Loading...
204541 (SFD)DEPARTMENT OF BUILDING & SAFETY • COUNTY OF RIVERSIDE • CONSTRUCTION ESTIMATE �s ELECTRICAL FEES I ST FL. SQ. FT. @ 2ND FL. SQ. FT. @ POR. SQ. FT. @ GAR. 13 A SQ.FT. @ .✓ CAR P. SQ. FT. @ WALL SQ.FT. @ SQ. FT. @ ESTIMATED VALUATION Is �L MECHANICAL FEES VENT SYSTEM '-J• FAN ❑ EVAP. COOL (9 HOOD APPLIANCE FURNACE ❑ UNIT ❑ WALL ffr 'FL64 ❑ SUSPENDED AIR HANDLING UNIT CFM GAS PIPE ❑ NATURAL ❑ L.P.G. ❑ OIL COMPRESSOR HP APPLIANCE VENT ABSORPTION SYSTEM BJ.U. INCINERATOR ❑ DOMESTIC ❑ INDUS. OR COMM.' HEATING SYSTEM FORCED ❑ GRAVITY BOILER B.T.U. PERMIT FEE TRAILER ISSUANCE FEE -PERMIT FEE [Nei • FIELD OFFICE PLUMBING FEES •'t'; MOTOR I OR LESS H.P. 4 5 41ITOTALaFEES REN. TRAILER FEE J.EAT a VENT. FEE PL. CK. FEE CONST. MOTOR 5 OR LESS H.P. oBL. E FE Del. SPEC. INSP. FEE PLMUBING-FLEE DCL ` MOTOR 20 OR LESS H.P. DRAINAGE PIPING DRINKING FOUNTAIN _ _ ..J F - M. M A M .. _ J .J A _ S .�V A M J .J A S URINAL �K w. UNITS f WATER PIPING USE # JOB ADDRESS '`,'��i� OWNER - s_`1 FLOOR DRAIN __ M14 5j�� WATER SOFTENER SIGN WASHER (AUTC1�(DISH) .mf e+i" FORMER O K.W. GARBAGE DISPOSAL' " OUTLETS USE 6F B ILDINGE LAUNDRY TRAY FUTURE OR SOCKET ,,r,'j KITCHEN SINK I I CONST. SERV, ENTRANCE WATER CLOSET POLE CHECKED BY z LAVATORY a AMPERES SERV. ENT. j( / SHOWER ; SQ. FT. @ 4 / BATH TUB 1 5lp SQ. FT. @ 4 �` j WATER HEATER b -v SQ. FT. RESID. @ 14 . T.P SEWAGE DISPOSAL LEGAL DESCRIPTION '7 SQ. FT. GARAGE @I�214 CONSTRUCTION FEE HOUSE SEWER BALANCE OF MIN. FEE 1-;A4,S GAS PIPING ./ PERMIT FEE / PFRMIT FFF 11oh n ti{ PER 204541 4 5 41ITOTALaFEES REN. TRAILER FEE J.EAT a VENT. FEE PL. CK. FEE CONST. oBL. E FE Del. SPEC. INSP. FEE PLMUBING-FLEE DCL ` _ _ ..J F - M. M A M .. _ J .J A _ S .�V A M J .J A S 0 _ N Dc.a O N D -. — SET LOT SIZE USE # JOB ADDRESS '`,'��i� OWNER - s_`1 __ M14 5j�� R '� kJ 'GF .` ..`3 .mf e+i" ZONE _ - USE 6F B ILDINGE PLAN CHECK FEE $ ,,r,'j y I I I Ej / CHECKED BY Cd' MU DISTRICT .C.- UNITS VALUATIONOFFICE MECHANICAL FEE $ '4i _"3 T `� f �` DBL $24541 T.P TYPE LEGAL DESCRIPTION '7 RMIT NUMBER CONSTRUCTION FEE • DBL $ PLAN CHECKER — SUPP. TO PERMIT ELECTRICAL FEE f 4` � .. 4 ! - C- 6 o �o DBL BOND $ BOND CASH PLAN FILEff FINAL DATE INSPECTOR PLUMBING FEE $ I I } TRAILER PERMIT NAME OF, CONSTRUCTION LENDERBRANCH OFFICE NO LNDER ISSUANCE FEE $ INVCLV ED • ADDRESS CRY- STATE FEE $ t. ! T j ✓ 6 E) 7!� y''`• i.✓ a s TOTAL FEES $ THIS PERMIT SHALL BECOME VOID IF WORK IS NOT COMMENCED WITHIN 60 DAYS. CESSATION OF.WORK FOR 120 DAYS SHALL ALSO CAUSE PERMIT TO BECOME VOID. I HEREBY AGREE THAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN AC-=OR- CASH Q CHECK M.O. N.C. DANCE WITH THE LAWS OF RIVERSIDE COUNTY AND TH,E STATE OF CALIFORNIA. I ALSO AGREE TO CARRY. COMPENSATION INSURANCE UPON MY EMPLOYEES. COMPLIANCE WITH THE LAWS OF THE STATE RECEIVED BY SEWAGE SYSTEM A" OF CALIFORNIA COVERING CONTRACTORS IS ALSO GUARANTEED. -AT LL P I HEREBY CERTIFY THAT THE INDIVIDUA LWHO PREPARED THE PLANS AND SPECIFICATIONS HAS GONE 40 IN ACCORDANCE WITH SECTION 5541 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE INFORMATION OF CALIFORNIA f'aJ4.T •'•�Y.°.t O ter' F.•.., �- , S CONTRACTOR AD 7 p S j ADDRESS TEL. � ./ TEL. NO. LICENSE NO. F(1D �• 'lRI.7/\R IDC\/ 1 'lfll /ele [5/ Cl� �.. _.. rNA TITLE 24 REPORT FOR: NEWELL W. ACkKERSON ��.d/3r5—HIGHLAND PALMS LA C�lfIh�TA, CALIFORNIA PROJECT DESIGNER: PALM SPRINGS DESIGN GROUP 4501 E . SUNNY DUNES ROAD PALM SPRINGS, CA 96 (619) 30-1211 OWNER: REPORT PREPARED BY: JOHN H HACKER AND ASSOCIATES 4501 E SUNNY DUNES ROAD SUITE D PALM SPRINGS CA 964 619 327-4565 CA LICENSE RCE 14514 Job Number: Date: 10/22/1992 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has interim approval and is authorized by the California Energy Commission for use with the Second Generation Nonresidential Building Energy/ Efficiency Standards for Nonresidential Occupancies. Second Generation Residential Occupancies shown to comply with this program conform to the results produced by the Public Domain Point System, developed by the California Energy Commission. This program developed by Gabel Dodd Associates (415) 428-0803. Table Of Contents for Title 24 Report ------------------------------------- Cover Page.... ................. ...................................... 1 Table of Contents ..:............................................. Farm CF71R Certificate of Compliance: Residential ................... 3 Form MF -1R Mandatary Measures Checklist: Residential ................ 6 Form P -2R Point System Summary ...................................... 8 Form WS -4 HVAC System Summary Sheets ............................... 13 Form CF -4 HVAC Summary ................................. ........... 11 Farm WS A R Paints Thermal Mass Worksheet ............................ 21 HVAC Zone & Space Leads Summary ..................................... 22 Domestic Hot Water Worksheet ........................................ 25 Farm WS -5A Lighting Controls Credit Worksheet .......................E, CERTIFICATE OF COMPLIANCE: Residential (part 1 of 3) CF -1R page 3 of 2E ------7-------------------------------------------------------------------- Project: NEWELL W. ACKERSON ; COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP ; Building Permit No ------------------ Location: Indio Date: 10/22/1992! Checked By ' ------------------ Documentation: �n: JOHN H HACKER AND ASSOCIATES ; Date (User # 2655) ------------------7-------------------------------------------------------- PROJECT ADDRESS Job Q HIGHLAND PALMS LA OUINTA, CALIFORNIA GENERAL INFORMATION Compliance Method: Point System Climate Zone: 15 Total Conditioned Floor Area: 2227 sqft Building Occupancy: Single Fam Det Front Entry Orientation: East Number of Dwelling Units: 1 Floor Construction Type: Slab Infiltration Control: Standard BUILDING SHELL INSULATION Component Area U -Value R-11 Frame Wall 955 0.0978 R-19 Frame Wall 375 0.0655 R-19 Roof/Gyp Ceiling 1789 0.0517 R-38 Roof/Gyp Ceiling 426 0.0288 Exposed Slab 340 0.9000 Carpeted Slab 1887 0.7200 Location/Comments EXISTING W/ADDITION EXISTING W/ADDITION EXISTING W/ADDITION EXISTING W/ADDITION EXISTING W/ADDITION/Insul = R-0.0 EXISTING W/ADDITION/Insul = R-0.0 THERMAL MASS Thick: Mass Material Area (in) Type Location/Description --------------------- ---- ----- ------ ------------------------------ Concrete, Heavyweight 340 4.000 Exposed EXISTING W/ADDITION/Int Mass Concrete, Heavyweight 1887 4.000 Covered EXISTING W/ADDITION/Int Mass CERTIFICATE OF COMPLIANCE: Residential (part 2 of Si CF -1R page 4 of 26 ------ 7-------------------------------------------------------------------- Pnoject: NEWELL W. ACKERSON 1 COMPLY 24 v 8.20 Designer: PALM SPRINGS DESIGN GROUP i Building Permit No ------------------ Location: India Date: 10/22/19921 Checked By Documentation: JOHN H HACKER AND ASSOCIATES ! Date (User # 2655) ----------------------- =--------------------------------------------------- GLAZING Glass w/Int Location Orient Area Type U -Val SC Shade Description --------- ------ ----- ------ ----- ----- ----- ----------------------- EXISTING W/ADDITION West 24.0 Single 1.10 1.00 0.34 Single/Light Blinds East 9.0 Double 0.65 0.88 0.33 Double/Light Blinds East 24.0 Single 1.10 1.00 0.34 Single/Light Blinds North 40.0 Single 1.10 1.00 0.34 Single/Light Blinds South 64.0 Single 1.10 1400 0.34 Single/Light Blinds North 6.0 Double 0.65 0.88 0.88 Double/No Int Shades South 40.0 Double 0.65 0.88 0.33 Double/Light Blinds West 127.0 Double 0.65 0.88 0.33 Double/Light Blinds Skylt 12.0 Double 0.65 0.88 0.88 Double/No Int Shades SHADING (for Glazing above) Over Location Exterior Device SC hang Framing Type --------- ------------------------ ---- ---- ----------------------- EXISTING W/ADDITION 50 X Bug Screen 0.84 2.0 Metal w/o Mullions 50 X Bug Screen 0.84 6.0 Metal w/• � Mullions 50 X Bug Screen 0.84 2.0 Metal w/o Mullions 50 % Bug Screen 0.84 2.0 Metal w/o Mullions 50 % -Bug Screen 0.84 2.0 Metal w/o Mullions None 1.00 2.0 Metal w/• � Mullions 50 X Bug Screen 0.84 2.0 Metal w/o Mullions 50 % Bug Screen 0.84 2.0 Metal w/o Mullions ins Nene . 1.00 0.0 Metal. w/o Mullions CERTIFICATE OF COMPLIANCE: Residential (part 3 of 3) CF -1R page 5 of 26 --------------------------------------------------------------------------- Project: NEWELL W. ACKERSON COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP Building Permit No ------------------ Location: Indic, Date: 10/22/19921 Checked By Documentation: JOHN H HACKER AND ASSOCIATES : Date (User ## 2655) --------------------------------------------------------------------------- HVAC SYSTEMS Minimum Output Duct Duct Manufacturer/Model No. System Type Efficiency (Btuh) Location RVal (or approved equal) ----------- ---------- ---------------------- ---- ----------------------- Gas Fired 0.734 SE 5846=1 Vent. Attic Space 5.2 Day&Night 5BOBV048074 Air Cond 10.000 SEER 48500 Vent. Attic Space Day&Night 580BV04eO74 Zane Furnace Max: 1.3 x 1 47261 Btuh + (lig x 2227 sgft)7 = 90390 Btuh Cooling Exception: ------ CFP? Cooling (see Load Calcs) requires ------ Btuh HOT WATER SYSTEMS Tank Manufacturer/Madel No. # of Energy R-12 System Type Volume (� �r approved equal) Sys Credits Blanket Gas Fired 50.0 Std Gas 50 gal or less 1 i_) Y SPECIAL FEATURES/REMARKS (Add extra sheets if necessary) --------------------------------------------------------------------------- COMPLIANCE STATEMENT This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Chapter 2-53 and Title 20, Chapter- 2, Subchapter 4, Article 1 of the California Administrative Cade. This certificate has been signed by the individual with overall design responsibility and the building owner, who shall retain a copy of it and transmit the certificate to any subsequent purchaser of the building. When this Certificate of Compliance is submitted for a single building plan to be built in multiple orientations, all building conservation features which vary are indicated in the Special Features/Remarks section. DESIGNER PALM SPRINGS DESIGN! GROUP 4501 E. SUNNY DUNES ROAD PALM SPRINGS, CA 9264 (619) 3WAIL11 License Signed: -Q --------------------- (Date) DOCUMENTATION AUTHOR JOHN H HACKER AND ASSOCIATES 4501 E SUNNY DUNES ROAD SUITE D PALM SPRINGS CA 9264 619 327-4565 CA LICENSE RCE 14614 Signed: - ----- Date) BUILDING OWNER Signed: ........................... (Date) ENFORCEMENT AGENCY Name: Agency: --------------------------- Telephone: ------------------------ Signed: -........................... MANDATORY ----------- MEASURES CHECKLIST (part 1 of 2) ---------------------------------------------------------------- MF -1R page 6 of 26 Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP ------------------ Building Permit No Location: Indica Date: 10/2/1992! Checked By Documentation: --------------------------------------------------------------------------- JOHN H HACKER AND ASSOCIATES ; Date (User # 2655) NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as binding minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES Enforcement o Sec. 2-5352(a): Minimum ceiling_ insulation R-19 weighted average. * o Sec. 2-5352(b): Loose fill insulation manufacturers labeled R -Value. o Seca -535 (c): Minimum wall insulation in framed walls R-11 weighted average (does not apply to exterior mass walls). o Sec. 2-5352(k): Slab edge insulation - water- absorption _rption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 perm/inch. o Sec. 2-5311: Insulation specified or installed meets. California Energy Commission (CEC) quality standards. Indicate type and form. o Sec. 2-5352(f): Vapor barriers mandatary in Climate Zones 14 and 16 only. o Sec. -5317: Infiltration/E filtration Controls a. Doors and windows, between conditioned and .unci �nditi� �ned spaces designed to limit air leakage. b. Doors and windows certified. c. Doors and windows weatherstripped; all joints and penetrations caulked and sealed. o Sec. 2-5352(e): Special infiltration barrier installed to comply with Sec. .5351 meets CEC quality standards. o Sec. -535(d): Installation of Fireplaces 1. Masonry and factory -built fireplaces have: a. Tight fitting, closeable metal or glass door b. 0utside air intake with damper and control c. Flue damper and control -2.,No continuous burning gas pilots allowed. MANDATORY MEASURES CHECKLIST (part 2 of 2) MF-1R page 7 of 26 ------ 7-------------------------------------------------------------------- Pr� eject: NEWELL W. ACKERSON COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP 1 Building Permit No ' ------------------ Location: Indite Date: 10/22/19921 Check: ed By. ------------------ Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 2655) --------------------------------------------------------------------------- HVAC AND PLUMBING SYSTEM MEASURES o Sec. 2-5352(g) and -5303: Space conditioning equipment sizing: attach calculations. o Sec. 5352(h) and 2-5315: Setback: thermostat on all applicable heating systems. o Sec. -5316(a): Ducts constructed, installed and insulated per Chapter 10, 1976 UMC. o Sec. -5316(b): Exhaust systems have damper controls. o Sec. -5314((): Gas-fired space heating equipment has intermittent ignition devices. o Sec. 3-5314: HVAC equipment, water heaters, showerheads and . faucets certified by the CEC. o Sec. 2-5352(i): Water heater insulation blanket (R-1:' or greater) for storage & backup tanks for solar water heating_ systems; first 5 feet of pipes closest to tank insulated (R-3 or greater) . o Sec. 2-5312 (Exception I) : Pipe in ulation on steam and steam condensate return & recirculating piping. o Sec. 5318(d): Swimming Pool Heating 1. System has: a. On/off switch on heater. b. Weatherproof instruction plate on heater. c. Plumbed to allow for solar. 2. 75 percent thermal efficiency. 3. Pool cover. 4. Time clock. 5. Directional water inlet. LIGHTING AND APPLIANCE MEASURES o Sec. 2-5352(j): Lighting - 25 lumens/watt or greater for general lighting in kitchens and bathrooms. o Sec. -5314(c): Gas fired appliances equipped with intermittent ignition devices. o Sec. -5314(a): Refrigerators, refrigerator -freezers, freezers and fluorescent lamp ballasts certified by the CEC. Indicate make and model number. Enforcement POINTS SYSTEM SUMMARY: CLIMATE -------------------------------- ZONE 15 ---I--------------------------------------- P -'R page 8 of 26 Pyoject: NEWELL W. ACKERSON ; COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP ; Building Permit No Location: Indi �.-, Date: 10/22/1992; ; ------------------ Checked By Documentation: --------------------------------------------------------------------------- JOHN H HACKER AND ASSOCIATES ; Date (User # 2655) BUILDING ------------- DATA Conditioned Floor Area 2227 sgft Number of Stories 1 Occupancy Type Single Fam Det SCORE CARD Measure Points 1. Roof Insulation 0.0473 (U -Value) -7 2. Wall Insulation O.Oe87 (U -Value) -5 3. Raised Floor Insulation 0.0000 (U -Value) 3a. -Controlled Vent Crawlspace 0.0 (R -Value) 4. Slab Edge Insulation 0.7737 (f2 factor)-! 5. Infiltration Standard 0 6. Glass Heat Loss 0.85 15.57 -6 Sum 1-6 -lE' 7. Shade Open Area % Glass ------------ SC OH Eff % a. N� Wirth 46. 0 2.1 ---- x 0.81 ---- ----- = 1.7 i) b. East 50.0 1.5 x 0.80 x 0.79 = 0.9 0 c. S-:,uth 104. 0 4.7 x 0.79 x 0.83 = 3.1 i) d. West 151.0 6.8 x 0.75 x 0.88 = 4.5 1 e. Skylight 12.0 0.5 x 0.77 = 0.4 0 8. Shade.Closed Area % Glass ------------ SC OH Eff a. North 46.0 2.1 ---- x 0.35 ---- ----- = 0.7 i) b. V .J East 33.0 1.5 x 0.28 x 0.68 = 0 c. South 104.0 4.7 x 0.28 x 0.63 = 0.8 8 d. West 151.0 6.8 x 0.2e x O.e2 = 1.6 -1 e. Skylight 12.0 0.5 x 0.77 = 0.4 -3 9. Interior Thermal Mass 2.26 0 10. Exterior Wall Mass 0.00 0 Sum 7-10 3 11. Heating System 0.734 SE x om Duct Eff = 0.61 Eff SE 2 Zonal ControlNo 12. Coaling System 10.000 SEER x 0.82 Duct Eff = 8.20 Eff SEER 13 13. Water Heating (see DHW Worksheet) 0 Point Total: 0 HVAC EQUIPMENT &,ZONING SUMMARY FORM (part 1 of ) CF -4 page 9 of 26 ------ 7-------------------------------------------------------------------- Prpject: NEWELL W. ACKERSON COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP Building.Permit No ' ------------------ Location: Indic, Date: 10/22/19921 Checked By Documentation: JOHN H HACKER AND ASSOCIATES t Date (User # 2b55.) -------------------------------------- =---- =------------------------------- SYSTEM EQUIPMENT SUMMARY No Heating Cooling No System Name System Type Sys Output COP Output EER ---------------------------------------- --- ------ ----- ------ ----- SYSTEM FAN SUMMARY (for Systems Above) Min Supply Fan Return Fan Economizer No Fan Type Ratio CFM BHP Eff CFM BHP Eff Type Temp --- -------------- ----- ----- ------ ---- ----- ------ ---- ---- ---- HVAC EQUIPMENT & ZONING SUMMARY FORM (part 2 of 'mo) CF-4 page 10 --If 26 --------------------------------------------------------------------------- Project: NEWELL W. ACK*ERSON f COMPLY 24 v "31.2'0 -------------- Designer: PALM SPRINGS DESIGN GROUP Building Permit No Location: Indic Date: 10/22/19921 Checked By Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 4615115) --------------------------------------------------------------------------- SYSTEM/ZONING SUMMARY No Zone/Spaces Served Central/Zonal System System Type Sys ------------------------------------------------------------------ --- CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page it of 26 --------------------------------------------------------------------------- Prpject: NEWELL W. ACK:ERSON 1 COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP Building Permit No , ------------------ Location: India Date: 10/'2'2/199'x: Checked T- D� �cumentati� Win: "JOHN H HACKER AND ASSOCIATES i Date(User # 2655) --------------------------------------------------------------------------- Assembly Name: R-11 Frame Wall Assembly Type: Wall Assembly Tilt: 90 deg t.Vertical? Framing Percentage: 15.0 Framing Material: Softwood, Douglas Fir -Larch Sk:et ch of Construction Assembly Calculation for Framing Adjustment Summer U -Value 0.0793 x O. 85 + O. 1969 x 0.15 = 0.0969 Winter U -Value 0. 6798 x 0. 85 + 0. 2000 x 0. 15 = Oi 0978 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Stucco, Wood Shingles Weight: 1.3 lb/sqft Heat Capacity: 2.88 R -Value 10.32 10.22 U -Value 0.0969 0.0978 Th R -Val Lie Construction Components =-------------------------------------------------------------------------- Fr (in) Summer Winter Outside Air Film 0.25 0.17 1. Stucco, 0.875 0.17 0.17 2. Membrane, Vapor -Permeable Felt 0.010 0.06 0.06 3. Insulation, Mineral Fiber, R-11 3.500 11.00 11.00 4. Gypsum or Plaster Board 0.500 0.45 0.45 J. G . 7. 8. Inside Air Film --------------------------------------------------------------------------- 0.68 0.68 Total 1.61 12.53 Framing Percentage: 15.0 Framing Material: Softwood, Douglas Fir -Larch Sk:et ch of Construction Assembly Calculation for Framing Adjustment Summer U -Value 0.0793 x O. 85 + O. 1969 x 0.15 = 0.0969 Winter U -Value 0. 6798 x 0. 85 + 0. 2000 x 0. 15 = Oi 0978 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Stucco, Wood Shingles Weight: 1.3 lb/sqft Heat Capacity: 2.88 R -Value 10.32 10.22 U -Value 0.0969 0.0978 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 12 of 26 Project: NEWELL W. ACKERSON 1 COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP f ------------------ Building Permit No Location: India Date: ' 10/22/1992 ------------------ Checked By 0.17 Documentation: JOHN H HACKER AND ASSOCIATES --------------------------------------------------------------------------- ; Date (User # 2655) Assembly Name: R-19 Frame Wall Assembly Type: Wall Assembly Tilt: Sir deg (Vertical) Framing Percentage: 15.0 Framing Material: Softwood, Douglas Fir -Larch Sketch of Construction Assembly Absorptivity: Roughness: Stucco, Weight: Heat Capacity: 0.70 Calculation for Framing Adjustment Summer U -Value 0.0515 % 0.85 + 0.1416 x 0.15 = 0.0650 Winter U -Value 0.0517 x 0.85 + 0.1433 .v, 0.15 = 0.0655 _OVERALL VALUES ADJUSTED FOR FRAMING Wood Shingles 13.2 lb/sqft R -Value 15.38 15.8 U -Value 0.0650 0.0655 Th R -Val 1_te Construction �n C• �mp� �nents Fr (in) Summer Winter Outside Air Film 0. 25 0. 17 1. Stucco - 0.875 0.17 0.17 2. Membrane, Vapor -Permeable Felt 0.010 0.06 0.06 S. Insulation, Mineral Fiber, R-17.8 * 5.500 17.BO 17.60 4. Gypsum or Plaster Beard 0.500 0.45 0.45 C 6. 7. 8. 9 Inside Air Film --------------------------------------------------------------------------- 0.68 0.68 Total 19.42 19.88 Framing Percentage: 15.0 Framing Material: Softwood, Douglas Fir -Larch Sketch of Construction Assembly Absorptivity: Roughness: Stucco, Weight: Heat Capacity: 0.70 Calculation for Framing Adjustment Summer U -Value 0.0515 % 0.85 + 0.1416 x 0.15 = 0.0650 Winter U -Value 0.0517 x 0.85 + 0.1433 .v, 0.15 = 0.0655 _OVERALL VALUES ADJUSTED FOR FRAMING Wood Shingles 13.2 lb/sqft R -Value 15.38 15.8 U -Value 0.0650 0.0655 CONSTRUCTION ASSEMBLY COMPLIANCE FORM --------------------------------------------------------------------------- CF -3 page 13 of 26 Pr,o ject: NEWELL W. ACKERSON 1 COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP ------------------ Building Permit No L'ocation: India Date: ' 10/22/1992; ------------------ Checked By 0.33 Documentation: JOHN H HACKER AND ASSOCIATES --------------------------------------------------------------------------- ' f ------------------ Date (User # 2655) Assembly Name: R-19 Roof/Gyp Ceiling Assembly Type: Roof e Assembly Tilt: 0 deg (Horizontal Roof) Total 22.58 Framing Percentage: 10.0 7. Framing Material: Softwood, Douglas Fir -Larch ------------------------------- Sketch of Construction Assembly 22.12 Calculation for Framing Adjustment Summer U -Value 0.0443 x 0.90 + 0.1051 x 0.10 =.0.0504 Winter U -Value 0.0452 x 0.90 + 0.1104 % 0.10 = 0.0517 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 7.7 lb/sqft Heat Capacity: 2.45 R -Value 19. 85 19.33 U -Value 0.0504 0.0517 Th R -Value Construction Components --------------------------------------------------------------------------- Fr (in) Summer Winter Outside-Air Film 0.25 0.17 1. Roofing, Built -Up 0.375 0.33 0.33 2. Plywood 0. 500 0.63 0.63 3. Air Space 12.000 1.00 0.13 4. Insulation, Mineral Fiber, R-19 6.000 19.00 19.00 5. Gypsum or Plaster Beard 0.500 0.45 0.45 6. 7. S. 9. Inside Air Film --------------------------------------------------------------------------- 0.92 0.61 Total 22.58 Framing Percentage: 10.0 7. Framing Material: Softwood, Douglas Fir -Larch ------------------------------- Sketch of Construction Assembly 22.12 Calculation for Framing Adjustment Summer U -Value 0.0443 x 0.90 + 0.1051 x 0.10 =.0.0504 Winter U -Value 0.0452 x 0.90 + 0.1104 % 0.10 = 0.0517 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 7.7 lb/sqft Heat Capacity: 2.45 R -Value 19. 85 19.33 U -Value 0.0504 0.0517 CONSTRUCTION ASSEMBLY COMPLIANCE FORM --------------------------------------------------------------------------- CF -3 page 14 of 26 Project: NEWELL W. ACKERSON } COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP 0.25 ------------------ Building Permit No Location: Indio Date: ' 10/2/1' 92: ------------------ Checked By 2. Plywood Documentation:' JOHN H HACKER AND ASSOCIATES ---------------------------------------------------------------------------- 1 Date (User # 2655 Assembly Name: R-38 Roof/Gyp Ceiling Assembly Type: Roof Assembly Tilt: 0 deg (Horizontal Roof) Framing Percentage: 10.0 Framing Material: Softwood, Douglas Fir -Larch , Sketch of Construction Assembly Calculation for Framing Adjustment Summer U -Value 0.0341 x 0.90 + 0.0668 x 0. 10 = 0. 0263 Winter U -Value 0.0243 x 0.96 + 0.0690 x 0.10 = 0.0288 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 8.6 lb/sqft Heat Capacity: 3.11 R -Value 35.30 34.74 U -Value 0_0283 00288 Th R -Value Constnuction Components --------------------------------------------------------------------------- Fr (in) Summer Winter Autside Air Film 0.25 0.17 1. Roofing, Built -Up 0.375 0.33 0.33 2. Plywood 0.500 0.63 0.63 3. Air Space 12.000 1.00 0.93 4. Insulation, Mineral Fiber, R-38 11.500. 38.00 38.00 5. Gypsum or Plaster Beard 0.500 0.45 0.45 G. 7. 8. S. Inside Air Film --------------------------------------------------------------------------- 0.92 0.61 Total 41.58 41.12 Framing Percentage: 10.0 Framing Material: Softwood, Douglas Fir -Larch , Sketch of Construction Assembly Calculation for Framing Adjustment Summer U -Value 0.0341 x 0.90 + 0.0668 x 0. 10 = 0. 0263 Winter U -Value 0.0243 x 0.96 + 0.0690 x 0.10 = 0.0288 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 8.6 lb/sqft Heat Capacity: 3.11 R -Value 35.30 34.74 U -Value 0_0283 00288 CONSTRUCTION ASSEMBLY COMPLIANCE FORM I ------ CF -3 page 10 of 26 7-------------------------------------------------------------------- Pr.� �.ject: NEWELL W. ACKERSON 1 , COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP f ------------ Building Permit No Location: Indio Date: ' 10/22/1992; 1 ------------------ Checked By 2. Flogging, Carpet and Fibrous Pad 3 Documentation; �n; JOHN H HACKER AND ASSOCIATES =-------------------------------------------------------------------------- : -------------A- Date (User # ": 655.) Assembly Name: Carpeted Slab Assembly Type: Floor Assembly Tilt: 180 deg THorizontal Floor) Framing'Percentage: 0.0 Framing Material: NONE ------------------------------- , i 1 1 1 1 1 1 , 1 1 1 , 1 , 1 1 i 1 , 1 1 , 1 1 � 1 1 1 , 1 , 1 , 1 1 1 , 1 1 Sketch of Construction Assembly Total - 4 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.9 lb/sgft. Heat Capacity: 9.01 R -Val ue - 3.45 U -Value 0.3106 0.2899 Th R -Value Construction Components Fr tin? Summer Winter --------------------------------------------------------------------------- Outside Air Film , 0.25 0.17 1. Concrete, 140 lb, Not Dried 3.500 0.28 0.28 2. Flogging, Carpet and Fibrous Pad 3 0.250 2.08 2.08 4. 5 G . 7. B. 9. Inside Air Film --------------------------------------------------------------------------- 0.61 0.92 Framing'Percentage: 0.0 Framing Material: NONE ------------------------------- , i 1 1 1 1 1 1 , 1 1 1 , 1 , 1 1 i 1 , 1 1 , 1 1 � 1 1 1 , 1 , 1 , 1 1 1 , 1 1 Sketch of Construction Assembly Total - 4 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.9 lb/sgft. Heat Capacity: 9.01 R -Val ue - 3.45 U -Value 0.3106 0.2899 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 16 of 26 --------------------------------------------------------------------------- Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20 Designer: PALM SPRINGS.DESIGN GROUP Buildinq Permit No ------------------ Location: India Date: 10/22/15521 Checked By ------------------ Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 2655) Assembly Name: Exposed used Slab Assembly Type: Floor Assembly Tilt: 180 deg (Horizontal Floor) Framing Percentage: 0.0 % Framing Material: NONE ------------------------------- OVERALL VALUES ADJUSTED FOR FRAMING Sketch :of Construction Assembly Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.5 lb/sqft Heat Capacity: 5.30 R -Value 1.19 1.42 U -Va 1 ue 0.8403 0.7042 Th R -Val Lie Construction Components --------------------------------------------------------------------------- Fr (in) Summer Winter Outside Air- Film 0.25 0.17 1: Concrete, 140 lb, Not Dried 3.500 0.28 0.28 2. Flooring, Asphalt, Ling, Vinyl or Rubber 3. 0.010 0.05 0.05 4. 5. 6. 7. 6. 5. Inside Air Film --------------------------------------------------------------------------- 0.61 0.92 Total 1.15 1.4 Framing Percentage: 0.0 % Framing Material: NONE ------------------------------- OVERALL VALUES ADJUSTED FOR FRAMING Sketch :of Construction Assembly Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.5 lb/sqft Heat Capacity: 5.30 R -Value 1.19 1.42 U -Va 1 ue 0.8403 0.7042 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -0 page 17 of 2G --------------------------------------------------------------=----------=- Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP Building Permit No ' ------------------ Location: India Date: 10/2/1992: Checked By ------------------ Documentation: JOHN H HACKER AND ASSOCIATES Date (User # 2655) --------------------------------------------------------------------------- Assembly Name: Solid Wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) Th R -Val Lie Construction Components Fr (in) Summer Winter ------------------------------7-------------------------------------------- Outside Air Film 0.25 0.17 1. Softwood, Douglas Fir -Larch 1.750 1.70 1.75 2. 3. 4. 5. . V . 7. 8 . J . Inside Air Film 0.68 0.68 --------------------------------------------------------------------------- Framing Percentage: 0.0 Framing Material: NONE Total 2.66 2.58 ------------------------------- OVERALL VALUES ADJUSTED FOR FRAMING Sketch of Construction Assembly Absorptivity: • Roughness: Clear Pine Weight: Heat Capacity: 0.70 5.1 lb/sqft 1.99 R -Value 2.66 2.58 U -Value 0.0756 0.0872 CONSTRUCTION ASSEMBLY COMPLIANCE FORM --------------------------------------------------------------------------- CF -3 page 18 of 26 Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP_ Building Permit No Location: Indic Date: ' 10/22/1992: ------------------ Checked By Documentation: JOHN H HACKER AND ASSOCIATES -------------------------------------- ------------------------------------ ! Date (User ## 655 ) Assembly Name: Single/Light.Blinds Assembly Type: Glazing Th R -Valu e Construction Components Fr Cin? Summer Winter -------------------------------------------------- ------------------------ Outside Air Film 0.25 0.17 1. CEC Single Glazing 0.125 0.06 0.06 2. 3 J 4. 5. 6. 7. S. 9. Inside "Air Film 0.68 0.68 --------------------------------------------------------------------------- Framing Percentage: 0.0 % Framing Material: NONE ------------------------------- , , , Sketch of Construction Assembly Winter Shading Coefficient: 1.00 Summer Shading Coefficient: 0.24 Total 0.99 0.91 OVERALL VALUES ADJUSTED FOR FRAMING R -Value 0.99 0.91 U -Value 1.0110 1.1000 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 19 of 26 --------------------------------------------------------------------------- Pno.ject: NEWELL" W. ACKERSON 1 COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP. P�_�ilding Permit Nc, ' ------------------ Location: Indic Date: 10/22/1992: Checked By Documentati� Win: JOHN H HACKER AND ASSOCIATES i Date (User # 2655) Assembly Name: Double/No Int Shades Assembly -Type: Glazing Th R -Value Construction Components Fr (in) Summer Winter - -------------------------------------------------------------------------- Outside Air Film 0.25 0.17 1. CEC Double Glazing 0.500 0.69 0.69 2. 3 ' u. '4. 5. G. 7. S. 9. Inside Air Film 0.68 0.66 --------------------------------------------------------------------------- Framing Percentage: 0.0 % Framing Material: NONE - ------------------------------ , Sketch of Construction Assembly Winter Shading Coefficient: 0.88 Summer Shading Coefficient: 0.88 Total 1.62 1.54 OVERALL VALUES ADJUSTED FOR FRAMING R -Va 1 ue 1.62 1.54 U -Value 0.6179 0.6500 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 20 of 26 ------ 7-------------------------------------------------------------------- Pr:oject: NEWELL W. ACKERSON f COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP_. Building Permit No ' ------------------ Location: Indian Date: 10/'22/1992; Checked By Documentation: JOHN H HACKER AND ASSOCIATES : Date (User # 2655) --------------------------------------------------------------------------- Assembly Namez Double/Light Blinds Assembly Type: Glazing Th R -Val ue Construction Components Fr (in) Summer Winter ----------------------- --------------------------------------------------- Outside Air Film 0.25 0.17 1. CEC Double Glazing 0.500 0.69 0.613 2. 3. 4. 5. 6. 7. 8. r� Inside Air Film 0.68 0.66 --------------------------------------------------------------------------- Framing Percentage: 0.0 Framing Material: NONE ------------------------------- f , f , , , Sketch of Construction Assembly Winter Shading Coefficient: 0.83 Summer Shading Coefficient: 0.33 Total 1.62 1.54 OVERALL VALUES ADJUSTED FOR FRAMING R -Value 1.62 1.54 U -Value 06179 0_6500 THERMAL MASS WO KSHEET --------------------------------------------------------------------------- WS -1R page 21 of 26 Pryject; NEWELL W. ACKERSON ; COMPLY 24 v 8.20 Designer: PALM SPRINGS DESIGN GROUP Building Permit No Location: India Date: 10/22/1992: ------------ Checked By Documentation: JOHN H HACKER AND ASSOCIATES 1 Date (User # 2650) INTERIOR THERMAL MASS Mass Material ---------------------- Concrete; Heavyweight Concrete, Heavyweight Sides Wall Thick Exposed U -Valve 4.00 1 4.00 0 Interior Interior Mass Mass Mass Area Factor Capacity 840.0 x 4.7 = 1887.0 x 1.8 = 8484.8 TOTAL 5032. 8 INTERIOR MASS FACTOR 5032.3 IMC / 2227 sqft = 2.26 Mass listed above with a Wall U -Value denotes the Interior Mass credit for Exterior Mass Walls, and ar, repeated below for Exterior Mass credit. 0 Sides Exposed indicates mass covered with surface material := R-2. EXTERIOR MASS WALLS Exterior Exterior Sides Wall Mass Mass Mass Mass Material Think: Exposed U -Value Area Factor Capacity ---------------=------ ------------------- ------ -------- -------- NONE HVAC ZONE ------ HEATING & COOLING LOAD SUMMARY COOLING page 22 of 26 7-------------------------------------------------------------------- Pr,_:ject: NEWELL W. ACKERSON LATENT COMPLY 24 v 3.20 Designer: PALM SPRINGS DESIGN GROUP TOTAL SPACE LOAD ------------------ Building Permit No Location: Indio Date: ' 10/22/1992: ------------------ Checked By 2057 Documentation: JOHN H HACKER AND ASSOCIATES --------------------------------------------------------------------------- Supply Duct Leakage Date (User # 2655) HVAC ZONE DESCRIPTION HVAC Zane Name: Heating System Name: Cooling System Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Peak: Load Method: Relative Humidity: EXISTING W/ADDITION Day&Night 58OBV048074 Days<Ni gh t 5B BV046 X74 1 Residential Heating Residential Cooling Residential Occupancy COINCIDENT 50 X NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment which will heat or cool this zone during the design conditions indicated. These numbers include no safety fatter, and the HVAC contractor should oversize by a reasonable margin to account for variations in weather conditions and the pick-up capacity required to bring the zone to temper- ature as a result of a setback: thermostat. Those responsible for final equipment selection should note that Sensible and Latent Cooling Loads are indicated to allow for accurate comparison with, manufacturer's output data. COOLING SPACES IN THIS ZONE PEAK ----------------------- ---- HEATING ------- PEAK SENSIBLE LATENT EXISTING W/ADDITION (Jan 12am) 45289 ------------ (Aug wpm? 41155 ------ 1673 TOTAL SPACE LOAD 45289 41185 1670 Supply Duct Conduction 2264 2057 Supply Duct Leakage 906 823 GO Ventilation ( 0 cfm) 0 0 cfm) 0 Q Return Air Lighting Gain 0 Return Duct Conduction 485 440 Return Duct Leakage 969 880 34 Fan Motor Heat Gain -2652 265 TOTAL SYSTEM LOAD 4761 47987 1737 SYSTEM OUTPUT AT DESIGN CONDITIONS 58460 34696 8967 NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment which will heat or cool this zone during the design conditions indicated. These numbers include no safety fatter, and the HVAC contractor should oversize by a reasonable margin to account for variations in weather conditions and the pick-up capacity required to bring the zone to temper- ature as a result of a setback: thermostat. Those responsible for final equipment selection should note that Sensible and Latent Cooling Loads are indicated to allow for accurate comparison with, manufacturer's output data. RESIDENTIAL SPACE HEATING LOAD SUMMARY page 23 of 26 ---------------------------------------------------------------------_------ Pnoject: NEWELL W. ACKERSON COMPLY 24 v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP Building Permit No -------- Location: Indic Date: 10/22/19921 Checked By Documentation: JOHN H HACKER AND ASSOCIATES : Date (User # 2655) ----------------=---------------------------------------------------------- Space Name: EXISTING W/ADDITION Design Indoor Dry Bulb Temperature: 70 F Design Outdoor Winter Dry Bulb Temperature: 29 F Design Temperature Difference: 41 F Conduction ----------------------- Area U -Value TD Btu/hr R-11 Frame Wall ------ 355.0 x ------- 0.0978 x ---- 41.0 = ------ 3830 R-19 Frame Wall 375.0 x _ 0.0 GAJ 55 :; 41.0 = 1006 Solid -Wood Door 20.0 x 0.3872 x 41.0 = 318 Single/Light Blinds 153.0 x 1.1000 x 41.0 = 6855 Double/Light Blinds 176.0 x 0.6500 x 41.0 = 4690 Double/No Int Shades 6.0 x 0.6500 x 41.0 = 160 R-19 Roof/Gyp Ceiling 1789.0 x 0.0517 x 41.0 = 3735 R-36 Roof/Gyp Ceiling 426.0 x 0.0288 x 41.0 = 503 Double/No Int Shades 12.0 x 0.6500 x 41.0 = 320 Exposed Slab Perim = 74.0 x 43 = 3183 Carpeted Slab Perim = 174.0 x 43 = 746 Infiltration: -1.00 x 0.018 x 2227 sgft x 8.0 ft x 1.00 AC x 41.0 = 13148 TOTAL HOURLY HEAT LOSS FOR SPACE 452813 SUPPLY AIR QUANTITY ------------------- Heating: 45289 Btu/fir / [1.10 * (105 F Supply - 65 F TStat )] = 1029 cfm RESIDENTIAL SPACE COOLING LOAD SUMMARY page 24 of 26 --------------------------------------------------------------------------- Project: NEWELL W. ACKERSON COMPLY 24 -v 3.20 Designer: PALM SPRINGS DESIGN GROUP B�_�ilding Permit N�� ' ------------------ Lccaticn: Indic Date: 10/22/1992: Checked By D� �cumentation: JOHN H HACKER AND ASSOCIATES f Date (User- # 2655) --------------------------------------------------------------------------- Space Name: Op Frac. -------- Area ------ Heat Gain --------- EXISTING W/ADDITION Btu/hr Design Indoor Dry Bulb Temperature: 2227.0 x 0.000 x ----- 3.413 78 F Occupants Design Outdoor Summer Dry Bulb Temperature: x 225 / 300 112 F Design Temperature Difference: LATENT HEAT GAIN FOR SPACE 1670 SUPPLY AIR QUANTITY 34 F Conduction ----------------------- Area ------ ------------------- Cooling: 41135 Btu/hr U -Value DETD Btu/hr R-11 Frame Wall 955.0 x ------- 0.0969 x ---- 29.6 _ ------ 2739 R-19 Frame Wall 375.0 x 0.0650 x 29.6 = 73 Solid Wood Door 20.0 x 0.3756 x 29.6 _ 222 Single/Light Blinds 152.0 x 1.0110 x 34.0 _ 5225 Double/Light Blinds 176.0 x 0.6179 x 34.0 = 3697 Double/No Int Shades 6.0 x 0.6179 x 34.0 = 126 R-19 Roof/Gyp Ceiling 1789.0 x 0.0504 x 50.0 _ 4506 R-38 Roof/Gyp Ceiling 46.0 x 0.0283 x 50.0 603 Double/No Int Shades 12.0 x 0.6179 x 34.0 = 25 Infiltration: 1.00 x 0.018 x 2227 agft x 8.0 fit x 1.00 At x 34.0 = 10903 Shaded Unshaded Solar Gain ----------------------- Orient. --------- Area SGF ---- --- Area SGF SC Btu/hr Single/Light Blinds West C 9.0 x 15 + ---- --- 15.0 x 733 ---- x 0.29 ------ = 353 Double/Light Blinds East C 8.6 x 15 + 0.4 x 731 x 0.28 = 45 Single/Light Blinds East C 12.0 x 15 + 12.0 x 731 x 0.29 = 303 Single/Light Blinds North C 0.0 x 15 + 40.0 x 153 x 0.29 = 172 Single/Light Blinds South C 64.0 x 15 + 0.0 x 321 x 0.29 = 276 Double/No Int Shades North C 0.0 x 15 + 6.0 x 153 x 0.77 = 70 Double/Light Blinds South C 40.0 x 15 + 0.0 x 321 x 0.28 = 167 Double/Light Blinds West C 38.1 x 15 + 88.9 x 733 x 0.28 = 1969 Double/No Int Shades Skylight C 0.0 x 15 + 12.0 x1523 x 0.77 = 1413 Internal Gain ----------------------- Op Frac. -------- Area ------ Heat .Gain Conv. Btu/hr Lighting Lighting 1.00 x 2227.0 x --------- 0.500 x ----- 3.413 = ----- ------ 3800 Equipment 1.00 x 2227.0 x 0.250 x 3.413 = 1900 Occupants 1.00 x 2227.0 x 225 / 300 = 167o TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 41135 Latent Gain ----------------------- Op Frac. -------- Area ------ Heat Gain --------- Conv. Btu/hr Equipment 1.00 x 2227.0 x 0.000 x ----- 3.413 ------ = C> Occupants 1.00 x 2227.0 x 225 / 300 = 1670 TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 1670 SUPPLY AIR QUANTITY ------------------- Cooling: 41135 Btu/hr / E1.08 * C 78 F TStat - 55 F Supply) 3 = 1656 cfm DHW WORKSHEET ONE: STORAGE TYPE GAS OR ELECTRIC page 25 of 26 --------------------------------------------------------------------------- Pro je cit : NEWELL W. ACKERSON 1 COMPLY 24 _v 3.20 ------------------ Designer: PALM SPRINGS DESIGN GROUP Building Permit No ------------------ Locati� Win: India Date: 10/22/1992: Checked By Documentation: JOHN H HACKER AND ASSOCIATES ; Date (User # 655) --------------------------------------------------------------------------- A EOUIPMENT DATA 1 Water heater type SG Enter SG or SE Manufacturer 94 Water heating budget 18700 3 Madel number 3 Std Gas 50 gal or less 4 Ignition device GP GP, gas pilot or IID, int. ignition device 5 Tank volume 50.0 Total gallons, from CEC Appliance Directory 6 Recovery efficiency 76.0 Percent from CEC Appliance Directory 7 Standby loss 3.1 Percent/hour, from CEC Appliance Directory 8 Rated input 55000 Btu/hr, from CEC Appliance Directory 0.0205 See Table 2 or Appendix B (1 kWh = 3413 Btu) 9 Number of Heaters 1 From building plans (total) lig Insulation Jacket Y (Y/N) R-12 insulating jacket on the plans B OPERATING DATA 1 Climate Zone 15 See Appendix. D Water heating budget 18700 FBtu/yr/unit, see Table 1 3 Tank set temp. 140 F, fixed input 4 Water main temp. 70.0 F, see Table 1 5 Daily hot water lead 50 50 or 35 gallons/unit, see Table 1 6 Ambient "air temp. 72.6 F, see Table 1 7 Ad j Standby Losses 0.0205 See Table 2 or Appendix B 8 No. dwelling units 1 From building plans (total) 9 Number of pumps 0 From building plans 10 Pumping energy 0.0 Watt-hr/yr per Pump, see Table 3 C. --------------------------------------------------------------------------- WATER HEATING ENERGY CREDITS 1 Credit name See Table 5 2 Annual savings, 0.0 kBtu/yr/dwelling unit, see Table 5 D CALCULATE ANNUAL WATER HEATING ENERGY (KBtu/yr) --------------------------------------------------------------------------- 1 Recovery load 10539.4 VD5 x 8.25 x ( 140-B4) x 365 x 0. 001 3 -C2!x B8 2 Recovery energy 13867.6 D1 / AG 3 Standby loss energy 4839.6 {24 - C (D3 x 1000)/(AB x A9 x 36011 x 8.35 x A5 x B7 x 365 x (140-86) x 0.001 x A9 4' Pumping energy 0.0 B9 x B10 x 3.413 x 3 x 0.001 5 Total energy 18707.2 GAS SYSTEMS: (D2 + D3 + D4) / B8 ELECTRIC: TE (D2 + D3) x 33 + D41 / B8 6 Water heating budget comparison -7.2 KBtu/yr/unit B2 - D5 7 Water heating budget -0.0 Paints (D6 / Floor Area) x 2 x B8