384531 (SPIN)PERMIT NO.
3845311
CONSTRUCTION ESTIMATE
DEPARTMENT OF BUILDING & SAFETY
COUNTY OF RIVERSIDE
NO. ELECTRICAL FEES
FIELD DST
NO. PLUMBING FEES
IST FL.
2ND. FL.
POR.
GAR.
CAR P.
WALL
ESTIMATED CONSTRUCTION
SQ. FT. @ $
UNITS
SQ. FT. @
YARD SPKLR SYSTEM
MOBILEHOME SVC.
SQ. FT. @
BAR SINK
POWER OUTLET
SQ. FT. @
ROOF DRAINS
SQ. FT. @
DRAINAGE PIPING
SQ. FT. @
DRINKING FOUNTAIN
SQ FT @
URINAL
VALUATION $
WATER PIPING
NOTE: Not to be used as property tax valuation
SWIM POOL, PVT
FLOOR DRAIN
MECHANICAL FEES
SWIM POOL, COMM
WATER SOFTENER
VENT SYSTEM FAN EVAP. COOL HOOD
SIGN
WASHER (AUTO)(DISH)
APPLIANCE DRYER
Micro Film Fee Cop $
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
Use/Case No.
LAUNDRY TRAY
AIR HANDLING UNIT CFM
IDLE METER
KITCHEN SINK
ABSORPTION SYSTEM B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET
COMPRESSOR HP
POLE, TEMP/PERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER B.T.U.
SQ. FT. @ t
BATH TUB
i^r r v i
SQ. FT. @ t
WATER HEATER
S0. FT. RESID @ 1114 C
SEWAGE DISPOSAL
Plan No.
S0. FT. GAR @ %t
HOUSE SEWER
Inspector �iQ%�
Unit
Sp. Insp. Fee $
PIPING
PERMIT FEE
EGAS
PERMIT FEE
PERMIT FEE
DBL.
TOTAL FSS
MOB.HM.FEE
MICRO FEE
MECH. FEE PL. CK. FEE
CONST. FEE ELECT. FEE
SMI FEE
,EE PLUMB. FEE
PERMIT NO.
Job Address Space
Zip
Owner
" �- ��
384531
> r , , r J\
. ) C-'
, , -
Community
"/
Vduotion
V
$
Date
Dist.
Off.
F.C.C.
MH Permit Fee $
r a,,,.,
/
Micro Film Fee Cop $
Us of Per .1
_
Parcel No.
Use/Case No.
Ck. By
Mech. Fee Dbl $
PI. Ck. Fee $
Set Backs
Lot Size
Construction Fee Dbl $
Legal Description F
(�,�' r j'�"'''��' "r +"' !
S
S
R
Electrical Fee Dbl S
Zone Restrictions
Group
Type
SMI Fee E
i^r r v i
Plumbing Fee Dbl $
Bond Amt.
b
Plan No.
Plan Checker
Final Date
Inspector �iQ%�
Unit
Sp. Insp. Fee $
Demol. Fee $
Const. Lender Branch
Supplimentol Permit NumbeW
Regist, Fee S
Mileage Fee $
Address City Zip
Witness Fee $
Reinsp. Fee $ '79
Owner/Agent / rr` %
Tel. Zip
4
Total Fees $ �'-
Address - �`�" a ''
City Zip
M.O. N.C. Cash Chec
Received by
Contractor
,I//
Tel.
r. h
License#
Trees required ,,....-�'.�
Sewage System
Address
_ -
City Zi P
F
r�
T LL P
Sewer District
Form 284-208 (Rev.8/78) @s
THIS PERMIT SHALL BECOME VOID IF WORK IS NOT COMMENCED WITHIN 120 DAYS. CESSATION OF WORK verified by:
FOR 120 DAYS SHALL ALSO CAUSE PERMIT TO BECOME VOID.
I HEREBY AGREE THAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN ACCORDANCE WITH
THE LAWS OF RIVERSIDE COUNTY AND THE STATE OF CALIFORNIA.
I HEREBY CERTIFY THAT THE INDIVIDUAL WHO PREPARED THE PLANS AND SPECIFICATIONS HAS DONE SO IN
ACCORDANCE WITH SECTION 5541 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE OF CALIFORNIA. 1"/Y�
NO.
OPERATION DATE
INSPECTOR
NO.
OPERATION
DATE INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
1
Set Back
33
Ventilation System
2
Figs & Frms
34
Plenums & Ducts
2A
Slab Grade
35
Furnace Comport.
3
Steel
36
Inlets & Outlets
4
Grout Blocks
37
Combustion Air
5
Bond Beams
38
Compressor
6
Roof Deck �_S— %
39
Appl. Clearance
7
Framing
40
Fire Damper
8
Vents
41
Smoke Detection Device
9
Garage Fire Wall
42
Commercial Hood
10
Fireplace P. L.
43
Final
IDA
Fireplace T.O.
NO
ADDITIONAL INFORMATION
SEWAGE SYSTEM SIZE & LOCATION
11 Exterior Lath
12 Internal Lath
12A Drywall
13 Finish Grade
INSULATION Thick R
Value
7A Walls (Batts)
12B Ceiling (Batts)
12C Ceiling (Blown)
14 Final
PLUMBING APPROVALS
15 Ground Plumb
16 Water Piping
17 Rough Plumb
18 Vents
19 Sewage Disposal
20 Sewer
21 Water Heater
22 Water Softener
23 Water Service
24 Gas Test
25
Final
Tank Pit L.Line
REAR OF PROPERTY LINE
ELECTRICAL APPROVALS
P/L
P/
26 Power Pole
27 Conduit
28 Service Entrance
29 Wiring
29A Grounding Wire
29B Bonding
30 Fixtures
31 Service,
32 Final
STREET NAME
BUILDING PERMIT
T LL P
.Sewer District
Form 284-208 (Rev.8/78) 4�_D
THIS PERMIT SHALL BECOME VOID IF WORK IS NOT COMMENCED WITHIN 120 DAYS. CESSATION OF WORK verified by:
FOR 120 DAYS SHALL ALSO CAUSE PERMIT TO BECOME VOID.
I HEREBY AGREE T) -IAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN ACCORDANCE WITH
THE LAWS OF RIVERSIDE COUNTY AND THE STATE OF CALIFORNIA.
I HEREBY CERTIFY THAT THE INDIVIDUAL WHO PREPARED THE PLANS AND SPECIFICATIONS HAS DONE SO IN
ACCORDANCE WITH SECTION 5541 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE OF CALIFORNIA.
PERMIT NO.
384531
DEPARTMENT OF BUILDING & SAFETY
COUNTY OF RIVERSIDE
FIELD OFFICE
DST
F//
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
IST FL.
2ND. FL.
FOR.
GAR.
CAR P.
WALL
ESTIMATED CONSTRUCTION
SQ. FT. @
UNITS
SQ. FT. @
YARD SPKLR SYSTEM
MOBILEHOME SVC.
SQ. FT. @
BAR SINK
POWER OUTLET
SQ. FT. @
ROOF DRAINS
SQ. FT. @
DRAINAGE PIPING
SQ. FT. @
DRINKING FOUNTAIN
SQ. FT. @
t URINAL
VALUATION $
WATER PIPING
NOTE: Not to be used as property tax valuation
SWIM POOL, PVT
FLOOR DRAIN
MECHANICAL FEES
SWIM POOL, COMM
WATER SOFTENER
VENT SYSTEM FAN EVAP. COOL HOOD
SIGN
WASHER (A.UTO)(DISH)
APPLIANCE
DRYER
GARBAGE DISPOSAL
FURNACE UNIT WALL
FLOOR SUSPENDED
LAUNDRY TRAY
AIR HANDLING UNIT
CFM
IDLE METER
KITCHEN SINK
ABSORPTION SYSTEM
B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET
COMPRESSOR
HP
POLE, TEMP/PERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER B.T.U.
SQ. FT. @ c
BATH TUB
SQ. FT. @ c
WATER HEATER
SQ. FT. RESID @I'/.t
SEWAGE DISPOSAL
SQ. FT. GAR @ 1%c
HOUSE SEWER
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FE
DBL.
TOTAL FEF,S
MOB.HM. FEE
MICRO FEE MECH. FEE
PL. CK. FEE I
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
f.
PERMIT NO,
1384531
Job Address
Space
P
Zip
Owner
/rte-�---
Commu� Sty
<
Va uution
$_
Date
Dist.
Off.
F.C.C.
MH.Permit Fee E
Micro Film Fee Cop $
UsT1 of PP�errrr�
Legal Description
60.7 Si& �'`" ' �" `T
rA
Parcel No.
m v—
Use/Case No. Ck.
By.
Mach. Fee Dbl E
PI. Ck. Fee $
Set Backs
Lot Size
Construction Fee Dbl b
F 5
S R '
Electrical Fee Dbl $
Zone Restrictions
Group
Type
SMIFee $
Plumbing Fee Dbl $
Bond Amt.
$
Plan No.
Plan Checker
Fi of Date
t��
Ins or
Unit
Sp. Insp. Fee $
Dental. Fee $
Const. Lender
Branch
Supplimental Permit Numbers
7 ar"4-
✓-")
Registr. Fee $
Mileage Fee $
Address /City /) Zip
ij /
Witness Fee $
Reinsp. Fee $
wner/Agent
!!f--2 Z,
`
Tel.
Zip
Total Fees $
d
Address t
City
Zip
M.O. El N.C. El Cash El Chec
Received by
Contractor
A W'. r
Tel.
2 Q nem' 3
License#
Trees required CK2��
SewageSystem
•w
Address,,' ►
�i.,.L,..
City
Zip
T LL P
.Sewer District
Form 284-208 (Rev.8/78) 4�_D
THIS PERMIT SHALL BECOME VOID IF WORK IS NOT COMMENCED WITHIN 120 DAYS. CESSATION OF WORK verified by:
FOR 120 DAYS SHALL ALSO CAUSE PERMIT TO BECOME VOID.
I HEREBY AGREE T) -IAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN ACCORDANCE WITH
THE LAWS OF RIVERSIDE COUNTY AND THE STATE OF CALIFORNIA.
I HEREBY CERTIFY THAT THE INDIVIDUAL WHO PREPARED THE PLANS AND SPECIFICATIONS HAS DONE SO IN
ACCORDANCE WITH SECTION 5541 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE OF CALIFORNIA.