Loading...
10-1104 (MECH)I P.O. BOX 1504 T4hf 4^' VOICE (760) 777-7012 78-495 CALLE TAMPICO FAX (760) 777-7011 LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPARTMENT INSPECTIONS (760) 777-7153 BUILDING PERMIT Date: 12/08/10 Application Number: 10-00001104 Owner: Property Address: 78590 HIGHWAY 111 WASHINGTON ADAM PARTNERSHIP APN: 604-080-999- - - 42620 CAROLINE CT #102 Application description: MECHANICAL PALM DESERT, CA 92211 Property Zoning: COMMUNITY COMMERCIAL Application valuation: 10000 f Contractor: p Applicant: Architect or Engineer: COOL PLO INC n o 0 2 10 79469 COUNTRY CLUB DR, #H BERMUDA DUNES, CA 92203tlTYOFLAtAdlNTF► (760)34 r LiC. No..:: 438 438781 coat- -—-————-————--------—--———--————--------—--—————-——--—---—-————————--———--——-———-——-------------- LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that 1 am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and professionals Code, and my License is in full force and effect. License` lass: t 20 i // License No.: 438781 a OWNER -BUILDER DECLARATION ' I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031 .5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031 .5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as -owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale ISec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project ISec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or. improves thereon, and who contracts for the projects with a contractors) licensed pursuant to the Contractors' State License Law.). ( 1 I am exempt under Sec. , BAP.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued ISec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier NORGUARD INS Policy Number COWC129001 I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should beco s bject to the workers' compensation provisions of Section 700 of the Labor Code, I spa o hwit�omply with thosepro isions. Date • G� Applican� �.%, WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS J$1 00,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1 . Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building constru do , and hereby authorize representatives of this cou y enter upon the above-mentioned property p i purpo y. Date: Signature (Applicant or Agen Application Number 10-00001104 Permit 'BUILDING PERMIT Additional desc . Permit Fee 117_00 Plan Check Fee 76.05 'Issue Date . . . Valuation 10000 Expiration Date 61/06/11 Qty Unit Charge Per Extension, BASE FEE 45.00 8.00 9.0000 THOU BLDG 2,001-25,000 ---------------------------------------------------------------------------- 72.00 Permit MECHANICAL Additional desc . Permit Fee . . . . 31.50 Plan Check Fee 7.88. Issue Date Valuation . . . . 0 Expiration Date 6/06/11 Qty Unit Charge Per Extension BASE FEE 15.00 1.00 16.5000 EA MECH B/C >3-15HP/>100K-500KBTU 16.50 ---------------------------------------------------------------------------- Special Notes and Comments ADDITIONAL ROOF TOP HVAC UNIT - INCLUDES REQUIRED ADDITIONAL FRAMING [ENGINEERED] 2007/2008 CALIFORNIA BUILDING CODES. December 8, 2010 10:16:36 AM AORTEGA ---------------------------------------------------------------------------- Other.Fees. . . . . . . . . . BLDG STDS ADMIN (SB1473) 1.00 ENERGY REVIEW FEE 7.61 Fee summary Charged Paid Credited --------------------------------------------------------- Due Permit Fee Total 148.50 .00 .00 148.50 Plan Check Total 83.93 .00 .00 83.93 Other Fee Total 8.61 .00 .00 8.61 Grand Total 241.04 .00 .00 241.04 LQPERMIT Bin #. C, C Permit # Project Address: A. P. Number: Address: City, ST, Zip: r City of La Quinta Building &r Safety Dfvfslon P.O. Box 1504, 78-495 Calle Tampico La Qtdnta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Owner's Name: < Address:3•f. Ci y. ST, Zip: L -C� . &h Fes. /616 ., GOv� 12Yr ce-0,d '?2�7 # Submittal Plan Sets Structural Calcs. Truss Cala. Title 24 Calcs. Flood plain plan Grading plan Subcoutactor list Grant Deed H.O.A. Approval IN HOUSE: - Planning Approval Pub. Wks. Appr School Fees 4 Vag,( do WAO Project Description: �� L5'--MAl A J ,■ r , „► 0 OF N541 CJ State Lic. # :V5K 7yl Construction Type: Occupancy: Arch., Engr., Designer. 9- Ad4=: —//T C Demo City.. ST.'Zip: — # Units: Telephone: ,(ef% SW - State Lid. #g20 Name of Contact Person:X AV Tclephono # of Contact person: -7/47 # Submittal Plan Sets Structural Calcs. Truss Cala. Title 24 Calcs. Flood plain plan Grading plan Subcoutactor list Grant Deed H.O.A. Approval IN HOUSE: - Planning Approval Pub. Wks. Appr School Fees 4 Vag,( do WAO Project Description: �� L5'--MAl A J ,■ r , „► 0 OF N541 CJ Construction Type: Occupancy: Project type (circle one): Naw Add'n tea)Repair Demo S9• F- :/SRO #Stories: ` # Units: Estimated Value of Project e) APPLICANT: DO NOT WWTE BELOW THIS LINE Recd TRACMG PERMIT FEES Plan Check submitted I D Item Amount Reviewed, ready for corrections �� Plan Check Deposit ^ Called Contact Person �� 3 (J Plan Check Balance. Plain picked up �►J it 3 Construction !� , -� Plans resubmitted Mechanical 2" Review, ready for correctioue Electrical Called Contact Person Plumbing Plana picked up S M.L _. Plans resubmitted Grading Review, ready for correcdons/rssuc Developer Impact Fee r Called Contact Person A.I-P.P. Date or permit issue I .� Total Permit Fees 71-780 San,Jacinto Dr. Ste. E2; Rancho Mirage,. Ca. 92270 ph. (760) 834-8860 fax (760) 834-8861 Letter of Transmittal To: City of La Quinta Today's Date: 12-7-10 78-495 Calle Tampico City Due Date: 12-6-10 La Quinta, CA 92253 Project Address: 78-590 Highway 111 Attn: Phillip Plan Check #: 10-1104 Submittal: ❑ 1st ❑ 4th ® 2nd ❑ 5th ❑ 3`d ❑ Other: We are forwarding: ® By Messenger ❑ By Mail (Fed Ex or UPS) ❑ Your Pickup Includes: 4 Of Descriptions: Includes: # Of Descriptions: Copies: Copies: ❑ Structural Plans ® 1 Revised Structural Plans ❑ Structural Calculations ® 1 Revised Struct. Calcs ❑ Truss.Calculations ❑ Revised Truss ❑ Soils Report ❑ Revised Soils Report ❑ Structural Comment List ❑ Approved Structural Plans ® 1 Redlined Structural Plans ❑ Approved Structural Calcs ® 1 Redlined Structural Calcs ❑ Approved Truss Calcs ❑ Redlined Truss Calcs ❑ Approved Soils Report ❑ Redlined Soils Reports ❑ Other: Comments: Structural content is approvable. This Material. Sent for: ❑ Your Files ❑ Your Review ❑ Checking Other: ❑ By: John W. Thompson Rancho MirCpi e: ® (760) 834-8860 Other: ❑ DEC0�101U $y•.I ® Per Your Request ❑ Approval ❑ At the request of: h BUILDING ENERGY ANALYSIS REPORT PROJECT: Subway 48246-0 Mechanical. 78590 Highway 111 La Quinta, CA 92253 Project Designer: G Design 0 f - Report Prepared by: Michael Dell DELL CO. 1629 York Drive Vista, Ca 92084 760-940-0064 CITY OF LA QUINTA BUILDING & SAFETY DEPT. Job Number: APPROVED rZE4 I� D FOR CONSTRUCTION nr10-1910m NOV H2010 Date: � IN BY Date: 11/15/2010 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.ene�gysoft.com. EnergyPro 5.1 by Energ Soft User Number: 1712 RunCode: 2010-11-15T20:20:17 ID: nr10-191Orn TABLE OF CONTENTS CoverPage 1 Table of Contents 2 Form MECH-1-C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 8 Form MECH-3-C Mechanical Ventilation 9 Form MECH-4-C HVAC Misc. Prescriptive Requirements 10 Form MECH-MM Mechanical Mandatory Measures 12 HVAC.System Heating and Cooling Loads Summary 13 EnergyPro 5.1 by EnergySoft Job Number: ID: nr10-1910m User Number: 1712 CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Subway 48246-0 Mechanical Date 11/15/2010 Project Address 78590 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 1,580 Addition Floor Area 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 270 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equi ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1 HP -1 Dining area ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 39,940 Btu/hr ❑ ❑ Minimum Heating Efficiency' 7.70 HSPF ❑ ❑ Max Allowed Cooling Capacity' 93,079 Btu/hr ❑ ❑ Cooling Efficiency' 13.2 SEER / 11.2 EER ❑ ❑ Duct Location/ R -Value R-4.2 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason'— Item or System Tags i.e. AC -1, RTU -1, HP -1 Kltchen/prep ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 9,481 Btu/hr ❑ ❑ Minimum Heating Efficiency' 7.70 HSPF ❑ ❑ Max Allowed Cooling Capacity' 54,971 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.1 EER ❑ ❑ Duct Location/ R -Value R-4.2 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ 1 hermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ 4 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 3 of 14 CERTIFICATE OF COMPLIANCE and (Part 2 of 5) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Subway 48246-0 Mechanical 11/15/2010 Discrepancies: ` n 171 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1 C Project Name Date Subway 48246-0 Mechanical 11/15/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Ot . VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control Day and Night RHS060S0' '**'A 1 IZI Il ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ener Pro 5.1 by Ener Soft User Number. 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 5 of 14 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1 C Project Name Subway 48246-0 Mechanical Date 11/15/2010 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Fault Detection & Diagnostics Ot . for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC S stems Thermal Energy Storage (TES) Systems Test Performed By: Day and Night RHS060S0""*"'A 1 ❑ ❑ ❑ ❑ Cool Flo A/C & Heating ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ 1 ❑ Ener Pro 5.1 by Ener Soft User Number: 1712 Run Code: 2010-11-15720:20:17 ID: nr10-1910m Pa e 6 of 14 CERTIFICATE OF COMPLIANCE Part 5 of 5 MECH-1 C Project Name Date Subway 48246-0 Mechanical 1 11/15/2010 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Signature Name Michael Dell - Company DELL CO. Date 11/15/2010 Address 1629 York Drive CEA# NR08-90-3530 CEPE # City/State/Zip Vista, Ca 92084 Phone 760-940-0064 The Principal Mechanical Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical design. • This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance with Title -24, Parts 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Mike Mangan Signature Company Cool Flo A/C & Heating Date Address - 2-// el (fCkJ1UTWY Clev ' y License # City/State//Zipi�UjVeS 6,4 y1�4) Phone 760 •J :�-'I,S =66A� Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual. Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. ® MECH-1 C Certificate of Compliance. Required on plans for all submittals. ® MECH-2C Mechanical Equipment Summary is required for all submittals. m MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation. ® MECH-4C Fan Power Consumption is required for all prescriptive submittals. Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-191Orn Page 7 of 14 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Subway 48246-0 Mechanical 11/15/2010 Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc... Item or System Tags ; �. i.e. AC-1, RTU-1, HP-1 Dining area Kltchen/prep Number of Systems Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 7.70 HSPF 7.70 HSPF Cooling Equipment Efficiency 112(a) 13.2 SEER/ 11.2 EER 13.0 SEER/ 11.1 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Yes Furnace Controls/Thermostat 112(c), 115 a n/a n/a Natural Ventilation 121 b No No Mechanical Ventilation 121 b 520 cfm 148 cfm VAV Minimum Position Control 121 c No No Demand Control Ventilation 121 c No No Time Control 122(e) Programmable Switch Programmable Switch Setback and Setup Control 122(e) Setback Required Setback Required Outdoor Damper Control 122(f) Auto Auto Isolation Zones 122 n/a n/a Pipe Insulation 123 Duct Insulation 124 R-4.2 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b 39,940 Btu/hr 9,481 Btu/hr Proposed Heating Capacity 144(a & b) 36,225 Btu/hr 34,352 Btu/hr Calculated Design Cooling Load 144(a & b 65,155 Btu/hr 38,480 Btu/hr Proposed Cooling Capacity 144(a & b 46,469 Btu/hr 37,368 Btu/hr Fan Control 144(c) Constant Volume Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 144(c) Yes Yes Simultaneous Heat/Cool 144(d) No No Economizer 144(e) No Economizer No Economizer Heat Air Supply Reset 144(f) Constant Temp Constant Temp Cool Air Supply Reset 144(f) Constant Temp Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 1712 Run Code: 2010-11-15720:20:17 ID: nr10-1910m Page=4d of 14 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Subway 48246-0 Mechanical Date 11/15/2010 MECHANICAL VENTILATION §121(b)2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area ft2 CFM per ft2 Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REO'D V.A. Max of D or G Design 50% of Ventilation Design Zone Air Supply CFM CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Dining area 659 0.50 330 34.7 15.0 520 520 520 Dining area Total 520 520 Kltchen/prep 595 0.15 89 3.0 30.0 89 89 89 Rest Room 60 0.15 9 0.6 15.0 9 9 9 Customer Service 201 0.15 30 1.3 30.0 40 40 40 Rest Room 65 0.15 10 0.71 15.0 10 10 10 Kitchen/prep Total 148 148 Totals 40.3 668 668 Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H Required Ventilation Air REO'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 9 of 14 FAN POWER CONSUMPTION s MECH-4C Project Name Subway 48246-0 Mechanical Dining t Date 11/15/2010 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consum tion of fan §144(c). A B C I D E F Fan Description Efficient Design Brake HP Motor Drive Number of Fans Peak Watts B X E X 746 / (C X D Supply Fan 1.070 82.5% 97.0% 1.0 997 t TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1 TOTAL FAN SYSTEM POWER WATTS, SUM COLUM F 997 2) SUPPLY DESIGN AIRFLOW (CFM) 2,000 A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan - pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX Row 1 / Row 2 W/CFM 4 SPa 5 SP, B Calculate Fan Adjustment and enter on line 6. 6 Fan Adjustment = 1 -(SPI— 1 / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) - ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.499 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. f Energ Pro 5.1 by Energ Soft - User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 10 of 14 FAN POWER CONSUMPTION MECH-4C Project Name Subway 48246-0 Mechanical Kitchen /Prep Date 11/15/2010 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach: See Power Consum tion of fan §144(c). A B C D E F Fan Description Design Brake HP Effici Incy Number of Fans Peak Watts B X E X 746 / C X D Motor Drive Supply Fan 1.070 82.5% 97.0% 1.0 997 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1 TOTAL FAN SYSTEM POWER WATTS, SUM COLUM F 997 2) SUPPLY DESIGN AIRFLOW (CFM) 2,000 A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3 TOTAL FAN SYSTEM POWER INDEX Row 1 / Row 2 W/CFM 4 SPa 5) SP, B Calculate Fan Adjustment and enter on line 6. 6 Fan Adjustment = 1- SPa-1 / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.499 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. Energ Pro 5.1 by EnergySoff User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 11 of 14 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Subway 48246-0 Mechanical T11/15/2010 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1 A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8)' square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. Ener Pro 5.1 by Ener Soft User Number: 1712 RunCode: 2010-11-15720:20:17 ID. nr10-1910m Pae 12 of 14 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Subway 48246-0 Mechanical Date 11/15/2010 System Name Dining area Floor Area 659 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 2,031 Return Vented Lighting Return Air Ducts Return Fan Ventilation 520 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 58,000 27,570 9,538 220 6,415 Total Output Btuh 58,000 0 Output Btuh/s tt 88.0 1,378 321 Cooling System 0 0 Output perSystem 61,500 20,116 4,982 520 24,278 Total Output Btuh) 61,500 3,404 14,520 -3,404 Total Output Tons 5.1 1,378 321 Total Output (Btuh/s ft) 93.3 Total Output s ft/Ton 128.6 53,847 27,930 Air System CFM perSystem 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 Day and Night RHS060S0"""A 46,469 11,653 36,225 Airflow cfm/s tt 3.03 Airflow (cfm/Ton) 390.2 Outside Air (%) 26.0% Total Adjusted System Output 46,469 11,653 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jul 5 PM 36,225 Jan 1 AM Outside Air cfm/s ft 0.79 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF Outside Air 520 cfm 70 OF 58 OF 96 OF 98 OF Heating Coil Supply Fan ° 2,000 cfm 97 F ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 111 178 OF Outside Air Ar 520 cfm 75 ; 65 OF 84 / 68 OF 59 / 58 OF 61 / 58 OF Cooling Coil Supply Fan 61 / 59 OF 2,000 cfm 60.5% ROOM 74 / 65 IF T - 1 EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2010-11-15T20:20:17 ID: nr10-1910m Page 13 of 14 MVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Subway 48246-0 Mechanical Date 11/15/2010 System Name Kitchen/prep Floor Area 921 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,486 Return Vented Lighting Return Air Ducts Return Fan Ventilation 148 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 55,000 20,436 2,125 96 2,823 Total Output (Btuh) 55,000 0 Output Stuh/s ft 59.7 1,022 141 Cooling System 0 0 Output perSystem 58,000 5,918 1,860 148 6,929 Total Output Btuh 58,000 3,404 3,985 -3,404 Total Output (Tons) 4.8 1,022 141 Total Output Btuh/s ft 63.0 Total Output s ft/Ton 190.6 31,802 6,630 Air System CFM perSystem 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 Carrier 50LJQ006--32 37,368 14,193 34,352 Airflow cfm/s ft 2.17 Airflow cfm/Ton 413.8 Outside Air %) 7.4% Total Adjusted System Output 37,368 (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK 14,193 34,352 Jul 2 PM Jan 1 AM Outside Air cfm/s ft 0.16 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak 26 OF 10-0 Outside Air 148 cfm 70 OF 67 OF 96 OF ^ 98 OF Heating Coil Supply Fan 2,000 cfm 98 OF ROOM i 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78°F Outside Air 148 cfm 74 ( 64 OF 77/65°F 59/58°F 61/59°F Cooling Coil Supply Fan 61 / 59 °F , 2,000 cfm 57.1 % 'ROOM 74 i 64 °F EnergyPro 5.1 by EnergySoff User Number: 1712 RunCode: 2010-11-15720:20:17 ID: nr10-1910m Page 14 of 14 GENERAL I. THE NOTES AND SPECIFICATIONS ON STRUCTURAL DRAWINGS GOVERN IN CASE OF CONFLICT WITH 07HEA5PECIFICATION5, — 2- NOTE 5AND DETAILS ON STRUCTURAL DRAWINGS SHAILL 7Ai4E PRECEDENCE OVER GENE RALNOTE 5, AND S P EC I F I CATIONS. W HERE NO DI TAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. 3• GCNERALCONTRACTOR SHALLVERIFY ALL DIMENSIONS AND SITE cONDITIONS BEFORE STARTING woRK- ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY, 4, DIMENS ICNSSHALL TAKE P REC F DF Nr- F OVE R SCALES 5H0VVN0N r)RAVVINGS.TYPkCAL DETAILS AND GENERAL NOTES ARE MINIMUM REQUIREM ENT5TO BE USED WHEN CONDITIONS ARE NOT SHOWN! OTHERWISE- S. ALL WORK SHALLCONFOR141TOTHE 2007 CAUFORNIA BUILDING CODE STANDARDS, AND REGULATIONS OF THE STATE OF CALIF. DIVISION OF INDUSTRIAL SAFETY, AND THOSE CODES AND STANDARDS LISTED IN THESE NOTES, C. THE DRAWINGS REPRESENTTHE FINISHED STRUCTURE.THEY DO NOT INDICATETHE METHOD OF CONSTRUCTION_ CONTRACTOR SHALL PROVIDE AI_l. MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURE5 SHALL INCLUDEAND 15 NOT LIMITEDTO BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC - "All construction shall comply with the 2007 Califamia Building, Electrical, Mvci arlicA-md Pturnbing Codes, ZU08 California Energy Code and the City of La Quinta Municipal Code." - T EACH END OF THE NLW 2 X 6'S. ATTACHING THE NEW 2 X 6 JOIST TO THE EXISTING 4 X 14 BEAMS, (E) BM 1 & (E) BM 3. LUMBER & GLU-LAMINATED BEAM 1. EXISTING MATERIALS ARE AS FOLLOWS: — ROOF SHEATHING; 15f32' CDX STRUCT 41 MAIN MEMBER GLU-LAMS RUNNING FAST AND WEST ARE 5-3/4 X 24" STANDARD CAMBER 24FV4. MEMBERS PERPENDICULAR TO THE GLU-1-AN1 BEAMS ARE 4 X 14 DF # 1. JOIST MEMBERS PARALLEL TO GLU- LAMS ARE 2 X 5 DF # 2 @) 24' O.C, NO ALTERATION, CUTTING, DRILLING OF THE LXI5TINGSTRUCTURAL WOOD NIATERIALSHALL i3E ALLOWED WITHOUT THE FXPRESS WRITTEN PERMISSION OF THE ENGINEER OF RECORD - GENERAL NAILING NOTES 4 I I I I fIL nLJrklIN710U 1 L 4Jr 1 F1L JAI LkiEYLJI I Ik-h YIIWO k-I.JLN 1 rhm,,-I kin 14-j rr%%jr C15L i JLLtlrSL I rlC NEW PROPOSED AIR CONDITIONING UNIT. ALL HARDWARE USED TO CONNECT THE UNIT SHALL BE APPLIED TO THE STRUCTU RAL TIMBER MEMBER5 ONLY AND NOT TH E ROOF SHEATHING. ROOFING NOTES 1 • IT IS THE RESPONSIBILITY OF THE PRIME CONTRACTOR, LL., THE INDIVIDUAL RESPONSIBLE FOR THis PROIECTOVERSITETO ENSURE THE FINAL ROOF REPAIR, OR MODIFICATION 5HALL BE PROPERLY AND ADEQUATELY COMPLETED $O THA1' NO LEAKING 1rVILL OCCUR, IMPOSING DAMAGE TO THE SUPPORTING STRUCTURAL. ME MBER5, (lN) 5 tan A/C unit, Cmd must sit directly over EAST ELEVATION the (E) 6-3/4 x 24 BM 3 Glu-Lain beam. l BAST yEL7LV- NEW A1C UNIT '-SFIALL BE ATTACH'I "TO THE CURB/ PL,A'I F-6R_V � - S[IOV1{IiVG THE USING THE FOLLONVINC -. (8004-SH**B SEISMIC IIOLD DOWN) SI M PSON SDS25212 SCREWS IN"["O THE (E) 4 14 {E) B 1 (N) CanFab roof curblcoinbinatian platform PART NO: (I005-CURB) EAST ELEVATION .As the Ilatform rest on the repaired doubled up 2 x 6 rang joist use 2- SDS25212 screw in each roof joist. 1-• DF#1 DRY 2 X 6 SHALL BE ADDED ALONG THE SIDE OF 'THE LXISTI.NC 2 X 6'S. EACH NEW 2 X 6 SHALL BE FULL LENGTH (8'-0" +-). EACH NEW 2 X 6 S Fl ALL BE NAIL : ro -rHE EXISTING US-lNG 2-116D SINKERS @ 12" O.C. LT O 1 0 WEST ELEVATION f WEST ELEVATION SHOWING 'ria SIMPSON SDS25212 SCREWS 8" O.C. INTO THE (E) 4 X 14 (F) BM I Not— im 4 a rs. L7 V 0 11 d d 4 o O o 4 (E) Hanger not to he interrupted (E-BM-3) 6--3/4 x 4" GIu--Lanz 241F -V4 (E) Hanger not to be interrupted ? X 6 REPAIR PLATr, OR ATTACHMENT (E-BM-3) 6-3/4 x 24" Glu-Lam 24F -V4 2 %011 (N) 5 ton A/C unit, end must six directly over the (E) 6-314 x 24 BM 3 Glu-Lam learn. NEW A/C UNIT SHALL BE ATTACHED TO THE CUMPLATFORM USING THE FOLLOWING: ( 044-SII��B SEISMIC HOLD DOWN) (N) CaaFah roof eurhlenlnl)ination platform PART NO: (1005-CURB) F WEST ELEVATION L?se Simpson SDS25212 SCREW 5 AS FOLLOWS: As the platform rests on the (E) 4 x 14 BM i & (E) 6-3l4" X 24 BM 3 use SDS25212 AT 8" O.C. Directly into the beams. (E) T.S. COLUMN 20541 2*A) (2*113 STRUCTURAL OBSERVATION NOTES: TNE SHALL EMPLOY THE ENGINEER TO PERFORM VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM FOR THE FOLLOWING ITEMS. ITIS THE RE S PON S I B1 LITY OF THE GENERAL CONTRACTOR TO NOTIFYTHE ENGINEER TWO DAY PRIOR TOTHE REQUIRED OBSERVATION- THE ENGINEER SHALL SUBMIT A STATEMENTTO THE BUILDING OFFICIAL QUALIFYING THAT THE 08ESERVATION HAS BEEN MADE AND WHETHER OR NOT ANY OBSERVED 5TRUCTURAt DEFICIENCIES HAVE BEEN CORRECTED TO CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. (A) nla (B) ALL HAIR DWAR LACEMEN1 INCLUDIRIG, BUT NOT LIMITED TO, STRAPS, FRAMING CLIPS, HANGERS AND 8EAM CON NE IONS. (C) ATTHF COIVIPLF�ION OF THE STRUCTURAL WORK FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND SPECIF ITIONS. {Dj THIS STRUCTUR OBSERVATION DOES NDT INANE THE RESPON5EBILITY FOR THE INSPECTIONS REQUIRED. E) HARDWARE ALL GLU-LAMINATED.BEAMS BEAR ONTO (E) COLUMNS, ALL (E) 4 X 14 6EAMS!JSE SIMPSON WPU 414, ALL (E) 2 X 6 R.R. JOlft- USE SIMP50N HF26N. 1 ABBREVIATIONS & A/C APPLICATION NOTES I I 1 I (E-BMA) 4 X I D[~ # 1. EXISTING BEAM # 1 (E-BM-2) 4 Xi t DF # 1: EXISTING BEA;:1,1 ## 2 (E-BM-3) 6-314 ` 24" GIu-Lanj 24F -V4: EXISTING; GLU-LAM ; 1T IS IMPARA I .X,�LL U TtiE NEW AIC UNIT DOES NOT LQAD ONTO (E-BM-1 1, .ALL LOADING MUST REMAIN ON (E-BM-3). THE NEW AIC: JNIT CAN BE PLACED ANYWHERE ALONGN (E-BM-3) SO L G AS [T STRADDLES THE BEAM AS SHOWN � IN THE FRAM NG LOCATION DIAGRAM BELOW. fl ------------------------------------------------------------- I (E) Hanger nl . to be interrupted (E-BM-3) 6-314 x 24 Ghi.-Lana 24F -V4 i I. (&BM-1) 4 X 14 f i SHEET it lame Stl`uctUxal General Notesjraming Play 1.0 S2.0 2.1 L.2 2.3 2.4 IS2.5 •I PROJECT DESIGN DATA 1. DESIGN LCAD5: A. ROOF DL = 15 psf LL = 20 psf 2• DESIGN CODE. CBC. 2007, (I.B•C. 2006) 3- WIND DESIGN: (RIOT APPLICAOLE) SEISMIC DESIGN n)a B C CODE PARAMETERS VALUE IMPORTANCE FACTOR S� SI Site Classification Fa FV MS S MI S DI CC R - Rho Veq (ASD) ELE VA 110N SHOWING COMPONENT ATTACHMENT 2 A 2.A 205-0" 1 207-0" i (E) T.S. COLUMN (E) T.S. COLUMN (N) 5 ton AEC unit, end must sit directly over the (E) 6-314 x 24 Glu-Lam beam. (N) CanFab roof curb/combination platform see detail 2 (E-BM-3) 6-314 x 24" Glu-Lana 24F -4 (E) Hanger not to be interrupted USE 3-16d sinkers (4'. 12." ox. entire length of new repair cohrrponent except a� en end use 3-16d sinkers Vox. for 3-rows . .. ( 6 studs 16 1 --.....— I n n n n n n n n (E) 2 X b LED(�E1 (E) 2 X G LEl][,ER E 2 X 6 LEDGER () (E) 2 �C 6 LEDGER ( 2Xc❑�#2IJ 247�0 [EX E z (F 2 1~i l)F {#2 u) 2411 O.C. D17' #2 4) 24" () X 6 DF #2 24' . C. ,..i � TRI B 1 w — U U U (E-UM-1) 4 X 14 D.l; # 1 L_I (E-BM-1) 4 14 DF # 1 U U (k.-BM-1) 4 X 14 DF # 1 U U U (E-BM-1) 4 14 DF # 1 - _� - - _ _ _ _ __ '] C- n n n n n n n n n n n 1 1 1 1 fi. 1 1 (E)2X6DF#2(k,2 " F##2 „ 2 6 D P 421`zi 2 `* }y O.C. 1 ! 1 1r (N) PROPOSED 5 - TON A/C UNIT f- 1 s p. --�, (E) 5- TON �4JC UNIT � (1- 1 location as shown, no exceptions I ------------------------ 6 (l.)£}-:14x24"Gila-Lam24F=V4 ) DV#2 a 24"O.C. 1 V 1 1 1 1 A. U U u (E-BM-2) 14 DF U U E-B�VI- U U (E-BM-2) 4 X 14 DF # 1 U U U (E-BM-2) 4 X 14 DF I 2) X14DF#1 �. (E) 2 1C b i)F#2 24,E (. (l=) 2 24F) 2 6 1]' #2 24 O,Gi It) DE #2 �� W ❑+ �•= . '. O.C. I (E-BM-3) 6-3}4 x 24" GRIT -I, m 24F -V4 (E-BM-3) 6-3/4 x 24" Cl"-Lam 24F-V4 (E:) 6 X 6 POST {E) 2 X 6 LEDGER I U U U LJ U L� (F 1 (f LEDGER U U (E) 2 71[ I..EfI(aER LA U U (E') 2 X 6 LEDGER : i (E)2Xstuds 16"O,C.T P. (E) T.S. COLUMN (E) T.S. COLUMN (E) T.S. COLUMN i (E) 6 X 6 POST Q LZ —>-�� 0� J0V 0.6 0FL° CL 0 LL Uj Cn — (E) 6 X 6 POST to PROPOSED NEW 5-TON A/C UNIT 01 [AM ]REVISIONS LIST REF DATE DESC'RIFF1'11 sr BY' 111/20/10 1 DLA E E Ln HI' 0 < LU LU U 8 P L i LL 00 44 The Contractor Lihall verify and be responsible for all dimerv, fans 8nd conditionsonfhejob. Acid ihixoffice must be notified of any VdHation From tho dimensions and coadiuon�, shuwn by those drawings. This dwvnent tihall not be reproduced nor shell the info matic+n contained dtercin>be uqcd urdirdoscd to uthcn. ckeept " cxprc:;sly aulhotizod by Concorde T:ouaulting Croup a_ U r 5J{EET TITLE GENERAL NOTES STRUCTURAL DRAWINGS SCALF- PIA DRAWN BY: DEA CHFCKEb 13Y: DATE: OCI'OBER IB2010 JOB ND: I)RAWTN(- NUMBHI S190 a-Nlm 1