2015-0020 (SIGN)e - , 1%
May 18, 2015
Mr. Bill Sigurdsen
Sign*A*.Rama
41945 Boardwalk
Palm Desert, CA 92211
SUBJECT: SIGN PERMIT APPLICATION 2015-0020
SYNERGY — POINT HAPPY SHOPPING CENTER
Dear Mr. Sigurdsen:
The Community Development Department has reviewed and approved your request for
one (1) permanent building -mounted internally -illuminated channel letter sign on the
east building elevations of 78474 Highway 11, at Suite A, for Synergy. The approval
is subject to the following Conditions of Approval:
1. Total square footage for the sign shall be no greater than 13.5 square feet.
Design and materials for the sign shall be per the approved plans on file with
the Community Development Department for SA 2015-0020.
2. A building permit shall be obtained prior to any work on the signs being started.
3. The sign installation and maintenance shall conform to the approved sign
program for the Point Happy commercial center.
Should you have any questions, please feel free to contact- me at (760) 777-7069.
Sincerely,
Wallace Nesbit
Principal Planner
c:. Building & Safety Division v
78-495 Calle Tampico I La Quinta I California 92253 1 760.777.7000 1 www.La-Quinta.org
96.3"
Illuminated
Acrylic Faced Channel Letters
Depth: 5"
er gy Face Color: Blue / Green / Orange
Return Color: Black
Trim Cap Color: Black
Mounting: Back
APPROVED BY PLANNING OEPARTNEWT Standoff: Flush
BY DATE -15-1,6Z'r �-- L.E.D. Color: Blue & White
E.=Bff %I
. ,CITY OF LA ()tjjNTA
BUILDING & SAFETY DEPT.
APPROVE
CJS FOR CONSTRUCTION
-+ nergy L
t �s �� DATE✓ �
L�-
RECEIVED
MAY 0 6 2015
1
CITY OF LA QUINTA
COMMUNITY DEVELOPMENT
CHANNEL LETTER & LIGHT BOX SECTION
INTERNALLY ILLUMINATED L.E.D.
WALL
HOUSE —+
POWER
DISCONNECT
SWITCH i
f
12VOLT L.E.D.
DRIVER
5",040 ALUMINUM
RETURNS
TRIMCAP
ACRYLIC FACES
L.E,D, MODULE
LOW VOLTAGE WIRE
WIRE NUTS
EACH LETTER FASTENED,& A
MINIMUM OF 4 #10 SMS
WITH STUCCO APPROVnr
ANCHORS
SHEET METAL SCREW
ALL WALL PENETRATIONS TO BE SEALED WITH UL LISTED SILICONE SEALANT
U.L. 48
NEC ELECTRICAL CODE 2010
TH15 SIGN 15 INTENDED TO BE IN5TALLED IN ACCORDANCE WITH REQUIREMENTS OF
ARTICLE 600 ON THE NATIONAL ELECTRIC CODE AND OR OTHER APPLICABLE LOCAL CODE5.
THI5 INCLUDE5 PROPER GROUNDING AND 80NDING OF THE 51GN.
CHANNEL LETTER CONNECTION DETAILHOUSE
POWER
_F 7 yT'' 7 ��cn
CHANNEL LETTER I I CHANNEL LETTER I I CHANNEL LETTER I I CHANNEL LETTER
U.L. LISTED AND LABELED
COMPLIES WITH 2013 CA ELECTRIC CODE, ARTICLE 600
Frontage: 50 Linear Feet
Customer:
Telephone: 760-xxx-xxxx
Jobsite: `*"""'"'
Synergy
Fax: 760-xxx-xxxx
Same
Address:
78474 Hwy. 111
i
a'dlor ppro 1.
`
Total Signage 13.4 S.F.
La Quinta, CA 92253
East ELEVATION
Si(;N*A*RAMA
Contractor's Llc # 830131 C45, C61/D42
DWg. No.: 72040
Rev.: 1
YOUR SIGNATURE ACKNOWLE GES FULL APPROVAL OF DESIGN CONTENT
AND LAYOUT, RELEASING SIGN*A*RAMA FROM RESPONSIBILITY IN REGARD
Workers Comp. #1938807
Date: 05-06-15
TO INCORRECT DESIGN AND INFORMATION. THE COLORS SHOWN ARE ONLY
REPRESENTATIVE OF ACTUAL PMS COLOR CALL OUTS. FINAL COLOR WILL
41-945 Boardwalk, Ste. L
Designer: JT
Palm Desert CA. 92211
BE MATCHED AS CLOSEAS POSSIBLE, COMMENSURATE WITH MATERIALS USED.
PH 760-776-9907 FX 760-776-9844
City LIC. #97005491
Salesperson: BS
THIS DESIGN IS PROPRIETARY PROPERTY AND MAY NOT BE USED WITHOUT
THE EXPRESSED WRITTEN CONSENT OF SIGN*A*RAMA.
Bin #
City of La Quin' to
Building 8l: Safety Division
P.O. Box 1504, 78-495 Calle Tampico
13La Quinta, CA 92253 - (760) 777-7012.
Building Permit Application and Tracking Sheet
Permit #
)01 ! od
Project Address: S' 'Ll -71) fi✓ , S A
Owner's Name:s#_ �- a N� /'�✓ �w l I
A. P. Number: L v,,
Address: IJ L174
Legal Description:
City, ST, Zip: L.,.
Contractor:
rJ —,Mpg
Telephone: a-
-• s
6 o I �-
Address:
City, ST, Zip:d-
Project Description:
T elen
Ph o e.• Q -7-74 L y G
State Lic. # : F-3 3 6 13 1 City Lie. #..
Arch., Engr., Designer:
Address:
City.; ST, Zip:
Telephone:
hone:
......Project
Construction Type: e: ccu
Occupancy:
Y P P Y:
State te Lic.#:
o e i ne (circle
o w N
type �c e Add', Alter er P
Re air Demo
Name of Contact Person: , LL......
i
Sq. Ft.:
# Stories:
# Units:
Telephone # of Contact Person: 6 d — •7 — �o /
Estimat6d Value of Project:
APPLICANT: DO NOT WRITE BELOW THIS LINE
#
Submittal
Req'd
Ree'd
TRACKING
PERMIT FEES
Plan Sets
Plan Check submitted
Item
Amount
Structural Calcs.
Reviewed, ready for corrections
Plan Check Deposit
Truss Calcs.
Called Contact Person
Plan Check Balance
Title 24 Cafes.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2°" Review, ready for corrections/issue
Electrical
Subcontactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
'^' Review, ready for corrections/issue
Developer Impact Fee
Planning Approval
Called Contact Person
A.I.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees
Projec'-Address: -7
Location of Sign -Outdoor Signs O Indoor Signs
Phase of Sign Construction X jNew Signs . . O Sign Alterations
Type of Lighting Control Nrr0C,5A El. New Lighting Controls O Replaced Lighting Controls O Not Installing Lighting Controls
This Certificate of Compliance Includes the following components (check all that apply) .
!V.Mandatory Measures (Lighting Controls) O Maximum Allowed Lighting Power O Specific Lighting Sources
1. Mandatory Sign Ughting Controls
NOTES:
1.
The some responsible person may install both the sign lighting power and the sign lighting controls, or o different responsible
person moy install the sign lighting controls than the responsible person installing the sign lighting power.
2.
The Mandatory Measures (sign lighting controls) ore required for compliance with the sign lighting Standards. If the person
responsible for installing the sign lighting power is not also responsible for the sign lighting controls, then the owner of the sign,
general contractor, or architect shall be responsible to have the sign lighting controls installed.
3.
if more than one person has responsibility for compliance, each responsible person shall prepare and sign a Certificate of
Compliance and on installation Certificate applicable to the portion of construction for which they are responsible, olternatively,
the person with chief responsibility for construction shall prepare and sign the Certificate of Compliance Declaration Statement
for the entire construction.
la.
Statements of Responsibility: Any person signing the Certificate of Compliance Declaration Statement on this NRCC-LTS-01-E
shall
complete Part la. Check Yes or No for all of the following statements:
1
1 have responsibility for installing the sign lighting controls
Oyes, complete parts la and lb of this form O No, complete part la of this form
z
There are no existing sign lighting controls and I will be installing compliant sign lighting controls
Yes O No
3
There are no existing sign lighting controls and someone else will be responsible to install compliant sign lighting controls
Yes O No
There are existing sign lighting controls that do not comply with the applicable provision of §110.9 and §130.3 and 1 will be
4
installing compliant sign lighting controls
O Yes ANo
There are existing sign lighting controls that do not comply with the applicable provision of §110.9 and §130.3 and someone
5
else will be responsible to install compliant sign lighting controls
O Yes gNo
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
lb. Mandatory Sign lighting Controls
If the person signing the Certificate of Compliance Declaration Statement on this NRCC-LTS-01-E is responsible for complying with
the sign lighting control requirements, that person shall answer all of the following questions:
If there are construction documents, indicate where on the building plans the
mandatory measures (sign lighting control) note block can be located:
§1303(a)l. All Indoor sign lighting is controlled with an automatic time -switch control or astronomical time-
YN
NA
switch control.
❑
❑
§1303(a)2A. All outdoor sign lighting is controlled with a photocontrol in addition to an automatic time-
Y
N
NA
switch control, or an astronomical time -switch control.
❑
2
Y
NA
EXCEPTION to Section 130.3(a)ZA: Outdoor signs in tunnels, and signs in large permanently covered outdoor
areas that are intended to be continuously lit, 24 hours per day and 365 days per year.
❑
§130.3(a)26. All outdoor sign lighting that is ON both day and night is controlled with a dimmer that provides
the ability to automatically reduce sign lighting power by a minimum of 65 percent during nighttime hours.
hours be ON both
Y
❑
N
❑
NA
Signs that are illuminated at night and for more than 1 hour during daylight shall considered
3
day and night.
EXCEPTION to Section 130.3(a)26: Outdoor signs in tunnels and large covered areas that are intended to be
Y
NA
illuminated both day and night. I
❑
§130.3(a)l Demand Responsive Electronic Message Center Control. An Electronic Message Center (EMC)
Y
N
N
N/A
having a new connected lighting power load greater than 15 kW has a control installed that is capable of
❑
4
reducingthe lighting power by a minimum of 30 percent when receiving a demand response signal.
EXCEPTION to Section 130.3(a)3: Lighting for EMCs that is not permitted by a health or life safety statute,
Y
NA
ordinance, or regulation to be reduced by 30 percent.
❑
Field Inspector Notes:
k
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance lune 2014
2 Ma:Liinum Allowed Uehtinft Power Method of Compliance
Certificate of Compliance and Field Inspection Energy Checklist
Complete this part if there are signs using the maximum allowed lighting power method of compliance. (Complete part 3 of
this Certificate of Compliance if there are signs using the Specific lighting sources method of compliance)
A
8
C
D E F G
H
I
i
Symbol
OPTIONAL— Energy
Complies
Filed Inspector
Description of the Sign
Verified Label (see
Allotted Watts
Design Watts
Y/N
Check that sign
Or Code
instructions below)
complies
O
_ a
off. t=,�
o
a
� ?
9
w
m e
N
d
C
60
V1
C W
It
Q `' LU
Q
F- 3
Ea
O
VI
u
✓
iG
��L5,
;� ❑
I
S
9 Z
Jbb y
?-v
❑
❑
❑
0
0
❑
o
o
❑
❑
o
❑
o
❑
❑
❑
o
❑
o
❑
❑
A
Symbol or code used on the
plans (when plans are required) and other documents.
B
A description of the sign, or location of sign on the building; and the location of sign on construction documents.
OPTIONAL - Check this box only if this sign has a permanent, pre-printed, factory -installed, ENERGY VERIFIED label, confirming that the
sign complies with the Section 140.8 of the California 2013 Title 24, Part 6 Standards, using the Maximum Allowed Lighting Power
method of compliance. The only labels that will be recognized for this purpose are ENERGY VERIFIED Certification Marks authorized by
Underwriters Laboratories (UL) or other Product Certification Body accredited to ISO/IEC Guide 65 by the American National Standards
C
Institute in accordance with ISO/IEC 17011. Surveillance by the Accredited Certification Body shall be an ongoing annual inspection
program carried out by a Type A Inspection body in accordance with ISO/IEC 17020. For signs with such an ENERGY VERIFIED label,
columns 'D' through 'I' are not required to be filled out. Note: Using an ENERGY VERIFIED label is an optional method to validate
compliance. An ENERGY VERIFIED label is not needed for compliance.
D
The sign area insquare feet.
E
List "I" if the sign is internally illuminated. List "E" if the sign is externally illuminated.
F
Allowed watts per square foot. Enter 12 if the sign is listed as "I" in column E. Enter 2.3 if sign is listed as "E" in column E.
G
Multiply the square footage in column D times the allowed Lighting Power Densf (LPD = watts) in column F.
H
Show the total installed watts in the sign, as determined according to the applicable provisions of §130(c).
I
Enter Y if the number in column H Is less than orequal to the number in column G. Otherwise, the sign does not comply.
1
This page doubles as a field Inspection checklist.
Field Inspector Notes:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance lune 2014
3. Spctcific Liehtinit Source Method of Compliance
Certificate of Compliance and Field Inspection Energy Checklist
Complete this part if there are signs using the Specific lighting source method of compliance. (Complete part 2 of this Certificate
of Compliance if there are signs using the maximum allowed lighting power method of compliance)
A
B
C
D
E
OPTIONAL
Specific light source used for
Symbol
ENERGY VERIFIED
compliance
Field Inspector
or
Description
label
Shall include only lighting
Check that Sign
Code
(see instructions
technologies listed below
Complies
below)
List all that apply
❑
❑
❑
❑
❑
❑
❑
o
❑
❑
A
Symbol or code used on the plans (when plans are required) and other documents.
e
A narrative description of the sign, or location of sign on the building; and the location of sign on construction documents
C
OPTIONAL - Check this box only if this sign has a permanent, pre-printed, factory -installed ENERGY VERIFIED label, confirming that this sign
complies with the Section 140.8 of the California 2013 Title 24, Part 6 Standards, using the Specific Lighting Source Method of Compliance. The
only labels that will be recognized for this purpose are ENERGY VERIFIED Certification Marks authorized by Underwriters Laboratories (UL) or
other Product Certification Body accredited to ISO/IEC Guide 65 by the American National Standards Institute in accordance with 150/IEC
17011. Surveillance by the Accredited Certification Body shall be an ongoing annual Inspection program carried out by a Type A Inspection body
in accordance with ISO/IEC 17020. For signs with such an ENERGY VERIFIED label, column 'D' is not required to be filled out. Note: Using an
ENERGY VERIFIED label is an optional method to validate compliance. An ENERGY VERIFIED label is not needed for compliance.
Specific Light Source Compliance Method. The sign(s) identified above use only the following lighting technologies:
List all applicable numbers (1 through 9) that apply in column D above for each row.
1
High pressure sodium lamps
Metal halide lamps that are pulse start or ceramic served by a ballast that has a minimum efficiency of 88 percent or
2
greater. Ballast efficiency is the measured output wattage to the lamp divided by the measured operating input wattage
when tested according to ANSI C82.6-2005.
Metal halide tamps that are pulse start that are 320 watts or smaller, are not 250 watt or 175 watt lamps, and are served by
3
a ballast that has a minimum efficiency of 80 percent.
Ballast efficiency is the measured output wattage to the lamp divided by the measured operating input wattage when tested
according to ANSI 082.6-2005.
Neon or cold cathode lamps with transformer or power supply efficiency greater than or equal to a minimum efficiency of 75 percent
D
4
when the transformer or power supply rated output current is less than 50 mA. The ratio of the output wattage to the input wattage is at
100 percent tubing load.
Neon or cold cathode lamps with transformer or power supply efficiency greater than or equal to a minimum efficiency of 68 percent
5
when the transformer or power supply rated output current is 50 mA or greater. The ratio of the output wattage to the input wattage is at
100 percent tubing load.
6
Fluorescent lighting systems meeting one of the following requirements: A. Use only lamps with a minimum color rendering index (CRI) of
80; or 8. Use only electronic ballasts with a fundamental output frequency not less than 20 kHz.
7
Light emitting diodes (LEDs) with a power supply having an efficiency of 80 percent or greater;
Single voltage external power supplies that are designed to convert 120 volt AC Input into lower voltage DC or AC output, and have a
8
nameplate output power less than or equal to 250 watts, shall comply with the applicable requirements of the Appliance Efficiency
Regulations (Title 20).
9
Compact fluorescent lamps that do not contain a medium screw base sockets (E24/E26).
E
This page doubles as a field inspection checklist.
Field Inspector Notes:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance lune 2014
r
'DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
L-1— S
Company: ` �
Signature Date:
Address:
4 (CN -5 BOA-R-DvJ SWTE -
CEA/ HERS Certification Identificatf n (if a plica le):
City/State/Zip:Phone:
N's— DES'EP-T c14, 9 zZ c
7�0 -?1 - y o
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer). `
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4., The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
S. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this
Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name:
ZvvcQ- �0 C:'s
Responsible Designer Signature: ,
, .
Company:
Date Signed: V1 I
Aedre:::Li t g y s13 0
130 W f2l� L, 16' SuI'TE-
ucenze: e B30
City/State/Zip: Z Z ( I
Phone: -� LOO —
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014