLIA_'P!CE — WATTAGES ** ROOM ROOM RCR TASK NO. Y NOTE SQ/FT NO. `'Q/FT • TOTAL WATTS ALLOWED NO. SQ/F1' . APPL. /OCC. , OCC /TASK SC FT -SQ/FT WATTS 1,06 242 0-5 114 242 1.00 2L12: 107 72 5+ 58 72 1.40 101 • 108 96', 5+ 241 1 100 1 = 50 48 4.70 226 [1T 48 1.57 75 109 .125. 5+ , 218 125 .1,30 163 110 61, 5+ 354 61 1.60 98 111 '101 5+ 354 C] 162 i ('('L:P'-,!lI.17 Y: .. JOII 1'!(I!"E", 1a1,-195 ' NIAitINI S EN, TERP RISS VIVAC 1_QLlIPH[.'l,1 T • 7I1+-3 24-]j131,COI'i'L IA(.10E F 0 f' H b— (-I V A C E Q U I. P it E 11 T R O C U ('1 != (%d 'T r1 T 1 0 1.1 • •. T:K:K:K C :*:Kx ta::K * * :% * :K :K ::K : c:K:K%f k ** :K*%:K c :*;YT :X :K#:}: :X%K KT, ::ex.;;: = :x:%} : I`IMHUFAC.TURE 2' LE('JI'JO};. OR. EQUAL UGIT ZOl,LS ONE ENTIRE CONDITIONED AREA • ----------------------------------------------------------------------------. ELECT:NICALLY OPERATED COOLI(.JG SYSTEM EQUIPMENT * 110DEL NJUMBER, HP18-31.1,V S'I' N!DARD I-;ATI('•1G CAPACITY, LTU/I-IR'; 21:111:!U (il!II9Ufi EER {COP} 7• l • REFERENCE- PAGE. SPECS All SORPTION; (JATEN: CHILLING COOLIN.IG SYSTEM E(,lUIPNIENT , * I'IODEL NUN'iBEI c NA, 1 IIEAT SOURCE N•A • IIINJIHUVI EER {COP} P,EFEREINCE . — PAGE klA C011B.OSTION 41EATING EQUIPMENT - OIL OR GAS FIRED . MODEL NUMBER NLA INPUT CAPACITY ,. .. 111 .OUTPUT CAPACITY N,IA. ` NIN!IMUf1 COMBUSTION EFFICIENCY AT NIAXIMUNI RATED OUTPUT !`vA REFERENCE — PAGE. !lA ELECTRICALLY OPERATED HEATING — HEAT PUMPS } >K V10DEL 'NUMBER', : HP18-311V -MINIMUM EER {COP} 1,.801. REFERENCE — PAGE SPECS SUPPLEMENTARY HEATER CONTROL NA REFERENCE - PAGE N!A : 'ELECTF;ICAL RESISTANCE SPACE HEATING EQUIPMENT * MODEL NUMBER : NA REFERENCE FOR FULL.LOAD ENERGY •. INPUT AND OUTPUT 11 REQUIREMENT FOR MAINTENANCE FOR MANUFACTURER'S MAINTENCE AN!D FULL AND PARTIAL CAPACITY AND STAND—BY INVPUT{S} AND OUTPUT{S} SPECIFICATION. ' ' REFERENCE - PAGE 'WITH UNIT NADLIN' S ENTERPRISES JOB PJUNiEjER .1,1,395' ENERGY BUDGET CONSULTANTS 06/1,5/87 11:35:37 - P.O. BOX 1443 DATA SUf`HARY PALH.SPRINGS, CALIFORNIA LOAD CALCULAT10N. TELPI-1011JE 619-324-1731 ASHR.AE f'IETHOD THE FOLLOtdING PAGES CONTAIN- A C6111- IERCIAL RO011 BY. ROOM HEAT LOAD CALCULATION DETERMINED IN ACCOf DANCE I;ITH THE PROCEDURE DESCRIBED IN TIME 1977 ASHRAE } HANDBOOK'OF FUNDAMIENTALS CHAPTERS 24 AND '25. TEf-IPEI\ATUl?E DATA: r WINTER TEVIPERATURES: INDOOR: 72. OUTDOOR= 31 SU ER TEf"IPERATUARES: INDOOR DRYBULB: 78 OUTDOOR DRYBULE: 112 • `TNI)001-, WETBULD: 65 OUTDOOR IjETBULB.: 7L DAILY F;Af'JGE: 3L DELTA W: • 2.5E-03 ;. ** SEE ATTACHED PSYCl-OMETRIC CHART FOR ENTHALPY, HUMIDITY RATIOS 'DELI POINT is • * OUTDOOR DESIGIJ TE11PERATURES OBTAIllED"FROM RECIONHENDED OUTDOOR DESIGt•1 TE11P— ERATURES SOUTHERN CALIFORNIA PUBLISHED 'BY ASHRZAE 4TH EDI'I'IOfJ OCT. 1972 ** INDOOR DESIGfl CONDITIONS FOR GENERAL COMFORT APPLICATIONS ARE IN ACCON'DAI-1 CE WITH ASHNAE STAIJDARD 55•.74 ** HEAT GAIN CALCULATED -AT,: DATE I, TIME. JULY 21 3,600 HOURS " LATITUDE: 33.8- 3.8H0UF;S H 0 U [,,'SOF-OPEF,ATION: .'VARIES WITH .SEASON ** HOURS PEI; DAY LIGI-ITS ARE ON: 12 HOURS PER DAY * OCCUPANCY.DEGNEE OF ACTIVITY:. LIGHT. WORK _ SEATED AT REST, * DESIGN CRITERIA FOR OCCUPANCY, TEMPERATURE AND VENTILATION" AIR BASED ON TITLE 24 ENERGY CONSERVATION STANDARDS. * GAIN {COOLINGI CREDITS NOT TAKEN FOR f INTERIOR SHADING BY DRAPES OR BLINDS; A •UNIT CONDUCTION. BETWEEN SPACE AIR AND`:SURROUNDINGS ti *. LOSS {HEATING} CREDITS NOT TAKEN FOR: • A PEOPLE, LIGHTS, EQUIPIhENT — . EXACT SCHEDULES UNKNOWN Y ** THERMAL LAG CONSIDERED — { ** VENTILATION RATES - ESTABLISHED FOR SMOKING AND NON-SMOKING AREAS SEE ATTACHED VENTILATION ADDENDUM ** SOL AIR TEMPERATURE USED FOR WALLS / ROOFS THAT ARE NEVER DIRECTLY ^' EXPOSED TO THE SUN'. ** ANY APPLIANCES / EQUIPMENT CONSIDERED.IN THIS LOAD WILL BE LISTED ' IN ADDENDUMS AND NOTES ' HADLI111 S ENTERPRISES ENEP,GY BUDGET CONSULTANTS POST OFFICE 130X 1.443 *** PALM SPRINGS, CALIFORNIA 92263 714-324-1731. ENTIRE BUILDING TOTALS FOR 'A. S. H. R. A. E. COMMERCIAL LOAD CALCULATION 00fi OF; SPACE COOLIPdG.LOAD HEATIFJG LOAD 106 LUNCH R00f I .11818 - 6410.11 107 IRR. CONTROLS 3429-17, 1237.85 108 OFFICE 5411.44 3773.65 ZCl9 LOCKERS 4214.1 '1894.22 1,10 Ill O1IEN S RR 2060.98 2156.28 111 VIEf-•IS R, R. 2030.93 1.61,5.34 e HADL•IPJ' S ENTES;PRISE'S JOB f-JU11C.Els': '11.395 . EflEf;GY [BUDGET COHISULTAf1TS 06/15/87 11:39:33; • TELEPHONE {714} 324-1721 VEi•.lTILAT10f-J DATA, PREPARED FOR ........... LANMiARIN' LAtlD COf•iPA1-JY ' PNOJLCT TITLE PGA VEST -- HADIS01-1 GOLF.11A!HT . FAC Z LOCATION ............. .LA QUINTA ** V. E N. T I L A T I 0 N. C F 11 U S A t E Q U I 'i c JI E tl T S ,-*:K*:K:K*% : x::K:K ::k:K ::K:KXc* :K***% k*:K t * Kx:**K%: **k:**% * *** *** *W*:K :T :h;•x. :*:K **:K:K k SPACE CFH PEI, kJ.0. OF CFH OSA- PEf`OPJ PEOPLE l ECLMNEi1 a '1116 LUNCH' ROW 15 5 7 S 1117 IRR. C0 J"fR0LS 15 1 15 108 OFFICE 15 >, : • . ,. 109 LOCKERS 15 2 30 • 110 U1011EPJ' S T --%N 10 1 - 10 111 HIEPJ-' S Rn 1CI 1 ,10 I TOTAL BUILDING CFP1 OSA _ 155 01-1T OE2 95° T NN S jNM TTT (.1T OE2 95° 11`IT 5T 52E 95° 2 5,:13;b01 LillT F, 'IF. 52E. h5'°. T 3)IJAO 913T pl,T OE2 95° T s10 I. NOD °;1 1I Z(3T TI 52E , 95' 5 1J00f1 i-ix.in1 •91.]'( • r Ii•13. V TIOMUS 31d03d i-ini o ruvq iv31-( A) . J0 0i'J 3)Vds :x :*:K*:k*:kY::K*x K** Y i k . K***** k k:k:k*:K k K k:k*** :* ***** k**: c* :*' : : ****:K* :* K C *** % • * 11 f1 [ . f l 3 Q Q V -I A I I V l.. iJ V i n D 0 ** VINI110 V1— ........ ... 1.101 !,V)O-1 'UVJ 'I"AIVIA °J109 PJOSNV!•1 - Is3n V9d.........: -.11 J, )JlVd1]O) Qi`A'I WA Q30r3; id VlVR L.LTATIJV -ChTZ}-IV.!OH(:1313..L ' CL Ili TT Ell /ST /` 0 si,rJtJ3.'..,uo) .1.3gqi1t] S6ETT :'r!3(:I!.If1 J (]Or s3` 12ic1d:31.1!j S hJI1Qv!,1 -lmo..SCW umag/► 1 mW 1N\I•►A■ 46Ii A wow- "141101h; no IA■■► IA 1♦O■■■C A ■■\'4■ wm■wllbm SO ! ■■\'/►// ■■/. ■■`/■/rte■■/ '\ ■`// ■ all all No up.:WWWRAPAW" 1010041111A 1111,910low 41001%."m 011 go'.20=aLq Motown onwow Walloon mwxmu an w.1 SO ■\`I./\`/ / '_ \'// // /// ■lift SO/ OIL OVA all ,P0.87 WWi mm9aa P ::-_; ■L?:: 11ADLIf] S ENTERPRISES EfJEIRGY' ,UDGET' COiNISULTANTS POST OFFICE, BOX 1.41.13 * PALM SPRINGS, CALIFORPIIA 922L3 *** 619-324-1731.. A. S. H. f,- A. F. f JETHOD COHMERCIAL RO0 ri BY ROOHLOAD CALCUL.ATIOf•1 * K 'Yr**:k :. 6%k** K7KV:%i %K %t%Y.* C :K:K%KIK%k% %K* *%K*%k%K*>k% *%K k*• .' %k* %K%* Ki'.* tX•z .**%K'X.Yna(x: %i: K <: %k* t * PROJECT: PGA 1:;EST - f'iADISOP•! GOLF. HAINT. FAC. JOE; H0: 1:1395 *gra SPACE 1,016 LUNCH ROOM * FLOOR AREA 242 SQFT >k VOLUHIL 1931_-, CLIFT ' COOLING LOAD. HEATING LOAD AF; iADLINS ENTERPRISES ENERGY iBUDGET CONSULTANITS " -POST OFFICE BOX 1,443. PALI'I SPRIidGS, CALIFORilIA 92263; 61.9-724-1731 • : c x *** Kk :*:K:k :: :Tx :X c**% * * * * z* :* k* * c****** K ::h : : : : :. : : K,: : : ::a::Kk:ac:K :*%::K:F.*.. A. S• H. R. A. E. I IETHOD COHIHERCIAL 8001-i BY 8.0011 LOAD CALCULATIOI! *. • *%iso* * *** : % * . * **** ** F* ***%KFC%k** % ** ** **7K **%Kmy ***% * %K** '*** % %K %k % ** PfiOJECT: PGA UIEST — MADISON GOLF. i•1AINT. FAC. JOB HO: 11395 ** SPACE • 1., 07 ,1NN'. CONTROLS ' ** FL, 001; AREA., , 72 SQFT VOLUME 576 CUFT " COOLING LOAD 1-IEATIIuG LOAD AREA SENSIBLE LATENT` SENSIBLE {CTU/H} .. {:E;TU/N}' ,; 'CTU /hi} WALLS 170.24: 0 91.84 28 ,DOORS 0 ., la j_;..0 • C i GLASS CONDUCTION 202.4. 0 36Ci.1} L' ' GLASS SOLAR 980.4 0 0 3 CEILINGS ', 130.536 ' 0 144.643 72 FLOORS - SLAB 0 , , 0 315.443. ; 7 FLOORS— OVER UI''JCOND SP 0 0 .0 0 OCCUPA11TS TO SPACE- 123.3 190 0 ;1 LIGHT TO SPACE 536.52. 0 0 2pC. EQUIPMENT TO SPACE • 0 • .. 0 0 VEINTILATIOi':! 561. 203:23 212.51'14 DUCT. CORN'ECTTOl''•l -275.99 0 : 112.532 .10% SUBTOTAL --------- 3035.39 .------- 393.23. ------- 1237.55 ------- ROOK TOTAL CLG= • 3429.17' _ HGT- 1237.85 NADLINI S ENTERPkiSES ENERGY BUDGET CONSULT"'ITS POST OFFICE BOX 1443 * * .PALII SPRINGS; CALIFORNIA 92263 * 61.9-324-1731 * , A. S.1 -I. R. A.E. HETHOD CONHERCIAL ROOI1 . BY . F 0,011 LOAD CALCULATION *. i. ** PROJECT: PGA UE -ST - VIADISON GOLF. MAINT. FAC. JOB NO:., 11395 * * SPACE ,: 108 OFFICE k FL 001% AREA. 913 SOFT * VOLUPIE 768. CUF.T COOLING -LOAD HEATING LOAD AfREA SENSIBLE LATENT SENSIBLE { BTU/ H} { OTU/ H} { CTU/ 11} F ALL S 1 540 .,96 . 313.76 117. DOORS .0 394.4 `0 483:8 211 } GLASS CONDUCTION 506 0 q02: 20 GLASS, SOLAR 1412.4 0 0 20 ; CEILINGS 174.0L18 0 192.86L1- 96. . FLOORS - SL AB 0 0 , 901:3 CS 20 '. FLOORS- OVER UNCOND SP 0 0 D U OCCUPANTS TO . SPACE.. 273: 315 0 1 LIGHT. TO SPACE 586.52 0 0. 200 EQUIPNEP;T TO SPACE -0 . • D D VENTILATION 561 203.28 566-784 ' DUCT COh h;ECTION '444.833 0 343.059 10% ----- - - - --i- - _ - t= SUBTOTAL 4893.16' 518.28 3773.65 * ,; ROOM TOTAL -CLG= 5411.44 HGT= 3773.65 k f1ADLIIN" S 'ENTERPRISES ENERGY BUDGET CONSULTAf,,TS POST OFFICE BUr, 1443 ** PALN SPRINGS, CALIFORNIA 92263 *** 61.9-324-1?31. z A. S. H. t . A. E. ' 11ETHOD CO1"lflEI:CIAL ROOM BY R0011 LOAD CALCULATIO;••l * * PROJECT..: PGA (JEST - MADISOfJ GOLF. NAIP-T, FAC.. JOS INO: 11395 ** SPACE 109 LOCKERS ** FL 0013 AREA 125 SQFT ** VOLUHE 1.000 CUFT COOLING -----------. LOAD HEATING LOAD ------------ .,f EA --- SECJSIBLE LATENT SENSIBLE {BTU/ Hl { ETU/ HT { ETU/ H} ------- -------, ------- ------UALLS UAL L S 341:758 0- 356.12-6 110 DOORS 394.4 0 483.8 ?Cl GLASS CONDUCTION p p 0. 0 GLASS SOLAR 0 "0 0 CI CEILINGS 226.625 ,0 251.125 • FLOORS - SLAB 0 : 0" • 630.966 -: 1,4 , FLOODS- OVER UfvCOiiD 'SP 0 0 0 11, OCCUPANTS TO SPACE 364' 630 .0 2 LIGHT TO SPACE 439.89 0 0 150 EQUIPfiEPJT TO SPACE 0 0 0 VEf•ITILATION 1122 - 406:56 0'- • DUCT' CORRECTION 288.867 0 172.202 1[li SUBTOTAL 3177.54 11136.86. 1894.22 ROOM TOTAL CLG= 4214.1' HGT= • 1894.22 i HADLINS ENTERPRISES ENERGY BUDGET CONSULTANTS POST OFFICE BOX 1443 *** PALM SPRINGS, CALIFORNIA 92263 *** 6119-324-1731 ** ' A.S.H. R.A.E. METHOD COMMERCIAL ROOM BY .R00f1 LOAD CALCULATION ** PROJECT: PGA WEST - NADISON GOLF. 19AINT. FAC. JOB N0:' 11395 * SPACE :.: 110 WOMENI S "RR ** FLOOR AREA 61: SQFT * VOLUME -488 CUFT. COOLING -LOAD.' -.HEATING LOAD AREA SENSIBLE LATENT. SENSIBLE { ETU/ H} { LTU/ III: {BTU/Hl FALLS " 349.954 0 407.L158 126 D00R'S 394.4 0 483.8 20 GLASS C01111>U.CTIOiN D D 0_, D GLASS SOLAi\ G D " 0 0 CEILINGS 11[].593 0 - 122.549 61 FLOORS - SLAB D 0 946.449 21 FLO01'S- OVER UNCOND SP 0 0 0 1) OCCUPANITS TO SPACE 121.8 19D 0 1. LIGHT 1*0 SPACE 219.945 0 0 75 ECUIPI-I-E1'IT TO SPACE 0 0 D VEf-ITILATION 374 135.52 0 DUCT CORi;ECTT01! 157.769 0 196.026 10% ,,SUBTOTAL 1735.46 325.52 2156.28 ROOM TOTAL" CLG= 20LO.98 HGT= 21.56.26 • i'IADLIi'V S ENTERPRISES ENERGY BUDGET CONSULTANTS POST OFFICE BOX 1443 * PALM SPRINGS, CALIFORNIA 92263 *** 619—.D24-1731, A—S.H.R. A.E. HETHOD COMMERCIAL, ROOM BY ROOM LOAD CALCULATION * * PROJECT: PGA '•.;JEST — MADISON GOLF. MAINT. FAG JOE NO: 11395 ** SPLICE :.111 MENS RR * FLOOR' AREA 101 SQFT ** VOLUME 308 CUFT COOLING LOAD HEATING LOAD AREA SE11SIPLE LATENT SENSIBLE { DTU/ H} I LTU/ H) — { E;TU/ h} Id ALL 571.2''. IJ 544-48 166 DOUi;S 0 U 0. Ia GLASS C01 --ID JCTION 0 Cl 0 CI CLASS SOLA 0 0 0 U CEILIidGS 183.113 [1 2U2.9C1`i ,L11 FL OOi',S — SL AI' 0 . U 7 21.104 1(., . FLUOr;l:— OVER UIICOND SP 0 U 0 U OCCUPANTS TO EPACE 12i'i.0 1:11J U TO SP AC'E .2L, a 0 1i lU 6QUIPHEN"I" TO ``-'ACE= E: 0 CI VG'f•ITILA•i IO: 374- 131 j-52 0 DUCT COl°i;ECT 1_`ON 1S5-037 Cl. 146 •u4`J 7,1J% SU!IOTAL 1705•41 325.52 7,615.31 1;001 iTU1'AL CLG= Ll -9] 1 IGT= ?,615.34 MOI 9NIIV3!-1 9-h.%'72. ,. _ IV.LO,L 9NI-1003 * T' h LZF_2 _ 3bJ 0 L. 3-11 IS.fd3S 9^1I-100) ** NOIIIi3t- iv) QVO-1 -IVIX1314,109 43*V*,\I'H'S'V c10J SIV10i 9PIIQIino 31i.LN3 • . ' T r.Z=1 -t '[Z * * Lrl?21 VII'.1llOJIIV) `S9f.dIzldS t.:l3dd * * ch.hT XO2 33IJJO ISOd S.LP!ninSi'.j03 139ano A97_I3fi+3 S3SI,,d 13lil"I3 S 041I3CVtl f, MADLIN'S ENTERPRISES P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263 (619) 324-1731 ADDENDUM: HVAC SYSTEM REQUIREMENTS * FIRST GENERATION NON-RESIDENTIAL ENERGY CONSERVATION STANDARDS TO COMPLY WITH DIVISIONS 5-6 OF TITLE 24 FOR NON-RESIDENTIAL BUILDINGS THE FOLLOWING APPLICABLE ITEMS SHOULD BE INCORPORTATED IN YOUR -PLANS BEFORE THEY ARE SUBMITTED FOR PERMIT. GENERALOWES: ------------ INDICATE, CSN, DRAWINGS MANUFACTUREN; MODEL NO'. CAPACLTY, EFFI'IANCY,., EER' OR COPW FOR HVAC EOUIPMENT._ SEE. FORMS 4 & 6 FOR .DATA. (T-20-15150) INDICATE ON DRAWINGS CUBIC FEET PER MINUTE OF OUTSIDE AND SUPPLY AIR OROVIbED .BY EACH AIR COND I T ON I NG ,SYSTEM. ('T72@- J. "0 ., 150Q ) INDICATE ON DRAWINGS THAT A MAINTENANCE LABEL, SHALL BE: AFFIXED TO MECHANICAL EQUIPMENT AND A MAINTENANCE MANUAL SHALL BE PROVIDED FOR THE OWNER'S USE. TIME CLOCK' EACH HVAC SYSTEM SHALL BE EQUIPPED WITH A READILY ACCESSIBLE MANUALLY ADJUSTABLE AUTOMATIC MEANS OF REDUCING THE ENERGY USED FOR HVAC DURING PERIODS OF NON-USE OR ALTERNATIVE USES OF THE BUILDING SPACE SERVED BY THE SYSTEM. ALL EQUIPMENT SHALL BE STARTED OR STOPPEN FROM A TIME CLOCK. A 6 -HR BY-PASS SWITCH SHALL. ALLOW OPERATION OF. ANY A.C. UNIT FOR NORMAL SCHEDULED HOURS. THERMOSTAT: EACH HVAC UNIT SHALL. HAVE A SE:PERATE: THERMOSTAT READILY ACCESSIBLE TO THE AREA IT SERVES. ALL THERMOSTATS SHALL BE OF THE AUTOMATIC CHANGEOVER TYPE TO SEQUENCE HEATING i R COOLING.- SET POINT RANGE: SHALT_.. BE 10 DEGREES BETWEEN FULL HEATING AND COOLING. ADJUSTABLE TEMPERATURE DIFFERENTIAL SHALL . BE 1 -1Y'2 -F. ALL THERMOSTAT CONTROL LIMITS SHALL BE FROM 55-F. TO 85-F. CONTROLS SHALL HAVE THECAPABILITY OF TERMINATING ALL HEATING AT' A TEMPERATURE: OF NU. MORE THAN 70° F AND OF TERM I NAT• I NG ' ALL COOLING At A TEMPERATUR1= NO..i.. LESS THAN 7S° F. bAMPER: EACH 'HVAC SYST E.M SHALL: .BE EQUIPPED WITH 'A FRESH AIR DAMPER. .i MADLIN'S ENTERPRISES P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263 (619) 324=1731 ADDENDUM:. HVAC - SYSTEM REQUIREMENTS FIRST GENERATION NON—RESIDENTIAL ENERGY CONSERVATION STANDARDS VENTILATION: ------------ A MINIMUM OF OUTSIDE VENTILATION"AIR (OSA) SHALL. BE ADDED Ti=p ALL HVAC SYSTEMS. SEE "VENTIL_ATION ADDENDUM". (T:20 -1501--B-3) DUCT: ALL DUCT WORK SHALL BE CONSTRUCTED4 ERECTED, AND'TESTED IN ACCORDANCE WITH THE MOST RESTRICTIVE OF LOCAL REGULATIONS, PROCEDURES DETAILED IN THE ASHRAE HANDBOOK OF FUNDAMENTALS OR THE APPLICABLE STANDARDS ADOPTED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION. (T20-1509) TRANSVERSE JOINTS ON ALL AIR SUPPLY' DUCTS, INSTALLED IN LOCATIONS WHERE AIR LEAKAGE THROUGH • THE• JO I NTS WOULD BE NON—BEN I F I C I AL T THE -OCCUPIED AREA TEMPERATURE REQUIREMENTS,, SHALL BE SEALED WITH MASTIC OR TAPE. LONGITUDINAL. JOINTS- ON LOW PRESSURE SUPPLY DUCT WORK WITH INTERNAL. STATIC PRESSURES IN EX(tESS 0F,0.75 INCHES OF WATER PRESSURE SHALL BE SEALED WITH MASTIC OR TAPE. DUCT LOCATION ON ROOF OR EXTERIOR OF BL.DG....... 1 1/2" OF 1.5 LB DENSITY MINERAL FIRER DUCT LINER OR: 3" OF 0.6 LB DENSITY MINERAL FIBER BLANKET WITH APPROVED VAPOR AND WEATHERPROOF BARRIER ALL OTHER LOCATIONS OUTSIDE OF THE CONDITIONED SPACE...e...... 1/'2" OF 1.5 LB DENSITY MINERAL FIBER DUCT" LINER OR: 1" OF 0.6 .LB DENSITY MINERAL FIBER BLANKET VENT I LAT I ORS: EACH MECHANICAL 0R GRAV IT:Y :O SYSTEM. ..R UNIT ,(SUPP.LY . ` AND/OR EXHAUST) SHALL BE'EOUIPPED WITH -A: MEAN OF` ,PROVIDING..AIR' VOLUME REDUCTION. AND/OR SHUT—OFF WHEN VENTILATION'IS NOT REQUIRED. MECHANI CAL.: ON MECHANICAL VENTIL.ATING SYSTEMS, AUTOMATIC DAMPERS INTERLOCKED ,.-AND CLOSED ON FAN SHUTDOWN SHALL.- BE PROVIDED.. GRAVITY.: ON GRAVITY VENTILATING SYSTEMS, EITHER AUTOMATIC OR READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN AL.L OPENINGS TO THE OUTSIDE OTHER THAN.COMBUSTION.'AIR OPENINGS SHALL BE PROVIDED. MADLIN'S ENTERPRISES . PCO. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263 ` (619)324-1731 ADDENDUM:-HVAC SYSTEM REQUIREMENTS a FIRST GENERATION . NON—RESIDENTIAL ENERGY CONSERVATION -STANDARDS MAINTENANCE: " EQUIPMENT WHICH REQUIRES PREVENTIVE MAINTENANCE FOR EFFICIENT' OPERATION' SHALL BE''FURNISHED WITH 'COMPLETE NECESSARY MAINTENANCE I NFA=>Rh1AT I CSN . *REQUIRED ROUTINE MAINTENANCE' ACTIONS SHALL BE' CLEARLY STATED AND INCORPORATED ON' AN ACCESSIBLE' LABEL, WF1IC1i MAY BE LIMITED TO IDENTIFYING, BY TITLE AND/OR PUBLICATION, NUMBER, THE OPERATION AND MAINTENANCE MANUAL" FOR THAT PARTICULAR MODEL AND TYPE OF PRODUCT.' AT LEAST ONE COPY GF THIS I NFORMAT I t IN SHALL BE FURN T SHED BY : THE MANUFACTURER FOR THF_ ORIGINAL .OWNER. UPi?N REQUEST.., . y t ♦ —. . , -. .. ._ '• ` - l stn ." t.:'r MADLIN'S ENTERPRISES P.O. BOX -1443 - PALM SPRINGS, CALIFORNIA 92263- (619) 324-1731 ADDENDUM: AIR LEAKAGE REQUIREMENTS FIRST GEIVERAT I ?N NOIR! REQ: I DENT I AL.::hli f?GY ::i: N ;E:F:'y' 11` :;. O"! 4;1. A .11)ARDS TO COMPLY WITH DIVISION 4 SECTION T-20-1495, ALL. WINDOWS AND DOORS MUST' MEET THE, FALLOWING:' STANDARDS. PLEASE. NOTE 'ON DRAWING. THE TEST METHODAND RE60I REMENTS°. T O-1495 • AIR LEAKAGE THE REQUIREMENTS FOR 7 AIR` -LEAKAGE. ARE -LIMITED TO • THOSE . LOCATIONS SEPF_RATING •EXTERIOR BUILDING AMBIENT CONDITIONS FROM INTERIOR BUILDING CONDITIONED•AIR SPACE AND ARE NOT APPLICABLE TO THE SEPERATION OF INTERIOR CONDITIONED SPACES FROM EACH OTHER. AIR LEAKAGE REQUIREMENTS, WINDOW AIR LEAKAGE -REQUIREMENTS FOR WINDOWS SHALL BE AS FOLLOWS:. THE AIR :INFILTRATION RATE FOR MANUFACTURED OPENABLE EXTERIOR WINDOWS SHALL NOT EXCEED 0.5 CFM.PER FOOT OF OPENABLE SASH CRACK. ALL MANUFACTURED WINDOWS SHALL_ DE CERTIFIED AND LABELED AND • SHALL...' COMPLY AS FOLLOWS: x METAL. WINDOWS .......................... ANS I A134.I-197 WOiD WINDOWS ..........................NWMA IS -2 NOTE: REQUIRED STEEL FIRE: -RATED WINDOWS ARE EXEMPTED FROM THESE ---- REQUIREMENTS. FIXED WINDOWS CONSTRUCTED ON SITE 'SHALL BE SEALED JO LIMIT AIR' INFILTRATION. AIR LEAKAGE REQUIREMENTS, DOORS THE: AIR INFILTRATION RATE FOR. MANUFACTURED' EXTERIOR SLIDING GLASS DOORS' . SHALI... NOT . EXCEED 0.75 C: M PER LINEAR FOOT (;,1F CRACK. ALL MANUFACTURED SLIDING.GLASS DOORS SHALL -BE CE:RTIFIED•AND LABELED AND SHALL_ COMPLY TO THE FOLLOWING STANDARDS: METAL' SLIDING.•GLASS DOORS ................. ANSI. A134.' -197. 2 WOOD SLIDING GI. -.ASS DOORS ................. NWMA IS -3 NOTE: REQUIRED:STEEL ..' FIRE=RATED DOORS ARE EXEMPTED- FROM .THESE -----. , REOU.IREMENTS.. ENTERPRISES MADLIN'S P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263 (619) 324-1731 . ADDENQUM: AIR LEAKAGE -REQUIREMENTS. * FIRST' GENERATION NON -RES I DENT I AL... ENERGY CONSERVAT I C >N STANDARDS ALL EXTERIOR DOORS, OTHER THAN FIRE -RATED DOORS, SHAI._L.. BE SO DESIGNED TO LIMIT AIR LEAKAuE. AROUND THEIR PERIMETER WHEN IN A CLOSED POSITION. ** ALL DOORS SHALL... BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE A'T THE HEAD AND SILL. *# DOORS MOUNTED ON EITHER THE INSIDE. OR (UTSIDE. OF AN EXTERIC WALL_ SHALL HAVE A MINIMUM ONE-INC.I-i LAP AT EACH JAMB. * DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONT I NUQUS MOUNTING ANGLE, SEALED IN ACCC)IRDANCE WITH SECTION T20 -1.495(E) AT EACH JAMB. ** DOORS MOUNTED -BETWEEN THE JAMB SHALL_ HAVE: A CC)NT I NUt SUS SEAL PAFFL^F_•,AT EACH . JAMB. MEETING RAILS OF SECT'IC)NAL. DOORS AND MEET.T.N(i STI'L:.ES OR RAILS OF p'r--PARTING DOORS SHALL_ n`:_ PROVIDED WITH A SEA!_:, ASTRAGAL, OR BAFFLE, a SWINGING AND REVOLV I NG DOORS SHALL BE WEA THE RS"I' R I PPIED Al" THE:: HEAD, 13"FILL._.5 AND JAMBS. ** DOUBLE DOOR'--,SHAL.I_.. BE' PROVIDED WI fF; A WEA1"HE:RT.rGH"f AS'T'RAGAL R CI._.(SURE AT THE CENTE R CRACK. CAULK T. NG AND SEALANTS OPEN EXTEIRIOR. JOINTS AR iUND WiNbow, AND DOC) R'- F'RAMES, BETWEEN -WALL AND F7OUNDATION, BETWEEN -WAC -L, " AND ` R()iiF," BET -WEEN W,0.OD PANELS., A'T' PENETRA•- T I oNS OF' OT I L I TY SERV ICES 'THROUGH_WAL.I_.S, `FLOOR`S AND ROOFS, AND ALL OTHER .-OPENINGS IN THE EXI"ERIOR ENV[ --LOPE SlIAI.J.- BE. SEAI._E:D, CAULKED, GASKETED, . CSR WEAT'HERSTR I PPED' TO LIMIT AIR LEAKAGE n MADLIN'S ENTERPRISES P.O. BOX 1443 - PALM SPRINGS, CALIFORNIA 92263 - (619)•324-1731. ` ADDENDUM: LIGHT 'SWITCHING ' FIRST GENERATION . I4ON--RES'C DEI\IT I AL` I_NEIRGY CONSERVATION* . STANDARDS THE LIGHTING LOADS AS DETERMINED IN ACCORDANCE WITH SECTION - T20-1.54:? SHALL BE CONTROI...LED AS FOL.Li AWS ' EACH AREA ENCLOSED BY CEIL..ING—HEIGF-I-I" PARTIONS SHAL.L. HAVE INDEPENDEN•1' CONTROL OF LIGHTING WITHIN THAI' AREA. AL...L. SWITCHING DEVICES USED TO CONTROL LIGHTING WITHIN AN AREA SHALL BE READILY ACCE.SIBLE Tib PERSONNEL.. OCCUPING THAT AREA., FOR ALL AREAS LARGER THAN 1.00 SO UARE FEET, AND FoR• WHICH A MAXIMUM CONNECTED 'LIGHTING' LOAD OF MORE THAN 1.0 WATT PER SWARF FOOT IS ALLOWED, THE LIGHTING LOAD SHALL BE ABLE: TO BE REDUCED BY AT LEAST ONE—HALF IN. A UNIFORM PATTERN. THE MAXIMUM AREA- THAT MAY BE & )NTROLLEA BY'ANY TWO . SWITCHING DEVI CES . SHALL BE.. LIMITED • TO - THAI' AREA,. .'WHI,CH • CAN BE.:'SERVED.. BY .TWO .20.. AMPERE, PULE. CIRCUITS,.. LOADED TO. NO, MORE THAN 80 PERC'.ENT. - PLEASE. INCORPORATE THESE -.REoU I REMENTS : I NTS i Yo?UR P'LAIV a MADLIN'S ENTERPRISES P.O. BOX 1443 - PALM SPRINGS, .CALIFORNIA 92263 ' (619) 324-1731 ADDENDUM: SERVICE HOT .WATER FIRST" GENERATION NON—RESIDENTIAL ENERGY.CONSERVATION STANDARDS TO COMPLY WITH T O-1520 — 00-1525 FOR COMMERCIAL .EUkLDINGS THE. FOLLOWING APPLICABLE ITEMS SHOULD BE INCORPOPATED IN -YOUR PLANS BEFORE 'THEY ARE SUBMITTED FOR PERMIT. - I - orr GAS AND 61L FI RED AUTOMATIC, -STORAGE HEATERS' SHALL HAVE A RECOVERY EFFICIENCY OF NOT LESS THAN 75%. TEST METHOD SHALL.BE DESCR'IPED 'IN SECTION 2.8 OF ANSI 2 1.10.3.• AUTOMATIC ELECTRIC 'STORAGE WATER HEATERS SHALL .HAVE A STANDBY LOSS NOT EXCEEDT.NG '4 WATTS PER• SOUARE FOOT OF TANK SERVICE AREA. f METHOD OF TESTING SHALL: P.F. Df=SCRIBED . IN SECTI04 4.3. 1. OF ANSI `C'72 -1-197'.x. NOTE ON bRAWING' THAT THE WATER HEATER SHALL HAVE A L._AB'EL_, ` WHICH STATES THAT. THE'.WATER.HEATER MEETS`THE REQUIREMENTS OF THE AMERICAN SOCIETY & HEATING REFRIGERATI.ON AND AIR CONDITIONING ENGINEER (ASHRAE).STANDARD 90-75. STANDARDS T20-1520 '. ALL LAVATORY FAUCETS, SHOWERS AND SINK FAUCETS SHALL_ BE EQUIPPED WITH . FLOW CONTROL_ DEVICES TO. LIMIT TOTAL_ VLOW' TOA MAXIMUM -OF THREE GALLONS PER MINUTE. PUMP OPERATION: CIRCULATION'.•HOT WATER SYSTEMS SHALL BE ARRANGED ',SO THAT THE 'CIRCUL.ATION.•-PUMNS} CAN RE ,AUTOMATICALLY TURNED .OFF, WHEN. THE HOT WATER - SYSTEM IS' NOT OPERATING. MADLIN'S ENTERPRISES P.O. BOX' 1443 —.PALM SPRINGS, CALIFORNIA 92263 (619) 324-1731 ADDENDUM: SERVICE HOT WATER'PIPE INSULATION REQUIREMENTS FIRST GENERATION NON—RESIDENTIAL ENERGY CONSERVATION STANDARDS TO COMPLY 'WITH T— 20-1521 .FOR COMMERCIAL* BUILDINGS THE FOLLOWING APPLICABLE -ITEMS. SHOULD BE INCORPORATED 11\1 YOUR PLANS BEFORE THEY ARE SUBMITTED FOR PERMIT.' INSULATION — T-20-151 (C) SERVICE HOT WATER SUPPLY AND RECIRCULATION PIPING (EX,CEPT FOR RUNOUTS TO FIXTURE NOT LONGER THAN 12.f=EET IN LENGTH) SHALL BE INSULATED IN ACCORDANCE.WITH THE FOLLOWING TABLE. MINIMUM PIPE INSULATION PIPE SYSTEM TYPES FLUID.TEMPERATURE INSULATION THICKNESS IN RANGE, OF F INCHES FOR NORMAL PIPE SIZES (IN INCHES) _._.------_•---------..__.._.__.___.._ _ Rl•1Ni TUTS 1" R, LESS 1.25-2" UP 'TO 2" LOW PRESSURE/TEMP 201--250 DEGREES 1.0 1.0 .1.5 4 LOW TEMPERATURE 105-200 DEGREES 0.5 0.75 1.0 # RUNOUTS'TG INDIVIDUAL TERMINAL UNITS {NOT EXCEEDING 12 FEET IN l...ENGTh{) INSULAT.l'ON TI-•IICI•.: 1C;: i I1'd T' IL; Ai :rVE:: l-r1:L?I... : ARE BASED oN INSULATION HAVING . THERMAL... RES I STANCE IN THE RANG!.-' k`:rF:' R=4.0 "17C 4.6. PER INC.{ OF THICKNESS ON A FLAT SURFACE AT' A MEAN TEMPERATURE OF 750 F. MINIMUM -INSULATION THICKNESS SHALL_ BE INCREASED P R<:rPc iRT I i rN—• ATELY FOR MATERIALS HAV I.NG R . VAL.:UES GREATER THAN 4.6 PER -INCH OF THICKNESS. 0■ ENGINEERING DATA K M,, HP18 SERIES 'HEAT,PUNIPs r. MATCHMREMOTE L G' • HEAT PUMP OUTDOOR UNITS irsTEly •' s s. *18;000 to 62,500 Btuh•Cooling Capacity P ee:5 *17,200 to 61,500 Btuh,Heating Capacity Mna7 *ARI standard 240 and DOE Certified Ratings "."Ia . Supersedes;March 1985; fLennox HP18 Series Heat Pump Systems Provide DENII' • 'Low Cost Installation With Heating -Cooling Efficiency The HP18 series outdoor units'with matching indoor units are - a •... : .' designed for builder type applications in apartments, hotels, motels, *CERWI T*N IVRLD.S ONIr condominiums, new single family housing or retrofits. HP18 units .. ` —USED—wlORrn CERTDGTDN ♦PRL EB ONLY fAIOONENTB IS LISTED •r YMEN USED WITI NIOPER CDMIPONFNT9 R8 w"D have SEER's of up to 9.40 with a cooling capacity range of 18,000 to 62,500 Btuh and a•COP rating of up to 2.94 with a heating. capacity range of 17,200 to 61,500 Btuh. Matching blower -powered • ' indoor units with optional supplemental electric heat -are available z to provide selective sizing and installation versatility. See Selec- tor table. For complete data on indoor units see individual bulletins indexed in this section. A; :;ae►! f_ I " Weather resistant cabinet is constructed of galvanized steel with • a baked -on outdoor enamel paint finish for maximum protection E .. from rust and corrosion. Extra large four sided wraparound coil - with durable copper tubing and ripple -edged aluminum'fins pro-' vides maximum efficiency. Powerful direct drive fan with totally ' enclosed motor draws air thru the entire coil and discharges it up . ` and away from shrubs and lawn. Rugged,'PVC coated steel wire I •L^ condenser fan and coil guards are furnished. Compressor is pro- tected from excessive current and temperatures. Electrical con- trol box is located for easy access. Service valves and refrigerant 4' line connections are externally located. Available as options to be n ordered extra are; refrigerant line sets, unit mounting bases and . Check and expansion valve kits. ., T • Outdoor units are shipped completely factory assembled, piped and wired. Each unit is test operated at the factory to ensure proper ' operation. The installer has only to set outdoor unit in the desired r location, connect refrigerant lines and make electrical connections. Typical Applications - . ' , • ` -r, NOTE — Specifications, Ratings and Dimensions subject to change without notice. • SELECTOR Lennox tARI Standard 240 Ratings HP18-311V HP18-411V HP18,413V HP78-461V HP18-511V HP18-513V High Low Net face area (sq. ft.) 9.24 6.46 Total 9.24 11.39 Total 18.22 Outdoor Unit c 3/8- 1 3/8-2 Model No. Cooling Temp. Temp. Total SEER EER Unit 20 High Unit Low w Lennox *Check and ,tARI Std. Capacity Htg. Htg. Unit (Btuh/ (Btuh/ High HSPF Temp. Low Temp. a Indoor Ex pension 2 SRN IBtuh► Cap. Cep. Cooling Watt) Watt) Temp. 3800 Htg. Temp. Htg. V Unit Valve (Bels) ( 1060 IBtuhl IBtuh) Watts Watts (factory setting) Htg 250 C.O.P. Htg. C.O.P. m Used Kit 4 lbs. 5 oz. 5 lbs. 9 oz. 6 lbs. 1 oz. 6 lbs. 15 oz. 9 lbs. 5 oz. 12 lbs. 15 lbs. 3 oz. Watts 5/16 5/16 Watts 3/8 C 3/8 1/2 HP18-211V 18,000 17,200 10,000 2140 8.60 8.40 1825 6.25 2.76 1515 1.92 21 % C818-21 LB-34792BE Z76 tNumber of packages in shipment 2 2 2 2 2 2 2 CBS18-21 (7.8) 18,500 17,600 10,000 2215 8.60 8.35 1895 6.20 2.72 1575 1.86 22% CP18-21/26V ttFactory /E16Q2 Installed HP18 261V 24,200 24,600 13,700 2930 8.40 8.25 2670 6.00 2.70 2170 1.84 24% CP18-21/26V ttFactory /E16Q2 Installed (7.8) 24,600 24,800 14,000 2930 8.50 8.40 2680 6.10 2.70 2160 1.90 23% CB18-26 LB -347928E CBS18-26 HP18V 28,700 28,500 14,700 3679 8.00 7.80 3094 6.00 2.70 2393 1.80 27% CP18-31/41V ttFactory /E16Q3 Installed 18..0)0) 400 29,800 16,500 3630 8.10 8.10 3100 6.20 2.82 2515 1.92 23% CB1131 LB-34792BG CBS18-31 HP18-411V 35,400 35,600 19,000 4355 8.40 8.15 3750 6.40 2.80 2820 1.94 21% CB18-41 LB-34792BG 35,500 34,500 18,900 4494 8.20 7.90 3745 6.15 2.70 2994 1.84 24% CP18-31/41V ttFactory HP18-413V (8.0) /E16Q3 Installed 36,000 36,000 19,400 4320 8.55 8.35 3750 6.50 2.80 2840 2.00 1 21% CBS18-41 LB -3479 H P18-461 V 40,500 40,600 21,600 4793 8.60 8.45 4249 6.55 2.80 3278 1.90 24% CP18-46/51V ttFactory /E1604. Installed (8.2► 41,500 41,500 23,000 5020 8.60 8.20 4380 6.45 2.80 3400 2.00 25% CB18-51 LB-34792BG CBS18-51 HP18-513V (8.21 46,046,000CP18-46/51V 45,600 24,100 5412 8.80 8.50 4849 6.50 2.74 3881 1.82 26% ttFactory /E16Q4 Installed HP18-511V 46,000 45,500 25,000 5412 8.80 8.50 4849 6.50 2.74 3802[2.2,0 2 26% CP18-46/51V ttFactory HP18-513V /E16Q4 Installed 46,500 48,500 27,000 5645 8.70 8.20 5035 6.60 2.80 39500 24% CB18-51 LB -347928F (8.2) CBS18-51 HP18-651V 61,500 61,500 37,000 7243 9.40 8.50 6143 6.90 2.94 49130 24% CB18-65 LB-34792BH HP18-653V CBS18-65 62,500 61,500 38,000 7538 9.40 8.40 6182 6.80 2.94 5060 23% CP18-65V ttFactory (8.2) / E16Q5 I Installed tRated in accordance with ARI Standard 240 and DOE; At 450 cfm Imaximuml Indoor air volume per ton of cooling capacity with 25 ft. of connecting refrigerant lines. Cooling Ratings - 95°F outdoor air temperature and 80°F db/67°F wb entering Indoor coil air. • High Temperature Heating Ratings - 47°F db/430F wb outdoor air temperature and 70°F db entering indoor coil air. Low Temperature Heating Ratings - 17°F db/15°F wb outdoor air temperature and 70°F db entering indoor coil air. *Heating Seasonal Performance Factor. *Kit must be ordered extra and field installed. ttFurnished as standard with coil. • Ok •owt rIN SPECIFICATIONS Model No. HP18-211V HP18-261V HP18-311V HP18-411V HP18,413V HP78-461V HP18-511V HP18-513V HP18-651V HP18-653V Outdoor Net face area (sq. ft.) 9.24 6.46 7.39 9.24 11.39 13.67 18.22 Coit Tube diameter (in.) & No. of rows 3/8- 1 3/8-2 3/8 -2 3/8-2 3/8 - 2 3/8 -2 3/8-2 Fins per inch 20 20 20 20 1 18 20 20 Diameter (in.)&No. of blades 18-4 18-4 18-4 18-4 22-4 22-4 22-4 Outdoor Motor hp 1/6 1/6 1/6 1/6 1/3 1/3 1/3 Fan Cfm (factory setting) 1900 2200 2400 2600 3800 3900 3970 Rpm (factory setting) 1170 1040 1040 1060 1060 1060 1090 Watts (factory setting) 150 250 250 260 400 395 385 Refrigerant -22 (charge furnished). 4 lbs. 5 oz. 5 lbs. 9 oz. 6 lbs. 1 oz. 6 lbs. 15 oz. 9 lbs. 5 oz. 12 lbs. 15 lbs. 3 oz. Liquid line connection o.d. (in.) (sweat) 5/16 5/16 3/8 3/8 3/8 3/8 1/2 Vapor line connection o.d. (in.) (sweat) 5/8 5/8 3/4 1 3/4 7/8 7/8 1-1/8 Shipping weight (lbs.) 142 158 169 186 234 246 Z76 tNumber of packages in shipment 2 2 2 2 2 2 2 • - •• y •.•••..... v. v.r. .,.,r rrr• orrV VIOIIIIVJIOI Wllll iUpPeae. -168-