Loading...
BPAT2014-101778-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT Application Number: BPAT20144017 Property Address: 81181 MERV GRIFFIN WY APN: 767780085 Application Description: .ZEN GARDEN PATIO COVER Property Zoning: Application Valuation: $15,000.00 Applicant: LENNAR HOMES OF CALIF INC 980 MONTECITO DR STE 302 CORONA, CA 0 VOICE (760) 777-7125 FAX (760) 777-7011 . INSPECTIONS.(760) 777-7153 Date: 10/7/2014 Owner: IOTA GRIFFIN Lr -v a 4675 MACARTHUR CT NO 1550 NEWPORT BEACH, CA 0 OCT 07 2014 CITY OF LA QUINTA COMMUNITY DEVELOPMENT DEPARTMENT Contractor: LENNAR HOMES OF CALIF INC 980 MONTECITO DR STE 302 CORONA, CA 0 Llc. No.::CONV:140528101253005876 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my License is in full force and effect. License j�: Lic se No.::CONV:140528 012 30058 Date: ' l Contractor: c/ OWNER -BUILDER DECLARATION ' I hereby affirm under penalty of perjury.that I am exempt fromL�,demolish, r's ate License Law for the following reason (Sec. 7031.5, Business andode:Any city or county that requires a permit to construct, alter, improv repair any structure, prior to its issuance, also requires the applicant fo file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or, she did not build or improve for the purpose of sale.). (_) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. B.&P.C. fo thi eason Date: (� r Owner: CONSTRUCTION LENDING AJ I hereby affirm under penalty of perjury that there is a ding a ency for the performance of the work forwhich this permit is issCiv. .). l Lender's Name: Lender's Add WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier: _ Policy Number: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to thew kers' compensation laws of California, and agree that, if I should become subject o the workers' compensation provisions of Section 00 o the La od , I sha forthwith comply with those rovisions. Date: �Q rt( Applicant: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COV AA�UNFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES A D CIO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT: Application is hereby made to the Building Official'for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application ,.the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any,act.or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance.of such permit, or cessation of work for 180 days will subject permit to cancellation. ' I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize'representatives of this city to enter upon the above- mentioned property for inspection purposes. Date: Signature (Applicant or Agent):. yfA •� �� ` DESCRIPYION x �` t £ACCOUNT QTY 9�AMOUNT. 4 z PAID' u~ PAID DATEr j BSAS SB1473 FEE 101-0000-20306 0 $1.00 $1.00 10/7/14 -PAID BY. METHOD g RECEIPT*..;z CHECK #, CLTD BY'' €' imL., tom:. ;,E S ""j . i . Ti-A�.-,: < <w, .wn.:r <?w. LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA Total Paid for BUILDING STANDARDS ADMINISTRATION BSA $1.00 $1.00 DESCRIPTION .>; # A ' s fi a ACCOUNT y QTY =F `A � $ =PAID PAID DATE F. _ , 1.MOUNTL' HOURLY PLAN CHECK - YES 101-0000-42600 2.5 $175.00 $175.00 10/7/14 BY rk < w '� METHODS RECEIPT # # x CLTD`BY h y- ry .' trCHECK LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA DESCRIPTION ` ° ACCOUNT ;,� QTY,r AMOUNT r s PAID PAID DATEI t<. ,`,e r X a HOURLY PLAN CHECK - YES 101-0000-42600 0.75 $52.50 $52.50 10/7/14 PAID BY r " k METHOD R T #; ECEIP H *tr C. E CK # _ ' CLT D BY .. s v' LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA Total Paid forCITY STAFF - PER HOUR: $227.50 $227.50 '+ " QTY_..x AMOUNT PAID PAID,DATEACCOUNTaDESCRIPTIO: WALL/FENCE - FIRST 100 LF 101-0000-42404 0 $47.19 $47.19 10/7/14 "' .`PAID BYE METHOD ` x RECEIPT #,ry # CLTD:"BY. x .CHECK LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA DESCRIPTION=ACCOIINT ''QTY AMOUNT'^ PAID PAIDDATE.' WALL/FENCE - FIRST 100 LF PC 101-0000-42600 0 $60.06 $60.06 10/7/14 PAID BYMETHOD » RECEIPT# CHECK # rCLTD BY; LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA Total Paid,forFENCE OR FREESTANDING WALL- $107.25 $107.25 DESCRIPTION vi < b '-ACCOUNT QTYa ; a AMOUNT, PAID` PAIDDATE, S PATIO COVER, DESIGNED 101-0000-42404 0 $131.56 $131.56 10/7/14 x' 1 BYE fit METHOD ° , RECEIPT # CHECK # CLTD BY'" .<"PAID .. «. a LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA y DESCRIPTION 3�' _ ,ACCOUNT QTY AMOUNT: PAID f" PAID,DATE''. < , PATIO COVER, DESIGNED.PC 101-0000-42600 0 $165.88 $165.88 10/7/14 "PAID:13y METHOD `_ g RECEIPT # CHECK# ` CLTD Blf' ti <, ."� LENNAR HOMES OF CALIF INC CHECK R1811 13165 MFA Total Paid for PATIO COVER/ COVERED PORCH / LATTICE $297.44 $297.44 ctu IL. DESCRIPTION + ACCOUNT Q TY�: '.w A MOUNT P AID` PAID DAT E w{ _ r SMI - RESIDENTIAL 101-0000-20308 0 $1.95 $1.95 10/7/14 { CEIPT #METHODx r RE CHECK # CLTD BY4. m LENNAR HOMES OF CALIF INC CHECK- R1811 13165 MFA . Total Paid forSTRONG MOTION INSTRUMENTATION SMI $1.95 $1.95 i Description: ZEN GARDEN PATIO COVER Type: PATIO COVER Subtype: Status: APPROVED Applied: 8/18/2014 PJU Approved: 10/6/2014 JJO Parcel No: 767780085 Site Address: 81181 MERV GRIFFIN WY LA QUINTA,CA 92253 Subdivision: TR 32879, Block: Lot: AW Issued: Lot Sci Ft: 0 Building Sci Ft: 0 Zoning: Finaled: Valuation: $15,000.00 Occupancy Type: Construction. Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: zen garden poles with 21 In ft. of 5 ft. high block walls. fountain will be seperate permit. ADDITIONAL SITES 49 � f Printed: Tuesday, October 07, 2014 5:04:44 PM 1 of 3 „___. FINANCIAL INFORMATION CLTD.' DESCRIPTION' ; ACCOUNT QTY AMOUNT. PAID ._ PAID: DATE RECEIPT # CHECK.# METHOD PAID BY • . BSAS SB1473 FEE 101-0000-20306 0 $1.00 $1.00 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA CALIF INC Total Paid for BUILDING STANDARDS ADMINISTRATION $1.00 $1.00 BSA: HOURLY PLAN CHECK - 101-0000-42600 2.5 $175.00 $175.00 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA YES CALIF INC HOURLY PLAN CHECK - 101-0000-42600 0.75 $52.50 $52.50 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA YES CALIF INC Total Paid forCITY STAFF - PER HOUR: $227.50 $227.50 WALL/FENCE - FIRST LENNAR HOMES OF 101-0000-42404 0 $47.19 $47.19 10/7/14 R1811 13165 CHECK MFA 100 LF CALIF INC WALL/FENCE - FIRST LENNAR HOMES OF 101-0000-42600 0 $60.06 $60.06 10/7/14 R1811 13165 CHECK MFA 100 LF PC CALIF INC Total Paid forFENCE OR FREESTANDING WALL $107.25 $107.25 PATIO COVER, 101-0000-42404 0 $131.56 $131.56 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA DESIGNED CALIF INC PATIO COVER, 101-0000-42600 0 $165.88 $165.88 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA DESIGNED PC CALIF INC Total Paid for PATIO COVER / COVERED PORCH / LATTICE $297.44 $297.44 SMI - RESIDENTIAL 101-0000-203080 $1.95 $1.95 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA CALIF INC Total Paid forSTRONG MOTION INSTRUMENTATION SMI: $1.95 $1.95 TOTALS: Printed: Tuesday, October 07, 2014 5:04:44 PM 2 of 3 Call" _••___ INSPECTIONS SEQID INSPECTION TYPE INSPECTOR. SCHEDULED ,COMPLETED RESULT REMARKS NOTES „ ._ ' DATE DATE' FINAL" PARENT PROJECTS ,,.,. Printed: Tuesday, October 07, 2014 5:04:44 PM 3 of 3 Description: ZEN GARDEN PATIO COVER -CHRONOLOGY Type: PATIO COVER Subtype: Status: APPROVED Applied: 8/18/2014 PJU Approved: 10/6/2014 JJO Parcel No: 767780085 Site Address: 81181 MERV GRIFFIN WY LA QUINTA,CA 92253 Subdivision: TR 32879 Block: Lot: AW Issued: Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: Valuation: $15,000.00 Occupancy Type:. Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 9/9/2014 Details:, zen garden poles with 21 In ft. of 5 ft. high block walls. fountain will be seperate permit. 9/9/2014. ADDITIONAL SITES- .... . .. ............ . .... 49 Printed: Tuesday, October 07, 2014 5:04:44 PM 1 of.3 __•,_ -CHRONOLOGY 77 x GOMPLET a 4. -« r "NOTESODAT >.CHRONOLOGYP.:;STAFFNAME .:. v_. . » 'a PLAN CHECK PICKED UP STEPHANIE KHATAMI 9/9/2014 9/9/2014 , CALLED LARRY @ 951-258-4890, GOT VOICE MAIL. LEFT TELEPHONE:CALL JIM JOHNSON 9/9/2014 9/9/2014. MESSAGE PLANS READY FOR CORRECTIONS. TELEPHONE CALL JIM JOHNSON 10/6/2014 10/6/2014 CALLED APPLICAND,PLANS READY TO ISSUE. CONTACTS ±.g... ... .rnx:`.f ::-:+. •R: :l" �: er. _.R✓.;, _--ADDRES51 .3.:R'.' F .t2'._ 'z':.'•` ,....::.. r. "._.,�. ^BitC i STATE.,,hZIP �a P,HONE. x.NAMETYPE w.NAME_ .;- rk- - 4� APPLICANT LENNAR HOMES OF CALIF INC 980 MONTECITO DR CORONA CA 0 STE 302 CONTRACTOR LENNAR HOMES OF CALIF INC 980 MONTECITO DR CORONA, CA 0 STE 302 . Printed: Tuesday, October 07, 2014 5:04:44 PM 1 of.3 __•,_ FINANCIAL • 1 n s^.:s'"�'KIFa.•,.Y .. .r^y, pw., ...N� m�. .s,: I. hF -n. dtL .. �r:K aE .:i +L. � E.^E'•. J a� Yr --s ':v' 'Y4*".:: t.. 'm[tcYy� ?X :. .,.... err ., �FrM CLTD `� E. .. '. t{� DESCRIPTION. r r ACCOUNT CITY - .i w rAMCiUNT .» ,x , PAID PAID DATE .:'RECEIPT # x;CHECK'# METHQD:°; i yK�.,.."#{x � ��N. i -� Y�-w•-I-�tN �'::. .4f.�-. �' ebh ., F^e+ae :.a ... :e a .x.S-f.. !+K:..:t ae S"'.'::.X. ,-.i., t a;.,C "N"✓. '+✓B .f' SS'.�':,i��.......�0v m.�%'.. "y,'�:'e'.a$•-*Ft.�.w.;�. ,,:rti.3,e, m+wti=d:::::Mie^xi7.t�"�. �d...-x'eFw afi. .-e,e.-:-Hiv .� r^..+rlLa. ::!•E:e;Y -. ..Yd Yx.vF, x�e- ae°a .. y.+,» t�..Ty mtr"�'1d $ea>��3a�''R`i;. x°,ea 1a LENNAR HOMES OF BSAS SB1473 FEE 101-0000-20306 0 $1.00 $1.00 10/7/14 R1811 13165 CHECK MFA CALIF INC 1 Total Paid forBUILDING STANDARDS ADMINISTRATION $1.00 $1.00 BSA: HOURLY PLAN CHECK - 101-0000-42600 2.5 $175.00 $175.00 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA YES CALIF INC HOURLY PLAN CHECK - 101-0000-42600 0.75 $52.50 $52.50 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA YES CALIF INC Total Paid forCITY STAFF - PER HOUR: $227.50 $227.50 WALL/FENCE -FIRST LENNAR HOMES OF 101-0000-42404 0 $47.19 $47.19 10/7/14 R1811 13165 CHECK MFA 100 LF CALIF INC WALL/FENCE - FIRST 101-0000-42600 0 $60.06 $60.06 10/7/14 R1811 13165 CHECK r LENNAR HOMES OF MFA 100 LF PC CALIF INC Total Paid for FENCE OR FREESTANDING WALL $107.25 $107.25 PATIO COVER, .101-0000-42404 0 $131.56 $131.56 10/7/14 R1811 13165 CHECK LENNAR HOMES OF MFA DESIGNED CALIF INC PATIO COVER, LENNAR HOMES OF 101-0000-42600 0 $165.88 $165.88 10/7/14 R1811 13165 CHECK MFA DESIGNED PC CALIF INC Total Paid for PATIO COVER / COVERED PORCH / LATTICE -$297.44 $297.44 LENNAR HOMES OF SMI - RESIDENTIAL 101-0000-20308 0 $1.95 $1.9510/7/14 R1811 13165 CHECK MFA CALIF INC Total Paid forSTRONG MOTION INSTRUMENTATION SMR $1.95 $1.95 TOTALS: Printed: Tuesday, October 07, 2014 5:04:44 PM 2 of 3 PARENT PROJECTS REVIEW TYPE REVIEWER SENT DATE: DUE DATE RETURNED STATUS REMARKS NOTES _ __. DATE N/S READY FOR CORRECTIONS NON-STRUCTURAL JIM JOHNSON 9/9/2014 9/9/2014 9/9/2014 REVISIONS REQUIRED 1ST. PLAN CHECK PLANS RETURNED TO F/C FILES 1ST.,PLAN CHECK BY YOUNG ENGINEERING STRUCTURAL JIM JOHNSON 9/9/2014 9/23/2014. 9/9/2014 REVISIONS REQUIRED 1ST. PLAN CHECK CORRECTION REQUIRED. NON-STRUCTURAL JIM JOHNSON 9/17/2014 10/1/2014 9/25/2014 APPROVED APPROVED NON STRUC APPROVED STRUCTURAL JIM JOHNSON 9/17/2014 10/1/2014 10/6/2014 APPROVED APPROVED PLANS APPROVED BY YOUNG ... „ ,,, BONG INE4R..... ATinN, . ATTACHMENTS Printed: Tuesday, October 07, 2014 5:04:44 PM 3 of 3 Bin # City of La Quinta -Building &r Safety Division 101 P.O. Box 1504, 78-495 Calle Tampico La Quin-ta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit# Project Address: /51 Owner's Name: Vn A. P. Number: Jt4 le'' Address: V Legal Description: City, ST, Zip: Contractor: 4 e–Vtv? eLv- telephone: Mum Address: Project Description: City, ST, Zip: Telephone: . ......... 14 JA State Lic. # City Lic. C)oArch., Engr., Designer: Address: jn City., ST, Zip: Construction Type: Occupancy: Telephone: ......... ...... ... ........ ............ ... State Lic. 4:• P roject ty p c (circle one): New Add'n Alter Repair Demo Name of Contact Person: Sq. Ft.: # Stories: # Units: Telephone. #,of Contact Person:; • �Xvo —I—E L 4 -9— stimated Value of Project: t9DO APPLICANT: DO NOT WRITE BELOW THIS LINE N Submittal Reqld Rec'd TRACKING PERMIT FEES Plan Sets Plan Check submitted 0/1 Item Amount' Structural CaIcs. Reviewed, ready for corrections Plan Check Deposit Truss Calcs. Called Contact Person C? Plan Check Balance. Title 24 CaIcs. Plans picked up Construction Flood plain plan Plans resubmitted • Mechanical Grading plan 2" Review, ready for correct f Electrical• 41 L Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up • S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees 7 1.5 Nis OP JI bSp'wo kG401 t-0 ' N P.O. Box 1.504 LA QUINTA, CALIFORNIA 92247-1504 78-495 CAL.LB TAiMPICO (760) 777-7000 LA QUINTA, CALIFORNIA 92253 FAX (760) 777-7101 Mr.' Scott McFarren In -Site Landscape Architecture 4 2400 Historic Decatur -Road, Suite'1.07-403 San Diego, CA 92106 �. a • SUBJECT: FINAL LANDSCAPING PLANS 2013-080, AMENDMENT #1 -REF: GRIFFIN RANCH CLUBHOUSE LANDSCAPING PLANS Dear Mr. McFarren: The Planning Division has reviewed and has approved the amended landscape plans for the Griffin Ranch Clubhouse. The Planning Division finds that the plans meet the requirements of Section 8.13. The installation of landscaping is subject to the conditions of approval for Site Development Permit 2006-872, Amendment #1. The Planning Division has stamped two copies of the plans as approved for your records. The third copy will remain in our files. Should you have any questions or need additional information, please feel free to contact me at (760) 777-7125 or ncriste@la-guinta.org. The Municipal Code can be accessed on the City's Website by logging onto www.la-guinta.org. Sincerely, Nicole Sauviat riste Consulting Planner G A ' GEOTECHNICAL INVESTIGATION PROPOSED GRIFFIN RANCH RESIDENTIAL DEVELOPMENT SEC AVENUE 54 AND MADISON STREET LA QUINTA, CALIFORNIA _. -Prepared By'- Sladden Engineering 39-725 Garand Lane, Suite G Palm Desert, California 92211 (760) 772-3893 Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 77273895 August 17, 2004 r :'` ProjectlVo`5414-4402` 04-08-571 Transwest Housing, Inc. 47-120 Dune Palms Road, Suite C La Quinta, California 92253 Attention: Mr. Rod Grinberg Project: Proposed Griffin Ranch Residential Development SEC Avenue 54 and Madison Street La Quinta,California Subject: Geotechnical Investigation Presented herewith is the report of our Geotechnical Investigation conducted for the construction of the proposed approximately 195 -acre residential development to be located on the southeast comer of Avenue 54 and Madison Street in the City of La Quinta, California. The investigation was performed in order to provide recommendations for site preparation and to assist in foundation design for the proposed residential structures and the related site improvements. This report presents the results of our field investigation and laboratory testing along with conclusions and recommendations for foundation design and site preparation. This report completes our original scope of services as outlined within our proposal dated July 8; 2004. We appreciate the opportunity to provide service to you on this project. If you have any questions regarding this report, please contact the undersigned - Respectfully submitted, SLADDEN ENGINEERING Brett L. Anderson Principal Engineer SER/pc Copies: 6/Transwest Housing ,I'FY 0 F LA QUINTA 3;.I{{._f?,iO & SAFETY DEPT "' P0\/ED FOR CONSTRUCTION 3 n�Tl` BY• GEOTECHNICAL INVESTIGATION PROPOSED GRIFFIN RANCH DEVELOPMENT SEC AVENUE 54 & MADISON STREET LA QUINTA, CALIFORNIA a' 'A'ugiist TABLE OF CONTENTS INTRODUCTION......................:............................................................................................................. 1 SCOPEOF WORK........................................................................................................................ ..... 1 PROJECTDESCRIPTION....................................................................................:.................................. 1 GEOLOGYAND SEISMICITY...........................................................................:.................................. 2 SUBSURFACE CONDITIONS............................................................................................................... 3 LIQUEFACTION..................................................................................................................................... 3 CONCLUSIONS AND RECOMMENDATIONS................................................................................ 3 FoundationDesign.....................................................................:..................................................... 4 Settlements...........................................:.......................:....................:...................c........................... 5 LateralDesign....:.............................................................................................................................. 5 RetainingWalls..................:.............................................................................................................. 5 ExpansiveSoils.......................................................................................:......................................... 5 Concrete Slabs-on-Grade................................................................................................................. 5 SolubleSulfates......................................................:.......................................................................... 6 TentativePavement Design............................................................................................................ 6 Shrinkageand Subsidence.............................................................................................................. 6 GeneralSite Grading.................................................................................................................. 1. Site Clearing........................................................................................................................... 6 2. Preparation of Building and Foundation Areas................................................................ 7 3. Placement of Compacted Fill............................................................................................... 7 4. Preparation of Slab and Pavement Areas...................................:...............:....................... 7 5. Testing and Inspection.......................................................................................................... 7 GENERAL................... ......................................................:...................................................:..................8 REFERENCES.................................................................................................................;........................ 9 APPENDIX A - Site Plan and Boring Logs Field Exploration APPENDIX B - Laboratory Testing Laboratory Test Results APPENDIX C - 1997 UBC Seismic Design Criteria CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY .. August 17, 2004 -1- Project No. 544-4402 04-08-571 INTRODUCTION This report presents the results of our Geotechnical Investigation performed in order to provide 1 :recorrimendatiorisfor site prepaiation and,.t assist ih the"design°and`coiYstrnc4ion ofthe'foundatioris''for ' the single-family residences proposed for the Griffin Ranch development. The project site is located on the southeast corner of Avenue 54 and Madison Street in the City of La Quinta, California. The preliminary plans indicate that the proposed project will include single-family residences along with various associated site improvements. The.associated site improvements are expected to include paved roadways, concrete driveways and patios, underground utilities, and landscape areas. SCOPE OF WORK The purpose of our investigation was to determine certain engineering characteristics of'the near surface soils on the site in order to develop recommendations for foundation design and site preparation. Our investigation included field exploration, laboratory testing, literature review, engineering analysis and the preparation of this report. Evaluation of hazardous materials or other environmental concerns was not within the scope of services provided. Our investigation was performed in accordance with contemporary geotechnical engineering principles and practice. We make no other warranty, either express or implied. PROJECT DESCRIPTION The approximately 195 -acre project site is located on the southeast corner of Avenue 54 and Madison Street in the City of La Quinta, California. It is our understanding that the project will consist of single- family residences along with various associated site improvements. It is our understanding that the proposed residences will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The associated improvements will include paved roadways, concrete walkways, patios, driveways, landscape areas and various underground utilities. The majority of the subject site is presently vacant and the ground surface is covered with scattered desert brush, short grass and weeds. Large tamarisk trees exist along the majority of the property lines. The majority of the property has apparently been previously used for agricultural purposes. The property has been leveled throughout and is near the elevation of the adjacent properties and roadways. The Griffin estate located within the central portion of the property is not a part of the proposed project. The eastern portion of the Griffin estate including a horse racing track and fields are a part of the proposed development. The PGA West development forms the southern site boundary and exists west of the site ' across Madison Street. There is a residential subdivision along the southeastern edge of the site. The properties along the northeast property boundary and north of the site across Avenue 54 remain vacant. CITY OF LA QUINTA BUILDING & SAFETY DEPT. FOR CONSTRUCTION DA-rE BY Sladden Engineering August 17, 2004 I -2- , Project No. 544-4402 04-08-57I Based upon our previous experience with lightweight residential structures, we expect that isolated column loads will be less than 30 kips and wall loading will be less than to 2.0 kips per linear foot. Grading is expected to include minor cuts and fills to match the nearby elevations and to construct sligfitly' elevated' building 'pads"to "accom'modate` `s'ite drainage:' Ttii"s°'does `not incliide iemdval 'and recompaction of the bearing soils within the building areas. If the anticipated foundation loading or site grading varies substantially from that assumed the recommendations included in this report should be reevaluated. GEOLOGY AND SEISMICITY The project site is located within the central Coachella Valley that is part of the broader Salton Trough geomorphic province. The Salton Trough is a northwest trending depression that extends from the Gulf of California to the Banning Pass. Structurally the Salton Trough is dominated by several northwest trending faults, most notable of which is the San Andreas system. A relatively thick sequence of sedimentary rocks have been deposited in the Coachella Valley portion of the Salton Trough from Miocene to present times. These sediments are predominately terrestrial in nature with some lacustrian and minor marine deposits. The mountains surrounding the Coachella Valley are composed primarily of Precambrian metamorphic and Mesozoic granitic rock. The Coachella Valley is situated in one of the more seismically active areas of California. .The San Andreas fault zone is considered capable of generating a maximum credible earthquake of magnitude 8.0 and due to its proximity to the project site the distance of approximately 9.9 kilometers should be considered in design fault for the project. Seismic activity along the nearby faults continues to affect the area and the Coachella Valley is considered one of the more seismically active regions in California. A computer program and pertinent geologic literature were utilized to compile data related to earthquake fault zones in the region and previous seismic activity that may have affected the site. E.Q. Fault Version 3.00 (Blake) provides a compilation of data related to earthquake faults in the region. The program searches available databases and provides both distances to causitive faults and the corresponding accelerations that may be experienced on the site due to earthquake activity along these faults. The attenuation relationship utilized for this project was based upon Joyner & Boore (1987) attenuation curves. The information generated was utilized in our liquefaction evaluation The site is not located in any Earthquake Fault zones as designated by the State but is mapped in the County's Liquefaction and Ground Shaking Hazard Zone V. Several significant seismic events have occurred within the Coachella Valley during the past 50 years. The events include Desert Hot Springs - 1948 (6.5 Magnitude), Palm Springs - 1986 (5.9 Magnitude), Desert Hot Springs - 1992 (6.1 Magnitude), Landers -1992 (7.5 Magnitude) and Big Bear -1992 (6.6 Magnitude). CITY OF LA QUINTA BUILDING & SAFETY DEPT. AdPrr—"RtuVE® FOR CONSTRUCTION DATE 8Y Sladden Engineering August 17, 2004 -3- Project No. 544-4402 04-08-571 SUBSURFACE CONDITIONS The soils underlying the site consist primarily of fine-grained silty sands with scattered generally thin Y ical for iie'area;the sil ty.sand'and,td silt'TaYa s'are'irncorsistently .: interbedded and vary in thickness. Silty sands were the most prominent soils within our exploratory borings but several prominent sandy silt and clayey silt layers were also encountered. The silty sands encountered near the existing ground surface appeared somewhat loose but the deeper silty sand and sandy silt layers appeared relatively firm. Sampler penetration resistance (as measured by field blowcounts) indicate that density generally increases with depth. The site soils were dry on the surface but moist below a depth of approximately 5 feet. Laboratory testing indicates that the surface soils within the upper 5 feet consist primarily of silty sands. Expansion testing indicates that the surface silty sands are generally non -expansive -and are classified as "very low" expansion category soils in accordance with Table 18-1-B of the 1997 Uniform Building Code. Groundwater was not encountered within our borings that extended to a depth of approximately 50 feet below the existing ground surface. Groundwater should not be a factor in design or construction. LIQUEFACTION Liquefaction occurs with sudden loss of soil strength due to rapid increases in pore pressures within cohesionless soils as a result of repeated cyclic loading during seismic events. Several conditions must be present for liquefaction to occur including; the presence of relatively shallow groundwater, generally loose soils conditions, the susceptibility of soils to liquefaction based upon grain -size characteristics and the generation of significant and repeated seismically induced ground accelerations. Liquefaction affects primarily loose, uniform grained cohesionless sands with low relative densities. In the case of this project site, several of the factors required for liquefaction to occur are absent. As previously indicated, groundwater was not encountered within our borings that extended to a depth of approximately 50 feet below the existing ground surface on the site. Due to the depth to groundwater, the potential for liquefaction affecting the site is considered negligible. CONCLUSIONS AND RECOMMENDATIONS Based upon our field investigation and laboratory testing, itis our opinion that the proposed residential development is feasible from a soil mechanic's standpoint provided that the recommendations included in this report are considered in building foundation design and site preparation. Due to the somewhat loose condition of the surface soils, remedial grading is recommended for the building areas. We. recommend that remedial grading within the proposed building areas include the overexcavation and recompaction of the primary foundation bearing soils. Specific recommendations for site preparation are presented in the Site Grading section of this report. CITY OF LA Q U ! NTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION d PDATE _ Sladden Engineering August 17, 2004 -4- Project No. 544-4402 04-08-571 Based upon the depth to groundwater and the generally firm condition of the deeper sand layers, it is our opinion that the potential for liquefaction affecting the site is minimal. The remedial grading recommended for building areas will result in the construction of a uniform compacted soil mat beneath all, footings. In our opinion,•liquefaction`relaye'd"mitigation'measu"res`in'additioii to the site'gra ding and foundation design recommendations included in this report should not be necessary. - The site is located in one of the more seismically active areas in California. Design professionals should be aware of the site setting and the potential for earthquake activity during the anticipated life of the structure should be acknowledged. The accelerations that may be experienced on the site (as previously discussed) should be considered in design. The seismic provisions included in the Uniform Building Code for Seismic Zone 4 should be considered the minimum design criteria. Pertinent 1997 UBC Seismic Design Criteria is summarized in Appendix C. Caving did occur within our borings and the potential for caving should be expected within deeper excavations. All excavations should be constructed in accordance with the normal CalOSHA excavation criteria. On the basis of our observations of the materials encountered, we anticipate that the near surface silty sands will be classified by CaIOSHA as Type C. Soil conditions should be verified in the field by a "Competent person" employed by the Contractor. The near surface soils encountered during our investigation were found to be non -expansive. Laboratory testing indicated an Expansion Index of 0 for the surface silty sands and sandy silts that corresponds with the "very low" expansion category in accordance with UBC Table 18 -I -B. The following recommendations present more detailed design criteria which have been developed on the basis of our field and laboratory investigation. The recommendations are based upon non -expansive soils criteria. Foundation Design: The results of our investigation indicate that either conventional shallow continuous footings or isolated pad footings that are supported upon properly compacted soils, may be expected to provide adequate support for the proposed structure foundations. Building pad grading should be performed as described in the Site Grading Section of this report to provide for uniform and firm bearing conditions for the structure foundations. Footings should extend at least 12 inches beneath lowest adjacent grade. Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 pounds per square foot (psf) and isolated pad footings may be designed using an allowable bearing pressure of 1800 psf. The allowable bearing pressures are applicable to dead and frequently applied Iive loads. The allowable bearing pressures may be increased by 1/3 to resist wind and seismic loading. Care should be taken to see that bearing or subgrade soils are not allowed to become saturated from the ponding of rainwater or irrigation: 'Drainage from the building area should be rapid and complete. CITY OF LA QUI NTA BUILDING & SAFETY DEPT. ,IPPR(DVE® FOR CONSTRUCTION DA-fE B`� August 17, 2004 -5- Project No. 544-4402 04-08-571 The recommendations provided in the preceding paragraph are based on the assumption that all footings will be supported upon properly compacted engineered fill soils. All grading should be performed under the testing and inspection of the Soils Engineer or his representative. Prior to tlie'placeme`nt of concrete, we recommend that'the'footiiig' excavations' be irispected' iri or'ije"r' to " verify that they extend into compacted soil and are free of loose and disturbed materials. Settlements: Settlements resulting from the anticipated foundation loads should be minimal provided that the recommendations included in this report are considered in foundation design and construction. The estimated ultimate settlements are calculated to be approximately one inch when using the recommended bearing values. As a practical matter, differential settlements between footings can be assumed as one-half of the total settlement. Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are poured against properly compacted native or approved non -expansive import soils. Passive earth pressure should be ignored within the upper 1 foot except where confined (such as beneath a floor slab). Retaining Walls: Retaining walls may be necessary to accomplish the proposed construction. Lateral pressures for use in retaining wall design can be estimated using an equivalent fluid weight of 35 pcf for level free -draining native backfill conditions. For walls that are to be restrained at the top, the equivalent fluid weight should be increased to 55 pcf for level free - draining native backfill conditions. Backdrains should be provided for the full height of the walls. Expansive Soils: Due to the prominence of "very low" expansion category soils near the surface, the expansion potential of the foundation bearing soils should not be a controlling factor in foundation or floor slab design. Expansion potential should be reevaluated subsequent to grading. Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain by a minimum compacted non -expansive fill thickness of 24 inches, placed as described in the Site Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or where dampness of the floor slab is not desired, we recommend the use of an appropriate vapor barrier or an adequate capillary break. Vapor barriers should be protected by sand in order to reduce the possibility of puncture and to aid in obtaining uniform concrete curing. . Reinforcement of slabs -on -grade in order to resist expansive soil pressures should not be necessary. However, reinforcement will have a beneficia . e ec co mi g c g Al concrete shrinkage. Temperature and shrinkage related era mg should' -be ti ' a ed Al concrete slabs -on -grade. Slab reinforcement and the spacing oftcontzala�joi t AR&RcT.b determined by the Structural Engineer.• ;"° 9 D ROA CaNsTwanon 6 Sladden Engineering August 17, 2004 -6- Project No. 5444402 04-08-571 Soluble Sulfates: The soluble sulfate concentrations of the surface soils have not yet been determined but native soils in the area have been known to be potentially corrosive with respect to concrete. The use of Type V cement and specialized sulfate resistant concrete mix designs may be necessary for concrete in contact with the native soils. Tentative Pavement Design: All paving should be underlain by a minimum compacted fill thickness of 12 inches (excluding aggregate base). This may be performed as described in the Site Grading Section of this report. R -Value testing was not conducted during our investigation but based upon the sandy nature of the surface soils, an R -Value of approximately 50 appears appropriate for preliminary pavement design. The following preliminary onsite pavement section is based upon a design R -Value of 50. Onsite Pavement (Traffic Index = 5.0) Use 3.0 inches of asphalt on 4.5 inches of Class 2 base material, Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section 39 of the CalTrans Standard Specifications. The recommended sections should be provided with a uniformly compacted subgrade and precise control of thickness and elevations during placement. Pavement and slab designs are tentative and should be confirmed at the completion of site grading when the subgrade soils are in-place. This will include sampling and testing of the actual subgrade soils and an analysis based upon the specific traffic information Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and replaced as controlled compacted *fill should be anticipated. We estimate that this shrinkage could vary from 20 to 25 percent. Subsidence of the surfaces that are scarified and compacted should be between 0.1 and 0.3 tenths of a foot. This will vary depending upon the type of equipment used, the moisture content of the soil at the time of grading and the actual degree of compaction attained. These values for shrinkage and subsidence are exclusive of losses that will occur due to the stripping of the organic material from the site and the removal of oversize material. General Site Grading: All grading should be performed in accordance with the grading ordinance of the City of La Quinta, California. The following recommendations have been developed on the basis of our field and laboratory testing and are intended to provide a uniform compacted mat of soil beneath the building slabs and foundations. 1. Site Clearing: Proper site clearing will be very important. Any existing vegetation, slabs, foundations, abandoned underground utilities or irrigation lines should be removed from the proposed building areas and the resulting excavations should be properly backfilled. Soils that are disturbed during site clearing should be removed and replaced as controlled compacted fill under the direction of the Soils Engineer. , CITY OF LA QUINTA BUILDING & SAFETY DEPT. � �PF� VED FOR CONSTRUCTION DATE --_— BY__ August 17, 2004 -7- Project No. 544-4402 04-08-571 2. Preparation of Building and Foundation Areas: In order to provide adequate and uniform bearing conditions, we recommend overexcavation throughout the proposed residential building areas. The building areas should be overexcavated to a depth of at least 3 "feeYbelow existing grade' of 2 feet below` the boifom of the footings,'whichever is ' deeper. The exposed soils should then be scarified to a depth of 1-foot; moisture conditioned and recompacted to at least 90 percent relative compaction. The excavated material may then be replaced as engineered fill material as recommended below. 3. Placement of Compacted Fill: Within the building pad areas, fill materials should be spread in thin lifts, and compacted at near optimum moisture content to a minimum of 90 percent relative compaction. Imported fill material shall have an Expansion Index not exceeding 20. The contractor shall notify the Soils Engineer at least 48 hours in advance of importing soils in order to provide sufficient time for the evaluation of proposed import materials. The contractor shall be responsible for delivering material to the site that complies with . the project specifications. Approval by the Soils Engineer will be based upon material delivered to the site and not the preliminary evaluation of import sources. Our observations of the materials encountered during our investigation indicate that compaction within the native soils will be most readily obtained by means of heavy rubber tired equipment and/or sheepsfoot compactors. A uniform and near optimum moisture content should be maintained during fill placement and compaction. 4. Preparation of Slab and Paving Areas: All surfaces to receive asphalt concrete paving or exterior concrete slabs -on -grade, should be underlain by a minimum compacted fill thickness of 12 inches. This may be accomplished by a.combination of overexcavation, scarification and recompaction of the surface, and replacement of the excavated material as controlled compacted fill. Compaction of the slab and pavement areas should be to a minimum of 90 percent relative compaction. 5. Testing and Inspection: During grading tests and observations should be performed by the Soils Engineer or his representative in order to verify that the grading is being performed in accordance with the project specifications. Field density testing shall be performed in accordance with applicable ASTM test standards. The minimum acceptable degree of compaction shall be 90 percent of the maximum dry density as obtained by the ASTM D1557-91 test method. Where testing indicates insufficient density, additional compactive effort shall be applied until retesting indicates satisfactory compaction. CITY OF lA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY Sladden Engineering August 17, 2004 -8- Project No. 544-4402 04-08-571 GENERAL The findings and recommendations presented in this report are based upon an interpolation of the soil conditioris' between boiirig locations and extrapolation' o—these`conditions ttiioughouf`'the pioposed ' building area. Should conditions encountered during grading appear different than those indicated in this report, this office should be notified. This report is considered to be applicable for use by Trans West Development, Inc. for the specific site. and project described herein. The use of this report by other parties or for other projects is not authorized. The recommendations of this report are contingent upon monitoring of the grading operations by a representative of Sladden Engineering. All recommendations are considered to be tentative pending our review of the grading operations and additional testing, if indicated. If others are employed to perform any soil testing, this office should be notified prior to such testing in order to coordinate any required site visits by our representative and to assure indemnification of Sladden Engineering. We recommend that a pre-job conference be held on the site prior to the initiation of site grading. The purpose of this meeting will be to assure a complete understanding of the recommendations presented in this report as they apply to the actual grading performed. ----..___--------------------------- Sladden Engineering August 17, 2004 -9 Project No. 5444402 04-08-571 REFERENCES ASCE Journal of Geotechnical Engineering Division, April 1974. "' Boore; Joyriei`and Fumal'(1'994) Estimatioii6f Response"Spectra and'Peak Ac' elerations%rom N`o'rth Aiiierican' " -' Earthquakes, U. S. Geological Survey, Open File Reports 94-127 and 93-509. Finn, W. E. Liam, (1996) Evaluation of Liquefaction Potential for Different Earthquake Magnitudes and Site Conditions, National Center for Earthquake Engineering Research Committee. Joyner and Boore, (1988) Measurements, Characterization and Prediction of Strong Ground Motion, ASCE ' Journal of Geotechnical Engineering, Special Publication No. 20. Lee & Albaisa (1974) "Earthquake Induced Settlements in Saturated Sands". Seed and ldriss (1982) Ground Motions and Soil Liquefaction During Earthquakes, Earthquake Engineering Research Institute Monograph. Seed, Tokimatsu, Harder and Chung, (1985), Influence of SPT Procedures in Soil Liquefaction Resistance Evaluations, ASCE Journal of Geotechnical Engineering, Volume 111, No. 12, December. Rogers, Thomas H., Geologic Map of California, Santa Ana Map Sheet. Riverside County, 1984, Seismic Safety Element of the Riverside County General Plan 4 Sladden Engineering C iT`,( OF LA Q U 6 NTA BUILDING & SAFETY DEPT., APPROVED FOR CONSTRUCTION ' 4 t�A1-E BY y. i C iT`,( OF LA Q U 6 NTA BUILDING & SAFETY DEPT., APPROVED FOR CONSTRUCTION ' 4 t�A1-E BY APPENDIX A FIELD EXPLORATION For our field investigation, 16 exploratory borings were excavated on July 16 and August 4, 2004, using.a truck mounted hollow stem auger rig (Mobile B-61) in the approximate locations indicated on the site ,. plan included in this appendix. Continuous log of the materials encountered were prepared on the site V by a representative of Sladden Engineering. Boring logs are included in this appendix. Representative undisturbed samples were obtained within our boring by driving a thin-walled steel penetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT) sampler with a 140 pound hammer dropping approximately 30 inches (ASTM D1586). The number of blows required to drive the samplers 18 inches was recorded (generally in 6 inch increments). Blowcounts are indicated on the boring log. The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5 inches. Undisturbed samples were removed from the sampler and placed in moisture sealed containers in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation spoils and samples were then transported to our laboratory for further observations and testing. CITY OF LA QUINTA BUILDING & SAFETY DEPT. APP OVED . FOR CONSTRUCTION DATE BY Griffin Ranch SEC Avenue 54 and'Madison Street '` = Date: 7/16/2004 Boring No. lJob Number: 544-4402 0 0 s v 3E - q o rn U at Description a �Z Remarks 0 ative Soils lib gip, f °1V 5 w wl 3/5/8 Dry Silty Fine Sand SM 5 -- rey in color , 10 "c11rM ?fid 418/11 Dry Fine to Medium Sand with Traces of Silt SM 1 7 Grey in color R Ali r 15 ,K! h'^Mill 2!6/7 Dry Silty Fine Sand SM 1 --- Grey in color n 20 trt ' 3!517 Dry Silty Fine Sand $M 1 11 Grey in color J 4 y;r 25 3/5/6 Clayey Silt ML, 1 67 irmly Packed. - Grey in color 30 314/7 Clayey Silt ML 1 69 Grey in color 35 5/6/9 Slightly moist Clayey Silt with Traces of Fine Sand ML I S 79 Grey in color 40 3/5/13 Slightly moist Clayey Silt with Traces of tine Sand ML 4 69 Grey in color - with a Layer of Silty Fine Sand --4" -Note- The stratification lines represent the approximate '_' _ �r yea III: 6/9/17 Slightly Moist Silty Fine Sand SM 4 -- 45 boundaries between the soil ;the transition may be - zs gradual. "tri o NTA 50 ? !i 9/15/20 li htl Moist Sil Fine Sand SM i ! j3�t R14: dw �irprml.avtsr� bjnco tered ck not encounter - FOR CONSTRUCTION - DATE BY r: t: Sladden Engineering - GriffmRanch SEC Avenue 54 and Madison Stfi' et Date: 7/16/2004 Boring No. 2 Job Number: ��4-4402 . .. ^ " - . . . ` ' ' ' ' U Description �D Remarks 6/10/13 F irm Clayey Silt ML 7 Grey in color. 10 3/4/6 Clayey Silt with Silty Fine Sand Layer —6" ML 6 77 Grey in color 15 5/6/6 Dry Sandy Silt ML 3 71 Grey in color 20 Grey in color ja 4/6/8 Dry Silty Fine Sand SM 2 25 3/6/11 Silty Medium to Coarse Sand SM .19 Grey in color 30 7 Silty Fine Sand SM 19 Grey in color 35 R 4/5/6 Silty Fine Sand with Firm Sandy Silt Layer —5" SIM, 5, Grey in color Note: The stratification lines re present the approximate - !M boundaries between the soil types 40 3/5/7 Silty Fine Sand SM 3 13 the transition may be gradual. 45 4/5/4 Moist Silty Fine to Medium Sand with a ivery Moist SM 19 --- Grey in color Sandy and Clayey Silt Layer —6" BU LUN G A t red 50' rotrj,,ITU so 3/6/9_ Wet Sandy and Clayey Silt with Slity Fine Sand sm IE .~ ^ ' ~ . . .. ^ " - . . . ` ' ' ' ' .~ ^ ' Griffin Ranch SEC Avenue 54 and Madison Street ` " Date: 7/16/2004 Boring No. 3 Job Number: 5444402 41 0 3 a � a 0 rn U rn �D e Remarks 0j lgh Surrounding Area is Flood wl Irrigated 5 y ". '�`` I'='i 3/3/5 Moist Silty Fine to Medium Sand SM 113 4 17 Grey in color a li 10I1 4/5/6 Moist Silty Fine Sand SM 6 21 Grey in color a: 15 Grey in color 1/1/1 Wet Clayey Silt Layer -10" ML 34 84 20 2/2/2 Wet Clayey Silt Layer —10" with Silty Fine Sand' ti ML 27 71 Grey in color 25 Grey in color '"' `tl w 3/3/6 Moist Silty Fine to Medium Sand with a"Clayey Silt SM 19 atMz Layer —6" " >' 3/2/2005 Moist Silty Clay Layer -16" CL 35 89 30 Grey in color 35 Grey in color 5/7/9 Moist Fine to Medium Sand with Traces of Silt SP 6 10 - Note: The stratification lines - represent the approximate 40 [ 5/8111 Moist Fine to Medium Sand with Traces of Silt ^ SP 4 7 boundaries between the soil types; the transition may be _ gradual. 45 6/10/16 Moist -Fine to Medium Sand with Traces of Silt- SP 5 8 Grey in color = ITY OF bt l 50 �IotA terms, 50 9/9117 Moist Fine to Medium Sand with Traces of Silt P BUILDING &S/ rod'' ter ot countered n _ A m _a N�Tlg FOR CONSTRUCTION DATE BY Sladden Engineering .; i r Griffin Ranch "- SEC'AVenue 54 and Madiion Street" Date: 7/16/2004 Boring No. 4 Job Number: 5444402 - U CL e 0 fV � .. q U Cq Description to Remarks 0 Native Soils clliL„F. _ } u. i'� - 5 kU 4!7/9 Dry Silty Fine Sand SM 2 20 Grey in color 4'lop 10 na! . 3/7/10 Damp Silty Fine Sand SM 6 25 Grey in color - !y!g !Qrgii� � " i:Ft;fhN ' (Fi� 15 Grey in color 2/3/7 Wet Silty Clay and Moist Silty Fine Sand ML — 20 2/3/4 IMoist Sandy and Clavey Silt ML -- — Grey in color 25 Total Depth = —20' - Bedrock not encountered - Groundwater not encountered 30 - Recovered Sample I - Unrecovered Sample , , Standard Penetration Sample ' 35 40 mote: The stratification lines represent the approximate - boundariw between the soil types; the transition may be gradual. 45 _ QUINTA' CRY V BUIL DING, & SAFETY DEPT. 50 d�i" I R -WE ' �VIi VVIVV 111vv11V w,'rE BY Sladden Engineering Griffin Ranch "SEC Avenue' 54 and Madison Street ., x r'.' ` ' Date: 8/4/2004 Boring No. 5 Job Number: 5444402 c 0 N R °' ti A vz U PC Description �° �D a Remarks . 0 ative Soils ':2. .. :_i. .. .r. i:. ;ry 'ha ,c. 4tC.. ._ r..,.tw:: ,. " .. •" .('' �r'. : r. 'a: 1.Jr: ": p` . 5 3/12/23 Dry Silty Clay CL 2 93 Greyish Brown in color 10 Grey in color 9/11/24 Dry Fine to Medium Sand with Traces of Silt SP 1 -7 15 Grey in color 14/15/27 Dry Clayey Silt ML 4 89 20 Grey in color `�,< 17/50-6`-1 Dry Silty Fine Sand I SM 11 1 1 12 -Total Depth x-20' - Bedrock not encountered -Groundwater of encountered 25 30 Recovered Sample - Unrecovered Sample - Standard Penetration Sample 35 40 Note: The stratification lines represent the approximate boundaries between the soil types; the transition may be gradual. 45 r QUINTA C I TYTYC) L 50 Esi� L_DIN a & FETY DEPT. FrR CONSTRUCTION 1EiE` 4 BY Sladden Engineering la _'_. Griffm Ranch `SEC AV64i'54 and M&d SdjiStr'e-e'f Date: 8/41/2004 Boring No. 6 Job Number: 5444402 o 0 a 0 U Description rn q >Z Remarks' 0 Native Soils rt a 5 gi.gf V 19/30/32 Dry Silty Fine Sand SM I Grey in color , gq. TENN. 0 Greyish brown in color IT 10/23/20 Dry Fine Sand with Traces of Silt SP 15 in color 10715713-lDry Silty Fine and with aCla-y-ey SiltLayer-3" 4 --6-T—,,GTey 'total Depth = 15' Bedrock not encounered Groundwater not encountered 20 25 30 Recovered Sample Unrecovered Sample Standard Penetration Sample 35 40 Note: The stratification lines represent the'approximate - boundaries between the soil types; the transition may be gradual. 45 INTA ITY OF LA 50 B j:LDNG & SAFE DEPT. ppT�TY Sladden Engineering FOR,CONSTRUCT—ION DATE, BY S.. Griffin Ranch - " - SEC Avenue 54 and Madison Street' Date: 8/4/2004 Boring No. 7 Job Number: 544-4402 o e 3 2 a 3 o- q a, � i Description o Remarks 0 ?tjljN ative Soils - 5 5/10/ 15 Dry Silty Pine Sand SM 0 - Grey in color I rG GI 84 �1..0 t7µh'F�f _ M IMI �il#ly 10th 6/10!19 Dry Silty Fine Sand SM - 2 22 rey in color ` �fitt 9/26/24 Dry Clayey Silt ML 6 81 15 Grey in color 2Und Grey in color SM 7 - t total Depth = —20' - Bedrock not encountered 25 Recovered Sample Groundwater not encountered - Unrecovered Sample - Standard Penetration Sample - 30 35 Note: The stratification lines represent the approximate - boundaries between the soil types; the transition may be f - gradual. 40 .. 45 y C1WO QUINTA UIL SING & SA :ETDEPT. 50 �P 1ROVED .. -. I' ", Griffin Ranch A-v"e-nindi `54 a'-n"d'Ma' s6i" SEC e di n 8t Date: 8/4/2004 Boring No. 8 Job Number: 544-4402 • 0 0 0 r)Description �D Remarks 0 ative Soils W up NMI ME p,if .. 5i 10/33/50-6" Dry Silty Fine Sand SM I Grey in color 'a 10 li 1 16/22/30 Dry Silty Fine Sand • SM 1 11 Grey in color 15 14/22/26 Dry Silty Fine Sand with Traces of Clay SM 4 35 _,Greyish Brown in color 20 Total Depth 15' Bedrock not encountered Groundwater not encountered - Recovered Sample 25 - Unrecovered Sample Standard Penetration Sample 30 - Note: The stratification lines represent the approximate . 35 boundaries between the soil types; the transition may be gradual. 40 45 QUI -NT -A CITY U BULDING I & S DEPT. 50 JkP RC VED' - I - -t,<. ': Griffin Ranch EC-Avenue 54 and'Nladison Street""_"_"__`_ Date: 8/4/2004 Boring No. 9 Job Namber: 544-4402 ,• Ufl. � 0 N a 3 o o .o 4 0 A cn U pa Description r„ q o emarks 0 Native Soils ...h . 5 8/14/30 Slightly Moist Silty Clay and Silty Fine Sand CL 10 92 Greyish Brown in color 10 Brown in color 22/22/50-6" Slightly Moist Fine to Medium Sand with Traces of Silt SP 2 11 15 Greyish Brown in color 15/20/22 IFine Sandy Silt with Traces of Clay M L-1. 6 75 - Recovered Sample Total Depth =--15' - I Bedrock not encountered 20 Unrecovered Sample Groundwater not encountered _ - I Standard Penetration Sample 25 30 - Note: The stratification lines represent the approximate - boundaries between the soil types; the transition may be gradual: 35 40 45 _ -I1 O LA QUINTA , UILC ING SA ETY DEPT. so ,PpjRO E9 run uviv.� i GATE BY 1 - Sladden Engineering • `: `. <<' r: _ . M Griffin Ranch SECAvenue 54 and ka"di-son' Stri; e-el"`7 Date: 8/4/2004 Boring No. 10 Job Number: 544-4402 0 P: 0 0 0 U Description 0 Remarks 0 Native Soils 9/11/12 Dry Fine Sand with Traces of Silt SP Grey in color 10 11/7/13 Dry Fine Sand with Traces of Silt SP 1 17 Grey in color is 7/10/16 Ory Fine Sand with Traces of Silt SP 1 15 Grey in color 20 --5710/14 '1 in color Dry Clayey Silt 1 MC -1 3 I'--6T—JlGrey Recovered Sample Total Depth = —29 25 1 Bedrock not encountered Unrecovered Sample Groundwater not encountered Standard Penetration Sample 30 35 Note: The stratification lines represent the approximate boundaries between the soil types; the transition may be gradual. 40 45 CIWOFLAQUINTA - BUILDING & SAFM DEPT. 50 Y�PFIIROVE Sladden Engineering LDATE By-- Griffin Ranch , " u ••....� .. P..e.+. i f:.,+e—.:•... . 'i •'.� 7 . !::'; ; -.. , .:. r SEC Av.enue;. .1�54 an.d Ma� •disodrStre'i � _✓ . r. S _: x" < :. ..._. •- Iy .. .... .i+..::.-• , _ . 9'i',> ' Date: 8/4/2004 Boring No.11 Job Number: 544-4402 o 0 o A cn U al Description rn o Remarks . 0 Dative Soils 5 5/8/13 Slightly Moist Fine to Medium Sand with Trace Silt SP 1 9 Grey in color ] 0 4/6/9 Slightly Moist Fine to Medium Sand with Trace Silt 3 SP 4 -- Greyish Brown in color and a Sandy Silt Layer •-•6" 15 5/9/12 Moist Fine Sand with Traces of Silt SP 2 14 Grey in color - Recovered Sample focal Depth =i 5' - IBedrock not encountered 20 Unrecovered Sample Groundwater not encountered - Standard Penetration Sample 25 30 35 Note: The stratification lines represent the approximate boundaries between the soil types; the transition may be _ gradual. 40 _ - I IATA ... C I • Y C 0= LA Q 45 • BUII DING & S FET DEPT. "ROVE D - T F .. R C NST RUC' ION 50 PATE f ly— ............. Sladden Engineering Griffin Ranch "SEC "A-ve'n"ille 54'*irid'im,adiii)n,St'ie�,e,,,i Date: 8/4/2004 Boring No.12 Job Number: 54441402 CD E Lei 0 U Description 0 0 -Z Remarks 0 alive Soils Iffigg"., 'ov e'6 5 4/6/8 Moist Silty Fine Sand SM • 3 Grey in color 10 Dark Grey in color 4/3/4 Wet Silty Clay Layer —5" and Sandy Silt ML 1 85 -is ark Grey in color 2/2/3 Wet Silty Clay CL V 93 ' Recovered Sample Total Depth =1 5' Bedrock not encountered 20 Unrecovered Sample Groundwater not encountered Standard Penetration Sample 25 30 Note: The stratification lines represent the approximate boundaries between the soil types; the transition maybe gradual. 35 40 C ITS' OF LA WINT,A ' 13 JILDRNG & SAF I DEPT. 45 APPMOVED FOF CO STR ICTION 50 V t Di TE BY Sladden Engineering Griffin Ranch CITY SEC Avenue 54 and'Madison Street F= QUINTA Date: 8/4/2004 Boring No.13 Job Number: 5444402 & Sj EETY DEPT. a' FDR PPIR( c 45 VEE) RUCTION DATE . Y o — .50' —6 s ` 1 f y a . A rn U Description rn U o Remarks 04` u'` E�iNff Native Soils v - I4x 3'fi. 1. ?'v:. '�... } .k.! ,. .. 1.?v • .. +. l..l — .lu+ R is �.. � 1 ..... 1 ^i.;. Y. y . �. �J S'r .}. yt.n . r (v ::�. �— .. 0 . rr;.. , 5 ��N 5/516 Moist Silty Pine Sand SM 6 26 Grey in color I';i'yiluF,p - 10 Dark Grey in color 5/5/10 Wet Clayey Silt ML 30 87 15 Dark Grey in color $' 2/3/6 Wet Silty Fine Sand with Traces of Clay SM 13 --- Recovered Sample Total Depth = 15', - IBedrock not encountered 20 Unrecovered Sample Groundwater not encountered Standard Penetration Sample 25 30 - Note; The stratification lines represent the approximate - boundaries betwoen the soil types; the transition may be 35 gradual. 40 CITY C F= QUINTA BUII-DING & Sj EETY DEPT. a' FDR PPIR( c 45 VEE) RUCTION DATE . Y _ — .50' s ` 1 f CITY C F= QUINTA BUII-DING & Sj EETY DEPT. a' FDR PPIR( c DNSI VEE) RUCTION DATE . Y -i i Sladden Engineering FI::. •: `.: r CIT LA Griffin Ranch NTA BUIL "SEC Averiae 54"and`Madison`Street & SA 45 Date: 8/4/2004 Boring No. 14 Job Number: 5444402 5-PRCVE R P CONSTRUCT 0 N CD0 S t 50 s q o U o pa - Descri tion - rn r q o o Remarks 0 e;, Ir r � Native Soils - ..Ai� .i' F'. r crp `f •. ,p, r& ,. ..'.7 .•�: k. eY .'7�¢ , aT--✓ ", `r,� ..,. j.< .S}?..`"7ti i'.. ,E .. ...i l - tu'� �Fu IAIM 5 _ r; 6/10112 Dry Silty Fine Sand with a Clayey Silt Laver —6" SM 13 --- Light Greyish Brown in color e4 10 akI�L�M 7/16/16 Dry Silty Fine Sand SM 1 „ Grey in color _ nlli: yy,eF�Z: h • t 15 a4' ; 9/16!20 ' Slightly Moist Silty Fine Sand SM 1' Grey in color - Recovered Sample Total Depth = 15' - I Bedrock not encountered 20 Unrecovered Sample Groundwater not encountered - Standard Penetration Sample 25 30 • - Note: The stratification lines represent the approximate _ boundaries between the soil types. the transition may be 35 gradual. . 40 CIT LA CSU NTA BUIL MING & SA 45 DEPT. 5-PRCVE R P CONSTRUCT N DATE - S t 50 CIT LA CSU NTA BUIL MING & SA =ETY DEPT. 5-PRCVE R P CONSTRUCT N DATE - S j ' gladden Engineering 1 CHY OF Griffin Ranch Q1 SEC Avetiue'54 and'Midison Street' 86I _DIN& 45 Date: 8/4/2004 Boring No.15 Job Number: 544-4402 DEPT., L� P} S 1 Y .® f OR c e 0 o N 50 1 t _ 5, [DA _ CL N 3 L 0 "G '0 A >1 (n C U pa Dmri tion O a o Remarks 0 aO+y.i Native Soils aP 3U i 5/5/7 Slightly Moist Silty Fine Sand SM3 13 Grey in color , IM w; TaG 10 411'g 1iijPC; 4/5/8 Silty Fine Sand with Traces of Clay SM 15 36 Light Greyish Brown in color h.: 15 'r 5/6/13 Sil Fine Sand with a Clayey ty yeySiltLay��S" SM SM 9 --- Grey in color 5,.. Recovered Sample Total Depth =--15' - I Bedrock not encountered 20 Unrecovered Sample Groundwater not encountered - Standard Penetration Sample s, 25 30 Note: The stratification lines represent the approximate _ boundaries between the soil types; the transition may be _ gradual 35 .. . 40 CHY OF LA Q1 JINTA 86I _DIN& 45 FE� DEPT., L� P} S 1 Y .® f OR c ONS RUC 50 1 t _ 5, [DA _ r ..Y 3 CHY OF LA Q1 JINTA 86I _DIN& S FE� DEPT., L� P} S 1 Y .® f OR c ONS RUC FION 1 t [DA _ r Sladden Engineering Griffin Ranch Sladden Engineering SEC Avenue 54 and IViadiib Street"`' Date: 8/4/2004 Boring No.16 Job Number: 544-4402 • - R. o 0 N .. cTr ° ',p '? 76. A 0 ci U 3 Cq Description _ r° e ] o Remarks 0 ~ " ���� Native Soils ave i s ,P i�i 1 . 5 :,;,-,��z 4/6/1 Silty Fine Sand with a Clayey Silt Layer —3" SM lU 22 Grey in color u"? t 10`M r 3/6/8 Slightly Moist Silty Fine Sand with Traces of Clay SM9 36 Grey in color ii. 15 ' 15 P� " 4/8/13' Silty Fine to Medium Sand -SM 1 2 1 25 IlGreyincolor - Recovered Sample Total Depth = 15' - I Bedrock not encountered 20 Unrecovered Sample I Groundwater not encountered ' _ Standard Penetration Sample - 25 30 - - - Note: The stratification lines represent the approximate 35 boundaries between the soil types; the transition may be _ gradual. 40 NTA C0 ® LA CSU BUIL WING & SAFETY DEPT. as AuPFIC ED F R C NST UCT N - ATE DATE- 50 50 - f i i , Sladden Engineering E D AP TRUCTION f%iC1iUMh�YMA:1MnAil A..... �iWA3....L4 ��{^y'.+.:•.i.P11? .ny...�ia �O�F' ii.i! -.�.,, 1elir�iw Jeiyl �F�.tAkS�G-ail,Bp �,j� •l:A�{d?rYL-'+tN�:M•4cp^"t{U{.r ,.:�A3. �.. .. ..., M1... •w 3�,. f�.. i,�^•�^�. {�..L�.: +4 •....,,..4.u.17': 5?.��[.'�:4-.k i�e'T�t�i. Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our laboratory for additional observations, and testing. Laboratory testing..was.generally,,performed.in.,two. vhases. ,The.::.: -,%,., . first phase consisted of testing in order to determine the compaction of the existing natural soil and the general engineering classifications of the soils underlying the site. This testing was performed in order to estimate the engineering characteristics of the soil and to serve as a basis for selecting samples for the second phase of testing. The second phase consisted of soil mechanics testing. This testing including consolidation, shear strength and expansion testing was performed in order to provide a means of developing specific design recommendations based on the mechanical properties of the soil. CLASSIFICATION AND COMPACTION TESTING Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture content. This was used in order to determine the dry density of the soil in its natural condition. The results of this testing are shown on the Boring Log. Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard D1557-91, Test Method A. The results of this testing are presented graphically in this appendix. The maximum densities are compared to the field densities of the soil in order to determine the existing relative compaction to the soil. This is shown on the Boring Log, and is useful in estimating the strength and compressibility of the soil. Classification Testing: Soil samples were selected for classification testing. This testing consists of mechanical grain size analyses and Atterberg Limits determinations. These provide information for developing classifications for the soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups having similar engineering characteristics. The results of this testing are very useful in detecting variations in the soils and in selecting samples for further testing. SOIL MECHANIC'S TESTING Direct Shear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the shear strength of the soil under various normal pressures and is used in developing parameters for foundation design and lateral design. Testing was performed using recompacted test specimens, which were saturated prior to testing. Testing was performed using a strain controlled test apparatus with normal pressures ranging from 800 to 2300 pounds per square' foot. Expansion Testing: One bulk sample was selected for Expansion testing. Expansion testing was performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4 -inch diameter by 1 -inch thick test specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the specimens are inundated with distilled water. The linear expansion is then measured until com le e Consolidation Testing. Four relatively undisturbed samples were selelct oor consi hEttio°irte�tinn �{�g�� V'—�' j one -inch thick test specimens are subjected to vertical loads varying fr m57Uiysj o1 32f?�psf ti d ro essivel . The consolidation at each load increment was recorded prior to place ent of each subs gue tfi��1�.We pecime were saturated at the 575 psf or 720 psf load increment. RUCTION FOR CO DATE ---- BY l .:- :i-n,v, fr . w. 5..:5;,_ �I .. Na.: :r!"�._ ....... ., "r... }o e -.�.1 w �:;2:<.c r . d'?:�r'•°^ ,.L.-. +.r ..Y'.. �... - i,, a ry.S„ tr,y •r✓..:, � �r ., r... ... uT 'SII ...,�:_� ".. !.4i .�..,\:{�..y. .i.: �,t d.I\).i Yf.r� .•: lil:l,K. ..GT �.w .':.�A Maximum Density/Optimum Moisture ASTMD698/DI557 Project Number: 544-4402 August 3, 2004 Project Name: Trans West Housing ASTM D-1 557 A Lab ID Number: Rammer Type: Manua Sample Location: Bulk 3 @ 0 -5 - Description: Silty Sand Maximum Density: 129 pcf Optimum Moisture: 9.5% 145 140 135 130 12 120 P" In, 110 105 100 0 Sieve Size % Retained 3/411 3/8" #4 0.0 10 Moisture Content, DATE BY Max Density Sladden Engineering., Revised 12/0342.- ---- zero Air Voids Lim sg =2.65, ILE 64 Ma r =w ! Q0 M & ON & 10 Moisture Content, DATE BY Max Density Sladden Engineering., Revised 12/0342.- Maximum Density/Optimum Moisture ASTM D698/D1557 Project Number: 544-4402 August 30, 2004 Project Name: Ave. 54 & Madison ASTM D-1557 A 'Lab ID Number: ammer-Type: ani Sample Location: Bulk 3 @ 0-5' Description: Silty Sand Maximum Density: 119 pef Optimum Moisture: 10.5% 145 140 135 130 u a 125 a. C C 120 0 115 110 105 Sieve Size % Retained 3/4" 3/8" #4 0.0 •r .,.....K:.�x.i a�..Y� 't. �'�Y�,..�r'S J=.� M Yjl-' P�:a .} (ra�'a.: N'.In '?..,. .... .,. tii�"M �at..'!i`.. .i�:!T .ns Fi i �i4. 'Yt�It.fE"SPr. y...r ..f ... .. Y. '+-.i.Pi.•�.. ^. -.h 'r. Max Density Sladden Engineering. Revised 12/03/02 Gradation ASTM C117 & C136 Project Number: 544-4402 August 3, 2004 Project Name: Trans West Housing y- i.:.r .:..'s �^..:..-: �....h... ;.:a> :., :. is ... . ,, ., ._ -: .i w+F .A.r. '. .iT--.. - , -..� -. q',•� ... ...i. Sample ID: Bulk 3 @ 0-5' Sieve Sieve Percent Size, in Size, mm Passing " 111 25.4 100.0 3/4" 19.1 100.0 1/2" 12.7 100.0 3/8" 9.53 100.0 #4 4.75 100.0 #8 2.36 100.0 #16 1.18 97.0 #30 0.60 94.0 #50 0.30 86.0 #100 0.15 75.0 #200 0.074 25.0 Gradation Sladden Engineering Revised 11/20/02 Gradation ASTM C1 17 & C136 Project Number: 544-4402 August 30, 2004 Project Name: Ave. 54 & Madison Sample ID: Bulk 3 @ 075' Sieve Sieve Percent Size, in Size, mm Passing 1" 25.4 100.0 3/4" 19.1 100.0 1/2" 12.7 100.0 3/8" 9.53 100.0 #4 4.75 100.0 #8 2.36 99.0 416 1.18 91.0 430 0.60 86.0 #50 0.30 71.0 #100 0.15 61.0 #200 0.074 25.0 DATE ��- Graaatinn Sladden Enaineerina Revised 11/20/02 Expansion Index ASTM D 4829/UBC 29-2 , Job Number: 544-4402 Date: 8/3/2004 tit Job.Nanie: ""Trans'West"Housing .:,<. , ='Tech.°` , w Jake Lab ID: Sample ID: Bulk 3 @ 0-5' Soil Description: Silty Sand Wt of Soil + Ring. 595.0 Weight of Ring: 179.0 Wt of Wet Soil: 416.0 Percent Moisture: 8% Wet Density, pcf: 126.0 Dry Denstiy, cf: 116.7 Saturation: 48.7 Expansion hack # Date/Time 8/4/2004 9:00 AM Initial Reading' 0.500 Final Reading 0.511 ` Y CITY OF LA QOiNTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY F.l h., r ;s—Sladden.Engineering w► : *' . < -s a:r• -Revised:l2/10/02' One Dimensional Consolidation ASTM D2435 & D5333 Job Number: 544-4402 JobName: Ave. -54 & Madison, - Sample ID: Boring 9 @ 5' Soil Description: Sandy Silt I 0 -1 -2 4 August 30, 2004 Initial! Dry Derisity;pcf.-,,-.88.0 Initial Moisture, %: 10 Initial Void Ratio: 0.894 Specific Gravity: 2.67 % Change in Height vs Normal Presssure Diagram 0 Before Saturation 6 After Saturation —e—Rebound Hydro, Consolidation 7- __7 - - - - -- - -- - -7 T I D 4P EP-li- 0.0 1.0 2.0 3.0 4.0 COFI F!CZM0NS_T1PUQT'0N 7.0 DATE BY Consolidation Sladden Engineering.::... Revised 11/20/01- One Dimensional Consolidation ASTM D2435 & D5333 Job Number: 544-4402 August 30, 2004 'Job"Name: Ave.54 & Madison•'• `f- `" j}4°"'Initial Dry Density,'pcf.,.,:"`: , 99:9':":` Sample ID: Boring 9 @ 10' Initial Moisture, %: 2 Soil Description: Sand Initial Void Ratio: 0.669 Specific Gravity: 2.67 % Change in Height vs Normal Presssure Diagram- 0 iagram 0 Before Saturation 6 After Saturation - -9 ReboundHydro Consolidation 1 , : -4 r_- • t -5 6 -7 4.0FU;o; CO DATE BY 7.0 Cnnt„rdation Sladden Enaineerinp- Revised 11/20/02• • 9 0.0 1.0 2.0 3.0 4.0FU;o; CO DATE BY 7.0 Cnnt„rdation Sladden Enaineerinp- Revised 11/20/02• One Dimensional Consolidation ASTM D2435 & D5333 Job Number: 544-4402 August 30, 2004 Job -Name-, -Ave2�54:&,Madison Initial Dry, Density; pef-..-� - Sample ID: Boring 15 @ 5' Initial Moisture, %: 3 Soil Description: Sand Initial Void Ratio: 0.837 Specific Gravity: 2.67 % Change in Height vs Normal Presssure Diagram 0 Before Saturation After Saturation 9 Rebound Hydro Consolidation 0 -2 -3 ........ .. 4 -5 ------- -6 -77 77 _LT -7 % 1 -9 4-ATY- _UNTA i vvza,., ri v r)EPT. -10 .I.@UCTIP 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 FOR4PONSON DATE - BY ConsolidationSladden Engineering .. Revised 11/20/02 One Dimensional Consolidation ASTM D2435 & D5333 Job Number: 544-4402 August 30, 2004 Ave,.,-,,54�&,!Madisori", Initial Dry Derisity; cf:. 95.9 Sample ID: Boring 15 @ 10, Initial Moisture, W 15 Soil Description: Silty Sand Initial Void Ratio: 0.738 Specific Gravity: 2.67 % Change in Height vs Normal Presssure Diagram 0 Before Saturation 6 After Saturation 9 Rebound --W- Hydro Consolidation i 0 -7- -2 -3 -4 -5 -j -6 . ...... -7 -8 - -9 -10 - 0.0 0.5 1.0 1:5 2.0 2.5 Consolidation Sladden Engineering IT -L -f-71 -Y--n- -F !E I -CH CONSTRUCTION 3.5 4.0 4.5 5.0 DATE - BY Revised11/20/02 Expansion Index ASTM D 4829/UBC 29-2 Job Number: 544-4402 Date: 8/30/2004 . Job`Narr"le Ave: 54`,&'1Vladison r". • ° ...`Tech:'` "Jake" � ., ,°- r k`;.,•:..: Lab ID: Sample ID: Bulk 3 @ 0-5' Soil Description: Silty Sand Wt of Soil + Ring: 585.0 Weight of Ring: 179.0 Wt of Wet Soil: 406.0 Percent Moisture: 9% Wet Density, cf.- 123.0 Dry Densti , pcf. 112.9 Saturation: 49.3 Expansion Rack # Date/Time 8/30/2004 9:00 AM Initial Reading 0.500 Final Reading 0.502 Expansion Index 2 (Final - Initial) x 1000 , CITY OF LA QUiNTA BUII"DING & SAFETY DEPT. APPROVED FOR CONSTRUCTION i BY DATE - .... �� •El Sladderi Engineering .,<., >i nom; - i,ri Gradation ASTM C117 & C136 Project Number: 544-4402 August 30, 2004 Project Name: Ave. 54 & Madison ILI! Sample ID: Boning 3 @ 5' Sieve Sieve Percent Size, in Size, mm Passing 111 25.4 100.0 3/4" 19.1 100.0 1/2" 12.7 100.0 3/8" 9.53 100.0 #4 4.75 100.0 #8 2.36 100.0 #16 1.18 97.0 430 0.60 79.0 450 0.30 68.0 #100 0.15 59.0 #200 0.074 17.0 100 go . 80 -------- 70 - 60 50 - N CL4 40 E JJJ J 30 T-- -I. 1 1! L JL: 20- 10 LA 'I; -,I JIN TA h OUILUIN & S G AR 0 100.000 10.000 I 1.000 0.100 A4 -X P0 POOR 001 - Sieve Size, mm d FOR CONST TRUCTION TE3Y__ r) A -r-i- '7 Gradation Sladden Engineering Revised 11/20102 Gradation ASTM C117 & C136 Project Number: 5444402 August 30, 2004 Project Name: Ave. 54 & Madison Sample ID: Boring 3 @ 10' Sieve Sieve Percent Size, in Size, mm Passing 111 25.4 100.0 3/4" 19.1 100.0 1/2" 12.7 100.0 3/8" 9.53 100.0 #4 4.75 100.0 #8 2.36 100.0 #16 1.18 100.0 #30 0.60 86.0 #50 0.30 74.0 #100 0.15 57.0 #200 0.074 21.0 ]GO go — 80 -4- 70 60 50 - i i W 30 20 to - 0_1 100.000 10.000 1.000 o.1 oo Sieve Size, mm. Gradation Sladden Engineering IILIJII%ql� SAFETY APPROVED FOR CONSTRUCTION DATE —___—,_ BY --------------- Revised 11/20/01:t- - •W .yy...,y, ,.. Wil.". v'. :�"' .. .1�. ."r r.i.�- i. :.�t../...6 �u: i 1' 1 .. {.S' .^'\.. !1�, • v :.h.• August 17, 2004 -15- Project No. 5444402 04-08-571 1997 UNIFORM BUILDING CODE SEISMIC DESIGN INFORMATION The Internation'al'Conference of Bildirig'Offival's 1997 Unifoim Building 'Code 'contains substantia] - " revisions and additions to the earthquake engineering section in'Chapter 16. Concepts contained in the updated code that will be relevant to construction of the proposed structures are summarized below. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity to significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. Fault Zone Approximate Distance From Site Fault Type (1997 UBC) San Andreas 9.9 km A San Jacinto 32.1 km A Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is SD, generally described as stiff or dense soil.. The site is located within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic mitigation for new construction upon adoption of the 1997 code. CITY OF LA QUINTq PUILDING & SAFETY DEPT, FOR CONSTRUCTION. GATE- BY ' S1addeii Engineering Near -Source Near -Source Seismic Seismic Seismic Acceleration Velocity Coefficient Coefficient Source Factor, Na Factor, Ny Ca C� San Andreas 1.0 1.2 0.44Na 0.64N.. San Jacinto 1.0 1.0 _ 0.44N8 0.64N� CITY OF LA QUINTq PUILDING & SAFETY DEPT, FOR CONSTRUCTION. GATE- BY ' S1addeii Engineering Sladden Engineering 77-725 Enfield Lane, Suite 100, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 6782 Stanton AvQ. Suitc A. Buena Park, CA 90621 (714) 523.0952 Fax (714) 523-1369 450 Egan Avcnuc, Bindumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 December 10, 2007 Project No. 544-4402 s 07-12-847 Trans West Housing, Inc. 47-120 Dune Palms Road,'Suite C La Quinta, California 92253 Attn: Ms. Marty Butler Project: Griffin Ranch- Tract 32879 SEC Avenue 54 and Madison Street La Quinta, California Subject: Geotechnical Update Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated August 17, 2004, project No. 544-4402, Report No. 04-08-571 Geotechnical Update prepared by Sladden Engineering dated December 2, 2005, Project No. 544-4402, Report No. 05-11-1133 As requested, we have reviewed the above referenced Geotechnical Tnvestigation report as it relates to the design and construction of the proposed residential development. The project site is identified as Tract 32879 and is located in the City of La Quinta, California. It is our understanding that the proposed residences will be relatively lightweight wood -frame structures supported by conventional shallow spread.footings and concrete slabs on grade." The lots are presently being graded during the rough grading of the Griffin Ranch project site. Tho rough grading includes overexcavation of the native surface soils along with the placement of engineered fill material to construct the building pads. The referenced reports include recommendations pertaining to the construction of residential structure foundations. Based upon our review of the referenced reports, it is our opinion that the structural values included in the referenced geotechnical report remain applicable for the design and construction of the proposed residential structure foundations. Because the majority of the lots have been previous rough gmdedtbe-remedi�g-roti at this time should be minimal. The building areas shoulaerc Ge Rf.L Q TA scarified and moisture conditioned prior to precise graJiniUJ'bf)teixv@scgcd&.'fffy1SOjb compacted so that a minimum of 90 percent relative compa •tio 19% tta' 0 to fill placement. Any fill material should be placed in thin lifts t near R i rn RU ht and compacted to at least 90 percent relative compaction. (: DATE BY -.,�.... ..:,[i..- ".:... .. -..[-r. r,..;: _-, .:: .-•... -_. .: .e..�.'. ..._.' n r ie[ ulP r . }�r•�. r '� . . u- _ _ _. 1 � • � r , - � 3 a _. ,. .... .. :December,•-I0;20Q7; ,_..., - ..�.., ...,. _2_ ,.. .,�. aa�=s . .�,.�Pruject-Nu:544-4402 .�„ _�_ .�. _ , 07-12-847 Allowable Bearing Pressures: The allowable bearing pressures recommended in the Geotechnical Investigation report prepared by Sladden Engineering remain applicable. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 .— inches wide.and isolated pad footings. should • be. at least.2.fect wide. Xontinuous:footings,.and._.. ,...,,_. isolated pad footings may be designed utilizing a allowable bearing pressures of 1500 and 1.800 psf, respectively. Allowable increases of 300 psf for each additional 1 foot of width and 300 psf for each additional 6 inches of depth may be utilized if desired. The maximum allowable bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. The bearing soils. are non -expansive and fall within the "very low' expansion. category in accordance with Uniform Building Code (UBC) classification criteria. Pertinent 1997 UBC and 2001 CBC Seismic Design parameters are summarized on the attached data sheet. If you have questions regarding this letter or the referenced report, please contact the undersigned. Respectfully submitted, SLADDEN ENGI NG PpFESSIpti COQ L. ANOFq�� h m m m Brett L. Anderson d EXp g.gp.200S Principal Engineer 13" CMIL SER/gl _ q.�r� Copies: 4/Trans West Housing, Inc. CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY Sladden Engineering 07-12-847 1997 UNIFORM BUILDING CODE INFORMATION The International Conference of Building Officials *1997 and 2001 CBC California Building Code •.,, ;...,.._ :;:.. r: Uniform.,:.:.Buildingw,:Code..,.- contain :: substantial: _revisions.. and_ ,additions,>to:.,,the• , earthquake, engineering section in Chapter 16. Concepts contained in the code that will be relevant to construction of the proposed structures arc summarized below. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity to significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. Fault Zone Approximate Distance From Site Fault Type (1997 UBC) San Andreas 9.8 km A San Jacinto 26 km A Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is SD, generally described as stiff or dense soil. The site is located within UBC Seismic Zone 4. The following table presents additional coefficients and ; factors relevant to seismic mitigation for construction based upon the 2001 CBC. Near -Source Near -Source Seismic Seismic Seismic Acceleration Velocity Coefficient Coefficient Source Factor, N, Factor, No C, C� _ San Andreas 1.01 1..22 0.44 N. 0.64 N� San Jacinto 1.0 1.0 0.44 N. 0.64 N,. .,...;I�, :....:: • . , ... • ,._ _. pecember 10; 2�/>.• .'•. t...., ; ti 9 1 �nC:".� . Y ..':y7;� r: =-4= � .. - � II , . I ��Project-.No:�54:4-4Q02<-.-�r r -� 07-12-847 Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is So, generally described as stiff soil. The site is located within UBC Seismic 7 -one 4. The following presents additional coefficients and factors relevant to seismic mitigation for new construction upon adoption of the 2006 code. .<.vno.iy F. .K} .. .'.P..2 . ^.n.v' .. .: ...... ::,6, ... ._. a.?. ..i. ...... -::.t ..� <-+.'.v .? a. •.. A .. .. Jr <. J The seismic design category for a structure may be determined in accordance with Section 1613 of the 2006 IBC or ASCE7. According to the 2006 IBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The period of the structures should be less than 1h second. This assumption should be verified by the project structural engineer. The 2006 IBC Seismic Design Parameters are summarized below. Occupancy Category (Table 1604.5):11 Site Class (Table 1613.5.5): D Ss (Figure 1613.5(3)):1.508 Si (Figure 1613.5(4)):0.60g Fa (Table 1613.5.3(1)): 1.0 Fv (Table 1613.5.3(2)):1.5 Sms (Equation 16-37 IFa X Ss)): 1.50g Smi (Equation 16-38 (Fv X $I)): 0.90g SDs (Equation 16-39 (2/3 X Smsl): 1.00g SDI (Equation 16-40 12/3 X Smt)): 0.60g Seismic Design Category based on SDS (Table 1613.5.6(1)): D Seismic Design Category based on SDI (Table 1613.5.6(2)): D CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPR®VED FOR CONSTRUCTION ATE Sladden Engineering Sladden Engineering 45090 Golf Center Park%vay, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite A. Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 I: March 29, 2012 -2- Project No. 544-12050 12-03-080 Footings should extend at least 12 inches beneath lowest adjacent grade. Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 powids per square fool (psf) and isolated pad footings niay t�e,desis;ned using. an. allo,rv�il?le hearing pressure of 1.800 psf. The allowable bearing pressures are applicable to.dead and frequently applied live loads. The allowable bearing pressures may be increased by 1/3 to resist wind and seismic loading. Care should be taken to see that bearing or subgrade soils are not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building area should be rapid and complete.. Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are poured against properly compacted native or approved non - expansive import soils. Passive earth.pressure should be ignored within the upper 1 "foot except Xwhere confined (such as beneath a floor slab). •I"he surface soil is non -expansive and falls within the "very low" expansion category in accordance with 2010 California Building Code (C13C) classification criteria. Slab thickness and reinforcement should be determined by the structural engineer. All slab reinforcement should be supported on concrete chairs to ensure that reinforcement is placed at slab mid -height. Slabs with moisture sensitive surfaces should be underlain with a moisture/vapor retarder consisting of 10 -mil Visqueen, or equivalent. All laps within the membrane should be sealed and at least 2 inches of clean sand should be placed over the membrane to promote uniform curing of the concrete. To reduce the potential for punctures, the membrane should be placed on a pad Surface that has been graded smooth without any sharp protrusions. If a smooth surface can not be achieved by grading, consideration should be given to placing a 1 -inch thick leveling course of sand across the pad surface prior to placement of the membrane. Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is So, generally described as stiff soil. The following presents additional coefficients and factors relevant to seismic mitigation for new construction based upon the 2010 California Building Code (CBC). CITY OF LA QUINTA BUILDING & SAFETY DEPT. A PROVED FOR CONSTRUCTION' DATE BY' I Sladdern Engineering a \4arch 29, 2012 -3 t _ s > Project No. 544-12050` . R 12-03-080 The seismic design category for a struchnre may be determined in accordance with Section 1613 of the 2010 C:13C or ASCI' --'7. According to the 2010 C13C, Site Class D may be used to estimate' . design seismic landing for the proposed structures. The period of the structures sliould be less than '/z second. This assumption should bc, verified, by the prajeet sl,:uclural engineer.; 'fhe 2Q10: .. ,, .. CBC Seismic Design Paramelers are summarized below. Occupancy Category (Table 160=1.5): If Site Class (Table 1613.5.2): D Ss (Figure 1613.5.1.): 1.508 41 SI (Figure'16'13.5.1):0.608 Fa (Table 1613.5.3(1)): 1.0 F%, ('fable 1613.5.3(2))::1.5 S.„s (I::quation '16-36 {Fa X Ss{): 7.50g Sint (Equation 16-37 (Fv X Sll): 0.901; SDs (Equation 16-38 12/3 X Sills)): 1.00g Sm (Equation 16-39 12/3 X S,»l{): 0.608 Seismic Design Category D - If you have questions regarding this letter or the refere nced report, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING Brett I... Anderson t:o. C 45389 ` Principal Engineer ” 12 SER/g1 Copies: 4/ Decatur A,dvisgrs, LLC Sladden Engineering f Sladden Engineering