Loading...
BSOL2014-005478-495 CALLE TAMPICO / D LA QUINTA, CALIFORNIA 92253 COMMUNITY DEVELOPMENT DEPARTD - , BIJILDING PERMIT . Application Number: BSOL2014-0054 Property Address: 52816 AVENIDA MENDOZA APN: 773333004 Application Description: 5.865kW PV SYSTEM - (23) 255W PANELS/(1) INVERTER Property Zoning: Application Valuation: $12,961.00 Applicant: SOLARCITY CORPORATION 3055 CLEARVIEW WAY ATTN ZOE STEELE SAN MATEO,CA 94402 F SNS 14 2015 Owne � L'F I A 52816 A LA QUINTA, CA 92253 Contractor: SOLARCITY CORPORATION 3055 CLEARVIEW WAY ATTN ZOE STEELE SAN MATEO, CA 94402. (650)963-5630 Llc. No.: 888104 VOICE (760) 777-7125 FAX (760) 777-7011 MN5 (760) 777-7153 Date: 1/14/2015 LICENSED CONTRACTOR'S DECLARATIONWORKER'S COMPENSATION DECLARATION I hereby affirm under p6alty of perjury that I am licensed under provisions of Chapter 911 I hereby affirm under penalty of perjury one of the following declarations: (commencing with Section 7000) of Division 3 of the Business and Professions Code, and _ I have and will maintain a certificate of consent to self -insure for workers' my License is in full force and effect. compensation, as provided for by Section 3700 of the Labor Code, for the performance of License Class- C46 B C10 A License No.: 888104 the work for which this permit is issued. _ I have and will maintain workers' compensation insurance, as required by Date: Z17:ractor: C,4,A v0 Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and polity number are: OWNER -BUILDER DECLARATION Carrier: _ Policy Number: I hereby affirm under penalty of perjury that I am exempt from the Contractor's State _ I certify that in the performance of the work for which this permit is issued, I License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any shall not employ any person in any manner so as to become subject to the workers' city or county that requires a permit to construct, alter, improve, demolish', or repair any compensation laws of California, and agree that, if I should become subject to the structure, prior to its issuance, also requires the applicant for the permit to file a signed workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith statement that he or she is licensed pursuant to the provisions of the Contractor's State comply with those ovisions. License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged Date: Applicant:° exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, (� I, as owner of the property, or my employees with wages as their sole AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE compensation, will do the work, and the structure is not intended or offered for sale. HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF -THE LABOR CODE, apply to an owner of property who builds or improves thereon, and who does the work INTEREST, AND ATTORNEY'S FEES. himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold APPLICANT' ACKNOWLEDGEMENT within one year of completion, the owner -builder will have the burden of proving that he IMPORTANT: Application is hereby made to the Building Official for a permit subject to ' or she did not build or improve for the purpose of sale.). the conditions and restrictions set forth on this application. (� I, as owner of the property, am exclusively contracting with licensed contractors to 1. Each person upon whose behalf this application is made, each person at whose construct the project. (Sec. 7044, Business and Professions Code: The Contractors' State request and for whose benefit work is performed under or pursuant to any permit issued License Law does not apply to an owner of property who builds or improves thereon, and as a result of this application ; the'owner, and the applicant; each agrees to; and shall who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and State License Law.). employees for any act or omission related to the work being performed under or (� I am exempt under Sec. B.&P.C. for this reason following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced,within 180 days from date of issuance of such permit, or cessation of work Date: Owner: for 180 days will subject permit to cancellation. . CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is correct. I hereby affirm under penalty of perjury that there is a construction lending agency for I agree to comply with all city and county ordinances and state laws relating to building the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). construction, and hereby authorize representatives of this city to enter upon the above- mentioned grope ty for inspection purposes. -lender's.Name: Date: ( Signature (Applicant or Age 4l Lender's Address: OR Total Paid forBUILDING STANDARDS ADMINISTRATION -BSA ` $1:00 $1.00 Total Paid for ELECTRICAL: $48:34 $48.34 Y- M FA 1/14/15 nr 1 `r �= N� i-� - gar' t�'.. t• 1 .�. _r .i rAAr we: ... .� _nl .i?v 9,_ .d ,... F. _. ..... .x '. Y':'F a--3, C�X +<;::r .x ;:--,_r. ..• Ki..' ca,. .t h{'P.'S£ .^41 !e>.!. .F .T 'L�t. ;`.�. ,, .,t'i...,✓ kF'..F, ..: ,.. » F d i rn n.t. _'ie^?f.,x.i �% :>..t>;Y ,_..x 4`>tL . vn ',. .• s-, ., ,. ,,,,,rt,y�i ,,,,,.._ x. _.. :x -.As^. __-..,.,n,::r- �:, �, �i45.'.- ,.,. ._..�E,6-x.-._. ._ .... � rr .,vu, !..4 e ,. _ .7 . ,!••g•"N.e,, x..rt... _R.,. ILf3`.... a .7''� :,. i•- 4^: n ., i. �. v, .iTt'> , i ^>.f.n vi , rrF , .: ,: ... ,t�' i., „,3:.:.rxt,.. ,x•�. �„a:. `+p,..F �'f .r1 4.� �'i,E.�"?='x �7 „'3_, i..., r.>.. S�?E �.,F., ,., r ..,.. s,., .__ .. _ _ ., ..,.. , k , , r z ,viY ! ,. , a , „ x ,. ,! d,l. i .,i �,n� i , . ,.. ,_r - .�,,a, n is" ,= F, . •.,y:w �+�4 , z , i. _ '.x. •ADD1710NAL>SITESfi`�^� � d .� nr..wla,.i.,7 .�..n,ei. e_ M ,.<.: .,. rv'•,..rwa na _7" _ .3An ,F": .w"yy'- :I '+�. .,:L.�i,,, U >. .Y:',"- .,. .A.. ,.5.... ._, w , +': f....tw,. .; {w''?'i'ter7.a v.,.�?2 ,.s .+l .-S. '9T.r _ ..'t, 1y,_y'-. na _... ., ^ .., ., G . . , ._. , r?'S . , _M G7.... _,.,. ndri,,,-,.,moi ., kc '"rh 1F[ ',r,. ...1 ' . w,F1u',1 nnn, .. ., sa _..!?.,_. .... ,,_.. ✓<. :. , ... .F.. ',.Ya . a.' ,_h! ., ,., `Y i- Z ): 4i' ,,.,,, .. .". ,,.« a. .xis : }.6.:•. .. ..f a, i L ,.,, ,u.A.. d,,,i'_,'m, ... .. > ,.., ;;;....,,�.,- _,.- .. _ ,.. .,. , m. ,<. ' 1i., ..,.... .'cif, '41 .H „ ,x L , , . >. _ ,.f,.z. .. ,« ,. _r _,.:,:l:A = .... , s .,.. x. . # Va.,....L_ .:' ,+._ 4...:xi, _ii ,.., r ._.-..,._.. ..1 , 1 rs d , Fes,.,. F .. ., ... .,._ :,,r_,i,3,F,.,...:.rX., ..,.. .,L d. cl tir rr,r ,l ,,,,,,, .,, ,1 'i .R ... ,_,i�'^.« •iF,•.., ,'-„a'E=” .._ ...n:�IaA. "� � _ ,�" E..a .. .._..... ,,.,..,.: «._.'_t1.. >. _, .- .r �i4[d ."� .. ,�;'-. rt.. ». " i'f �v_ ..v, f. '�. .,�,. .. ,4C . „�?n.... ..�. .. .. >.. :. P. ,.. , i., u.., ... >�., `! .Yi.. 11. a ,i•�, Y ova .,r, r. _. _�',r... .._r ,,., ........nl..i..i. v,..,, e E. �:.,,JI 5.,r �.,. , e.ss. ^�x%t .., •..,trv, ...v ,!.. r .,.. ..r,_ ,,_...,� .s>> ..«�.,.r..�..,.>,.�.,..� R N L Y �_ A,_ ��. � , . « ., .. CH 0.. � OG ..� ... ,.. ,. _,,., �,x,, r_ u_ 3 ,u...r.. r, .... .,� r..._. ......... , �..r_.v. _ � e .,.rl...n _ r. ... Yir-n ix d §iF, ,_. ,L.%'!,.... F d�f h_. �. -.4. �.,. `L� _.-. r -,. ... .{ _... . .4.:. ,.fRf_ •._.. .....2. .u.,.l., r...-__ .: _. _.. .-_dkx,_.. -v ,_2 +:�a +A. ,s . J. r..uF.sm. ,5.... .. AE., .,}{,. �.J. •b.v P.v,L,.r.l....,..u�SCAir .Yi1 :.2.v ...�,.ea„�.�t�,uriu 'fwu::� �5...: J.�'".sT'di,.e'i..4,....x, ..5: :i �:w!„•..� 3�� w!'s e``”: �'ixv�Ss;�, ?w!:�- u:�Lwxvadrf.'�-x�r....__..-.:�?.le`�'_ta2.....i.c ".::�x"..:-i,.,1,.-..�......c •• ® 0 B B• ® ,ski ®,.. D • W• o • L I AR I CITY PLAN AEVIEWWAS�, JAKE .12/36/id14 COMPLETEAND-ftEVISIONS REQUIRED. SENT: CORRECTION, PLAN SET VIA EMAIL • OMPLETE AND.FURTHER•REQUIRED.SENT CORRECTION NOOLAR CITY -PLANREVIEW WAS E-MAIL'c • • o • -JAKE AIC SINGLE LINE DRAWINGmA • ... _ .. .. ._ .... _ ,- ... <, m .., . ,..r s ra r ..: ...,. ,.x .r. „ _,... , «,,,:.. .a _, cra-F _ iyY ,°'4 i. f',.., m+ -g- ..-,,.._ ... r e,e: ., n a . ... _ns .. n_. _. rk ,+., G. ._, C_n:l1 x.3 ._e., .t... ..d t,. _.. A. _,.,^Ti? .:Yt. rlJlu r, T..r_i,. .., da :t ... {'. _ d_,�`'. $F,'++ i 1:.> ,. L.d„ g� I ,:r rw•`, ._.«........ ....s ,.. t ..xa_. a ,Sts. ,,s.... +a.,ltr+r H ._ ., :_, r t.4 __ ". _ ...., r t ._n ,. .A I ..7„ k. T. _-2§ i...,_ _ ,... .. _ i:tTL at .. .!. ,dES. m_l fs. _ ri. tAr-,`.t. '{'. „"•i,^. ,r, ifi>.A'_ tu. -, .. _', ., .._. .., x.. .^'X.ti{ i _..:_ i . v,. .'1 _v. , ...« YJ" .,i -Y. fir. i ., .... F, ..ta«. £r ..i,n r_ .vJ }v�, ,:'T. .. .C. . 9 'imp..,._ ,, p ... .... , r .. 'x7.. .e $ _.., .., cr. _. __..,._ .,.§ .. .ry _a;' _.,. .�.: .2 moi".:. _.FC�'!'�. , _ i . . fn. - „1, '?�.+_: rSr r- ! �,._ i : 's ,. ` ,>,. ,x'_. _te..,.nx .,... ... n . , .x,c. .... _. n _.r. : .. ., , , ... _.. '�!:,... > u,4.. . _„w x..-... r !k'r�.i. _. k .. w�,+...'. ,. t,#r.. 5 ..r..,.:, R, : n.. ._. _ _... J..! . _7 ,, fi. .... s�. .r4 ,. ,, .. _. ..., _x, ,,._.. _�..�y__ x, ,. , _ .r.._d -- ..__>s. :,3 ''i-.xrF $. k�F_ -: k_i.>r - .. ., al ... ..... .i ...,., .._. .... �._ fi:. u. .... ..,r. >.. ...., n..>✓`” ,. ._....v. .1. _ ,. {. F. .4. r,k»:d.r}. r .a,,. ...W ... a.. r.. ,«:{..'�; r... ,. «„fl,...v r,z r _ ,-.. ..A-.._ En,�,,,: . rr. .: '�._- _+ _:,.1. 'fi .. .. ^.l !i. nG�l: :',3sw :M-'�'r y. ..4. _r.., ...c ,.n.R. ....l.. -.,x13: ^ .. _ 7 ,u.,�.l. _ c r./ , .... ..... 3'- t,ti'r f-„ 4 ....Y. ,,.Ska^US .x l 4hi rrc.d , ... !li _u , n ,.., , .. ,..... Yh _ ... _,. _. .. . r ... ,_... ...s A. _iLi F xu:: ... „£L, f�L' x 1' r .. - .vP.iuv ,�r1> , . i,..a` J> , ,._v..,.....M1 _..... ,u_a.., . . ., e_. _..'(, n.. i. -1 s 1.... { u r.,. 'F.•f},_ a i. ':k .. _ .... [.,t _ ..:..<.. F. > .. _ v. s., .._. ...u, �q �Yt f' - , �, F• #.� h .. ]. .F , r t, .,_fir. �. _ ..{ .,� :£ ., d v: a.. ... ...2<�.. . �v Yr ..,.'4$„. .. :. _.. _.. _I 1>°..... 1 ... ,�,x v"`” , : :k« . -.s� -i%f , J : ,�.. ,..,, . r x ._x,_.,._..:... CON O . � , . �., � .,. _. � ,� � ^: '_ _ �;. i� n..... .x v#!. .. ,. , a r <.... ..�e: � s:xH �..�'.;{a..,4v.uY'c''ry _ . 1Y5„ 5 "l. ,,..i {, ..5. .F.-`?`�?VA" .,.... �......... .. ...�......Ir`! a, ... G:'t- _ r ....v. ` . <.x4s'r_,..F.... _. J„t.�•3s,li�vv',L"=::vct:ri`°..,.,.....uc:tr°�:ta.l. 'Frvfa^1�.-_u'vi,u__�u�?�'v�_��iCb"Ztva.�'e is %,Y��?.'l._ v�,_+:5. �kt�.uuA_.::!v.�,x3e.'=,Lrn�.r,v.E.�_+.>_yrty,._,.�v'!._ux_..tv�z�i,vl•_.l:,F•,�:=„--:: �'c»a�.�xi�,c:,,uu�t ey5�4:P _ _a, �s..n ill NE R �..:;y l'�. .: '.r .3tr.., '.Y .'A.::: - ^ �. . 1" :. ..:.' ... , . 1r. L - : ti"4..•? A:«: l `L i%..::,� . ) :.r=^. -.� b %. . h� . p 7 ., yr Sff . 1k 4 .. s , t .,:�: .. ..: ,. x' )..: S+'.s �', >:��5. .. ,.. c�` < '• -._„ SUBDIR , r , ETRAKIT ENABLED "N"M DESCRIPTION 5, PATHNAME :.:.: .�mlaT• Y C W : 1 :. G`.... k, L.. ...: z. REVIEW. TYPE ...RET.URNED SENTtiDATE ;. ;,.. , D.UE,DATE: ., n �,. ;.s s.., :...., a .{ R,.STATUS,� . . ..: ..4-L J?:di ::.. ..:. .. REMARKS ,.. ... :'-.. .. , :..::<<4 y ..:: NOTES __ :I. 4 f K .Li ,. '. - ,REVIEWER �y r,..N i. 4 • - , .. .L f � :,Z 'h. ^. .. 'S'ss- ..3 .. Kt 1 k -: , � m{-. 'v.: Y 3 Q"5': -.. , «....Y' • ..�. S tit., jt� '% ��{{ •f,� ..-:.� n>. S_s v. > ... %...Ar e i :_��+,.A, 3 > _ _t.t- . ^� .. o..,-,.4 5 , ? :..,ar N.... :, ...,_ :� ii_ ,.: i. h., ?3 :.•2$ f ..rt'e ..,.•z .DATE,." .r r. .. �. II n a <, Y.> :t ti.SY , �..s,n.. .3_.. . P»'✓_., .n"r:2'.-. i4,. .T�-� .V -If �:: , i�A , NON-STRUCTURAL : JAKE FUSON ' 12/30/2014 1/7/2015 _ ,12/30/2014 REVISIONS REQUIRED - ,SEE ATTACHED. REVIEW. `NON=STRUCTURAL' JAKE FUSON" 1/5/2015 1/5/2015 1/5/201S_ . REVISIONS REQUIRED :. SEE ATTACHED REVIEW. NONSTRUCTURAL .. JAKE FUSON � 1/13/201'5 ,. ,. .1/20/2015-: ` 1/13/2015: REVISIONS; REQUIRED :. : , SEE ATTGHED REDLINED SINGLE LINE DRAWING: w ' 2 e SECOND REVIEW. �`^ :.s 'JAKE FUSON FUSON ' «'1/20/2015 !'.1/14/2015, "APPROVED ", " ; ' . FOURTH REVIEW'- APPROVED ,:DOC1/5/2015. :1/13/20151. > -CORRECTION LIST.pdf- ,' _ ill NE R _..... .. ... .. . .. ... . x.,.....v .Y. -�.. . ._.. ::...u. + .. ,e,r , - w ._ _ . +^r . :v". .. 6 -", i .:::x .. ...i _... Y ..eYO S y..,F. ..r:�i :: , . U REATED OWNERr '.Y .'A.::: - ^ �. . 1" :. ..:.' ... , . 1r. L - : ti"4..•? A:«: l `L i%..::,� . ) :.r=^. -.� b %. . h� . p 7 ., yr Sff . 1k 4 .. s , t .,:�: .. ..: ,. x' )..: S+'.s �', >:��5. .. ,.. c�` < '• -._„ SUBDIR , r , ETRAKIT ENABLED "N"M DESCRIPTION 5, PATHNAME ., : .,: Attachment T. a �.,� C 1 � ::.:., ..:,r � s, :.. .. ., ,: , �. n.. � ;y . �� . ; s <�' DOC' r 12/30/2014 * F '+, = 9 ,'JAKE FUSON' FIRST REVIEW, REDLINES FIRST REVIEW ... k.. �' • y r. REDLINES pdf ,n ••� 1,,. r.r L REVIEW ` g FIRST REVIEW �7 DOC 12/30/2014 +JAKE FLISON.',," ;FIRST 3^. CORRECTION LIST ~CORRECTIO,N LIS? , �. r _t 0 4' pdf .�.. t, ' $WT. :SECOND REVIEW > SECOND REVIEW - .r K:" •". .. DOC ' = ; µ ' 1/5/2015 �, ` �. JAKE-FUSON,- . ' 1 ' "'#`"` `:�� `q . , ..',; a''REDLINES ;. •REDLINES pdf . 1 L Hr ? X� O _, ti 3 -• �� < _ ;, .;.� ,� ,. ,k T 'F+. `,y, yi=.. ..'� _ • y ._ ESECOND REVIEW .�' w ' 2 e SECOND REVIEW. �`^ :.s j.' X' +S. O� r�� r Aµ., TM N- � JAKE�FUSON w . r _ _'.: U ,:DOC1/5/2015. ,' CORRECTION LIST,, -CORRECTION LIST.pdf- ,' _ 'THIRD REVIEW 52816 Avenida K ° ,� ' .� 4 .tie at ,DOC '' '1/13/2015 ',, -a JAKE FUSON: 'REDLINES f. Mendoza Redlines. 0: r z ,• ,. ,,.# a+ s �1a ir}t'r+�i �i �. �y Z �1 •iro♦ s t Q��/ i1 ••� 1,,. r.r L .i -•t}' .�.. t, ' $WT. /fr' �`- '� � ' t �� � FCS• W• +v ��. T 4i: �' , f ? • 4., ij� * 4v M Z �, , " 1 M1� X� i y - )Y r'� •` 3, sr w."L k w,, . +,.I'. . -. T U r, l '7jr- 41 v 4 ti •• � ! �S• � - i. ,. g�� 3�- '� h • fir-. � [ ,•, it at T' �. .•� rr k ST_. ^ F 1 C T';f r > s ' r F : « , � 5 �. 2015 12:33:19 PM . x- 3 of 3 '' . 4Frinted::Wednesday,Jamsary^14, DECA® 2014 CITY OF LA QUINTA COMMUNITY DEVELOPMENT Cid}/ Of. ld QUIi1td Building ar Safety Division P.0 Box 1504,-7&495 Calle Tamplco 1a.Qulnta, CA 92253 -:(760) 777-7012 Building Pennit Application' and Tracking Sheet Pemdt # E601-20 Project Address: S 2 2V1 owner's Name:. V Ilrl 2vG �Cj O A P. Number Addtrss:.52(61(o I Legal Description: city, sP.zip: La Quinta, CA 01'1:7-53 Contractor,Solar City Telephoner (p 0 - l000 -LI-1 -7 1 y PcojectDescription: -23 roof mounted solar panels . Address: 3055 Clearview Way. city, $r, zip: San Mateo, CA, 94402 inverter(s)L57,7(,9-'5 kW Telephone: 650-638-1028 State Lia # : 888104City Lie C. Arch., Engr., Designer. Address: City, ST, zip: Telephone: Construction Type:. Occupancy: Project type (circle one): New Add'n Alter Repair Demo Sq. Ft: #Stories #Units: State Lia #: Name of Contact Person: Melissa Quintero Telephone # of Contact Pelson: 9.09-85.5-0038 Estimated value of Project UI✓T�21 D1�S01QYC4Cum APPLICANT: DO NOT WRITE BELOW THIS UNE # Submittal RectaRecd TRACMG PERWrFEFS Plan Sets Plan Cheek submitted la item Amount Structural Coles. Reviewed, ready for corrections I Plan Check Deposit. . Ivan Cales. Called Contact Person E M Ai t . 12 O Plan Check Balance. Mile 24 Cake. Plaus picked up Construction Flood plain plan Pians resubmitted.. Mechanical Giadiag Plan '` Review, ready for Electrical SubeontaetorList Called Contact Person EMA•itr .1 rj Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN ROUSE:- ir° Review; ready or eo d ere• 11.3 Developer Impact Fee Planing Approval. Called Contact Person £ /} / L y i3 A.LP.P. Pub. W.U. Appr Date of permit issue school Fees RE p Y 7U 15S UE Totaler It ees DECA® 2014 CITY OF LA QUINTA COMMUNITY DEVELOPMENT ABBREVIATIONS 'ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. THIS SYSTEM IS GRID=INTERTIED VIA A ALL CONSTRUCTION SHALL COMPLY WITH THE 2013 4' M- r AC ALTERNATING CURRENT UL -LISTED POWER -CONDITIONING INVERTER. CALIFORNIA BUILDING, RESIDENTIAL, MECHANICAL, BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. ELECTRICAL, PLUMBING, ENERGY, AND GREEN CONIC CONCRETE 3. A NATIONALLY -RECOGNIZED TESTING BUILDING CODES AND THE LA QUINTA MUNICIPAL DC DIRECT CURRENT LABORATORY SHALL LIST ALL EQUIPMENT IN CODE EGC EQUIPMENT GROUNDING CONDUCTOR COMPLIANCE WITH ART. 110.3. (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING APN NUMBER: 773333004 EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET -BACK A SIGN WILL BE PROVIDED WARNING OF THE GALV GALVANIZED HAZARDS PER ART. 690.17. GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY HOG HOT DIPPED GALVANIZED PHASE AND SYSTEM PER ART. 210.5. I CURRENT 6. CIRCUITS OVER 250V TO GROUND SHALL Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(B). OT ENTER DC CODUTORS ETHERDO NRACEWAYS LA QUINTA kVA KILOVOLTI AMPEREURRENT BUILDING ORNARECRUN IMI ME A7. OR CIN OF DEPT. kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC BUILDING & SAFETY LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). MIN MINIMUM B. ALL WIRES SHALL BE PROVIDED WITH STRAIN APPR( CONSTRUCTION! (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY FOR NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE I �� Zo its ®Y ._._ OC ON CENTER UL -LISTED LOCATION PROVIDED BY THE 1171 PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING POI POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT VICINITY MAP INDEX VOLTAGE AT MAX PCIIRCUIT OWER V cp VOLTAGE AT OPEN W 3R WATT NEMA 3R, RAINTIGHT V,a a , r * PV1 PV2 COVER SHEET SITE PLAN � PV3 PV4 STRUCTURAL VIEWS UPLIFT CALCULATIONS LICENSE GENERAL NOTES vin �" . �'� 1 ;" �; �1 �+ �� ,a PV5 THREE LINE DIAGRAM ,_ _ ��—� - — 7��( o �P �, o� PV6 ONE LINE DIAGRAM PV7 ELECTRICAL CALCULATIONS Cutsheets Attached CA 888104 # C- 10 1. ALL WORK TO BE DONE TO THE 2013'x, CALIFORNIABUILDING CODE D THE 2013 AN CALIFORNIA RESIDENTIAL CODE. 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2011 NATIONAL ELECTRIC CODE AS AMENDED BY9a3 THE 2013 CALIFORNIA ELECTRIC CODE. Ey ® w !�• �iti' ,1 _°I , �'rJrVy , pra .�J ` ��;: d MODULE GROUNDING METHOD: ZEP SOLAR REV BY DATE CO TS AHJ: Lo Quints REV A KWA 1/4/15 CLOUD CORRECTIONS/COMMENTS ON PV2 &PV5 REV B 1/12/15 Upda I s & combined strings to inverter per PC UTILITY: Imperial Irrigation District�t LhImers �x x CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., J[3-9222539 0 0 JOB NUMBERSolarCity. PREMISE � DESCF7PTIorr AVINA, GERARDO AVINA RESIDENCE DESIGN: Kyle Ahlers MDUNTING SYSIEN: NOR SHALL IT BE DISCLOSED IN WMOLE OR INZEP Mighty Hook 52816 AVENIDA MENDOZA 5.865 KW PV ARRAY PART OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH LA QUINTA r CA 92253 MODULE& 3055 geomm wr THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN (23) KYOCERA # KU2556XCA APN: * PAGE NAPE ._ Md�. 94402 :(650) 638-1028 F:(650) 638-1029 SHEET: REV DATE PERMISSION OF SOLARgTY INC ABB PVI-5000-OUTD-US-Z-A 7606004771 COVER SHEET PV 1 b 1/12/2015 SOL—CITY (765-2489) www.adarcity.corn dy a TRANSFORMER INFORMATION: KVA PHASE HIGH KV LOW 120/240V -METER# AM1B4-1088 "PROPOSED BI-DIRECTIONAL METER# CUTLER HAMMER DG22 - AC DISCONNECT: 1 FT FROM MAIN PANEL - INVERTER: ABB PVI-5000-OUTD-US-Z-j '00b 0 N 0 M c Q CD 00 CV LC7 Vt -•4 .s _ To •r •�tiJ Vi i.� ? r � �1I� �(jJ�L� (E) DRIVEWAY/ e )S C; C 81r'�O0 Aid):? I14 CITY OF LA QUIZ' BUILDING & SAFETY D' APPROVED FOR CONSTRUCTION `�f BYE --- .1 ICI N 125A, 240V, SINGLE PHASE, a 2 WIRES, 22kAiC EXISTING BI DIRECTIONAL METER AM1B4-1088 PITCH: 18 ARRAY PITCH: 18 MP1 AZIMUTH: 90 ARRAY AZIMUTH: 90 MATERIAL: Flat Cement Tile STORY: 1 Si '' PITCH: 18 ARRAY PITCH: 18 MP2 AZIMUTH: 270 ARRAY AZIMUTH: 270 MATERIAL: Flat Cement Tile STORY: 1 Si MATION REEF NUMBER JB -9222539 00 CONTAINED SHALL NOT BERUSED FOR 2 3' FSB aMs BENEFIT OF ANYONE EXCEPT SOLARCI INC?R, MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WH �11[IN ZEP Might Hook PART TO OTHERS OUTSIDE THE RECIPI TS°' ORGANIZATION, EXCEPT IN CONNECTIONgWITH ODULES: THE SALE AND USE OF THE RESPECTI , a(23) KYOCERA # KU2556XCA SOLARCITY EOUIPMENT, WITHOUT THE I1TEN PERMISSION OF SOLARCITY INC. " VOt7ER: A ABB PVI-5000-OUTD-US-Z-A V ifiJ G LEGEND PITCH: 18 ARRAY PITCH: 18 MP1 AZIMUTH: 90 ARRAY AZIMUTH: 90 MATERIAL: Flat Cement Tile STORY: 1 Si '' PITCH: 18 ARRAY PITCH: 18 MP2 AZIMUTH: 270 ARRAY AZIMUTH: 270 MATERIAL: Flat Cement Tile STORY: 1 Si J O 2 3' FSB 1 3' FSB _ I 0 0 D 0 o D 0 I A LEGEND Pte, I o 0" (E) UTILITY METER &WARNING LABEL 4/12 r�I ° ° m� INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS o - o c� Z1/ `�' " g DC DISCONNECT & WARNING LABELS ° FAC p AC DISCONNECT & WARNING LABELS 0 DC JUNCTION/COMBINER BOX & LABELS Q DISTRIBUTION PANEL & LABELS 0 ° I LC LOAD CENTER & WARNING LABELS 3' FSB 3' FSB O DEDICATED PV SYSTEM METER 0 STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR --- CONDUIT RUN ON INTERIOR — GATE/FENCE 0 HEAT PRODUCING VENTS ARE RED r, _ INTERIOR EQUIPMENT IS DASHED L _-'J SITE PLAN N Scale: 1/8" = V W E 0 1' 8' 16' S PROSE OWNER: AVINA, GERARDO DESW'n0N: AVINA RESIDENCE DESIGN: Kyle Ahlers COI���I}` , 52816 AVENIDA MENDOZA 5.865 KW PV ARRAY Ai,,J m LA QUINTA, CA 92253 3D55 aeaview Way So Mateo, T: (650) 638-10 BF ((650) 838-1029 (866)—SCI—CITY (765-2469) ww.saarcfty.com PAGE NAME: 7606004771 - - SITE PLAN - - - SKr' RM PV 2 b DAM' 1/12/2015 J MP1 X -SPACING X -CANTILEVER Y -SPACING Y -CANTILEVER NOTES LANDSCAPE 4811 24" 5211 24" 3055 Clearview Way . San Mateo. CA 94402 T.(650) 638-1028 F. (650) 6J8-1029; - (ee6�soL-CITY (765-2489) •wwsolarcity,com., PORTRAIT 48" 20" , 52" 241" TOP CHORD 2X4 @ 24" OC BOT CHORD 2X4 @24" OC ROOF AZI ARRAY AZI 90 PITCH 18 - 90 PITCH 18 STORIES: 1 Flat Cement Tile A: sJ 1 y J+.kyr INSTALLATION ORDER x ZEP SPANNER BAR _ LOCATE RAFTER, MARK RAFTER r (6) LOCATION, AND REMOVE TILE. () PLACE STANDOFF BASE "& DRILL _ j-,• PILOT HOLES AT THE RAFTER t" > DIA BOLT & NUT•CLEAN PAPER AROUND. PILOT 2 (1) (2) (Z). (3) ) HOLE. • , ' � .... .. � '= .- -� Vit: �.� ZEP SPANNER ' r r BAR CLAMP 3) ADJUST STANDOFF TO BATTEN 8 —g j- 7 • �' t; ; . HEIGHT. r _ r . STANDOFF j (E) LBW s z s r SEAL PILOT• HOLES AND BOTTOM e. �. (E) TILE V : (J (4) OF STANDOFF WITH POLYURETHANE t�' (4) SEALANT. B SIDE VIEW O F M P2 i NTS . ;"' (E) ROOF DECKING (5) ,:� ,, 't " DIA STAIN STEEL LAG BOLT r 5) 5 S LAG STANDOFF•INTO RAFTER S •LOWEST MODULE 4,SUBSEQUENT. MODULES 1'. + (2-1/2" EMBED MIN) _ MP2 _ . X -SPACING • X -CANTILEVER Y -SPACING Y -CANTILEVER NOTES LANDSCAPE 48" • 24" 52" ' '24'-1 3055 Clearview Way . San Mateo. CA 94402 T.(650) 638-1028 F. (650) 6J8-1029; - (ee6�soL-CITY (765-2489) •wwsolarcity,com., PORTRAIT 48" 20" 52" , 2411 TOP CHORD 2X4 @ 24" OC BOT CHORD2A@24" OC ROOF AZI -ARRAY AZI 270 PITCH '18 STORIES: -1 -270 PITCH 18 .. Flat Cement Tile + . ,roB NUMBER: J B-9.222539 OO NOTCH TILE WEATHERING TO FIT DESCRIPTION: AVINA RESIDENCE - 5:865 'KW PV ARRAY R 3 r , a �r .» tr PAGE NAME :- �, �.- y M , j + _,_ STRUCTURAL. -.VIEWS s�► ` DESIGN: Kyle Ahlers•�\k y (E) RAFTER ,, r• MOUNTING SYSTEM: r ZEP Mighty Hook AROUND STANDOFF: NODDLES 23 KYOCERA KU2556XCA ( ) 3055 Clearview Way . San Mateo. CA 94402 T.(650) 638-1028 F. (650) 6J8-1029; - (ee6�soL-CITY (765-2489) •wwsolarcity,com., SHEET: REV. DATE PU 3 - b ' 1/12/2015 � �- STAN DOFF � � .• ' • r. .3:' .4 t.;��• � � <J S 1 `'" 1 �, . 7) -. . . REINSTALL TILE. - ;�' :. }4. Scale: 1/2 — 1• _ _ _ CONFlDENIIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE • BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY, EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. �'• ,roB NUMBER: J B-9.222539 OO PREMISE OWNER. �AVINA; GERARDO 52816 AVENIDA MENDOZA ,: LA QUINTA CA 92253 r t . . 7606004771+ + )- �.• , DESCRIPTION: AVINA RESIDENCE - 5:865 'KW PV ARRAY R 3 r , a �r .» tr PAGE NAME :- �, �.- y M , j + _,_ STRUCTURAL. -.VIEWS s�► ` DESIGN: Kyle Ahlers•�\k y - +� • �'•'" r® .,,SOIa�CIty MOUNTING SYSTEM: r ZEP Mighty Hook NODDLES 23 KYOCERA KU2556XCA ( ) 3055 Clearview Way . San Mateo. CA 94402 T.(650) 638-1028 F. (650) 6J8-1029; - (ee6�soL-CITY (765-2489) •wwsolarcity,com., SHEET: REV. DATE PU 3 - b ' 1/12/2015 INVERTER: .. ABB :PVI-5000—OUTD—US—Z—A a- 1 UPLIFT CALCULATIONS 12.29.2014 ��•'PV System Structural Version #41.5 =�;;SolarCity Design Software Project Information & Table Of Contents Risk Category: II DESCPoPnoIt. PV System Type CONTAINED eau NOT BE USED FOR THE SolarCity SleekMount— Flat Tile Roof AVINA Flat Tile Roof BEHEFlT OF ANYONE EXCEPT SOlARG1Y INC., NOR SHALL IT BE DlsaosED IN WHOLE OR IN Layers of Comp Roofing 52816 AVENIDA MENDOZA 5.865 Roof Slope PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH 180 Rafter Spacing 24" O.C. THE SALE AND USE OF THE RESPECTIVE PV System Module Orientation Landscape and Portrait PV Module Area SOLARGIY. EQUIPMENT, ;WITHOUT THE -WRITTEN � PERMISSION OF SOLARGTY INC. 401 sf — -- - - - - � PV Module Width - _ � _PAGE NAPE 39" UPLIFT PV Module Length - 64" Standoff Attachment Hardware Mighty Hook HDG FT Reduced Ground/Roof Live/Snow. Loads �. Ground Snow Load pg 0.0 psf ASCE Table 7 1 Surrounding Roof Snow 0.0 Psf ASCE Eq: 7.41 Roof Snow Over PV Modules 0.0 psf ASCE Eq, 7.4-1 Wind Design Criteria Wind Design Code ASCE 7-10 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 110 mph Flg. 26.5-1A Exposure Category C Section 26.7 Roof Style Gable Roof Fig. 30.4-2A/13/C-5A/B Mean Roof Height h 15 ft Section 26.2 Effective Wind Area 1 Module A 17.5 sf IBC 1509.7.1 Wind Pressure Calculation Coefficients Wind Pressure Exposure Kz 0.85 Table 30.3-1 Topographlc Factor Kzt 1.00 Section 26.8 Wind Directionality Factor Kd 0.85 Section 26.6-1 Importance Factor I NA Velocity Pressure qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) Equation 30.3-1 22.4 psf Ext. Pressure Coefficient (Up) GCp (Up) -0.88 Fig. 30.4-2A/B/C-5A/B Ext. Pressure Coefficient Down G Down 6.45 fig. 30.4-2A/B/C-5A/8 Design Wind Pressure P p = gh GC Equation 30.4-1 Wind Pressure Up P(up) -19.6 Psf Wind Pressure Down down 16.0 psf Allowable Standoff, Spacings X -Direction Y -Direction Max Allowable Standoff Spacing Landscape 48" 52" Max Allowable Cantilever Landscape 24" 24" Standoff Configuration Landscape Not -Staggered Max Standoff Tributary Area Trib 17 sf PV Assembly Dead Load W -PV 3 psf Net Wind Uplift at Standoff T -actual -174 lbs Uplift Capacity of Standoff T -allow 500 lbs Standoff Demanb/Cirpacity DCR 34:80% Max Allowable Standoff Spacing Portrait 48" 52" Max Allowable Cantilever Portrait 20" 24" Standoff Configuration Portrait Not -Staggered Max Standoff Tributary Area Trib 17 sf PV Assembly Dead Load W -PV 3 psf Net Wind Uplift at Standoff T -actual -174 lbs Uplift Capacity of Standoff T -allow 500 lbs Standoff Demand Ca ad DCR 34.8% r , Kyle Ahlers k'A&L-� "'nd .,;SolarCity 3055 GeaMew Way SHEET: REV. DATE Son Mateo, CA 9402 _ T.(650)63& -1028F:(650).638-1029 P V --4— b 1712/2015 �(ees)-soL-a,Y (765-2e89 ) ....eaardty.eom a CONFIDENTIAL —THE INFORMATION HEREIN JOB NUMBER: JB -9222539 0 o PREMISE OWNER: DESCPoPnoIt. CONTAINED eau NOT BE USED FOR THE AVINA, GERARDO AVINA RESIDENCE BEHEFlT OF ANYONE EXCEPT SOlARG1Y INC., NOR SHALL IT BE DlsaosED IN WHOLE OR IN MOUNTING SYSTBt ZEP Might Hook 52816 AVENIDA MENDOZA 5.865 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES: LA QUINTA CA 92253 r THE SALE AND USE OF THE RESPECTIVE (23) KYOCERA # KU2556XCA SOLARGIY. EQUIPMENT, ;WITHOUT THE -WRITTEN � PERMISSION OF SOLARGTY INC. INVT]27EIC ABB PVI-5000—OUTD—US—Z—A — -- - - - - � - — ---—,--__-- -- X7606004771"�— - _ � _PAGE NAPE �CALCULATIONS UPLIFT r , Kyle Ahlers k'A&L-� "'nd .,;SolarCity 3055 GeaMew Way SHEET: REV. DATE Son Mateo, CA 9402 _ T.(650)63& -1028F:(650).638-1029 P V --4— b 1712/2015 �(ees)-soL-a,Y (765-2e89 ) ....eaardty.eom GROUND SPECS MAIN PANEL SPECS GENERAL.NOTES INVERTER SPECS MODULE SPECS - LICENSE OND (N) #6 GEC TO (E) LIFER AT PANEL WITH IRREVERSIBLE CRIMP Panel Number: Meter Number: AM1B4-1088 Inv 1: DC Ungrounded INV 1 — (1) ABBPVI-5000—OUTD—US—Z—A BEL: A #40V/208V, 96.5%/96.5%/96% AFCI Inverter; Zigbee 50( 277V 2 — (23) KYOCERA # KU2556XCA PV Module; 255W, 228.3W PTC, 40MM, Blk Frame, H4, ZEP, 1000V, w/Ba CA # 888104 kbor C-10 Underground Service Entrance INV 2 Voc: 38 Vpmax: 30.8 INV 3 �, Isc AND Imp ARE SHOWN IN THE DC STRINGS IDEITkIEfr."' �E 125A MAIN SERVICE PANEL E; 10OA/2P MAIN CIRCUIT BREAKER ADJUST MIN. ACTIVATION VOLTAGES! 3 I SolarCity f CUTLER—HAMMER InVerter 1 IND A 100A/2P Disconnect 5 ABB DCS Vstart = 120V PVI-5000—OUTD—US—Z—A Dc MP 2: 1x7 (E) LOADS B— L7 _ EGC _ – 2 L? DC* i DC+ vscart – 120V • N DGI DG- 30A/2P GND EGG DC+ DC+ MP 1: 2x8 - - _ _ A – – ––– -GEC' ---lN DG DC- I B I----�---- EGC--- -------------------- EGC --- ------------------- o 10 IT I 1 x 10 10'.EMT Conduit . N I _ . I EGGGEc _ FUSED COMBINER BOXED FOR OCP Gec PROTECTION TO 120/240V I LA U I' T SINGLE PHASE CITY OF V( ` UTILITY SERVICE BUILDING & SAFETY DEPT. FOR CONSTRUCTION —1_ X _ DATE ,r' CUTSHEET FOR COMBINER BOX r.' IS ATTACHED Voc* = MAX VOC AT MIN TEMP OTT (1)CUTLER–HAMM g BOC 30240 PV BACKFEED BREAKER 1 Breaker 30A�P-4OA/2P, 2 Spaces, Quadplex {� (I )CUTLER–HAMMER # DG221URB v Disconnect; 30A, 24OVac, Non –fustle NEMA 3R AC, ' e ^ (1) SolarCity g 4 STRING COMBINER BOX DC 4 STRINGS, FUSED, GROUNDED – (1)Ground Rod; 5/8' x B', Copper _(l) CUTLER– AMMER gg DG03ONB Ground%Ne.tral Kit; 30A, General Duty (DG) AWG #10, THWN-2, Black (1)AWG#10, THWN-2, Red [[['''��� (1)AWG #10, THWN-2, Black Voc* = 299.52VDC Isc = 8.83 ADC O (1)AWG #10, THWN-2, Red Vmp = 215.6 VDC Imp= 8.28 ADC * _ (2)AWG g10, PV WIRE, Black Voc 299.52VDC Isc = 8.83 ADC- DC•(1)AWG O (1)AWG #6, Solid Bare Copper EGC Vmp = 215.6 VDC Imp= 8.28 ADC _ (1)AWG #10, THWN-2, White NEUTRAL VmP =240 VAC Imp = 23 AA . . (1) AWG #10, THWN-2, Greeo.. EGC ........(J) AWG #8,. THWN-2, Green .. EGC/GEC . (I )Conduit. Kit;. 3/4.' .EMT... .. _ . [� (1) AWG j4, THWN-2, Blade ®Igo (1) AWG /4, THWN-2, Red ... , , , • . . Voc* =342.3 VDC Isc = 6.83 ADC ` Vmp = 246.4 VDC Imp= 8.28 ADC (4) AWG g10, PV WIRE Blaek Voc* = 342.3 VDC Isc = 8.83 ADC O (1)AWG 86, Solid Bare Copper EGC Vmp = 246.4 VDC Imp= 8.28 ADC. (1)Con04it Kit;. 1-1/4' EMT .......... CONFIDENTIAL – THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE OF ANYONE EXCEPT SOLARCITY INC., JOB NUMBER JB-9222539 O O PREMISE OYNER DESCRIPTION: AVINA, GERARDO AVINA RESIDENCE DESIGN: Kyle AhlersSolarCityBENEFIT MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN ZEP Mighty Hook 52816 AVENIDA MENDOZA > 5.865 KW PV ARRAY ►� PART OTHERS OUTSIDE THE RECIPIENTS LA QUINTA CA 92253 MODULES (23) KYOCERA # KU2556XCA 3055 aearview Way ` San Mateo, CA 94402 ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE � z - , „ 2eh SHEET: REV DATE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. PAGE NAME 7606004771 THREE LINE DIAGRAM PV 5 b 1/12/2015 T:(650) 638-1028 F:(650) 638-1029• (888)–SOL–CITY (765-2489) www .solarcny.aom INVERTER: ABB PVI-5000-ouTD-US-z-A ELECTRICAL CALCULATIONS •`> er 2. String and 2 Combined Strings Module Type: Module Count: (cont = (Amps): Kyocera 255 1000V 23 11.04 Branch Circuit Individual MPPT 2 strings per Branch A 1 strings per Branch B 8 modules per series string 7 modules per series string Icont' 1.25 = (Amps) 30 deg C ampacity = PV Wire Size: (cont = (Amps) Start ampacity Temperature derate (%=F) Conduit fill derate Derated ampacity (cont' 1.25 = (Amps) Ampacity Inverter Output Inverter Type: Inverter Count: ABB PVI -5000-S AFCI 1 String Branch A Branch B Conductor: Conductor: Conductor: 13.8 34.49 13.8 40 95 40 AWG #10 AWG #4 AWG #10 11.04 27.59 11.04 40 95 40 0.41 0.41 0.41 1 1 1 16.4 38.95 16.4 13.8 34.49 13.8 40 95 40 Total (cont = (Amps): 23 U CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT E USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART IZ OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTENINVERTER:PAGE PERMISSION OF SOLARCITY INC. (cont' 1.25 = (Amps) 28.75 DESIGN: Kyle Ahlers OCP Size = 30 kAMYIL-�3055 Conductor 3: AWG #10 THWN-2 Icont' 1.25 = (Amps) 28.75 _ 30 deg C ampacity = 40 (cont = (Amps) 23 Start ampacity 40 Temperature derate (%=F) 0.91 + Conduit fill derate (%=#) Derated ampacity 1 36.4 -- - - Icont' 1.25 = (Amps) 28.75 Ampacity 35 Total (cont = (Amps): 23 U CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT E USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART IZ OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTENINVERTER:PAGE PERMISSION OF SOLARCITY INC. JOB NUMBER: JB -9222539 0 0 PRWU MIX UUM111UN: AVINA, GERARDO AVINA RESIDENCE 52816 AVENIDA MENDOZA 5.865 KW PV ARRAY LA QUINTA CA 92253 , wmr_- 7606004771 ELECTRICAL CALCULATIONS DESIGN: Kyle Ahlers \\`' . � ,,, `SolarCity. k m MOUNTING SYSTEM: ZEP Mighty Hook kAMYIL-�3055 MODULES (23) KYOCERA # KU2556XCA awe!' Way son T:(650) 638-1029, C ( 5 638-1029 (Bee)-soL—aTY (165-2489) www.sdarcRy.co„ Siu1: REV UAIL. PV 7 b 1/12/2015 ABB PVI-5000—OUTD—US—Z—A d mil bta ^.* 'AUTI,O N POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: - Address: 52816 Avenida Mendoza L ---i UTILITY SERVICE SOLAR PHOTOVOLTAIC ARRAYS) , L— — — — — — — — — — — — — — — — — — — — — — — — — — J - PHOTOVOLTAIC BACK—FED CIRCUIT BREAKER INS MAIN �ELECTRICAV PANEL IS AN A/C DISCONNECT PER; -NEC ' 690:17 OPERATING VOLTAGE = 240V 1i i JB 4221539-00 x CONFIDENTIAL - THE INFORMATION HEREIN' CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR INZEP PART TO OTHERS OUTSIDE THE RECIPIENT ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY VA INC. JOB NUMBER JB -9222539 0 0 PREWSE OWNER: DESCRIPPON: AVINA GERARDO AVINA RESIDENCE 52816 AVENIDA MENDOZA 5.865 KW PV ARRAYS LA QUINTA CA 92253 , , PAGE NAME 7606004771 << SITE. PLAN PLACARD DESIGN: Kyle Ahlers ar.w1;SOhr'CiY MOUNTING SYSTEM: Mighty Hook MODULES: (23) KYOCERA # KU2556XCA 3055 alp way soy Mateo, CA 94402 T -SOL CITY (7 5 F:9) w 638-1029 (BBB)-soL-aTY (ass-z4as) solaraRy.com SHEET: REV DATE PV 8 b 1/12/2015 w�� ABB PVI-5000-000-US-z—A - Label Locatio6: (C)(IC)(CB) Per Code: CRC,2331.2 Label Location: (DC) (INV) Per Code: CEC 690.14.C.2 Label Location: (DC) (INV) Per Code: CEC 690.53 Label Location: (DC) (CB) Per Code: CEC 690.17 Label Location: (INV) Per Code: CEC 690.5(C) Label Location: (AC) (POI) Per Code: CEC 690.14.C.2 Label Location: (AC) (POI) Per Code: CEC 690.54 Label Location: (AC) Label Location: (DC) Per Code: CEC 690.17 Label Location: (POI) Per Code: CEC 705.12.D.7 Label Location: (POI) Per Code: CEC 690.54; CEC 690.17 Label Location: (D) (POI) Per Code: CEC 690.64.13.4 Label Location: (POI) Per Code: CEC 705.12.D.7 Label Location: (DC)(INV)(CB) Per Code: CEC 690.35(F) TO BE USED WHEN INVERTER IS UNGROUNDED CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY L I (AC): AC Disconnect (C): Conduit (CB): Combiner Box (D): Distribution Panel (DC): DC Disconnect (IC): Interior Run Conduit (INV): Inverter With Integrated DC Disconnect (LC): Load Center (M): Utility Meter (POI): Point of Interconnection CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR ��%@$ 3055 Ueaview way THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED49 San IN WHOLE OR INPARTTO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, SC CA Label Set SolarCity.T:(65o) 63aMoz�B F(65063&1029 EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE - - -- -- - /� (888}SO 50) 63 (765-2489) w)638-1rcity.com SOLARg1Y EQUIPMENT. WITHOUT THE WRIIIEN PERMISSION OF SOLARg1Y INC. - - - -- — - - - - - _ SolarCity SleekMountTM - Tile ^ _ SolarCity SleekMountTM - Tile ' w The SolarCity SleekMount hardware solution. • Utilizes Zep Solar hardware and UL 1703 listed 1 R�Y Installation Instructions - . Zep CompatibleTM modules is optimized to achieve superior strength and . '• .. r4'"'Remove tile and locate rafter aesthetics while minimizing roof disruption and r • Interlock and grounding devices in system UL labor. The elimination of visible rail ends and listed to UL 2703 Vii.2 Drill pilot holes of proper diameter for mounting clamps, combined with the addition ,t y; fastener size per NDS section 1.1.3.2 Interlock and Ground Zep ET•L listed to UL 1703 {: of array trim and a lower, profile all contribute to _ " � 0 Seal pilot holes with roofing sealant as "Grounding and Bonding System" amore visually appealing system. SleekMount 1. ® Place rile hook utilizes Zep CompatibleTM modules with - • Ground Zep UL and ETL listed to UL 467 as t. _ ' '" r�1 strengthened frames that attach directly to Zep grounding device O Install lags pursuant to NDS section 11.1.3 4 with fender washer Solar standoffs, effectively reducing the number \ • Anodized components for corrosion resistance of standoffs required, when compared to - © Notch underside of tile and reinstall tile -+�7 , conventional rail -based systems. Applicable for vent spanning functions • F _ ..._.,.J.... . _ 0 Attach Spanner Clamps and tighten firmly in place Insert Cam Foot into Spanner, Bar and rotate e : Cam Nut 100 degrees Components `' ■ 0 Place modules , O Cam Foot O- ©Spariner Bar _. - ~ • 3 q'<f ' _ _ �'—•�"^. _.� _ - - . - " _ © 3/8" Machine Screw and Nut "4 -- Spanner Bar Clamp Tile Hook p _ A,tr• ' - y �, ,.' ~ , . - .♦ ' • I / 0 Lag Screwo (2) T` � rY { � 'Yt <, � . - ^' • f . • �• •' '- 1 ,O - � •..� a.�t ',r iL_ - w `' - ` r .�1`-� � 1 x s' �. ,�.�' f �� � _ w A ♦ • r � r AC Lr r , r r �i1S®I1t'i;�t o January 2013W UL LISTED ;; �It� �ooa��t o January 2013 y y Designed for residential and small commercial PV installations, this inverter fills a specific niche in the ABB product line to cater for those installations producing between 5kW and 20M This inverter includes dual input section to process two strings with independent MPPT. The high speed and precise MPPT algorithm offers real-time power tracking and energy harvesting. Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance across the entire input voltage and output power range. This outdoor inverter has been designed as a completely sealed unit to withstand the harshest environmental conditions. The wide input voltage range makes the inverter suitable to low power installations with reduced string size. The transformerless operation offers high performance efficiencies of up to 97.1%. Free remote monitoring capability available with every installation. This enables homeowners to view their energy production and offers installers a proactive and economic way of maintaining and troubleshooting the system. Highlights: - Single phase and split phase output grid connection. - Wide input range for increased stringing flexibility. - The high speed and precise MPPT algorithm offers real time power tracking and improved energy harvesting. — Outdoor NEMA 4X rated enclosure for unrestricted use under any environmental conditions. — Integrated DC disconnect switch in compliance with international Standards (-S Version). Power and productivity AN nnQn OD for a better world'"" PR LJL�J OD r Additional highlights: - RS -485 communication interface (for connection to laptop or data logger). — Integrated Arc Fault Detection and Interruption (-A Version). Technical data and types TVDe code Contributory fault current' Ambient air operating temperature range 2. inverter can appy that much current - Breaker will open 2 ABB Solar Inverters I Product fryer for PVI-5000/6000-TL-OUTD PVI-5000-OUTD-US . :91 PVI-6000-OUTD-US ...........................................................................:6i)I)V....................................................................................... ......................... ..........................................200V (ad{120.350)......................................................................... 200 - 530V ............................................................................................................................................................ 0.7 x Vstart - 580V .......................................................................................................................................................... .......................................................... 22A......................................................................................... ............................................................................................................................................................ 2 Pairs 1 X -13T to +140°F (-25°C to +60°C) " Jco + tm ................................... m).............................. s KU -60 1000V Series ELECTRICAL SPECIFICATIONS MODULE CHARACTERISTICS StandardTest Conditions Cells per module: 60 (6 x 10)I(yO C ERE] KU UO 1 000V 7 Series rr� � - Dimensions: 65.43in/38 .98in)1.57in KU255-6XCA A 606 lengthAvidth/height (1662mmi990mmi40mm) r F Weight: 47.4lbs (21.5kg) - 260 W CUTTING EDGE TECHNOLOGY As a pioneer with four decades of experience in the development of photovoltaic systems, Kyocera drives the market as a leading provider of PV products: We demonstrate our Kaizen philosophy; or commitment to -continuous improvement, by setting the industry standard in the innovation of best -in -class solar energy equipment. QUALITY BUILT IN • UV -stabilized, anodized aluminum frame in black • Supported by major mounting structure manufacturers • Easily accessible grounding points on all four corners for fast installation • Proven junction box technology with 12 AWG PV wire works with transformerless inverters •Amphenol H4-UTX locking plug-in connectors provide safe, quick connections PROVEN RELIABILITY y • Kyocera modules confirmed by the Desert Knowledge Australia Solar. Centre to have the highest average o -• output of any crystalline module • First module manufacturer in the world to pass long- term sequential testing performed by TUV Rheinland • Only module manufacturer to achieve the rank of Performance Leader" in all six categories of GTM • Pm� vm, 255 30.8 .. 31.0 V PACKAGING SPECIFICATIONS , - - - ,I .. -" .- .. 8.28 8.39 _ A ' ( - Modules per pallet 20 WARNING: Read the instruction ^ V T 38.0 38.3 V Pallets per 53' container. 36 t handling, installing B operat- ing Kyocera Solar modules. V 062614 Pallet box dimensions: 66ini40ini43in " tl 8.83 9.09 A length/width/height (1675mm)1005mmi1055mm) P.Ieaaae +5i-0 +5i-0 % Pallet box weight 1060lbs(480kg) r •• Nominal Operating Cell Temperature Conditions• „ -. :,, , 1.57- 4.33- (T. 45 45 oC P 183 ` 187 W IL JUNCTIONJUNCTIONBOK(IP65) a -27.7 Vm_ V.,+..�. - ..._.- 27.9 V f _ s� ❑ LABEL 1 P 6.61 6.71 A -? f__r' STABILIZER BAR 34.8` 35.1�V _y 7.15 7.36 A g W...J� .. 't = PTC�4 228.3 232.9 ,-- --nts Temperature STABILIZER BAR P„- -0.45 -0.45 %/°C * 1.10 (sBw . r• 4.Vmc _ .,•---- �-0.48 - ,._...0.48 r F %i°C IR • 1m°•-.� ....� �. ...0.02 ��., ., r-••r� �- 0.02 w yF %�°C�# � V. i -0.36 -0.36 %i°C 38.98" (99Um8 Research's 2014 PV Module Reliability Scorecard . - -'- - ""- "� ^" "'t' -1 -0 i •., �< _ 0.06 0.06 %i°C € (U/ ? CERTIFICATIONS y , Operating Temp -40 to +90 1 -40 to +90 °C Grwml°r x°I° .Slotted Nowlin Hole•' 0.18- (4aW . 6.35-16.0- (9-12.0 • UL1703 Certified and Registered, UL Module Fire . • ' Performance: Type 2, CEC System Design FRAME CROSS SECTION DIAGRAM r • NEC 2008 Compliant, IEC 6121561730, and ISO 14001' Series Fuse Rating _ w 15A i AW ' a°oMpAT� - Maximum DC System Voltage (UL) �rT 4 1000V u2. r E k� H ilstone Impact in (25mm) @ 51 mp (23m/s) C Uzi pcUMFPSYO •K• 'Subject to simulator measurement uncertainty of +l- 3%._. - - 1. , - - - KYOCERA reserves the right to modify these specifications without notice. _ LONG/SHORT SIDE ; 1 STABILIZER BAR ` a WARNING: Read the instruction ^ - ,. - ,t manual in its entirely prior to • • t handling, installing B operat- ing Kyocera Solar modules. 062614 OUR VALUED PARTNER 4 D BI 3.75 [95] OI m ®.36 f 1 1 3 6.81 (173) 6.36 [162] 1 .34 ON � I n m - u ry e O O o o OFF O CONCENTRIC KNOCKOUTS FOR TANGENTIAL KNOCKOUTS FOR v1 1/2, 3/4 CONDUIT 1/2, 3/4 CONDUIT °� •�� O• OUANTITY 2 QUANTITY 4 O ry .27 [6.8] DIA. N 2 46 [62] 3 MOUNTING HOLES N e .88 [22] N v 4.75 [121]m B m n 1.01 [26] TANGENTIAL KNOCKOUTS FOR 1/2, 3/4, 1 CONDUIT QUANTITY 1 NOTE: 1. METRIC DIMENSIONS (IN MILLIMETERS) ARE SHOWN IN BRACKETS. .281 (5.5) DIA. 2. WIRE RANGE OF LUGS IS AS FOLLOWS KNOCKOUT LINE AND LOAD LUGS #6-#14 COPPER OR ALUMINUM QUANTITY 1 .82 [46 .82 146 N NEUTRAL #4-#14 COPPER OR ALUMINUM 6.10 (155] m m A MC IWIF"IY Or a10."CORPOIUIIpx WARREN SPE 8/'19'/98 CUTLERHAMMER PITT59URCH PA aa" aim a fla Nn - R. PRORASKA 8/119/98 DIMENSION SHEET �rw "wog n s -E0.— 30 AMP TYPE 3R GENERAL DUTY 95 11445.DDWC S574DGCI I-2 A c "n95-1445 iaF 1 3 2 1 O N M 0 3.75 [95] OI m ®.36 f 1 1 3 6.81 (173) 6.36 [162] 1 .34 ON � I n m - u ry e O O o o OFF O CONCENTRIC KNOCKOUTS FOR TANGENTIAL KNOCKOUTS FOR v1 1/2, 3/4 CONDUIT 1/2, 3/4 CONDUIT °� •�� O• OUANTITY 2 QUANTITY 4 O ry .27 [6.8] DIA. N 2 46 [62] 3 MOUNTING HOLES N e .88 [22] N v 4.75 [121]m B m n 1.01 [26] TANGENTIAL KNOCKOUTS FOR 1/2, 3/4, 1 CONDUIT QUANTITY 1 NOTE: 1. METRIC DIMENSIONS (IN MILLIMETERS) ARE SHOWN IN BRACKETS. .281 (5.5) DIA. 2. WIRE RANGE OF LUGS IS AS FOLLOWS KNOCKOUT LINE AND LOAD LUGS #6-#14 COPPER OR ALUMINUM QUANTITY 1 .82 [46 .82 146 N NEUTRAL #4-#14 COPPER OR ALUMINUM 6.10 (155] m m A MC IWIF"IY Or a10."CORPOIUIIpx WARREN SPE 8/'19'/98 CUTLERHAMMER PITT59URCH PA aa" aim a fla Nn - R. PRORASKA 8/119/98 DIMENSION SHEET �rw "wog n s -E0.— 30 AMP TYPE 3R GENERAL DUTY 95 11445.DDWC S574DGCI I-2 A c "n95-1445 iaF 1 3 2 1 Switching Devices . E:T*N* Powenng Business Woddwide 30A 24 DG221URB o— General Duty Safety Switch Interru for a se uridad servicio li ero 2 Pole Non -Fusible sfarie$: aty: Polos sin fusibles Seri®s: B Cant.: TREMA) 3R Rain roof MOE IN U.S.A. 0311612012 p HECHO EN E.U.A. $531430 REMA) Tipo 3R a prueba de LI 7 82113 12023 2 Safety Switches DG321NRB 120/240 Vac General -Duty, Fusible, Single -Throw, continued Maximum Horsepower Ratings - Single -Phase AC Three -Phase AC Ampere Fuse Type NEMA1 DC Endasure Indoor NEMA 3R Enclosure RainproofSystem Rating Provision 120V 240V 240V 250V CatalogNumber Catalog Number Ff Cartridge Type -Three -Pole, Three -Wire (Three Blades, Three Fuses) -240 Vac b 1 1 30 — — — — — f goo 400 If — — 50-125 — OG325FGK OC' DG325FRK bC 600 H — — 75-200 — DG326FGK OOO OG326FRK 70 - Cartridge Type-Four•Wire (Three Blades, Three Fuses, S/N)-120/240 Vac 30 H — 1-1/2-3 3-7-1/2 — OG321NGB DG321NRB 75 y 1 00 H — 7-11/2-15 15-30 — DG323NGB OG323NRB Trill 200 H — 15 25-60 I I I I — DG324NGK OG324NRK - 400 If — — 5D-125 — DG325NGK OG325NRK 600 H — — 75-200 — OG326NGK DG326NRK 0' —0URB 120/240 Vac General -Duty, Non -Fusible, Single -Throw Maximum Horsepower Ratings NEMA 1 NEMA 311 Ampere Single -Phase AC Three -Phase AC DC Enclosure Indoor Enclosure Rainproof System Rating 12DV 240V 240V 250V Catalog Number Catalog Number Two -Pole, Two -Wire (Two Blades) -240 Vac 30 7 3 — — DG221UGB C OG221URB G) _ 11 60 3 10 — — OG222UGS11 - OG222URB,-t i.. 100 15 — — OG223UGBEl OG2Z3URB S �p - - 200 - Three -Pole, Three -Wire (Three Blades) -240 Vac i' r ` - 30 2 3 7 -in — DG321UG8 DG321URB,@ 60 8 r` 15 30 — 100 - OG323UGB O OG323URB O 200 — 15 60 — OG324UGKE DG324URK0 400 — — 125 — OG325UGK= DG325URKG 600 — — 200 — DG326UGK _ DG325URK 0 I• a Notes G Maximum hp ratings apply only when dual element time delay fuses are used. C�. Use four -wire catalog numbers below. 7 Solid neutral hats are nm included. Order separately from table on Page 15. c^ WARNING! Switch is not approved for service entrance unless a neutral kit is installed. - a, O C9 Use three -wire catalog numbers below. - ip ' W Drilfed to accept field installed neutral kits. - All general -duty safety switches are individually packaged. - O Accessories are limited in scope on general-0uty safety switches. See Page 15 for availability.• In addition, clear line shields are available as an accessory `- _ ' on 20D -600A general-dulyswi(ches. Catalog Numbers: 200A=70.7759-11, 400A=70.8063-8.ODA=70-8064-8. - A t _ +1 ' Volume 2- Commercial Distribution CA08100003E—February2o11 www.eamncom 27 4 t E:T*N* Powenng Business Woddwide 30A 24 DG221URB o— General Duty Safety Switch Interru for a se uridad servicio li ero 2 Pole Non -Fusible sfarie$: aty: Polos sin fusibles Seri®s: B Cant.: TREMA) 3R Rain roof MOE IN U.S.A. 0311612012 p HECHO EN E.U.A. $531430 REMA) Tipo 3R a prueba de LI 7 82113 12023 2 F 4 D 31 ry _ 3.75 (95] m m F,4.36 flII A c p 4 2 1 0 D 0 6.89[175) 6.81 (173] 5.73 [145] 6.36 (162] 1 .34 [9] ON I M O O c 0 O d m OFF o CONCENTRIC KNOCKOUTS FOR TANGENTIAL KNOCKOUTS FOR 1/2, 3/4 CONDUIT 1/2, 3/4 CONDUIT _ E O. QUANTITY 2 QUANTDY 4 ri M O N .27 [6.8] DIA MOUNTING HOLES 2.46 [62] 3 N .281 (5.5) DIA. KNOCKOUT QUANTITY I e NGENTIAL KNOCKOUTS FOR /2, 3/4, 1 CONDUIT JANTITY 1 NOTE: 1. METRIC DIMENSIONS (IN MILLIMETERS) ARE SHOWN IN BRACKETS. 2. WIRE RANGE OF LUGS IS AS FOLLOWS LINE AND LOAD LUGS #6-#14 COPPER OR ALUMINUM NEUTRAL ]f4-#14 COPPER OR ALUMINUM A Ma p G1amRRanox WARREN SIPEeil9/96 CUTLER—HAMMER 6IT�N 60* m 8E �i6rmr'O PITfSBIIRGH PA aR o6a� n DA[ "d_ R. PROHASKA 8/119/98 ^� DIMENSION SHEET �rOR RR R 6 r~MED' dn• 30 AMP TYPE 3R GENERAL DUTY 95-1445.DWG vrRu n — ov¢ (nuan -1 swe S574DGCI I-2 775__ a °" c —"°95-1445 i or 1 2 1 0 N 0 Tfa ko ry _ 3.75 (95] m m F,4.36 flII A c p 4 2 1 0 D 0 6.89[175) 6.81 (173] 5.73 [145] 6.36 (162] 1 .34 [9] ON I M O O c 0 O d m OFF o CONCENTRIC KNOCKOUTS FOR TANGENTIAL KNOCKOUTS FOR 1/2, 3/4 CONDUIT 1/2, 3/4 CONDUIT _ E O. QUANTITY 2 QUANTDY 4 ri M O N .27 [6.8] DIA MOUNTING HOLES 2.46 [62] 3 N .281 (5.5) DIA. KNOCKOUT QUANTITY I e NGENTIAL KNOCKOUTS FOR /2, 3/4, 1 CONDUIT JANTITY 1 NOTE: 1. METRIC DIMENSIONS (IN MILLIMETERS) ARE SHOWN IN BRACKETS. 2. WIRE RANGE OF LUGS IS AS FOLLOWS LINE AND LOAD LUGS #6-#14 COPPER OR ALUMINUM NEUTRAL ]f4-#14 COPPER OR ALUMINUM A Ma p G1amRRanox WARREN SIPEeil9/96 CUTLER—HAMMER 6IT�N 60* m 8E �i6rmr'O PITfSBIIRGH PA aR o6a� n DA[ "d_ R. PROHASKA 8/119/98 ^� DIMENSION SHEET �rOR RR R 6 r~MED' dn• 30 AMP TYPE 3R GENERAL DUTY 95-1445.DWG vrRu n — ov¢ (nuan -1 swe S574DGCI I-2 775__ a °" c —"°95-1445 i or 1 2 1 -. , �. . .. J s - ,, MI`s A a ' ' J .0 � ,„ ', �, • -I ! ' . Y �. , Datasheet: ZS Tile . - Datasheet: ZS Tile `ra « (\Components?e'P S Iar, o lU I - «� � , Interlock The Interlock Prohandednorth-southr landock. east-estlasstructural and ground bond connections -creating a structurally, , �, '-,xf - Tel's • 1'` '� - 1 contiguous hyper -horded array. Interlock. UL fisted to UL 2703 and ETL listed to UL 1703. , • r - 4 r l l3 -18r 13o1..2y-m1 inmLeveling Foot I.25in18,mm S_ 320irt ,• REZV Ile" ss�` 139.4mm1 foritile roofa 'tin �19.2m• m1' - - ` - ` ' The Leveling Foot provides a means of attachment bet.een the PVarrayand the mount ny 5urace orf lashed attachment apparatus and aliows for easy array height adjust meet(1.25"throw). 4 ,3 kr. ' Array Skirt ZS Tile' offers the fastest and least expensive way to install PV Zep Compatible " '. arrays on tile roofs. it's designed to interoperate with a growing list of ZS Tile mounting hardware is r. Zep Compatible PV modules that incorporate the patented Zep Groove designed for use with Zep The array skirt facilitates easy frcnt•rowinstallation white Providing a clean looknt the front of the PV array. frame specification. Utilizing quarter -turn, rock -in, and drop-in con •�, Compatible"PV modules from- nectlons, ZS tile eliminates the need for rails and separate grounding 'leading PV module Manufacturers. x^n�'� ` Ground Zep "hardware while offering a superior aesthetic approach. " r s � Visit zepsolar.com for a current list of Zep Compatible" PV modules. • �� ~ '� T • k. point of connection bevneen the PV arra and the equipment grounding conductor. One Ground 3. f. �r-_ - "��, The Grouts Zep prcvitlesa y y 9 - r . _ - _ - v,.- - '� - r - - �'i - 'f.. x"i iia`. ' •s >'Zepisrequiredfor every 72 PV modules. UL and ETL listed to UL 467. ULtistedto UL2703. - - • - -'. Key System Benefits - Key Technical Features - Our Other Product Families Universal Box Bracket. AC/DC Cable Clip ti' Replacement Tile t , : L . Y µ • _ Dramatically reduces installation " Low system weight' .ZS Aero ` - - �•, time ; R O for low -slope &flat roofs y Easil enables additional support Eliminated mounting rails and clip +^ Y PP ZS COMP ' Pit- " • 9 p at array edges for -high wind .- ® for composition shingle roofs FIS ' `r x , hardware zapp applications ZS Seam` ' Eliminates separate roundin - for standing seam metal roofs • : g g Interlock ETL fisted t0 UL 1703 as `'ri A s The Universal Box Bmcketullows rapid, tu!chmenf of ;' Clips into Zep Groove for ultra -fast and easy, The Replacement Tile -itriwides ameans of hashed ' ZS S an` �r _ . hardware * ;_ ground bond means' .�a' p • etectricalhores to the module frame.-'.• y•�, managememof PVwiripgand mlcio-inverter cables.y` attachment for ZSTile installstions. - �•, s r _ �' • } .' O for rail based applications `N /J t �. ,w , Rapid, top accesslblepreclslon •• r �7 • Array Skirt Cap Set Tools U' t array leveling 3 Ground Zep UL ETL listed to UL . ZS Trap_ r ~ ~ _ �•`'* ; ` 467 as roundin and banding device_ for trapezoidal metal foots' .,T a - , grounding 9 P t i 3'' .. r .. ,r Ultra -retia hyper bonded. c ZS Wave r' r i r• 4 Interlock, Level Foot. and Ground' , S:f ;„ •, t •. �" z grounding matrix g 0 for corrugated roofs Zep listed to UL 2703 as PV bonding *r A f device _ r , 3` • } Ultradow parts count �' € ,. 4 f. `r The Arra Skin, Ca Set provides an arslhlaic cover tor? .Ze Toot: functions, I tool; Flat Tool: For inter-modute •. y • . S-• - - '• ,Enhanced aesthetics v i- - - } • the exposed end of the Array Skirt. Made of anodized '''removal.'a•- -" a _ aluminum. eachset comes with two Skirt Caps. ry ' •..r - - + •J • y; • V �p,0MP4l,�! _ y _ • } , ', l• ` - a •:.s - 3 • ,� _ • S' Ihn do[omerd Epti rot peu¢u yi2p ass tmmly bi Zcp Sob,or•mol Upmpiro or se+ai[e Z GSalti;!clr as rn..uww sal mitt � ao eredtd ammti! tottral Visa repwlar.com for note ",r etonnbout Gut ottduns ad tompapy. i - .L LISTED �� prodal.Ir e'duseneo[omew;mnsh:7o[dniihLpSu�a�ioma.n!comttu:cil'r sol[,oxe:li�r!um rtf[*ee lcintMpe;.:n �narr ihcw lovv uol[Y!e!la:rziotetu! '1'' •M1' ` .. �oarvr•� .. p2 rr:Ui �91A?spn.rd tg pl7roSolr:: p:oduc:t l,tea[('U.eSproru ice an suble[ttoMarcse 'n5am nonce LoGri:gh; �7Ula-Zap lro Sola61tU.5. %tt[nr a'S91i71, U1 ' � - Page 1 c f 2' + i ea:ettalo�.uda us akuPatn:nvM;lGc .;uoa le b u yvao'stuen Page 2 of 2 - -. .. • (• < ". ,, - . .. 3~" ' i f � a r�� � _ i:i : 7 f .. -"s.• e`er' _ Y r S _ p f Q. av x•.r.;i Y C� J ��.k .; _ r r SolarCity Standard Box 4C 4 -String Fused Combiner Box The SolarCity Standard Box 4C is a compact combiner box capable of fusing and combining 4 strings. NEMA 4X Rated Provides maintenance -free, weathertight, corrosion resistant, continued protection. Includes Integrated Cordgrip Integral components ensure proper installation and eliminates additional steps in the installation process. UL Listed The SolarCity Standard Box 4C is Listed by UL. Representative samples of this product have been evaluated by UL and meet applicable safety standards pursuant to UL 1741. Key Features • Voltage Rating: 600 V DC • Maximum Input Circuits: 4 • Maximum Input Current: 24 A DC Per Channel • Maximum Fuse Size: 30 A • Wire Size: #6—#14 AWG • Enclosure Rating: NEMA 4X • Operating Temperature: -40 to 50°C • Typical Dimensions: 10"x10"x8" April 2014 41.h I I SolarCity. 888.SOL.CITY 888.765.2489 solarcity.com ��� I 4 -String Fused Combiner Box The SolarCity Standard Box 4C is a compact combiner box capable of fusing and combining 4 strings. NEMA 4X Rated Provides maintenance -free, weathertight, corrosion resistant, continued protection. Includes Integrated Cordgrip Integral components ensure proper installation and eliminates additional steps in the installation process. UL Listed The SolarCity Standard Box 4C is Listed by UL. Representative samples of this product have been evaluated by UL and meet applicable safety standards pursuant to UL 1741. Key Features • Voltage Rating: 600 V DC • Maximum Input Circuits: 4 • Maximum Input Current: 24 A DC Per Channel • Maximum Fuse Size: 30 A • Wire Size: #6—#14 AWG • Enclosure Rating: NEMA 4X • Operating Temperature: -40 to 50°C • Typical Dimensions: 10"x10"x8" April 2014 41.h I I SolarCity. 888.SOL.CITY 888.765.2489 solarcity.com ���