Loading...
BRES2015-032851775 Avenida Madero BRES2015-0328 Bin # Qty of La Quinta Building &T Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit # Project Address: Owner's Name: A. P. Number: /-7_1 6 ( -Y Address: J/7 Legal Descriptio - City, ST, Zip:/7-, 1001 Contractor: /<e/6Je(—N 4 4S<* Telephone: Address: t 4 Project Description: City, ST, Zip Telephone: Vd— ......... ! CSS StateLic.#: City Lic. Arch., Engr., Designer: City., ST, Zip: &A-ler, 11,5 Telephone: 36-7 . . . . . . . . . . . . X. ......... C an onstruction Type: 61W f eapccup cy: 7:2 State Lic. Project type (circle one): New Add'nDemo Name of Contact Person: Sq. Ft.:/V 91 # Stori es: # Units: Telephone 4 of Contact Person: Estimated Value of Project: Iwo APPLICANT: DO NOT WRITE BELOW THIS LINE Y Submittal Reqld Rec1d TRACKING PERMIT -FEES Plan Sets Plan Check submitted Item Amount Structural Cales. Reviewed, ready for corrections Plan Check Deposit Truss Cales. Called Contact Person Plan Check Balance. Title 24 Cates. Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2" Review, ready for corrections/issue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue I Sdtool Fees Total Permit Fees To: Attn: Letter of Transmittal City of La Quinta Today's Date: .10-13-15 78-495 Calle Tampico City Due Date: 10-14-15 La Quinta, CA 92253 Project Address: 51775 Avenida Madero Kay Plan Check #: BRES 2015-0328 Submittal: ❑ 1st ❑ 4th ® 2nd ❑ 5th ❑ 3rd ❑ Other: We are forwarding: ® By Messenger ❑ By Mail (Fed, Ex or UPS) ❑ Your Pickup Includes: # Of 'Descriptions: Includes: # Of Descriptions: ® Per Your Request Copies: ❑ Your Review Copies: - ® 1 Structural Plans ® 1 Revised Structural Plans ® 1 Structural Calculations ® 1 Revised Struct. Calcs El Calculations Floor ❑ Revised Truss and Roof and ❑ Soils Report O Revised Soils Report ' . ® 2 Structural Comment List/ ❑ Approved Structural Plans Responses ❑ Redlined Structural Plans ❑ Approved Structural Calcs ❑ Redlined Structural Calcs ❑ - - Approved Truss Calcs ❑ Redlined Truss Calcs ❑ , Approved Soils Report ❑ Redlined Soils Reports, ❑ Other: Comments: Structural content is approvable. IT you nave any questions, please caii. Time = 1 HR UC 1 13 2019. This Material Sent for: CITY OF LAQUINT ❑ Your Files ® Per Your Request MUNITY DEVELOPM ❑ Your Review ❑ , Approval ❑ Checking ❑ At the request of: Other: ❑ BY: Kathryn Samuels Palm Desert Office: ® (760) 772-5107 Other : ❑ Christina R. Silva, P.E. 7652 Ontario Drive Huntington Beach, CA 92648 (714) 307-7101 September 15, 2015 City of La Quinta Building and Safety. Department 78-495 Calle Tampico La Quinta, CA 92253 Project: 51-775 Avenida Madero Subject: Re- built of existing walls To whom it may concern, As the engineer of record for the above captioned project I find that no specific calculations are required for the walls at the bedroom and kitchen due to replacing studs that were damaged by termite. The existing residence is a one story and adequate as standard construction. Anchor bolts are being added since there were none at the walls. And, at the kitchen exterior wall structural panel was added around the window opening. The other walls are adequate with stucco and drywall. Feel free to contact me should there be any questions or concerns. Sincerely, Christina R. Silva V NP Ab. QP D 6 o V►L P RECEIVEDFCALIFO SEP 17 2015 CITY OF LA QUINTA COMMUNITY DEVELOPMENT CHRISTINA R. SILVA, P.E. STRUCTURAL CALCULATIONS FOR AN INTERIOR REMODEL Grant Residence Job # :01834-15 Date : April 15, 2015 CIT Y .1111111 OF LA QUINTA Location : 51-775 Avenida Madero SAFETY DEPT La Quinta CA 92253 BUILDING ED Client : AA Design FOR CONSTRUCTION Code : 2013 CBC DATES BY The attached calculations are valid only when bearing Original Signature of Christina R. Silva, hereon Christina R. Silva, P.E. C37201, Exp. 6/30/2016 7652 Ontario Drive, Huntington Beach, CA 92648 (714) 307-7101 s U L Nb. 37201 \ EXP. !Ov0/ C SEP 17 2015 CITY OF LA QUINTA COMMUNITY DEVELOPMENT 0 CHRISTINA R. SILVA, P.E. DESIGN LOADS Code: 2013 CBC Roof L.L. 20psf Roof D.L. D.L. of roofing 12 %" Sheathing 2 Roof Framing 3 Ceiling 2.5 Insulation 1 TOTAL D.L. 21psf FOUNDATION Allowable soils bearing pressure: 1500psf(Table 1806.2) Page :1 Project: Grant Job # : 01834-15 Date :04/15/15 Christina R. Silva, P.E. Project Title: Grant residence 7652 Ontario Drive Engineer: Us Project ID: 01834-15 Huntington Beach, CA 92646 Protect Descr: Interior remodel (714)-307-7101 Z Pnatec.' 13APR^21,144 2:PA MUltlple slniple Beata . : Fid=caUsersICHRIST-21DOCOME IIENERCA-11GRAM 1:EC6 ENERCALC, INC. 1983-201'5, Build:6.15.t.19; Ver:615:.1.19 Description Wood Beam Design: Beam 1: new ridqe beam over livinq room Calculations per 2012 NDS, IBC 2012, CBC 2013, ASCE.?-10 BEAM Size: 6x14, Sawn, Fully Braced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending Wood Species: Douglas Fir - Larch Wood Grade: No.1 Fb - Tension 1350 psi Fc - Prll 925 psi Fv 170 psi Ebend- xx 1600 ksi Density 32.21 pcf Fb - Compr 1350 psi Fc - Perp 625 psi Ft 675 psi Eminbend - xx 580 ksi Applied Loads Beam self weight calculated and added to loads Unif Load: D = 0.0210, Lr = 0.020 k/ft, Trib= 10.250 ft Des/gn Summary (k) D L Lr S w E H 2.14 1.90 Max fb/Fb Ratio = 0.978: 1 fb : Actual : 1,342.44 psi at 9.250 ft in Span # 1 Fb: Allowable: 1,372.42 psi Load Comb: +D+Lr+H Max fv/FvRatio = 0.423: 1 fv : Actual : 71.84 psi at 17.390 ft in Span # 1 Fv: Allowable: 170.00 psi Load Comb: +D+Lr+H Max Reactions Left Support (k) D L Lr S w E H 2.14 1.90 Downward L+Lr+S 0.301 in Downward Total 0.642 in Right Support 2.14 1.90 Upward L+Lr+S 0.000 in Upward Total Live Load Defl Ratio 737 >360 Total Def] Ratio 0.000 in 346 >240 Wood Beam Design,: Beam 2: header between kitchen and livinq 2,825.70 psi 180.00 psi Load Comb: Calculations per 2012 NDS; IBC 2012, CBC 2013,,ASCE 7-10 BEAM Size: 3.5x11.25, Parallam'Fully Unbraced 1 fv : Actual : 162.90 psi Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending 290.00 psi Wood Species: Truss Joist Wood Grade : Parallam PSL 2.0E Fb - Tension Fb - Compr 2900 psi Fc - Prll 2900 psi Fv 2900 psi Fc - Perp 750 Ft 290 psi Ebend- xx 2000 ksi Density 32.21 pcf 1.03 psi 2025 psi Eminbend - xx 1016.535 ksi 2.35 Applied Loads Beam self weight calculated and added to loads Unif Load: D = 0.0210, Lr = 0.020 k/ft, 0.0 ft to 5.50 ft, Trib= 4.50 ft Unif Load: D = 0.0050 k/ft, 5.50 to 13.50 ft, Trib= 4.50 ft Point: D = 0.310, Lr = 0.280 k (a) 11.0 ft Point: D = 2.140, Lr = 1.90 k (a) 11.0 ft Point: D = 0. 1150, Lr = 0.1350 k @ 7.50 ft Design Summary 1,069.78 psi at 4.000 ft in Span # 1 Fb : Allowable: Max fb/Fb Ratio = 0.613: 1 fb : Actual : 1,731.84 psi at 10.980 ft in Span # 1 Fb: Allowable: 2,825.70 psi 180.00 psi Load Comb: +D+Lr+H Max Reactions (k) Max fv/FvRatio = 0.562: 1 fv : Actual : 162.90 psi at 12.600 ft in Span # 1 Fv: Allowable: 290.00 psi Load Comb: +D+Lr+H Max Reactions (k) D L Lr fi w E Left Support 1.03 0.86 .Right Support 2.35 1.95 D(O.09450Lr(O.090 Dr0.0225ct C i 13.50 ft, 3.5x11.25 Downward L+Lr+S 0.168 in Downward Total 0.372 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Defl Ratio 963 >360 Total Defl Ratio 435 >240 Wood Beam Design, Beam 3: new header at livinq exterior wall Calculations per 2012 NDS; IBC 2012, -CBC 2013, ASCE 7-10 BEAM Size : 4x8, Sawn, Fully Unbraced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending Wood Species: Douglas Fir - Larch Wood Grade: No.1 Fb - Tension 1000 psi Fc - Prll 1500 psi Fv 180 psi Ebend- xx 1700 ksi Density 32.21 pcf Fb - Compr 1000 psi Fc - Perp 625 psi Ft 675 psi Eminbend - xx 620 ksi Applied Loads Beam self weight calculated and added to loads Unif Load: D = 0.0220, Lr = 0.020 k/ft, Trib= 8.0 ft Design Summary Max fb/Fb Ratio = 0.827: 1 fb : Actual : 1,069.78 psi at 4.000 ft in Span # 1 Fb : Allowable: 1,292.92 psi Load Comb: +D+Lr+H Max fv/FvRatio = 0.383: 1 fv : Actual : 68.94 psi at 0.000 ft in Span # 1 Fv: Allowable: 180.00 psi Load Comb: +D+Lr+H Max Reactions (k) D L Lr a w E Left Support 0.73 0.64 D(0.1760 Lr(0.1601 r. f;:1, 8.0 ft, 4x8 H Downward L+Lr+S 0.078 in Downward Total 0.168 in Upward L+Lr+S 0.000 in Upward Total 0.000 in CHRISTINA R: SILVA, P.E. Page: 3 Job No: 01834-15 Project: Grant Date: 04/15/15 co NTs'G wtic - ter -rte s - — ( ' X. # 3 ' l3 -70k --- , DK, an/ e yT. CaOT - Fr'G . I BUILDING ENERGY ANALYSIS REPORT PROJECT: Grant Residence -Alteration 51-775 Avenida Madero La Quinta, CA 92253 Project Designer: AA Designs 81-692 Rancho Santana Dr. a La Quinta, CA 92253 w 760--272-4285 CITY OF LA QUINTA Report Prepared by: BUILDING & SAFETY DEPT. APPROVED Gina Rose FOR CONSTRUCTION EQS, Inc. P.O. BOX 170 DATE BY Gold Hill, OR 97525 760-218-3350 ra '°°""'"°" RECEIVED Date: SEP 17 2015 9/14/2015 CITY OF LA QUINTA COMMUNITY DEVELOPMENT The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. EnergyPro 6.7 by EnergySoft User Number: 5862 ID: I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Form CF -1 R -PRF -01-E Certificate of Compliance 3 Form RMS -1 Residential Measures Summary 12 Form MF -1 R Mandatory Measures Summary 14 HVAC System Heating and Cooling Loads Summary 18 Room Load Summary 22 EnergyPro 6.7 by EnergySoft Job Number: ID: User Number: 5862 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CFI R -PRF -01 Page 1 of 9 GENERAL INFORMATION ENERGY USE SUMMARY 01 Project Name Grant Residence 04 05 02 Calculation Description Title 24 Analysis 08 Energy Use (kTDV/ft2-yr) 03 Project Location 51-775 Avenida Madero Compliance Margin Percent Improvement 04 City La Quinta 05 Standards Version Compliance 2015 06 Zip Code 92253 07 Compliance Manager Version BEMCmpMgr 2013-4 (744) 08 Climate Zone CZ15 09 Software Version EnergyPro 6.6 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 90 12 Project Scope Addition and/or Alteration 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ft) 1258 15 Number of Zones 4 16 Slab Area (ft2) 1258 17 Number of Stories 1 18 Addition Cond. Floor Area 0 19 Natural Gas Available Yes 20 Addition Slab Area (ft2) 0 21 j Glazing Percentage (%) 15.9% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building DOES NOT require HERS Verification 03 This building incorporates one or more Special Features shown below Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-08252015-744 HERS Provider: Report Generated at: 2015-09-14 10:58:07 ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ft2-yr) Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 1.77 3.98 -2.21 -124.9% Space Cooling 134.17 110.43 23.74 17.7% IAQ Ventilation 0.00 0.00 0.00 0.0% Water Heating 16.40 28.99 -12.59 -76.8% Photovoltaic Offset --- 0.00 0.00 ---- Compliance Energy Total 152.34 143.40 8.94 5.9% Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-08252015-744 HERS Provider: Report Generated at: 2015-09-14 10:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence ' Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Cool roof • Exposed slab floor in conditioned zone CF1 R -PRF -01 Page 2 of 9 HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • -- None -- Cooling System Verifications: • -- None -- HVAC Distribution System Verifications: • -- None -- Domestic Hot Water System Verifications: • ..None -- ENERGY DESIGN RATING This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an on-site renewable energy system. Reference Energy Use *` r Energy Design Rating; Margin Percent Improvement Total Energy (kTDV/f2-yr)* 210.83 :201.89,;.::8.94 4.2% • includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Grant Residence 1258 1 2 4 0 1 Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-09-14 10:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CFI R -PRF -01 Page 3 of 9 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 Existing Master Bdrm Conditioned HVAC Systeml 278 9 DHW Sys 1 Existing Master Bath Conditioned HVAC System2 100 9 DHW Sys 1 Existing Bedroom Conditioned HVAC System3 154 9 DHW Sys 1 Existing Kitchen/Living A Conditioned HVAC System4 726 9 DHW Sys 1 OPAQUE SURFACES 01 02 03 04 05 06 07 08 09 10 Name Zone Construction Azimuth Window & Door Orientation Gross Area (W) Area (W) Tilt (deg) Status Verified Existing Condition Exterior Wall -North Existing Master Bdrm R-19 Wall 0 Right 192 16 90 Existing No Exterior Wall -East Existing Master Bdrm R-19 Wall 90 Front 104 90 Existing No Exterior Wall -South Existing Master Bdrm R-19 Wall 180 Left 96 35 90 Existing No Exterior Wall -West Existing Master Bdrm R-19 Wall 270 Back 104 10 90 Existing No Roof Existing Master Bdrm R-30 Roof Attic 278 Altered N/A Exterior Wall -South 2 Existing Master Bath R-19 Wall 180 Left 80 5 90 Existing No Exterior Wall -West 2 Existing Master Bath R-19 Wall 270 Baric 80 22.7 90 Existing No Roof 2 Existing Master Bath R-30 Roof Attic 100 Altered N/A Exterior Wall -North 2 Existing Bedroom R-19 Wall 0 Right 48 6 90 Existing No Exterior Wall -North -New Existing Bedroom R-19 Wall 0 Right 96 8 90 Altered N/A Exterior Wall -East 2 Existing Bedroom R-19 Wall 90 Front 16 90 Existing No Exterior Wall -East -New Existing Bedroom R-19 Wall 90 Front 88 13.5 90 Altered N/A Exterior Wall -West 3 Existing Bedroom R-19 Wall 270 Back 16 90 Existing No Roof 3 Existing Bedroom R-30 Roof Attic 154 Altered N/A Exterior Wall -North 3 Existing Kitchen/Living A R-19 Wall 0 Right 64 90 Existing No Exterior Wall -East 3 Existing Kitchen/Living A R-19 Wall 90 Front 144 60.8 90 Existing No Exterior Wall -East New Existing Kitchen/Living A R-19 Wall 90 Front 96 18 90 Altered N/A Exterior Wall -South 3 Existing Kitchen/Living A R-19 Wall 180 Left 232 36.3 90 Existing No Exterior Wall -West 4 Existing Kitchen/Living A R-19 Wall 270 Back 160 23.7 90 Existing No Roof 4 Existing Kitchen/Living A R-30 Roof Attic 726 Altered N/A Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 HERS Provider: Report Generated at: 2015-09-1410:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation DatefTime: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CF1 R -PRF -01 Page 4 of 9 ATTIC 01 02 03 04 05 06 07 08 09 10 04 05 06 07 08 09 10 Radiant Name Statu Verified Existing Name Construction Type Roof Rise Roof Reflectance Roof Emittance Barrier Cool Roof s Condition Attic Existing Master Bdrm Attic RoofExisting Master Bdrm Ventilated 4 0.53 0.86 No Yes Altdere No 0.25 Insect Screen (default) Altered N/A 3 Exterior Wall -South (Left -180) --- --- 1 35.0 0.32 0.25 Attic Existing Master Bath Attic RoofExisting Master Bath Ventilated 4 0.53 0.86 No Yes Altdere No Altered N/A E Exterior Wall -South 2 (Left -180) -- --- 1 5.0 1.19 0.83 Insect Screen (default) Existing Attic Existing Bedroom Attic RoofExisting Bedroom Ventilated 4 0.53 0.86 No Yes Altdere No M Exterior Wall -North 2 (Right -0) --- --- 1 6.0 0.32 0.25 Insect Screen (default) Altered N/A N Attic Existing Kitchen/Living A Attic RoofExisting Kitchen/Living Ventilated 4 0.53 0.86 No Yes Altere No 1 A 0.32 0.25 Insect Screen (default) Altered N/A B d ---- 1 WINDOWS 01 02 03 04 05 06 07 08 09 10 11 Name Surface (Orientation -Azimuth) Width(ft) Multiplie Height (ft) r Area (ft) U -factor SHGC Exterior Shading Status Verified Existing Condition K Exterior Wall -North (Right -0) --- ---- 1 8.0 0.32 0.25 Insect Screen (default) Altered N/A L Exterior Wall -North (Right -0) --- --- 1 8.0 0.32 0.25 Insect Screen (default) Altered N/A 3 Exterior Wall -South (Left -180) --- --- 1 35.0 0.32 0.25 Insect Screen (default) Altered N/A J Exterior Wall -West (Back -270) -- -- 1 10.0 0.32 0.25 Insect Screen (default) Altered N/A E Exterior Wall -South 2 (Left -180) -- --- 1 5.0 1.19 0.83 Insect Screen (default) Existing No E 2 Exterior Wall -West 2 (Back -270) ---- -- 1 5.0 1.19 0.83 Insect Screen (default) Existing No M Exterior Wall -North 2 (Right -0) --- --- 1 6.0 0.32 0.25 Insect Screen (default) Altered N/A N Exterior Wall -North -New (Right -0) ---- --- 1 8.0 0.32 0.25 Insect Screen (default) Altered N/A A Exterior Wall -East -New (Front -90) -- 1 13.5 0.32 0.25 Insect Screen (default) Altered N/A B Exterior Wall -East 3 (Front -90) --- ---- 1 7.0 0.32 0.25 Insect Screen (default) Altered N/A C Exterior Wall -East 3 (Front -90) --- - 1 26.8 0.32 0.25 Insect Screen (default) Altered N/A D Exterior Wall -East 3 (Front -90) - -- 1 7.0 0.32 0.25 Insect Screen (default) Altered N/A F Exterior Wall -East New (Front -90) --- -- 1 18.0 0.32 0.25 Insect Screen (default) Altered N/A 1 Exterior Wall -South 3 (Left -180) --- ---- 1 30.0 0.32 0.25 Insect Screen (default) Altered N/A G Exterior Wall -South 3 (Left -180) --- -- 1 6.3 0.32 0.25 Insect Screen (default) Altered N/A H Exterior Wall -West 4 (Back -270) 1 1 6.0 0.32 0.25 1 Insect Screen (default) Altered N/A Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 HERS Provider: Report Generated at: 2015-09-14 10:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CFI R -PRF -01 Page 5 of 9 DOORS 01 02 03 04 05 01 02 03 04 05 06 Name Side of Building Area (ft) U -factor Status Verified Existing Condition Door Exterior Wall -West 2 17.7 0.50 Existing No Door 2 Exterior Wall -East 3 20.0 0.50 Altered No 2 Exterior Wall -West 4 17.7 0.50 Altered No OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R -value U -value Assembly Layers • Cavity/ Frame: no insul. /2x4 Top Chrd • Roof Deck: Wood Siding/sheathing/decking 2x4 Top Chord of Roof Truss @ 24 Tile Gap: present Attic RoofExisting Master Bdrm Attic Roofs Wood Framed Ceiling in. O.C. none 0.400 Roofing: 10 PSF (RoofTile) • Inside Finish: Gypsum Board • Cavity/Frame: R -19/2x6 • Exterior Finish: Wood R-19 Wall Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 19 0.069 Siding/sheathing/decking • Inside Finish: Gypsum Board Ceilings (below Cavity/ Frame: R-9.1 /2x4 R-30 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.032 Over Floor Joists: R-20.9 insul. • Cavity/ Frame: no insul. /2x4 Top Chrd • Roof Deck: Wood Siding/sheathing/decking 2x4 Top Chord of Roof Truss @ 24 Tile Gap: present Attic RoofExisting Master Bath Attic Roofs Wood Framed Ceiling in. O.C. none 0.400 Roofing: 10 PSF (Rooffile) • Cavity/ Frame: no insul. /2x4 Top Chrd • Roof Deck: Wood Siding/sheathing/decking 2x4 Top Chord of Roof Truss @ 24 Tile Gap: present Attic RoofExisting Bedroom Attic Roofs Wood Framed Ceiling in. O.C. none 0.400 Roofing: 10 PSF (RoofTile) • Cavity/ Frame: no insul. / 2x4 Top Chrd • Roof Deck: Wood Siding/sheathing/decking Attic RoofExisting 2x4 Top Chord of Roof Truss @ 24 Tile Gap: present Kitchen/Living A Attic Roofs Wood Framed Ceiling in. O.C. none 0.400 Roofing: 10 PSF (RoofTile) Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 HERS Provider: Report Generated at: 2015-09-14 10:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CFI R -PRF -01 Page 6 of 9 SLAB FLOORS 01 02 03 04 05 06 07 08 09 Name Zone Area (ft2) Perimeter (ft) Edge Insul. R -value Carpeted Fraction Heated Status Verified Existing Condition Slab -on -Grade Existing Master Bdrm 278 62 None 1 No Existing No Slab -on -Grade 2 Existing Master Bath 100 20 None 0 No Existing No Slab -on -Grade 3 Existing Bedroom 36 10 None 0 No Existing No Slab -on -Grade 4 Existing Bedroom 118 23 None 1 No Existing No Slab -on -Grade 5 Existing Kitchen/Living A 352 49 None 0 No Existing No Slab -on -Grade 6 Existing Kitchen/Living A 374 26 None 1 No Existing No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Not Required Not Required Not Required --- WATER HEATING SYSTEMS 01 02 03 04 05 06 07 08 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction N Status Verified Existing Condition DHW Sys 1 DHW Standard DHW Heater 1 1 Annual Altered No WATER HEATERS 01 02 03 04 05 06 07 08 Name Heater Element Type Tank Type Tank Volume (gal) Energy Factor or Efficiency Input Rating Tank Exterior Insulation R -value Standby Loss (Fraction) DHW Heater 1 Electric Resistance Small Storage 50 0.95 EF 4500 -watts 0 0 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation with Manual Control Recirculation with Sensor Control DHW Sys 1 n/a n/a n/a n/a n/a n/a Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 HERS Provider: Report Generated at: 2015-09-14 10:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CFI R -PRF -01 Page 7 of 9 SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 Heating Component 3 Electric - All electric heating systems other than heat pump Heating System Cooling System System Type EER SEER Zonally Controlled Compressor HERS Verification Cooling Component 1 RoomAirCond - Non -central room 8.5 N/A Distribution Fan Floor Area Verified Existing Name System Type Name Ducted Name Ducted System System Served Status Condition HVAC Systeml Other Heating and Heating No Cooling No none - 278 Altered No RoomAirCond - Non -central room Cooling System Component 1 No Component 1 Cooling Component A/C system HVAC System2 Other Heating and Heating No Cooling No none - No 100 Altered No Cooling System Component 2 Component 2 HVAC System3 Other Heating and Heating No Cooling No none - 154 Altered No Cooling System Component 3 Component 3 HVAC System4 Other Heating and Heating No Cooling No _F - none - 726 Altered No Cooling System Component 4 Component 4 HVAC - HEATING SYSTEMS 01 01 02 03 Name Type Efficiency Heating Component 1 Electric - All electric heating systems other than heat pump --- Heating Component 2 Electric - All electric heating systems other than heat pump --- Heating Component 3 Electric - All electric heating systems other than heat pump Heating Component 4 Electric - All electric heating systems other than heat pump HVAC - COOLING SYSTEMS 01 02 03 04 05 06 07 Efficiency Multi -speed Name System Type EER SEER Zonally Controlled Compressor HERS Verification Cooling Component 1 RoomAirCond - Non -central room 8.5 N/A No No Cooling Component A/C system 1 -hers -cool Cooling Component 2 RoomAirCond - Non -central room 8.5 N/A No No Cooling Component A/C system 2 -hers -cool Cooling Component 3 RoomAirCond - Non -central room 8.5 N/A No No Cooling Component A/C system 3 -hers -cool Cooling Component 4 RoomAirCond - Non -central room 8.5 N/A No No Cooling Component A/C system 4 -hers -cool Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-09-14 10:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Calculation Description: Title 24 Analysis Input File Name: Grant Alteration.xml CF1 R -PRF -01 Page 8 of 9 HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1 -hers -cool Not Required Not Required Not Required Not Required Cooling Component 2 -hers -cool Not Required. Not Required Not Required Not Required Cooling Component 3 -hers -cool Not Required Not Required Not Required Not Required Cooling Component 4 -hers -cool Not Required Not Required Not Required Not Required IAQ (Indoor Air Quality) FANS 01 02 03 04 05 Name IAQ CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 0 Default 0 Not Required Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-08252015-744. Report Generated at: 2015-09-1410:58:07 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Grant Residence Calculation Description: Title 24 Analysis Calculation Date/Time: 10:56, Mon, Sep 14, 2015 Input File Name: Grant Alteration.xml CFI R -PRF -01 Page 9 of 9 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Gina Rose ivf Company: Signature Date: EQS, Inc. 9/14/2015 Address: CEA/HERS Certification Identification (If applicable); P.O. Box 170 City/State old Hill, OR 97525 Phone: 760-218-3350 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the.following under penalty of perjury, under the laws of the State of California: 1. I am eligible. under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature: Armen Altounian Auucea 14&0"Wu za Company: Date Signed: 10-14-15 AA Designs Address: License: 81-692 Rancho Santana Dr. City/State/Zip: Phone: La Quinta,,CA 92253 760--272-4285 Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-09-14 10:58:07 RESIDENTIAL MEASURES SUMMARY RMS -1 .Project Name Grant Residence -Alteration Building Type m Single Family ❑ Addition Alone ❑ Multi Family m Existing+ Addition/Alteration Date 9/14/2015 Project Address 51-775 Avenida Madero La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 1,258 Addition 0 # of Units 1 INSULATION Construction Type Area Cavi(ft) Special Features Status Wall Wood Framed R 19 1,121 Existing Slab Unheated Slab -on -Grade - no insulation 1,258 Perim = 190' Existing Roof Wood Framed Attic R 30 1,258 Cool Roof Altered Demising Wood Framed - no insulation 376 Existing Door Opaque Door - no insulation 18 Existing Wall Wood Framed R 19 241 Altered Door Opaque Door - no insulation 38 Altered FENESTRATION Total Area: 200 Glazing Percentage: 15.9 % New/Altered Average U -Factor: 0.32 Orientation Area ft2 U -Fac SHGC Overhang Sidefins Exterior Shades Status Right (N) 30.0 0.320 0.25 none none Bug Screen Altered Left (S) 71.3 0.320 0.25 none none Bug Screen Altered Rear (Kq 16.0 0.320 0.25 none none Bug Screen. Altered Left (S) 5.0 1.190 0.83 none none Bug Screen Existing Rear (W) 5.0 1.190 0.83 none none Bug Screen Existing Front (E) 72.3 0.320 0.25 none none Bug Screen Altered HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Electric 3.41 HSPF Room PTAC with Side t 8.5 EER Setback Altered 1 Electric 3.41 HSPF Room PTAC with Side t 8.5 EER Setback Altered 1 Electric 3.41 HSPF Room PTAC with Side t 8.5 EER Setback Altered HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R -Value Status HVAC System Ductless/ with Fan Ductless n/a n/a Altered HVAC System Ductless/ with Fan Ductless n/a n/a Altered HVAC System Ductless / with Fan Ductless. n/a n/a Altered WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Small Storage Electric 50 0.95 Standard Altered EneMvPro 6.7 by EneMySoft User Number. 5862 RunCode: 2015-09-14710:58:47 ID: Pae 12 of 25 RESIDENTIAL MEASURES SUMMARY RMS -1 Project Name Grant Residence -Alteration Building Type m Single Family ❑ Addition Alone ❑ Multi Family m Existing+ Addition/Alteration Date 9/14/2015 Project Address. 51-775 Avenida Madero La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 1,258 Addition 0 # of Units 1 INSULATION Construction Type Area Cavi(ft) Special Features Status FENESTRATION Total Area: 200 Glazing Percentage: 15.9 New/Altered Avera a U -Factor: 0.32 Orientation Area ft2 U -Fac SHGC Overhang Sidefins Exterior Shades Status HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Electric 3.41 HSPF Room PTAC with Side L 8.5 EER Setback Altered HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R -Value Status HVAC System Ductless/ with Fan Ductless n/a n/a Altered WATER HEATING Qty. Type Gallons Min. Eff Distribution Status EnemyPro 6.7 by EnemySoft User Number: 5862 Run Code: 2015-09-14710:58:47 ID: Pae 13 of 25 2013 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the compliance approach used. Exceptions may apply. Review the respective code section for more information. Building Envelope Measures: § 110.6(a)1: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. § 110.6(a)5: Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain Coefficient SHGC , and infiltration that meets the requirements of § 10-11 I (a). § 110.7: Exterior doors and windows are weatherstripped; all joints and penetrations are caulked and sealed. §I 10.8(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on the CF2R. § 110.8(i): The thermal emittance and aged solar reflectance values of the cool roofing material meets the requirements of § 110.8(i) when the installation of a cool roof is specified on the CF 1 R. §110.80): A radiant barrier shall have an emittance of 0.05 or less when the installation of a radiant barrier is specified on the CFIR. Minimum R-30 insulation in wood -frame ceiling; or the weighted average U -factor shall not exceed 0.031. Minimum R-19 in a § I50.0(a): rafter roof alteration. Attic access doors shall have permanently attached insulation using adhesive or mechanical fasteners. The attic access shall be gasketed to prevent air leakage. § I50.0(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -value. § I50.0(c): Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or 0.074 maximum U - factor). § I50.0(d): Minimum R-19 insulation in raised wood -frame floor or 0.037 maximum U -factor. In Climate Zones 14 and 16 a Class II vapor retarder shall be installed on the conditioned space side of all insulation in all exterior § 150.0(g)l: walls, vented attics and unvented attics with air -permeable insulation. In Climate Zones 1-16 with unvented crawl spaces the earth floor of the crawl space shall be covered with a Class I or Class II § 150.0(g)2: vapor retarder. In a building having a controlled ventilation crawl space, a Class I or Class II vapor retarder shall be placed over the earth floor of § I50.0(g)3: the crawl space to reduce moisture entry and protect insulation from condensation, as specified in the exception to Section 150.0(d). § 150.0(1): Slab edge insulation shall: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; have water vapor permeance rate is no greater than 2.0 perm/inch, be protected from physical damage and UV light deterioration; and when installed as part of a heated slab floor meets the requirements of § 110.8 §150.0(q): Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors shall have a maximum U - factor of 0.58; or the weighted average U -factor of all fenestration shall not exceed 0.58. Fireplaces, Decorative Gas Appliances and Gas Log Measures: §150.0(e)IA: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. §150.0(e)IB: Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is equipped with a readily accessible, operable, and tight -fitting damper or a combustion -air control device. § 150.0(e) I C: Masonry or factory -built fireplaces have a flue damper with a readily accessible control. §150.0(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: §110.0-§110.3: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified to the Energy Commission. §110.3(c)5: Water heating recirculation loops serving multiple dwelling units meet the air release valve, backflow prevention, pump isolation valve, and recirculation loop connection requirements of § 110.3(c)5. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appli- § 110.5: ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool ands a heaters. §150.0(h)l: Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA using design conditions specified in §150.0(h)2. § 150.0(h)3A: Installed air conditioner and heat pump outdoor condensing units shall have a clearance of at least five feet from the outlet of any dryer vent. § I50.0(i): Heating systems are equipped with thermostats that meet the setback requirements of § 110.2(c). § 150.00)IA: Storage gas water heaters with an energy factor equal to or less than the federal minimum standards shall be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. § 150.00)1B: Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, have R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. For domestic hot water system piping, whether buried or unburied: the first 5 feet of hot and cold water pipes from the storage tank, all piping with a nominal diameter of 3/4 inch or larger, all piping associated with a domestic hot water recirculation system § I50.00)2A: regardless of the pipe diameter, piping from the heating source to storage tank or between tanks, piping buried below grade, and all hot water pipes from the heating source to kitchen fixtures must be insulated according to the requirements of TABLE 120.3- A. §150.00)2B: All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve that allows for installation, removal, and replacement of the enclosed pipe and insulation. 2013 Low -Rise Residential Mandatory Measures Summary §150.00)2C: Pipe for cooling system lines shall be insulated as specified in § ] 50.00)2A. Piping insulation for steam and hydronic heating systems or hot waters stems with pressure > 15 psig shall meet the requirements in TABLE 120.3-A. § 150.00)3: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall either be rated for outdoor use or installed with a cover suitable for outdoor service. For § 150.00)3A: example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation protected as specified or painted with coating that is water retardant and provides shielding from solar radiation that degrades the material. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space shall have a Class I §150.00)3B: or Class II vapor retarding facing, or the insulation shall be installed at the thickness that qualifies as a Class I or Class II vapor retarder. Systems using gas or propane water heaters to serve individual dwelling units shall include: a 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the §150.0(n)l: space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the installed water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr. § 150.0(n)2: Recirculating loops serving multiple dwelling units shall meet the requirements of § 110.3(c)5. § 150.0(n)3: Solar water -heating systems and collectors shall be certified and rated by the Solar Rating and Certification Corporation (SRCC) or by a testing agency approved by the Executive Director. Ducts and Fans Measures: All air -distribution system ducts and plenums installed are sealed and insulated to meet the requirements of CMC §601.0, §602.0, §603.0, §604.0, §605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-6.0 (or higher if required by CMC §605.0) or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts are mechanically fastened. Openings shall be sealed §150.0(m)l: with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. Factory -Fabricated Duct Systems shall comply with specified requirements for duct construction, connections, and closures; joints § I50.0(m)2: and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. §150.0(m)3-6: Field -Fabricated Duct Systems shall comply with requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements specified for duct construction; duct insulation R -value ratings; duct insulation thickness; and duct labeling, § 150.0(m)7: All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic dampers. § 150.0(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers except combustion inlet and outlet air openings and elevator shaft vents. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not § 150.0(m)9: limited to the following: insulation exposed to weather shall be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. § 150.0(m)] 0: Flexible ducts cannot have porous inner cores. When space conditioning systems use forced air duct systems to supply conditioned air to an occupiable space, the ducts shall be § 150.0(m)11: sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal §150.0(m)12: conditioning component, except evaporative coolers, shall be provided with air filter devices that meet the requirements of §150.0(m)12. Space conditioning systems that utilize forced air ducts to supply cooling to an occupiable space shall have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the supply plenum. The § 150.0(m)13: space conditioning system must also demonstrate airflow > 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy:5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Zonally controlled central forced air cooling systems shall be capable of simultaneously delivering, in every zonal control mode, §150.0(m)15: an airflow from the dwelling, through the air handler fan and delivered to the dwelling, of> 350 CFM per ton of nominal cooling capacity, and operating at an air -handling unit fan efficacy of:5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. All dwelling units shall meet the requirements of ASHRAE Standard 62.2. Neither window operation nor continuous operation of § 150.0(0): central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing the Whole Building Ventilation. §150.0(o)IA: Whole Building Ventilation airflow shall be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Pool and Spa Heating Systems and Equipment Measures: Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency § 110.4(a): Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating. 2013 Low -Rise Residential Mandatory Measures Summary §I 10.4(b)1: Any pool or spa heating equipment shall be installed with at least 36 inches of pipe between filter and heater or dedicated suction and return lines, or built-up connections for future solar heating. § 110.4(b)2: Outdoor pools or spas that have a heat pump or gas heater shall have a cover. § 110.4(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or pro- grammed to run only during off-peak electric demand periods. § 110.5: Natural gas pool and spa heaters shall not have a continuous burning pilot light. §150.0(p): Residential pool systems or equipment shall meet specified pump sizing, now rate, piping, filters, and valve requirements. Lighting Measures: § 110.9: All lighting control devices and systems, ballasts, and luminaires shall meet the applicable requirements of § 110.9. §150.0(k)IA: Installed luminaires shall be classified as high -efficacy or low -efficacy for compliance with § 150.0(k) in accordance with TABLE 150.0-A or TABLE 150.0-B, as applicable. §150.0(k)1B: When a high efficacy and low efficacy lighting system are combined in a single luminaire, each system shall separately comply with the applicable provisions of § 150.0(k). The wattage and classification of permanently installed luminaires in residential kitchens shall be determined in accordance with §150.0(k)IC: § 130.0(c). In residential kitchens, the wattage of electrical boxes finished with a blank cover or where no electrical equipment has been installed, and where the electrical box can be used for a luminaire or a surface mounted ceiling fan, shall be calculated as 180 watts of low efficacy lighting er electrical box. § 150.0(k)1D: Ballasts for fluorescent lamps rated 13 watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans shall be rated to consume no §150.0(k)IE: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled by vacancy sensors. §150.0(k)IF: Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) shall meet the applicable requirements of § 150.0(k). § 150.0(k)2A: High efficacy luminaires must be switched separately from low efficacy luminaires. § 150.0(k)2B: Exhaust fans shall be switched separately from lighting systems. § 150.0(k)2C: Luminaires shall be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Controls and equipment are installed in accordance with manufacturer's instructions. § 150.0(k)2E: No control shall bypass a dimmer or vacancy sensor function if the control is installed to comply with § 150.0(k). § 150.0(k)2F: Lighting controls comply with applicable requirements of § 110.9. An Energy Management Control System (FMCS) may be used to comply with dimmer requirements if. it functions as a dimmer § 150.0(k)2G: according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in §150.0(k)2. An Energy Management Control System (FMCS) may be used to comply with vacancy sensor requirements of § 150.0(k) if: it § I50.0(k)2H: functions as a vacancy sensor according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in § 150.0(k)2. § 150.0(k)2I: A multiscene programmable controller may be used to comply with dimmer requirements of this section if it provides the ftinctionality of a dimmer according to § 110.9, and complies with all other applicable requirements in § 150.0(k)2. § 150.0(k)3A: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. Kitchen lighting includes all permanently installed lighting in the kitchen except internal lighting in cabinets that illuminate only § 150.0(k)3B: the inside of the cabinets. Lighting in areas adjacent to the kitchen, including but not limited to dining and nook areas, are considered kitchen lighting if they are not separately switched from kitchen lighting. § 150.0(k)4: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. § I50.0(k)5: A minimum of one high efficacy luminaire shall be installed in each bathroom; and all other lighting installed in each bathroom shall be high efficacy or controlled by vacancy sensors. § 150.0(k)6: Lighting installed in attached and detached garages, laundry rooms, and utility rooms shall be high efficacy luminaires and controlled by vacancy sensors. § 150.0(k)7: Lighting installed in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy, or shall be controlled by either dimmers or vacancy sensors. Luminaires recessed into ceilings shall: be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; have a label that certifies that the luminaire is airtight with air leakage less than 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; be sealed with a gasket or caulk between the luminaire housing § 150.0(k)8: and ceiling, and shall have all air leak paths between conditioned and unconditioned spaces sealed with a gasket or caulk; and allow ballast maintenance and replacement without requiring cutting holes in the ceiling. For recessed compact fluorescent luminaries with ballasts to qualify as high efficacy for compliance with § I50.0(k), the ballasts shall be certified to the Energy Commission to comply with the applicable requirements in § 110.9. For single-family residential buildings, outdoor lighting permanently mounted to a residential building or other buildings on the same lot shall be high efficacy, or may be low efficacy if it meets all of the following requirements: i. Controlled by a manual ON and OFF switch that does not override to ON the automatic actions of Items ii or iii below; and § 150.0(k)9A: ii. Controlled by a motion sensor not having an override or bypass switch that disables the motion sensor, or controlled by a motion sensor having a temporary override switch which temporarily bypasses the motion sensing function and automatically reactivates the motion sensor within 6 hours; and iii. Controlled by one of the following methods: 2013 Low -Rise Residential Mandatory Measures Summary a. Photocontrol not having an override or bypass switch that disables the photocontrol; or b. Astronomical time clock not having an override or bypass switch that disables the astronomical time clock, and which is programmed to automatically turn the outdoor lighting OFF during daylight hours; or c. Energy management control system which meets all of the following requirements: At a minimum provides the functionality of an astronomical time clock in accordance with § 110.9; meets the Installation Certification requirements in § 130.4; meets the requirements for an EMCS in § 130.5; does not have an override or bypass switch that allows the luminaire to be always ON; and, is programmed to automatically turn the outdoor lighting OFF during daylight hours. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site shall comply with one of the § 150.0(k)9B: following requirements: i. Shall comply with § 150.0(k)9A; or ii. Shall comply with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. § 150.0(k)9C: For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by § 150.0(k)9B or 150.0(k)9D shall comply with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. § 150.0(k)9D: Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site shall comply with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. § 150.0(k)10: In illuminated address signs shall comply with § 140.8; or shall consume no more than 5 watts of power as determined according to § 130.0(c). § I50.0(k)11: Lighting for residential parking garages for eight or more vehicles shall comply with the applicable requirements for nonresidential garages in § 110.9, § 130.0, § 130. 1, § 130.4, § 140.6, and § 141.0. In a low-rise multifamily residential building where the total interior common area in a single building equals 20 percent or less of § 150.0(k)12A: the floor area, permanently installed lighting for the interior common areas in that building shall be high efficacy luminaires or controlled by an occupant sensor. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building shall: § 150.0(k)12B: i. Comply with the applicable requirements in § 110.99 § 130.0, § 130. 1, § 140.6 and § 141.0; and ii. Lighting installed in corridors and stairwells shall be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors shall be capable of turning the light fully On and Off from all designed paths of ingress and egress. Solar Ready Buildings: Single family residences located in subdivisions with ten or more single family residences and where the application for a §110.10(a)1: tentative subdivision map for the residences has been deemed complete, by the enforcement agency, on or after January 1, 2014, shall comply with the requirements of § 110.10 through § 110.10 e . § 110.10(a)2: Low-rise multi -family buildings shall comply with the requirements of § 110.10(b) through § 110.10(d). The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for §1 10.10(b)l: buildings with roof areas greater than 10,000 square feet. For single family residences the solar zone shall be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone shall be located on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project and have a total area no less than 15 percent of the total roof area of the building excluding any skylight area. § 110.10(b)2: All sections of the solar zone located on steep -sloped roofs shall be oriented between 110 degrees and 270 degrees of true north. § 110.10(b)3A: No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be located in the solar zone. Any obstruction, located on the roof or any other part of the building that projects above a solar zone shall be located at least twice § 110.10(b)3B: the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane. § 110.10(b)4: For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load shall be clearly indicated on the construction documents. The construction documents shall indicate: a location for inverters and metering equipment and a pathway for routing of conduit § 110.10(c): from the solar zone to the point of interconnection with the electrical service (for single family residences the point of interconnection will be the main service panel); a pathway for routing of plumbing from the solar zone to the water -heating system. § 110.10(d): A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through § 110.10(c) shall be provided to the occupant. § 110.10(e)1: The main electrical service panel shall have a minimum busbar rating of 200 amps. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a § 110.10(e)2: future solar electric installation. The reserved space shall be: positioned at the opposite (load) end from the input feeder location or main circuit location, and permanently marked as "For Future Solar Electric". HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Grant Residence -Alteration Date 9/14/2015 System Name HVAC System Floor Area 278 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 144 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK Sensible 3,528 0 0 0 0 0 0 3,528 COIL HTG. Latent CFM 260 179 0 0 260 PEAK Heating S stem Sensible Output perSystem 16,000 5,157 Total Output Btuh 16,000 Output Btuh/s ft 57.6 0 Cooling System 0 Output perSystem 24,000 0 Total Output Btuh 24,000 0 Total Output Tons 2.0 0 Total Output Btuh/s ft 86.3 Total Output s ftrron 139.0 5,157 Air System CFM perSystem 600 HVAC EQUIPMENT SELECTION Airflow cfm 600 NEW WALL PTAC (Daikin) 18,496 1,962 16,000 16,000 F Jan 1 AM Airflow cfm/s ft 2.16 Airflow cfm/Ton 300.0 Outside Air % 0-0% Total Adjusted System Output 18,496 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 1,962 Aug 3 MI Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF 70 OF 97 OF Outside Air 0 cfm Supply Fan Heating Coil 600 cfm 70 OF rr. 97 OF R00M 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78°F 78/62°F 78!62°F 55/54°F Outside AirAr 0 cfm Supply Fan Cooling Coil 600 cfm 78 ! 62 OF „ 41.7% 55154 OF -:--.._:.....:: ; :._ _......... R•Oi71 78 / 62 OF EnergyPro 6.7 by EnergySoft User Number: 5862 RunCode: 2015-09-14710:58:47 ID: Page 18 of 25 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Grant Residence-Alteration Date 9/14/2015 System Name HVAC System Floor Area 100 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL CFM 118 0 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 16,000 2,897 94 80 2,306 Total Output Btuh 16,000 0 Output Btuh/s ft 160.0 0 0 Cooling System 0 0 Output per System 24,000 0 0 0 0 Total Output Btuh 24,000 0 0 2,897 94 0 Total Output Tons 2.0 0 Total Output Stuh/s ft 240.0 Total Output s ft/Ton 50.0 2,306 Air System CFM per System 600 HVAC EQUIPMENT SELECTION Airflow cfm 600 NEW WALL PTAC (Daikin) 18,572 1,853 16,000 Airflow cfm/s ft 6.00 Airflow cfm/Ton 300.0 Outside Air % 0.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 18,572 1,853 16,000 Aug 3 PM Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF Outside Air 0 cfm Supply Fan 600 cfm 70 OF 70 OF 97 OF Heating Coil U-L .. 97 OF R4:0 1 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78°F 78!62°F 78/62°F 55/54°F Outside Air Ar 0 cfm Supply Fan Cooling Coil AL 600 cfm 78!62°F 55 / 54 OF ....._......I..._._:....... ..._n............ 41.3% o o 78/62°F EnergyPro 6.7 by EnergySoft User Number: 5862 Run Code: 2015-09-14710:58:47 ID: Page 19 of 25 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Grant Residence-Alteration Date 9/14/2015 System Name HVAC System Floor Area 154 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 80 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 1,955 144 94 2,710 t16,000 Total Ou ut Btuh 0 Out ut Btuh/s ft 0 0 Cooling System 0 0 Output perSystem 24,000 0 0 0 0 Total Output Btuh 24,000 0 144 0 Total Output Tons 2.0 0 0 Total Ou utBtuh/s ft 155.8 Total Output s ft/Ton 77.0 1,955 2,710 Air System CFM erS tem 600 HVAC EQUIPMENT SELECTION Airflow cfm 600 NEW WALL PTAC (Daikin) 18,549 1,886 16,000 Airflow cfm/s ft 3.90 Airflow cfm/Ton 300.0 Outside Air % 0.0% Total Adjusted System Output 18,549 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 1,886 Aug 3 PM 16,000 Outside Air (c isft 0.00 Note: values above given at ARI conditions Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF Ar Outside Air 0 cfm Supply Fan 600 cfm 70 OF 70 OF 97 OF Heating Coil 97 OF I' ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78°F 78/62°F 78!62°F 55/54°F Outside Air 0 cfm Supply Fan Cooling Coil 55 / 54 OF 600 cfm 41.4% R it l 78 ! 62 OF 78 / 62 OF EnergyPro 6.7 by EnergySoft User Number: 5862 RunCode: 2015-09-14710:58:47 ID: Page 20 of 25 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Grant Residence -Alteration Date 9/14/2015 System Name HVAC System Floor Area 726 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 341 Return Vented Lighting Return Air Ducts Return Fan Ventilation F 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 16,000 8,354 679 306 8,801 Total Output Btuh 16,000 0 Output Btuh/s ft 22.0 0 0 Cooling System 0 0 Output per System 24,000 0 0 0 0 Total Output Btuh 24,000 0 679 0 Total Output Tons 2.0 0 0 Total Output Btuh/s ft 33.1 Total Output s ftrron 363.0 8,354 8,801 Air System CFM per System 600 HVAC EQUIPMENT SELECTION Airflow cfm 600 NEW WALL PTAC (Daikin) 18,304 2,234 16,000 Airflow cfm/s ft 0.83 Airflow cf nfTon 300.0 Total Adjusted System Output (Adjusted for Peak Design conditions) 1 TIME OF SYSTEM PEAK 18,304 2,234 16,000 Aug 3 M1 F Jan 1 AM Outside Air % 0-0% Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF I Outside Air 0 cfm Supply Fan 600 cfm 70 OF 70 OF 97 OF Heating Coil 97 OF VROOM 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78°F 78/63°F 78163°F 55/54°F Air 0 cfm Supply Fan Cooling Coil 600 cfm 78/63°F LLOutside 55154 OF ........ ..... ..:.....:.:........_.......... 42.4% I t00l91 78/63°F I EnergyPro 6.7 by EnergySoff User Number: 5862 RunCode: 2015-09-14710:58:47 ID: Page 21 of 25 ROOM LOAD SUMMARY Project Name Date Grant Residence -Alteration 9/14/2015 System Name Floor Area HVAC System 278 ROOM COOLINAPEAK COIL COOLING PEAK COIL HTG. PEAKZone Name Room Name Mult. CFM SensibleCFM Sensible Latent CFM Sensible Existing Master Bdrm Existing Master Bdrm 1 144 3,528 144 3,528 260 179 5,157 PAGE TOTAL TOTAL ' Total includes ventilation load for zonal 144 3,528 260 179 5,157 144 3,528 260 179 5,157 22 ROOM LOAD SUMMARY Project Name Date Grant Residence -Alteration 9/14/2015 System Name Floor Area HVAC System 100 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. I CFM Sensible I Latent CFM I Sensible I Latent CFM I Sensible Existing Master Bath Existing Master Bath 1 1 1181 Z8971 94 1181 Z8971 94 801 2306 PAGE TOTAL TOTAL ' 118 Z8971 941 801 2,306 1181 Z8971 941 801 2306 Total includes ventilation load for zonal systems. EnergyPro 6.7 by EnerqySoft User Number: 5862 RunCode: 2015-09-14710:58:47 ID: Page 23 of 25 ROOM LOAD SUMMARY Project Name Date Grant Residence -Alteration 9/14/2015 System Name Floor Area HVAC System 154 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK I COIL HTG. PEAK Zone Name Room Name Mult. I CFM I Sensible I Latent CFM Sensible Latent I CFM I Sensible Existing Bedroom I Existing Bedroom 1 1 801 1,9551 1,441 801 1,9551 1441 941 2,710 PAGE TOTAL TOTAL ' Total includes ventilation load for 80 1,9551 144 94 Z710 80 1,955 144 94 2,710 I ROOM LOAD SUMMARY Grant Residence -Alteration 9/14/2015 System Name Floor Area HVAC System 726 ROOM LOAD SUMMARY OOCOOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult.[;341' M Sensible Latent CFM Sensible Latent CFM Sensible Existing Kitchen/Living Area Existing Kitchen/Living An 1 8,3541 679 3411 8,3541 6791 306 8,801 Total 6.7 PAGE TOTAL TOTAL' 341 8,354 679 306 8,801 341 8,354 679 306 8,801