14155 (SFD) Title 24-A
Engineering
Incorporated
1981 20th Anniversary 2001
Consulting Electrical Engineers
19031 Hlghway 18 Ste 200
72330 OuWoti Lane
Apple Valley, CA 92307
Palm Desert, CA 92260
Phone: (760) 242-3369
Phone: (766Y773-4419
Fax: (760)242-1092
Fax: (76()) 242-1092
drewnjoe(dAartennet
drean�ioe@aol.com
S�- Ave Carrax z&
/1AP'N
TITLE 24, JANUARY 2001 ENERGY EFFICIENCY STANDARDS
FOR LOW RISE RESIDENTIAL BUILDINGS
COMPTON RESIDENCE
1,784 SQ. FT.
3/19/04
Energy Budgets for this building were determined using the CALRES VERSION 1.4 certified by the
California Energy Commission. The Calres analysis attached was conducted using tables from the
Residential Manual for Compliance With the Energy Efficiency Standards (for Low Rise Residential
Buildings) JUNE 2001, certified by the California Energy Commission.
*** HOUSE COMPLIES ***
***REFERENCE ADJUSTED ENERGY BUDGET WORKSHEET***
I hereby certify that the California Energy Commission Conservation Division regulations establishing
Energy Efficiency Standards for Residential Buildings, Title -24, Part 6, have been reviewed and the design
submitted substantially complies with these regulations.
Joseph M. Nolan
Electrical Engineer
ATTACHMENTS:
#1 -Adjusted Energy Budget Worksheet- Additions only
#2 - CF -1 R
#3 - C-2 R
#4 - MF -1 R Mandatory Measures Checklist: Residential
#5 - CF -6R Installation Certificate
#6 - Calculation Work Sheet Existing
#7 - Calculation Work Sheet - Composite CITY OF LA QUINTA
#8 - FHA FORM J Heating and Cooling Calculations BUILDING & SAFETY DEPT.
ft 911 Tom VY -Vkor-
FOR CONSTRUCTION
K:Imsoffice\WINWORDITITLE 24-COVERSIBIdg Add Typ.docTITLE 24 - RESIDENTIAL
PAGE -1
Wd
ADDITION PLUS EXISTING, ADJUSTED ENERGY BUDGET METHOD
EXISTING COMPOSITE
BUDGET USAGE BUDGET USAGE
62.98 85.51 59.28 79.18
.� 4!4W*Q1
Engineering Incorporated
1981 20th Anniversary 2001
Consulting Electrical Engineers
19031 Highway 18 Ste 200 72330'Cavyon Lane
Apple Valley, CA 92307 Palm ]Desert, CA 92260
Phone: (760) 242-3369 Phone: (760) 773-4478
For: (760)2424092 Fax: (760).242-1'092
dreamjoerq�charler.net dreamjoegaol.com
(ENERGY USEAGE existing +add)<\=(ENERGY BUDGET existing + add)+(FACTOR)(ENERGY USAGE existing -ENERGY BUDGET existing))
ENERGY USEAGE existing +add = EUe+a = 79.18
ENERGY BUDGET existing + add = EBe+a = 59.28
FACTOR = existing/existing+add = F = 0.89 0.89
ENERGY USAGE existing = EUe = 85.51
ENERGY Budgetexisting = Ebe = 62.98
79.18 1 < 79.34 1 »»»COMPOSITE PASSES
Reference Example 7-9 pg 7-19 of the 2001 Residential Manual
CERTIFICATE OF COMPLIANCE: Residential Page 1 CF -1R
Project Title: COMPTON EXISTING Run: 608 18 -Mar -04
Project Address: 51-610 AVENIDA CARRANZA COMPTON EXISTING
LA QUINTA
Building Title: MANRIQUEZ EXISTING Building Permit #
Document Author: DREAM ENGINEERING INC. (760)242-3369
Telephone: Plan Check / Date
Compliance Method: CALRES2 1.4.02 Field Check / Date
Climate Zone: 15
GENERAL INFORMATION
Conditioned Floor Area:
1588
ft2
Exterior
Conditions/Descripti
Average Ceiling Height:
9'0"
ft -in
Yes
-------------------------
Grade
Building Type:
SFA
Single Family
Detached
Building Front Orientation:
270 deg (West)
Glazing Area, % of Floor Area:
11.8%
Fenestration
Exterior
Overhang
Average Fenestration U-Value:0.87
(ft2)
U -factor
SHGC
Shading
Average Fenestration SHGC:
0.74
-----
25.0
------------
0.87
------------
0.74
Number of Stories:
1
Window East
40.2'
0.87
Number of Dwelling Units:
1.00
None
Window North
61.8
Floor Construction Type:
Slab
on grade
None
Window South
BUILDING SHELL INSULATION
0.87
0.74
BugScrn
None
Cavity Sheathing
Component Insul
Insul
Total
Assembly
Type R -value
-------------------------------
R -value
R -value
--------
U -value
--------
Location/Comments
-----------------------
Door 0
--
3.03
0.330
Outside
Wall 13
0
11.36
0.088
Outside
Wall 13
0
11.36
0.088
Outside
Wall 13
0
11.36
0.088
Outside
Wall 13
0
11.36
0.088
Outside
Ceiling 38
0
41.67
0.024
Outside
Floor, 0
0
3.38
0.295
Grade
Slab Perimeter 0
0
0
0.756
Outside
FLOOR TYPES AND AREAS
Construction Type
Area (ft2)
Conditioned?
Exterior
Conditions/Descripti
-------------------
Slab
------------
--------------
1588
Yes
-------------------------
Grade
FENESTRATION
Area
Fenestration
Fenestration
Exterior
Overhang
Type/Orientation
(ft2)
U -factor
SHGC
Shading
and Fins
-----------------
Window West
-----
25.0
------------
0.87
------------
0.74
----------
BugScrn
--------
None
Window East
40.2'
0.87
0.74
BugScrn
None
Window North
61.8
0.87
0.74
BugScrn
None
Window South
60.0
0.87
0.74
BugScrn
None
CERTIFICATE OF COMPLIANCE: Residential Page 2 CF -1R
Project Title: COMPTON EXISTING Run: 608 18 -Mar -04
THERMAL MASS Area Thick
Type Cover (ft2) (in) Location/Comments
----------------------- ----- ----- ---------------------------------------
None
HVAC SYSTEMS Refrigerant Distribution System
Charge and Location
Type Efficiency Airflow TXV and R -value
-------------------------- ---------- ----------- -------------------
Furnace 0.78 AFUE N/A Attic R-4.2
Air cond. - central split 10.00 SEER No Attic R-4.2
HVAC DISTRIBUTION EFFICIENCY DETAILS
Duct Leakage
Supply Target
Duct Surface ACCA Manual D (leakage cfm/
System Name Area Design % of fan cfm) Fan CFM
--------------------------------------------------------------
CEC 100%R4.2 429 No n/a 1112
WATER HEATING SYSTEMS
Distrib
Water
Water
# of
Energy
Volume
System Name Type
------------ --------
Heater Name
------------
Heater Type
-----------------
Htrs
----
Factor
------
(gal)
------
Standard—Gas Standard
StandardGas
Storage gas
1
0.58
40
SPECIAL WATER HEATING SYSTEM CREDITS
Solar savings Wood stove Wood stove
System Name fraction boiler? boiler pump?
------------ ------------- ---------- -------------
Standard Gas -- No No
SPECIAL WATER HEATER/BOILER DETAILS
Rated Pilot
Water Recovery Input Standby Tank Light
Heater Name Efficiency AFUE (kBtuh) Loss R -value (Btuh)
---------------------- ------------------------- ------
StandardGas 785 -- 28.00 -- -- --
HYDRONIC DISTRIBUTION AND TERMINALS
Pipe Pipe Insul Insul
System/Name Type Number run (ft) diam (in) thck (in) R -value
-------------- ------------- ------ -------- --------- --------- -------
None
.CERTIFICATE OF COMPLIANCE: Residential Page 3 CF -1R
Project Title: COMPTON EXISTING Run: 608 18 -Mar -04
SPECIAL FEATURES, REMARKS, AND NOTES
1. Heating duct register location: Ceiling.
2. Cooling duct register location: Ceiling.
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with the Energy Standards in Title 24, Parts 1
and 6, of the California Code of Regulations, and the Administrative regulations
to implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is submitted
for a single building plan to be built in multiple orientations, any shading
feature that is varied is indicated in the Special Features, Remarks, and Notes
section.
DESIGNER OR OWNER DOCUMENTATION AUTHOR
DREAM ENGINEERING INC. (760)242-3369
760-564-4447
Certification #: Ae-v
Signed
ENFORCEMENT AGENCY
Name:
Title:
Signed
Date
COMPUTER METHOD SUMMARY Page 1 C -2R
Project Title: COMPTON EXISTING Run: 608 18 -Mar -04
Project Address: 51-610 AVENIDA CARRANZA COMPTON EXISTING
LA QUINTA
Building Title: MANRIQUEZ EXISTING Building Permit #
Document Author: DREAM ENGINEERING INC. (760)242-3369
Telephone: Plan Check / Date
Compliance Method: CALRES2 1.4.02 Field Check / Date
Climate Zone: 15
ENERGY USE SUMMARY (kBtu/ft2-yr)
Energy Use Standard Design
Space
Heating
4.05
Space
Cooling
43.77
Water
Heating
15.16
Total
Type
----------
62.98
GENERAL INFORMATION
Conditioned Floor Area:
Average Ceiling Height:
Building Type:
Building Front Orientation:
Glazing Area, % of Floor Area:
Average Fenestration U -Value:
Average Fenestration SHQC:
Number of Dwelling Units:
Number of Stories:
Floor Construction Type:
Number of Conditioned Zones:
Total Conditioned Volume:
Proposed Design
---------------
4.11
67.77
13.63
-------- Complies
85.51 No
1588 ft2
9'0" ft -in
SFD Single Family Detached
270 deg (West)
11.8%
0.87
0.74
"1.00
1
Slab on grade
1
14292 ft3
BUILDING ZONE INFORMATION
Floor Vent
Zone Area Volume Thermostat Height
Name (ft2) (ft3) Type Type (ft)
HOUSE 1588 14292 Conditioned CEC Standard 2'0"
OPAQUE SURFACES
Surface
Area
U-
Insl
Total
Tru
Slr
Construction
Type
----------
(ft2)
------
factor
------
Rval
----
Rval
-----
Azm
---
Tlt
---
Gns
---
Type
------------
Location/Comments
-------------------
Zone = HOUSE
Door
20.0
0.330
0
3
270
90
Yes
30 -Wood
Outside
Wall
315.0
0.088
13
11
270
90
Yes
W13.2x4.16
Outside
Wall
496.2
0.088
13
11
0
90
Yes
W13.2x4.16
Outside
Wall
319.8
0.088
13
11
90
90
Yes
W13.2x4.16
Outside
Wall
498.0
0.088
13
11
180
90
Yes
W13.2x4.16
Outside
Ceiling
1588.0
0.024
38
42
--
0
Yes
R38.2x4.24
Outside
Floor
1580.0
--
0
--
--
160
No
51abl40C
Grade
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title: COMPTON EXISTING Run: 608 18 -Mar -04
PERIMETER LOSSES
Fenestration
-------------------------- Length Height Left Right
Name Width Height 'H' 'V' Extension Extension
------------ ------ ------ ------ --------- --------- ---------
None
FINS Left Fin Right Fin
Fenestration Dist Dist
-------------------------- Fin Fin Ht from Fin Fin Ht from
Name Height Width Depth Height 'V' fenes Depth Height 'V' fenes
------------ ------ ------ ------ ------ ----- ------ ------ ------ ----- ------
None
THERMAL MASS
Vol Cond-
Area Thck Heat duct- Construction Insd
Mass Name (ft2) (in) Cap ivity Type Rval Location/Comments
-------------- ----- ---- ---- ----------------- ---- -------------------------
None
SOLAR GAIN DISTRIBUTION
Fenestration Winter Summer Targetted
Name Fraction Fraction Thermal Mass Comments
------------ -------- -------- ------------ --------------------------------
None
Insul
Perimeter
Length
F2
Insul
Depth
Type
-----------
(ft)
--------
Factor
------
R-val
-----
(in)
------
Location/Comments
----------------------------------
Zone = HOUSE
Exposed
20410"
0.756
0
16
Outside
FENESTRATION
SURFACES
Fenestration
Exterior
Shade
Over -
Fenestration
Area ---------------
Tru
-----------------
hang
Name
--------------
Type
------
(ft2) U
--------------
-factor
SHGC
------
Azm
---
Tilt
----
Type
----------
SHGC
------
/Fins
------
Zone = HOUSE
FRONT
Window
25.0
0.87
0.73
270
90
BugScrn
0.76
None
_GLAZ
BACK_GLAZ
Window
40.2
0.87
0.73
90
90
BugScrn
0.76
None
LEFT_GLAZ
Window
61.8
0.87
0.73
0
90
BugScrn
0.76
None
RIGHT GLAZ
Window
60.0
0.87
0.73
180
90
BugScrn
0.76
None
OVERHANGS
Fenestration
-------------------------- Length Height Left Right
Name Width Height 'H' 'V' Extension Extension
------------ ------ ------ ------ --------- --------- ---------
None
FINS Left Fin Right Fin
Fenestration Dist Dist
-------------------------- Fin Fin Ht from Fin Fin Ht from
Name Height Width Depth Height 'V' fenes Depth Height 'V' fenes
------------ ------ ------ ------ ------ ----- ------ ------ ------ ----- ------
None
THERMAL MASS
Vol Cond-
Area Thck Heat duct- Construction Insd
Mass Name (ft2) (in) Cap ivity Type Rval Location/Comments
-------------- ----- ---- ---- ----------------- ---- -------------------------
None
SOLAR GAIN DISTRIBUTION
Fenestration Winter Summer Targetted
Name Fraction Fraction Thermal Mass Comments
------------ -------- -------- ------------ --------------------------------
None
HVAC DISTRIBUTION EFFICIENCY DETAILS
Duct Leakage
Supply Target
Duct Surface ACCA Manual D (leakage cfm/
System Name Area Design % of fan cfm) Fan CFM
--------------------------------------------------------------
CEC 100%R4.2 429 No n/a 1112
WATER HEATING SYSTEMS
Distrib
Water
Water
# of
COMPUTER METHOD SUMMARY
Volume
Page 3
C -2R
Project Title: COMPTON EXISTING
Htrs
Run: 608
18 -Mar -04
HVAC SYSTEMS
Refrigerant
Minimum
----
1
------
0.58
Charge and
Equipment
Duct Location
System Name System Type
------------
Airflow TXV
Efficiency
and R-value
--------------------------
Zone = HOUSE
-----------
----------
-------------
GasFurn.78 Furnace
N/A
0.78 AFUE
Attic R-4.2
ACsplit10 Air cond. - central split
No
10.00 SEER
Attic R-4.2
HVAC DISTRIBUTION EFFICIENCY DETAILS
Duct Leakage
Supply Target
Duct Surface ACCA Manual D (leakage cfm/
System Name Area Design % of fan cfm) Fan CFM
--------------------------------------------------------------
CEC 100%R4.2 429 No n/a 1112
WATER HEATING SYSTEMS
Distrib
Water
Water
# of
Energy
Volume
System Name Type
Heater Name
Heater Type
Htrs
Factor
(gal)
------------ --------
Standard—Gas Standard
------------
StandardGas
-----------------
Storage gas
----
1
------
0.58
------
40
SPECIAL WATER HEATING SYSTEM CREDITS
Solar savings Wood stove Wood stove
System Name fraction boiler? boiler pump?
------------ ------------- ---------- -------------
Standard Gas -- No No
SPECIAL WATER HEATER/BOILER DETAILS
Rated Pilot
Water Recovery Input Standby Tank Light
Heater Name Efficiency AFUE (kBtuh) Loss R -value (Btuh)
---------------------- ------------------------- ------
StandardGas 78% -- 28.00 -- -- --
HYDRONIC DISTRIBUTION AND TERMINALS
Pipe Pipe Insul Insul
System/Name Type Number run (ft) diam (in) thck (in) R -value
-------------- ------------- ------ -------- --------- --------- -------
None
COMPUTER METHOD SUMMARY Page 4 C -2R
Project Title: COMPTON EXISTING Run: 608 18 -Mar -04
SPECIAL FEATURES, REMARKS, AND NOTES
1. Heating duct register location: Ceiling.
2. Cooling duct register location: Ceiling.
CERTIFICATE OF COMPLIANCE: Residential
--------------------------------------------
Project Title: COMPTON COMPOSITE
Project Address: 51-610 AVENIDA CARRANZA
LA QUINTA
Building Title: COMPTON COMPOSITE
Document Author: DREAM ENGINEERING INC.
Telephone:
Page 1 CF -1R
-----------------------------------
Run: 611 18 -Mar -04
`COMPTON COMPOSITE
(760)242-3369
Building Permit #
Plan Check / Date
Compliance Method: CALRES2 1.4.02 Field Check / Date
Climate Zone: 15
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
GENERAL INFORMATION
Conditioned Floor Area:
1784
ft2
Conditioned?
Exterior
-------------------------
Average Ceiling Height:
9'0"
ft -in
1784
Yes
Building Type:
SFD
Single Family
Detached
Building Front Orientation:
270 deg
(West)
Area Fenestration
Glazing Area, % of Floor Area:
10.5%
Overhang
Type/Orientation
(ft2)
Average Fenestration U-Value:0.81
SHGC
Shading
and Fins
-----------------
Window West
Average Fenestration SHGC:
0.72
------------
0.77
----------
BugScrn
-------•-
None
Number of Stories:
1
0.87
0.77
BugScrn
Number of Dwelling Units:
1.00
40.2
0.60
0.65
Floor Construction Type:
Slab
on grade
21.6
0.87
BUILDING SHELL INSULATION
BugScrn
None
Window South
60.0
Cavity Sheathing
0.77
BugScrn
None
Component Insul
Insul
Total
Assembly
Type R -value R -value
-------------------------------
R -value
--------
U -value
--------
Location/Comments.
-----------------------
Door 0
--
3.03
0.330
Outside
Wall 13
0
11.36
0.088
Outside
Wall 13
0
11.36
0.088
Outside
Wall 13
0
11.36
0.088
Outside
Wall 13
0
11.36
0.088 ,
Outside
Ceiling 38
0
41.67
0.024
Outside
Floor 0
0
3.38
0.295
Grade
Slab Perimeter 0
0
0
0.756
Outside
FLOOR TYPES AND AREAS
Construction Type
-------------------
Area
------------
(ft2)
--------------
Conditioned?
Exterior
-------------------------
Conditions/Descripti
Slab
1784
Yes
Grade
FENESTRATION
Area Fenestration
Fenestration
Exterior
Overhang
Type/Orientation
(ft2)
U -factor
SHGC
Shading
and Fins
-----------------
Window West
----- ------------
25.0
0.87
------------
0.77
----------
BugScrn
-------•-
None
Window East
40.2
0.87
0.77
BugScrn
None
Window East
40.2
0.60
0.65
BugScrn
None
Window North
21.6
0.87
0.77
BugScrn
None
Window South
60.0
0.87
0.77
BugScrn
None
CERTIFICATE OF COMPLIANCE: Residential Page 2 CF -1R
Project Title: COMPTON COMPOSITE Run: 611 18 -Mar -04
THERMAL MASS Area Thick
Type Cover (ft2) (in) Location/Comments
------------------------ ----- ----- ---------------------------------------
Intmassl 195.8 1.0 Interior
HVAC SYSTEMS. Refrigerant Distribution System
Charge and Location
Type Efficiency Airflow TXV and R -value
-------------------------- ---------- ----------- -------------------
Furnace 0.78 AFUE N/A Attic R-4.2
Air cond. - central split 10.00 SEER No Attic R-4.2
HVAC DISTRIBUTION EFFICIENCY DETAILS
Duct Leakage
Supply Target
Duct Surface ACCA Manual D (leakage cfm/
System Name Area Design % of fan cfm) Fan CFM
--------------------------------------------------------------
CEC-100%R4.2 482 No n/a 1249
WATER HEATING SYSTEMS
Distrib
Water
Water
# of
Energy
Volume
System Name Type
Heater Name
Heater Type
Htrs
Factor
(gal)
------------ --------
Standard—Gas Standard
------------
StandardGas
-----------------
Storage gas
----
1
------
0.58
------
40
SPECIAL WATER HEATING SYSTEM CREDITS
Solar savings Wood stove Wood stove
System Name fraction boiler? boiler pump?
Standard Gas -- No No
SPECIAL WATER HEATER/BOILER DETAILS
Rated Pilot
Water Recovery Input Standby Tank Light
Heater Name Efficiency AFUE (kBtuh) Loss R -value (Btuh)
StandardGas 78% -- 28.00
HYDRONIC DISTRIBUTION AND TERMINALS
Pipe Pipe Insul Insul
System/Name Type Number run (ft) diam (in) thck (in) R -value
-------------- ------------- ------ -------- --------- --------- -------
None
CERTIFICATE OF
COMPLIANCE:
Residential
Page
3
CF -1R
Project Title:
---------------------------------------------------------------------------------
--------------------------------------------------------------------------------
COMPTON
COMPOSITE
Run:
611
18 -Mar -04
SPECIAL FEATURES, REMARKS, AND NOTES
1. Heating duct register location: Ceiling.
2. Cooling duct register location: Ceiling.
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with the Energy Standards in Title 24, Parts 1
and 6, of the California Code of Regulations, and the Administrative regulations
to implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is submitted
for a single building plan to be built in multiple orientations, any shading
feature that is varied is indicated in the Special Features, Remarks, and Notes
section.
DESIGNER OR OWNER DOCUMENTATION AUTHOR
DREAM ENGINEERING INC. (760)242-3369
760-564-4447
Certification #:
Signed
ENFORCEMENT AGENCY
Name:
Title:
Agency:
Telephone:
Date // Si
Signed Date
(0/
Date
COMPUTER METHOD SUMMARY Page 1 C -2R
Project Title: COMPTON COMPOSITE Run: 611 18 -Mar -04
Project Address: 51-610 AVENIDA CARRANZA COMPTON COMPOSITE
LA QUINTA
Building Title: COMPTON COMPOSITE Building Permit #
Document Author: DREAM ENGINEERING INC. (760)242-3369
Telephone: Plan Check / Date
Compliance Method: CALRES2 1.4.02 Field Check / Date
Climate Zone: 15
ENERGY USE SUMMARY (kBtu/ft2-yr)
Energy Use Standard Design
Space
Heating
3.70
Space
Cooling
41.55
Water
Heating
14.03
Total
Type
59.28
GENERAL INFORMATION
Conditioned Floor Area:
Average Ceiling Height:
Building Type:
Building Front Orientation:
Glazing Area; % of Floor Area:
Average Fenestration U -value:
Average Fenestration SHGC:
Number of Dwelling Units:
Number of Stories:
Floor Construction Type:
Number of Conditioned Zones:
Total Conditioned Volume:
Proposed Design
---------------
3.17
63.36
12.65
-------- Complies
79.18 No
1784 ft2
9'0" ft -in
SFD Single Family Detached
270 deg (West)
10.5%
0.81
0.72
1.00
1
Slab on grade
1
16054 ft3
BUILDING ZONE INFORMATION
Floor Vent
Zone Area Volume Thermostat Height
Name (ft2) (ft3) Type Type (ft)
HOUSE 1784 16054 Conditioned CEC Standard 210"
OPAQUE SURFACES
Surface
Area
U-
Insl
Total
Tru
Slr
Construction
Type
(ft2)
factor
Rval
Rval
Azm
Tlt
Gns
---
Type
------------
Location/Comments
-------------------
----------
Zone = HOUSE
------
------
----
-----
---
---
Door
20.0
0.330
0
3
270
90
Yes
30 -Wood
Outside
Wall
315.0
0.088
13
11
270
90
Yes
W13.2x4.16
Outside
Wall
536.4
0.088
13
11
0
90
Yes
W13.2x4.16
Outside
Wall
279.6
0.088
13
11
90
90
Yes
W13.2x4.16
Outside
Wall
498.0
0.088
13
11
180
90
Yes
W13.2x4.16
Outside
Ceiling
1783.8
0.024
38
42
--
0
Yes
R38.2x4.24
Outside
Floor
1783.8
--
0
--
--
180
No
Slabl40C
Grade
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title: COMPTON COMPOSITE Run: 611 18 -Mar -04
PERIMETER LOSSES
Insul
Perimeter Length F2 Insul Depth
Type (ft) Factor' R-val (in) Location/Comments
------------------- ------ ----- ------ ----------------------------------
Zone = HOUSE
Exposed 204'0" 0.756 0 16 Outside
FENESTRATION
SURFACES
Fenestration
Exterior
Shade
Over -
Fenestration
Area
---------------
Tru
-----------------
hang
Name
Type
(ft2)
U -factor
---------
SHGC
------
Azm
---
Tilt
----
Type
----------
SHGC
-------
/Fins
------
--------------
Zone = HOUSE
------
-----
FRONT_GLAZ
Window
25.0
0.87
0.73
270
90
BugScrn
0.76
None
BACK GLAZ
Window
40.2
0.87
0.73
90
90
BugScrn
0.76
None
BACK NEW
Window
40.2
0.60
0.63
90
90
BugScrn
0.76
None
LEFT_GLAZ
Window
21.6
0.87
0.73
0
90
BugScrn
0.76
None
RIGHT GLAZ
Window
60.0
0.87
0.73
180
90
BugScrn
0.76
None
OVERHANGS
Fenestration
-------------------------- Length Height Left Right
Name Width Height 'H' 'V' Extension Extension
------------ ------ ------ ------ --------- --------- ---------
None
FINS Left Fin Right Fin
Fenestration Dist Dist
-------------------------- Fin Fin Ht from Fin Fin Ht from
Name Height Width Depth Height 'V' fenes Depth Height 'V' fenes
------------ ------ ------ ------ ------ ----- ------ ------ ------ ----- ------
None
THERMAL MASS
Vol Cond-
Area Thck Heat duct- Construction Insd
Mass Name (ft2) (in) Cap ivity Type Rval Location/Comments
-------------- ----- ---- ---- ----------------- ---- -------------------------
Zone = HOUSE
TILE 195.8 1.0 19 0.09 Tile 0 Interior
COMPUTER METHOD
SUMMARY
Page
3
C -2R
Project Title:
COMPTON COMPOSITE
Run:
611
18 -Mar -04
SOLAR GAIN DISTRIBUTION
Fenestration Winter Summer Targetted
Name Fraction Fraction Thermal Mass Comments
------------ -------- -------- ------------ --------------------------------
None
HVAC SYSTEMS
Refrigerant
Minimum
#f of
Energy
Charge and
Equipment
Duct Location
System Name System Type
--------------------------
Airflow TXV
-----------
Efficiency
and R-value
------------
Zone = HOUSE
StandardGas
----------
-------------
GasFurn.78 Furnace
N/A
0.78 AFUE
Attic R-4.2
ACsplit10 Air cond. - central split
No
10.00 SEER
Attic R-4.2
HVAC DISTRIBUTION EFFICIENCY DETAILS
Duct Leakage
Supply Target
Duct Surface ACCA Manual D (leakage cfm/
System Name Area Design % of fan cfm) Fan CFM
--------------------------------------------------------------
CEC_100%R4.2 482 No n/a 1249
WATER HEATING SYSTEMS
Distrib
Water
Water
#f of
Energy
Volume
System Name Type
Heater Name
------------
Heater Type
Htrs
Factor
(gal)
------------ --------
Standard-Gas Standard
StandardGas
-----------------
Storage gas
----
1
------
0.58
------
40
SPECIAL WATER HEATING SYSTEM CREDITS
Solar savings Wood stove Wood stove
System Name fraction boiler? boiler pump?
------------ ------------- ---------- -------------
Standard Gas -- No No
SPECIAL WATER HEATER/BOILER DETAILS
Rated Pilot
Water Recovery Input Standby Tank Light
Heater Name Efficiency AFUE (kBtuh) Loss R -value (Btuh)
---------------------- ------------------------- ------
StandardGas 78% -- 28.00 -- -- --
COMPUTER METHOD
SUMMARY
Page
4
C -2R
Project Title:
--------------------------------------------------------------------------------
COMPTON COMPOSITE
Run:
611
18 -Mar -04
HYDRONIC DISTRIBUTION AND TERMINALS
Pipe Pipe Insul Insul
System/Name Type Number run (ft) diam (in) thck (in) R -value
-------------- ------------- ------ -------- --------- --------- -------
None
SPECIAL FEATURES, REMARKS, AND NOTES
1. Heating duct register location: Ceiling.
2. Cooling duct register location: Ceiling.
--------------------------------------------------------------------------------
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page >i of 2) MF -M
Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used
Items marked with an asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable.
DESCRIPTION
DESIGNER
ENFORCEMENT
Building Envelope Measures:
" § 150(a): Minimum R-19 ceiling insulation.
x
§150(b): Loose fill insulation manufacturer's labeled R -Value.
§ 150(c): Minimum R- 13 wall insulation in wood framed walls or equivalent U-.Pactor in metal flume walls
�/
X
does nota l to exterior mass walls).
' §150(d): Minimum R-13 raised floor insulation in framed floors.
§150(1): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no
x
greater than 2.0 permlinch.
§ 113: Insulation specified or installed meets insulation quality standards. Indicate type and form.
§116-17: Fenestration Products, Exterior Doors, and Infiltration/Extiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field -fabricated) have label with certified U -Factor, certified Solar Heat
Gain Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
§ 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
§ 150(f): Special infiltration barrier installed to comply with § 151 meets Commission quality standards.
x
§ 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
Flue damper
V
c. and control
2. No continuous burning gas pilot lights allowed.
Space Conditioning, Water Heating and Plumbing System Measures:
§110-§113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
§ 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA.
§ 150(i): Setback thermostat on all applicable heating and/or cooling systems.
§1506): Pipe and tank insulation
1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater)
3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12
external insulation or R-16 combined interval/external insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55° F insulated.
,X\
6. Piping insulated between heating source and indirect hot water tank.
Compliance Forms August 2001 X.5
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 2 of 2) MF -IR
Note: Lowrise residential buildings subject to the Standards must contain these treasures regardless of the compliance approach used.
Items marked with an asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory treasures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable.
DESCRIPTION J
DESIGNER
ENFORCEMENT
Space Conditioning, Water Heating and Plumbing System Measures: (continued)
* § 150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to meet the requirement of the 1998 CMC Sections 601,
603, 604, and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in
conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system
that meets the applicable requirements of UL 181, UL 181 A, or IN, 181B. If mastic or tape is used to seal
openings grater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building
cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their
components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in
combination with mastic and drawbands.
2. Building cavities, support platforms for air handlers, and plenums defrred or constructed with materials
other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned
air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support
platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts.
3. Joints and seams of duct systems and their components shall not be sealed with cloth back tubber
adhesive duct tapes unless such tape is used in combination with mastic and dmwbands.
4. Exhaust ran systems have back draft or automatic dampers.
5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible,
manually operated dampers.
6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight,
moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to
weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas,
or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is
water retardant and provides shieldin • from solar radiation that can cause degradation of the material.
§ 114: Pool and Spa Heating Systems and Equipment
1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no
electric resistance heating and no pilot light.
2. System is installed with:
a. At least 36" of pipe between fitter and heater for furure solar heating.
b. Cover for outdoor pools or outdoor spas.
�f
3. Pool system has directional inlets and a circulation pump time switch.
§ 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no
continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr)
§118(f): Cool Roof material meet specified criteria
Lighting Measures:
§150(k)l.: Luminaires for general lighting in kitchens shall have lamps with an efficacy of 40 lumerns/watt
ort reater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily
�[
accessible lightin • control panel at an entrance to the kitchen.
/ \
§ I50(k)2.: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an
efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternatives to this
requirement allowed in § 150(k)2.; and incandescent recessed ceiling fixtures are IC (insulation cover)
approved.
Compliance Forms August 2001 A-6
INSTALLATION CERTIFICATE (Page 1 of 13) CF -CR
Site Address Permit Number
An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The
information provided on this form is required; however, use of this form to provide the information is optional.) After
completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at
occupancy, per Section 10-103(b).
HVAC SYSTEMS:
Heating Equipment
Equip. # of Efficiency Duct Duct or Heating Heating
Type (pkg. CEC Certified Mfr Natne Identical (AFUE, etc.) Location Piping Load Capacity
heat oumn) and Model Number Systems 2CF-1R valuel (attic. etc.) R -value (Btu/hr) (Btu/hr)
Cooling Equipment
Equip. CEC Certified Compressor # of Efficiency Duct Cooling Cooling
Type (pkg. Unit Mfr Name and Identical (SEER, ctc.)' Location Duct Load Capacity
heat pump) Model Number Systems (>_CF -1R valuel (attic, etc.) R -value (Btu/hr) (Btu/h[)
1. > reads greater than or equal to.
I, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more
efficient than that specified in the.certificate of compliance (Form CF -1R) submitted for compliance with the Energy
Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for
manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable.
Signature, Date Installing Subcontractor (Co. Name)
OR General Contractor (Co. Name) OR Owner
WATER HEATING SYSTEMS:
Distribution If Recir- # of Rated' Tank Effi- External
Heater CL•C CertifiedMtr Type (Std, culation, Identical Input (kW Volume ciency'- Standby' Insulation
Type Name & Model Number Point -of -Use) Control Type Systems or Bm/hr) (gallons) (EF, RE) Loss (%) R -valet
2 For small gas storage (rated input of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list Energy Factor.
For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Recovery Efficiency, Standby Loss and Rated Input.
For instantaneous gas water heaters, list Recovery Efficiency and Rated Input.
3. R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0.58.
Faucets & Shower Heads:
All faucets and showerheads installed are certified to the Commission, pursuant to Title 24, Part 6, Section 111.
I, the undersigned, verify that equipment listed above my signature is: 1) the actual equipment installed; 2) equivalent to
or more efficient than that specified in the certificate of compliance (Form CF -IR) submitted for compliance with the
Enera Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate
requirements for manufactured devices (from the Appliance Effrciencv Regulations or Part 6), where applicable.
Signature, Date
COPY TO: Building Department
HERS Provider (if applicable)
Building Owner at Occupancy
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
Compliance Forms August 2001 A-23
NSTALLATION CERTIFICATE (Page 2 of 13) CF -6R
Site Address Permit Number
FEN ESTRATION/GLAZING:
Total
Quantity
Product Product of Like Exterior Shading
U -Factor (5 SHGC' (< # of Product Square Device or Comments/Location/
Manufacturer/ElrandName CF-1Rvalue)2 CF-1Rvalue)' Panes (Optional) Feet Overhang Special Features
(GROUP LIKE PRODUCTS)
1.
2.
3. ---- --- — .
4 ---
-- - — -- ----- --- --
4. -- — — --
6. --- — -- — — ---- --- —
7.
8.- — —
9. - -- --- ---- ---- --
10.
11. - -- -- -
12.
1.3. — --- -- —
14.
15.
Manufactured fenestration products use the values from the product label. Field fabricated fenestration products use the
default values from Section 116 of the Energy Efficiency Standards.
' Installed U -Factor must be less than or equal to values from CF -1 R. Installed SHGC must be less than or equal to values
from CF -1R, or a shading device (exterior or overhang) is installed as specified on the CF -1R. Alternatively, installed
weighted average U -Factors for the total fenestration area are less than or equal to values from CF -IR.
I, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product
installed; 2) is equivalent to or has a lower U -Factor and lower SHGC than that specified in the certificate of compliance
(Form CF -1R) submitted for compliance with the Energv Efciencv Standards for residential buildings; and 3) the
product meets or exceeds the appropriate requirements for manufactured devices (from Part 6), where applicable.
Item #s Signature, Date
(if applicable)
Item #s Signature, Date
(if applicable)
Item #s Signature, Date
(if applicable)
COPY TO: Building Department
HERS Provider (if applicable)
Building Owner at Occupancy
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
OR Window Distributor
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
OR Window Distributor
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
OR Window Distributor
Compliance Forms August 2001 A-24
INSTALLATION CERTIFICATE (Page 3 of 13) CF -6R
Site Address Permit Number
DUCT LEAKAGE AND DESIGN DIAGNOSTICS
_ ❑ DUCT LEAKAGE REDUCTION
Pressurization Test Results (CFM @ 25 PA)
Test Leakage (CFM)
Fan Flow
If Fan Flow is Calculated as 400 cfin/ton x number of tons, or as 21.7 x .Heating Capacity
in Thousands of Btu/hr, enter calculated value here
If fan flow is measured, enter measured value here
Leakage Fraction = Test Leakage/(Measured or Calculated Fan Flow) =
Pass if leakage fraction 5 0.06 ❑ []
Pass Fail
❑ For AEROSOL TYPE SEALANTS ONLY - The following diagnostic testing was completed:
Duct Fan Pressurization at rough -in measured leakage (CFM)
CHECK AFTER FINISHING WALL:
❑ Yes ❑ No ❑ Pressure pan test or House pressurization test
❑ Yes ❑ No ❑ Visual Inspection of Duct Connections ❑ ❑
Pass Fail
❑ THERMOSTATIC EXPANSION VALVE (TXV)
❑ Yes ❑ No Thermostatic Expansion Valve is installed and Access is
provided for inspection ❑ ❑
Yes is a pass Pass Fail
❑ DUCT DESIGN
1 ❑ Yes ❑ No ACCA Manual D Design calculations have been
completed, Duct Design is on the plans and duct installation
matches plans.
2. ❑ Yes ❑ No TXV is installed or Fan flow has been verified. If no TXV,
verified fan flow matches design from CF -1R.
Measured Fan Flow =
❑ ❑
Yes for both 1 and 2 is a Pass Pass Fail
❑ I, the undersigned, verify that the above diagnostic test results and the work I performed associated with the test(s) is in
conformance with the requirements for compliance credit. [The builder shall provide the HERS provider a copy of the CF -6R
signed by the builder employees or sub -contractors certifying that diagnostic testing and installation meet the requirements
for compliance credit.]
Tests Signature, Date
Performed
COPY TO: Building Department.
HERS Provider (if applicable)
Building Owner at Occupancy
Installing Subcontractor (Co. Naive) OR
General Contractor (Co. Name)
Compliance Forms August 2001 A-25
INSTALLATION CERTIFICATE (Page 4 of 13) CF -6R
Site Address Permit Number
REFRIGERANT CHARGE AND AIRFLOW MEASUREMENT
Verification for Required Refrigerant Charge and Adequate Airflow for Split System Space Cooling Systems without
Thermostatic Expansion Valves
Outdoor Unit Serial #
Outdoor Unit Make
Outdoor Unit Model
Cooling Capacity
Date of Verification
Date of Refrigerant Gauge Calibration
Date of Thermocouple Calibration
Btu/hr
(must be checked monthly)
(must be checked monthly)
Standard Charge and Airflow Measurement (outdoor air dry-bulb 55 T and above):
Note: The system should be installed and charged in accordance with the manufacturer's specifications before starting this
procedure.
Measured Temperatures
Supply (evaporator leaving) air dry-bulb temperature (Tsupply, db)
OF
Return (evaporator entering) air dry-bulb temperature (Tretorn, db)
OF
Return (evaporator entering) air wet -bulb temperature (Treturn, wb)
OF
Evaporator saturation temperature (Tevaporator, sat)
OF
Suction Line temperature (Tsuction, db)
OF
Condenser (entering) air dry-bulb temperature (Tcondenser, db)
OF
Superheat Charge Method Calculations for Refrigerant Charge
Actual Superheat = Tsuction, db — Tevaporator, sat.
°F
Target Superheat (from Table 1)
OF
Actual Superheat— Target Superheat
OF
(System passes if between -5 and +5'F)
Temperature Split Method Calculations for Adequate Airflow
Actual Temperature Split = T return, db - Tsupply, db OF
Target Temperature Split (from Table 2) OF
Actual Temperature Split - Target Temperature Split °F
(System passes if between -3°F and +3°F or, upon
remeasurement, if between +3°F and -25'F)
Standard Charge and Airflow Measurement Summary:
System shall pass both refrigerant charge and adequate airflow calculation criteria from
the same measurements. If corrective actions were taken, both criteria must be
remeasured and recalculated
System Passes
yes or no
Compliance Forms August 2001 A-26
INSTALLATION CERTIFICATE (Page 5 of 13) CF -6R
Site Address Permit Number
Alternate Charge and Airflow Measurement (outdoor air dry-bulb below 55 °F):
Weigh -In Charging Method for Refrigerant Charge
Actual liquid line length: $,
Manufacturers Standard liquid line length: ft.
Difference (Actual — Standard): $.
Manufacturers correction (ounces per foot) _ x difference in length = ounces
(+ = add) (- = remove)
Measured Airflow Method for Adequate Airflow
Airflow criterion: Cooling Capacity X 0.032 = __ CFM
Measured Airflow is _CFM and passes since it is greater than the criterion.
Alternate Charge and Airflow Measurement Summary:
System charge shall be corrected and it shall also pass measured adequate airflow criterion.
System Passes yes or no
Compliance Forms August 2001 A-27
INSTALLATION CERTIFICATE (Page 6 of 13) CF -6R
Site Address Permit Number
Table K-1: Target Superheat (Suction Line Temperature - Evaporator Saturation Temperature)
Compliance Forms August 2001 A-28
Return Air Wet -Bulb Temperature (°F)
50
51
52
53
54
1 55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
55
8.8
10.1
11.5
12.8
14.2
1 15.6
17.1
18.5
20.0
21.5
23.1
24.6
26.2
1 27.8
29.4
31.0
32.4
1 33.8
35.1
36.4
37.7
39.0
40.2
41.5
42.7
43.9
45.0
56
8.6
8.3
7.9
7.5
7.0
9.9
9.6
9.3
8.9
1 8.4
11.2
11.0
10.6
10.2
9.8
12.6
12.3
12.0
11.6
1 11.2
14.0
13.7
13.4
13.0
1 12.6
15.4
15.1
14.8
14.4
14.0
16.8
16.5
16.2
15.8
15.4
18.2
17.9
17.6
17.2
16.8
19.7
19.4
19.0
18.6
18.2
21.2
20.8
20.4
20.0
19.6
22.7
22.3
21.9
21.4
21.0
24.2
23.8
23.3
22.9
22.4
25.7
25.3
24.8
24.3
23.8
27.3
26.8
26.3
25.7
25.2
28.9
28.3
27.8
27.2
26.6
30.5
29.9
29.3
28.7
28.1
31.8
31.3
30.7
30.1
29.6
33.2
32.6
32.1
31.5
31.0
34.6
34.0
33.5
32.9
32.4
35.9
35.3
34.8
34.3
33.7
37.2
36.7
36.1
35.6
j 35.1
38.5
38.0
37.5
36.9
36.4
39.7
39.2
38.7
38.3
37.8
41.0
40.5
40.0
39.5
39.1
42.2
41.7
41.3
40.8
40.4
43.4
43.0
42.5
42.1
1 41.6
44.6
44.2
43.7
43.3
42.9
57
58
59
60
61
6.5
6.0
5.3
-
7.9
7.4
6.8
6.1
5.4
9.3
8.8
8.3
7.6
7.0
10.7
10.2
9.7
9.1
8.5
12.113.5
11.7
11.1
10.6
10.0
13.1
12.6
1 12.0
i 11.5
14.9
14.5
14.0
13.5
12.9
16.3
15.9
15.4
14.9
14.3
17.7
17.3
16.8
16.3
1 15.8
19.1
18.7
18.2
17.7
17.1
20.5
20.1
19.6
19.0
1 18.5
21.9
21.4
20.9
20.4
1 19.9
23.3
22.8
22.3
21.7
21.2
24.7
24.2
23.6
23.1
1 22.5
26.1
25.5
25.0
24.4
23.8
27.5
27.0
26.4
25.8
25.2
29.0
28.4
27.8
27.3
1 26.7
30.4
29.9
29.3
28.7
1 28.2
31.8
31.3
30.7
30.2
29.7
33.2
32.7
32.2
31.6
31.1
34.6
34.1
33.6
33.0
32.5
35.9
35.4
34.9
34.4
33.9
37.3
36.8
36.3
35.8
35.3
38.6
38.1
37.7
37.2
36.7
39.9
39.4
39.0
38.5
38.1
41.2
40.7
40.3
39.9
39.4
42.4
42.0
41.6
41.2
40.8
62
63
64
65
°.
E ..
66
-
6.3
5.5
7.8
7.1
6.3
5.5
-
9.3
8.7
8.0
7.2
6.4
10.8
10.2
19.5
18.8
18.1
1 12.3
11.7
11.1
10.4
9.7
13.8
13.2
12.6
11.9
11.2
15.2
14.6
14.0
13.4
12.7
16.6
16.0
15.5
14.8
14.2
18.0
17.4
16.8
16.3
15.7
19.3
18.8
18.2
17.6
17.0
20.7
20.1
19.5
19.0
18.4
22.0
21.4
20.8
203
19.7
23.2
22.7
22.1
21.5
1 20.9
24.6
24.1
23.5
22.9
22.3
26.1
25.6
25.0
24.4
23.9
27.6
27.1
26.5
26.0
25.4
29.1
28.6
28.0
27.5
27.0
30.6
30.1
29.5
29.0
1 28.5
32.0
31.5
31.0
30.5
1 30.0
33.4
33.0
32.5
32.0
31.5
34.9
34.4
33.9
33.4
1 33.0
36.3
35.8
35.3
34.9
1 34.4
37.6
37.2
36.8
36.3
35.9
39.0
38.6
38.1
37.7
1 37.3
40.4
39.9
39.5
39.1
1 38.7
67
68
69
70
F" 4.
F?
a
71
5.6
i
7.3
16.4
5.6
-
-
8.9
8.1
7.3
6.5
5.6 1
10.5
9.8
9.0
8.2
7.4 1
12.1
11.4
10.7
9.9
92
13.6
12.9
12.2
11.5
10.8 1
15.0
14.4
13.7
13.1
12.4 1
16.4
15.8
15.2
14.5
13.9
17.8
17.2
16.6
15.9
15.3 1
19.1
18.5
17.9
17.3
16.7
20.3
19.7
19.2
18.6
18.0
21.7
21.2
20.6
20.0
19.4 1
23.3
22.8
22.2
21.6
21.1 1
24.9
24.3
23.8
23.2
22.7
26.4
25.9
25.4
24.8
24.3
28.0
27.4
26.9
26.4
25.9
29.5
29.0
28.5
28.0
27.5
31.0
30.5
30.0
29.5
29.1
32.5
32.0
31.5
31.1
30.6
34.0
33.5
33.1
32.6
32.2
35.4
35.0
34.6
34.1
33.7
36.9
36.5
36.0
35.6
35.2
38.3
37.9
37.5
37.1
36.7
72
73
74
75
4
h
,D
c
76
-
6.6
5.7
8.4
7.5
6.7
5.9
10.1
9.3
8.5
7.7
6.9
11.7
11.0
10.2
9.5
8.7
13.2
12.5
11.8
11.1
10.4
14.7
14.0
13.4
12.7
12.0
16.1
15.4
14.8
14.2
13.5
17.4
16.8
16.2
15.6
15.0
18.9
18.3
17.7
17.1
16.6
20.5
20.0
19.4
18.8
183
22.1
21.6
21.1
20.5
20.0
23.8
23.2
22.7
22.2
21.7
25.4
24.9
24.4
23.8
23.3
27.0
26.5
26.0
25.5
25.0
28.6
28.1
27.6
27.1
26.7
30.1
29.7
29.2
28.8
28.3
31.7
31.3
30.8
30.4
29.9
33.3
32.8
32.4
32.0
31.6
34.8
34.4
34.0
33.6
33.2
36.3
36.0
35.6
35.2
34.8
77
78
79
80
81
6.0
52
-
7.9
7.1
6.3
5.5
9.7
8.9
8.2
7.4
6.6
11.3
10.6
9.9
9.2
8.5
12.9
122
11.6
10.9
10.3
14.3
13.7
13.1
12.5
11.9
16.0
15.4
14.9
14.3
13.7
17.7
17.2
16.6
16.1
15.5
19.4
18.9
18.4
17.8
17.3
21.1
20.6
20.1
19.6
19.0
22.8
22.3
21.8
21.3
20.8
24.5
24.0
23.5
23.0
22.6
26.2
25.7
25.2
24.8
24.3
27.9
27.4
26.9
26.5
26.0
29.5
29.1
28.6
28.2
27.8
31.2
30.7
30.3
29.9
29.5
32.8
32.4
32.0
31.6
31.2
34.4
34.0
33.7
33.3
32.9
82
83
84
85
86
5.8
5.0
-
7.8
7.0
6.3
5.5
9.6
8.9
32
7.5
6.8
11.3
10.6
10.0
9.4
8.8 1
13.2
12.6
12.0
11.5
10.9 1
15.0
14.4
13.9
13.3
12.8
16.7
16.2
15.7
15.1
14.6
18.5
18.0
17.5
17.0
16.5
20.3
t9.8
19.3
18.8
18.3
22.1
21.6
21.1
20.6
20.1
23.8
23.4
22.9
22.4
22.0
25.6
25.1
24.7
24.3
23.8 1
27.3
26.9
26.5
26.1
25.6
29.1
28.7
28.3
27.9
27.5
30.8
30.4
30.1
29.7
29.3
32.6
32.2
31.8
31.5
31.1
87
88
89
90
Compliance Forms August 2001 A-28
INSTALLATION CERTIFICATE (Page 7 of 13) CF -6R
Site Address
Permit Number
Table K -l: Target Superheat (Suction Line Temperature - Evaporator Saturation Temperature) (continued)
Compliance Forms August 2001 A-29
Return Air Wet -Bulb Temperature ff)
c63
50
1 51
52
53
1 54
55
56
57
58
59
1 60
61
62
1
1 64
65
66
1 67
68
69
70
71
1 72
73
74
75
76
91
-
-
-
-
-
-
-
-
-
-
-
-
-
6.1
5.4
-
8.1
7.5
6.8
6.2
5.6
10.3
9.8
9.2
8.7
8.1
12.2
11.7
11.1
10.6
10.0
14.1
13.5
13.0
12.5
12.0
15.9
15.4
14.9
14.4
13.9
17.8
17.3
16.8
16.3
15.8
19.7
19.2
18.7
18.2
17.8
21.5
21.1
20.6
20.2
19.7
23.4
22.9
22.5
22.1
21.6
25.2
24.8
24.4
24.0
23.6
27.1
26.7
26.3
25.9
25.5
28.9
28.5
28.2
27.8
27.4
30.8
30.4
30.1
29.7
29.4
92
93
94
95
fs
F
°
2
96
I
( -
-
7.5
7.0
6.4
5.8
5.3
9.5
8.9
8.4
7.9
7.3
11.4
10.9
10.4
9.9
9.3
13.4
12.9
12.4
11.9
11.4
15.3
14.9
14.4
13.9
13.4
17.3
16.8
16.4
15.9
15.4
19.2
18.8
18.3
17.9
17.5
21.2
20.8
20.3
19.9
19.5
23.2
22.7
22.3
21.9
21.5
25.1
24.7
24.3
24.0
23.6
27.1
26.7
26.3
26.0
25.6
29.0
28.7
28.3
28.0
27.7
97
98
99
100
� a
r £
A
101
102
103
104
-
6.8
6.2
5.7
5.2
8.8
8.3
7.8
7.2
6.7
10.9
10.4
9.9
9.3
8.8
12.9
12.4
11.9
11.5
11.0 1
15.0
14.5
14.0
13.6
13.1
17.0
16.6
16.1
15.7
15.2 1
19.1
18.6
18.2
17.8
17.4 1
21.1
20.7
20.3
19.9
19.5
23.2
22.8
22.4
22.1
21.7 1
25.3
24.9
24.5
24.2
23.8
27.3
27.0
26.7
26.3
26.0
105
Q
v
j
106
-
I
-
6.2
5.7
5.2
-
8.3
7.9
7.4
6.9
6.4
-10.5
10.0
9.5
9.1
8.6
12.6
12.2
11.7
11.3
10.8 1
14.8
14.4
13.9
13.5
13.1
17.0
16.6
16.1
15.7
15.3
19.1
18.7
18.4
18.0
17.6
21.3
21.0
20.6
20.2
19.9
23.5
23.2
22.8
22.5
22.1 1
25.7
25.4
25.1
24.7
24.4
107
108
109
110
111
I
-
5.9
5.4
-
8.1
7.6
7.2
6.7
6.2
10.4
9.9
9.5
9.0
8.6
12.6
12.2
11.8
11.4
10.9 i
14.9
14.5
14.1
13.7
13.3 1
17.2
16.8
16.4
16.1
15.7
19.5
19.1
18.8
18.4
18.1
21.8
21.5
21.1
20.8
20.5
24.1
23.8
23.5
23.2
22.9
112
113
114
I l5
Compliance Forms August 2001 A-29
INSTALLATION CERTIFICATE (Page 8 of 13) CF -6R
Site Address Permit Number
Table K-2: Target Temperature Split (Return Dry -Bulb - Supply Dry -Bulb)
Return Air Wet -Bulb (T) (Tmur.,, b)
50
51
52
53
54
55
56
57
1 58
59
60
61
62
1 63
1 64
65
66
1 67
68
1 69
1 70
71
72
73
74
75
76
70
20.9
20.7
20.6
20.4
20.1
19.9
19.5
19.1
18.7
18.2
17.7
17.2
16.5
15.91
15.2
14.4
13.7
12.8
11.91
11.01
10.0
9.0
7.9
6.8
5.7
4.5
3.2
71
21.4
21.3
21.1
20.9
20.7
20.4
20.1
19.7
19.3
18.8
18.3
17.7
17.1
16.4
15.7
15.0
14.2
13.4
12.5
11.5
10.6
9.5
8.5
7.4
6.2
5.0
3.8
_
72
21.9
21.8
21,7
21.5
21.2
20.9
20.6
20.2
19.8
19.3
18.8
18.2117.6
17.0
16.3
15.5
14.7
13.9
13.0
12.1
11.1
10.1
9.0
7.9
6.8
5.6
4.3
22.5
22.4
22.2
22.0
21.8
21.5
21.2
20.8
20.3
19.9
19.4
18.8118.2
17.5
16.8
16.1
15.3
14.4
13.6
12.6
11.7
10.6
9.6
8.5
7.3
6.1
4.8
73
F
23.0
22.9
22.8
22.6
22.3
22.0
21.7
21.3
20.9
20.4
19.9
19.31
18.7
18.1
17.4
16.6
15.815.0
14.1
13.2
12.2
11.2
10.1
9.0
7.8
6.6
5.4
74
23.6
23.5
23.3
23.1
22.9
22.6
22.2
21.9
21.4
21.0
20.4
19.9
19.3
18.6
17.9
17.2
16.4
15.5
14.7
13.7
12.7
11.7
10.7
9.S
8.4
7.2
5.9
75
76
24.1
24.0
23.9
23.7
23.4
23.1
22.8
22.4
22.0
21.5
21.0
20.4
19.8
19.2
18.5
17.7
16.9
16.1
15.2
14.3
13.3
12.3
11.2
10.1
8.9
7.7
6.5
77
Ca
-
24.6
24.4
24.2
24.0
23.7
23.3
22.9
22.5
22.0
21.5
21.0
20.4
19.7
19.0
18.3
17.5
16.6
15.7
14.8
13.8
12.8
( 11.7
10.6
9.5
8.3
7.0
24.7
24.5
24.2
23.9
23.5
23.1
22.6
22.1
21.5
20.9
20.2
19.5
18.8
18.0
17.2
16.3
15.4
14.4
13.4
12.3
11.2
10.0
8.8
7.6
78
79
A
-
-
24.8
24.4
24.0
23.6
23.1
22.6
22.1
21.4
20.8
20.1
19.3
18.5
17.7
16.8
15.9
14.9
3.9
12.8
11.7
10.6
9.4
8.1
Q
25.0
24.6
24.2
23.7
23.2
22.6
22.0
21.3
20.6
19.9
19.1
18.3
17.4
16.4
15.5
14.4
13.4
12.3
11.1
9.9
8.7
80
81
25.1
24.7
24.2
23.7
23.1
22.5
21.9
21.2
20.4
19.6
18.8
17.9
17.0
16.0
15.0
13.9
12.8
11.7
10.4
9.2
o
y
-
-
25.2
24.8
24.2
23.7
23.1
22.4
21.7
21.0
20.2
19.3
18.5
17.5
16.6
15.5
14.5
13.4
12.2
11.0
9.7
82
I
25.3
24.8
24.2
23.6
23.0
22.3
21.5
20.7
19.9
19.0
18.1
17.1
16.1
15.0
13.9
12.7
11.5
10.3
83
-
25.9
25.3
24.8
24.2
23.5
22.8
22.1
21.3
20.4
19.5
18.6
17.6
16.6
15.6
14.4
13.3
12.1
10.8
84
Compliance Forms August 2001 A-30
.INSTALLATION CERTIFICATE (Page 9 of 13) CF -6R
Site Address Permit Number
DUCT LOBATION AND AREA REDUCTION DIAGNOSTICS
❑ DUCT IN CONDITIONED SPACE
❑ Yes ❑ No Duct in conditioned space criteria matches CF -1 R
❑ ❑
Yes is a Pass Pass Fail
❑ REDUCED DUCT SURFACE AREA
Measured duct exterior surface area in the following unconditioned duct locations (square feet):
Attics
Crawlspaces
Basements
Other (e.g., garages, etc.)
❑ Yes I❑ No Duct surface area matches CF -1 R? ❑ ❑
Yes is a Pass Pass Fail
❑ I, the undersittmed, verify that the duct surface area and duct locations claimed for duct surface area reductions and duct
location improvements beyond those covered by default assumptions match those on the plans. (The builder shall provide
the HERS provider a copy of the CF -6R signed by the builder employees or sub -contractors certifying that diagnostic testing
and installation meet the requirements for compliance credit.]
Tests Signature, Date installing Subcontractor (Co. Natne) OR
Performed General Contractor (Co. Name)
COPY TO: Building Department
HERS Provider (if applicable)
Building Owner at Occupancy
Compliance Forms August 2001 A-31
•INSTALLATION CERTIFICATE (Page 10 of 13) CF -16R
Site Address
Permit Number
BUILDING ENVELOPE LEAKAGE DIAGNOSTICS
❑ ENVELOPE SEALING INFILTRATION REDUCTION
Diagnostic Testing Results
Building
Envelope Leakage (CFM @ 50 Pa) as measured by Rater
1.
❑
Is measured envelope leakage less than or equal to the required level from
Yes
No
CF -1R?
2. ❑
Is Mechanical Ventilation shown as required on the CF -1R?
Yes
No
2a. ❑
If Mechanical Ventilation is required on the CF- IR (Yes in line 2), has it
Yes
No
been installed?
2b. ❑
❑
Check this box yes if mechanical ventilation is required (Yes in line 2)
Yes
No
and ventilation fan watts are no greater than shown on CF -IR.
Measured Watts =
3. ❑
❑
Check this box yes if measured building infiltration (CFM @ 50 Pa) is
Yes
No
greater than the CFM @ 50 values shown for an SLA of 1.5 on CF -1R
(If this box is checked no, mechanical ventilation is required.)
4.
❑
Check this box yes if measured building infiltration (CFM @ 50 Pa) is less
Yes
No
than the CFM @ 50 values shown for an SLA of 1.5 on CF -1R,
mechanical ventilation is installed and house pressure is greater than
minus 5 Pascal with all exhaust fans operating.
❑ ❑
Pass if: Pass Fail
d. Yes in Line I and line 3, or
e. Yes in line 1 and line2, 2a, and 2b, or
f. Yes in line 1 and Yes in line 4.
Otherwise fail.
❑ 1, the undersigned, verify that the building envelope leakage meets the requirements claimed for building leakage
reduction below default assumptions as used for compliance on the CF -IR. This is to certify that the above diagnostic test
results and the work I performed associated with the test(s) is in conformance with the requirements for compliance credit.
[The builder shall provide the HERS provider a copy of the CF -6R signed by the builder employees or sub -contractors
certifying that diagnostic testing and installation meet the requirements for compliance credit.]
Test Performed Signature Date
COPY TO: Building Department
HERS Provider (if applicable)
Building Owner at Occupancy
Testing Subcontractor (Co. Name) OR
General Contractor (Co. Name)
Compliance Forms August 2001 A-32
INSTALLATION CERTIFICATE (Page 11 of 13) CF -6R
Site Address Permit Number
The following is an explanation of many of the input values required on this form:
HVAC SYSTEMS
Heating Equipment Type must be one of the following:
Furnace:
Gas (including Liquefied Petroleum Gases) or oil -fired central furnace &
space heater
Boiler:
Gas or oil -fired boiler
PckgHeatPump:
Packaged central heat pump
SplitHeatPump:
Split central heat pump
RoomHeatPump:
Room heat pump
I.,gPkgHeatPump:
Large packaged heat pump (>_ 65,000 Btu/hr output)
Electric:
Electric resistance heating (fixed HSPF = 3.413); .radiant electric resistance
(fixed HSPF = 3.55)
Coimbinedflydro:
Reference water heater under water heating systems below
CEC Certified Manufacturer Name & Model Number from applicable Commission approved appliance directory.
# of Identical Systems is for those systems with the same efficiency, duct. location, duct R -value and capacity.
Efficiency from applicable Commission certified appliance directory.
Duct (or Piping) Location is attic, crawl space, CVC crawl space, conditioned space, unconditioned space or none.
Duct (or Piping) R -Value from Directory of Certified Insulation Materials and/or manufacturer's data.
Heating/Cooling Load refer to Commission approved load calculation procedure.
Heating/Cooling Capacity from the applicable Commission certified appliance directory. Note: location elevations over
2,000 fl above sea level require a derating of output capacity (refer to manufacturer's literature).
looting Equipment T e must be one of the following:
SplitAirCond:
Split system air conditioner
PckgAirCond:
Packaged air conditioner
Split Heat Pump:
Split system heat pump
PckgHeatPump:
Packaged heat pump
RoomHeatPump:
Room heat pump
L gPkgHeatPump:
Large packaged heat pump (>_ 65,000 Btu/hr output). Substitute EER for SEER
when SEER is not available
RooinAirCond:
Room air conditioner. Minimum SEER varies*
LgPkgAirCond:
Large packaged air conditioner (>_ 65,000 Btu/hr output). Substitute EER for
SEER when SEER is not available
EvapDirect:
Direct evaporative cooling system. For compliance calculation purposes, fixed
values: SEER = l 1.0; duct location = attic; duct insulation R -value = 4.2
Evapindirect:
Indirect evaporative cooling system. For compliance calculation purposes, fixed
values: SEER = 13.0; duct location = attic; duct insulation R -value = 4.2
`Refer to Energy Commission publication Appliance Efficiency Regulations, P400-92-029
Compliance Forms August 2001 A-33
r
E`4STALLATION CERTIFICATE (Page 12 of 13) CF -6R
Site Address Permit Number
The following is an explanation of many of the input values required on this form:
WA'rER HEATING SYSTEMS
Distribution Systems Refer to Residential Manual for more details:
Standard:
Standard — Supply pressure based system, no pumps
Pipe Insulation:
Pipe Insulation on all 3/4 -inch pipes
POU/HWR:
Point of Use/Hot Water Recovery System
Recirc/NoControl:
Recirculation loop with no controls
Recirc/Timer:
Recirculation loop with a timer
Recirc/Temp:
Recirculation loop with temperature control
Recirc/Time+Temp:
Recirculation loop with a timer and temperature control
Recirc/Demand:
Recirculation loop with demand control
Water Heater Tyne
Windows, sliding glass doors, French doors, skylights, garden windows, and
Information Needed
any door with more than one square foot of glass
Operator Type:
Energy Factor
Recovery Efficiency
Standby Loss
Rated Input
Storage Gas, Oil or Electric
Yes
No
No
No
Heat Pump
Yes
No
No
No
Instantaneous Gas
No
Yes
No
No
Instantaneous Electric
Yes
No
No
No
Large Storage Gas
No
Yes
Yes
Yes
Indirect Gas (Boiler)
No
Yes (AFUE)
No
Yes
FENESTRATION/GLAZING
Fenestration:
Windows, sliding glass doors, French doors, skylights, garden windows, and
any door with more than one square foot of glass
Operator Type:
Slider, hinged, fixed
U -Factor:
Installed U -Factor must be less than or equal to value from CF -1R
OR
Installed weighted average U -Factor for the total fenestration area is less than
orequal to value from CF -1R
SHGC:
Installed SHGC must be less than or equal to value from CF -1R
OR
Installed weighted SHGC for the total fenestration area is less than or equal to
value from CF -1R
OR
An interior shading device, overhang, or exterior shading device is installed
consistent with the CF -IR
Shading Device:
Include when the building complied using an exterior shading device: woven
sunscreen, louvered sunscreen, low sun angle sunscreen, roll -down awning,
roll -down blinds or slats (do not list bug screen), or an overhang (include
depth in feet
Compliance Forms August 2001 A-34
INSTALLATION CERTIFICATE (Page 13 of 13) CF -6R
Site Address
Permit Number
The following is an explanation of many of the input values required on the Diagnostic portion of this form (page 3 oI.6):
TYPE OF CREDIT
Refer to Residential Manual Chapters 4 and 5 for more details:
Reduced Duet Surface Area:
Calculated as the outside area of the duct. Areas must be measured and
verified by a HERS rater.
Improved Duct Location:
Supply duct located in other than attic, as verified by location of registers
(does not require HERS rater verification).
Catastrophic Leakage:
Pressure pan test readings must be less than 1.5 Pascal at a house pressure of
25 Pascal.
TXV:
Access cover requited to facilitate verification.
Infiltration Reduction:
Infiltration is measured without mechanical ventilation operating.
Mechanical ventilation is required for very tight house construction when
credits for infiltration reduction using diagnostic testing are being used for
achieving compliance. These very tight houses are defined as those with SLA
of less than I.S. The compliance documentation (CF -1R) will contain the
measured CFM target value from a blower door test at 50 Pascal pressure
difference that represents this SLA of 1.5. Mechanical ventilation is also
required if the builder chooses to design the building to use mechanical
ventilation and claims a credit for infiltration below an SLA of 3.0. The
compliance documentation (CF -1R) will contain the measured CFM target
value that represents this 3.0 SLA. If the builder claims credit in a design for
infiltration reduction that is at an SLA of 3.0 or higher, and the actual
measured SLA is 1.5 or greater, then mechanical ventilation is not required.
If the SLA in this case were below 1.5, then mitigation (such as mechanical
ventilation) would be required.
Compliance Forms August 2001 A-35
perimeter
204.0
Slab
1,588.0
Area
1,588.0
lazin
167.0
average ceiling height
9.0
Calculation Work Sheet Existing
Engineering Incorporated
1981 20th Anniversary 2001
Consulting Electrical Engineers
19W1 Highw"+' IV S. 200 72330'(:aT'� I.m1c.
Appk VNk y. CA 92307 Pulm D. -It G 91]60
rnm.•: (760) 2,0 Ph- (760)7 3-"78
Yqa: (760)242-IW2 Va.: (760)213-1093
dn+ny:�'�dmMrsN dnvmJuc�rtuuL�vm
FRONT
HEIGHT
GLAZING
W H AREA
5.0 5.0 25.0
u so
0.87 0.70
CODE
DREAM 25.0
1 0.87 0.70
LEFT
HEIGHT
9.0
WALL AREA
FRONT
40.0
360.0
LEFT
62.0
558.0
BACK
40.0
360.0
RIGHT
62.0
558.0
0.70
1.836.0
LEFT
CODE
GLAZING
H
AREA
CODE
W H AREA
u
sc
GBLK
2.0 2.8 5.6
0.87
0.70
TOTAL
4.0 4.0 16.0
0.87
0.70
6.0 6.7 40,2
0.87
0.70
61.8 1
0.87
1 0.70
SKYLIGHTS
CODE
I W
H
AREA
u
sc
NONE
0.87
0.70
7.0 5.0 35.0
0.87
TOTAL
BACK
GLAZING
CODE W H AREA u. sc
6.0 6.7 40.2 0.87 0.70
40.2 0.87 1 0.70
DOORS
CODE W
H
AREA
front 3.0
6,7
20.1
FOTAL 1 20.1
RIGHT
GLAZING
W H AREA
u
so
CODE
5.0 5.0 25.0
0.87
0.70
7.0 5.0 35.0
0.87
0.70
1 60.0 i 0.87 1 0.80 I
(i
Calculation Work Sheet
perimeter
204.0
Slab
1,783.8
Area
1,783.8
glazing
187.0
average ceiling height
9.0
Composite
Engineering Incorporated
1981 20th Anniversary 2001
Consulting Electrical Engineers
1903110amey 16 Sic 2W 723306Lm,m",r
Applin V.0 y, rA 929117 Pdm D� rs 92260
rb-: (7W) 242-3369 Pb- (703) 773-4478
F-: (760) 242-1092 F- (760)242 -IM
Jrt�ja�n\�n,r.nct d.uul Iryq.,La
FRONT
HEIGHT
GLAZING
W H AREA
5.0 5.0 25.0
u
1.28
sC
0.99
40.0
DREAM 25.0
1,28 1
0.99
LEFT
HEIGHT
9.0
WALL AREA
FRONT
40.0
360.0
LEFT
62.0
558.0
BACK
40.0
360.0
RIGHT
62.0
558.0
1,836.0
LEFT
CODE W H
GLAZING
W H AREA
2.0 2.8 5.6
4.0 4.0 16.0
u
0.87
0.87
SC
0.70
0.70
GBLK
21.6
0.87
0.70
SKYLIGHTS
CODE W H
I AREA
u
so
NONE
80.4 0.74 10.68
1.281
0.99
TOTAL
BACK
GLAZING
W H AREA
6.0 6.7 40.2
6.0 6.7 40.2
u
0.87
0.60
SC
0.70
0.65
NEW
80.4 0.74 10.68
1.281
DOORS
W H
AREA
Existing
3.0 6.7
20.1
rOTAL 1 20.11
RIGHT
GLAZING
W H AREA
5.0 5.0 25.0
7.0 5.0 35.0
u
1.28
1.28
SC
0.99
0.99
60.01
1.281
0.99
,-f
Engineering Incorporated
1
1404
156
1784
9.0
WEST
LA QUINTA
112
24
N/A
1981 20th Anniversary 2001
Consulting Electrical Engineers
19031 77 zhy� x> 18 $ft. 200
72.330 <wVD l aue
Apple V.Uey, CA 92307
Palm D—n t, CA 92260
Pb—: (760) 242-3369
Phuuc: (760) 773-4478
Fax: (766)242-1092
Fax: (760)242-IO92
-
drearo)ne�aleheler.�M
dRwnjua�r)auLcum
FORM J EQUIPMENT LOADS
PROJECT:
22 BTU/SQ FT DREAM ENGINEERING INC.
72330 CANYON LANE
COMPTON RESIDENCE
1784 SQ FT PALM DESERT, CA
(760)773-4478/F242-1092
LA QUINTA
CA HTM HTM •
AREA/ BTU
BTU
NUMBER OF FLOORS
CLG HTG
LENGTH CLG
HTG
EXPOSED WALL (SQ FT)
GROSS EXPOSED WALLS
FOOTPRINT - PERIMETER (FT)
FIXED WINDOWS
34
0 0
0
BUILDING DIMENSIONS (SQ FT)
SLIDING WINDOWS
35
187 0
6452
CEILING HEIGHT (FT)
WINDOWS &
NORTH 30
22 648
DIRECTION FACING
GLASS DOORS:
EAST 80
80 6432
LOCATION
SOUTH 45
60 2700
SUMMER DESIGN OUTDOOR - 78
WEST 80 _
25 2000
WINTER DESIGN OUTDOOR - 68
SKY LIGHTS
0 48
0 0
0
UBC 50% OCCUPANCY
OPAQUE DOORS
38 25
40 1520
1000
DISCLAIMER:
NET EXPOSED WALL
R13 2.5 2.6
1404 3510
3650
1.THE BUILDING HEAT LOSS & RESULTING MAXIMUM HEATING
AVE CEILINGS
R38 2.460 2.53
1784 4388
4506
EQUIPMENT OUTPUT CALCULATIONS IN THIS REPORT MEET THE
CEILINGS (R#2)
0
0
CRITERIA OF TITLE 24. THIS MAXIMUM MAY BE EXCEEDED
FLOOR (SLAB - PERIMETER)
0 28
156 0
4415
WHEN THE FURNACE IN THE SELECTED PRODUCT LINE MUST BE
FLOOR (RAISED FLOOR)
0 0
0
0
LARGER TO MEET COOLING LOAD AIR FLOW REQUIREMENTS.
SUBTOTAL BTUH LOSS
20023
23HE BUILDING SENSIBLE HEAT GAIN CALCULATED IN THIS
DUCT BTUH LOSS (15%)
2403
REPORT MEETS THE CRITERIA OF TITLE 24 AND MAY BE
HEATING: TOTAL BUTH LOSS
22425
USED BY THE MECHANICAL CONTRACTOR IN EQUIPMENT
PEOPLE & APPLIANCES
1200
SELECTION AND SYSTEM DESIGN. THE ARI STANDARD 210
SENSIBLE BTU GAIN
22398
RATED CAPACITY OF THE EQUIPMENT SELECTED MAY NEED
DUCT BTU GAIN (15°x)
3360
TO BE HIGHER THAN THAT STATED IN THE CALCULATIONS
SUM OF SENSIBLE AND DUCT GAINS
25758
BECAUSE THE DESIGN CONDITIONS FOR THE LOCATION ARE
COOLING: TOTAL BTUH GAIN (TOTAL X 1.3)
33485
DIFFERENT FROM THE TEST CONDITIONS USED IN THE RATINGS.
HTG UNIT SIZING =
BTUH LOSS X 1.3 + 10 X AREA =
46991 BTU HEATING OUTPUT, MINIMUM REQUIRED
CLG UNIT SIZING =
BTUH GAIN X 1.15 =
38508 BTU COOLING SENSIBLE, MINIMUM REQUIRED
3 TON
1
1404
156
1784
9.0
WEST
LA QUINTA
112
24
N/A