Loading...
PLBG (9606-073)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter,9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. ' -License # Lic. Class Exp. Date y, 475515 YN, B el Date #2 t1Signature of Contractor t,'xA e- < +P ✓ } OWNER -BUILDER DECLARATION' I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: - ( ) I, as owner of the property, or my employees with wages as .their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am. exclusively contracting with licensed contractors to construct the.project (Sec. 7044, Business & Professionals Code). O I am exempt under Section B&P.C. for this reason Date Signature of Owner x WORKER'S COMPENSATION DECLARATION .I hereby affirm under penalty of perjury •one of the. following declarations: () I have and will maintain a certificate of consent to selfinsure for workers' compensation, as provided for by Section 3700 of the Labor Code, for.the performance of the work for. which this permit is issued.• ( ) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for'which•this permit is}➢s�ue�d�; My�tWkers' compensation insurance car9gr. pplicy no. are: Carrier Policy No. (This section need not be completed if the permit valuation is for $100.00 or less): O I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, .and agree that if I should become subject to the workers' compensation. provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions: ,,:,,Date:(-/.. 1-104- APPlicant r f • � �// ' .F Warning: Failure to secure Workers' Compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $1.00,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of, Building and Safety for a permit subject to the conditions 'and restrictions set forth on' his application: 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to,'& shall, indemnify & hold harmless the. City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes. null and void'if work is not commenced within ,180 days from date of issuance of. such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. Lagree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this -City to enter;upon— the above-mentioned property for inspection purposes. Signature (Owner/Agent) +'�� -'+,' - " '"^ Date !i,57 .7 :. BUILDING PERMIT PERMIT# °°NTR°`# 9606-10733.5 2 • DATE 6/44/9 ,VALUATION � � ��.�1. LOT 1 . : ,• TRACT JOB SITE ADDRESS X705 AVS NIDA I♦6`%F-1 t� M APN s. 774-132 -021 OWNER CONTRACTOR / DESIGNER / ENGINEER •te0N.STi MCK i&NIACY MEAL i.:l. i.i0. N - , 'FRI gTA ,3703 :�.�'E1°�ti3.A �+3:8i�1' � 1� 31LI 0 CAN 1;7LNrOOD 97 LA. QUIRIA. CA. 9.2257# .. C.AT[3_EDRA_L CITY .C.A. 92231. CBul.7G2, USE OF PERMIT SEWER C(.)NNr,.C! ' CONTRACT AdvlOLIN s 1.100.00 LS vmNrii°r:'E�I'.�r1:16�rii�Y . i M18ING t**F -- SEWi R 101-000,419-OOn • $10.e0 i�..y CONS'CR:I I(E ��'fA! AND PLAN CHECK $30.00 �aL , LESS PRE -PAI FLEE a $0.00 JUN 1 _; �•>1rv�,ne3�.���1 1996r�i<;,.:�»:>s 3y. RECEIPT DATE BY DATE FINALED INSPECTOR . A INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Gradq Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K to Wrao F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wail Firewall Exterior Lath Drywall - Int. Lath Final Final BLOCKWALL APPROVALS POOLS - SPAS steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final I I Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Ap fiances (i Final Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) COMMENTS: ` ' f COACHELLA VALLEY WATER DISTRICT �" • ����� CASH RECEIPT DETAIL Received From: » Date _ i " y / ^ Y� n /lAadress: �ccount No. J/ U ? C!. Lot(s) Tract / Service Address �'. "c.�y_/ r, ..; %� Q 1 G. A. Code q Meter(s) $ f ❑ Service(s) ' ❑ Backflow(s) ❑ House Laterals) ❑ Detector-Check(s) ❑M er Surcharge i Sanitation Capacity Charge 1. " O W.S.B.F.C. . ❑ Temporary Construction Meter r ❑ Turn on Charge ❑ Uncollected Account - Name ❑ Inspection Fee -Tract - .. Fee - "., ❑ Plan Check Fees Water I Sewer = ' Tract -. E, ❑ Bond Payment - A.D. - Bond Assmt. '. ❑ Customer Deposit " ❑ 'Other TOTAL $ SE Remarks: ❑ Copy "to: ' ' Cash Water Service ' Check Mone Y Cashier :. Order1s./ CVWD 438(11/89) HAMMER PUMPING INC. JOB INVOICE -ti P.O. Box 2448 CATHEDRAL CITY, CALIFORNIA 92235-2448 (619) 360-7448 ri QUANT. DESCRIPTION OF MATERIAL USED CUSTOMER'S ORDER NO. DATE ORDERED (619) 321-7448 Gallons - --�� 000 Pumping Fee per 1000 gal. ORDER TAKEN BY ATE PROMISED ❑ A.M. ❑ P.M. BILL TO ....p./ _ PHONE r ADDRESS '/ MECH6NIC Out of Area Fee CITY HELPER JOB N9 ANDISO CAy �vy - b Locating / Opening Fee (per hour) �F LSI DESCRIPTION OF WORK rr cl r~ moi✓ /� L CONTRACT ❑EXTRA Size System: ri QUANT. DESCRIPTION OF MATERIAL USED PRICE AMOUNT ,9Qp Gallons 000 Pumping Fee per 1000 gal. )a 0 Dumping Fee per 1000 gal. �� O Out of Area Fee Locating / Opening Fee (per hour) Size System: A SERVICE CHARGE OF $20 WILL BE DUE ON ALL RETURNED CHECKS. A FINANCE CHARGE OF 11/2% PER MONTH, 18% PER YEAR WILL BE CHARGED ON PAST DUE ACCOUNTS OVER 30 DAYS. HOURS LABOR AMOUNT TOTAL MATERIALS MECHANICS Q HELPERS Q TOTAL LABOR I hereby acknowledge the satisfactory TOTAL LABOR completion of the above described work: TAX SIGNATURE �«✓ .".rti.,x, Ke, /, /DATE COMPLETED % �'� TOTAL , 2 6� V 1 NOTICE TO OWNER Under the.California Mechanics Lien Law any contractor, subcontractor, laborer, supplier or other person who helps to improve your property, but is not paid for his/her work or supplies, has a right to enforce a claim against your property. This means that after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your contractor in full if the subcontractors, laborers or suppliers remain unpaid. To preserve their right to file a claim or lien against your property, certain claimants such as subcontractors or material suppliers are required to provide you with a document entitled "Preliminary Notice:' Original (or prime) contractors and laborers for wages do not have to provide this notice. A Preliminary Notice is not a lien against your property. Its purpose is to notify you of persons who may have a right to file a lien against your property if they are not paid. Generally, the maximum time allowed for filing a claim or lien against your property is ninety (90) Days after completion of your project. TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY, YOU MAY WISH TO TAKE ONE OR MORE OF THE FOLLOWING STEPS: 1) Require that payments be made directly to subcontractors and material suppliers through a joint control. Any joint control agreement should include the addendum approved by the Registrar of Contractors. 2) Issue joint checks for payment, made out to both your contractor and subcontractors or material suppliers involved in the project. This will help to insure that all persons due payment are actually paid. 3) After UPON making payment on any completed phase of the project, and before making any further payments, require your contractor to provide you with unconditional lien releases signed by each material supplier, subcontractor and laborer involved in that portion of the work for which payment was made. On projects involving improvements to a single family residence or a duplex owned by individuals, the persons signing these releases lose the right to file a claim against your property. In other types of construction this protection may still be important, but may not be as complete. TO PROTECT YOURSELF UNDER THIS OPTION YOU MUST BE CERTAIN THAT ALL MATERIAL SUPPLIERS, SUBCONTRACTORS OR LABORERS HAVE SIGNED.