204541 (SFD)DEPARTMENT OF BUILDING & SAFETY
• COUNTY OF RIVERSIDE •
CONSTRUCTION ESTIMATE �s ELECTRICAL FEES
I ST FL. SQ. FT. @
2ND FL. SQ. FT. @
POR. SQ. FT. @
GAR. 13 A SQ.FT. @ .✓
CAR P. SQ. FT. @
WALL SQ.FT. @
SQ. FT. @
ESTIMATED VALUATION Is �L
MECHANICAL FEES
VENT SYSTEM '-J• FAN ❑ EVAP. COOL (9 HOOD
APPLIANCE
FURNACE ❑ UNIT ❑ WALL ffr 'FL64 ❑ SUSPENDED
AIR HANDLING UNIT CFM
GAS PIPE ❑ NATURAL ❑ L.P.G. ❑ OIL
COMPRESSOR HP
APPLIANCE VENT
ABSORPTION SYSTEM BJ.U.
INCINERATOR ❑ DOMESTIC ❑ INDUS. OR COMM.'
HEATING SYSTEM FORCED ❑ GRAVITY
BOILER B.T.U.
PERMIT FEE
TRAILER ISSUANCE FEE -PERMIT FEE
[Nei
• FIELD OFFICE
PLUMBING FEES •'t';
MOTOR I OR LESS H.P.
4 5 41ITOTALaFEES
REN. TRAILER FEE J.EAT a VENT. FEE
PL. CK. FEE CONST.
MOTOR 5 OR LESS H.P.
oBL. E FE Del.
SPEC. INSP. FEE
PLMUBING-FLEE
DCL `
MOTOR 20 OR LESS H.P.
DRAINAGE PIPING
DRINKING FOUNTAIN
_ _ ..J F
- M.
M
A M .. _ J .J A _ S .�V
A M J .J A S
URINAL
�K w. UNITS
f
WATER PIPING
USE #
JOB ADDRESS '`,'��i�
OWNER -
s_`1
FLOOR DRAIN
__
M14
5j��
WATER SOFTENER
SIGN
WASHER (AUTC1�(DISH)
.mf e+i"
FORMER O K.W.
GARBAGE DISPOSAL'
"
OUTLETS
USE 6F B ILDINGE
LAUNDRY TRAY
FUTURE OR SOCKET
,,r,'j
KITCHEN SINK
I I
CONST. SERV, ENTRANCE
WATER CLOSET
POLE
CHECKED BY
z
LAVATORY
a
AMPERES SERV. ENT.
j(
/
SHOWER
;
SQ. FT. @ 4
/
BATH TUB
1 5lp
SQ. FT. @ 4
�`
j
WATER HEATER
b -v
SQ. FT. RESID. @ 14
.
T.P
SEWAGE DISPOSAL
LEGAL DESCRIPTION
'7
SQ. FT. GARAGE @I�214
CONSTRUCTION FEE
HOUSE SEWER
BALANCE OF MIN. FEE
1-;A4,S
GAS PIPING
./ PERMIT FEE
/
PFRMIT FFF
11oh n
ti{
PER 204541
4 5 41ITOTALaFEES
REN. TRAILER FEE J.EAT a VENT. FEE
PL. CK. FEE CONST.
oBL. E FE Del.
SPEC. INSP. FEE
PLMUBING-FLEE
DCL `
_ _ ..J F
- M.
M
A M .. _ J .J A _ S .�V
A M J .J A S
0 _ N Dc.a
O N D -. —
SET
LOT SIZE
USE #
JOB ADDRESS '`,'��i�
OWNER -
s_`1
__
M14
5j��
R
'� kJ 'GF .` ..`3
.mf e+i"
ZONE _ -
USE 6F B ILDINGE
PLAN CHECK FEE
$
,,r,'j
y I
I I
Ej /
CHECKED BY
Cd' MU DISTRICT
.C.-
UNITS
VALUATIONOFFICE
MECHANICAL FEE
$
'4i
_"3 T `�
f
�`
DBL
$24541
T.P
TYPE
LEGAL DESCRIPTION
'7
RMIT NUMBER
CONSTRUCTION FEE
• DBL
$
PLAN CHECKER
—
SUPP. TO PERMIT
ELECTRICAL FEE
f
4`
� .. 4 ! - C- 6 o �o
DBL
BOND $
BOND
CASH
PLAN FILEff FINAL
DATE
INSPECTOR
PLUMBING FEE
$
I
I
}
TRAILER PERMIT
NAME OF, CONSTRUCTION LENDERBRANCH
OFFICE
NO LNDER
ISSUANCE FEE
$
INVCLV ED
•
ADDRESS
CRY-
STATE
FEE
$
t. ! T j ✓ 6 E) 7!�
y''`•
i.✓ a s
TOTAL FEES
$
THIS PERMIT SHALL BECOME VOID IF WORK IS NOT COMMENCED WITHIN 60 DAYS. CESSATION
OF.WORK FOR 120 DAYS SHALL ALSO CAUSE PERMIT TO BECOME VOID.
I HEREBY AGREE THAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN AC-=OR-
CASH Q CHECK M.O.
N.C.
DANCE WITH THE LAWS OF RIVERSIDE COUNTY AND TH,E STATE OF CALIFORNIA. I ALSO AGREE TO
CARRY. COMPENSATION INSURANCE UPON MY EMPLOYEES. COMPLIANCE WITH THE LAWS OF THE STATE
RECEIVED BY SEWAGE SYSTEM
A"
OF CALIFORNIA COVERING CONTRACTORS IS ALSO GUARANTEED.
-AT
LL
P
I HEREBY CERTIFY THAT THE INDIVIDUA LWHO PREPARED THE PLANS AND SPECIFICATIONS HAS GONE
40 IN ACCORDANCE WITH SECTION 5541 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE
INFORMATION
OF CALIFORNIA
f'aJ4.T •'•�Y.°.t
O ter' F.•.., �- ,
S
CONTRACTOR
AD 7 p S j
ADDRESS
TEL. �
./
TEL. NO.
LICENSE NO.
F(1D �• 'lRI.7/\R IDC\/ 1 'lfll
/ele [5/
Cl� �..
_..
rNA
TITLE 24 REPORT FOR:
NEWELL W. ACkKERSON
��.d/3r5—HIGHLAND PALMS
LA C�lfIh�TA, CALIFORNIA
PROJECT DESIGNER:
PALM SPRINGS DESIGN GROUP
4501 E . SUNNY DUNES ROAD
PALM SPRINGS, CA 96
(619) 30-1211
OWNER:
REPORT PREPARED BY:
JOHN H HACKER AND ASSOCIATES
4501 E SUNNY DUNES ROAD SUITE D
PALM SPRINGS CA 964
619 327-4565 CA LICENSE RCE 14514
Job Number:
Date: 10/22/1992
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has interim approval
and is authorized by the California Energy Commission for use with the
Second Generation Nonresidential Building Energy/ Efficiency Standards
for Nonresidential Occupancies. Second Generation Residential Occupancies
shown to comply with this program conform to the results produced by the
Public Domain Point System, developed by the California Energy Commission.
This program developed by Gabel Dodd Associates (415) 428-0803.
Table Of Contents for Title 24 Report
-------------------------------------
Cover Page.... ................. ...................................... 1
Table of Contents ..:.............................................
Farm CF71R Certificate of Compliance: Residential ................... 3
Form MF -1R Mandatary Measures Checklist: Residential ................ 6
Form P -2R Point System Summary ...................................... 8
Form WS -4 HVAC System Summary Sheets ............................... 13
Form CF -4 HVAC Summary ................................. ........... 11
Farm WS A R Paints Thermal Mass Worksheet ............................ 21
HVAC Zone & Space Leads Summary ..................................... 22
Domestic Hot Water Worksheet ........................................ 25
Farm WS -5A Lighting Controls Credit Worksheet .......................E,
CERTIFICATE OF COMPLIANCE: Residential (part 1 of 3) CF -1R page 3 of 2E
------7--------------------------------------------------------------------
Project: NEWELL W. ACKERSON ; COMPLY 24 v 3.20
Designer: PALM SPRINGS DESIGN GROUP ; Building Permit No
------------------
Location: Indio Date: 10/22/1992! Checked By
' ------------------
Documentation: �n: JOHN H HACKER AND ASSOCIATES ; Date (User # 2655)
------------------7--------------------------------------------------------
PROJECT ADDRESS Job Q
HIGHLAND PALMS
LA OUINTA, CALIFORNIA
GENERAL INFORMATION
Compliance Method: Point System
Climate Zone: 15
Total Conditioned Floor Area: 2227 sqft
Building Occupancy: Single Fam Det
Front Entry Orientation: East
Number of Dwelling Units: 1
Floor Construction Type: Slab
Infiltration Control: Standard
BUILDING SHELL INSULATION
Component Area U -Value
R-11 Frame Wall 955 0.0978
R-19 Frame Wall 375 0.0655
R-19 Roof/Gyp Ceiling 1789 0.0517
R-38 Roof/Gyp Ceiling 426 0.0288
Exposed Slab 340 0.9000
Carpeted Slab 1887 0.7200
Location/Comments
EXISTING W/ADDITION
EXISTING W/ADDITION
EXISTING W/ADDITION
EXISTING W/ADDITION
EXISTING W/ADDITION/Insul = R-0.0
EXISTING W/ADDITION/Insul = R-0.0
THERMAL MASS Thick:
Mass Material Area (in) Type Location/Description
--------------------- ---- ----- ------ ------------------------------
Concrete, Heavyweight 340 4.000 Exposed EXISTING W/ADDITION/Int Mass
Concrete, Heavyweight 1887 4.000 Covered EXISTING W/ADDITION/Int Mass
CERTIFICATE OF COMPLIANCE: Residential (part 2 of Si CF -1R page 4 of 26
------ 7--------------------------------------------------------------------
Pnoject: NEWELL W. ACKERSON 1 COMPLY 24 v 8.20
Designer: PALM SPRINGS DESIGN GROUP i Building Permit No
------------------
Location: India Date: 10/22/19921 Checked By
Documentation: JOHN H HACKER AND ASSOCIATES ! Date (User # 2655)
----------------------- =---------------------------------------------------
GLAZING Glass w/Int
Location Orient Area Type U -Val SC Shade Description
--------- ------ ----- ------ ----- ----- ----- -----------------------
EXISTING W/ADDITION
West 24.0 Single 1.10 1.00 0.34 Single/Light Blinds
East 9.0 Double 0.65 0.88 0.33 Double/Light Blinds
East 24.0 Single 1.10 1.00 0.34 Single/Light Blinds
North 40.0 Single 1.10 1.00 0.34 Single/Light Blinds
South 64.0 Single 1.10 1400 0.34 Single/Light Blinds
North 6.0 Double 0.65 0.88 0.88 Double/No Int Shades
South 40.0 Double 0.65 0.88 0.33 Double/Light Blinds
West 127.0 Double 0.65 0.88 0.33 Double/Light Blinds
Skylt 12.0 Double 0.65 0.88 0.88 Double/No Int Shades
SHADING (for Glazing above) Over
Location Exterior Device SC hang Framing Type
--------- ------------------------ ---- ---- -----------------------
EXISTING W/ADDITION
50 X Bug Screen 0.84 2.0 Metal w/o Mullions
50 X Bug Screen 0.84 6.0 Metal w/• � Mullions
50 X Bug Screen 0.84 2.0 Metal w/o Mullions
50 % Bug Screen 0.84 2.0 Metal w/o Mullions
50 % -Bug Screen 0.84 2.0 Metal w/o Mullions
None 1.00 2.0 Metal w/• � Mullions
50 X Bug Screen 0.84 2.0 Metal w/o Mullions
50 % Bug Screen 0.84 2.0 Metal w/o Mullions
ins
Nene . 1.00 0.0 Metal. w/o Mullions
CERTIFICATE OF COMPLIANCE: Residential (part 3 of 3) CF -1R page 5 of 26
---------------------------------------------------------------------------
Project: NEWELL W. ACKERSON COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP Building Permit No
------------------
Location: Indic, Date: 10/22/19921 Checked By
Documentation: JOHN H HACKER AND ASSOCIATES : Date (User ## 2655)
---------------------------------------------------------------------------
HVAC SYSTEMS Minimum Output Duct Duct Manufacturer/Model No.
System Type Efficiency (Btuh) Location RVal (or approved equal)
----------- ---------- ---------------------- ---- -----------------------
Gas Fired 0.734 SE 5846=1 Vent. Attic Space 5.2 Day&Night 5BOBV048074
Air Cond 10.000 SEER 48500 Vent. Attic Space Day&Night 580BV04eO74
Zane Furnace Max: 1.3 x 1 47261 Btuh + (lig x 2227 sgft)7 = 90390 Btuh
Cooling Exception: ------ CFP? Cooling (see Load Calcs) requires ------ Btuh
HOT WATER SYSTEMS Tank Manufacturer/Madel No. # of Energy R-12
System Type Volume (� �r approved equal) Sys Credits Blanket
Gas Fired 50.0 Std Gas 50 gal or less 1 i_) Y
SPECIAL FEATURES/REMARKS (Add extra sheets if necessary)
---------------------------------------------------------------------------
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Chapter 2-53 and Title 20,
Chapter- 2, Subchapter 4, Article 1 of the California Administrative Cade.
This certificate has been signed by the individual with overall design
responsibility and the building owner, who shall retain a copy of it and
transmit the certificate to any subsequent purchaser of the building. When
this Certificate of Compliance is submitted for a single building plan to
be built in multiple orientations, all building conservation features which
vary are indicated in the Special Features/Remarks section.
DESIGNER
PALM SPRINGS DESIGN! GROUP
4501 E. SUNNY DUNES ROAD
PALM SPRINGS, CA 9264
(619) 3WAIL11
License
Signed: -Q ---------------------
(Date)
DOCUMENTATION AUTHOR
JOHN H HACKER AND ASSOCIATES
4501 E SUNNY DUNES ROAD SUITE D
PALM SPRINGS CA 9264
619 327-4565 CA LICENSE RCE 14614
Signed: - -----
Date)
BUILDING OWNER
Signed: ...........................
(Date)
ENFORCEMENT AGENCY
Name:
Agency: ---------------------------
Telephone:
------------------------
Signed:
-...........................
MANDATORY
-----------
MEASURES CHECKLIST (part 1 of 2)
----------------------------------------------------------------
MF -1R page
6 of 26
Pnoject:
NEWELL W. ACKERSON
COMPLY 24
v 3.20
Designer:
PALM SPRINGS DESIGN GROUP
------------------
Building Permit No
Location:
Indica Date:
10/2/1992!
Checked By
Documentation:
---------------------------------------------------------------------------
JOHN H HACKER AND ASSOCIATES
;
Date (User
# 2655)
NOTE: Lowrise residential buildings subject to the Standards must contain
these measures regardless of the compliance approach used. Items marked
with an asterisk (*) may be superseded by more stringent compliance
requirements listed on the Certificate of Compliance. When this checklist
is incorporated into the permit documents, the features noted shall be
considered by all parties as binding minimum component performance
specifications for the mandatory measures whether they are shown elsewhere
in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES Enforcement
o Sec. 2-5352(a): Minimum ceiling_ insulation R-19
weighted average. *
o Sec. 2-5352(b): Loose fill insulation manufacturers
labeled R -Value.
o Seca -535 (c): Minimum wall insulation in framed walls R-11
weighted average (does not apply to exterior mass walls).
o Sec. 2-5352(k): Slab edge insulation - water- absorption _rption rate
no greater than 0.3%, water vapor transmission rate no
greater than 2.0 perm/inch.
o Sec. 2-5311: Insulation specified or installed meets.
California Energy Commission (CEC) quality standards.
Indicate type and form.
o Sec. 2-5352(f): Vapor barriers mandatary in Climate Zones 14
and 16 only.
o Sec. -5317: Infiltration/E filtration Controls
a. Doors and windows, between conditioned and .unci �nditi� �ned
spaces designed to limit air leakage.
b.
Doors and windows certified.
c. Doors and windows weatherstripped; all joints and
penetrations caulked and sealed.
o Sec. 2-5352(e): Special infiltration barrier installed to
comply with Sec. .5351 meets CEC quality standards.
o Sec. -535(d): Installation
of Fireplaces
1. Masonry and factory -built fireplaces have:
a. Tight fitting, closeable metal or glass door
b. 0utside air intake with damper and control
c. Flue damper and control
-2.,No continuous burning gas pilots allowed.
MANDATORY MEASURES CHECKLIST (part 2 of 2) MF-1R page 7 of 26
------ 7--------------------------------------------------------------------
Pr� eject: NEWELL W. ACKERSON COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP 1 Building Permit No
' ------------------
Location: Indite Date: 10/22/19921 Check: ed By.
------------------
Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 2655)
---------------------------------------------------------------------------
HVAC AND PLUMBING SYSTEM MEASURES
o Sec. 2-5352(g) and -5303: Space conditioning equipment
sizing: attach calculations.
o Sec. 5352(h) and 2-5315: Setback: thermostat on all
applicable heating systems.
o Sec. -5316(a): Ducts constructed, installed and insulated
per Chapter 10, 1976 UMC.
o Sec. -5316(b): Exhaust systems have damper controls.
o Sec. -5314((): Gas-fired space heating equipment has
intermittent ignition devices.
o Sec. 3-5314: HVAC equipment, water heaters, showerheads and
. faucets certified by the CEC.
o Sec. 2-5352(i): Water heater insulation blanket (R-1:' or
greater) for storage & backup tanks for solar water heating_
systems; first 5 feet of pipes closest to tank insulated
(R-3 or greater) .
o Sec. 2-5312 (Exception I) : Pipe in ulation on steam and steam
condensate return & recirculating piping.
o Sec. 5318(d): Swimming Pool Heating
1. System has:
a. On/off switch on heater.
b. Weatherproof instruction plate on heater.
c. Plumbed to allow for solar.
2. 75 percent thermal efficiency.
3. Pool cover.
4. Time clock.
5. Directional water inlet.
LIGHTING AND APPLIANCE MEASURES
o Sec. 2-5352(j): Lighting - 25 lumens/watt or greater for
general lighting in kitchens and bathrooms.
o Sec. -5314(c): Gas fired appliances equipped with
intermittent ignition devices.
o Sec. -5314(a): Refrigerators, refrigerator -freezers,
freezers and fluorescent lamp ballasts certified by the CEC.
Indicate make and model number.
Enforcement
POINTS SYSTEM SUMMARY: CLIMATE
--------------------------------
ZONE 15
---I---------------------------------------
P -'R page 8
of 26
Pyoject:
NEWELL W. ACKERSON
;
COMPLY 24 v
3.20
Designer:
PALM SPRINGS DESIGN GROUP
;
Building Permit
No
Location:
Indi
�.-,
Date: 10/22/1992;
;
------------------
Checked By
Documentation:
---------------------------------------------------------------------------
JOHN H HACKER AND
ASSOCIATES
;
Date (User #
2655)
BUILDING
-------------
DATA
Conditioned
Floor Area 2227 sgft
Number of
Stories
1
Occupancy
Type Single
Fam Det
SCORE
CARD
Measure
Points
1.
Roof Insulation
0.0473
(U -Value)
-7
2.
Wall Insulation
O.Oe87
(U -Value)
-5
3.
Raised Floor Insulation
0.0000
(U -Value)
3a. -Controlled
Vent Crawlspace
0.0
(R -Value)
4.
Slab Edge Insulation
0.7737
(f2 factor)-!
5.
Infiltration
Standard
0
6.
Glass Heat Loss
0.85
15.57
-6
Sum 1-6
-lE'
7.
Shade Open Area % Glass
------------
SC
OH Eff
%
a.
N� Wirth 46. 0 2.1
----
x 0.81
---- -----
=
1.7
i)
b.
East 50.0 1.5
x 0.80
x 0.79 =
0.9
0
c.
S-:,uth 104. 0 4.7
x 0.79
x 0.83 =
3.1
i)
d.
West 151.0 6.8
x 0.75
x 0.88 =
4.5
1
e.
Skylight 12.0 0.5
x 0.77
=
0.4
0
8.
Shade.Closed Area % Glass
------------
SC
OH Eff
a.
North 46.0 2.1
----
x 0.35
---- -----
=
0.7
i)
b.
V .J
East 33.0 1.5
x 0.28
x 0.68 =
0
c.
South 104.0 4.7
x 0.28
x 0.63 =
0.8
8
d.
West 151.0 6.8
x 0.2e
x O.e2 =
1.6
-1
e.
Skylight 12.0 0.5
x 0.77
=
0.4
-3
9.
Interior Thermal Mass
2.26
0
10.
Exterior Wall Mass
0.00
0
Sum 7-10
3
11.
Heating System 0.734 SE
x om
Duct Eff =
0.61
Eff SE
2
Zonal ControlNo
12.
Coaling System 10.000 SEER
x 0.82
Duct Eff =
8.20
Eff SEER
13
13.
Water Heating (see DHW Worksheet)
0
Point
Total:
0
HVAC EQUIPMENT &,ZONING SUMMARY FORM (part 1 of ) CF -4 page 9 of 26
------ 7--------------------------------------------------------------------
Prpject: NEWELL W. ACKERSON COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP Building.Permit No
' ------------------
Location: Indic, Date: 10/22/19921 Checked By
Documentation: JOHN H HACKER AND ASSOCIATES t Date (User # 2b55.)
-------------------------------------- =---- =-------------------------------
SYSTEM EQUIPMENT SUMMARY
No Heating Cooling
No System Name System Type Sys Output COP Output EER
---------------------------------------- --- ------ ----- ------ -----
SYSTEM FAN SUMMARY (for Systems Above)
Min Supply Fan Return Fan Economizer
No Fan Type Ratio CFM BHP Eff CFM BHP Eff Type Temp
---
-------------- ----- ----- ------ ---- ----- ------ ---- ---- ----
HVAC EQUIPMENT & ZONING SUMMARY FORM (part 2 of 'mo) CF-4 page 10 --If 26
---------------------------------------------------------------------------
Project: NEWELL W. ACK*ERSON f COMPLY 24 v "31.2'0
--------------
Designer: PALM SPRINGS DESIGN GROUP Building Permit No
Location: Indic Date: 10/22/19921 Checked By
Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 4615115)
---------------------------------------------------------------------------
SYSTEM/ZONING SUMMARY
No
Zone/Spaces Served Central/Zonal System System Type Sys
------------------------------------------------------------------ ---
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page it of 26
---------------------------------------------------------------------------
Prpject: NEWELL W. ACK:ERSON 1 COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP Building Permit No
,
------------------
Location: India Date: 10/'2'2/199'x: Checked T-
D� �cumentati� Win: "JOHN H HACKER AND ASSOCIATES i Date(User # 2655)
---------------------------------------------------------------------------
Assembly Name: R-11 Frame Wall
Assembly Type: Wall
Assembly Tilt: 90 deg t.Vertical?
Framing Percentage: 15.0
Framing Material: Softwood, Douglas Fir -Larch
Sk:et ch of Construction Assembly
Calculation for Framing Adjustment
Summer U -Value
0.0793 x O. 85 + O. 1969 x 0.15 = 0.0969
Winter U -Value
0. 6798 x 0. 85 + 0. 2000 x 0. 15 = Oi 0978
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Stucco, Wood Shingles
Weight: 1.3 lb/sqft
Heat Capacity: 2.88
R -Value
10.32 10.22
U -Value 0.0969 0.0978
Th
R -Val Lie
Construction Components
=--------------------------------------------------------------------------
Fr (in)
Summer
Winter
Outside Air Film
0.25
0.17
1. Stucco,
0.875
0.17
0.17
2. Membrane, Vapor -Permeable Felt
0.010
0.06
0.06
3. Insulation, Mineral Fiber, R-11
3.500
11.00
11.00
4. Gypsum or Plaster Board
0.500
0.45
0.45
J.
G .
7.
8.
Inside Air Film
---------------------------------------------------------------------------
0.68
0.68
Total
1.61
12.53
Framing Percentage: 15.0
Framing Material: Softwood, Douglas Fir -Larch
Sk:et ch of Construction Assembly
Calculation for Framing Adjustment
Summer U -Value
0.0793 x O. 85 + O. 1969 x 0.15 = 0.0969
Winter U -Value
0. 6798 x 0. 85 + 0. 2000 x 0. 15 = Oi 0978
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Stucco, Wood Shingles
Weight: 1.3 lb/sqft
Heat Capacity: 2.88
R -Value
10.32 10.22
U -Value 0.0969 0.0978
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
CF -3 page 12
of 26
Project: NEWELL W. ACKERSON
1
COMPLY 24 v
3.20
Designer: PALM SPRINGS DESIGN GROUP
f
------------------
Building Permit
No
Location: India Date:
'
10/22/1992
------------------
Checked By
0.17
Documentation: JOHN H HACKER AND ASSOCIATES
---------------------------------------------------------------------------
;
Date (User #
2655)
Assembly Name: R-19 Frame Wall
Assembly Type: Wall
Assembly Tilt: Sir deg (Vertical)
Framing Percentage: 15.0
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Calculation for Framing Adjustment
Summer U -Value
0.0515 % 0.85 + 0.1416 x 0.15 = 0.0650
Winter U -Value
0.0517 x 0.85 + 0.1433 .v, 0.15 = 0.0655
_OVERALL VALUES ADJUSTED FOR FRAMING
Wood Shingles
13.2 lb/sqft
R -Value
15.38 15.8
U -Value 0.0650 0.0655
Th
R -Val 1_te
Construction �n C• �mp� �nents
Fr (in)
Summer
Winter
Outside Air Film
0. 25
0. 17
1. Stucco -
0.875
0.17
0.17
2. Membrane, Vapor -Permeable Felt
0.010
0.06
0.06
S. Insulation, Mineral Fiber, R-17.8
* 5.500
17.BO
17.60
4. Gypsum or Plaster Beard
0.500
0.45
0.45
C
6.
7.
8.
9
Inside Air Film
---------------------------------------------------------------------------
0.68
0.68
Total
19.42
19.88
Framing Percentage: 15.0
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Calculation for Framing Adjustment
Summer U -Value
0.0515 % 0.85 + 0.1416 x 0.15 = 0.0650
Winter U -Value
0.0517 x 0.85 + 0.1433 .v, 0.15 = 0.0655
_OVERALL VALUES ADJUSTED FOR FRAMING
Wood Shingles
13.2 lb/sqft
R -Value
15.38 15.8
U -Value 0.0650 0.0655
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
---------------------------------------------------------------------------
CF -3 page
13 of 26
Pr,o ject: NEWELL W. ACKERSON
1
COMPLY 24
v 3.20
Designer: PALM SPRINGS DESIGN GROUP
------------------
Building Permit
No
L'ocation: India Date:
'
10/22/1992;
------------------
Checked By
0.33
Documentation: JOHN H HACKER AND ASSOCIATES
---------------------------------------------------------------------------
'
f
------------------
Date (User
# 2655)
Assembly Name: R-19 Roof/Gyp Ceiling
Assembly Type: Roof e
Assembly Tilt: 0 deg (Horizontal Roof)
Total 22.58
Framing Percentage: 10.0 7.
Framing Material: Softwood, Douglas Fir -Larch
-------------------------------
Sketch of Construction Assembly
22.12
Calculation for Framing Adjustment
Summer U -Value
0.0443 x 0.90 + 0.1051 x 0.10 =.0.0504
Winter U -Value
0.0452 x 0.90 + 0.1104 % 0.10 = 0.0517
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 7.7 lb/sqft
Heat Capacity: 2.45
R -Value
19. 85 19.33
U -Value 0.0504 0.0517
Th
R -Value
Construction Components
---------------------------------------------------------------------------
Fr (in)
Summer
Winter
Outside-Air Film
0.25
0.17
1. Roofing, Built -Up
0.375
0.33
0.33
2. Plywood
0. 500
0.63
0.63
3. Air Space
12.000
1.00
0.13
4. Insulation, Mineral Fiber, R-19
6.000
19.00
19.00
5. Gypsum or Plaster Beard
0.500
0.45
0.45
6.
7.
S.
9.
Inside Air Film
---------------------------------------------------------------------------
0.92
0.61
Total 22.58
Framing Percentage: 10.0 7.
Framing Material: Softwood, Douglas Fir -Larch
-------------------------------
Sketch of Construction Assembly
22.12
Calculation for Framing Adjustment
Summer U -Value
0.0443 x 0.90 + 0.1051 x 0.10 =.0.0504
Winter U -Value
0.0452 x 0.90 + 0.1104 % 0.10 = 0.0517
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 7.7 lb/sqft
Heat Capacity: 2.45
R -Value
19. 85 19.33
U -Value 0.0504 0.0517
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
---------------------------------------------------------------------------
CF
-3 page
14 of 26
Project: NEWELL W. ACKERSON
}
COMPLY 24
v 3.20
Designer: PALM SPRINGS DESIGN GROUP
0.25
------------------
Building Permit
No
Location: Indio Date:
'
10/2/1' 92:
------------------
Checked By
2. Plywood
Documentation:' JOHN H HACKER AND ASSOCIATES
----------------------------------------------------------------------------
1
Date (User
# 2655
Assembly Name: R-38 Roof/Gyp Ceiling
Assembly Type: Roof
Assembly Tilt: 0 deg (Horizontal Roof)
Framing Percentage: 10.0
Framing Material: Softwood, Douglas Fir -Larch
,
Sketch of Construction Assembly
Calculation for Framing Adjustment
Summer U -Value
0.0341 x 0.90 + 0.0668 x 0. 10 = 0. 0263
Winter U -Value
0.0243 x 0.96 + 0.0690 x 0.10 = 0.0288
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 8.6 lb/sqft
Heat Capacity: 3.11
R -Value 35.30 34.74
U -Value 0_0283 00288
Th
R -Value
Constnuction Components
---------------------------------------------------------------------------
Fr (in)
Summer
Winter
Autside Air Film
0.25
0.17
1. Roofing, Built -Up
0.375
0.33
0.33
2. Plywood
0.500
0.63
0.63
3. Air Space
12.000
1.00
0.93
4. Insulation, Mineral Fiber, R-38
11.500.
38.00
38.00
5. Gypsum or Plaster Beard
0.500
0.45
0.45
G.
7.
8.
S.
Inside Air Film
---------------------------------------------------------------------------
0.92
0.61
Total
41.58
41.12
Framing Percentage: 10.0
Framing Material: Softwood, Douglas Fir -Larch
,
Sketch of Construction Assembly
Calculation for Framing Adjustment
Summer U -Value
0.0341 x 0.90 + 0.0668 x 0. 10 = 0. 0263
Winter U -Value
0.0243 x 0.96 + 0.0690 x 0.10 = 0.0288
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 8.6 lb/sqft
Heat Capacity: 3.11
R -Value 35.30 34.74
U -Value 0_0283 00288
CONSTRUCTION ASSEMBLY COMPLIANCE FORM I
------
CF
-3 page
10 of 26
7--------------------------------------------------------------------
Pr.� �.ject: NEWELL W. ACKERSON
1
,
COMPLY 24
v 3.20
Designer: PALM SPRINGS DESIGN GROUP
f
------------
Building Permit
No
Location: Indio Date:
'
10/22/1992;
1
------------------
Checked By
2. Flogging, Carpet and Fibrous Pad
3
Documentation; �n; JOHN H HACKER AND ASSOCIATES
=--------------------------------------------------------------------------
:
-------------A-
Date (User
# ": 655.)
Assembly Name: Carpeted Slab
Assembly Type: Floor
Assembly Tilt: 180 deg THorizontal Floor)
Framing'Percentage: 0.0
Framing Material: NONE
-------------------------------
, i
1
1 1
1 1
1 ,
1
1 1
, 1
,
1 1
i 1
, 1
1 ,
1
1 �
1 1
1 ,
1 ,
1 ,
1 1
1 ,
1 1
Sketch of Construction Assembly
Total
- 4
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb/sgft.
Heat Capacity: 9.01
R -Val ue
- 3.45
U -Value 0.3106 0.2899
Th
R -Value
Construction Components
Fr tin?
Summer
Winter
---------------------------------------------------------------------------
Outside Air Film ,
0.25
0.17
1. Concrete, 140 lb, Not Dried
3.500
0.28
0.28
2. Flogging, Carpet and Fibrous Pad
3
0.250
2.08
2.08
4.
5
G .
7.
B.
9.
Inside Air Film
---------------------------------------------------------------------------
0.61
0.92
Framing'Percentage: 0.0
Framing Material: NONE
-------------------------------
, i
1
1 1
1 1
1 ,
1
1 1
, 1
,
1 1
i 1
, 1
1 ,
1
1 �
1 1
1 ,
1 ,
1 ,
1 1
1 ,
1 1
Sketch of Construction Assembly
Total
- 4
OVERALL VALUES ADJUSTED FOR FRAMING
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb/sgft.
Heat Capacity: 9.01
R -Val ue
- 3.45
U -Value 0.3106 0.2899
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 16 of 26
---------------------------------------------------------------------------
Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20
Designer: PALM SPRINGS.DESIGN GROUP Buildinq Permit No
------------------
Location: India Date: 10/22/15521 Checked By
------------------
Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 2655)
Assembly Name: Exposed used Slab
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Framing Percentage: 0.0 %
Framing Material: NONE
-------------------------------
OVERALL VALUES ADJUSTED FOR FRAMING
Sketch :of Construction Assembly
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.5 lb/sqft
Heat Capacity: 5.30
R -Value
1.19 1.42
U -Va 1 ue 0.8403 0.7042
Th
R -Val Lie
Construction Components
---------------------------------------------------------------------------
Fr (in)
Summer
Winter
Outside Air- Film
0.25
0.17
1: Concrete, 140 lb, Not Dried
3.500
0.28
0.28
2. Flooring, Asphalt, Ling, Vinyl or Rubber
3.
0.010
0.05
0.05
4.
5.
6.
7.
6.
5.
Inside Air Film
---------------------------------------------------------------------------
0.61
0.92
Total
1.15
1.4
Framing Percentage: 0.0 %
Framing Material: NONE
-------------------------------
OVERALL VALUES ADJUSTED FOR FRAMING
Sketch :of Construction Assembly
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.5 lb/sqft
Heat Capacity: 5.30
R -Value
1.19 1.42
U -Va 1 ue 0.8403 0.7042
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -0 page 17 of 2G
--------------------------------------------------------------=----------=-
Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP Building Permit No
' ------------------
Location: India Date: 10/2/1992: Checked By
------------------
Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 2655)
---------------------------------------------------------------------------
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Th R -Val Lie
Construction Components Fr (in) Summer Winter
------------------------------7--------------------------------------------
Outside Air Film 0.25 0.17
1. Softwood, Douglas Fir -Larch 1.750 1.70 1.75
2.
3.
4.
5. .
V .
7.
8 .
J .
Inside Air Film 0.68 0.68
---------------------------------------------------------------------------
Framing Percentage: 0.0
Framing Material: NONE
Total 2.66 2.58
-------------------------------
OVERALL VALUES ADJUSTED FOR FRAMING
Sketch of Construction Assembly
Absorptivity: •
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
5.1 lb/sqft
1.99
R -Value
2.66 2.58
U -Value 0.0756 0.0872
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
---------------------------------------------------------------------------
CF -3 page
18 of 26
Pnoject: NEWELL W. ACKERSON
COMPLY 24
v 3.20
Designer: PALM SPRINGS DESIGN GROUP_
Building Permit No
Location: Indic Date:
'
10/22/1992:
------------------
Checked By
Documentation: JOHN H HACKER AND ASSOCIATES
-------------------------------------- ------------------------------------
!
Date (User
## 655 )
Assembly Name: Single/Light.Blinds
Assembly Type: Glazing
Th R -Valu e
Construction Components Fr Cin? Summer Winter
-------------------------------------------------- ------------------------
Outside Air Film 0.25 0.17
1. CEC Single Glazing 0.125 0.06 0.06
2.
3
J
4.
5.
6.
7.
S.
9.
Inside "Air Film 0.68 0.68
---------------------------------------------------------------------------
Framing Percentage: 0.0 %
Framing Material: NONE
-------------------------------
,
,
,
Sketch of Construction Assembly
Winter Shading Coefficient: 1.00
Summer Shading Coefficient: 0.24
Total
0.99 0.91
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value
0.99 0.91
U -Value 1.0110 1.1000
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 19 of 26
---------------------------------------------------------------------------
Pno.ject: NEWELL" W. ACKERSON 1 COMPLY 24 v 3.20
Designer: PALM SPRINGS DESIGN GROUP. P�_�ilding Permit Nc,
' ------------------
Location: Indic Date: 10/22/1992: Checked By
Documentati� Win: JOHN H HACKER AND ASSOCIATES i Date (User # 2655)
Assembly Name: Double/No Int Shades
Assembly -Type: Glazing
Th R -Value
Construction Components Fr (in) Summer Winter
-
--------------------------------------------------------------------------
Outside Air Film 0.25 0.17
1. CEC Double Glazing 0.500 0.69 0.69
2.
3 '
u.
'4.
5.
G.
7.
S.
9.
Inside Air Film 0.68 0.66
---------------------------------------------------------------------------
Framing Percentage: 0.0 %
Framing Material: NONE
-
------------------------------
,
Sketch of Construction Assembly
Winter Shading Coefficient: 0.88
Summer Shading Coefficient: 0.88
Total 1.62 1.54
OVERALL VALUES ADJUSTED FOR FRAMING
R -Va 1 ue
1.62 1.54
U -Value 0.6179 0.6500
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 20 of 26
------ 7--------------------------------------------------------------------
Pr:oject: NEWELL W. ACKERSON f COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP_. Building Permit No
' ------------------
Location: Indian Date: 10/'22/1992; Checked By
Documentation: JOHN H HACKER AND ASSOCIATES : Date (User # 2655)
---------------------------------------------------------------------------
Assembly Namez Double/Light Blinds
Assembly Type: Glazing
Th R -Val ue
Construction Components Fr (in) Summer Winter
----------------------- ---------------------------------------------------
Outside Air Film 0.25 0.17
1. CEC Double Glazing 0.500 0.69 0.613
2.
3.
4.
5.
6.
7.
8.
r�
Inside Air Film 0.68 0.66
---------------------------------------------------------------------------
Framing Percentage: 0.0
Framing Material: NONE
-------------------------------
f
,
f
,
,
,
Sketch of Construction Assembly
Winter Shading Coefficient: 0.83
Summer Shading Coefficient: 0.33
Total 1.62 1.54
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value
1.62 1.54
U -Value 06179 0_6500
THERMAL MASS WO KSHEET
---------------------------------------------------------------------------
WS -1R page 21
of 26
Pryject; NEWELL W. ACKERSON
;
COMPLY 24
v 8.20
Designer: PALM SPRINGS DESIGN GROUP
Building Permit
No
Location: India Date:
10/22/1992:
------------
Checked By
Documentation: JOHN H HACKER AND ASSOCIATES
1
Date (User #
2650)
INTERIOR THERMAL MASS
Mass Material
----------------------
Concrete; Heavyweight
Concrete, Heavyweight
Sides Wall
Thick Exposed U -Valve
4.00 1
4.00 0
Interior Interior
Mass
Mass
Mass
Area
Factor
Capacity
840.0
x 4.7 =
1887.0
x 1.8 =
8484.8
TOTAL 5032. 8
INTERIOR MASS FACTOR 5032.3 IMC / 2227 sqft = 2.26
Mass listed above with a Wall U -Value denotes the Interior Mass credit
for Exterior Mass Walls, and ar, repeated below for Exterior Mass credit.
0 Sides Exposed indicates mass covered with surface material := R-2.
EXTERIOR MASS WALLS Exterior Exterior
Sides Wall Mass Mass Mass
Mass Material Think: Exposed U -Value Area Factor Capacity
---------------=------ ------------------- ------ -------- --------
NONE
HVAC ZONE
------
HEATING & COOLING LOAD SUMMARY
COOLING
page 22
of 26
7--------------------------------------------------------------------
Pr,_:ject:
NEWELL W. ACKERSON
LATENT
COMPLY 24 v
3.20
Designer:
PALM SPRINGS DESIGN GROUP
TOTAL SPACE LOAD
------------------
Building Permit No
Location:
Indio Date:
'
10/22/1992:
------------------
Checked By
2057
Documentation: JOHN H HACKER AND ASSOCIATES
---------------------------------------------------------------------------
Supply Duct Leakage
Date (User #
2655)
HVAC ZONE DESCRIPTION
HVAC Zane Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak: Load Method:
Relative Humidity:
EXISTING W/ADDITION
Day&Night 58OBV048074
Days<Ni gh t 5B BV046 X74
1
Residential Heating
Residential Cooling
Residential Occupancy
COINCIDENT
50 X
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety fatter, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback: thermostat. Those responsible for final
equipment selection should note that Sensible and Latent Cooling Loads are
indicated to allow for accurate comparison with, manufacturer's output data.
COOLING
SPACES IN THIS ZONE PEAK
----------------------- ----
HEATING
-------
PEAK SENSIBLE
LATENT
EXISTING W/ADDITION (Jan 12am)
45289
------------
(Aug wpm? 41155
------
1673
TOTAL SPACE LOAD
45289
41185
1670
Supply Duct Conduction
2264
2057
Supply Duct Leakage
906
823
GO
Ventilation ( 0 cfm)
0
0 cfm) 0
Q
Return Air Lighting Gain
0
Return Duct Conduction
485
440
Return Duct Leakage
969
880
34
Fan Motor Heat Gain
-2652
265
TOTAL SYSTEM LOAD
4761
47987
1737
SYSTEM OUTPUT AT DESIGN CONDITIONS
58460
34696
8967
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety fatter, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback: thermostat. Those responsible for final
equipment selection should note that Sensible and Latent Cooling Loads are
indicated to allow for accurate comparison with, manufacturer's output data.
RESIDENTIAL SPACE HEATING LOAD SUMMARY page 23 of 26
---------------------------------------------------------------------_------
Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP Building Permit No
--------
Location: Indic Date: 10/22/19921 Checked By
Documentation: JOHN H HACKER AND ASSOCIATES : Date (User # 2655)
----------------=----------------------------------------------------------
Space Name:
EXISTING W/ADDITION
Design Indoor Dry Bulb Temperature:
70 F
Design Outdoor Winter Dry Bulb
Temperature:
29 F
Design Temperature Difference:
41 F
Conduction
-----------------------
Area
U -Value
TD
Btu/hr
R-11 Frame Wall
------
355.0
x
-------
0.0978
x
----
41.0 =
------
3830
R-19 Frame Wall
375.0
x
_
0.0 GAJ 55
:;
41.0 =
1006
Solid -Wood Door
20.0
x
0.3872
x
41.0 =
318
Single/Light Blinds
153.0
x
1.1000
x
41.0 =
6855
Double/Light Blinds
176.0
x
0.6500
x
41.0 =
4690
Double/No Int Shades
6.0
x
0.6500
x
41.0 =
160
R-19 Roof/Gyp Ceiling
1789.0
x
0.0517
x
41.0 =
3735
R-36 Roof/Gyp Ceiling
426.0
x
0.0288
x
41.0 =
503
Double/No Int Shades
12.0
x
0.6500
x
41.0 =
320
Exposed Slab
Perim = 74.0
x
43 =
3183
Carpeted Slab
Perim = 174.0
x
43 =
746
Infiltration: -1.00 x 0.018 x
2227 sgft x 8.0
ft
x 1.00 AC
x
41.0 =
13148
TOTAL HOURLY
HEAT
LOSS FOR
SPACE
452813
SUPPLY AIR QUANTITY
-------------------
Heating: 45289 Btu/fir / [1.10 * (105 F Supply - 65 F TStat )] = 1029 cfm
RESIDENTIAL SPACE COOLING LOAD SUMMARY page 24 of 26
---------------------------------------------------------------------------
Project: NEWELL W. ACKERSON COMPLY 24 -v 3.20
Designer: PALM SPRINGS DESIGN GROUP B�_�ilding Permit N��
' ------------------
Lccaticn: Indic Date: 10/22/1992: Checked By
D� �cumentation: JOHN H HACKER AND ASSOCIATES f Date (User- # 2655)
---------------------------------------------------------------------------
Space Name:
Op Frac.
--------
Area
------
Heat Gain
---------
EXISTING W/ADDITION
Btu/hr
Design Indoor Dry Bulb
Temperature:
2227.0
x 0.000 x
-----
3.413
78 F
Occupants
Design Outdoor Summer
Dry Bulb Temperature:
x 225 /
300
112 F
Design Temperature Difference:
LATENT HEAT GAIN FOR
SPACE
1670
SUPPLY AIR QUANTITY
34 F
Conduction
-----------------------
Area
------
-------------------
Cooling: 41135 Btu/hr
U -Value
DETD
Btu/hr
R-11 Frame Wall
955.0
x
-------
0.0969 x
----
29.6 _
------
2739
R-19 Frame Wall
375.0
x
0.0650 x
29.6 =
73
Solid Wood Door
20.0
x
0.3756 x
29.6 _
222
Single/Light Blinds
152.0
x
1.0110 x
34.0 _
5225
Double/Light Blinds
176.0
x
0.6179 x
34.0 =
3697
Double/No Int Shades
6.0
x
0.6179 x
34.0 =
126
R-19 Roof/Gyp Ceiling
1789.0
x
0.0504 x
50.0 _
4506
R-38 Roof/Gyp Ceiling
46.0
x
0.0283 x
50.0
603
Double/No Int Shades
12.0
x
0.6179 x
34.0 =
25
Infiltration: 1.00 x
0.018 x 2227
agft x 8.0
fit
x 1.00 At x
34.0 =
10903
Shaded
Unshaded
Solar Gain
-----------------------
Orient.
---------
Area SGF
---- ---
Area SGF
SC
Btu/hr
Single/Light Blinds
West
C 9.0 x 15
+
---- ---
15.0 x 733
----
x 0.29
------
= 353
Double/Light Blinds
East
C 8.6 x 15
+
0.4 x 731
x 0.28
= 45
Single/Light Blinds
East
C 12.0 x 15
+
12.0 x 731
x 0.29
= 303
Single/Light Blinds
North
C 0.0 x 15
+
40.0 x 153
x 0.29
= 172
Single/Light Blinds
South
C 64.0 x 15
+
0.0 x 321
x 0.29
= 276
Double/No Int Shades
North
C 0.0 x 15
+
6.0 x 153
x 0.77
= 70
Double/Light Blinds
South
C 40.0 x 15
+
0.0 x 321
x 0.28
= 167
Double/Light Blinds
West
C 38.1 x 15
+
88.9 x 733
x 0.28
= 1969
Double/No Int Shades
Skylight
C 0.0 x 15
+
12.0 x1523
x 0.77
= 1413
Internal Gain
-----------------------
Op Frac.
--------
Area
------
Heat .Gain
Conv.
Btu/hr
Lighting
Lighting
1.00
x 2227.0
x
---------
0.500 x
-----
3.413 =
-----
------
3800
Equipment
1.00
x 2227.0
x
0.250 x
3.413 =
1900
Occupants
1.00
x 2227.0
x
225 /
300 =
167o
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 41135
Latent Gain
-----------------------
Op Frac.
--------
Area
------
Heat Gain
---------
Conv.
Btu/hr
Equipment
1.00 x
2227.0
x 0.000 x
-----
3.413
------
= C>
Occupants
1.00 x
2227.0
x 225 /
300
= 1670
TOTAL HOURLY
LATENT HEAT GAIN FOR
SPACE
1670
SUPPLY AIR QUANTITY
-------------------
Cooling: 41135 Btu/hr
/ E1.08 * C 78
F TStat
- 55 F Supply) 3 =
1656 cfm
DHW WORKSHEET ONE: STORAGE TYPE GAS OR ELECTRIC page 25 of 26
---------------------------------------------------------------------------
Pro je cit : NEWELL W. ACKERSON 1 COMPLY 24 _v 3.20
------------------
Designer: PALM SPRINGS DESIGN GROUP Building Permit No
------------------
Locati� Win: India Date: 10/22/1992: Checked By
Documentation: JOHN H HACKER AND ASSOCIATES ; Date (User # 655)
---------------------------------------------------------------------------
A EOUIPMENT DATA
1
Water heater type
SG
Enter SG or SE
Manufacturer 94
Water heating budget
18700
3
Madel number
3
Std Gas 50 gal or less
4
Ignition device
GP
GP, gas pilot or IID, int. ignition device
5
Tank volume
50.0
Total gallons, from CEC Appliance Directory
6
Recovery efficiency
76.0
Percent from CEC Appliance Directory
7
Standby loss
3.1
Percent/hour, from CEC Appliance Directory
8
Rated input
55000
Btu/hr, from CEC Appliance Directory
0.0205
See Table 2 or
Appendix B
(1 kWh = 3413 Btu)
9
Number of Heaters
1
From building plans (total)
lig
Insulation Jacket
Y
(Y/N) R-12 insulating jacket on the plans
B OPERATING DATA
1
Climate Zone
15
See Appendix. D
Water heating budget
18700
FBtu/yr/unit,
see Table 1
3
Tank set temp.
140
F, fixed input
4
Water main temp.
70.0
F, see Table 1
5
Daily hot water lead
50
50 or 35 gallons/unit,
see Table 1
6
Ambient "air temp.
72.6
F, see Table 1
7
Ad j Standby Losses
0.0205
See Table 2 or
Appendix B
8
No. dwelling units
1
From building
plans (total)
9
Number of pumps
0
From building
plans
10
Pumping energy
0.0
Watt-hr/yr per
Pump, see Table 3
C.
---------------------------------------------------------------------------
WATER HEATING ENERGY
CREDITS
1
Credit name
See Table 5
2
Annual savings,
0.0
kBtu/yr/dwelling
unit, see Table 5
D CALCULATE ANNUAL WATER HEATING ENERGY (KBtu/yr)
---------------------------------------------------------------------------
1 Recovery load 10539.4 VD5 x 8.25 x ( 140-B4) x 365 x 0. 001 3 -C2!x B8
2 Recovery energy 13867.6 D1 / AG
3 Standby loss energy 4839.6 {24 - C (D3 x 1000)/(AB x A9 x 36011 x 8.35
x A5 x B7 x 365 x (140-86) x 0.001 x A9
4' Pumping energy 0.0 B9 x B10 x 3.413 x 3 x 0.001
5 Total energy 18707.2 GAS SYSTEMS: (D2 + D3 + D4) / B8
ELECTRIC: TE (D2 + D3) x 33 + D41 / B8
6 Water heating budget
comparison -7.2 KBtu/yr/unit B2 - D5
7 Water heating budget -0.0 Paints (D6 / Floor Area) x 2 x B8