Loading...
RR (05-0671)52500 Avenida Martinez 05-0671 T4hf 4 4 Q" 1504 kLLE TAMPICO A, CALIFORNIA 92253 BUILDING PERMIT BUILDING & SAFETY DEPARTMENT (760).777-7012 FAX (760) 777-7011 INSPECTION REQUESTS (760) 777-7153 -; T-0 5 _-0 0 00 G6 7 1___ - Property Address . . . . . 525007AVENIDA-MARTINEZ APN: 773-302-001-2 -000000- Application description . . . RE -ROOF Property Zoning . . . . . . . COVE RESIDENTIAL Application valuation . . . . 6780 Date 2/25/05 Owner. Contractor ------------------------ ------------------------ MARTIN /REED OWNER 4932.0 AVENIDA FERNANDO LA QUINTA CA 92253 -------7-------------------------------------------------------------------- Permit RE -ROOF Additional desc Permit Fee . . . . 30.00 Plan Check Fee .00 Issue Date . . . . Valuation . . . . 0 Qty Unit Charge Per Extension BASE FEE '30.00 ---------------------------------------------------------------------------- Special Notes and Comments REROOF/SHINGLES/CLASS "A" MATERIALS ONLY Fee summary Charged ----------------- Paid Credited Due ---------- ---------- Permit Fee Total 30.00 ---------- .00 ------- .00 7 -- 30.00 Plan Check Total .00 .00 .00 .00 Grand Total 30.00 .00 .00 30.00 P.O. BOX 1504 • VOICE (760) 777-7012 78-495 CALLE TAMPICO FAX (760) 777-7011 LA QUINTA, CALIFORNIA 92253 INSPECTIONS (760) 777-7153 BUILDING & SAFETY DEPARTMENT Application Number: DS -04 Z Applicant: � P� Applicant's Mailing Address: Date: %— 2 Architect or Engineer: Architect or Engineer's Address: Lic. No.: BUILDING PERMIT DECLARATIONS LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class License No. Date Contractor OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury tfiat I am exempt from the Contractors' State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500),): U I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself or through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). I; as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). �L) I am exempt under Sec. BA P.C. for this reason `Date �j o?S rte` Owner _419�9� WORKER 'COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier Policy Number / el certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' ( compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. CDate Oo oZ OS fi'5plicant WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE q UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name Lender's Address APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application.. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall, defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this county to enter upon the above-mentioned property for inspection purposes. " Date W7-5—/<aS— Signature (Applicant or Agent): �� Jan 04 05 03:52p Jacques 76d=345-3924 p.1 PALM DESERT CONTRACTORWROOFING P.O. Box 2795 Palm Desert California, 92261 Lic# 477507 760-346-2420 Fax 760-345-3924 DATE: 1-3-05 PROPOSAL submitted to; WORK to be performed at; Donna Martin Reed 6640611 fax6644838 52500 Martinez L a Palm Desert Contractors/Roofing hereby proposes to furnish material and perform the labor necessary for the completion of; Total removal of existing roof and re -roof as follows. Pitch: Install 15 ib base sheet, Install Owens Corning 30 year warranty dimensional shingles, Desert Tan, install standard metal. Paint all roof jaxs. Flat: Install 28 Ib base sheot, Install John Manville modified tar commercial roofing membrane, tan. Install standard metal, paint all roof jaxs. Extras; Permit, plywood (;$$35.00 per sheet, extra painting, custom sheet metal work, extra layers of roofing to be removed ®$20.00 per layer per square, taper system Q$9.00 per sheet, vents Q$75.00 per vent. 5 Year contractor warranty. The work will be performed in accordance with the drawings and specification submitted for the above work and completed In a workman like manner for the sum of; $ 6780.00 With payments as followst 10% down, Balance upon completion Respectfully, submitted 000 ACCEPTANCE OF PROPOSAL The above price, specification and conditions are satisfactory and are hereby accepted. Palm Desert Contractors/Roofing Is authorized to do the work as specified. Payments will be made as outlined. Date c oj0O. Signature -2 e The attached ADDENDUM is a part of this proposal van u -t ua u.s: ocp Jacques "NOTICE TO OWNER" 7.60-345-3524 p.2 THE LAW REQUIRES THAT, BEFORE A LICENSED CONTRACTOR CAN ENTER INTO A CONTRACT WITH YOU FOR A WORK OF IMPROVEMENT ON YOUR PROPERTY. HE MUST GIVE YOU A COPY OF THIS NOTICE. Under the Mechanics' Lien Laws of the State of California, persons who help to improve your property and are not paid have a right to enforce their claim against your property. This "claim" is known as a Mechanics' Lien. Basically, when somebody files a Mechanics' Lien, they are making a claim on your properly as security against payment of a just debt. In other words, this law allows contractors, subcontractors, laborers, materialmen. or certain others who may have provided goods or services to place a lien on your home or rhe structure they built or improved for you for any unpaid portion of the goods and services they furnish. For example, it you tail to pay your contractor', or if your contractor fails to pay his subcontractor or laborers, or neglects to make required contributions to a trust and/or other funds (where applicable), then those Mpie can look to your property for payment, EVEN IF YOU HAVE PAID YOUR CONTRACTOR 1N FULL. There are a number of ways to protect yourself and your property at the onset of contracting and throughout the construction project. You might• for instance, request that the contractor furnish you with a payment and performance bond. (This is a different bond than the one currently required by Contractors License Law.) The additional cost is usually minimal and is a certain guarantee that the project will be completed and the bills paid. You may also wish to record this payment and performance bond and file the contract with the County Recorder to further protect yourself from anyone liening your property. If you do have a contractor provide a special bond on your project and the bonding company does not honor your claim promptly in the event the contractor defaults. you may wish to contact the California Insurance Commission to see it the bonding company s engaging in an unfair claims practice Another avenue available to you is to use a funding control company. The control company acts as a third party, disbursing all funds for payment and usually securing all the necessary releases of lien. A funding control company is a specialized construction escrow which makes payment directly to subcontractors and suppliers. By doing this. it affords additional protection against valid liens. Should you choose not to use the above, the following are some of the important time requirements you should be aware of regarding the Mechan'cs' Lien Laws: 1. PRELIMINARY NOTICE. A claimant, contractor. subcontractor. or malerialman is entitled to enforce a lien only it he gives the preliminary twenty (20) days notice, it applicable. All claimants, other than the original contractor (the person you contracted with). or a laborer performing actual labor for wages, must give this notice. Therefore• people who you may not even know. such as a subcontractor. Of a material supplier. must notify you that they are providing supplies or services to your property which may later create a lien. This Preliminary Notice must be given no later than twenty (20) days after the claimant has first furnished labor. services, equipment or material to the job site. If you get such a Preliminary Notice, do not be alarmed. The notice is intended for your protection so that you may then require your contractor to furnish you with an unconditional lien release prior to or concurrently with payment to him. 2. NOTICE OF MECHANICS' LIEN. Usually claimants must record a Notice and Claim of Lien within ninety (90) days of the completion at the work. it a Notice of Completion, or a Notice Of Cessation of Labor has been recorded. then the Mechanics' Lien must be recorded within sixty (60) days by the original contractor and within thirty (30) days by all Wirer claimants such as subcontractors, materialmen, etc. The claimants must indicate on the notice what is owed to them. This lien will now bind your property like a mortgage or trust deed. 3. COMPLAINT TO FORECLOSE A MECHANICS' LIEN. If the claimants' demands are not satisfied, then they must usually file suit within ninety (90) days atter the recordation of a Notice oI Meatanics' Lien: The complaint to foreclose the lien is filed in a regular court proceeding and follows in a similar manner. YOU SHOULD BE AWARE THAT YQUR PROPERTY COULD BE SOLO AND THE PROCEEDS FROM THE SALE USED TO SATISFY THE CLAIM, 4. NOTICE OF NON -RESPONSIBILITY.. You can Pr0tWA yourself and your property from a valid claim of a contractor, or subcontractor who is doing work on your property, but not at your request for example, if you have a tenant who has contracted for work to be done). You can do this by posting and recording a Notice of Non -Responsibility. The notice must be posted in a conspicuous place within ten (10) days alter you have obtained knowledge of the vvOrk_Xqu use_ then record the notice arthe CduntyAertord"er's-OTtice. You can uivally purchase this form from various sources. S. UNCONDITIONAL LiEN RELEASE. You may also require that the original contractor provide you with unconditional lien releases signed by each and every person who has performed any work or labor as well as every person who has delivered any materials to your job Be sure to get releases tram each person who gave you a Preliminary Notice. 6. NOTICE OF COMPLETION. The owns► of the property or tits agent (sometimes the general contractor) can record a Notice of Completion within ten (10) days following the actual subcontractors of the work their improvement. The effect of the Notice of Completion is to shorten the time period within which the contractors or subcontractors may file their Mechanics' Lien. The above is not meant to be an exhaustive review of Mechanics' Llens. it is intended that you understand that you are entering into a contract which may bind your property and it is intended that you understand now to act to protect your property. Read and acknOwledged: _......_...._.... ignature r Siprlatu OaOed 1-20-05 ADDENDUM TO THE 1-3-05 PROPOSAL BY PALM DESERT CONTRACTORS / ROOFING 1.) The color of the shingles will be `Brownwood" by Owens Corning. Z.) Palm Desert Contractors / Roofing will provide Reed -Martin with unconditional releases signed by each and every person who has performed any work or labor as well as every person who has delivered any materials to this job at the time of completion of the job and. submission of the request for payment of the balance of the contract. 3.) The flat portion of the roofwill have two drains installed at the suggestion of Jacques of Palm Desert Contractors / Roofing to minimize standing water. The approximate cost for the drains is $800.00 The above conditions are satisfactory and are hereby accepted. PALM DESERT. CONTRACTORS / ROOFING REED -MARTIN By By Date Dal ylJ