Loading...
9804-139 (PLBG)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chia t 'r 9 (commencing with Section 7000) of Division 3 of the Business and P4ofessionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date 2667.14 i042 Date f'/ f 1/7' Signature of Contractor " OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. (�) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Cartier Policy No. :� I hi.l i' ftl'3u�4`'>{I13�«E��i (This section need not be completed if the permit valuation is for $100.00 or less). ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation,provisions Section 3700 of the Labor Code, I shall forthwith comply with those provisions. /bate: %/% r ✓� "Applicant r Warning: Failure to secure Workers' Compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon the,"a'bove-mentioned property for'inspection' purposes. .Signature (Owner/Agent) ' Date-', BUILDINGPERMIT PERMIT# CONTROL# 7671 DATE 4/ZZ/98 VALUATION $t 4� ' i LOT TRACT ADDRESS 46-965 HIGHLAND ��E3�s!�' S 1�R8T1IV JOB SITE APN 1343-191-02 OWNER CONTRACTOR/DESIGNER/ENGINEER DAN 'f-IUMES'"011 A -I Cr'SS110 1, Sr --VICE, INC 45000 c:;I10P. OR 1dt319 .L,i"nto AIt.`,iR-oNiaCa ii). INDJAN WELLS CEI, 92210 ix.,s oai-It`;t'SrRlNo: C11. tf..,_mo USE OF PERMIT id 8 PTtC AiiANi)ON, S.i-:%V.E,ttC(YNN4 C s: t PAID APR 2 2 .1998 VjkLuAr o.Ni i I., to . u L3 CITY 0 F LA QUINTA J�.Rl If P.• i9�Ci C\e�.l��V iiia 1. X Pri,RN1.R i FE.V S6.i.11"AMetRY 1.1Tri!iBINOFEE,4• tit;?,'d►ER 101-000-094)00 $30.00 s t Qg""i��. Vi+:¢9t1' 1�I+�4 1)1lir;`tCl1r;31�,t9ti RECEIPT DATE BY f DATE FINALED INSPECTOR INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K to Wrap F.A.U. Framing Compressor . Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final BLOCKWALL APPROVALS POOLS - SPAS steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection _ Encapsulation Gas Piping Gas Test Appliances / _ Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power t Final Utility Notice (Perm) Final COMMENTS: - ",y-a,--mom.-�at'�^ +- ' COACHELLA VALLEY WATER DISTRICT CASH RECEIPT DETAIL -. Received From: r 1T 1�(� (�,(i _`°`:t c e•�.. - - _ ' _ .,t'-�!'a nate C n � !XA1 I•[./tFLLJ Address: Account No. Lots) Tract PA Service Address Ne IG.A. Code ❑ Meter(s) $ ❑ Service(s) ❑ Backflow(s) ❑ House Laterals) . ❑ Detector Check(s) ❑ Meter Surcharge -5S / O Sanitation Capacity Charge ❑ W.S.B.F.C. ❑ Temporary Construction Meter ❑ Turn on Charge ❑ Uncollected Account -Name ❑ Inspection Fee - Tract - Fee - ❑ Pian Check Fees Water I Sewer - Tract - • ❑ Bond Payment - A.D. - Bond Assmt ❑ Customer Deposit ❑ OVier TOTAL $ Remarks: / / G6 t � h AI J Copy to: __ -. . Water Service A-1 CESSPOOL SERVICE, INC. P.O. Box 183 Desert Hot Springs, CA 9224"� 'Since 1959' (619) 329-6875 CLISTOMERS'S OF State Lic. #265214 ORDER TAKEN BY ------------ .TO A 1 7/- ;,3e- q JOB INVOICE ORDERED PROMISED _7c/_6Y vi C 0 ADDRESS I MECHANIC C. Wes A a CITY 'HELPER JO A. AND "OCATIO All" 2 ra G C 0 DAY WORK F 0 DESCRIPTION OF WORK L ', 111 In_ CONTRACT n OUANT DESCRIPTION OF WORK PRICE AMOUNT Gallons, I PunI Fee per 1000 gal. Dump!ng as per 1003 gat. Out�i Area Fee Locating Opening Fee (per hour) 1. Size System: A SERVICE CHARGE OF $20VOLL BE DUE . ON ALL RETURNED CHECKS. A FINANCE CHARGE OF 11/2% PER MONTH, 18% PER YEAR WILL BE CHARGED ON PAST PUE ACCOUNTS OVER 30 DAYS. OUANT. AMOUNT TOTAL MATERIALS MECHANICS @ TOTAL LABOR HELPERS @ I hereby ackowledge the satisfactory completion of j1te. be described work: • ME LABOR TAX snNATURE7 I DATE COMPLETED 9 TOTAL i_ r NOTICE T WNER Under the California Mechanics Lien Law any ontractor, subcontractor, laborer, supplier, or other person who ?ielps to it proveyouur property, but is not paid for his/her work or hearing, your pro} erty;codld-be sold by.aa court officer and the proceeds of the sale used to sat 'sfy the indebtedness. This can happen even if you have riaid your cons ractor in full if the subcontractors, laborers, or suppliers„remain unpaid. i To preserve their right to file a claim or lien against your ,property, certain claimants such as subcontractors of material suppliers • re required to provide you with a document entitled("Preliminary Notice"-lA Preliminary Notice is not a lien against your property. Its purpose is to *notify you of persons who may have a right to file alien against your property if they are not paid. Generally, the maximum time allowed for filing a /claim or lien against your property is ninety (90) Dads after the completion o'j your project. -.:,'....,moi= �-.`-"t+ti.•C'..�7S:..r:=..y`1: �..+n.,-+`.-Y'.:,.,-^�_....�..r+. ..• -�_. - --- TO INSURE EXTRA PROTECTION FON YOURSELF ,AND YOL;;4ROPERTY--,- YOU MAY WISH TO TAKE ONE OR hOREOF THE FOLLOWI&G STEPS: 1) Require that payments be made Jectly to subcontractors ai:1 material suppliers through a joint control. Any joint control agreement should include the addendum approved by the Regi4trar of Contractors. 2) Issue joint checks for payment, made out to both your contractor and subcontractors or material suppliers involved in the project. This will insure that all persons due,payment are actually made. 3) After UPON making payment on y completed phase of the project, and before making any further pais, require your contractor to pi•ov;de you with unconditional lien release ''signed by each material suppliers, subcontractor and laborer involved n.that portion of the work for which payment was made. On projects invo vng improvements to a single family residence or a duplex owned by 'in i t iduals, the persons signing these releases lose the right to file a claim, gainst your property. In Wier types of construction this protection ma' Mill be important, but may be as complete. TO PROTECT YOURSELFjUNDER THIS OPTION YOU MUST BE CERTAIN THAT ALL MATERIAL SUPOLIERS, SUBCONTRACTORS OR LABORERS HAVE SIGNED.i ice✓