2007 05 15 RDAe4 4 4 ad4a
Redevelopment Agency agendas are
available on the City' web page
@ www.la-quinta.org
REDEVELOPMENT AGENCY
AGENDA
CITY COUNCIL CHAMBERS
78-495 Calle Tampico
La Quinta, California 92253
Regular Meeting
TUESDAY, MAY 15, 2007 - 3:00 P.M.
Beginning Resolution No. RA 2007-005
CALL TO ORDER
Roll Call:
Agency Board Members: Adolph, Henderson, Kirk, Sniff, and Chairman Osborne
PUBLIC COMMENT
At this time, members of the public may address the Redevelopment Agency on
any matter not listed on the agenda. Please complete a "request to speak" form
and limit your comments to three minutes.
CLOSED SESSION
NOTE: Time permitting the Redevelopment Agency Board may conduct Closed
Session discussions during the dinner recess. In addition, persons identified as
negotiating parties are not invited into the Closed Session meeting when acquisition
of real property is considered.
1. CONFERENCE WITH THE AGENCY'S REAL PROPERTY NEGOTIATOR,
DOUGLAS R. EVANS, PURSUANT TO GOVERNMENT CODE SECTION
54956.8 CONCERNING POTENTIAL TERMS AND CONDITIONS OF
ACQUISITION AND/OR DISPOSITION OF REAL PROPERTY LOCATED
SOUTHWEST OF THE INTERSECTION OF HIGHWAY 111 AND LA QUINTA
CENTRE DRIVE. PROPERTY OWNERS/NEGOTIATOR: TORRE NISSAN,
GEORGEVELARDE.
001
Redevelopment Agency Agenda 1 May 15, 2007
2. CONFERENCE WITH THE AGENCY'S REAL PROPERTY NEGOTIATOR,
DOUGLAS R. EVANS, PURSUANT TO GOVERNMENT CODE SECTION
54956.8 CONCERNING POTENTIAL TERMS AND CONDITIONS OF
ACQUISITION AND/OR DISPOSITION OF REAL PROPERTY IDENTIFIED AS
APN: 649-030-016, -017. PROPERTY OWNERS/NEGOTIATOR: DESERT
EUROPEAN MOTOR CARS INC., JERRY JOHNSON.
3. CONFERENCE WITH THE AGENCY'S REAL PROPERTY NEGOTIATOR,
DOUGLAS R. EVANS, PURSUANT TO GOVERNMENT CODE SECTION
54956.8 CONCERNING POTENTIAL TERMS AND CONDITIONS OF
ACQUISITION AND/OR DISPOSITION OF REAL PROPERTY LOCATED AT
THE NORTHEAST AND SOUTHEAST CORNERS OF AVENUE 50 AND
W,ASHINGTON STREET IDENTIFIED AS APN: 646-070-013 AND
770-040-012, RESPECTIVELY. PROPERTY OWNERS/NEGOTIATORS:
WIESTPORT LA QUINTA, L.P. AND URBAN HOUSING COMMUNICATIONS,
ROGER DAVILA.
RECESS TO CLOSED SESSION
RECONVENE AT 4:00 P.M.
PUBLIC COMMENT
At this time members of the public may address the Redevelopment Agency on any
matter not listed on the agenda. Please complete a "request to speak" form and
limit your comments to three minutes.
CONFIRMATION OF AGENDA
APPROVAL OF MINUTES
1. APPROVAL OF MINUTES OF MAY 1, 2007
CONSENT CALENDAR
NOTE: Consent Calendar items are considered to be routine in nature and will be
approved by one motion.
APPROVAL OF DEMAND REGISTER DATED MAY 15, 2007.
2. RECEIVE AND FILE TREASURER'S REPORT DATED MARCH 31, 2007.
OG
Redevelopment Agency Agenda 2 May 15, 2007
3. RECEIVE AND FILE REVENUE & EXPENDITURES REPORT DATED MARCH
31, 2007.
4. APPROVAL OF A CONTRACT EXTENSION WITH THE ROSENOW SPEVACEK
GROUP (RSG) FOR REDEVELOPMENT AND ECONOMIC DEVELOPMENT
SERVICES.
5. APPROVAL OF A CONTRACT AMENDMENT WITH RBF CONSULTING FOR
CIVIL ENGINEERING SERVICES FOR SILVERROCK RESORT, PHASE II
INFRASTRUCTUREIMPROVEMENTS.
BUSINESS SESSION
1. CONSIDERATION OF CONSULTANT SELECTION COMMITTEES FOR THE
REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL AND
LAKES AND WATER FEATURES DESIGN SERVICES FOR PHASE II
SILVERROCK RESORT IMPROVEMENTS.
A. MINUTE ORDER ACTION
STUDY SESSION - NONE
CHAIR AND BOARD MEMBERS' ITEMS - NONE
PUBLIC HEARINGS - NONE
For all Public Hearings on the agenda, a completed "request to speak" form must
be filed with the City Clerk prior to consideration of that item.
ADJOURNMENT
Adjourn to a regularly scheduled meeting of the Redevelopment Agency to be held
on June 5, 2007, commencing with closed session at 3:00 p.m. and open session
at 4:00 p.m. in the City Council Chambers, 78-495 Calle Tampico, La Quinta, CA
92253.
00"
Redevelopment Agency Agenda 3 May 15, 2007
DECLARATION OF POSTING
I, Veronica Montecino, City Clerk of the City of La Quinta, do hereby declare that
the foregoing agenda for the La Quinta Redevelopment Agency meeting of May 15,
2007, was posted on the outside entry to the Council Chamber at 78-495 Calle
Tampico and on the bulletin boards at 51-321 Avenida Bermudas and 78-630
Highway 1 1 1, on May 11, 2007.
DATED- Qay 11, 2007
VERONICA J. NTECINO, City Clerk
City of La Quinta, California
00'r
Redevelopment Agency Agenda 4 May 15, 2007
ce-ar 4 4 a0mrs,
AGENDA CATEGORY:
COUNCIL/RDA MEETING DATE: May 15, 2007 BUSINESS SESSION:
ITEM TITLE: Demand Register Dated May 15, 2007
CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
RECOMMENDATION:
It is recommended the Redevelopment Agency Board:
Receive and File the Demand Register Dated May 15, 2007 of which
$1,687,014.46 represents Redevelopment Agency Expenditures.
PLEASE SEE CONSENT CALENDAR ITEM NUMBER 1 ON CITY COUNCIL AGENDA
T-af 4 4 a"
COUNCIL/RDA MEETING DATE: May 15, 2007
ITEM TITLE: Receive and File Transmittal of
Treasurer's Report as of March 31, 2007
RECOMMENDATION:
AGENDA CATEGORY:
BUSINESS SESSION:
CONSENT CALENDAR: CP.—
STUDY SESSION:
PUBLIC HEARING:
It is recommended the La Quinta Redevelopment Agency:
Receive and File the Treasurer's Report as of March 31, 2007.
PLEASE SEE BUSINESS SESSION ITEM ON CITY COUNCIL AGENDA
00
T-dw4lwR
AGENDA CATEGORY:
COUNCIL/RDA MEETING DATE: May 15, 2007
BUSINESS SESSION:
ITEMTITLE: Receive and File Transmittal of Revenue and 3
Expenditure Report for March 31, 2007 CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
RECOMMENDATION:
Receive and File
BACKGROUND AND OVERVIEW:
Transmittal of the March 31, 2007 State of Revenue and Expenditures for the La
Quinta Redevelopment Agency.
Respectfully submitted,
( 4Aft
John M. Falconer, Finance Director
Approved for submission b
Thomas P. Genovese, Executive Director
Attachment 1. Revenue and Expenditures Report, March 31, 2007
LA OUINTA REDEVELOPMENT AGENCY
REVENUE SUMMARY
PROJECT AREA NO. 1:
07/0112006 - 313112007 REMAINING %
BUDGET RECEIVED BUDGET RECEIVED
A 1 I AUHMtN I 'I
LOW/MODERATE BOND FUND:
"located Interest
Home Sale Proceeds
Non Allocated Interest
Transfer In
TOTAL LOW/MOD BOND
LOW/MODERATE TAX FUND:
lax Increment
Allocated Interest
Non Allocated Interest
Miscellaneous revenue
Non Allocated Interest
LORP-Rant Revenue
Home Sales Proceeds
Sale of Land
Sewer Subsidy Reimbursements
Rehab0it3hon Loan Repayments
2nd Trust Deed Repayment
Transferin
TOTAL LOW/MOD TAX
DEBT SERVICE FUND'
Tax Increment
Allocates Interest
Non Allocated Interest
Intend - County Loan
Interest Advance Proceeds
Transfers In
TOTAL DEBT SERVICE
000
000
coo
0.000 %
000
000
000
0000%
000
000
000
0000%
000
000
000
0000%
coo
0.00
000
0000%
10,349,20000
5,253,33160
5,095, B6840
50760%
442,30000
296,70861
145,59139
67080%
000
127,96860
(127,96860)
0000%
000
8197
(6197)
0000%
000
45660
(45660)
0000%
252,000.00
189.48242
62,51756
75190%
480,00000
311,09238
168, 90762
64810%
000
000
000
0.000 %
50,00000
28,44611
21,55489
56890%
000
000
000
0000%
1.000,00000
705,85817
294,14183
70590%
140,000 00
100,000 00
40,X000
71 430%
12,713,50000
7,013,42546
5,700,07454
55170%
41,396,80000
21,013,32645
20,383, 47355
50760%
553,10000
640,16617
(87,066.17)
115740%
000
000
000
0 000 %
000
000
000
0 000 %
000
000
000
0000%
4,448,30400
4,448,13799
166.01
100000%
46,398,20400
26,101,63061
20,296, 57339
56260%
CAPITAL IMPROVEMENT FUND - NON-TAXABLE
Pooled Cash Allocated Interest
199,50000
148,88341
50,61659
74630%
Non Allocated Interest
1,000.000 00
722,066 64
277,933 36
72 210 %
Developer Agreement Funding
coo
22,84650
(22,134650)
0000%
Loan Proceeds
coo
000
000
0000%
Rental lnarne
000
000
000
0000%
Transfers In
000
000
000
0000%
TOTAL CAPITAL IMPROVEMENT
1,199,50000
893,79655
305,70345
74510%
CAPITAL IMPROVEMENT F UND-TAXABLE
Pooled Cash Allocated Interest
000
000
0.00
0 000 %
Non Allocated Interest
0,00
coo
000
0000%
Litigation Settlement Revenue
000
000
000
0000%
Bond proceeds
000
000
000
0 000 %
Rental Income
000
000
000
0 000 %
Transfers In
000
000
000
0000%
TOTAL CAPITAL IMPROVEMENT
000
000
000
0000%
F. 00.
2
LA OUINTA REDEVELOPMENT AGENCY 0710112006 - 3/3112007 REMAINING
EXPENDITURE SUMMARY BUDGET EXPENDITURES ENCUMBERED BUDGET
PROJECT AREA N0, 1:
LOWIMODERATE BONE) FUND
PERSONNEL
000
000
000
000
SERVICES
000
000
000
000
REIMBURSEMENT TO GEN
000
000
000
D00
HOUSING PROJECTS
000
000
000
000
TRANSFERS OUT
000
000
000
000
TOTAL LOWIMOD BOND
000
000
000--000
LOW/MODERATE TAX FUND:
PERSONNEL
490000
4,25015
000
64985
SERVICES
368,88100
190,98989
000
177.89111
BUILDING HORIZONS
25D.00000
000
000
250,00000
LO RENTAL PROGRAM
200.00000
18231151
000
17.68649
2nd TRUST DEED PROGRA
500,00000
000
000
500p0000
LAND ACQUISITION
1,800, 00000
12,02875
000
1, 787,97125
FORECLOSURE
150,00000
000
000
150,00000
REI MBURSE MENT TO GE N
484,12700
363,09429
000
121,03271
TRANSFERS OUT
20,448,30400
4,448, 13799
000
16, 300,16601
TOTAL LOWIMOD TAX
24 206,21200
5,200,8125
000
19, ,3565 9942
DEBT SERVICE FUND:
SERVICES
657,30000
491,26326
000
166,03674
BOND PRINCIPAL
2,640,00000
2,640,00000
000
000
BOND INTEREST
7658.90000
7,658,90025
000
(026)
INTEREST CITY ADVANCE
1,020.00000
765.00000
000
255,00000
PASS THROUGH PAYMENT
19 950,170 00
10,146,49994
000
9, E0367006
ERAF SHIFT
000
000
000
000
TRANSFERS OUT
4.108,51500
4,068,34892
000
4D,166D6
TOTAL DEBT SERVICE
3603488500
25, 70,01238
000
10264�, 266 -
CAPITAL IMPROVEMENT FUND:
PERSONNEL
4,90000
4,25015
000
64985
SERVICES
659.73000
615,57026
000
44.15974
LAND ACQUISITION
000
000
000
000
ASSESSMENT DISTRICT
000
000
000
000
ADVERTISINGECONOMIC000
000
000
000
ECONOMIC DEVELOPMEN
000
000
000
000
BOND ISSUANCE COSTS
000
000
000
000
CAPITAL - BUILDING
000
000
000
000
REIMBURSEMENT TO GEN
213.01600
159.76197
000
5325403
TRANSFERS OUT
20,556,05700
3,966,75663
000
16,58930037
TOTAL CAPITAL IMPROVEMENT
21,433, 70300
4 46,33901
0 0
16,68,3
CAPITAL IMPROVEMENT FUNOITAXABLE BOND
BOND ISSUANCE COSTS
000
000
000
000
TRANSFERS OUT
(42,80700)
000
000
(42,BD700)
TOTAL CAPITAL IMPROVEMENT
(42,8070)
_ 000
000
(42,80700)
OOQ
3
LA OUINTA REDEVELOPMENT AGENCY
REVENUE SUMMARY
PROJECT AREA NO. 2:
07/0112006 - 3131/2007 REMAINING %
BUDGET RECEIVED BUDGET RECEIVED
LOW/MODERATE BOND FUND:
Allocated Interest
Non Allocated Interest
Bond proceeds (net)
Transfer In
TOTAL LOW/MOD BOND
LOW/MODERATE TAX FUND:
Tax Incement
Allocated Interest
Non Allocated Interest
Developer tuning
Vista Dunes MI Rental Rev
2nd Trust Deed Repayment
ERAF Shift - Interest
Sale of Land
I•ransfer in
TOTAL LOW/MOD TAX
2004 LOW/MODERATE BOND FUND:
Allocated Interest
Home Sale Proceeds
Non Allocated Interest
Transfetln
TOTAL LOW/MOD BOND
000
000
000
0 000 %
000
000
000
0000%
000
000
0.00
0 000 %
000
000
0.00
0.000%
000
000
000
-0000%
5,401,80000
2,582,54493
2,819,25507
47810%
441,000 00
303,225 41
137,774 59
68 760 %
000
000
000
0 000 %
000
000
000
0000%
000
0.00
000
0.000 %
100,000 00
59.409 08
40,590 92
59 410%
000
000
000
0 000 %
12,641,90300
000
12.6Il,90300
0000%
16,000,000.00
000
16 000 000 00
0 000 %
34,584.70300
2,945,17942
31,639,52358
8520%
000
000
000
0000%
000
000
000
0 000 %
2,800,00000
2, 103,80190
69619810
75140%
000
000
000
0.000 %
2,800,00000
2,103,80190
69619810
75140%
DEBT SERVICE FUND
l'ax lncrsment
21,607,20000
10,330,17973
11.277,02027
47810%
Allocated Interest
399,90000
366,77409
33, 12591
91720%
Non Allocated Interest
000
0 00
000
0000%
Interest Advance Proceeds
000
000
000
0 000 %
l ransfer In
1 954 642 00
7 954 559 91
8209
100,000 %
TOTAL DEBT SERVICE
23,961,74200
12,651,51373
11,310,22827
52800%
CAPITAL IMPROVEMENT FUND:
Allocated Interest
105,60000
90,46484
15,13516
85670%
Non Allocated Interest
000
000
000
0000%
Developer Agreement
000
0.00
000
0000%
Transfers In
000
000
000
0000%
TOTAL CAPITAL IMPROVEMENT
105,60000
90,46484
15, t35.16
85.670%
010
`l
LA DUINTA REDEVELOPMENT AGENCY 07101/2006 - 3131/2007
REMAINING
EXPENDITURE SUMMARY
BUDGET
EXPENDITURES
ENCUMBERED
BUDGET
PROJECT AREA NO, 2:
LOW/MODERATE BONG FUND
2nd TRUST DEEDS
000
000
0DO
0DO
LAND
0DO
000
000
000
BOND ISSUANCE COSTS
000
000
000
000
TRANSFERS OUT
000
000
0DO
000
TOTAL LOWIMOD BOND
000
000
000
000
LOW/MODERATE TAX FUND:
PERSONNEL
2,90000
2,57204
000
32796
SERVICES
324,11100
167,46804
000
156,642%
2NG TRUST DEEDS
000
000
000
000
FORECLOSURE ACQUISITI
150,00000
000
000
150 NO 00
WATERCOLOR COURT HO
4,500,00000
000
000
4, 500,00000
LAND ACQUISITION
20,300 000 00
19,963,50414
000
336.49586
REIMBURSEMENT TO GEN
264,523 DO
198,39123
000
66,131]]
TRANSFERS OUT
3523,09700
21248,63241
000
1274,46459
TOTAL LOW/MOD TAX
9064,631
22, 80,Sfi]
000
8�84,06314
2004 LOW/MODERATE BOND FUND
HOUSING PROGRAMS
6283,00000
2,665, 10000
000
3E 17,90000
LAND
000
000
0DO
000
TRANSFERS OUT
53091]9500
],214,2523]
000
458]],54263
TOTAL LOWIMOD BOND
593 ]9500
9,819, 23]
00
4949 4� 4263
DEBT SERVICE FUND:
SERVICES
176,10000
181, 79707
000
(5,69707)
BOND PRINCIPAL
205,00000
10500000
000
1C0,00000
BONDINTEREST
31478500
314,78500
000
000
INTEREST CITY ADVANCE
1, OOD00000
749,99998
000
250,000 02
PASS THROUGH PAYMENT
18 046,995 00
8,573,43641
000
9473,55859
TRANSFERS OUT
1.954,64200
1954,55991
000
8209
TOTAL DEBT SERVICE
21691, 200
11,879,5783
000
119436
CAPITAL IMPROVEMENI'FUND:
PERSONNEL
2,90000
2,57016
000
32984
SERVICES
13304300
46,78426
000
86,25874
ADVERTISING -ECONOMIC
000
000
000
000
ECONOMIC DEVELOPMEN
000
000
000
000
REIMBURSEMENT TO GEN
36,53400
27,39951
000
9,13449
TRANSFERS OUT
193,23500
66,10700
0DO
121,12800
TOTAL CAPITAL IMPROVEMENT
36 ]i W
142,8609
000
2 8510]
0 A
5
COUNCIL/RDA MEETING DATE: May 15, 2007
ITEM TITLE: Approval of a Contract Extension with
the Rosenow Spevacek Group for Redevelopment and
Economic: Development Services
AGENDA CATEGORY:
BUSINESS SESSION:
CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
Please see the City Council staff report regarding this item.
COUNCILIRDA MEETING DATE: May 15, 2007
ITEM TITLE: Approval of a Contract Amendment
with RBF Consulting for Civil Engineering Services
for SilverRock Resort, Phase II Infrastructure
Improvements
RECOMMENDATION:
AGENDA CATEGORY:
BUSINESS SESSION: `
CONSENT CALENDAR: �1
STUDY SESSION:
PUBLIC HEARING:
Approve an amendment to the Professional Services Agreement with RBF
Consulting to provide additional civil engineering services in an amount not -to -
exceed $942,950, and authorize the Executive Director to execute the amendment.
FISCAL IMPLICATIONS:
The Phase II SilverRock Resort Improvements are included within the 2007-2008
Capital Improvement Program. Project components include: Infrastructure,
Permanent Clubhouse, Second Golf Course, and Entry Feature/Roads. A total of
$5,850,000 is budgeted within the CIP under the "engineering" category for the
above -listed project components. To date, a total of $2,802,200 has been
encumbered by engineering and project management contracts, leaving a balance
of $3,047,800 for additional engineering services.
The costs for the additional civil engineering services contained within this
amendment ($459,150) will be charged to the appropriate "engineering" category
for each of the project components.
The 2007-2008 CIP also includes funds for "inspection/testing/survey" for each of
the SilverRock Resort Phase II components listed above, totaling $4,288,290. To
day, these funds have not been encumbered.
013
The costs for technical services contained within this amendment ($368,800) will
be charged to the "inspection/testing/survey" category for each of the project
components. It should be noted that technical services will be performed during
the construction phase of each project, but only when and if they are needed. (It's
possible that some of the tasks will not be necessary; however, in order to lock in
costs, staff endeavored to make the list as comprehensive as possible.) RBF will
not proceed with these tasks until directed by City staff and the project manager.
There is also a list of "optional tasks" which are further detailed in the staff report.
RBF will not proceed with these tasks until directed by City staff and the project
manager. These costs will be charged to the appropriate "engineering" or
"inspection/testing/survey" categories within each of the project components.
Lastly, the PSA amendment includes a budget for reimbursable items in an amount
not to exceed $20,000.
The PSA amendment is included as Attachment 1; Exhibit B lists all tasks and
respective costs, which are summarized below:
Civil Engineering
Cost
Clubhouse
$ 108,700
Golf Course
$ 165,300
Additional Infrastructure
$ 170,150
Landscape & Entry Features•
$ 15,000
Subtotal for Civil Engineering
$ 459,150
Technical Services
Construction Support
$ 18,500
Clubhouse Staking
$ 21,000
Golf Course Staking
$ 119,000
Additional Infrastructure Staking
$ 194,300
Landscape & Entry Feature Staking
$ 16,000
Subtotal for Technical Services
$ 368,800
Optional Tasks
Reinforced Concrete Box Canal
Crossings
$ 61,000
Other Technical Services (Clubhouse
& Golf Course)
$ 34,000
Subtotal for Optional Tasks
$95,000
Reimbursables
$20,000
Grand Total
$942,950
F'...� Oil
BACKGROUND AND OVERVIEW:
The Phase II SilverRock Resort improvements include the installation of: the
"backbone" infrastructure; on -site streets; vehicular, pedestrian, and golf cart
bridges and undercrossings; the permanent clubhouse; a second 18-hole golf
course; primary and secondary entry features; a passive park; and project support
facilities. Portions of this work are completed or are currently in progress.
On August 1, 2006, the Agency Board approved a professional services agreement
("PSA") with RBF Consulting in the amount of $602,200 to provide initial civil
engineering services for the SilverRock Resort, Phase II project. The Agency used
the consultant selection process to approve the PSA with RBF Consulting.
A committee of City staff members and contract staff developed a short list of
three qualified civil engineers to prepare the plans, specifications and engineer's
estimate for the SilverRock Resort Phase II Infrastructure Improvements. Each of
the three: engineering firms has done work for the City of La Quinta, and were
deemed qualified to provide the needed engineering services. The firms included
Psomas, LAN Engineering, and RBF Consulting. Each of the three firms was
interviewed and evaluated on their qualifications, project understanding and
proposed scope of work. Following the committee's evaluation of the three firms,
the committee unanimously recommended RBF Consulting. The Agency Board
approved this recommendation at its August 1, 2006 meeting with a 5-0 vote.
Pursuant to La Quinta Municipal Code Section 3.32.050.C, the City is permitted to
forgo the formal request for proposal procedures where experience with the
proposed service provider had demonstrated competence and satisfactory
performance. Given the large number of projects RBF Consulting has completed for
the City, the selection of RBF meets the requirements of 3.32.050.C.
When the PSA was first negotiated with RBF, time was of the essence, as it was
imperative to complete CVWD and Bureau of Reclamation submittals and
applications for canal crossings and water/sewer lines. The current PSA's scope is
limited to infrastructure improvements; however, it was anticipated that a contract
amendment would be required to include engineering related to the permanent
clubhouse, the second golf course, the passive park, aerial mapping, site hydrology,
technical services, etc.
A detailed summary of the additional work, tasks, deliverables, and fees is set forth
in Attachment No. 1, RBF contract amendment, Exhibit A, scope of services.
.il- 015
It should be noted the PSA amendment includes a list of "optional tasks." The
majority of these tasks relate to recent discussions with CVWD regarding a
.concrete box" structure that could be used in place of a traditional cart bridge to
cross the canal. This option places less stress on the canal lining, costs less to
construct:, and provides a more "seamless" look on the golf course than a bridge.
Another optional task is "golf course storm drain stakes" which allow for survey
stakes to be placed by RBF during the construction of the golf course storm drain
system. RBF will perform these tasks if so directed by City staff and the project
manager.
FINDINGS AND ALTERNATIVES:
The alternatives available to the Agency Board include:
1 . Approve an amendment to the Professional Services Agreement with RBF
Consulting to provide additional civil engineering services in an amount
not -to -exceed $942,950, and authorize the Executive Director to execute
the amendment; or
2. Do not approve an amendment to the Professional Services Agreement
with RBF Consulting to provide additional civil engineering services in an
amount not -to -exceed $942,950: or
3. Provide staff with alternative direction.
Respectfully submitted,
Thomas P. Genovese, Executive Director
Attachment: 1. RBF Consulting Contract Amendment
- 016
k1191leF11:Ikri140k&
` 4 laQumrw
PROFESSIONAL SERVICES AGREEMENT
AMENDMENT NO.1
PROJECT: SilverRock Resort, Phase II Civil Engineering Services
CONSULTANT: RBF Consulting
*********x****,a**xxxx****,t***********t**********t•x****************,t*************x*:r*****x*
Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do
the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work
shall conform to the terms, general conditions, and special provisions of the original Contract.
xxxx****xxxxx**+•**xxxxx*****xxxxxx****xxxxx******xxxxx*****xxxxxxx*****xxxxx******xxxx*****xxxxxxx
DESCRIPTION OF CHANGE
Provide additional civil engineering and technical services in support of SilverRock Resort Phase II Improvements.
Submitted By:,
Approved By:,
Previous Contract Amount
$602,200
Amendment No. 1
$942,950�
Revised Contract Total
$1,545,150
6-' 1' D
We, the undersigned Consultant, havegiven careful consideration to the changeproposed and hereby agree, if thisproposal
is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and
perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown
above.
Accepted
Consultant: Date:
017
PSA96041.dm
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 1
EXHIBIT "A"
PROFESSIONAL SCOPE OF SERVICES
A. RBF agrees to perform the following Professional Scope of Services for the
City of La Quinta SilverRock Golf Resort Site:
Clubhouse Improvements
The following Tasks,1-10, pertain to the Club House Improvements.
TASK 1 SITE PLAN CALCULATION
Based on the site plan prepared by the City's Clubhouse Architect, RBF will review the
site plan and provide engineering calculations for the horizontal geometry of the site.
This task will include review of the parking standards, fire access and horizontal
geometry. In addition, this task will include meeting with the Fire Marshal's office for
review and approval of the fire access and overall clubhouse site. RBF is assuming that
this task will take approximately 80 hours, with three design iterations.
TASK 2 PARKING LOT LAYOUT
Based on the site plan prepared by the City's Clubhouse Architect, RBF will review the
site plan and provide engineering design options for the layout of the 270-stall parking
lot. This task will include review of the parking standards, fire access and horizontal
geometry. RBF is assuming that this task will take approximately 50 hours, with three
design iterations.
TASK. 3 PRECISE GRADING PLAN
RBF shall prepare 1" = 20' scale Precise Grading Plans for the proposed Clubhouse,
based on the final site layout provided by the City's Clubhouse Architect and the city
approved parking lot layout. The plans shall be designed in accordance with the Soils
and Geology Report, and the City's Grading Ordinance.
The Precise Grading Plans shall indicate pad elevations, banks, berms, drainage devices,
parking lot, grassed event areas (no more than two), outside hardscape patios (no more
than two) and possible corrective grading areas as referenced in the Preliminary Soils
Report, and erosion control measures necessary for obtaining a grading permit and
construction of the Project.
In addition to the precise grading plans, RBF shall prepare a hydrology report for the
specific improvements that will be shown on the precise grading plans based on the
overall site hydrology report listed below in this scope. Included with this task will be
the preparation of an on -site Hydrology Study specifically for the clubhouse, which will
determine the storm water run-off amounts, and the drainage facilities necessary to
accommodate projected storm flows. The study will describe components such as the
location and volume of retention/detention basins as well as the general routing of storm -
water flows throughout the site.
.W. 018
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 2
RBF will prepare a PM10 Dust Mitigation Plan for approval by the City. This plan lists
required actions for dust control during the construction process. The plan will be one
24"06" sheet with dust control specifications and a reference map of the overall site
grading; features.
RBF will provide final engineering services for the preparation of construction plans for
the drainage facilities associated with the clubhouse site, including parking lot. It is
anticipated that all of the proposed catch basins will utilize dry wells prior to discharging
into the proposed golf course water hazards/lakes.
The Precise Grading Plan set will also include a sheet showing the ADA path of travel
around the clubhouse site.
RBF shall prepare a Preliminary Estimate of Earthwork Quantities based upon the
existing surface information provided by the City. Allowances for shrinkage and
subsidence and quantities for corrective grading work shall be accounted for based upon
the Soils Engineer's Report, unless otherwise specified.
It is assumed that 1 title, 1 detail, 3 plan, 1 PM-10 and 1 ADA path of travel sheet will be
required for this task. The plan sheet size for grading plans to be no larger than 24"06".
TASK 4 HORIZONTAL CONTROL PLAN
R13F shall prepare a dimensioned plot plan of the Clubhouse site to establish the precise
location of the building, roadway alignment, and parking lots. This plan will be based on
the site; plan drawing files provided to RBF by the City's Clubhouse Architect and the
approved parking lot layout. This plan will be prepared at a scale of 1 "=40', on a 24"06"
sheet, and will be the base sheet for other subsequent drawings of the Civil Plan submittal
package. The plan will include parking lot striping and handicap parking signage. This
horizontal control plan will be incorporated into the Precise Grading plan set.
TASK 5 PRIVATE UTILITY PLAN
RBF shall prepare a plan that shows the design of the private onsite sewer and domestic
water system necessary to accommodate the proposed clubhouse. The design of these
improvements will be shown in plan view at 1'= 40' scale, and conform to the standards
of the American Water Works Association. It is assumed the entire sewer and water
system will be private and a separate plan and profile set of improvement plans for
CVWD will not be needed. This task will also include a water model to determine the
fire flow demands for the clubhouse site, using the actual fire hydrant locations.
TASK 6 DRY UTILITY PLAN
RBF with the assistance from Butsko Utility Design shall prepare a plan that shows the
design of the private dry utility to service the proposed clubhouse. The design of these
improvements will be shown in plan view at V= 40' scale, and conform to the industry
standards.
�r� 019
RBF Consulting
Amendment No. 1, IN 20-100784
May 10, 2007
Page 3
TASK 7 PARKING LOT LIGHTING PLAN
RBF will provide electrical plans to install lighting for the parking lot area. Lighting
fixtures will be selected and specified to maintain lighting levels as recommended by
Illuminating Engineering Society Standard DG-5 and in accordance with the City of
La Quinta's "Dark Sky" ordinance. The electrical plans will include lighting fixtures,
pull boxes, conduit/wiring sizing and routing, connection diagrams, panel schedules and
construction details. The following Lighting Plans are anticipated:
E-1 Single Line Diagrams, Panel Schedules and Conduit Schedules
E-2 Conduit and Power Plan (Tunnel 1)
E-3 Conduit and Power Plan (Tunnel 2)
E-4 Conduit and Lighting Plan (Tunnel 3)
The design of these improvements will be shown in plan view at 1 "= 40' scale.
TASK 8 SILVERROCK WAY CREEK CROSSING
As part of the SilverRock Golf Course improvements the original site plan for the
clubhouse includes a clubhouse lake that is connected to a golf course lake by a creek and
culvert crossing. It is intended that this structure will be vendor supplied pre -cast
concrete or corrugated multi -plate steel arches. An initial study will be done reviewing
the proposed clear opening dimensions, soil parameters, and estimated cost to select the
preferred tunnel type. The project plans will provide layout and cross -sectional
information for the preferred option and performance specification detailing the design
criteria. to be used by the vendor. The vendor selected by the successful construction
bidder will prepare the design of the underpass. Signed plans and calculations, prepared
by the vendor, will be submitted to the City and RBF for review and approval prior to
fabrication or construction of the underpass structure. Headwalls and traffic barriers will
be designed by RBF and detailed on the project plans. This proposal is based upon the
following assumed geometry for the underpass:
SilverRock Way Creek Crossing by Clubhouse
Clear Opening Size: 10 feet wide by 6 feet high
Culvert Length: 90 feet
Minimum Earth Cover: 3 feet at the curb line
Headwall Orientation: Parallel to culvert
Maximum Wall Height: 9 feet (fill slopes down to 1' at parapet wall)
Wall Length: Total length 100 feet (50 feet at each end)
8.1 Tunnel Type Selection / Vendor Coordination
RBF will review the proposed clear opening widths, soil parameters, City requirements
and estimated cost to select the preferred tunnel type. It is anticipated that Con -Span,
Con -Arch and Corrugated metal arch options will be evaluated. RBF will meet with
potential vendors to obtain pertinent information regarding arch cross sections available,
construction constraints, and estimated construction costs to determine the preferred arch
type. This task also included coordination with the geotechnical sub -consultant and
preparation of a brief summary memo. RBF will review the summary memo and discuss
020
RBF Consulting
Amendment No. I, JN 20-100784
May 10, 2007
Page 4
the selected type with the City to gain concurrence on the selection. At this time it is
anticipated that conventional concrete headwalls and traffic barriers will be utilized. No
special aesthetic treatment to the headwalls is proposed. Traffic barriers, where
applicable will be detailed to match the proposed barrier at the bridge over the All
American Canal.
8.2 Tunnel Performance Specification
Based upon the selected tunnel type RBF will meet with the vendor to obtain information
to be included in the performance specification to be used in bidding for the arches. This
will include dimensional criteria, loading conditions, materials, installation criteria,
testing and inspection requirements and additional information required for construction
of the arch tunnels. This specification will be included in the form of notes within the
plan sett.
8.3 Tunnel Plan and Profile Sheets
RBF will prepare a plan and profile sheet that will provide tunnel alignment data, culvert
profile, headwall orientations, and precise contour grading of the slopes adjacent to the
tunnel, headwalls and stream.
TASK 9 CLUBHOUSE BID PACKAGE & BIDDING ASSISTANCE
RBF will prepare construction specifications, which will be added to the overall bid
document for the civil improvements associated clubhouse construction. RBF will
supply to the Project Manager a construction estimate, bid item schedule, bid item
descriptions, technical specifications, special provisions and details for inclusion by the
City into the overall bid package for the clubhouse construction. Technical specifications
for construction of each item of work in the Project shall be prepared. Where applicable,
the latest edition of the Standard Specifications for Public Works Construction
("Gree:nbook") and City of La Quinta Standard Drawings will be utilized and referenced
in the construction documents.
The RBF team will assist the City with any technical questions regarding interpretation of
construction plans that may arise during contract bidding and advertising phase of the
project. RBF will plan on attending the pre -bid meeting to clarify questions by
prospective bidders. RBF assumes 12 hours for this task.
TASK 10 PROJECT MANAGEMENT, COORDINATION & QUALITY
CONTROL — CLUBHOUSE
Project Management
This task includes overall project management, liaison with affected agencies, meeting
attendance and participation, progress monitoring and maintenance of project files.
RBF will perform project administration, coordination, and management for the civil
improvements associated with the Clubhouse Design. RBF will supervise, coordinate,
monitor and review design for conformance with City standards, policies and procedures.
"'-� 0 21
RBF Consulting
Amendment No. 1, IN 20-100784
May 10, 2007
Page 5
This task will also include any necessary coordination with the Clubhouse Architect, Golf
Course Architect, Landscape Architect, Lake and Water Feature Designer, City Staff,
Project Manager, utilities and miscellaneous agencies as directed by the City or its
representatives.
Meetings
Progress meetings will be held at regular intervals or as needed between the City, the City
Architect and RBF. These meetings will be held to review the project status to verify that
the project objectives and milestones are achieved by all parties. RBF will attend the
meetings as called by the Project Manager, provide discussion materials as necessary and
meeting notes and decisions associated with the civil improvements on this site. RBF
will document all civil improvement. RBF assumes this task will entail attendance at 12
meetings (specifically for the above mentioned tasks) through the length of the contract.
Once the 12 meetings have been exceeded, additional meetings will be performed, if
required, on an hourly basis for an additional fee or at a mutually negotiate fee.
Project Coordination
A number of agencies, organizations and consultants, as well as the community, are
stakeholders in this project. This task includes time for coordination with the City's
Clubhouse Architect, Project Manager, City Staff, Landscape Architect, Golf Course
Architect and Site Project Manager as necessary. RBF anticipates 48 hours for project
coordination on the clubhouse site. If 48 hours has been exceeded, the City and RBF will
mutually negotiate additional project coordination fee.
Qualitv Control
RBF will supervise, coordinate, monitor and review design for conformance with City of
La Quinta and other local agency standards, policies and procedures as appropriate.
For the purpose of estimating the proposed fee, RBF anticipates 24 hours for this task.
Miscellaneous Exhibits
This task will consist of the preparing exhibits for weekly SilverRock team meetings,
project management team meeting, City Council presentations and other events as
requested by the City or its authorized agents. RBF assumes 16 hours for this task. If 16
hours has been exceeded, additional time for preparation of miscellaneous exhibits and
the fee will be mutually negotiated by the City and RBF.
TASK 11 CONSTRUCTION SUPPORT — CLUBHOUSE
RBF will assist with the following activities for the bidding and construction for the
improvements proposed in this amendment.
Pre -Construction Meeting
RBF will attend the Pre -Construction meeting to clarify questions by the contractor and
or their subcontractors.
,_ 022
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 6
Construction RFI's and Submittal Reviews
During the construction phase, RBF will review and provide comments on shop drawing
submittals and request for information (RFI). In addition, will attend the regular
constriction meetings to answer any design related questions, as well as provide the City
assistance on revisions to the approved construction plans. RBF assumes 20 hours for
this task.
Prepare Record Drawings
The R13F team will utilize the contractor's and City inspector's redline "As -Built" plans
upon project completion to prepare the Record Drawings (Mylar) for the City. Upon
completion, RBF will provide the Record Drawings package to the City that will
complete the civil improvments of this project. RBF assumes 12 hours for this task.
Golf Course Work Tasks
The following Tasks, 12-18, pertain Golf Course Improvements.
TASK 12 PRIVATE UTILITY PLAN (COMFORT STATION)
RBF shall prepare a plan that shows the design of the private onsite sewer and domestic
water system necessary to accommodate two proposed comfort stations (restroom
facilities only) for the second 18-hole golf course. The design of these improvements
will be shown in plan view at V= 100' scale, and conform to the standards of the
American Water Works Association. It is assumed the entire sewer and water system
will be; private and a separate plan and profile set of improvement plans for CVWD will
not be needed. RBF assumes that this design will take one title sheet and two (2) plan
sheets. In addition, RBF assumes that each of the comfort stations will be located at the
mid points of each of the front and back nine of the second course.
TASK.13 GOLF CART PATH
RBF shall prepare a plan that shows the design of the golf cart paths based on the Golf
Course Architects cart routing schematic. These plans will be shown in plan view at V=
100' scale and will depict the horizontal alignment of the path as well as locations of
curbing. Prior to initiating final plans, RBF will coordinate with the Golf Course
Architect on the proposed cart path alignments. RBF assumes that this design will take
one title sheet and four (4) plan sheets.
In addition, this task will include the design of no more than two cart path bridges
crossing water features. RBF assumes that these structures will be similar to the bridges
that were constructed on the Phase I golf course and will not exceed a pipe size of 48".
RBF assumes that this design will take one plan and one detail sheet, which will be added
to the cart path plan set.
This task will also include coordination with the City's Lake and Water feature Designer,
as well as a hydrologic analysis of the culvert to assure that it will provide adequate
hydraulic capacity in relation with the overall lake routing plan, prepared by the Lake
Designer.
a: 023
RBF Consulting
Amendment No. 1, IN 20-100784
May 10, 2007
Page 7
TASK 14 GOLF CART PATH TUNNEL
As part of the SilverRock Golf Course improvements there will be three golf cart
underpass tunnels. It is intended that the tunnel portions will be vendor supplied pre -cast
concrete or corrugated multi -plate steel arches. An initial study will be done reviewing
the proposed clear opening dimensions, soil parameters, and estimated cost to select the
preferred tunnel type. The project plans will provide layout and cross -sectional
information for the preferred option and performance specification detailing the design
criteria to be used by the vendor. The vendor selected by the successful construction
bidder will prepare the design of the underpass. Signed plans and calculations, prepared
by the vendor, will be submitted to the City and RBF for review and approval prior to
fabrication or construction of the underpass structure. Headwalls and traffic barriers will
be designed by RBF and detailed on the project plans. Lighting will be provided for the
three golf cart underpasses. This proposal is based upon the following assumed geometry
for the underpasses
Golf Cart Underpass Number 1: SilverRock Way Tunnel
Clear Opening Size: 16 feet wide by 12 feet high
Underpass Length: 100 feet
Minimum Earth Cover: 3 feet at the curb line
Headwall Orientation: Parallel to Roadway
Maximum Wall Height: 18 feet plus traffic barrier, wall located at back of sidewalk
Wall Length: Total length 1000 feet (500 feet at each end)
Golf Cart Underpass Number 2: Hotel Drive Tunnel
Clear Opening Size:
16 feet wide by 12 feet high
Underpass Length:
90 feet
Minimum Earth Cover:
3 feet
Headwall Orientation:
Parallel to tunnel
Maximum Wall Height:
14 feet (fill slopes down to 1 foot at parapet wall)
Wall Length:
Total length 150 feet (75 feet at each end)
Golf Cart Underpass Number 3: SilverRock Way Maintenance Tunnel
Clear Opening Size: 12 feet wide by 10 feet high
Underpass Length: 115 feet
Minimum Earth Cover: 3 feet at the curb line
Headwall Orientation: Parallel to the Roadway
Maximum Wall Height: 15 feet plus traffic barrier, wall located at back of sidewalk
Wall Length: Total length 150 feet (75 feet at each end)
14.1 Tunnel Type Selection / Vendor Coordination
RBF will review the proposed clear opening widths, soil parameters, City requirements
and estimated cost to select the preferred tunnel type. It is anticipated that Con -Span,
Con -Arch and Corrugated metal arch options will be evaluated. RBF will meet with
potential vendors to obtain pertinent information regarding arch cross sections available,
construction constraints, and estimated construction costs to determine the preferred arch
type. This task also included coordination with the geotechnical sub -consultant and
R13F Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 8
preparation of a brief summary memo. RBF will review the summary memo and discuss
the selected type with the City to gain concurrence on the selection. At this time it is
anticipated that conventional concrete headwalls and traffic barriers will be utilized.
Minor special aesthetic treatment to the headwalls is proposed, as developed by the
Landscape Architect. Traffic barriers, where applicable will be detailed to match the
proposed barrier at the bridge over the Coachella Canal.
14.2 Tunnel Performance Specification
Based upon the selected tunnel type RBF will meet with the vendor to obtain information
to be included in the performance specification to be used in bidding for the arches. This
will include dimensional criteria, loading conditions, materials, installation criteria,
testing and inspection requirements and additional information required for construction
of the arch tunnels. This specification will be included in the form of notes within the
plan sex.
14.3 Tunnel Plan and Profile Sheets
R13F will prepare a plan and profile sheet for each of the 3 tunnels. Each plan will
provide tunnel alignment data, cart path profile, headwall orientations, and precise
contour grading of the slopes adjacent to the tunnel, headwalls and cart path. Three
separate plans will be developed, one for each tunnel.
14.4 Lighting Plans
RBF will provide electrical plans to install lighting in the tunnels. Lighting fixtures will
be selected and specified to maintain lighting levels as recommended by Illuminating
Engineering Society Standard DG-5. The electrical plans will include lighting fixtures,
pull boxes, conduit/wiring sizing and routing, connection diagrams, panel schedules and
construction details. The following Lighting Plans are anticipated:
E-1
Single Line Diagrams, Panel Schedules and Conduit Schedules
E-2
Conduit and Power Plan (Tunnel 1)
E-3
Conduit and Power Plan (Tunnel 2)
E-4
Conduit and Lighting Plan (Tunnel 3)
TASR:15 ROUGH GRADING PLAN — GOLF COURSE
RBF shall coordinate with the Golf Course Architect and prepare 1" = 40' scale rough
grading plans, is necessary, for the second 18-holes of golf. Prior to starting the grading
plans, the golf course Architect will provide RBF with the electronic CAD files of the
proposed shaping plan. The plans shall be designed in accordance with the shaping plans
prepared by the Golf Course Architect, Soils and Geology Report, and the City of La
Quinta Grading Ordinance. In addition, the Rough Grading Plans shall indicate banks,
berms, drainage and grading as referenced in the golf course architects plans, lake
designers plans and the Soils Report. RBF shall prepare a Preliminary Estimate of
Earthwork Quantities based upon the Rough Grading Plan. Allowances for shrinkage
and subsidence, and over -excavation grading work shall be accounted for based upon the
Soils Engineer's Report, unless otherwise specified.
.»'_ - 45
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 9
RBF assumes that the rough grading design will take one title sheet one detail sheet and
15 plan sheets.
In addition to the rough grading plans, RBF will prepare the golf course storm drain
plans. These plans will be for draining low depressions within the golf course playing
area, and direct the flows through storm drain piping to either water features or low lying
desert areas.
RBF assumes that the golf course storm drain plans will be shown on the above
mentioned rough grading plans.
TASK 16 GOLF COURSE BID PACKAGE & BIDDING ASSISTANCE
RBF will prepare construction specifications, which will be added to the overall bid
document for the civil improvements associated with the golf course construction. RBF
will supply to the Project Manager a construction estimate, bid item schedule, bid item
descriptions, technical specifications, special provisions and details for inclusion by the
City into the overall bid package for the golf course construction. Technical
specifications for construction of each item of work in the Project shall be prepared.
Where applicable, the latest edition of the Standard Specifications for Public Works
Construction ("Greenbook") and City of La Quinta Standard Drawings will be utilized
and referenced in the construction documents.
The R13F team will assist the City with any technical questions regarding interpretation of
construction plans that may arise during contract bidding and advertising phase of the
project:. RBF will plan on attending the pre -bid meeting to clarify questions by
prospective bidders. RBF assumes 12 hours for this task.
TASK.17 PROJECT MANAGEMENT, COORDINATION & QUALITY
CONTROL —GOLF COURSE
Project Management
This task includes overall project management, liaison with affected agencies, meeting
attendance and participation, progress monitoring and maintenance of project files.
RBF will perform project administration, coordination, and management for the civil
improvements associated with the Resort Golf Course Design. RBF will supervise,
coordinate, monitor and review design for conformance with City standards, policies and
procedures.
This task will also include any necessary coordination with the Clubhouse Architect, Golf
Course Architect, Landscape Architect, Lake and Water Feature Designer, City Staff,
Project Manager, utilities and miscellaneous agencies as directed by the City or its
representatives.
>'- 0 L 6
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 10
Meetings
Progress meetings will be held at regular intervals or as needed between the City, the City
Architect and RBF. These meetings will be held to review the project status to verify that
the project objectives and milestones are achieved by all parties. RBF will attend the
meetings as called by the Project Manager, provide discussion materials as necessary and
meeting notes and decisions associated with the civil improvements on this site. RBF
will document all civil improvement. RBF assumes this task will entail attendance at 12
meetings (specifically for the above mentioned tasks) through the length of the contract.
Once the 12 meetings have been exceeded, additional meetings will be performed, if
required, on an hourly basis for an additional fee or at a mutually negotiate fee.
Project Coordination
A number of agencies, organizations and consultants, as well as the community, are
stakeholders in this project. This task includes time for coordination with the City's
Clubhouse Architect, Project Manager, City Staff, Landscape Architect, Golf Course
Architect and Site Project Manager as necessary. RBF anticipates 36 hours for project
coordination on the clubhouse site. If 36 hours has been exceeded, the City and RBF will
mutually negotiate additional project coordination fee.
Quality Control
RBF will supervise, coordinate, monitor and review design for conformance with City of
La Quinta and other local agency standards, policies and procedures as appropriate.
For the purpose of estimating the proposed fee, RBF anticipates 24 hours for this task.
Miscellaneous Exhibits
This task will consist of the preparing exhibits for weekly SilverRock team meetings,
project management team meeting, City Council presentations and other events as
requested by the City or its authorized agents. RBF assumes 16 hours for this task. If 16
hours has been exceeded, the City and RBF will mutually negotiate a fee for the
additional exhibit preparation time.
TASK.18 CONSTRUCTION SUPPORT —GOLF COURSE
RBF will assist with the following activities for the bidding and construction for the
improvements proposed in this amendment.
Pre -Construction Meeting
RBF will attend the Pre -Construction meeting to clarify questions by the contractor and
or their subcontractors.
Construction RFI's and Submittal Reviews
During the construction phase, RBF will review and provide comments on shop drawing
submittals and request for information (RFI). In addition, will attend the regular
construction meetings to answer any design related questions, as well as provide the City
assistance on revisions to the approved construction plans. RBF assumes 20 hours for
this task.
RBF Consulting
Amendment No. 1, ]N 20-100784
May 10, 2007
Page 11
Prepare Record Drawings
The R13F team will utilize the contractor's and City inspector's redline "As -Built" plans
upon project completion to prepare the Record Drawings (Mylar) for the City. Upon
completion, RBF will provide the Record Drawings package to the City that will
complete the civil improvements of this project. RBF assumes 12 hours for this task.
Infrastructure Work Tasks
The following Tasks,19-26, pertain to additional infrastructure improvements.
TASK 19 REINFORCED CONCRETE BOX (OPTIONAL TASK)
The City of La Quinta is proposing to cross the Coachella Canal with a roadway as part
of the SilverRock Project. In lieu of using a bridge for the crossing of the trapezoidal
canal, a two cell Reinforced Concrete Box Culvert. The proposed canal improvements
will be coordinated with the street improvement plans for the SilverRock Project.
The proposed canal improvements considered for this proposal and designed by RBF
consisl' of a double -cell RCB expected to replace approximately 200 feet of concrete
lined trapezoidal canal section. On each end of the RCB will be approximately 20 ft. of
rectangular channel with a center wall aligning with the box center wall. Rectangular
channel sections will be detailed with slots to accommodate stop logs for temporary
blocking of one cell from water flow so that it may be periodically maintained. Warped
wing walls will be required to transition from the existing trapezoidal canal sections to
the new rectangular sections. RBF will evaluate using precast RCB sections during our
preliminary design task.
Construction of the new RCB will require some temporary diversion of water in the canal
during construction. It is our understanding that design of diversion systems such as
pipes or other required structures will be designed by others and not RBF. During
preliminary design, RBF will identify the likely system type after discussing the project
with Coachella Valley Water District (CVWD).
Earth ]Mechanics, Inc. will provide design recommendations for the proposed RCB under
their current agreement with RBF. Geotechnical borings and lab testing previously
performed will be used to develop the recommendations and prepare a supplemental
report for the box culvert.
The improvement plans will be processed through the City of La Quinta and coordinated
with the CVWD for hydraulics and work within CVWD right of way. All plans and
calculations prepared by RBF will be submitted to the City for review at a draft (30%)
level and after completing the final design.
Task 19.1 Meetings
Prior to starting design and as needed during plan preparation, RBF will meet with the
City, Coachella Valley Water District (CVWD), and RBF's roadway designers and utility
consultants as necessary, to coordinate the alignment, profile, design parameters and plan
028
RBF Consulting
Amendment No. I, JN 20-100784
May 10, 2007
Page 12
review and approval process for the canal improvements. The proposed fee assumes a
maximum of 5 meetings.
Task 19.2 Preliminary Concept Design and Geotechnical Report
Based upon the initial meeting with the City and CVWD, RBF will provide preliminary
design concepts of the canal improvements including probable canal diversion and
construction details. The concept plans will be 15% design level including plan layout
and cross sections along canal where improvements are proposed, and describing
temporary diversion and construction phasing. A preliminary hydraulic analysis will be
prepared to determine RCB dimensions. The use of various temporary diversion
techniques for canal will be reviewed as well as use of pre -cast RCB sections.
RBF will coordinate with Earth Mechanics, Inc. (EMI) to provide information required
for the Culvert Design, this will include bearing pressure, anticipated settlements,
removal requirements, design criteria and bedding sections needed for structural design
details. EMI will utilize field data and analysis previously performed for the bridge
option to prepare a supplemental report with recommendations for the culvert.
R13F will meet with CVWD to discuss preliminary concept plans. After CVWD provides
approval of concept, RBF will proceed with Task 18.3-18.7.
Task 19.3 Hydraulics Analysis and Report
RBF will prepare a hydraulic analysis and brief report of findings to determine the
geometrics of the final canal improvements. Temporary structures and means for
diversion of water in the canal are not included. The canal hydraulics analysis prepared
by RBF will be performed in accordance with the requirements and design criteria of
CVWD. The report, analysis and preliminary (30% level) plan will be submitted to
CVWD for concept approval. Response to comments by CVWD, if required, is included
in this task. Upon review and concept approval by CVWD, RBF will proceed with final
canal improvement plans and structural engineering design.
Task 19.4 Canal Improvement Plans and Details
RBF will prepare AutoCAD drafted plans, sections, and details associated with the RCB,
channel, and warped wing walls for the canal improvements. The canal improvement
plans prepared by RBF will be performed in accordance with the requirements and design
criteria of CVWD.
Anticipated Drawings include:
Title Sheet
Plan and Profile of Canal Improvements
Typical Excavation and Backfill Details
RC Box Sections and Schedules
Channel Sections and Schedules
Warped Wing Wall Sections and Details
Miscellaneous Structural Details No. 1
.#",. 0 G s
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 13
Task 19.5 Structural Calculations
RBF will perform structural analysis of the RCB, channel, and warped wing walls, and
provide structural calculations for agency review. The design criteria will be in
confonnance with ACI-318 for concrete design with earth loads provided by the
Geotechnical engineers and traffic loading per Caltrans Bridge Design Specifications.
Standard plans normally used by the CVWD and the City of La Quinta will be used to the
greatest extent practical. Where appropriate, standard plans will be referred to for typical
details.
A complete bound set of design calculations will be prepared and submitted to the City
for review at 100% design level.
Task 19.6 Special Provisions and Cost Estimates
Standard Specifications for Public Works Construction (Green Book) will be used for
construction of the canal improvements. RBF will prepare any supplemental technical
Special Provisions for bidding to be inserted by the City to their bid documents. It is
understood the City will incorporate the Special Provisions into their bid documents (i.e.
Notice to Contractors, Instructions to Bidders, Contractor Forms, etc.) and coordinate the
specifications with any other non-structural bid items, such as roadway improvements.
RBF will prepare itemized quantity take -off calculations and a construction cost estimate
for the canal improvements designed by RBF.
Task 19.7 Construction Engineering Support
The Consultant will provide the following services during bidding and construction of the
project:
Respond to Contractor's inquiries during bidding and construction phase.
Review shop drawings for reinforcing steel and concrete design mixes
Prepare as -built drawings from mark-ups provided by the Contractor.
Construction engineering support services will be provided on a time and materials basis,
a budget amount is shown.
TASK: 20 AERIAL TOPOGRAPHIC BASE MAP
RBF from assistance from Inland Aerial, shall prepare an Aerial Topographic Map of the
undeveloped second golf course site, at a scale of 1 "=40', with one foot contour intervals.
The work shall include field surveying services to set ground control, aerial
photogrammetric services, compilation of planimetric and topographic features from
controlled stereo pair photographs to digital medium, and completion of field survey
check profiles. In addition, RBF will supply the city with a color aerial photo of the full
site, including the existing Championship Course.
TASK 21 FULL SITE HYDROLOGY REVIEW/REPORT
RBF shall determine the total retention volume for the areas of the SilverRock Golf
Resort: north of SilverRock Way and east of the Coachella Canal in accordance with the
requirements of the RCFC&WCD Manual and the City of La Quinta. The volume shall
.4•. - 039
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 14
include all onsite and offsite sources. RBF anticipated that this study would be done
prior to the development of the golf course shaping plans by the Golf Course Architect.
The hydrologic analysis will be based on the following items, provided by the City of La
Quinta:
1. The Master Drainage Plan for the City of La Quinta.
2. Update Master Drainage Plan currently being prepared by Psomas.
3. Pace's updated drainage report supporting the memo, dated March 8, 2004, to
Berryman & Henigar. The memo addressed the MDS Consulting's Storm Water
Study for the offsite mountain watersheds.
4. Latest topo for the tributary mountain watersheds.
5. Hydrologic analysis/report for the Avenue 52 storm drain, designed by Stantec.
6. The latest plans for the onsite proposed development.
Upon review of the above items, the Consultant shall prepare unit hydrographs for the
100-year design storm for each of the following events: 1-hour, 3-hour, 6-hour, and I -
hour storms. The most conservative results will be used in the design of the retention
volumes.
Following a review of the existing hydrology studies prepared for the SilverRock project
as well as adjacent projects, RBF shall prepare a Hydrology Study for the project area
listed above in accordance with the requirements of the City of La Quinta, Riverside
County Flood Control and Water Conservation District Manual, the overall site Mass
Grading Plan, and the approved Parcel Map. This report will determine on and off -site
storm water runoff amounts, and the drainage facilities necessary to accommodate
projected storm flows. RBF, as a part of the Hydrology Study, will prepare an exhibit
which will include components such as the location and size of retention/detention basins
as well as the general routing of storm -water flows throughout the site. RBF assumes
that the proposed resort areas will be draining into the on -site lakes and water features.
This task will also include coordination with the City's Lake & Water Feature designer.
TASK 22 DOMESTIC WATER MODEL
RBF will prepare, in accordance with the requirements of CVWD, a water model to
determine the fire flow demands for the proposed water distribution system for the
SilverRock Resort area. This model will assume locations of future water stubs into the
proposed resort development areas. The resort hotel/retail developer will need to update,
revise and finalize the water model per each site at the time of the final engineering of
each of the specific development sites.
TASK 23 DRY UTILITY DESIGN
RBF with assistance from Butsko Utility Design will provide coordination and design
services for the dry utility improvements necessary for the SilverRock resort site.
Based on our conversations with Imperial Irrigation District and the understanding of the
project, the following have been identified the specific assumptions of the project to
include:
031
RBF Consulting
Amendment No. 1, IN 20-100784
May 10, 2007
Page 15
A. This project consists of seven (7) work order phases taken into
consideration.
B. Utility Coordination and Management
C. IID Applicant Design
D. Phase I Private Electric System Conversion Coordination and
Management.
E. Phase 2 Golf Course Facility Coordination.
F. CVWD Pump Overhead Conversion Coordination.
G. CVWD Well Site Coordination "3 Sites".
H. Development Team Meetings
Butsko will attend development team meetings as requested by the City.
I. Construction Coordination
Following the initial pre -construction meeting, requested by the City's
project management or construction management team, Butsko will assist
with dry utility construction phase coordination which will be billed on an
hourly basis, or in accordance with a separately mutually agreed upon fee.
Assumptions based on "Anticipated Silver Rock site schedule exhibit", dated 11/6/06,
provided by RBF Consulting.
23.1 SITE PROFILE
A. Field review of project site and adjacent areas to assess existing utility systems,
probable source locations, and potential site constraints.
B. Obtain the necessary Cable Television, Telephone, Gas, and Electric Company
as-builts to identify possible conflicts.
C. Confirm project needs with City and determine utility work orders and/or service
orders required.
D. Prepare one dry utility cost estimate, upon City request, summarizing utilities'
refundable and non-refundable charges, contractor costs, and public street light
costs.
E. Forward site profile summary to City.
23.2 SUBMITTAL PHASE
A. Coordinate with utility companies and consulting team members to obtain and
review pertinent design information and prepare for utility's submittal.
B. Communicate with each utility company to verify schedule and review conflicts
and specific source locations.
C. Obtain civil engineer, architectural, landscape plans, project loads, and project
schedule from City; prepare plan submittal letters to each utility company.
D. Examine utility design requirements and identify potential issues with consulting
team members.
E. Obtain work orders required to submit plan package to utility companies and
establish schedule for design, review, and completion.
032
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 16
23.3 PRELIMINARY DESIGN PHASE
A. Attend utility design/global meeting and continue liaison role with all parties
involved.
B. Forward preliminary utility design to City and consulting team members for their
review, conflict identification, and acceptance.
C. Review preliminary design revisions with each utility and ensure all necessary
modifications are complete.
23.4 FINAL DESIGN PHASE
A. Forward revised preliminary design to City and project team for final
approval/signature and engineering certification.
B. Coordinate with utilities, City, and consulting team members for final utility
submittal.
C. Obtain and review all utility agreements for accuracy of cost methodology and
rule application. Process agreements and utility prepared right-of-way
documents.
D. Deliver final utility agreements/contracts to City. Provide summary of project
costs incurred and potential refunds.
E. Coordinate with City, utility companies, and consulting team members for
scheduling/attendance of pre -construction meeting.
Butsko Utility Design, Inc. will perform the following electric design services for III) as
follows:
1. Design drawings and provide support documentation
2. Joint trench drawings
3. Key sketch / single line drawings
4. Base maps
5. Construction detail drawings
6. Engineering calculations (e.g., voltage drop, flicker, pulling tension, pole
sizing, guying, etc.)
7. Substructure information
8. Stub/full/branch service locations (pre -approved by utility)
9. Main locations
10. Meter locations (pre -approved by utility)
11. Identify permits as requested by the utility.
12. Identify rights -of -way as requested by the utility.
13. Coordination with other utilities if joint trench or joint pole
14. Tentative design and construction scheduling
15. Conflict checks
16. Material list
17. Stamped by a Registered Professional Engineer (PE)
18. Final Design
19. Technical Specifications as necessary
033
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 17
TASK 24 WELL SITE & PRESSURE REDUCING/BOOSTER STATION
SITE
RBF shall prepare 1" = 40' scale plans for one well site and one pressure reducing/booster
station (PR/BS) site. The plans shall be designed in accordance with the Soils and
Geology Report and the Coachella Valley Water District standards for well sites. The
site will contain a block wall, vehicle gate, man gate, and CVWD required utility
connections/stubs. This task shall also include the preparation of one legal and exhibit
for each site to convey the parcel to CVWD.
RBF will prepare construction specifications, which will be added to the overall bid
document for the civil improvements associated with the well site construction. RBF will
supply to the Project Manager a construction estimate, bid item schedule, bid item
descriptions, technical specifications, special provisions and details for inclusion by the
City into the overall bid package for the golf course construction. Technical
specifications for construction of each item of work in the Project shall be prepared.
Where applicable, the latest edition of the Standard Specifications for Public Works
Construction ("Greenbook") and City of La Quinta Standard Drawings will be utilized
and referenced in the construction documents.
The R13F team will assist the City with any technical questions regarding interpretation of
construction plans that may arise during contract bidding and advertising phase of the
project. RBF will plan on attending the pre -bid meeting to clarify questions by
prospective bidders.
TASK. 25 GEOTECHNICAL INVESTIGATIONS
RBF with the assistance from Construction Testing the Engineering, Inc. (CTE), will
provide surface exploration for the golf course and proposed tunnel locations. CTE will
provide 9 borings to depths ranging from 20 to 50 feet to determine the soil profiles at the
site. Soil samples will be collected for laboratory testing. One boring will be extended to
50 feet to evaluate the liquefaction potential in accordance with CDMG Special
Publication 117. In addition, CTE will perform 3 shallow (2-3 feet)
percolation/infiltration tests. The laboratory test will determine the engineering
properties of the site soils, including shear strength, expansive potential, corrosive
potential, R-value and consolidation characteristics. The above information and
geotechnical findings will be presented in a geotechnical investigation report, which will
provide recommendations for foundation design, golf course grading recommendations,
seismic design parameters, liquefaction potential, pavement design, lateral earth pressure
criteria, assessment of the expansive and corrosive nature of the site soils, and mitigation
(if needed), preliminary pavement design and general grading recommendations.
TASK: 26 CONSTRUCTION SUPPORT —ADDITIONAL INFRASTRUCTURE
RBF will assist with the following activities for the bidding and construction for the
improvements proposed in this amendment.
-v, 0J1
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 18
Construction RFFs and Submittal Reviews
During the construction phase, RBF will review and provide comments on shop drawing
submittals and request for information (RFI). In addition, will attend the regular
construction meetings to answer any design related questions, as well as provide the City
assistance on revisions to the approved construction plans. RBF assumes 12 hours for
this task.
Prepare Record Drawings
The R13F team will utilize the contractor's and City inspector's redline "As -Built" plans
upon project completion to prepare the Record Drawings (Mylar) for the City. Upon
completion, RBF will provide the Record Drawings package to the City that will
complete civil improvements of this project. RBF assumes 12 hours for this task.
Landscape and Entry Feature Work Tasks
The fallowing Task, 27, pertains to improvements associated with the passive park
area.
TASK 27 ROUGH GRADING PLAN — PASSIVE PARK
RBF shall coordinate with the Landscape Architect and prepare 1" = 40' scale rough
grading plan for lot 15, located at the corner of Jefferson Street and Avenue 52. The
plans shall be designed in accordance with the Soils and Geology Report, and the City of
La Quinta Grading Ordinance. In addition, the Rough Grading Plans shall indicate
banks, berms, drainage devices, and, grading as referenced in the Soils Report. The
passive park site is intended for overflow parking during golf events and grassed open
space. The grading plans will provide for non -uniform grading. RBF shall prepare a
Preliminary Estimate of Earthwork Quantities based upon the Rough Grading Plan.
Allowances for shrinkage and subsidence, and over -excavation grading work shall be
accounted for based upon the Soils Engineer's Report, unless otherwise specified.
RBF assumes that this design will take one title sheet one detail sheet and 2 plan sheets.
RBF will prepare construction specifications, which will be added to the overall bid
document for the civil improvements associated with the park grading construction. RBF
will supply to the Project Manager a construction estimate, bid item schedule, bid item
descriptions, technical specifications, special provisions and details for inclusion by the
City into the overall bid package for the golf course construction. Technical
specifications for construction of each item of work in the Project shall be prepared.
Where: applicable, the latest edition of the Standard Specifications for Public Works
Construction ("Greenbook") and City of La Quinta Standard Drawings will be utilized
and referenced in the construction documents.
The RBF team will assist the City with any technical questions regarding interpretation of
construction plans that may arise during contract bidding and advertising phase of the
project. RBF will plan on attending the pre -bid meeting to clarify questions by
prospective bidders.
00
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 19
Clubhouse Construction Staking Work Tasks
RBF will provide the following construction staking as a part of the improvements
associated with the Phase 2 SilverRock Resort. The following Tasks pertain to
construction staking associated with the clubhouse improvements. The following
tasks and associated fees are based upon preliminary improvement plans and are
subject to review upon receipt of approved improvement plans.
TASK 28 CLUBHOUSE ROUGH GRADING STAKES
Consultant shall provide one (1) set of line and grade stakes to construct the clubhouse
and parking lot rough grading improvements. These stakes will be located on the building
envelope comers, or an offset thereto, with cuts or fills referenced to the pad grade to
develop the building pad to within f 0.1 foot of the final rough grade. Concurrent with
the above, stakes for the parking area will be located on face of curb, or an offset thereto,
with cuts or fills referenced to top of curb grade. The fee for this task assumes one
hundred (120) rough grade stakes will be set for this scope.
TASK 29 BUILDING LOCATION STAKES
Consultant shall provide one (1) set of line and grade stakes for the clubhouse and
comfort stations, set on appropriate offsets, as agreed upon by Consultant and the
Contractor, and shall be marked cut or fill to finish floor. These stakes will be set on
referenced grid lines or building comers.
City shall protect these stakes until construction of both the curb adjacent to and the slab
upon the subject lot has been completed, so that they may be used by Consultant to check
the footing form locations prior to the placement of concrete, if such checks are required.
(Form checks are not a part of this exhibit item but may be covered in a separate item in
this agreement).
The Architect shall provide Consultant with complete dimensioned building plans and a
digital file in an AutoCAD 2004 format at least one week prior to staking any building or
grid lines. Consultant takes no responsibility for any errors in the dimensioning of the
building as shown on the building plans supplied by the architect.
TASK: 30 CLUBHOUSE FOOTING FORM VERIFICATION
(OPTIONAL TASK)
Consultant shall check the building footing forms for their horizontal placement, with
respect to their conformance to that shown on the approved plot plan, prior to the
concrete pour.
Consultant shall provide a Letter of Verification, if required, to the local agency,
acknowledging substantial conformance of the footing forms in terms of horizontal
placement on the lot.
Consultant will require the use of the previously set building location stakes to perform
this verification survey. If additional work is required due to these stakes being lost or
damaged, the City shall compensate Consultant for all additional work in accordance
with the fee schedule for extra work within this contract.
n.. 036
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 20
Golf Course Construction Staking Work Tasks
The following Tasks pertain to construction staking associated with the resort golf
course improvements. The following tasks and associated fees are based upon
preliminary improvement plans and are subject to review upon receipt of approved
improvement plans.
TASK 31 GOLF COURSE ROUGH GRADING STAKES
Consultant shall provide two (2) sets of line and grade stakes for golf course grading on
the tees, greens and turning points of each golf hole. The first set will be provided near
the beginning of grading and the second set will be set near the end of grading to provide
basic control for the golf course finish. It is assumed that the golf course architect and
contractor will be responsible for the finished grade. The fee for this task assumes three
hundred sixty (360) stakes will be set for golf course rough grading.
TASK 32 LAKE ROUGH GRADING STAKES
Consultant shall provide one (1) set of line and grade slope stakes for each slope around
the perimeter of each lake, as shown on the improvement plans. Slope stakes shall be set
at approximate 50-foot intervals and at angle points and other points of control at an
offset to be agreed upon. Slope stakes shall be set and marked with cut or fill
information, slope ratios and bench grades. The fee for this task assumes four (4) lakes
totaling seven hundred fifty thousand (750,000) square feet will be constructed for this
scope.
TASK. 33 GOLF CART PATH STAKES
Consultant shall provide one (1) set of line and grade stakes for cart paths on the golf
course. These stakes will be located on 25-foot stations. Stakes will be set with
appropriate offsets to the center or edge of path, as agreed upon by the Contractor and
Consultant. All stakes will be marked to the finish surface grade. The fee for this task
assumes thirty two thousand (32,000) lineal feet of cart path stakes will be set for this
scope.
TASK 34 BRIDGE AND TUNNEL ROUGH GRADING STAKES
Consultant shall provide one (1) set of line and grade stakes to construct the rough
grading of one (1) roadway bridge, two (2) cart/pedestrian bridges, and three (3) cart
tunnels. These stakes will be located on centerline of structures, or an offset thereto, with
cuts oir fills referenced to the finished surface grade to develop grade to within f 0.1 foot
of the; final rough grade. The fee for this task assumes six (6) structures will be
constructed for this scope.
TASK 35 BRIDGE AND TUNNEL STAKES
Consultant shall provide one (1) set of line and grade stakes to construct one (1) roadway
bridge, two (2) cart/pedestrian bridges, and three (3) cart tunnels. These stakes will be set
on both ends of each abutment on an offset agreed upon, with cuts or fills referenced to
top of footings. Also, one (1) set of line and grade stakes will be set with appropriate
offsets to the center of retaining walls on 25-foot stations, with cut or fill referenced to
top of footing. The fee for this task assumes six (6) structures will be constructed and one
._1 037
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 21
thousand four hundred (1,400) lineal feet of retaining wall stakes will be set for this
scope. Should City request Consultant to provide staking from the Landscape Architect's
plan, slakes and calculations shall be performed as additional work.
TASK 36 LAKE PUMP STATION STAKES
Consultant shall provide one (1) set of line and grade stakes for the pump station
structure, set on appropriate offsets, as agreed upon by Consultant and the Contractor,
and shall be marked cut or fill to finish pad. Also, one (1) set of line and grade stakes will
be set on an appropriate offsets for the pump station piping system with cuts or fills
referenced to flow line of pipe, provided pipe profile is shown on improvement plans.
The fee for this task assumes one (1) pump station and three thousand (3,000) lineal feet
of piping stakes will be set for this scope.
TASK 37 GOLF COURSE STORM DRAIN SYSTEM STAKES
Consultant shall provide one (1) set of line and grade stakes for the golf course storm
drain system on 25-foot stations and at all angle points, beginning and end of curves,
junctions, manholes and inlets and outlets, marked with cuts or fills referenced to the
flow line grade. Consultant shall provide one (1) set of line and grade stakes for
structures with cuts or fills referenced to finish grade of openings, top of structure, or rim
of manhole. These stakes will be set on appropriate offsets, as agreed upon by Consultant
and the Contractor. One set of stakes for a structure shall consist of a minimum of three
and a maximum of four offset stakes per structure.
All storm drain stakes shall be set starting from the point of connection to the existing
system, and no stakes shall be set until the point of connection to the existing system has
been uncovered by the Contractor and verified by Consultant for compliance with the line
and grade as shown on the storm drain plans. If the Client requests Consultant to set
stakes prior to verification of connection point, Client assumes all responsibility for any
additional costs of re -staking by Consultant or reconstruction by Contractor due to a
variation between the approved plan grade and the actual "as -built" line and grade. The
fee for this task assumes fourteen thousand three hundred (14,300) lineal feet of storm
drain stakes will be set for this scope.
Infrastructure Construction Staking Work Tasks
The following Tasks pertain to construction staking associated with the backbone
infrastructure improvements. The following tasks and associated fees are based
upon preliminary improvement plans and are subject to review upon receipt of
approved improvement plans.
TASK, 38 ESTABLISH CONTROL
RBF shall establish the horizontal control as required to provide local horizontal control
to the project site. Consultant shall also establish vertical control based on the referenced
Benchmark local to the project. Consultant shall prepare a coordinate control plan for use
by the survey field crews in construction staking of the project. The plan shall be utilized
throughout the other tasks within this project scope. The fee for this task assumes twenty
(20) horizontal and vertical control points will be established and maintained on site for
use in construction.
h...� 03IS
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 22
TASK 39 STREET ROUGH GRADING STAKES
Consultant shall provide one (1) set of line and grade stakes to construct the street rough
grading; improvements. These stakes will be located on one hundred (100) foot stations
on the right -or -way of the streets, or an offset thereto, and at the B.C.'s, E.C.'s and angle
points, with cuts or fills referenced to the top of curb grade to develop streets and
parkways to within f 0.1 foot of the final rough grade. The fee for this task assumes
twenty one thousand (21,000) lineal feet of street rough grade stakes will be set for this
scope.
TASK 40 SANITARY SEWER STAKES
Consultant shall provide one (1) set of line and grade stakes for the sanitary sewer
mainline and manholes on 25-foot stations. One (1) stake will be set for manholes, with
cuts or fills referenced to finished grade of the manhole rim. These stakes will be set on
appropriate offsets as agreed upon by the Contractor and RBF. All stakes shall be
marked cut to the flow line of the pipe. All staking requests for sanitary sewer mainline
staking; shall have a minimum length of 1,000 lineal feet when feasible.
All sewer stakes shall be set starting from the point of connection to the existing system,
and no stakes shall be set until the point of connection to the existing system has been
uncovered by the Contractor and verified by Consultant for compliance with the line and
grade as shown on the plans. If City requests Consultant to set stakes prior to verification
of connection point, City assumes all responsibility for any additional costs of re -staking
by Consultant or reconstruction by Contractor due to a variation between the approved
plan grade and the actual "as -built" line and grade. The fee for this task assumes nine
thousand one hundred (9,100) lineal feet of sewer stakes will be set for this scope.
TASK. 41 CURB AND GUTTER STAKES
Consultant shall provide one (1) set of line and grade stakes for curb and gutter. These
stakes will be located on 25-foot stations. Stakes will be set with appropriate offsets to
the face of curb, as agreed upon by the Contractor and Consultant. All stakes will be
marked to the finish top of curb grade. The fee for this task assumes twenty nine
thousand (29,000) lineal feet of curb stakes will be set for this scope.
TASK 42 WATER DISTRIBUTION SYSTEM STAKES
Consultant shall provide one (1) set of line only stakes for the water system after
construction of the curb and gutter. Stakes for water services, fire hydrants, and tee's
shall be marked on existing curb. This task assumes eight thousand two hundred (8,200)
lineal feet of water stakes will be set for this scope.
TASK 43 IRRIGATION RELOCATION STAKES
Consultant shall provide one (1) set of line and grade stakes for the irrigation mainline
located on 50-foot stations offset to the mainline at a distance agreed to by Consultant
and the Contractor. Stakes will be set at all pipe tee locations. All mainline stakes shall
be marked to cut to flow line of the pipe, when pipe profile is shown on Consultant's
.9 . 0300
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 23
construction plans. The fee for this task assumes two thousand eight hundred (2,800)
lineal feet of irrigation stakes will be set for this scope.
TASK 44 JOINT TRENCH UTILTY STAKES
Consultant shall provide one (1) set of line only stakes for the joint trench utilities after
constriction of the curb and gutter. Stakes for vaults will be marked on existing curb. The
fee for this task assumes six thousand five hundred (6,500) lineal feet of trench stakes
will be set for this scope.
TASK 45 STORM DRAIN SYSTEM STAKES
Consultant shall provide one (1) set of line and grade stakes for each catch basin, set on
appropriate offsets as agreed upon by Consultant and the Contractor, and shall be marked
for finish grade to the top of curb, top of structure, or rim of manhole covers. One set of
stakes for a structure shall consist of a minimum of two and a maximum of four offset
stakes per structure.
All storm drain stakes shall be set starting from the point of connection to the existing
system, and no stakes shall be set until the point of connection to the existing system has
been uncovered by the Contractor and verified by Consultant for compliance with the line
and guide as shown on the storm drain plans. If the City requests Consultant to set stakes
prior to verification of connection point, City assumes all responsibility for any additional
costs of re -staking by Consultant or reconstruction by Contractor due to a variation
between the approved plan grade and the actual "as -built" line and grade.
Since the locations and lengths of the storm drain system is not presently known, any
staking for the storm drain mainlines and laterals shall be provided under a separate
agreement. The fee for this task assumes ten (10) catch basins will be constructed for this
scope.
TASK46 CVWD WELL SITE STAKES
Consultant shall provide one (1) set of line and grade stakes for the well site structures
and perimeter walls surrounding the well sites with cuts or fills referenced to finish grade
or top of footing. These stakes will be set on an appropriate offsets, as agreed upon by
Consultant and Contractor. The fee for this task assumes two (2) well sites will be
constricted.
Landscaping and Entry Monument Construction Staking Work Tasks
The following Tasks pertain to construction staking associated with the landscaping
improvements. The following tasks and associated fees are based upon preliminary
improvement plans and are subject to review upon receipt of approved
improvement plans.
Task .47 PARK SITE ROUGH GRADING STAKES
Consultant shall provide one (1) set of line and grade stakes for the park site on a 100-
foot grid with cuts or fills referenced to finish grade to develop the park site to within +/-
0.10' of the final grade. These stakes will be set on appropriate offsets, as agreed upon
�. 040
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 24
by the Consultant and Contractor. The fee for this task assumes one hundred fifty (150)
rough grade stakes will be set for this scope.
Additional Services
Services that are not specifically identified herein as services to be performed by RBF are
considered "Additional Services" for purposes of this Agreement. City may request that
RBF perform services that are Additional Services, however, RBF is not obligated to
perform such Additional Services unless an amendment to this Agreement has been fully
executed setting forth the Scope, Schedule and Fee of such Additional Services.
Assumptions and Exclusions
Consulting services relating to any of the following tasks may be completed by RBF if
negotiated under a separate contract for an additional fee; but are presently specifically
excluded from this Agreement:
1. Environmental studies;
2. Traffic Signal Modification Plan;
3. Offsite Sewer Plans;
4. Offsite Water Plan;
5. Well and or Pressure Reducing, Booster Station System Design;
6. Parcel Map;
7. Dams, walls or other feature necessary as a result of the golf course or
landscape architects design;
8. Golf course irrigation system stakes;
9. Landscape stakes;
10. Monumentation other than that required by Parcel Map 33367;
11. Traffic Control Plan;
12. Staking for sidewalks and flatwork other than the cart path, as listed in
above Task;
13. As -built and topographic surveys;
14. Earth quantity estimates or exhibits during construction;
15. Re -staking;
16. Hazardous wastes;
17. Environmental documents, permitting or processing;
18. Regulatory Permitting;
19. Canal Diversion Plans;
20. Retaining wall design plans not specifically included in the above;
21. Water Quality Reports or Storm Water Pollution Prevention Plan;
22. Bid package reproduction costs;
23. Landscape Design;
24. Street Lights;
25. Construction Management, Inspection or Material Testing;
26. Any other services not specifically set forth in the above Scope of
Services.
041
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 25
City Responsibilities
1. City shall provide access to the site.
2. City is to provide any and all indemnification, abatement, disposal or other
actions required by local, state or federal law regarding hazardous
materials.
3. City shall pay all governmental fees and costs.
042
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 26
EXHIBIT "B"
COMPENSATION
B. City agrees to compensate RBF for such services as follows:
Monthly on a percentage of completion basis, a fee of Eight Hundred and Twenty Seven
Thousand Nine Hundred and Fifty Dollars ($827,950), plus an estimated budget amount
of $20,000 for the direct cost of reimbursable expenses.
TASK
DESCRIPTION
Professional Services
Clubhouse Improvements
1
Site Plan Calculation
2
Parking Lot Layout
3
Precise Grading Plan
4
Horizontal Control Plan
9
10
Private Utility Plan
Dry Utility Plan
Parking Lot Lighting Plan
SilverRock Way Creek Crossing
8.1 Tunnel Type Selection/Vendor Coordination 3,300
8.2 Performance Specification 2,000
8.3 Tunnel Plan and Profile Sheets 4,000
Task 8 Sub -total
Clubhouse Bid Package & Bidding Assistance
FEE
8,000
5,500
36,500
2,500
5,000
9,000
12,500
9,300
6,000
Project Management, Coordination & QA/QC-Clubhouse 14,400
Sub -total Clubhouse - $108,700
Golf Course Improvements
12 Private Utility Plan (Comfort Station) 5,500
13 Golf Cart Path 11,500
14 Golf Cart Path Tunnel
14.1 Tunnel Type Selection/Vendor Coordination
9,600
14.2 Performance Specification
4,700
14.3 Tunnel Plan and Profile Sheets
7,400
14.4 Lighting Plans
14,800
Task 14 Sub -total
36,500
15 Rough Grading Plan - Golf Course
90,000
16 Golf Course Bid Package & Bidding Assistance
5,500
17 Project Management, Coordination & QA/QC-Golf
Course
16,300
Sub -total
Golf Course - $165,300
Infrastructure Improvements
20 Aerial Topographic Base Map
Aerial Cost
14,500
Color Aerial Photo
1,000
Field Control Work
6,000
Profile Check Study
3,000
Task 21 Sub -total
24,500
RBF Consulting
Amendment No. 1, JN 20-100784
May 10, 2007
Page 27
21 Full Site Hydrology Review/Report
22 Domestic Water Model
23 Dry Utility Design
24 Well Site & Pressure Reducing/Booster Station Site
25 Geotechnical Investigations
Landscape and Entry Feature Improvements
27 Rough Grading Plan - Passive Park
Total ]Fee for Amendment Professional Services
22,200
4,000
93,900
13,500
12,050
Sub- total Infrastructure - $170,150
15,000
Sub- total Landscape - $15,000
Technical Services
The following fees are based upon preliminary improvement plans and are subject
to review upon receipt of approved improvement plans.
Construction Assistance
11 Construction Support -Clubhouse
18 Construction Support -Golf Course
26 Construction Support -Additional Infrastructure
Clubhouse Staking Work Tasks
28 Clubhouse Rough Grading Stakes
29 Building Location Stakes
Golf Course Staking Work Tasks
31 Golf Course Rough Grading Stakes
32 Lake Rough Grading Stakes
33 Golf Cart Path Stakes
34 Bridge and Tunnel Rough Grading Stakes
35 Bridge and Tunnel Stakes
36 Lake Pump Station Stakes
Infrastructure Work Tasks
38 Establish Control / Coordinate Plan
39 Street Rough Grading Stakes
40 Sanitary Sewer Stakes
41 Curb and Gutter Stakes
42 Water Distribution System Stakes
43 Irrigation Relocation Stakes
44 Joint Trench Utility Stakes
45 Storm Drain System Stakes
46 CVWD Well Site (2 locations)
$459,150
6,500
8,500
3,500
Sub- total Clubhouse Staking - $18,500
12,500
8,500
Sub- total Clubhouse Staking - $21,000
37,500
20,000
37,000
7,500
10,500
6,500
Sub- total Golf Course Staking - $119,000
10,000
47,800
26,500
68,500
17,000
4,000
8,500
5,500
6,500
Sub- total Infrastructure Staking - $194,300
RBF Consulting
Amendment No. 1, 7N 20-100784
May 10, 2007
Page 28
Landscape & Entry Feature Work Tasks
47 Passive Park Rough Grading Stakes
Total Fee for Amendment Technical Services
Amendment Total
OPTIONAL ITEMS WORK TASKS
Optional Professional Services
19 Reinforced Concrete Box
16,000
Sub- total Landscape Staking — $16,000
Estimated Reimbursable Budget
19.1 Meetings
19.2 Preliminary Concept Design and Geotechnical Report
19.3 Hydraulics Analysis and Report
19.4 Canal Improvement Plans & Details
19.5 Structural Calculations
19.6 Special Provisions & Cost Estimate
19.7 Construction Engineering Support
Task 19 Sub -total
Total Optional Fee for Professional Services
Optional Technical Services
30 Clubhouse Building Form Verification
37 Golf Course Storm Drain Stakes
Total Optional Fee for Technical Services
Optional Services Total
FEE
6,000
10,500
7,000
21,000
8,500
3,000
5,000
$368,800
$827,950
$20,000
61,000
$61,000
3,500
30,500
$34,000
$95,000
045
a
FM OFF
COUNCIL/RDA MEETING DATE: May 15, 2007
ITEM TITLE: Consideration of the Consultant
Selection Committees for the Request for Proposals
for Landscape Architectural and Lakes & Water
Features Design Services for Phase II SilverRock
Resort Improvements
RECOMMENDATION:
As deemed appropriate by the Agency Board.
FISCAL IMPLICATIONS:
None.
BACKGROUND AND OVERVIEW:
AGENDA CATEGORY:
BUSINESS SESSION:
CONSENT CALENDAR:
STUDY SESSION:
PUBLIC HEARING:
On May 1, 2007, the Agency Board approved the release of two Requests for
Proposal (RFPs) relating to the Phase II SilverRock Resort improvements. The RFPs
are for design services for the landscape and lakes & water features.
The staff reports recommended that Doug Evans, Edie Hylton, Nick Nickerson, and
Rob Jones of Golf Dimensions serve on the Consultant Selection Committees for
both RFPs, and that Steve Howlett serve as an additional Committee member for
the lake and water feature design team.
Pursuant, to the City Code, the Consultant Selection Committee is to be "composed
of members competent to judge the qualifications of firms for the category of
services to be provided." Technically, the Agency is not subject to the City's
04�
Municipal Code on this provision or to City Council Resolution 2003-026, which
implements the Municipal Code provisions relating to services contracts.
The Agency Board approved the release of both RFPs and expressly voted to
appoint Consultant Selection Committees for both RFPs consisting of all of persons
referenced in the staff reports, as well as Chairman Osborne and Agency Board
Member Adolph. Because the Agency Board appointed the Committees by formal
action, and appointed both Board Members and non -Board Members to the
Committees, the Committees do not qualify as an "ad hoc committees"; thus the
Committees' meetings would be subject to the Brown Act.
The Brown Act applies to any board, commission, committee or other body of a
local agency created by charter, ordinance, resolution or "formal action" of the City
Council or a Agency Board. (Govt. Code § 54952(b).) This is the general rule
"regardless of whether the body is permanent or temporary, advisory or decision_
making." (Cal. Atty. Gen., The Brown Act (2003) at p. 5.) "However, there is a
specific exemption for an advisory committee which is comprised solely of less
than a quorum of the members of the legislative body that created the advisory
body." (ld.; emph. added; Govt. Code § 54952(b).) Such "ad hoc advisory
committees" must meet a number of qualifications in order to be exempted from
the Brown Act: (1) membership to the advisory committee must be limited to
legislative body members (i.e., no members of the public or staff); (2) there cannot
be more than a quorum of officials on the committee; (3) the committee can only
be charged with accomplishing a specific task in a short period of time (i.e., it must
be a limited term committee, no ongoing jurisdiction); and (4) the committee's
meeting schedule cannot be fixed by charter, ordinance, resolution or other formal
action. (Govt. Code § 54952(b); Joiner v. City of Sebastopol (1981) 125
Cal.App.3d 799, 805; Taxpayers for Livable Communities v. City of Malibu (2005)
126 Cal.App.4th 1123.
For example, in Henderson v. Board of Education (1978) 78 Cal.App.3d 875, the
court held that the open meeting requirement of the Brown Act did not apply to
meetings of three "ad hoc advisory committees" created by the board of education
to interview candidates for appointment to the board, because each committee was
composed solely of members of the governing body, and each comprised less than
a quorum of that body, thus meeting the requirements of an ad hoc advisory
committee.
The Consultant Selection Committees created by the Agency Board on May 1,
2007, cannot qualify as an ad hoc advisory committee because they do not consist
"solely" of members of the legislative body. However, there are numerous
alternatives which would provide Agency Board involvement in the selection of the
.,., 0 4
firms that would be interviewed by the full Board. Several of those options are
outlined below as alternatives.
FINDINGS AND ALTERNATIVES:
The alternatives available to the Agency Board include:
1. Rescind the portion of the May 1, 2007 action appointing the Consultant
Selection Committees for the RFPs relating to the design services for Phase II
SilverRock Resort improvements ("Design Service RFPs") and:
(a) create new Consultant Selection Committees consisting only of
Agency Chair Osborne and Agency Board Member Adolph; or
(b) choose not to follow the City's Service Contract selection process,
and appoint Agency Chair Osborne and Agency Board Member Adolph
to serve as an ad hoc committee to review the RFP responses the
Design Service RFPs, to conduct interviews as desired, to seek any
desired input from Agency staff and Agency consultants, and to make
a recommendation to the full Agency Board (which can range from
recommending approval of a contract with the top -rated firm, or
bringing any number of firms forward for Agency Board interview); or
(c) appoint Agency Chair Osborne and Agency Board Member Adolph
to serve as an ad hoc committee to review the responses to the
Design Service RFPs, which review would be parallel to the review of
a Consultant Selection Committee to be appointed by the Executive
Director, to conduct or observe interviews as desired, and to make a
recommendation to the full Agency Board (which can range from
recommending approval of a contract with the top -rated firm, or
bringing any number of firms forward for Agency Board interview); or
(d) Allow the Agency staff to proceed on the basis of the normal
selection process outlined in the Contract Services Chapter of the
City's Municipal Code, with a Consultant Selection Committee to be
appointed by the Executive Director; or
2. Proceed with the previously appointed Consultant Selection Committees
which will be subject to the Brown Act; or
3. Provide staff with alternative direction.
.h__ 04S
Respectfully submitted,
M. Katherine. Jenson, Agency Counsel
Approved for submission by:
Thomas P. Genovese, Executive Director
0ot