Loading...
BSOL2015-012352840 Avenida Martinez BSOL2015-0123 lin r 73.495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: Property Address: APN: Application Description: Property Zoning: Application Valuation: Applicant: SOLARCITY CORPORATION 3055 CLEARVIEW WAY ATTN ZOE STEELE SAN MATEO, CA 94402 C& 0 D seP VOICE (760) 777-7125 FAX (760) 777-7011 COMMUNITY DEVELOPMENT DEPARTMENT INSPECTIONS (760) 777-7153 BUILDING PERMIT Date: 9/29/2015 BSOL2015-0123 Owner: 52840 AVENIDA MARTINEZ EVA RODRIGUEZ 773332006 52840 AVENIDA RODRIGUEZ RODRIGUEZ/7.155 kW PV SYSTEM - (27) 265W PANELS/(1)__ EByE LA QUINTA, CA 92253 $15,812.55 SEP 2 "+ 2015 V Contractor: 0 rL SOLARCITY CORPORATION CITY OF LA QUINTA 3055CLEARVIEW WAY COMMUNITYDEVELOPMENTDEPARTMENT ATTN ZOE STEELE SAN MATEO, CA 94402 (650)963-5630 Llc. No.: 888104 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Busir4)_ and Professions Code, and my License is in full force and effect. License Class: C46,13, C10, A, C20 L' Len'se 881 Dat V Contracto . v ` C OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt fro a Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or imProves,thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. . B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Lender's WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of .work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by n 00 of the Labor Code, for the performance of the work for which this permit My workers' compensation insurance carrier and policy number are: r:_ Policy Number: _ I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subj the workers' compensation laws of California, and agreethat, if I sho d beco a subject to the workers' compensation provisions of Sectio f e Labor ode/l shall forthwith comply ith those r visions. i Date: Applicant: 0eel 27 WARNI G: FAILURE TO SECURE WORKERS' COMPENSATION COVGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND IL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO E COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT: Application is hereby made to the Building Official for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application , the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state law elati o ilding construction, and hereby authorize representatives of ci me u n the above -me tioned p operty for inspection purposes 11 Dam Signature (Applicant orAgen : FINANCIAL • , DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE BSAS SB1473 FEE 101-0000-20306 0 $1.00 $0.00 PAID BY'. METHOD RECEIPT # CHECK # CLTD BY Total Paid for BUILDING STANDARDS ADMINISTRATION BSA: $1.00 $0.00 DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - ARRAY, FIRST 20 101-0000-42403 1.0 $24.17 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - ARRAY, FIRST 20 PC 101-0000-42600 0 $24.17 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY Total Paid for ELECTRICAL: $48.34 $0.00 DESCRIPTION ACCOUNT QTY AMOUNT PAID :PAID DATE PERMIT ISSUANCE 101-0000-42404 0 $91.85 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY Total Paid for PERMIT ISSUANCE: $91.85 $0.00 • •• ^ - Fay t. _ ` ;, -4- ;, • . D gum Description: RODRIGUEZ/7.155 kW PV SYSTEM - (27) 265W PANELS/(1) INVERTER Type: SOLAR Subtype: Status: APPROVED Applied: 8/7/2015 SKH Approved: 8/17/2015 JFU Parcel No: 773332006 Site Address: 52840 AVENIDA MARTINEZ LA QUINTA,CA 92253 Subdivision: SANTA CARMELITA VALE LA QUINTA Block: 146 Lot: 21 Issued: UNIT 15 Lot Scl Ft: 0 Building Sq Ft: 0 Zoning: Finaled: Valuation: $15,812.55 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 COMPLETION DATE Details: 7.155 kW SOLAR ARRAY - (27) 265W KYOCERA KU2656ZPA PANELS W/ (1) ABB PVI-5000-OUTD-US-Z-A INVERTER [486SF] 2013 CALIFORNIA ELECTRICAL CODE • 10 r ' Applied to Approved r .. Y Printed: Tuesday, September 29, 2015 8:35:59 AM 1 of 3 L Li U CJ SYSTEMS CHRONOLOGY TYPE STAFF NAME ACTION DATE* COMPLETION DATE NOTES NOTIFIED ELENA W/ SOLAR CITY THAT PLAN REVIEW WAS 'E-MAIL JAKE FUSON 8/17/2015 8/17/2015 COMPLETE AND REVISIONS WERE REQUIRED. SENT CORRECTION LIST VIA EMAIL. WAITTING ON ELENA TO PROVIDE STRUCTURAL CALCS FOR E-MAIL LUIS URIBE 9/21/2015 ROOFLOAD. E-MAIL LUIS URIBE 9/28%2015 9/28/2015 SENT ELENA AN EMAIL, LET HER KNOW PERMIT IS READY TO BE ISSUED. PLAN CHECK SUBMITTAL STEPHANIE KHATAMI 8/7/2015 8/7/2015 RECEIVED RESUBMITTAL AJ ORTEGA 9/17/2015 9/17/2015 PLANS RESUBMITTED BY SOLARCITY - ELENA LOYA RESUBMITTAL STEPHANIE KHATAMI 9/24/2015 9/24/2015 F' ±+ y 's,y r ,_ . - t: J' eAT;.- ,t / t- } t +'..` -.i. • Y.G ii .? i y, w'(. R✓! . '-J J }o'i '. r.+.q 1 1'C',-i,'S 7 - . 4 D, •x . > Cyte. tet. - ^t} t i.. [, ;'} +' , -: .t! .'. :t , * t^ P F y: .. . '. --A}'i f Yj,-. y; .l[4A .. .Lr,i Yf 1?xk w pN Printed: Tuesday, September 29, 2015 8:35:59 AM 1 of 3 L Li U CJ SYSTEMS " L"; k ,'jgr ........... NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL 7Z APPLICANT SOLARCITY CORPORATION 3055 CLEARVIEW WAY SAN MATEO CA 94402 (760)774-7460 . CONTRACTOR SOLARCITY CORPORATION 3055 CLEARVIEW WAY SAN MATEO CA 94402 (760)774-7460 $24.17 OF EVA RODRIGUEZ 52840 AVENIDA I I LA QUINTA " L"; ,'jgr ........... NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL 7Z APPLICANT SOLARCITY CORPORATION 3055 CLEARVIEW WAY SAN MATEO CA 94402 (760)774-7460 . CONTRACTOR SOLARCITY CORPORATION 3055 CLEARVIEW WAY SAN MATEO CA 94402 (760)774-7460 $24.17 OWNER EVA RODRIGUEZ 52840 AVENIDA I I LA QUINTA CA 92253 (760)774-7460 I I' RODRIGUEZ I I I MINI CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY BSAS SB1473 FEE 101-0000-20306 0 $1.00 $0.00 Total Paid for BUILDING STANDARDS ADMINISTRATION $1.00 $0.00 BSA: PV SYSTEM = ARRAY, 101-0000-42403 0 $24.17 $0.00 FIRST 20 PV SYSTEM - ARRAY, 101-0000-42600 0 $24.17 $0.00 FIRST 20 PC Total Paid for ELECTRICAL: $48.34 $0.00 PERMIT ISSUANCE --T-101-0000-42404 0 $91.85 $0.00 Total Paid for PERMIT ISSUANCE: $91.85 $0.00 INSPECTION ,f 4'1` WNW -0 '?ARENT PROJECTS,q-j. w, 4 1 . '. i'.- Printed: Tuesday, September 29, 2015 8:35:59 AM 2 of 3 cWw'YSTEMS Printed: Tuesday, September 29, 2015 8:35:59 AM 3 of 3 lAff CR SYSTEMS • • INFORMATIONi PATHNAMF SURDIR FTRAKIT ENABLED AY+ srhmant Titno 1, rRFeTrn nWNFR I ATTACHMENTS nFwRIPTION Printed: Tuesday, September 29, 2015 8:35:59 AM 3 of 3 lAff CR SYSTEMS 10'AsolarCity., September 22, 2015 Project/Job # 9224235 RE: Project: To Whom It May Concern, COVER LETTER Rodriguez Residence 52840 Avenida Martinez La Quinta, CA 92253 Version #48.9 CITY OF LA QUINTA BUILDING & SAFETY DEPT. . .APPROVED FOR CONSTRUCTION DATE i P( BY A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was based on site observations and the design criteria listed below: 17 A Design Criteria: - Applicable Codes = 2013 CBC, ASCE 7-10, and 2012 NDS - Risk Category = II - Wind Speed = 110 mph, Exposure Category C - Ground/Roof Snow Load = 0 psf - MPl & MP2: Roof DL = 9 psf, Roof LL = 20 psf On the above referenced project, the components of the structural roof framing impacted by the installation of the PV assembly have been reviewed. After this review it has been determined that the existing structure is adequate to withstand the applicable roof dead load, PV assembly load, and live/snow loads indicated in the design criteria above. The structural roof framing and the new attachments that directly support the gravity loading and wind uplift loading from PV modules have been reviewed and determined to meet or exceed structural strength requirements of the 2013 CBC. Please contact me with any questions or concerns regarding this project. James H. Childs, P.E. Professional Engineer T: 888.765.2489 x58390 email: jchildsl@solarcity.com Digitally signed by James H. Childs, P.E. Date: 2015.09.22 11:19:11 -07'00' 3055 Clearview Way San Mateo, CA 94402 T (650) 638-1028 (888) SOL -CITY F (650) 638-1029 solarcity.com AZ ROC 243771, CA CSLB 888104. M CC 9041, C 1 HIC 0632778. UC Hle: /110148!1, E1q HIS 71101488, PII CT -297Y0, MA HIC 1f+8672, k;0 MMIC 128946. NJ I3VHC61E116rt0. OR CCB 180493. PA 017343,'1 X 7 DI.R 27040, WA GCL SOLA RC'91907. ^ -,013 Sal irC.tp. All nghto,oxfwwl IN o PV System Structural Design Software 09.22.2015 • Version #48.9 PROJECT IN- F -O- R_M_ A -T -1-0-N! &-T-AB-L—E 0--f—CONTENTS _ Project Name: Rodriguez Residence AHJ: La Quinta -Job -Num-ber: 9224235 Building Code: 2013 CBC_ Customer Name:- Rodriguez, Eva -Based On: IRC 2012 /_ IBC 2012 Address: 52840 Avenida Martinez Code: ASCE 7-10 Qty/State: 'La Quinta, CA -ASCE Risk Category-;_ ii - Zip Code 92253 33.6645V - -116.306823 u pgra6 -e 'd? _es __ R_ q_ StamD Reci'd? No Yes Latitude Lonqitude: SC Office: Thousand Palms PV Desiqner: Ryan Duncan Cover Letter I Project Information, Table Of Contents, & Vicinity Map 2 Seismic Considerations 3 Structure Analysis (Loading Summary and Member Check) 4 Hardware Design (PV System Assembly) 5 P GF;W11 1_5'L ..•1t 1 4— J,%Zr--4 I—F;.- s --i ,` _JZ; lzmtni ':- X 1 11 _ e11 1PcEfh r–vi-i! _ I oma -9e y M 52840 Avenida Martinez, La Quinta, CA 92253 Latitude: 33.664527, Longitude: -116.306823, Exposure Category: C [SEISMIC -CONSIDERATIONS. - Seismic sign Criteria(per USGS Seismic Design Code Latitude Area ASCE 7-10 IBC Sect. 3404:4 PV System Weight 33:6645 478 sf1 Longitude Roof -116.3068 W(PV) SRA at Short Period SS _ _ _ _ __ 1.515 USGS SRA at is Period S, 0.600 USGS Soil Site Class Seismic Desi n Category Exterior Walls o Hal ___ _ D _ ,IBC.1613.5.2 SDC D USGS Seismic Check Required (Ss >_ 0.4q & SDC >_ D)? Yes IBC 1613.1 ALTERATION LATERAL DESIGN 10% EXCEPTION CHECK Weight of Proposed PV System Sum Area of MPs with PV Area I Dead Load Weight IBC Sect. 3404:4 PV System Weight 478 sf1 3 psf 1 435lbs Roof Total Weight of PV System W(PV) 1,435 lbs C_e.iling Weight of Roof. on Existing Building Sum Area of MPs with PV Wcrv / W(exist) 1312 sf IBC Sect. 3404:4 Portion of Roof Weight Area Dead Load Weight Roof 1 312 sf 9.0 psf 11,809 lbs C_e.iling 1,312 sf 5.0 psf 6,56 lbs Interior Walls (Top Half) 580 sf 5.0 psf 2,898 lbs Exterior Walls o Hal 580 sf 8.5 psf 4,926 lbs Net Weight of Roof Under PV W(exist) 26,193 lbs Check % Increase of Roof Weight / Seismic Shear Load Increase of DCR of Lateral Force ResistingSystem Wcrv / W(exist) 5.5% Increase Seismic Shear Load < 10% ->[OK] IBC Sect. 3404:4 Note: Seismic base shear is directly proportional to roof weight. STRUCTURE ANALYSIS -LOADING SUMMARY AND MEMBER CHECK - MP1 & MP2 Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) Pg; Ce=0.9, Ct=1.1, I5=1.0 Member Design Summa(per NDS Governing Load Comb CD CL + CL - CF Cr D 0.9 1.00 0.94 1 1.5 1.15 Member Properties Summary Roof Pitch MPI & MP2 Horizontal Member Spans Overhang 1.91 ft Rafter Pro erties Actual W 1.50" Roof System Proerties San 1 8.43 ft Actual D 3.50" Number of Spans (w/o Overhang) 2 San 2 7.29 ft Nominal Yes Roofing Material Comp Roof San 3 Bending - Stress A 5.25 in A2 Re -Roof No San 4 Total Load Deflection S. 3.06 in.^3 Plywood Sheathing Yes San 5 I 5.36 in.^4 Board Sheathing None Total Span 17.63 ft TL DON Limit 120 Vaulted Ceiling No PV 1 Start 4.83 ft Wood Species DF Ceiling Finish 1/2" Gypsum Board PV 1 End 14.50 ft Wood Grade #2 Rafter Sloe 120 PV 2 Start 9 Fb 900 psi Rafter Spacing 24" O.C. PV 2 End F„ 180 psi Top Lat Bracing Full PV 3 Start E 1600000 psi Bot Lat Bracing At Supports PV 3 End Em;n 580000 psi Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) Pg; Ce=0.9, Ct=1.1, I5=1.0 Member Design Summa(per NDS Governing Load Comb CD CL + CL - CF Cr D 0.9 1.00 0.94 1 1.5 1.15 Member Loading mary Roof Pitch 3/12 Initial Pitch Ad'ust Non -PV Areas PV Areas Roof Dead Load DL 9.0 Psf x 1.02 9.2 psf 9.2 psf PV Dead Load PV -DL 9.0 Psf x 1.02 0.26 9.2 psf Roof Live Load RLL 20.0 psf x 1.00 20.0 psf 1397 psi Live/Snow Load LL/SL 1,2 Bending - Stress -943 psi Total Load(Governing LC TL 9.2 psf 1 18.4 psf Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) Pg; Ce=0.9, Ct=1.1, I5=1.0 Member Design Summa(per NDS Governing Load Comb CD CL + CL - CF Cr D 0.9 1.00 0.94 1 1.5 1.15 Member Anal sis Results Summary Maximum Max Demand @ Location Capacitv DCR Load Combo Shear Stress 42 psi 1.9 ft. 162 psi 0.26 D + Lr Bending + Stress 592 psi 5.7 ft. 1397 psi 0.42 D Bending - Stress -943 psi 10.3 ft. -1320 psi 0.71 D Total Load Deflection 0.18 in. 564 5.8 ft. 0.86 in. 120 0.21 D + Lr [CALCULATION OF DESIGN_WINLO ADS = MP1 &'MPI __ _ Mounting Plane Information Roofing Material KZ Comp Roof Table 30.3-1 PV System Type Krt Sola_r_City SleekMoun_tTM Fig. 26.5-1A Spanning Vents V No Exposure.Category Standoff Attachment Hardware C _ _ _ _ _ Como Mount TVDe C Roof Style Roof Slope Gable Roof 120 Mean Roof Height Rafter pacing 15 ft 24" O.C. Framing Type Direction 500 lbs Y -Y Rafters Standoff Demand Ca paci Purlin Spacing X -X Purlins Only NA Tile Reveal Tile Roofs Only NA Tile Attachment System _Tile Roofs Only NA Standing Seam/Trap Spacing SM Seam Only NA Wind Design Criteria Wind Design Code KZ ASCE 7-10 Table 30.3-1 Wind Design Method Krt _ Partially/Fully_ Enclosed Method Fig. 26.5-1A Basic Wind Speed V 110 mph Exposure.Category Importance Factor C _ _ _ _ _ _Section 26.7 _ Roof Style Velocity Pressure Gable Roof Fig. 30.4-2A/B/C-5A/B Mean Roof Height h 15 ft I Section 26.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure KZ 0.85 Table 30.3-1 Topographic Factor Krt _^ _ r' 1.00 _ _Section 26.8 Wind Directionality Factor Kd 0.85 Section 26.6-1 Importance Factor I NA 22 sf Velocity Pressure qh qh = 0.00256 (Kz) (Kzt) (Kd) (VA2) 22.4 pslF Equation 30.3-1 Wind Pressure Ext. Pressure Coefficient U GC -0.88 Fig. 30.4-2A/B/C-SA/B Ext. Pressure Coefficient Down GC W 0.45 Fig; 30.4-2A/B/C-5A/B Design Wind Pressure p p = qh (GC) Equation 30.4-1 Wind Pressure U -19.6 psf Wind Pressure Down 16.0 pslF ALLOWABLE STANDOFF SPACINGS X -Direction Y -Direction Max Allowable Standoff Spacing Mox_Allowable-Cantilever Standoff Configuration Landscape 72" 39" Landscape 24" NA Landscape Not -Staggered Not -Staggered Max%ndoffTributary.Area Trib _ _ _ _ _ 19_sf 22 sf PV Assembly Dead Load W -PV 3.0 psf Net Wind Upliftat_ Sit andoff Uplift Capacity of Standoff T -actual - -194 lbs T -allow 500 lbs 500 lbs Standoff Demand Ca paci DCR 38.9% 43.5% X -Direction Y -Direction Max Allowable Standoff Spacing Portrait 48" 65" Max -Allowable, Standoff Confi uration Portrait_ 20'_ _NA` Portrait Not -Staggered Max Standoff Tributary Area PV Assembly Dead Load Trib 22 sf W -PV 3.0 psf Net Wind Uplift at Standoff T -actual -_218 lbs Uplift Capacity of Standoff T -allow 500 lbs Standoff gn—d—/capacity aci^^DCR 43.5% AHJ: La Quinta UTILITY: Imperial Irrigation District CONFIDENTIAL — THE INFORMATION HEREIN ABBREVIATIONS . ELECTRICAL NOTES A AMPERE 1. THIS SYSTEM IS GRID—INTERTIED VIA A AC ALTERNATING CURRENT UL—LISTED POWER—CONDITIONING INVERTER. BLDG BUILDING 2. ' THIS SYSTEM .HAS N0' BATTERIES, NO UPS. . CONC CONCRETE 3. A NATIONALLY—RECOGNIZED TESTING DC - DIRECT CURRENT LABORATORY SHALL LIST ALL EQUIPMENT IN EGC EQUIPMENT GROUNDING CONDUCTOR COMPLIANCE WITH ART. 110.3. (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET—BACK A SIGN WILL BE PROVIDED WARNING OF THE GALV GALVANIZED HAZARDS PER ART. 690.17. GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY HDG HOT DIPPED GALVANIZED PHASE AND SYSTEM PER ART. 210.5. 1 CURRENT 6. CIRCUITS OVER 250V TO GROUND SHALL Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(B). Isc SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER kVA KILOVOLT AMPERE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL—LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED. GROUNDING P01 POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT LICENSE GENERAL NOTES CA # 888104 1. ALL WORK TO BE DONE TO THE 2013 C-10 CALIFORNIA BUILDING CODE AND THE 2013 CALIFORNIA RESIDENTIAL CODE. 2. ALL ELECTRICAL WORK SHALL COMPLY WITH " THE 2011 NATIONAL ELECTRIC CODE AS AMENDED BY THE 2013 CALIFORNIA ELECTRIC CODE. MODULE GROUNDING METHOD: ZEP SOLAR AHJ: La Quinta UTILITY: Imperial Irrigation District CONFIDENTIAL — THE INFORMATION HEREIN JOB NUMBER JB -9224235 0 0 CONTAINED SHALL NOT BE USED FOR THE DN: cn=Luis BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C PART TO OTHERS OUTSIDE THE RECIPIENT'S a7 uinta.org, ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE MODULES (27 KYOCERA # KU2656ZPA SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTTR PERMISSION OF SOLARCITY INC. ABB # PVI-5000—OUTD—US—Z—A JURISDICTION NOTES ALL CONSTRUCTION SHALL COMPLY WITH THE 2013 CALIFORKIA BUILDING, RESIDENTIAL, MECHANICAL, ELECTRICAL, PLUMBING, ENERGY, AND GREEN BUILDING CODES AND THE LA QUINTA MUNICIPAL CODE RODRIGUEZ, EVA E. 52840 AVENIDA MARTINEZ LA QUINTA, CA 92253 (760) 774-7460 Digitally signed VICINITY MAP RODRIGUEZ RESIDENCE 7.155 KW PV ARRAY PAGE NAME-- COVER AMECOVER SHEET INDEX PV1 COVER SHEET PV2 SITE PLAN PV3 STRUCTURAL VIEWS PV4 THREE LINE. DIAGRAM PV5 THREE LINE DIAGRAM PV6 ELECTRICAL CALCULATIONS Cutsheets Attached REV by Luis Uribe COMMENTS DN: cn=Luis CITY OF LA QUINTA Uribe, o, ou., eL%DaQas*rraEn APPROVED email=luribe@I '"10"x""' a7 uinta.org, TCONL 12/20/15 MPU depicted in TLD Date: 2015.12.29 DOGN: 08:05:08 -08'00' VICINITY MAP RODRIGUEZ RESIDENCE 7.155 KW PV ARRAY PAGE NAME-- COVER AMECOVER SHEET INDEX PV1 COVER SHEET PV2 SITE PLAN PV3 STRUCTURAL VIEWS PV4 THREE LINE. DIAGRAM PV5 THREE LINE DIAGRAM PV6 ELECTRICAL CALCULATIONS Cutsheets Attached REV BY DATE COMMENTS REV A NAME DATE COMMENTS REV A RDUN 9/16/15 TLD UPDATED REV C TCONL 12/20/15 MPU depicted in TLD DOGN: Ryan Duncan i,.SolarCity. Rvn rti 3055 geonAew Way San Mateo, CA 94402 SHEET: REV: DATE PV 1 C 12/20/2015 T:(650) 638-1028 F:(650) 638-1029 (888)—SOL—CITY (765-2 89) www.solaraitycom Digitally signed by James H. Childs,P.E. Date: 2015.12.21 19:28:00 08'.00' TRANSFORMER INFORMATION: KVA PHASE HIGH KV LOW 120/240V –METER#: 1 NF093015944 "PROPOSED 81–DIRECTIONAL METER# – AC DISCONNECT: DG221URB 30A CUTLER–HAMMER DISCONNECT 5FT FROM MAIN PANEL – INVERTER: ABB PVI-5000–OUTD–US–Z–A 5kW . s ' i E) DRIVEWAY CONFIDENTIAL — THE INFORMATION HEREIN JOB NUMBER: JB -9224235 00 CONTAINED MALL NOT BE USED FOR THE LEGEND BENEFIT OF. ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSIEN: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE MWJLES: (27) KYOCERA # KU2656ZPA SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF SOLARCITY INC. ABB # PVI-50007-OUTD–US–Z–A PITCH: 12 ARRAY PITCH: 12 MP1 AZIMUTH: 90 ARRAY AZIMUTH: 90 MATERIAL: Comp Shingle STORY: 1 S1 PITCH: 12 ARRAY PITCH: 12 MP2 AZIMUTH: 270. ARRAY AZIMUTH:270 MATERIAL: Comp Shingle STORY: 1 S1 2 WIRES, 22kAiC 0. STANDOFF LOCATIONS Digitally Signed EXISTING BI DIRECTIONAL CONDUIT RUN ON EXTERIOR METER 1NF093015944 --- CONDUIT RUN ON INTERIOR t by LUIS'Uribe — GATE/FENCE Did' =Luis O HEAT PRODUCING VENTS ARE RED CITY OF LA QUINTA . `' DN-,, =Luis o,ou, I INTERIOR EQUIPMENT IS DASHED. U , APPROVED\= FOR 0Q1"" email=luribe@la V, - SITE PLAN gainta or c_US Scale: 1/8" = 1' w E Date: 2015:12.29 0 1' 8' 16' 08:05:26 -08'00' s PREMISE OYNER: DESCRIPTION: DESIGN: RODRIGUEZ, EVA E. RODRIGUEZ RESIDENCE Ryan Duncan dar'City 52840 AVENIDA MARTINEZ 7.155 KW PV ARRAY LA QUINTA, CA 92253' 3055 ate. Way PAGE NAME SHS' REV: DATE Son T. (650) 638 Mate CA 9"02 638-1029 (760) 774-7460 SITE PLAN PV 2 C 12/20/2015 (888)-SOL-CITY(765-2489) www.solarcity.com LEGEND (E) UTILITY METER & WARNING LABEL AINVERTER Inv W/ INTEGRATED DC DISCO & WARNING LABELS co <e {n c OC. DC DISCONNECT & WARNING LABELS O O AC © AC DISCONNECT & WARNING LABELS ACQ DC- JUNCTION/COMBINER BOX & LABELS QD PANEL DISTRIBUTION & LABELS 3' FSB lnv Lc LOAD CENTER & WARNING LABELS O DEDICATED PV SYSTEM METER 200A 240V SINGLE PHASE 2 WIRES, 22kAiC 0. STANDOFF LOCATIONS Digitally Signed EXISTING BI DIRECTIONAL CONDUIT RUN ON EXTERIOR METER 1NF093015944 --- CONDUIT RUN ON INTERIOR t by LUIS'Uribe — GATE/FENCE Did' =Luis O HEAT PRODUCING VENTS ARE RED CITY OF LA QUINTA . `' DN-,, =Luis o,ou, I INTERIOR EQUIPMENT IS DASHED. U , APPROVED\= FOR 0Q1"" email=luribe@la V, - SITE PLAN gainta or c_US Scale: 1/8" = 1' w E Date: 2015:12.29 0 1' 8' 16' 08:05:26 -08'00' s PREMISE OYNER: DESCRIPTION: DESIGN: RODRIGUEZ, EVA E. RODRIGUEZ RESIDENCE Ryan Duncan dar'City 52840 AVENIDA MARTINEZ 7.155 KW PV ARRAY LA QUINTA, CA 92253' 3055 ate. Way PAGE NAME SHS' REV: DATE Son T. (650) 638 Mate CA 9"02 638-1029 (760) 774-7460 SITE PLAN PV 2 C 12/20/2015 (888)-SOL-CITY(765-2489) www.solarcity.com SIDE VIEW OF MP1 NTS MP1 X -SPACING X -CANTILEVER Y -SPACING Y -CANTILEVER - NOTES LANDSCAPE 72" 2411- 4"PORTRAIT INSTALLATION ORDER Min & FENDER WASHERS PORTRAIT. 48" 20" THE SALE AND USE OF THE RESPECTIVE TOP CHORD 2X4 @ 24° OC BOT CHORD 2X4 @24" OC ROOF AZI 90 PITCH 12 STORIES: 1 ARRAY AZI 90 PITCH 12 Comp Shingle (E) 2x4 s, (E) 2x 3'-11" 8'-5" 7'-3" (E) LBW SIDE VIEW. OF MP2 NTS B MP2:X-SPACING PV MODULE X -CANTILEVER: Y -SPACING -Y-CANTILEVER; NOTES LANDSCAPE 72" '2411- 4"PORTRAIT INSTALLATION ORDER Min & FENDER WASHERS PORTRAIT 48" 20° THE SALE AND USE OF THE RESPECTIVE TOP CHORD 2X4 @ 24" OC- BOT CHORD.2X4 @24" OC ROOF AZI 270 PITCH 12 ARRAY AZI 270 PITCH 12 STORIES: 1 Comp Shingle CONFIDENTIAL -THE INFORMATION HERON CONTAINED SHALL NOT BE USED FOR THE PV MODULE r'¢""` °""`A RODRIGUEZ, EVA E. RODRIGUEZ RESIDENCE Ryan Duncan BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN NMOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS 5/16" BOLT WITH LOCK ` ,,;Solar-City. INSTALLATION ORDER Min & FENDER WASHERS ORGANIZATION, EXCEPT IN CONNECTION WITH LOCATE RAFTER, MARK HOLE THE SALE AND USE OF THE RESPECTIVE ZEP LEVELING FOOT PAGE NAYS (1) LOCATION, AND DRILL PILOT '"` ABBBB PVI-5000-OUTD-US-Z-A ZEP ARRAY SKIRT (6) T.(650) 638-1028 F:(650)638-1029 (866)—SOL—CITY (765-2489) www.solarcity.com HOLE. (4) (2) SEAL PILOT HOLE WITH POLYURETHANE SEALANT. ZEP COMP MOUNT C ZEP FLASHING C (3) (3) INSERT FLASHING. (E) COMP. SHINGLE (4) PLACE MOUNT. (E) ROOF DECKING (2) (5) INSTALL LAG BOLT WITH 5/16° DIA STAINLESS_//. (5) SANG WNSHER. STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES (6) INSTALL LEVELING FOOT.WITH WITH SEALING WASHER POLY & WASHERS. (2-1/2' EMBED, MiN) / . - (E) RAFTER J 1 STANDOFF S1 Scale: 1 1/2".= 1' CONFIDENTIAL -THE INFORMATION HERON CONTAINED SHALL NOT BE USED FOR THE JOB NUYBFR J B-9224235 00 r'¢""` °""`A RODRIGUEZ, EVA E. RODRIGUEZ RESIDENCE Ryan Duncan BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN NMOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS 52840 AVENIDA MARTINEZ 7.155 KW PV ARRAYC rt LA QUINTA, CA 92253 ` ,,;Solar-City. MOUNTING SYSTEM: Comp Mount Type C Min MODULES ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE 27 KYOCERA KU2656ZPA PAGE NAYS way on Mateo, CA 94402 SHEET: REV DATE '"` ABBBB PVI-5000-OUTD-US-Z-A SOLARCITY EQUIPMENT, VATHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. (760) 774-7460 STRUCTURAL VIEWS PV 3 C 12/20/2015 T.(650) 638-1028 F:(650)638-1029 (866)—SOL—CITY (765-2489) www.solarcity.com GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE OND N GEC TO E UFER AT PANEL () #6 () ' WITH IRREVERSIBLE CRIMP Panel Number. MpU Meter Number: IID-184SR-149185 Inv 1: DC Ungrounded INV 1 -(I)ABB PVI-5000-OUTD-US-Z-A LABEL: A FCI Inverter, Zigbee 5000W,. 240V, 96.5% — (27) KYOCERA KU2656ZPA PV Modure; 265W, 238.1W PTC, 40MM, Blk Frm, H4, ZEP, 1000V, Blk Cell, CA 888104 ic, Backbar C-10' INV 2 Overhead Service Entrance Voc: 38.3 Vpmax: 31 , INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER (N 200A MAIN SERVICE PANEL N; 20DA/2P MAIN CIRCUIT BREAKER CUTLER -HAMMER 200A/2P Disconnect (E) LOADS B • • 30A/2P- JA - - - - - _ _ ADJUST MIN. ACTIVATION VOLTAGES! Inverter 1 IND 5 ABB PVI-5000-OUTD-US-Z-A 2404 r------ - L1 + 1 N DG 1 EGG DC+ -- - GEC --. TN UG GND -- EGC--- --- ------ solarC ty 4 A 1 Dc« Vstart = 2004 DG MP 2: 1x13 EGC ------------ -- ---- -- --------------------J 2 DC+ Vstart = 200V 3 G C* G ------------ --4- .--- GC ------------------ ' Conduit'Kit:.3/4' EMT. - - _ EGCIGEC •_ J z - - - GEC Digitally signed TO 120/240v . by Luis Uribe SINGLE PHASE UTILITY SERVICE ; ' 1 CITY OF LA OUINTA DN: cn=Luis BUMN°'SVV'aEn [Uribe, o, ou, APPROVED 1 Fptp0N31i1Cf0N : email-luribe@la- age - wnta,or. - I Date: 2015:1.2.29 PHOTOVOLTAIC SYSTEM CONDUCTORS SHALL BE IDENTIFIED AND GROUPED. THE MEANS OF IDENTIFICATION SHALLBE PERMITTED BY SEPARATE COLOR CODING, MARKING TAPE, TAGGING, OR OTHER APPROVED MEANS. THE MEANS OF GROUPING SHALL BE WIRE TIES OR SIMILAR MEANS AT LEAST 08:05:41 -0800' /f ONCE, AND THEN AT INTERVALS NOT TO EXCEED SIX (6) FEET. PHOTOVOLTAIC EQUIPMENT AND SYSTEMS AND ALL ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE INSTALLED ONLY BY QUALIFIED PERSONS CONDUCTOR SIZING IS CALCULATED IN ACCORDANCE WITH NEC 690.8(A)(1)-(4) & (B)(2)(B)• Voc* = MAX VOC AT MIN TEMP OI (1)CUTLER-HAMM / BR230 PV BACKFEID BREAKER Breaker, 30A 2P,.2 Spaces B 0 )CUTLER -HAMMER / DG221UR8 Disconnect; 30A,,240Vac, Nan -Fusible, NEMA 3R.. - (U) CUTi ERAMMER ! DG030NB Ground eutral Kit 30A; General Duty (DG) /r, C A A (1) SdarCiII 4 STRING JUNCTION BOX DC 2x2 STRINGS, UNFUSED, (MOUNDED - (6) Shoals STG.ILF.I5.MC4 Inline fuse and holder, 15A, MC4, Unserviceable, Wtherproof - O (1)AWG /10, THWN-2, Blade (1)AWG /10, THWN-2, Red F 1 t AMC f'6; THWd1-2; Black Voc* - = 301.88 VDC t - S ) (1) AWG #6, THWN-2, Red Vmp = 217 VDC Isc = 16.52 OTIC Imp= 17.1 ADC Z'_ jA6Z -x'18, FV -Wire, 60OV, Blade O I (1)AWG /10, Solid Bare Copper EGC Voc* = 560.64VDC Isc=.9.2ti ACC Vmp = 403 VDC Imp= 8.55 ADC • • , , , 4 (1) AWG j10, THNN-2. White NEUTRAL Vmp = 240 VAC' Imp= 23 , .-(1 )AWG 16,.1H_WN-2,; Preen • , EGC/GEC.-(1)Conduit. Kit , 3/4'.EMT.. , AAC . i • .. , ... J II. 0 ) AWG /I,O, THHN/THWN-2,. Gree. EGC ............. (1)AWG /10, THWN-2, Blade Voc* = 560.64VDC ® (1)AWG /10, THNN-2, Red Vmp = 403 VDC (1) AWG /t0; THHN/1HWN-2 . Gree. EGC ... . ......................... Isc = 9.26 ADC Imp= 8.55 ADC LJ (4)AWG /10, P1l %ir e, 6004, Blade O" (1)AWG /10, Solid Bare Copper EGC ................................................................ Voc* '= 301.88 VDC Isc = 9.26 ADC Vmp = 217 VDC Imp= 8.55 ADC CONFIDENTIAL -THE INFORMATION HEREIN CON CONTAINED MALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND u of THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. JOB NUMBER:\\ JB-9224235 0 0 PROMISE 0N' ` DESCRIPTION: RODRIGUEZ, EVA E. RODRIGUEZ RESIDENCE 52840 AVENIDA MARTINEZ 7.155 KW PV ARRAY LA OUINTACA 92253 , PACE NAME: (760) 774-7460 THREE LINE DIAGRAM DESIGN: Ryan Duncan Vii, ';;;So arCity. MOUNTING SYSTEM: Comp Mount Type C - ' Molx>LEs 27 KYOCERA # KU2656ZPA 3055 aeorNeN Way Sar, Mateo, CA 9„02 T.(050) 638-1028 F:(650) 638-1029 (666)-SOL-aTY (765-2489) w".sdarcity.aam SHEET: DATE PV 4 C 12/20/2015 ABB PVI-S000—ouTD-us—z—a, C3- (2) AWG #8, THWN-2 (1) AWG #10, THWN-2 (1 ) AWG #10, THWN-2; Green, EGC -0 ) AWG #6, Solid Bare Copper • Vmp 240 VAC • Imp` . = 25 AAC 2 (1) AWG #6, THWN-2 (.6) AWG #10, PV—WIRE, Black (1) AWG #6, THWN-2 (1) AWG #10, Solid Bare Copper EGC (I)AWG.-#10, . THINK Green EGr CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLAROTY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, SOLAR, WITHOUT THE WRITTEN SO PERMISSION PERMISSION OF SOLARCITY INC. JOB NUMBER: JB -9224235 0 0 ELECTRICAL ONE LINE DIAGRAM ut tr: Ryan Duncan EXISTING ELECTRICAL SERVICE ENTRANCE MOUNTING SYSTEM: Comp Mount Type C MDou Es (27) KYOCERA # KU2656ZPA AND NEW LOAD CENTER , DAA PV 5 C- 12/20/2015 INVERTER: ABB # PVI-5000—OUTD—US—Z-A 200A' 240V 10 200A MAIN BREAKER 200A/2P o PHOTOVOLTAIC SYSTEM UTILITY . 3710 WATT DISCONNECT SWITCH PHOTOVOLTAIC CUTLER HAMMER # DG222UR8 - r — ARRAY #1 60A, 240VAC .. o 14 Modules AC ------.- ---- ----- - " -- -- DC 3445 WATT . 5000 WATT UTILITY INTERACTIVE INVERTER PHOTOVOLTAIC 90 TO 600 VDC TO 1.20 /240 VAC.10 ARRAY #2. ABB # PVI 5000 13 Modules ---- ---J C3- (2) AWG #8, THWN-2 (1) AWG #10, THWN-2 (1 ) AWG #10, THWN-2; Green, EGC -0 ) AWG #6, Solid Bare Copper • Vmp 240 VAC • Imp` . = 25 AAC 2 (1) AWG #6, THWN-2 (.6) AWG #10, PV—WIRE, Black (1) AWG #6, THWN-2 (1) AWG #10, Solid Bare Copper EGC (I)AWG.-#10, . THINK Green EGr CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLAROTY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, SOLAR, WITHOUT THE WRITTEN SO PERMISSION PERMISSION OF SOLARCITY INC. JOB NUMBER: JB -9224235 0 0 rni■ix vnnuc: uwuariivn: RODRIGUEZ, EVA E. RODRIGUEZ RESIDENCE 52840 AVENIDA MARTINEZ 7.155 KW PV ARRAY LA 'QUINTA CA 92253. PAGE.NAME: (760) 774-7460 THREE LINE DIAGRAM ut tr: Ryan Duncan ' hl c ■ ,,,`CO ar '}" J 1. r® MOUNTING SYSTEM: Comp Mount Type C MDou Es (27) KYOCERA # KU2656ZPA 3055 qea. Way San Mateo, CA 9„02 T:(650) 636-1028 F:(650) 638-1029 (888)—SOL-aTY(765-2489) www.solaeltr.con , DAA PV 5 C- 12/20/2015 INVERTER: ABB # PVI-5000—OUTD—US—Z-A ELECTRICAL CALCULATIONS . Digitally'si ned . 9 t by LUIS U rl be. DN: Cn _ Uri be, O, O U, CIN OF LA OUINTA ' BUIIDtWf3 NASAFE7Y DEPT _ e ril all = l u r l b e@ l a APPROVED P \ -qu i nta.org, ~1` _ C -U -S Date: '`- 0 .2015.12.29 08:05:59 -08[00[ Module: Inverter 1: Module: Inverter 2: 27 Kyocera 265W 1000V 238.1 Inv Power WPTC Voltage Drop Calculations Version 5.8.0 Vdrop = lm 2Length) ' Resistance' / Vmp) IMP A Max. Length ft Wire String: 1 8.55 1 35 1 AWG #10 at Max Ave Hi: 109 deg F Vdrop = 8.55 70.- 0.00124 Ohms /. 339.53 0.22 Branch: 8.55 50 AWG #10 at Max Ave Hi: 109 deg F Vdrop = (8.55 100 0.00124 Ohms) / 403 0.31 Total volts a dro in DC conductors = 0.53 Inverter: F 23 15 AWG #10 1 at 240V Vdrop = (23 30 0.00124 Ohms •/ 240 V 0.13 Combinedi at 240V Vdrop.= Ohms) ! 240 V Total voltage drop in AC conductors = 0.13 Total voltage drop in AC and DC conductors = 1 ABB PVI -5000-S AFCI 0.96 5000 6203.7 Kyocera 265W 1000V 238.1 Module: Kyocera 265W 1000V 238.1' Inverter 3: Module: Inverter 4: Kyocera 265W 1000V 238.1 Total: 27 _ Modules Total Inv Pwr. 5000 16203.7 PTC Photovoltaic Module Electrical Specifications: Total STC:j 7155 Voc: 38.3 V deg F deg C Vmp: 31 V Record Low Temp: 14 -10 Isc: .9.26. A Max Average Hi Temp: 109 43 Imp: 8.55 A Record Hi Temp: Tvoc:. -0.14 V/deg C Tisc: ,. 5.56 mA/deg C String Type A and 2 Combined Strings Type A Voc Correction Method: Voc correction Factor: ABB PVI-5000-S AFCI Inverter Min Vdc Input: 13 Kyocera 265W 1000V Min Vmp at Max Temp: Voc= 497.9 Max Voc at Min Temp: Vmp= 403 Isc= 9.26 Inverter Max Vd lnput: Max StringSize: Imp= 8.55 1 -way wire length: 'Icont= -11,58 Art 690.8(A)(1) Manuf Noc Data Branch Circuit Type A t, way_wire length: 50 2 strings per branch 1 1 strings per branch 2 7 modules per series string 13 modules per series string Voc- 268.1 V Voc- 497.9 V Vmp= 217 V Vmp= 403 V Isc= 18.52 A Isc= 9.26 A Imp= 17.1 A Imp= 8.55' A p= P- Icont= 23.15 A Icont= 11.58 A Art 690.8(A)(1) 130 339.53 560.64 600 13 50 I.a . Conductor: AWG #10 PV Wire Icont ' 1.25 = (Amps) 14.47 30 deg C ampacity = 40 2.a Conductor 1: AWG #6 Conductor 2: AWG #10 Icont.' 1.25 = (Amps) 30 deg C ampacity = Conductor 1 Conductor 2 28.94 14.47 75 40 1.b (cont= (Amps) Start ampacity Temperature derate (%=F) Conduit fill Berate (%_#) Derated ampacity . 11.58 40 0.41 1 16.4 2.b lcont= (Amps) Start ampacity Temperature derate (%=F) Conduit fill derate (%mak) Derated ampacity 23.15 11'.58 1 F 75 40 0.41 0.41 0.8 0.8 t.c 'Icont' 1.25 = (Amps) 14.47 Ampacity 40 24.6 13.12 2.c Term 1 Term 2 Temp table 90 °C:Ta ®0fI1 1)gp.15(B)(16) Icont'1,.25= (Amps) 28.94 14.47 Ampacity 75 40 1.d Icont' 1.25 = (Amps) OCP Size = 14.47 15 Inverter Type A Outpuf ABB PVI -5000-S AFCI 1 way wire length: 15 ft (cont = 23 A Art 690.8(A)(1) 2.d OCP Size 1 301 15 Combined Inverter Output Service Voltage= Total Inverter Power= 1 way wire length= 15 Icont = # of inverters*max inverter current Art 690.8(A)(1) (cont = (Amps) 3.a lcont' 1.25 = (Amps) OCP Size= 28.75 Art 690.8(B)(1) Art 240.6(A) 30 3.b Conductor: -AWG #10 Icont' 1.25 = (Amps) 30 deg C ampacity = THWN-2 at 90 deg C: Table 310.16 28.75 40 4.a Icont'1.25 = (Amps) OCP size = 28.75 Art 690.8(B)(1) Art 240.6(A) 301 4.b Conductor: JAWG #10 Icont * 1.25 = (Amps) 30 deg C ampacity =' THWN-2 at 90 deg. C: Table 310.16 28.75 40 3.c. Icon! _ (Amps) Start ampacity -Temperature derate (%=F) Conduit fill derate (%_#) Derated ampacity 23 40 0.82 4.c Icont = (Amps) Start ampacity. Temperature derate (%=F) Conduit fill derate (%=#) Derated ampacity 23 1 40 1 32.8 0.82 3.d Icont * 1.25 = (Amps) 28.75 Ampacity35 1 32.8 4.d . (cont * 1.25 = (Amps) Ampacity 28.75 35 CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH . THE SALE AND USE OF THE RESPECTIVE PERRMISSoN OFlSOL ARCI1Y WITHOUT THE WRITTEN JOB NUMBER: J B-9 2 2 42 3 5 0 0 PREMISE OMNER: RODRIGU.EZ, EVA E. 52840 AVENIDA MARTINEZ LA QUINTA, CA .92253 760 774-7460 ( ) DESCRIPTION: RODRIGUEZ RESIDENCE 7.155 KW PV ARRAY PACE NAME: ELECTRICAL CALCULATIONS DESIM. Ryan Duncan \\\ ';AI ;;So a City MOUNTING SYSTEI Com Mount Type C - 1`' ' MaDII - (27 KYOCERA # KU2656ZPA per, y Son Mateo, CA 94402 (888j SOL aTTY ('i65-24489) www.sdarcity.com SHEET: REV: DATE PV 6 C 12/20/2015 INVERTER: ABB PVI-5000-OUTD-US-Z-A ARNING: PHOTOVOLTAIC POWER SOURCE ' PV SYSTEM WARNING • • - DISCONNECT FOR •' _ UTILITY OPERATION - 1111rTHE CTRIC SHOCK HAZARD • C CONDUCTORS OF THIS OVOLTAIC SYSTEM ARE • • PHOTOVOLTAIC DC MAY BE ENERGIZED DISCONNECT ••" •• WARNING ELECTRIC SHOCK HAZARD • • • - • DO NOT TOUCH TERMINALS MAXIMUM POWER- TERMINALS ON BOTH LINE AND POINT CURRENT (Imp)®A • _ LOAD SIDES MAY BE ENERGIZED MAXIA9UM POWER- IN THE OPEN POSITION POINT VOLTAGE (Vmp) = V MAXIMUM SYSTEMV VOLTAGE (Voc) SHORT-CIRCUIT®A CURRENT (Isc) .. - . • WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE WARNING THIS OVERCURRENT • DEVICE ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS • • TERN41NALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION . • _ • • • • • DC VOLTAGE IS PHOTOVOLTAIC POINT OF • • 1 . • ALWAYS PRESENT WHEN INTERCONNECTION • _ • • SOLAR MODULES ARE WARNING: ELECTRIC SHOCK '' ® • • EXPOSED TO SUNLIGHT HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDE MAYBE ENERGIZED IN THE OPEN POSITION. FOR SERVICE _ • DE -ENERGIZE BOTH SOURCE ' • WARNING AND MAIN BREAKER. Pt: POWER SOURCE •- •• MAXIMUM ACA i • • a i all ELECTRIC SHOCK HAZARD • . OPERATING CURRENT - IF AGROUND FAULT IS INDICATED NORMALLY GROUNDED OPERATINGG VOLTAGE ft1OLA AC TAGE - V CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED PHOTOVOLTAIC AC_ PHOTOVOLTAIC SYSTEM r • DISCONNECT • • CIRCUIT IS BACKFED • • •' ' ' • MAXIMUM AC =A • • CAUTION ' • •. • OPERATING CURRENT • - . • - DUAL POWER SOURCE • • - MAXIMUM AC• . SECOND SOURCE IS _ OPERATING VOLTAGE ®V PHOTOVOLTAIC SYSTEM • • • • • • 1' 1 1' / 1 1 1 /•3055 Clearview Way .1 i munj paw San Mateo, CA 94402 F:(650)63871029 (888) -SOL -CITY (765-2489) www.solarcity.com FEN ml1 7 1 7 V.1 / • •'•