10-1104 (MECH)I
P.O. BOX 1504 T4hf 4^' VOICE (760) 777-7012
78-495 CALLE TAMPICO FAX (760) 777-7011
LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPARTMENT INSPECTIONS (760) 777-7153
BUILDING PERMIT
Date: 12/08/10
Application Number: 10-00001104 Owner:
Property Address: 78590 HIGHWAY 111 WASHINGTON ADAM PARTNERSHIP
APN: 604-080-999- - - 42620 CAROLINE CT #102
Application description: MECHANICAL PALM DESERT, CA 92211
Property Zoning: COMMUNITY COMMERCIAL
Application valuation: 10000
f
Contractor: p
Applicant: Architect or Engineer: COOL PLO INC n o 0 2 10
79469 COUNTRY CLUB DR, #H
BERMUDA DUNES, CA 92203tlTYOFLAtAdlNTF►
(760)34 r
LiC. No..:: 438 438781
coat-
-—-————-————--------—--———--————--------—--—————-——--—---—-————————--———--——-———-——--------------
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that 1 am licensed under provisions of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and professionals Code, and my License is in full force and effect.
License` lass: t 20 i // License No.: 438781
a
OWNER -BUILDER DECLARATION '
I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the
following reason (Sec. 7031 .5, Business and Professions Code: Any city or county that requires a permit to
construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State
License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or
that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031 .5 by
any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).:
(_) I, as -owner of the property, or my employees with wages as their sole compensation, will do the work, and
the structure is not intended or offered for sale ISec. 7044, Business and Professions Code: The
Contractors' State License Law does not apply to an owner of property who builds or improves thereon,
and who does the work himself or herself through his or her own employees, provided that the
improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner -builder will have the burden of proving that he or she did not build or
improve for the purpose of sale.).
(_ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project ISec.
7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of
property who builds or. improves thereon, and who contracts for the projects with a contractors) licensed
pursuant to the Contractors' State License Law.).
( 1 I am exempt under Sec. , BAP.C. for this reason
Date: Owner:
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the
work for which this permit is issued ISec. 3097, Civ. C.).
Lender's Name:
Lender's Address:
LQPERMIT
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided
for by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued.
I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor
Code, for the performance of the work for which this permit is issued. My workers' compensation
insurance carrier and policy number are:
Carrier NORGUARD INS Policy Number COWC129001
I certify that, in the performance of the work for which this permit is issued, I shall not employ any
person in any manner so as to become subject to the workers' compensation laws of California,
and agree that, if I should beco s bject to the workers' compensation provisions of Section
700 of the Labor Code, I spa o hwit�omply with thosepro
isions.
Date • G� Applican� �.%,
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL
SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND
DOLLARS J$1 00,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
APPLICANT ACKNOWLEDGEMENT
IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the
conditions and restrictions set forth on this application.
1 . Each person upon whose behalf this application is made, each person at whose request and for
whose benefit work is performed under or pursuant to any permit issued as a result of this application,
the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City
of La Quinta, its officers, agents and employees for any act or omission related to the work being
performed under or following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is not commenced
within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject
permit to cancellation.
I certify that I have read this application and state that the above information is correct. I agree to comply with all
city and county ordinances and state laws relating to building constru do , and hereby authorize representatives
of this cou y enter upon the above-mentioned property p i purpo y.
Date: Signature (Applicant or Agen
Application Number 10-00001104
Permit 'BUILDING PERMIT
Additional desc .
Permit Fee 117_00 Plan Check Fee
76.05
'Issue Date . . . Valuation
10000
Expiration Date 61/06/11
Qty Unit Charge Per
Extension,
BASE FEE
45.00
8.00 9.0000 THOU BLDG 2,001-25,000
----------------------------------------------------------------------------
72.00
Permit MECHANICAL
Additional desc .
Permit Fee . . . . 31.50 Plan Check Fee
7.88.
Issue Date Valuation . . . .
0
Expiration Date 6/06/11
Qty Unit Charge Per
Extension
BASE FEE
15.00
1.00 16.5000 EA MECH B/C >3-15HP/>100K-500KBTU
16.50
----------------------------------------------------------------------------
Special Notes and Comments
ADDITIONAL ROOF TOP HVAC UNIT - INCLUDES
REQUIRED ADDITIONAL FRAMING [ENGINEERED]
2007/2008 CALIFORNIA BUILDING CODES.
December 8, 2010 10:16:36 AM AORTEGA
----------------------------------------------------------------------------
Other.Fees. . . . . . . . . . BLDG STDS ADMIN (SB1473)
1.00
ENERGY REVIEW FEE
7.61
Fee summary Charged Paid Credited
---------------------------------------------------------
Due
Permit Fee Total 148.50 .00 .00
148.50
Plan Check Total 83.93 .00 .00
83.93
Other Fee Total 8.61 .00 .00
8.61
Grand Total 241.04 .00 .00
241.04
LQPERMIT
Bin #.
C, C
Permit #
Project Address:
A. P. Number:
Address:
City, ST, Zip:
r
City of La Quinta
Building &r Safety Dfvfslon
P.O. Box 1504, 78-495 Calle Tampico
La Qtdnta, CA 92253 - (760) 777-7012
Building Permit Application and Tracking Sheet
Owner's Name: <
Address:3•f.
Ci
y. ST, Zip: L -C� . &h
Fes. /616 .,
GOv� 12Yr ce-0,d
'?2�7
# Submittal
Plan Sets
Structural Calcs.
Truss Cala.
Title 24 Calcs.
Flood plain plan
Grading plan
Subcoutactor list
Grant Deed
H.O.A. Approval
IN HOUSE: -
Planning Approval
Pub. Wks. Appr
School Fees
4 Vag,( do WAO
Project Description: ��
L5'--MAl A
J ,■
r , „► 0
OF N541
CJ
State Lic. # :V5K 7yl
Construction Type:
Occupancy:
Arch., Engr., Designer.
9-
Ad4=: —//T C
Demo
City.. ST.'Zip:
—
# Units:
Telephone: ,(ef% SW -
State Lid. #g20
Name of Contact Person:X
AV
Tclephono # of Contact person: -7/47
# Submittal
Plan Sets
Structural Calcs.
Truss Cala.
Title 24 Calcs.
Flood plain plan
Grading plan
Subcoutactor list
Grant Deed
H.O.A. Approval
IN HOUSE: -
Planning Approval
Pub. Wks. Appr
School Fees
4 Vag,( do WAO
Project Description: ��
L5'--MAl A
J ,■
r , „► 0
OF N541
CJ
Construction Type:
Occupancy:
Project type (circle one): Naw Add'n tea)Repair
Demo
S9• F- :/SRO
#Stories: `
# Units:
Estimated Value of Project
e)
APPLICANT:
DO NOT WWTE BELOW THIS LINE
Recd
TRACMG
PERMIT FEES
Plan Check submitted
I D
Item
Amount
Reviewed, ready for corrections ��
Plan Check Deposit
^
Called Contact Person �� 3
(J
Plan Check Balance.
Plain picked up �►J
it 3
Construction
!�
,
-�
Plans resubmitted
Mechanical
2" Review, ready for correctioue
Electrical
Called Contact Person
Plumbing
Plana picked up
S M.L
_.
Plans resubmitted
Grading
Review, ready for correcdons/rssuc
Developer Impact Fee
r
Called Contact Person
A.I-P.P.
Date or permit issue
I .�
Total Permit Fees
71-780 San,Jacinto Dr. Ste. E2; Rancho Mirage,. Ca. 92270 ph. (760) 834-8860 fax (760) 834-8861
Letter of Transmittal
To:
City of La Quinta Today's Date:
12-7-10
78-495 Calle Tampico City Due Date:
12-6-10
La Quinta, CA 92253 Project Address:
78-590 Highway 111
Attn:
Phillip Plan Check #:
10-1104
Submittal: ❑ 1st
❑
4th
® 2nd
❑
5th
❑ 3`d
❑
Other:
We are forwarding: ® By Messenger ❑ By Mail (Fed Ex or UPS)
❑ Your Pickup
Includes: 4 Of Descriptions: Includes:
# Of
Descriptions:
Copies:
Copies:
❑
Structural Plans
®
1
Revised Structural Plans
❑
Structural Calculations
®
1
Revised Struct. Calcs
❑
Truss.Calculations
❑
Revised Truss
❑
Soils Report
❑
Revised Soils Report
❑
Structural Comment List
❑
Approved Structural Plans
®
1 Redlined Structural Plans
❑
Approved Structural Calcs
®
1 Redlined Structural Calcs
❑
Approved Truss Calcs
❑
Redlined Truss Calcs
❑
Approved Soils Report
❑
Redlined Soils Reports
❑
Other:
Comments: Structural content is approvable.
This Material. Sent for:
❑ Your Files
❑ Your Review
❑ Checking
Other: ❑
By: John W. Thompson
Rancho MirCpi e: ® (760) 834-8860
Other: ❑
DEC0�101U
$y•.I
® Per Your Request
❑ Approval
❑ At the request of:
h BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Subway 48246-0 Mechanical.
78590 Highway 111
La Quinta, CA 92253
Project Designer:
G Design
0
f -
Report Prepared by:
Michael Dell
DELL CO.
1629 York Drive
Vista, Ca 92084
760-940-0064
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
Job Number: APPROVED
rZE4 I� D FOR CONSTRUCTION
nr10-1910m
NOV H2010 Date: � IN BY
Date:
11/15/2010
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.ene�gysoft.com.
EnergyPro 5.1 by Energ Soft User Number: 1712 RunCode: 2010-11-15T20:20:17 ID: nr10-191Orn
TABLE OF CONTENTS
CoverPage
1
Table of Contents
2
Form MECH-1-C Certificate of Compliance
3
Form MECH-2-C Air & Water System Requirements
8
Form MECH-3-C Mechanical Ventilation
9
Form MECH-4-C HVAC Misc. Prescriptive Requirements
10
Form MECH-MM Mechanical Mandatory Measures
12
HVAC.System Heating and Cooling Loads Summary
13
EnergyPro 5.1 by EnergySoft Job Number: ID: nr10-1910m User Number: 1712
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Subway 48246-0 Mechanical
Date
11/15/2010
Project Address
78590 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
1,580
Addition Floor Area
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
270 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equi ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1 HP -1
Dining area
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
39,940 Btu/hr
❑
❑
Minimum Heating Efficiency'
7.70 HSPF
❑
❑
Max Allowed Cooling Capacity'
93,079 Btu/hr
❑
❑
Cooling Efficiency'
13.2 SEER / 11.2 EER
❑
❑
Duct Location/ R -Value
R-4.2
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason'—
Item or System Tags
i.e. AC -1, RTU -1, HP -1
Kltchen/prep
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
9,481 Btu/hr
❑
❑
Minimum Heating Efficiency'
7.70 HSPF
❑
❑
Max Allowed Cooling Capacity'
54,971 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.1 EER
❑
❑
Duct Location/ R -Value
R-4.2
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
1 hermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
4
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 3 of 14
CERTIFICATE OF COMPLIANCE and (Part 2 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Subway 48246-0 Mechanical 11/15/2010
Discrepancies: `
n
171
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1 C
Project Name
Date
Subway 48246-0 Mechanical
11/15/2010
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air
Control
Supply
Valve
Water
Variable
Demand
For
Single -Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Re uirin Testing or Verification Ot .
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
Day and Night RHS060S0' '**'A 1
IZI
Il
❑
❑
❑
❑
1 ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Ener Pro 5.1 by Ener Soft User Number. 1712 RunCode: 2010-11-15720:20:17
ID: nr10-1910m Page 5 of 14
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5)
MECH-1 C
Project Name
Subway 48246-0 Mechanical
Date
11/15/2010
TEST DESCRIPTION
MECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Re uirin Testing
Fault
Detection &
Diagnostics
Ot . for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
S stems
Thermal Energy
Storage (TES)
Systems Test Performed By:
Day and Night RHS060S0""*"'A
1 ❑
❑
❑
❑ Cool Flo A/C & Heating
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1 ❑
❑ 1
❑
Ener Pro 5.1 by Ener Soft
User Number: 1712
Run Code: 2010-11-15720:20:17 ID: nr10-1910m
Pa e 6 of 14
CERTIFICATE OF COMPLIANCE Part 5 of 5 MECH-1 C
Project Name
Date
Subway 48246-0 Mechanical
1 11/15/2010
Documentation Author's Declaration Statement
I certify that this Certificate of Compliance documentation is accurate and complete.
Signature
Name
Michael Dell
-
Company DELL CO.
Date 11/15/2010
Address 1629 York Drive
CEA# NR08-90-3530
CEPE #
City/State/Zip Vista, Ca 92084
Phone 760-940-0064
The Principal Mechanical Designer's Declaration Statement
• I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical
design.
• This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance
with Title -24, Parts 1 and 6 of the California Code of Regulations.
• The design features represented on this Certificate of Compliance are consistent with the information provided to document
this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the
enforcement agency for approval with this building permit application.
Name Mike Mangan
Signature
Company
Cool Flo A/C & Heating
Date
Address - 2-// el (fCkJ1UTWY Clev ' y
License #
City/State//Zipi�UjVeS 6,4 y1�4)
Phone 760 •J :�-'I,S =66A�
Mandatory Measures
Indicate location on building plans of Note Block for Mandatory Measures
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual.
Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
® MECH-1 C Certificate of Compliance. Required on plans for all submittals.
® MECH-2C Mechanical Equipment Summary is required for all submittals.
m MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation.
® MECH-4C Fan Power Consumption is required for all prescriptive submittals.
Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-191Orn Page 7 of 14
AIR SYSTEM REQUIREMENTS
(Part 1 of 2) MECH-2C
Project Name
Date
Subway 48246-0 Mechanical
11/15/2010
Indicate
Air Systems Type (Central,
Single Zone, Package, VAV, or etc...
Item or System Tags
; �.
i.e. AC-1, RTU-1, HP-1
Dining area
Kltchen/prep
Number of Systems
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112(a)
7.70 HSPF
7.70 HSPF
Cooling Equipment Efficiency
112(a)
13.2 SEER/ 11.2 EER
13.0 SEER/ 11.1 EER
HVAC Heat Pump Thermostat
112(b), 112(c)
Yes
Yes
Furnace Controls/Thermostat
112(c), 115 a
n/a
n/a
Natural Ventilation
121 b
No
No
Mechanical Ventilation
121 b
520 cfm
148 cfm
VAV Minimum Position Control
121 c
No
No
Demand Control Ventilation
121 c
No
No
Time Control
122(e)
Programmable Switch
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Setback Required
Outdoor Damper Control
122(f)
Auto
Auto
Isolation Zones
122
n/a
n/a
Pipe Insulation
123
Duct Insulation
124
R-4.2
R-4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
39,940 Btu/hr
9,481 Btu/hr
Proposed Heating Capacity
144(a & b)
36,225 Btu/hr
34,352 Btu/hr
Calculated Design Cooling Load
144(a & b
65,155 Btu/hr
38,480 Btu/hr
Proposed Cooling Capacity
144(a & b
46,469 Btu/hr
37,368 Btu/hr
Fan Control
144(c)
Constant Volume
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (DDC only)
144(c)
Yes
Yes
Simultaneous Heat/Cool
144(d)
No
No
Economizer
144(e)
No Economizer
No Economizer
Heat Air Supply Reset
144(f)
Constant Temp
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(k)
No
No
1. Total installed capacity (MBtu/hr) of all electric heat on
this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 1712
Run Code: 2010-11-15720:20:17
ID: nr10-1910m Page=4d of 14
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
Subway 48246-0 Mechanical
Date
11/15/2010
MECHANICAL VENTILATION §121(b)2 REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I J
K
L
M
N
Zone/System
Condition
Area
ft2
CFM
per
ft2
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REO'D
V.A.
Max of
D or G
Design 50% of
Ventilation Design Zone
Air Supply
CFM CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
Dining area
659
0.50
330
34.7
15.0
520
520
520
Dining area
Total
520
520
Kltchen/prep
595
0.15
89
3.0
30.0
89
89
89
Rest Room
60
0.15
9
0.6
15.0
9
9
9
Customer Service
201
0.15
30
1.3
30.0
40
40
40
Rest Room
65
0.15
10
0.71
15.0
10
10
10
Kitchen/prep
Total
148
148
Totals 40.3 668 668 Column I Total Design Ventilation Air
C
Minimum ventilation rate per Section 121, Table 121-A.
E
Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting.
H
Required Ventilation Air REO'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K
Condition area ft2 x 0.4 CFM / ft2; or
L
Maximum of Columns H, J, K, or 300 CFM
M
This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m
Page 9 of 14
FAN POWER CONSUMPTION
s MECH-4C
Project Name
Subway 48246-0 Mechanical Dining
t
Date
11/15/2010
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consum tion of fan §144(c).
A
B C I D
E
F
Fan Description
Efficient
Design Brake
HP Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(C X D
Supply Fan
1.070 82.5% 97.0%
1.0
997
t
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
1 TOTAL FAN SYSTEM POWER WATTS, SUM COLUM F 997
2) SUPPLY DESIGN AIRFLOW (CFM) 2,000
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
- pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX Row 1 / Row 2 W/CFM
4 SPa
5 SP,
B Calculate Fan Adjustment and enter on line 6.
6 Fan Adjustment = 1 -(SPI— 1 / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7
7) - ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.499 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
f
Energ Pro 5.1 by Energ Soft - User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 10 of 14
FAN POWER CONSUMPTION
MECH-4C
Project Name
Subway 48246-0 Mechanical Kitchen /Prep
Date
11/15/2010
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach: See Power Consum tion of fan §144(c).
A
B
C D
E
F
Fan Description
Design Brake
HP
Effici Incy
Number of
Fans
Peak Watts
B X E X 746 /
C X D
Motor Drive
Supply Fan
1.070
82.5% 97.0%
1.0
997
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
1 TOTAL FAN SYSTEM POWER WATTS, SUM COLUM F 997
2) SUPPLY DESIGN AIRFLOW (CFM) 2,000
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3 TOTAL FAN SYSTEM POWER INDEX Row 1 / Row 2 W/CFM
4 SPa
5) SP,
B Calculate Fan Adjustment and enter on line 6.
6 Fan Adjustment = 1- SPa-1 / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.499 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
Energ Pro 5.1 by EnergySoff User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 11 of 14
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
Subway 48246-0 Mechanical T11/15/2010
Equipment and System Efficiencies
§111:
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
§123:
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124:
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1 A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1 C.
A 4 -hour timer that can be manually operated to control the operating period of the system.
2
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(8)'
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c):
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b):
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e):
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f):
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID. nr10-1910m Pae 12 of 14
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Subway 48246-0 Mechanical
Date
11/15/2010
System Name
Dining area
Floor Area
659
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 2,031
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 520
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System
58,000
27,570
9,538 220
6,415
Total Output Btuh
58,000
0
Output Btuh/s tt
88.0
1,378
321
Cooling System
0
0
Output perSystem
61,500
20,116
4,982 520
24,278
Total Output Btuh)
61,500
3,404
14,520
-3,404
Total Output Tons
5.1
1,378
321
Total Output (Btuh/s ft)
93.3
Total Output s ft/Ton
128.6
53,847
27,930
Air System
CFM perSystem
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
2,000
Day and Night RHS060S0"""A 46,469 11,653
36,225
Airflow cfm/s tt
3.03
Airflow (cfm/Ton)
390.2
Outside Air (%)
26.0%
Total Adjusted System Output 46,469 11,653
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK Jul 5 PM
36,225
Jan 1 AM
Outside Air cfm/s ft 0.79
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF
Outside Air
520 cfm
70 OF
58 OF 96 OF 98 OF
Heating Coil Supply Fan °
2,000 cfm 97 F
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
111 178 OF
Outside Air Ar
520 cfm
75 ; 65 OF
84 / 68 OF 59 / 58 OF 61 / 58 OF
Cooling Coil Supply Fan 61 / 59 OF
2,000 cfm
60.5% ROOM
74 / 65 IF
T - 1
EnergyPro 5.1 by EnergySoft
User Number: 1712 RunCode: 2010-11-15T20:20:17 ID: nr10-1910m Page 13 of 14
MVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Subway 48246-0 Mechanical
Date
11/15/2010
System Name
Kitchen/prep
Floor Area
921
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,486
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 148
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 55,000
20,436
2,125 96
2,823
Total Output (Btuh) 55,000
0
Output Stuh/s ft 59.7
1,022
141
Cooling System
0
0
Output perSystem 58,000
5,918
1,860 148
6,929
Total Output Btuh 58,000
3,404
3,985
-3,404
Total Output (Tons) 4.8
1,022
141
Total Output Btuh/s ft 63.0
Total Output s ft/Ton 190.6
31,802
6,630
Air System
CFM perSystem
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
2,000
Carrier 50LJQ006--32 37,368
14,193
34,352
Airflow cfm/s ft
2.17
Airflow cfm/Ton
413.8
Outside Air %)
7.4%
Total Adjusted System Output 37,368
(Adjusted for Peak Design conditions)
I TIME OF SYSTEM PEAK
14,193 34,352
Jul 2 PM Jan 1 AM
Outside Air cfm/s ft 0.16
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
(Airstream Temperatures at Time of Heating Peak
26 OF
10-0
Outside Air
148 cfm
70 OF
67 OF 96 OF ^ 98 OF
Heating Coil Supply Fan
2,000 cfm 98 OF
ROOM
i
70 OF
COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak)
112/78°F
Outside Air
148 cfm
74 ( 64 OF
77/65°F 59/58°F 61/59°F
Cooling Coil Supply Fan 61 / 59 °F ,
2,000 cfm
57.1 % 'ROOM
74 i 64 °F
EnergyPro 5.1 by EnergySoff
User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 14 of 14
GENERAL
I. THE NOTES AND SPECIFICATIONS ON STRUCTURAL DRAWINGS GOVERN IN CASE OF CONFLICT WITH
07HEA5PECIFICATION5, —
2- NOTE 5AND DETAILS ON STRUCTURAL DRAWINGS SHAILL 7Ai4E PRECEDENCE OVER GENE RALNOTE 5,
AND S P EC I F I CATIONS. W HERE NO DI TAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK
ON THE PROJECT.
3• GCNERALCONTRACTOR SHALLVERIFY ALL DIMENSIONS AND SITE cONDITIONS BEFORE STARTING woRK-
ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY,
4, DIMENS ICNSSHALL TAKE P REC F DF Nr- F OVE R SCALES 5H0VVN0N r)RAVVINGS.TYPkCAL DETAILS AND
GENERAL NOTES ARE MINIMUM REQUIREM ENT5TO BE USED WHEN CONDITIONS ARE NOT SHOWN!
OTHERWISE-
S. ALL WORK SHALLCONFOR141TOTHE 2007 CAUFORNIA BUILDING CODE STANDARDS, AND REGULATIONS OF
THE STATE OF CALIF. DIVISION OF INDUSTRIAL SAFETY, AND THOSE CODES AND STANDARDS LISTED IN
THESE NOTES,
C. THE DRAWINGS REPRESENTTHE FINISHED STRUCTURE.THEY DO NOT INDICATETHE METHOD OF
CONSTRUCTION_ CONTRACTOR SHALL PROVIDE AI_l. MEASURES NECESSARY TO PROTECT THE
STRUCTURE DURING CONSTRUCTION. SUCH MEASURE5 SHALL INCLUDEAND 15 NOT LIMITEDTO
BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC -
"All construction shall comply with the 2007 Califamia Building, Electrical, Mvci arlicA-md
Pturnbing Codes, ZU08 California Energy Code and the City of La Quinta Municipal Code." -
T EACH END OF THE NLW 2 X 6'S.
ATTACHING THE NEW 2 X 6 JOIST
TO THE EXISTING 4 X 14 BEAMS,
(E) BM 1 & (E) BM 3.
LUMBER & GLU-LAMINATED BEAM
1. EXISTING MATERIALS ARE AS FOLLOWS: —
ROOF SHEATHING; 15f32' CDX STRUCT 41
MAIN MEMBER GLU-LAMS RUNNING FAST AND WEST ARE 5-3/4 X 24" STANDARD CAMBER 24FV4.
MEMBERS PERPENDICULAR TO THE GLU-1-AN1 BEAMS ARE 4 X 14 DF # 1.
JOIST MEMBERS PARALLEL TO GLU- LAMS ARE 2 X 5 DF # 2 @) 24' O.C,
NO ALTERATION, CUTTING, DRILLING OF THE LXI5TINGSTRUCTURAL WOOD NIATERIALSHALL i3E
ALLOWED WITHOUT THE FXPRESS WRITTEN PERMISSION OF THE ENGINEER OF RECORD -
GENERAL NAILING NOTES
4 I I I I fIL nLJrklIN710U 1 L 4Jr 1 F1L JAI LkiEYLJI I Ik-h YIIWO k-I.JLN 1 rhm,,-I kin 14-j rr%%jr C15L i JLLtlrSL I rlC
NEW PROPOSED AIR CONDITIONING UNIT. ALL HARDWARE USED TO CONNECT THE UNIT SHALL
BE APPLIED TO THE STRUCTU RAL TIMBER MEMBER5 ONLY AND NOT TH E ROOF SHEATHING.
ROOFING NOTES
1 • IT IS THE RESPONSIBILITY OF THE PRIME CONTRACTOR, LL., THE INDIVIDUAL RESPONSIBLE FOR THis
PROIECTOVERSITETO ENSURE THE FINAL ROOF REPAIR, OR MODIFICATION 5HALL BE PROPERLY AND
ADEQUATELY COMPLETED $O THA1' NO LEAKING 1rVILL OCCUR, IMPOSING DAMAGE TO THE SUPPORTING
STRUCTURAL. ME MBER5,
(lN) 5 tan A/C unit, Cmd must sit directly over
EAST ELEVATION the (E) 6-3/4 x 24 BM 3 Glu-Lain beam.
l
BAST yEL7LV- NEW A1C UNIT '-SFIALL BE ATTACH'I "TO THE CURB/ PL,A'I F-6R_V
� -
S[IOV1{IiVG THE USING THE FOLLONVINC -. (8004-SH**B SEISMIC IIOLD DOWN)
SI M PSON SDS25212 SCREWS
IN"["O THE (E) 4 14 {E) B 1 (N) CanFab roof curblcoinbinatian platform PART NO: (I005-CURB)
EAST ELEVATION .As the Ilatform rest on the
repaired doubled up 2 x 6 rang joist use 2- SDS25212
screw in each roof joist.
1-• DF#1 DRY 2 X 6 SHALL BE ADDED ALONG THE SIDE OF
'THE LXISTI.NC 2 X 6'S. EACH NEW 2 X 6 SHALL BE FULL
LENGTH (8'-0" +-). EACH NEW 2 X 6 S Fl ALL BE NAIL
:
ro -rHE EXISTING US-lNG 2-116D SINKERS @ 12" O.C.
LT
O
1
0
WEST ELEVATION
f
WEST ELEVATION SHOWING 'ria
SIMPSON SDS25212 SCREWS 8" O.C.
INTO THE (E) 4 X 14 (F) BM I
Not—
im
4 a rs.
L7 V 0 11 d d
4 o O o 4
(E) Hanger not to he interrupted
(E-BM-3) 6--3/4 x 4" GIu--Lanz 241F -V4
(E) Hanger not to be interrupted
? X 6 REPAIR PLATr, OR ATTACHMENT
(E-BM-3) 6-3/4 x 24" Glu-Lam 24F -V4
2 %011
(N) 5 ton A/C unit, end must six directly over
the (E) 6-314 x 24 BM 3 Glu-Lam learn.
NEW A/C UNIT SHALL BE ATTACHED TO THE CUMPLATFORM
USING THE FOLLOWING: ( 044-SII��B SEISMIC HOLD DOWN)
(N) CaaFah roof eurhlenlnl)ination platform PART NO: (1005-CURB)
F
WEST ELEVATION
L?se Simpson SDS25212 SCREW 5 AS FOLLOWS:
As the platform rests on the (E) 4 x 14 BM i & (E) 6-3l4" X 24 BM 3
use SDS25212 AT 8" O.C. Directly into the beams.
(E) T.S. COLUMN
20541
2*A) (2*113
STRUCTURAL OBSERVATION NOTES:
TNE SHALL EMPLOY THE ENGINEER TO PERFORM VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM
FOR THE FOLLOWING ITEMS. ITIS THE RE S PON S I B1 LITY OF THE GENERAL CONTRACTOR TO NOTIFYTHE
ENGINEER TWO DAY PRIOR TOTHE REQUIRED OBSERVATION- THE ENGINEER SHALL SUBMIT A
STATEMENTTO THE BUILDING OFFICIAL QUALIFYING THAT THE 08ESERVATION HAS BEEN MADE AND
WHETHER OR NOT ANY OBSERVED 5TRUCTURAt DEFICIENCIES HAVE BEEN CORRECTED TO CONFORM
TO THE APPROVED PLANS AND SPECIFICATIONS.
(A) nla
(B) ALL HAIR DWAR LACEMEN1 INCLUDIRIG, BUT NOT LIMITED TO, STRAPS, FRAMING CLIPS, HANGERS
AND 8EAM CON NE IONS.
(C) ATTHF COIVIPLF�ION OF THE STRUCTURAL WORK FOR GENERAL CONFORMANCE TO THE APPROVED
PLANS AND SPECIF ITIONS.
{Dj THIS STRUCTUR OBSERVATION DOES NDT INANE THE RESPON5EBILITY FOR THE INSPECTIONS REQUIRED.
E) HARDWARE
ALL GLU-LAMINATED.BEAMS BEAR ONTO (E) COLUMNS,
ALL (E) 4 X 14 6EAMS!JSE SIMPSON WPU 414,
ALL (E) 2 X 6 R.R. JOlft- USE SIMP50N HF26N.
1
ABBREVIATIONS & A/C APPLICATION NOTES
I I
1 I
(E-BMA) 4 X I D[~ # 1. EXISTING BEAM # 1
(E-BM-2) 4 Xi t DF # 1: EXISTING BEA;:1,1 ## 2
(E-BM-3) 6-314 ` 24" GIu-Lanj 24F -V4: EXISTING; GLU-LAM ;
1T IS IMPARA I .X,�LL U TtiE NEW AIC UNIT DOES NOT LQAD
ONTO (E-BM-1 1, .ALL LOADING MUST REMAIN ON (E-BM-3).
THE NEW AIC: JNIT CAN BE PLACED ANYWHERE ALONGN (E-BM-3) SO L G AS [T STRADDLES THE BEAM AS SHOWN �
IN THE FRAM NG LOCATION DIAGRAM BELOW. fl
-------------------------------------------------------------
I
(E) Hanger nl . to be interrupted
(E-BM-3) 6-314 x 24 Ghi.-Lana 24F -V4
i
I. (&BM-1) 4 X 14 f
i
SHEET it
lame
Stl`uctUxal General Notesjraming Play
1.0
S2.0
2.1
L.2
2.3
2.4
IS2.5
•I
PROJECT DESIGN DATA
1. DESIGN LCAD5: A. ROOF
DL = 15 psf LL = 20 psf
2• DESIGN CODE. CBC. 2007, (I.B•C. 2006)
3- WIND DESIGN: (RIOT APPLICAOLE)
SEISMIC DESIGN n)a
B C CODE
PARAMETERS
VALUE
IMPORTANCE FACTOR
S�
SI
Site Classification
Fa
FV
MS
S MI
S DI
CC
R
-
Rho
Veq (ASD)
ELE VA 110N SHOWING COMPONENT ATTACHMENT
2 A
2.A
205-0" 1 207-0"
i
(E) T.S. COLUMN (E) T.S. COLUMN
(N) 5 ton AEC unit, end must sit directly over
the (E) 6-314 x 24 Glu-Lam beam.
(N) CanFab roof curb/combination platform
see detail 2
(E-BM-3) 6-314 x 24" Glu-Lana 24F -4
(E) Hanger not to be interrupted
USE 3-16d sinkers (4'. 12." ox. entire length
of new repair cohrrponent except a� en end
use 3-16d sinkers Vox. for 3-rows
. .. ( 6 studs 16 1
--.....—
I
n n n n n n n n
(E) 2 X b LED(�E1 (E) 2 X G LEl][,ER E 2 X 6 LEDGER
() (E) 2 �C 6 LEDGER
( 2Xc❑�#2IJ 247�0 [EX E z
(F 2 1~i l)F {#2 u) 2411 O.C. D17' #2 4) 24" () X 6 DF #2 24' . C.
,..i
� TRI B 1
w — U U U (E-UM-1) 4 X 14 D.l; # 1 L_I (E-BM-1) 4 14 DF # 1 U U (k.-BM-1) 4 X 14 DF # 1 U U U (E-BM-1) 4 14 DF # 1
- _� - - _ _ _ _ __ '] C-
n n n n n n n n n n n
1 1
1 1 fi.
1 1
(E)2X6DF#2(k,2 " F##2 „
2 6 D P 421`zi 2 `* }y O.C. 1 ! 1 1r
(N) PROPOSED 5 - TON A/C UNIT f- 1 s p.
--�, (E) 5- TON �4JC UNIT �
(1- 1 location as shown, no exceptions I ------------------------
6 (l.)£}-:14x24"Gila-Lam24F=V4 ) DV#2 a 24"O.C. 1 V
1 1
1 1
A.
U U u (E-BM-2) 14 DF U U E-B�VI- U U (E-BM-2) 4 X 14 DF # 1 U U U (E-BM-2) 4 X 14 DF I
2) X14DF#1
�.
(E) 2 1C b i)F#2 24,E (. (l=) 2 24F) 2 6 1]' #2 24 O,Gi
It) DE #2 �� W ❑+ �•= .
'. O.C.
I
(E-BM-3) 6-3}4 x 24" GRIT -I, m 24F -V4
(E-BM-3) 6-3/4 x 24" Cl"-Lam 24F-V4
(E:) 6 X 6 POST {E) 2 X 6 LEDGER
I
U U U LJ U L� (F 1 (f LEDGER U U (E) 2 71[ I..EfI(aER LA U U (E') 2 X 6 LEDGER
:
i
(E)2Xstuds 16"O,C.T P.
(E) T.S. COLUMN (E) T.S. COLUMN
(E) T.S. COLUMN
i
(E) 6 X 6 POST
Q LZ
—>-��
0�
J0V
0.6
0FL°
CL
0
LL Uj
Cn
— (E) 6 X 6 POST
to
PROPOSED NEW 5-TON A/C UNIT
01
[AM
]REVISIONS LIST
REF DATE DESC'RIFF1'11 sr BY'
111/20/10 1 DLA
E
E
Ln
HI'
0
<
LU
LU
U
8 P
L i
LL
00
44
The Contractor Lihall verify and be
responsible for all dimerv, fans 8nd
conditionsonfhejob. Acid ihixoffice
must be notified of any VdHation From
tho dimensions and coadiuon�, shuwn
by those drawings.
This dwvnent tihall not be
reproduced nor shell the info matic+n
contained dtercin>be uqcd urdirdoscd
to uthcn. ckeept " cxprc:;sly
aulhotizod by Concorde T:ouaulting
Croup
a_
U
r
5J{EET TITLE
GENERAL NOTES
STRUCTURAL
DRAWINGS
SCALF- PIA
DRAWN BY: DEA
CHFCKEb 13Y:
DATE: OCI'OBER IB2010
JOB ND:
I)RAWTN(- NUMBHI
S190
a-Nlm
1