Loading...
09-0104 (MECH)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: Property Address: APN: Application description Property Zoning: Application valuation: Applicant: .. I T4ht 4 4 Q" 09-00000104- 78722 HIGHWAY 111 643-220-015-16 -000000- MECHANICAL REGIONAL COMMERCIAL 40000 - Architect or Engineer: olk BUILDING & SAFETY -DEPARTMENT BUILDING PERMIT LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class: C20 -C38 LicenseNo.: 632098 ate: C ractor: OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury t I am exempt from the Contractor's State License Law for the following reason (Sec. 7031 .5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT Owner: RED ROBIN INTERNATIONAL 6312 GREENWOOD VILLAGE GREENWOOD VILLAGE, CO 8 Contractor: J V S REFRIGERATION 6725 BARKDALE LANE RIVERSIDE, CA 92509 (800)869-8218 Lic. No.: 632098 VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 2/11/09 WORKER'S COMPENSATION DECLARATION . I hereby affirm under penalty of perjury one of the following declarations: _ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier AMGUARD INS Policy Number JVWC910224 _ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the abor Code, I shall forttAith comply with those provisions. Date: 09 pplicant: - WARNING: FAILURE TO SECURE WO S' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS 1$100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1 . Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this county to enter upon the above-mentioned prop y for inspecti ur oses. �{jate; 2- 'A 01 Signatu Applicant or Agentl: Application Number 09-00000104 Permit . . . MECHANICAL Additional desc . Permit Fee 168.00 Plan Check Fee 42.00 Issue Date Valuation . . 0 Expiration Date .. 8/10/09 Qty Unit Charge Per Extension BASE FEE 15.00 6.00 9.0000 EA •. MECH FURNACE <=100K 54.00 6.00 16.5000 EA MECH B/C >3-15HP/>100K-500KBTU 99.00 ---------------------------------------------------------------------------- Special Notes and Comments REPLACEA/C UNITS TO 6 HIGH EFFICIENCY .6 A/C 13 SEER, 410 REFRIGERANT ---------------------------------------------------------------------------- Other Fees . . . . . . . . BLDG STDS ADMIN (SB1473) 2.00 Fee summary Charged Paid Credited --------------------------------------------------------- Due Permit Fee Total 168.00 .00 •.00 168.00 Plan Check Total 42.00 -.00 .00 42.00 - Other Fee Total 2.00 .00 .00 2.00 Grand Total 212.00 .00 ..00 212.00 LQPERMIT City of La Quinta Building U Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit # 0 Project Address: ZZ� Owner's Name: A. P. Number: Address: Z Legal Description: Contractor- �� - +I City, ST, Zip: Telephone: [] j Address: 7 lil JAr 6—Smte Project Description: City, ST, Zip: S 2 �v 9(A-c, L iAJ r . Telephone: 800 _ _ State Lic_ # : O 9 FA Arch., Engr., Designer: tsoon= City Lic. #:� 23 (d .� 3 Address: City, ST, Zip: Telephone: State Lic. #. Name of Contact Person: _� 5 �� Construction Type: Occupancy: Project type (circle one): New Add'n Alter Repair Demo Sq. Ft_: # Stories: # Units: Telephone # of Contact Person: 80,o 82_(gEstimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req-'-d Reed- TRACKING PERMIT FEES Plan Sets Plan Check submitted Item Amount Structural Cales. Reviewed, ready for corrections Plan Check Deposit Truss Calls. Called Contact Person Plan Check Balance Energy Calcs. Plans bicked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2"" Review, ready for corrections/issue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- '"' Review, ready for corrcetionsrssue Developer Impact Fee Planning Approval Called Contact Person " A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees This Certificate of Complianae lists the building features and performance SPecificatims needed to comply With T-" Z4. rans 1 arra o w uw California Code of Regulations. This certificate applies only to building mechanical requirements. The documentation preperer hereby certifies that the documentation is aoarate ano oampreme. GATE DOCUMENTATION AUTHOR 5! 111RE Z./ii Io4 The Principes Mechanical Designer hereby certifies that the proposed building design represented in this set of construction documents Is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in the applicable parts of Sections 100.101,102, 11D (tough 115, 120 through 125, 142.144 and 145. G The plans & specifications meet the requirements of Part 1 (Sections 10-103a). The Installation certificates meet the requirements of Part 1 (10-103a 3). `J The operation & maintenance information meets the requirements of Part 1 (10-103c). Plaese check one- (These sections of the Business and Professions Code are printed an tutl in the Nonresidential Manual.) I hereby affirm that i am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of CaBfbmia as a civil engineer or mechanical engineer, or I am a licensed atchitecl. I affam that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign tMs document as the person responsible for its preparation; and that 1 am a licensed contractor performtrg amts work. I affirm that 1 am eligible under the exemption to Division 3 of ttie Business and Professions Code to sign this docwwt El because it pertains to a structure ortype of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1. PRINCIPAL MECHAMCAL DESICedER-NAME DATE LIG tl w V. S. �. �� z i INSTRUCTIONS TO APPLICANT MECHANICAL COMPLIANCE & WORKSHEETS (check box if worksheet is lneluded) C MECH-I -C Certificate of Compliance. Pact 1 of 3.2 of 3.3 of 3 are required on plans for all submittals P Waaleri$ervic ater Pools Requirements Part 1 of 3.2 of 3.3 of 3 are required for all submittals. but may be on C MECH 2 C G MECH-3-C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation, but may be on plans MECH-4-C HVAC Misc. Prescriptive Requirements is required for al prescriptive submittals, but may be on plans. 2005 Nonresidential Compliance Fouls December 2005 £'d 9268b609L sueydelS ie4do;suy0 eoo: L L 60 OL qej CERTIFICATE. OF COMPLIANCE (Part 2 of 3) MECH-1-C PROJECT NAME DATE Designer: This form is to be used by the designer and attached to the plans. lasted below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form wKI be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departnents: Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space - conditioning system serving a building or space is operated for nomnal use, all control devices serving the building or, space shall be certified as meeting the Acceptance Requirements For Code Compliance. In addition a Certificate of Acceptance, MECH-I-A, Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10- 103 b and Title 24 Part 6. Test ascii fon Test Performed MECH-24A: Ventilation System Acceptance Document Variable Air Volume Systems Outdoor Air Acceptance Constant Air Volume Systems Outdoor Air Acceptance Test required on all New systems both New Construction and Retrofit. Equipment requiring acceptance testing ✓ MECH-3-A: Packaged HVAC Systems Acceptance Document Test required on all New packaged systems both New Construction and Retrofit. Equipment requiring acceptance testing ✓ ❑ MECH-4-A: Air -Side Economizer Acceptance Document Test required on all new air -side economizers for both New Construction and Retrofit. Units with econornizers that are installed at the. factory and certified with the Commission.do not require equipment testing but do require constriction inspection. Equipment requiring acceptance testing e 2005 Nonresiftntiat Compiiance Forms September 2005 t,,d 9268b609L sue4delg jegdojsu40 eLO:LI 60 OL qej CERTIFICATE OF COMPLIANCE (Part 3 of 3) MECH-1-rC PROJECT NAME DATE Test Description Test Performed B v ❑ MECH-S-A: Air Distribution Acceptance Document This test required If the unit serves 5,000 ft2 of space or less and 25% or more of the ducts are in nonconditioned orsemiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet theabove requirements and either extend ducts, replace ducts or replace the packaged unit. Equipment requiring acceptance testing ❑ MECH--A : Demand Control Ventitation Acceptance Document All new DCV controls installed on new or existing packaged systems must be tested. I.. Equipment requiring acceptance testing v/ ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document All new VAV fan volume controls installed on new or existing systems must be tested. Equipment requiring acceptance testing -/❑ MECH-B-A: - Hydronic System Control Acceptance Document • Variable Flow Controls, Applies to chilled and hot water systems, • Automatic Isolation Controls, Applies to new boilers and chillers and the primary pumps are connected to a common header • Supply Water Temperature Reset Controls, Applies to new constant flow chilled and • hot water systems that have a de capacity greater than or equal to 500,000 Btulhr. • Water -loop Heat Pump Controls, Applies to all new watertoop heat pump systems where the combined loop pumps are greater than 5 hp. • Variable Frequency Control, Applies to all new distribution pumps on new variable Row chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment requiring acceptance testing 2005 NonneskwAaaf Compliance Forms 5'd 91Z69V609L Apr# 2005 sueydeig 1a4do;su40 eL0:ll, 60 OL qac 4 2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 2) MECH-1-A 11— 6`) - G / BUILDING TYPE O NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL W HOTELlMOTEL GUEST ROOM PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION 0 ADDITION W<TERATION ❑ UNCONDITIONED STATEMENT OF ACCEPTANCE This Certificate of Acoeptanoe summarizes the results of the acceptance tests related to building mechanical requirements per Title 24, Part 6. (Sections 10-103.b, 1211, 122.h, 125.a, 125.b, 125.c, 125.c.5, 125.d) Please check one: { 1 hereby affirm that 1 am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for Ws preparation; and that I am licensed in the State of California as a civil engineer or mechanical engineer, or I am a licensed architect. 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2.or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing: this work. I affirm that I am eligible under the exemption to Division 3 of the business and Professions Code to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1. These sections of the Business and Professions Code are printed in full in the.Nonresidential Manual. ?torr_ At fn.rWITV _ uaelF ISIGNATURE n I JUATE LIC.# I \�_.... �— 3 �f l Io lt'o3 2 O S Y For Detailed instructions on the use of this and all Energy efficiency Standards acceptance forms, please refer to the Nonresidential Manual published by the Califomia Energy Commission. Part 1 of 2 - Statement of Acceptance Part 2 of 2 - Summary of Acceptance Tests 2005 Nonresidential Acceptance Fors September 2005 ZL,d 9269V609L sueydelS j94doisil4O eZO:LL 60 0L qe:j ,jnns t_FRTIFICATE OF ACCEPTANCE (Part 2 of 2) MECH-1-A o,NA - — - - DATE l 1gT Ie)�te ( rj 3 A, /o 9 UMMARY OF ACCEPTANCE TESTS SYSTEIU ACCEPTANCE DOCUMENT` g�dg, Dept: Use TESTING AUTHOti1TY DATE OF TEST PASS 1 FAIL 6 is as necessary 2005 Nonresidential Complrence Forms September 2005 £L,d 9269V609L sueyde;g jaydoisuyo SCO: LL 60 0L qa_j 2005 ACCEPTANCE REQUIREMENTS FOR CODE COMPLIANCE MECH-2-A 1 Instrumentation to perform test incudes, but not limited to: a. Watch b. Means to measure airflow (hot wire anemometer or pilot tube) 2 Check one of the following: O Variable Air Volume (VAV) - Check as appropriate: a. Sensor used to control outdoor air flow must have calibration certificate or be field calibrated O Calibration certificate (attach calibration certification) C Feld calibration (attach results) O Constant Air Volume (CAV) -Check as appropriate: .0 System is designed to provide a fixed minimum OSA when the unit is on CertMation Statement: I certify that all statements are true on this MECH-2-A form including the PASSIFAIL Evaluation. 1 affirm I am eligible to sign this form under the provisions described in the Statement of Acceptance on form MECH-I-A Name. �b b-��n -ST-24 1-"S Company: T l� $ 1� 2s • S S2rOL Signature: Date: 3 i /O 2005 Compliance Acceptance Forms December 2005 tq'd 9268b609L sueydelg aeydolsu40 . e60: L 1 60 OL qa-A PASS: All Construction Inspection responses are complete and Testing Calculations & Results responses are ❑ FAIL: Any Construction Inspection responses are incomplete OR there is one or more negative (N - no responses in Testing Calculations & Results section. Provide explanation below. Use and attach additional Inaaes if necessary. 2005 Compliance Acceptance Forms December 2005 5L'd 9269ti609L sueydelS aeydolsuyD eE041, 60 OL qej 2005 ACCEPTANCE REQUIREMENTS FOR CODE COMPLIANCE MECH-3-A 1 1 Instrumentation to perform test includes, but not limited to: a. None required 2 Inst Ilation eT Thermostat or zone temperature sensor is located within the zone that the HVAC system serves Thermostat or sensor is wired to the HVAC system correctly 3 Programming (check all of the following) 211Heating and cooling thermostats are capable of a 5°F deadband where cooling and hearing at a minimum %M(b)3) f2' Occupied, unoccupied. and holiday schedule have been programmed. Er'�re-occupancy purge (at least lesser of minimum outside air or 3 ACH for one hour prior t pancy) programmed (§121(c)2) MZSand set back setpoints have been programmed as required Certification Statement: i aertity that all statements are true on this MECH-3-A form including the PASS/FAIL Evaluation. I affirm I am eligible to sign this form under the provisions described in the Statement of Acceptance on form MECH-1-A Name: 3 -OS tA-s j. CompanytS . 22 Signature: Date: December 2005 2005 Mechanical Acceptance Farms 9l'd 9268ti609L sueyde)g aeydo)su4O e£O:LL 60 OL qe� -2nru ArrVPTA1JCF RFOU1REMENTS FOR CODE COMPLIANCE MECH-3-A - Pack(a ediS lit HVAC Systems Acceptance Document Form of NJAI I verify the following for each simulation mode requited >upply fen operates continually Supply fan tum s off Supply tan cycles on and off System reverts to "occupied mode to satisfy any condition System turns off when manual override time period expires Gas. fired furnace, heat pump,.or electric heater stages on Neither heating or cooling is provided by the unit t No heating is provided by the unit No cooling is provided by the unit Compressor stages on Outside air damper is open to minimum position Outside air damper closes completely Svstem returned to initial operating conditions after all tests have been C. Testing Results A B C O E F G Indicate it Passed (P) Failed (F) or NIA (X} fit' In appropriate letter Note: Shaded areas do not apply for particular test procedure D. PASS I FAIL Evaluation cheek one): 0 PASS: All Construction Inspection responses are complete and all applicable Testng Results resoonses are "Passed" P O FAIL: Any Construction inspection responses are incomplete OR there is one or more "Failed" (F) responses in Testing es is —.4",. rhe as Pynlanation below. Use and attach additional pages if necessary. 2005 Mechanical Acceptance Forms L L' d 9 L Z68V609L Decernber 2005 suegdelg j9ydo}su40 e80: L L 60 0 L qac