Loading...
11503 (RC)Building Owner '78-910 Highwav Payless Shoest6re aw • P.O. BOX 1504 o. 11543 78-105 CALLE ESTADO \ LA QUINTA, CALIFORNIA -92253 Mailing BUILDING: TYPE CONST. OCC: GRP. Address 3231 Easy: 6th Street City Zip Tel. Tim JOnes opeke, ,Hansas 66603 1 714-937-396 Contractor City lziji I Tel.: State Lic. I City & Classif. Lic. # rucn:, cttyr., Designer Double D Development Services Address Tel. ,34 Caaous Drive 714-252-0170 CityZip State 'Newport.. Bch 1 92660 Lic. # C13972 LICENSED. CONTRACTOR'S DECLARATION I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. 1GNATURE DATE OWNER -BUILDER DECLARATION I hereby affirm that 1 am exempt from the Contractor's License Law for the following reason: (Sec. 7031.5,Business and Professions Code: Any city or county which, requires a permit to construct, alter, improve, demolish, or, repair any structure, prior to its Issuance also requires the applicant for such permittorile a signed statement -that he is licensed pursuant to the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) or Division 3 of the Business and Professions Code, or that. he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by. 'any applicant for a permit subjects the applicant to's civil penalty -of not more than five hundred dollars.($500). ❑ I, as, owner of the property, or my employees with wages as their.sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and Professions Code: The Contractor's License Law does, not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees, provided that such, improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build. or improve for the purpose or sale.) ❑ I, as owner of the property, am exclusively contracting with licensed contractors to con- struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects with a contractors) licensed pursuant to the Contractor's License Law.) ❑ 1 am exempt under Sec. B. & P.C. for this reason Date Owner WORKERS' COMPENSATION DECLARATION - I hereby affirm that I have a certificate of consent to self -insure, or a certificate of Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.) Polic No. Company Copy is filed:with the city. ❑ Certified copy is hereby furnished. CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section need not be completed if the permit -is for one hundred dollars ($100) valuation or less.) I certify that in the -performance of thg work for which this permit is -issued, I shall not employ anyperson in any manner so as to become subject to the Workers' Compensation Laws of California.' Date Owner NOTICE TO APPLICANT: If, after making this Certificate or Exemption you should become "subject to the Workers' Compensation provisions of the Labor Code, you must forthwith complywith such provisions or this permit shall be deemed revoked. ' CONSTRUCTION LENDING AGENCY. I= affirm that there is a construction lending agency for the performance of the work for which this permit is issued. (Sec. 3097, Civil Code.) Lender's Name Lender's Address This is'a building permit when properly filled out, signed and validated, and is subject to expiration if work thereunder is suspended for 180 days. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter the above-. mentioned property for inspection purposes. Signature of applicant Date' Mailing Address City, State, Zip A.P. Number ,Legal Description Project Description `.i'enhzit Tmnrov6nTnp:1f-g Sq. Ft. Size No. Stories No. Dw. Units New ❑ Add ❑ Alter Repair ❑ Demolition ❑ Estimated Valuation p 000 •,00 PERMIT AMOUNT Plan Chk. Dep. 50-0 •To-.Z, 72TU —.4 Plan Chk. Bal. Const. U . 5 0 Mech. Electrical 9.66 Plumbing S.M.I. Grading Driveway Enc. Infrastructure TOTALs3�•b7 j ta4f.bJ REMARKS �\ ZONE: BY: Minimum Setback Distances: Front Setback from Center Line Rear Setback from Rear Prop. Line Side Street Setback from Center Line Side Setback from. Property Line FINAL DATE INSPECTOR Issued by: Date Permit Validated by: Validation: J I 1 CONSTRUCTION ESTIMATE NO. ELECTRICAL FEES NO. PLUMBING FEES 1ST FL. SQ. FT. ® $ 2ND FL. SQ. FT. POR. SQ. FT. ® GAR. SQ. FT. ® CARP. SQ. FT. WALL SO. FT. ® SQ FT ® ESTIMATED CONSTRUCTION VALUATION $ UNITS MOBILEHOME SVC. POWER OUTLET YARD SPKLR SYSTEM BAR SINK ROOF DRAINS DRAINAGE PIPING DRINKING FOUNTAIN. URINAL WATER PIPING NOTE: Not to be used as property tax valuation BONDING FLOOR DRAIN MECHANICAL FEES FORMS WATER SOFTENER VENT SYSTEM FAN EVAP.COOL HOOD SIGN WASHER(AUTO)(DISH) APPLIANCE DRYER GAS (ROUGH) GARBAGE DISPOSAL FURNACE UNIT WALL FLOOR SUSPENDED OTHER APP./EQUIP. LAUNDRYTRAY AIR HANDLING UNIT CFM TEMP. POLE KITCHEN SINK ABSORPTION SYSTEM B.T.U. TEMP USE PERMIT SVC WATER CLOSET' COMPRESSOR HP POLE,TEMIPERM LAVATORY HEATING SYSTEM FORCED GRAVITY AMPERES SERV ENT SHOWER BOILER, B.T.U. SQ. FT. ®c BATH TUB SQ. FT. ®c WATER HEATER MAX. HEATER OUTPUT, B.T.U. SQ. FT. RESID ® 1% c SEWAGE DISPOSAL SQ.FT.GAR ® 8Lc HOUSE SEWER REMARKS: GAS PIPING PERMIT FEE PERMIT FEE PERMIT FEE DBL TOTAL FEES MICRO FEE MECH.FEE PLCK.FEE CONST. FEE ELECT. FEE SMI FEE PLUMB. FEE STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR SETBACK GROUND PLUMBING UNDERGROUND A.C. UNIT COLL. AREA SLAB GRADE ROUGH PLUMB. BONDING HEATING (ROUGH) STORAGE TANK FORMS SEWER OR SEPTIC TANK ROUGH WIRING, DUCT WORK ROCK STORAGE FOUND. REINF. GAS (ROUGH) METER LOOP HEATING (FINAL) OTHER APP./EQUIP. REINF. STEEL GAS (FINAL) TEMP. POLE GROUT WATER HEATER SERVICE FINAL INSP. BOND BEAM WATER SYSTEM GRADING cu. yd. $ plus x$ =$ LUMBER GR. FINAL INSP. FRAMING FINAL INSP. ROOFING REMARKS: VENTILATION FIRE ZONE ROOFING FIREPLACE SPARK ARRESTOR GAR. FIREWALL LATHING MESH INSULATIONISOUND FINISH GRADING FINAL INSPECTION - CERT. OCC. FENCE FINAL INSPECTOR'S SIGNATURESIINITIALS GARDEN WALL FINAL :d T, "it 4 4 Q" P.O. BOX 1504 APPLICATION ONLY Building11i'��))' 7&105 CALLE ESTADO AddressAwl-(_ " u%�},C(G��Pro%� LA QUINTA, CALIFORNIA 92253 Owner ����� Mailing BUILDING- _TYPE CONST. OCC. GRP. Address 1�;> 1:1( I=,- I lo -T 11'X G,f A.P. Number Ciy Zip &eI.'(1 _ .I 11J Q ( 4 f (o If Legal,Description Contractor _ Project.Description Address ity lZip Tel.. State Lic. City & Class if. Lice. p# Designer Engr U�jLE Address_j / Tel 7i4 c> City � Zips( State t{ eWFOPT 01=9t Lic. #G� { 7 Z LICENSED CONTRACTOR'S DECLARATION I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code; and my licenseis'in full force and " effect. r OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for the following reason: (Sec. 7031.5,Business and Professions Code: Any city or county which 'requires a Permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, or that. he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500). ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and Pro/essions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees, provided that such improvements are not Intended or offered for sale. If, however, the building orimprovement is sold within one year of completion, the owner -builder will have the burden of proying that he did not build or improve for the purpose of sale.). ❑ I, as owner of the property, am exclusively contracting with licensed contractors to con- struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property ,who builds or Improves .thereon, and who contracts for such projects with a contractor(s) licensed pursuant to the Contractor's License Law.) I 0 1 am exempt under Sec. B. & P.C. for this reason Date Owner WORKERS' COMPENSATION DECLARATION I hereby affirm that I have a certificate of consent to self -Insure, or a certificate of Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.) Policy No. Company ❑ Copy is filed with the city. ❑ Certified copy is hereby furnished. CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section need not be completed If the permit is for one hundred dollars ($100) valuation or less.) I certify that in the performance of thq work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation - Laws of California. Date Owner NOTICE TO APPLICANT: If, after making this Certificate of Exemption you should become subject to the Workers' Compensation provisions of the Labor Code, you must -forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for= this permit is issued. (Sec. 3097, Civil Code.) Lender's 'Name Lender's Address This is a building permit when properly filled out, signed and validated, and is subject to expiration if work thereunder is suspended for 180 days. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives -of this city to enter the above-. mentioned property for Inspection purposes. Signature of applicant Date .Mailing Address City, State, Zip 4 BUILDING DIVISION Sq. Ft. Size No. No. Dw. Stories Units New ❑ Add ❑ Alter Repair ❑ -Demolition ❑ r Estimated Valuation` �� �QO y PERMIT AMOUNT Plan Chk. Dep. N7 Plan Chk. Bal. Const. Mech. Electrical Plumbing S.M:I. - Grading Driveway Enc. Infrastructure TOTAL IY A ` ra - VS Ui T 41 w 1_`` 500. 00 Q, REMARKS ZONE: BY: Minimum Setback Distances: Front. Setback from Center Line Rear Setback from Rear Prop. Line Side Street Setback from Center Line Side Setback from Property Line FINAL DATE INSPECTOR Issued by: Date Permit Validated by: Validation: CONSTRUCTION ESTIMATE NO. ELECTRICAL FEES NO. PLUMBING FEES IST FL. SQ. FT. ® $ UNITS f 2ND FL. SQ. FT. YARD SPKLR SYSTEM POR. SQ. FT. ® MOBILEHOME SVC. BAR SINK GAR. SQ. FT. ® POWER OUTLET ROOF DRAINS CAR P. SQ. FT. ® I DRAINAGE PIPING WALL SO. FT. STORAGE TANK DRINKING FOUNTAIN SQ FT ® ROUGH WIRING URINAL ESTIMATED CONSTRUCTION VALUATION $ FOUND. REINF. WATER PIPING NOTE: Not to be used as property tax valuation HEATING (FINAL) FLOOR DRAIN MECHANICAL FEES GAS (FINAL) WATER SOFTENER VENT SYSTEM FAN EVAP.COOL HOOD SIGN WASHER(AUTO)(DISH) !APPLIANCE DRYER SERVICE GARBAGE DISPOSAL FURNACE UNIT WALL FLOOR SUSPENDED BOND BEAM LAUNDRYTRAY UR HANDLING UNIT GRADING cu. yd. $ plus x$ =$ CFM KITCHEN SINK t3SORPTION SYSTEM. FINAL INSP. B.T.U. TEMP USE PERMIT SVC WATER CLOSET )MPRESSOR HP POLE, TEMIPERM LAVATORY iATING SYSTEM FORCED GRAVITY AMPERES SERV ENT SHOWER ILER, B.T.U. SQ. FT. ® c BATH TUB SQ. FT. ® c WATER HEATER �. HEATER OUTPUT, B.T.U. SQ. FT. RESID ® 11/4 c SEWAGE DISPOSAL SQ.FT.GAR ® 3/ac HOUSE SEWER M GAR. FIREWALL GAS PIPING MIT FEE PERMIT FEE PERMIT FEE MESH TOTAL FEES MICRO FEE MECH.FEE PL.CK.FEE CONST. FEE ELECT. FEE SMI FEE PLUMB. FEE STRUCTURE PLUMBING ELECTRICAL HEATING R AIR COND. SOLAR f SETBACK GROUND PLUMBING UNDERGROUND A.C. UNIT COLL. AREA SLAB GRADE ROUGH PLUMB. .' BONDING HEATING (ROUGH) STORAGE TANK FORMS SEWER OR SEPTIC TANK ROUGH WIRING DUCT WORK ROCK STORAGE FOUND. REINF. GAS (ROUGH) METER LOOP HEATING (FINAL) OTHER APP./EQUIP. IREINF. STEEL GAS (FINAL) TEMP. POLE GROUT WATER HEATER SERVICE FINAL INSP. BOND BEAM WATER SYSTEM GRADING cu. yd. $ plus x$ =$ LUMBER GR. FINAL INSP. FRAMING FINAL INSP. ROOFING REMARKS: VENTILATION FIRE ZONE ROOFING FIREPLACE SPARK ARRESTOR GAR. FIREWALL LATHING MESH INSULATIONISOUND FINISH GRADING FINAL INSPECTION CERT. OCC. FENCE FINAL INSPECTOR'S SIGNATURESIINITIALS GARDEN WALL FINAL Cate, Of° 6mpllah' o (Part 1 bf'2) Performance Requirements CF -1 B srar,E oto_.& For Enforcement Agency Use Only req a ,RaymaW Phip 714-261-7734 uocvmentaaon Auvw/Frm Telephone Approved Principal Designer. The proposed building will be In substantial Energy Analyst The energy performance analysis summarized below comppliance with the Callfomla BuAding Energy Etfidency Standards was Pcf6m+ed Using an aP CEC calculation method, with CEC pprovided h le built according to die s ands fications and ided approved Axed and restricted ern ineer(np Inputs for the applicable climate future Improvements are come soon rg to the requirements tone end occupancy ty an ousts an �� build zoning end ppee dconfiguration. �P��a� representation of .. In on this 0016110//9 of Compliance. The plans and a ficedons ng 0 ph etcal All significant energy have bean prepared to include AN significant anergy conservation features conservation features are Ns , or on an attached pple ent. required for compliance wilt the Standards. Building areas that are unconditioned ands not subject 10 the standards are Indicated on the plans. sighature Iv oats Rihvmow k. Phua ame.. e.. Plans 5 e IM ENGINEERINGgn a �' Warner Ave. SIE. 1-0 L ss WarneiapaiataAm, 1alifOs lia 92705 ��� e � 5 /�j Liu -State✓ap 4S� 7 4-261-7734 Telephone General Reference 1 Unconditioned or Mudd -tenant shell? .. . 2 CEC Occupancy Type. (� 1919phone se o. 3 UBC 000. Group/Divislon Owner. The energy conservation features and performance 4 Climate tone .. , .... . specifications indicated on this document and on the plans and 5 Conditioned Floor Area .... sf speciffeadons shah appy to future alterations, unless compliance is , s Unconditioned Floor Area ... sf onstrated anew and a new Certificate of Compfianoe is submitted. A C opy of this Certificata will be retained and transmitted to future tenants, T Budget Table lire Standards) . subsseeqquueent owners or others with res PonsiDifi y for Making improvements 8 AM. Energy Budget (WS•1A) . 22 kBtu/sf-yr -or modificedons to the building. II tido certificate is lost, a new Certificate may be required before a permit Is Issued for alterations. Unconditioned 9 Calo.Method CEC Code/Date areas are Indicated on the plans and. H these areas are conditioned M the 10 Multiplier , , .. . _ future, they must be made comp the applk a energy standards then 11 Calculated Energy Use ...� Z kBtu►sf-yr Envelope Requirements gna a s, � 12 Average RoollCe11ing At. y' _3 23 3 h-F-sf/Btu (< 4E:-1. M13 Average Exterior Foot Rt'. 981 h-F-sVBtu. 14 Average Opaque Wan Rt ... 777Th-F-al/Btu Company �S �-- 15 Glazing Area in Wan ..... - L C� t o -(a 18 Average Be (Wan glazing) /A q Z t I I Glazing Area M Roof .... O. s f C�ryi�tate�cip ► 18 Average SC (Root glazing) . Ughting Requirements .. , EnrorOetti A . art p nqy ante p' ;posed bundnp, and'h6ri alterations win . 19.. Alklavetl Whol Euildino LPD'. /� : ' watts/sf comply with a CeAtornla Buildurg Energy Efficiency Standards. provided future alterations 20 Allowed Common Areas LPD . wetwal cite requirements on this Certificate and ON applicable mandatory measures, as long as the building occupancy 21 Allowed Tenant Space LPD .. watmf type remains unchanged. 22 Package Ughdmg Reduction . watts/sf 23 Lighting Controls Required? .. _� (Y/N) Sgnature DateMechanlesl RequirementsNamwMe ; 24 System Type ... • .. �/! `25 Unit Fan Power ... , .. watts/dm Ag" 28 Rated Cooling Efficiency... / ---�5 �` (anile) to 21 Rated Coding Capeclty . . .�/� �.� (units) 28 Rated Heating Efficiency ... (units) P 29 gated Heating Capacity... (units) 30 Economizer cooing? .... (yin) 31 CF-WAdached? ........... _ (yin) EEM Form Revised September lose Page of [Number Hold ChodW By- vile uocvmentaaon Auvw/Frm Telephone Approved Principal Designer. The proposed building will be In substantial Energy Analyst The energy performance analysis summarized below comppliance with the Callfomla BuAding Energy Etfidency Standards was Pcf6m+ed Using an aP CEC calculation method, with CEC pprovided h le built according to die s ands fications and ided approved Axed and restricted ern ineer(np Inputs for the applicable climate future Improvements are come soon rg to the requirements tone end occupancy ty an ousts an �� build zoning end ppee dconfiguration. �P��a� representation of .. In on this 0016110//9 of Compliance. The plans and a ficedons ng 0 ph etcal All significant energy have bean prepared to include AN significant anergy conservation features conservation features are Ns , or on an attached pple ent. required for compliance wilt the Standards. Building areas that are unconditioned ands not subject 10 the standards are Indicated on the plans. sighature Iv oats Rihvmow k. Phua ame.. e.. Plans 5 e IM ENGINEERINGgn a �' Warner Ave. SIE. 1-0 L ss WarneiapaiataAm, 1alifOs lia 92705 ��� e � 5 /�j Liu -State✓ap 4S� 7 4-261-7734 Telephone General Reference 1 Unconditioned or Mudd -tenant shell? .. . 2 CEC Occupancy Type. (� 1919phone se o. 3 UBC 000. Group/Divislon Owner. The energy conservation features and performance 4 Climate tone .. , .... . specifications indicated on this document and on the plans and 5 Conditioned Floor Area .... sf speciffeadons shah appy to future alterations, unless compliance is , s Unconditioned Floor Area ... sf onstrated anew and a new Certificate of Compfianoe is submitted. A C opy of this Certificata will be retained and transmitted to future tenants, T Budget Table lire Standards) . subsseeqquueent owners or others with res PonsiDifi y for Making improvements 8 AM. Energy Budget (WS•1A) . 22 kBtu/sf-yr -or modificedons to the building. II tido certificate is lost, a new Certificate may be required before a permit Is Issued for alterations. Unconditioned 9 Calo.Method CEC Code/Date areas are Indicated on the plans and. H these areas are conditioned M the 10 Multiplier , , .. . _ future, they must be made comp the applk a energy standards then 11 Calculated Energy Use ...� Z kBtu►sf-yr Envelope Requirements gna a s, � 12 Average RoollCe11ing At. y' _3 23 3 h-F-sf/Btu (< 4E:-1. M13 Average Exterior Foot Rt'. 981 h-F-sVBtu. 14 Average Opaque Wan Rt ... 777Th-F-al/Btu Company �S �-- 15 Glazing Area in Wan ..... - L C� t o -(a 18 Average Be (Wan glazing) /A q Z t I I Glazing Area M Roof .... O. s f C�ryi�tate�cip ► 18 Average SC (Root glazing) . Ughting Requirements .. , EnrorOetti A . art p nqy ante p' ;posed bundnp, and'h6ri alterations win . 19.. Alklavetl Whol Euildino LPD'. /� : ' watts/sf comply with a CeAtornla Buildurg Energy Efficiency Standards. provided future alterations 20 Allowed Common Areas LPD . wetwal cite requirements on this Certificate and ON applicable mandatory measures, as long as the building occupancy 21 Allowed Tenant Space LPD .. watmf type remains unchanged. 22 Package Ughdmg Reduction . watts/sf 23 Lighting Controls Required? .. _� (Y/N) Sgnature DateMechanlesl RequirementsNamwMe ; 24 System Type ... • .. �/! `25 Unit Fan Power ... , .. watts/dm Ag" 28 Rated Cooling Efficiency... / ---�5 �` (anile) to 21 Rated Coding Capeclty . . .�/� �.� (units) 28 Rated Heating Efficiency ... (units) P 29 gated Heating Capacity... (units) 30 Economizer cooing? .... (yin) 31 CF-WAdached? ........... _ (yin) EEM Form Revised September lose Page of Certificate of Compliance (Part 2 of 2) Performance Compliance C F-16 --s/3-x— s For Enforcement Agency Use Only FrolocsT e a e oortiftate Ccr4pr . Raymond Phua/ITO ENGINEERING (7141 uoaxrwMDOn AUvnonrsm P 2 61— 7 7 3 4 Utu Uco- We ^ CNOR By oafs- Note. a sNote. More than one Part Z may be submMted, but all must reference the acme Pan 1. The person responsible for design compliance for each major building system ocknowledges to following compliance statement by signing the appropriate spill below. Compllanoe statement. The proposed bulding knpoveMonte substantially compy with the requirements Mooted on the Certificate of Compliance for this building, datedTM plans and spedBcatbM kidude the significant energy conservation features and the compliance docurnentallon r consistent with the p aro and specifications. Envelope Allowed Prepeeed 1 _ Average Roofs Ing.Rt . .173' / h-F411ftk"ni,of improvemen ts Z Average Exterior Floor Rt MF-eNBtu . PIM dated dated 3 Average Opaque Wal Rt . h-F411/80j 4 Gluing Area In, Wall ... � of lima re ale 5, AVOM90 so (Wall) N 8 (leasing Area In Roof 4 sf L,L� /.% �s�Go�'Y1�j�%�,�"l�✓��E+ 7 Average sC (Root) .... Uo 3v O Cls /� ,...�f 4Z Other requkements: � . X77 P 2 -0170 Lighting 8 Basis or Allowed LPD IUwed . Proposed .. o LPD 10 Paekage Lighting Rsductlon waftahf 11 Ac;ustedLPD .......2-C� wattshl 12 Lighting Control Credits? . (YM) Other requirements: Mechanical Allowed Proposed 13 Unit Fan Power. /� wstts/efrm' 14 Rated cooling Efficiency .. ✓ . tfi — (units) 15 Rated cooling capacity ^_(units) 18 - Rated Head" Ef derrey .. (units) 17 Rated Healing Capacity'(units) to !Economtser cooling? ....._T (Y/N) 19 simultaneous heWood? ..— 44 (YM) Other requirements: 11 Enforcement enry ID819 xtent ol Improvemen Plans dated specs dated Ognalu Date mPa^y Address 1 is p Telephone r.W. License No. Intomement Agency . veto Santa Ana/California/92705 citylatiVE P License No. vote ,Energy Budgets Worksheet WS -1A For Enforcement Agency Use Only C�. Frolect I Itle., Raymond phtia/ITO ENGINEERING .., . ' " Vo' mentation u r irm ete•.. ,... .. ....... Checksate Summary Data Second Genantlon Standards Ooeupeney Types IConditioned Floor Area ................................. ...... sf 2 Total Allowed Energy Use (MMStu are Btu x 1061 .. ............ .. Z MMBtuiyr 3 Energy Budget (Una 2 x 1000 / Line 1) (kStu • Btu x 1031.. ......... ... '22. k8tuyr-sf First Generation Standards Occupancy Types 4 Conditioned Floor Area .: ..... ................... ......... sl 'S Total Allowed Energy Use 'jMMBtu are Btu x 1061 .. ................ ... . . .... �— MMBtuyr -• 6 - Energy Budget (Una 5 x 1000/ Una 4) (k8tu • Btu x 1031 ......... k8tuyr-sl r Second Generation Nonresidential Standards A B C D E F G H 1 J K L •DescriptiorV 0 Conditioned Floor Area Perimeter by Story Area to Perim. Ratio Energy Budget Adj orgy BudgetFloor IG J) . L.,.Pkg. (CF -5) A LPD Rqt. Total Per Total First Generation Nonresidential Standards A B......,.... .0 13- -----E Otx;upancy Type DescriptioN Floor A� Conditioned Floor Area Energy But�d�ef/ (kBtGTyr-ef) Allowed Energy (C x Dy1000 Total Total Total Allowed Energy 75� EEM Forth Revised September 1988 Page of *CERTIFICATE OF COMPLIANCE _ 31A PERFORMANCE REQUIREMENTS CF -1X ---------------------------------------7------------7---------------------- Project Title: PAYLESS SHOESOURCE Date: 05-12-1992 Architect/Engineer: RAYMOND PHUA Time: 16:22 Project Location: HWY111 & WASHINGTON ST. City/Town: LA QUINTA Author/Firm: RAYMOND PHUA Telephone # 714-261-7734 RUNCODE: 05 -12 -1992 -IF PAGE 1 OF 1 ------------=-------------------------------------------------------------- Total Zones Zone 1 #1 ---=---=-------=----------------------------------------------------------- " GENERAL .... ..N_/A ...........,.-: ........ I-- ..... , ......__ ........: ............. . ... . 1 Multi -tenant ?.......... Y 2 CEC Occ Type ........... RETAIL 3 UBC Occ ............... RETAIL 4 Climate Zone ........... 15 5 Cond Floor Area (SQFT) 3349. 5A Cond Perimeter (FT) .. 117 6 Uncond Floor Area.(SQFT) 4 :....,., 7....Budget .Table. .......,...._ . ... - 2.....5,3 ._.. ....... ...,....._.... ... :.....B..All:.'Eag. Budgett..._.......... 9 Calc. Method 4......... CPO -02 10 Multiplier ............. 1.027 11 Calc Eng Use (KBTU/SQFT) 184.83 ENVELOPE REQUIREMENTS 12 Avg Roof R ............ 23.13 13 Avg Ext Floor R ....... 0.00 14 Avg Opaque Wall R ..... 7.54 15 Wall Glaze Area (SQFT). 750 16 Avg SC (Wall Glaze) .... 0.95 16A SideFins/Overhangs ... YES 17 Roof Glaze Area (SQFT).. 0 18 Avg SC (Roof Glaze) .... 0.00 LIGHTING REQUIREMENTS 19 Modeled Zone LPD ....... 2 _20,.. Common .....ar. ea....LPD......,., .,,.,...,.... .... ..N_/A ...........,.-: ........ I-- ..... , ......__ ........: ............. . ... . 21 Tenant Space LPD. ...... N/A 22 Package Light Reduction. $ 23 Light Controls Required? NO MECHANICAL REQUIREMENTS 24 System Type * .......... GF/AC/EW 25 Unit Fan Power (W/SQFT). 0.79 26 Rated Cooling EER....... 8.20 27 Rated Cooling Capacity . 141900 28 Rated Heating EFF .... 0.81 29 Rated Heating Capacity.. 16,21¢¢e!p 30 Economizer Cooling ..... YES * GF = Gas Furnace, ER = Electric Resistance, HP = Heat Pump, OF = Oil Furnace AC = Air Conditioning, EC = Evaporative Cooler GW = Gas Water Heater, EW = Electric Water Heater 91, SCM - SUMMARY OF ENVELOPE INPUTS (PART 1 OF 2 ) CF -2X Project Title: PAYLESS SHOESOURCE Date 05-12-1992 Time 16:22 Plan Checked By Date Author/Firm: RAYMOND PHUA RUNCODE: 05 -12 -1992 -IF ----------------------------------------------------------------=--------------- ROOF Roof Roof Design Area/ Ceiling Zone Type Abs. Area R -value R -Value Height 1 ROOF1 ----------------------------------------------------------------------------- 0.70 3349 23.13 144.78 11.0 Totals 3349 144:8 Avg:"R-Val 23:13 OPAQUE EXTERIOR WALLS AND DOORS Wall 'Wall Door ------------------------------------- Heat Wall Zone Type Area Area Cap. Abs. R -Value ------------- At/Rt 1 EXT WALL ----------------------------------------------------------------------------- 1602 0 1.500.70 7.5 212.44 Totals 1602 0 212.44 Weighted Average R -Value 7.54 GLAZING IN ROOF Horizontal Design ------------ Modeled Zone Type Area U -Value SC 1 NONE 0.0 N/A 0.00 ----------------- Total 0 EXTERIOR SURFACE AREA :2..3.52. _.......,:., SCM — SUMMARY OF ENVELOPE INPUTS (PART 2 OF 2 ) CF -2X Project Title:'PAYLESS SHOESOURCE Date 05-12-1992 Time 16:22 Plan Checked By Date Author/Firm: RAYMOND PHUA RUNCODE: 05-12-1992-IF -----=-------------------------------------------------------------------------- FLOOR AREA/SOFFITS Floor Design Area/ Zone Type Area R -value R -Value , ......1...... .........,...:SLAB....._. ...: ............... 3`34'9'.::. ; ...: �...`...,'..::�_ .. ...: ,.:..'.:,........._..,.. :. ...., . . ' .�...... . ----------------------------------------------------------------------------- Totals 3349 0 Avg. R-val N/A Azimuth= 0 GLAZING IN WALLS - ArealShading Coefficient(sc) Zone Glazing Nlsc Elsc. Slsc Wlsc Total 1 WINDOW 010.95 010.95 32010.95 43010.95 750 ------------------=---------------------------------------------------------- Totals 0 0 320 430 750 GLAZING CHARACTERISTICS AND WEIGHTED AVERAGES Zone Total West Total Avg. Area X Area X Area X Zone Glazing U -Value SC U -Val. SC SC ---- 1 ----------------------------------------------- - - --------------------------------------------------- WINDOW 1.11 0:95 832 408.50 712.50 Totals ------------------------------- 832 408.50 712.50 Building Area -Weighted Averages 1.1 0.95 0.95 *** SCM ENERGY ANALYSIS MODEL VERSION 3.1A **** DATE: 05-12-1992 *** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARDS *** TIME: 16:22 ****************************************************** PAGE: 1 CLIMATE ZONE : 15 ASHRAE SDT 112 RUN TYPE : COMPLIANCE TOTAL ZONES 1 RUNCODE: 05-12-1992-IF ******************************************************************* ANNUAL SITE ENERGY REQUIREMENTS (MBTU'S) Zone 1 BUILDING SITE HEATING 0.8 0.8 SITE COOT ING. ............ ..,64..E ..._....... ...... ..... ........... ,,...._ ....., . 64.0 SITE LIGHTING 74.7 74.7 SITE RECEPTACLE 18.7 18.7 SITE FAN 40.5 40.5 SITE HOT WATER 5.4 5.4 ANNUAL SOURCE ENERGY USE ESTIMATE (KBTU/SQ.FT.) -------------- ---------------------------------------------------------------------- BUILDING ANNUAL SOURCE ENERGY USE ESTIMATE IS 184.8 KBTU/SQ.FT. ( NOTE: 1 KWH = 10.239 KBTUS OF SOURCE ENERGY ) ZONE# ZONE FILE Zone 1 BUILDING SOURCE HEATING 10.2 0.2 SOURCE COOLING 57.3 57.3 SOURCE LIGHTING 66.9 66.9 SOURCE RECEPTACLE 16.7 16.7 SOURCE FAN 36.3 36.3 SOURCE HOT WATER 4.9 4.9 -------------- ---------------------------------------------------------------------- BUILDING ANNUAL SOURCE ENERGY USE ESTIMATE IS 184.8 KBTU/SQ.FT. ( NOTE: 1 KWH = 10.239 KBTUS OF SOURCE ENERGY ) ZONE# ZONE FILE OCCUPANCY TYPE WATTS/SF DAYLIGHTING ------------- 1' PSS RETAIL .a . 2.00 - CERTIFICATE OF COMPLIANCE - 31A SPECIAL ZONE FEATURES CF -1X Project Title: PAYLESS SHOESOURCE Date: 05-12-1992 Architect/Engineer: RAYMOND PHUA Time: 16:22 Project Location: HWYlil & WASHINGTON ST. City/Town: LA QUINTA Author/Firm: RAYMOND PHUA Telephone # 714-261-7734 RUNCODE: 05 -12 -1992 -IF Zone File: PSS ZONE 1 OF 1 OVERHANG CHARACTERISTICS (FT.) NORTH/NORTHEAST . WINDOW HEIGHT ............................. OVERHANG HEIGHT FROM BASE OF WINDOW ....... 0 0 OVERHANG.. EXTENSION. -FROM. WINDOW._............................0........ .... EAST./SOUTHEAST WINDOW HEIGHT ............................. OVERHANG HEIGHT FROM BASE OF WINDOW ....... 0 0 OVERHANG EXTENSION FROM WINDOW ............ 0 SOUTH/SOUTHWEST . WINDOW HEIGHT ............................. OVERHANG HEIGHT FROM BASE OF WINDOW ....... 10 10 OVERHANG EXTENSION FROM WINDOW ............ 12 WEST /NORTHWEST . WINDOW HEIGHT ............................. OVERHANG HEIGHT FROM BASE OF WINDOW ....... 10 10 OVERHANG EXTENSION FROM WINDOW 12 Envelope Summary Form & Worksheet (Part 1 of 2) CF -2 For Enforcement AWcy Use Only DoWnefftflon ftftffft Date Roof Floor Area/Soffits A B c D A B C D FbTr ypeArea Pa U.d Area R-velue i cod B I cot o Glazing in Roof A B c D i Exterior Wall Area r B c D E F TOW L r� 6x%w Area North East S" West TOW cod B I cot o Glazing in Roof A B c D i Exterior Wall Area r B c D E F TOW L r� 6x%w Area North East S" West TOW Exterior Wall Area r B c D E F TOW L r� 6x%w Area North East S" West TOW L-L7L EEM Foran Rw4w Septsmt►er 1088 Page of Envelope Summary Form & ;Worksheet (Part 2 of 2) Opaque Exterior. Walls and Doors A B C D E F a M CF -2 For Enforosrtwm .. . A9" Use Onl MW Uwe WNphled AwW9 R -Value � - Glazing in Walls 001F/Coll A B. c D E F a u J K Col F I Col K t �. SC Adjustment Notes: AvemW Coll/COIF CWJ/CWE CWKICOIF,.. EEM Form Fbvbw September 1989 Pape of _ construction Assembly compi- nc0 f=orm CF -3 PrQjW Tide For Enforcement Agency Use Only Documentation rum DatePlan ChOCW By Date General Information ''I Assembly Type and Number .. . . ............ . .... .. ... 2 Framing Type-..'.. . '... ............. ... ... a�Q 9 Framing Size ............ ...................... . ... ... . 4 Framing g .......... ............................ . .. inches 6 Insulation in Cavity . ........ ... ... .... F-ef-hr/Bw 6 Effective R -value of Cavity/Framing..................................F-ef-hr/Btu .Sketch of Construction Assembly. List of Construction Components EEM Form Revised September 1998 Page of A B C D Description wan Sppae a-fic HC (b 0ht (BW%F4b Col C x Col D R -value ) (Btu✓F-sf) ' 6 C=-) U fJG Ti L 6 7 8 Total R -Value w/o films ............... Total HC 9 Inside surface air films.,. ... ... ... ..... Cj , � � 10 Outside surface air film .. ...... O .11 Total thermal resistance (Rd ........... 2 12 U,value (1 / Une 11) .... ".. ... O . EEM Form Revised September 1998 Page of Construction Assembly Compliance Form CF -3 Project a For Enforcement Agency Use Only Kanngth H_ T n/TTO ENCTNPPg1H6 vvwmenalOn AUPu7APlmt- wage Plan Chocked Uy Date General Information 1 Assembly Type and Number ........................••..14�L(/ 2 Framing Type.........:... ....:.................,.•.....•...... 1 V 3 Framinq Size ..... . .. : . : . . . . . . . . . . . . . . . . . . . . . . ... I Framing Spacing .................:...... .............. . . ..inches aInsulation in Cavity ...:........ 0 ............ 0 ............. .• I 1 ��O F•st•hr/Stu Effective a FI -value of Cavity/FM"mq ...................... F•til•hn9tu Sketch of Construction Assembly . C List of Construction Components 8 Total R•Value w/o tfims ............. r G. CO I Total HC I - 9 Inside .surface air film ' ............... 49. (p 10 Outside surface as film ........ .... 11 Total Thermal resistance (Rt) ............ 12 U•value (1 / line 11) .. m. EEM Form Revised September 1988 . Page __ of MOMMOMW �. A B C wall 0 Speatiie E HC II Oesuiptgn �/$ ��O FI•valus weight (Idaf) Heat (9tu/F•Ib) Cot C x Col 0 (BtWF•a1) 1 _ r I 2 _N17L LA -Te. -W.... ._ ._ 3— I e -AJ .+�c-n )'i . a 6 7 .. 8 Total R•Value w/o tfims ............. r G. CO I Total HC I - 9 Inside .surface air film ' ............... 49. (p 10 Outside surface as film ........ .... 11 Total Thermal resistance (Rt) ............ 12 U•value (1 / line 11) .. m. EEM Form Revised September 1988 . Page __ of MOMMOMW HVAC Summary(Part , of 2) �s vu CF -4 For Enforcement Agency Use Only r r vrvv� � wv /ITO ENGINEERING 0.ocumentation u r stn• Vate Plan Chocked By Date Required Measures Checklist (Prescriptive Approach) /Economizer Requirement'. eq I►ement. List each cooling fan/coil system. List the reference In the constriction documents indicating that an integrated air'or - water economizer has been specified, or, if an economizer is not included, list applicable exceptions 1 to 6 per Section 2.5342(e)1.A. Description jo r, / / T, 1, . of rence t _4Z t- 2 2 3 5 6 tZIndependent thermoitatic control of each zone. If an Independent perimeter system (� . baseboard or fan coil) is specified, indicatereference' that shows zoningand controlrequirements have been met per 2-5342(e)1.B. 1 Cooling S tem Dcrl tion Z Refer rice 3 5 6 ❑ Simultaneous heating or cooling. List each central fan system which uses reheat, retool, mixing of hot and cold air streams, or other simultaneous operation of heating and cooling for zone temperature or humidity control. Also indicate if VAV is required per 2.5342(e)t .C., and that it meets zone minimum air Now setpoint requirements. Reference location in construction documents where supply air reset controls have been specified. VAV min.set. Reset VAV req'mt.(Y/N) Control System Description Required? (Att. WS -4C) Reference 1 2 :. 3 - 4 5 6 ❑ Variable air volume performance. List each variable air volume fan system, fan type (eg. airfoil centrifugal, vane -axial). VAV control device (eg. inlet vanes, variable pitch blades), and system reference in construction documents. For airfoil or backward inclined oentntugai fans, attach manufacturer's tan performance data showing that part load performance meets 2.5342(e).1.b.2. VAV Constrction Fan Control Document Type Device Reference HVAC Surnmary (Part z of 2) L�-4 For Enforcement Agency Use Only Raymond Phua/ITO ENGINEERING Documentation AUM M-Irm Plan Chocked Uy Usle Whole Building HVAC Approach .(attach WS -4A) This approach me on be used for whole buildings, not individual . y y no systems. See Section 2=5342(9)2. HVAC Power Index Set Selected from CF -11, Part 1 .. - Allowed Proposed . 1 Fan Wattage Index (WS -4A, Line 3) .. .................... .. . wattNh2 ' i. 2 Cooling Power Index (WS -IA, Line 5) ..... ... . BtWhr-h2 3 Heating Power Index (WS -4A, Line 7) . , .. .... .. Stulhr-112 Tailored HVAC Approach (attach one WS -4B for each system). When this approach is used, it must be applied to each HVAC system individually. See Section 2.5342(9)3. ' ! • Allowed Proposed Load L oad 1 Cooling S st m as Ipt n Rrl// �/ '�G.�'Z'� (25a WS -48) 2��•O� (26a 8) FPI 5 Allowed Proposed . • Load Load Healing System . s 1ptxl L (2� ,WS B) (26b, B FPI 2 r 3 5 8 z Attach additional summary shied ss nicessary. Tailored HVAC Worksheet (Equipfneni loads) vM-:>0 -C-, WS -4B For Enforcement Apenoy use only Kan Roclied By OsloOne of these tonin must be Completed for each heating and/or 000lfng primary pant (eg. Hitler, air conditioner unit in the bui tand general ACmaries (hand or computer calaAated). and equipment catslop performance data This approach d06 rrot exemch pt req Wwwjs of Bea 2.6342(9)1. GENERAL INFORMATION i DESIGN CONDITIONS 1. System n 0w (ArvAde brief descriptor as referenced in plans) -----COp G----- ----1iEATWG----- K 7 � 2. Flow area served ,� . rG' h2 O h2 3. Oudoor drybulb MMP*mk n (per ASHRAE SPCOX)p _ 'F 4. Outdoor w91bdb tsmpsratun (per ASHRAE SPCDX) F F 6. Indoor drybulb t fWatute (per ASHRAE Sta WW 66.1981) F 72 F 6. indoor relative humidity (per ASHRAE Standard 56.1981) RH __ RH LOAD CALCULATION SUMMARY Area Design R2 Parameter Value 7. Glass conduction Ave. U•value: Bw/M1t3-F 8. Glass $olar pain Ave. SC: 9. Wall Cortdu IIN _ Ave. U -value: BtWh-0* 10. Roof conduction .. Ave. U-vak+e: Bb06-0-F 11. Floor conducilan -__ Ave. U -value: BKA-ft2-F 12. People __. Aw. density:. _ ft2"rson 13. Ughts Pwr. density: W/ft2 14.. Miss equipment Pwr. danaIV: Wgt2 15. Infiltration . C%ftW area: drvlt2 16. Ventilation C" area: drA2 17.'' Fan feat Fan stado: in. H2O 16. Pump heat Pump Mad: _,_,_ It, H2O 19. Ductlolping lam 20. Otey 21. Ot w 22. Oder:__ 23... Total Load (win knee 7 b 22): 24. Safely/Warmup Factor (max of 160% cooling, 160% heating): 25. Maximum Adjusted Load (lane 23 x Ike 24/ 100): 26. Installed Equipment Cape* at Design Conditions: .-----COOLING----- -HEATING----- Sensible Load Sensible Load kBOA kBDA See attached load Gals. Line 26a must b9 Nes than Or equal b Line 26a Line 26b must be less than or equal Is Una 25b. 0 not, reference exosptlon: FAN POWER DEMAND-_-0000NG----- (Unes 27 trough 30 may be left blv* for lowiss buildings with Nae than 4 stories.) 27. Fan supply air gw ft 26. Fan total preeaun drop ch H2O 29. A4wl men t for VAV systms (-a 1.0 for constant volume systems) _ 30. Adjustsd Fan perforrtartoe Index (1196 27 x Ike 28 x Ikw 29/Ike 2) FPI Buikting average of 119680 mutt be Im ow 8.0 dm4w' e If not 'reference -----HEATING----- ch in. H2O . FPI �� �/•SGS a✓�}7rs/tTZ-�/•�ua1.1b) y7�� •i� EEM Form Rw sed September. 1988 • Page of ~ . ZONE DESIGN COOLING LOAD SUMMARY ` , Location � CZ -15 LA QUINTA, California 04-03-92 Prepared By ITO ENGINEERING 6100190202 Carrier Hourly Analysis Program �� ..Page l of 2 *��*�*���**����*������*���*���������m�*������*�**��*�*������������ CALCULATION DATA: ' ' Zone Name PAYLE8S SHOESOURCE Calc Time: Jul 1.500h Al' Job Name PAYLESS SHOESOURCE Amb db/wb: 112'0/ 73'0 F ' LOAD INFORMATION '' ' ------------------__---_-_----------~------------_---_-----_ SENSIBLE LATENT, LOAD COMPONENT --_------_----------_-_--------_--------------_--�--�_--�-�- (BTU/hr) (BTU/hr) SOLAR LOAD 19,495 O TRANSMISSION 26"1'36 WALL TRANSMISSION 2,851 O �ROOF TRANSMISSION 12,150 ' 'O . PARTITION TRANSMISSION 0 O .LIGHTING / 7,000 W TOTAL) 23`834 � b. - OTHER ELEC. ( 1`,75O -W TOTAL) 5,967 O ' PEOPLE ( ` 35.00 PEO-PLE TOTAL) 8,562 7/17S MISCELLANEOUS LOADS O _ 0 . _ COOLING INFILTRATION O 0 PULLDOWN/WARM-UP 781 D COOLING SAFETY LOAD ---------------- 0 O SUB - TOTALS � �9,7�6 7,l75 ` NET VENTILATION LOAD ( 7.00 CFM) 27,961 -1~429 SUPPL'Y FAN LOAD'(BHP= 1`7) 4,282 O ` _ WALL LOAD TO PLENUM O 0 ROOF LOAD TO PLENUM 8 .0 . LIGHTING LOAD TO PLENUM � .� � ` . --_----------_---_--_-----_-----_--_-_--_---_----------_-_-- 0 � 0 .' TOTAL COOLING -LOADS 132,018 5''-746, COIL SELECTION PARAMETERS: '. COIL ENTERING AIR TEMP' (.D8/WB) 80.6/ 63,8 deg F .COIL LEAVING AIR TEMP' (D8/W8) 54.1/ 53,4 deg F ~ COIL SENSIBLE LOAD � 132,018 BTU/hr ' -COIL TOTAL LOAD � 137.764 BTU/hr ^ COOLL�� SUPPLY AIR TEMPERATURE S5.0 deg F ' TOTAL COOLING CFM (actual) 4,621 CFM ' TOTAL COOLING'CFM (atiJ' air) 4`619 CFM RESULTING ROOM REL. HUMIDITY ' � 47'2 � ^ COIL BYPASS FACTOR ` � 0'06O COIL APPARATUS'DEWPOINT ' � S2'7 deg F ' REHEAT REQUIRED 0 BTU/hr GENERAL INFORMATION. ' TOTAL COOLING LDAD � 11'48 Ton*a � 304.87 sqft/Tons . TOTAL FLOOR*AREA ' � 3,SOO'00 aqft OVERALL U FAC R � � /u � 6'208 BTU/hr/sqft/F . COOLING CFM/sqft' 1'32 CFM/sq. t _,*�*�*** 98L 9Lb N 0 0 MN - 09L`T OL6 M _ 0 0 ms S02 9ST S" 0. 0 SS _ .. 0. 0 3 , 0 0 _3 N SOdO`1 'VIVM 0 ... 0 0 H Q.. 0- 0 N 0 0 0 MN 'OtbO`,ZT S86`tbT 02t, "M 0 0 0 MS SSb`L TST`TT OZ2 S :0 0 0 3S 0 0 0 .3 .0 0 0 3 N " SOVOI SSV•lo avol ldvios NOIS8IWSNV81 d3bd 1N3NOdWOO gd0I NMOCJ W3b8 OVOI SSOIS ON'V -I-IVM J 0' 2L... /0' ZT T r qM/qP .qwd 3obnOS30HS SS3_1AVd : aweN qor uOOST Tnf : awtl OTeO 3obnOS30HS SS3-lAVd = aw'eN.. aunt :Vida NOIld-ino"Ido Z 4.0 Z a5ed weJ6oJd sTsATeud AjjnhH jaTijeo ZOZ06TOOT9 SNIb33NION3 Ol.z : A8. •pajvdGJd Z6. -20-b0,.. eTuJo..TTeo `ViNlni) d-1 ST -70 UOT- AbdWWnS Od0`1.9NI1003 NOIS30 3NOZ ' ZONE DESIGN HEATING LOAD SUMMARY Location CZ -15 LA QUINTA., California 04-03-92 Prepared By ; ITO ENGINEERING :6100190202. u. Carrier Hourly Analysis Program' Page 1. of 1 :kWY�-K*9K:K;k��c;k*-k:k�**�K*�:k�c%K.:k*%K%K-k*W�;K=K=k:k>K�****:K�Yt�c��;k:k****�c*�c:k-K-k�c**�:k*�c:K:k-K*:kyc CALCULATION DATA: Zone Name : PAYLESS SHOESOURCE Calc Time: Winter design Job Name : PAYLESS SHOESOURCE Amb db 3,5_6 'F. r LOAD COMPONENT LOAD (BTU/hr)' ' WALL TRANSMISSION 4,149 ROOF TRANSMISSION 10,360 GLASS- TRANSMISSION • 30,525 TRANSMISSION LOSS TO UNCOND. SPACES 0 ' INFILTRATION'LOSS 0. SLAB . F,L.00R 0 HEATING SAFETY BTU/hr ------------- O SUB-TOTAL 45,034 NET- VENTI LOTION LOSS 27,96.1 TOTAL HEATING LOAD 72.,995 ' HEATING SUPPLY CFM 1,098 CFM HEATING SUPPLY AIR TEMPERATURE 110.0 deg F HEATING VENTILATION AIR CFM 700 CFM HEATING THERMOSTAT SETPOINT TEMP 72.0 deg F' 7 nnanawory ures Checklist MF -1 For Enforcement Ag" We Only This Checklist is applicable to both First and Ssoond Gweration Nonresidential Standuds Compliance.. Reference in Constriction Documents Envelope Measures . ( I CertiNed insulation materiels per 2-6311(.> ...... . I 1 Insulation Installed m most Name spread and smoke density requirements of 2-6311(b) ........... . ( ) Urea formaldehyde foam insulation Is Installed per 2.6311(c) .......... ' ...... ... . I 1 Retrofit insonation 5pecf8ed as per 2.6313 ... .. . I 1 Air Miration is minimized by spedflcation of tested marxrtacuued dopa and windowsnts and . proper sealing and d wea� trrpof q'rg as per NOW 2-533117 .or walls.. . Lighting System Measures I I CvrtfAed iuminaireakellasts per 2-6314(b) ........ I I lndeperhdent control w/ an GlOsed areas per 2.5319(a) . . j) Manual switching readily aooessible per 2-6319(b) .. . I 1 Reduction of fighting bad to as least one half per 2-6319(c). occupancy sensors or programmable timers meeting CEC arteria may substitute ......... . I 1 69Panme switching of daylit arses per 2.5319(d) ... . Separate witch I 1 lighting in retail and wholleesals s per 2of display and166311 Wh) ..... . l 1 � wholesale storestic control Of �par" 2-6319(hh i. retail... ... . I 1 Tandem wiring of ora and three -lamp luminaires W2.6919(1).... .............. . Daylighting and Lumen Maintenance Controls (when applicable) Uniform* illumination reductlon b one-half �//j5,. W2.6319(9)1 ........... 0 .. 0 ... 0 . Flicker fres operation and no premature lamp Wure W2-31 )2 .................. . delays ung v 2.6319(9)3 ...M urhd� ............ . Step switching devto9s with separation between OfM aettinps per 2.6319(e)4 . ; . Relerence in . Construction Doom is t 1 Photocell sensors with a diffusingcover and no opaque cover per 2.6319(e).......... . (I Manufacturer's instructions provided for Installation and calibration per 2.63/9(e)o ........ . . . I 1 Proper installation of controls Including sensor location, �tl =n of initial calibration and control of luminaires only within daylit area per 2.6319(e)8 ...... . . . T. t 1. Visible or audible malfunction alarms per 2-63/9(9) Occupancy Sensing Devices (when applicable) I 1 Visible or audible malfunction alarms per 2-5319(8) j) Units on emissions per exception* to 2-5319(x) . ; • .. "" HVAC and Plumbing System Measures (I Piping Insulated as required by 2-6312 . .. . . . . () Certified HVAC equipment per 2-5314(a) .... ... . t 1 Certified plumbing equipment per 2-5314(a) :.. .. . I 1 Heating and cooling equipment efficiency per 2-5314(b) . I 1 Pilotless ignition of gas appliances per 2-5314(c) ... . t 1 Automatic controls for oil -hours per 2.5315(a)l ... t 1 Thermostat set point requirements per 2-5316(a) ... . 11Sequendal control of heating and cooling per 2-631 5(a)3 I 1 Autornatio exhaust fan dampers per 2.5316(b) .... . Thermostat controls for each zone per 2-5315(b) ... . Ventilation provided per 2.6318 and 2-5343 ..... . Ventilation and recirculation air quarhtlty Information provided per 1403(b� .: ..... ... . Heaters Our domestic not water ardor pools per 2-5316 , W-- l M. I EEM Foran Revised, September 190 Page of Certificate df, Compliance, � - -pe ' `�' � 8, Partr1 of 2) -pe Requirements CF -18 S S/7i4Gs-'ux:. C'4c- Sid/4E # </a-& Ravmonr�Phia 714-261-7734 uoixunentatton Author peTe Fano For Enforcement Agency Use�Ony Building Few Number ----- -- Dam Da{�nw• The proposed building Ig be) in substildaf �--WWAnalyaL The energy I witfi the California Building EnergyUfAdv-K Standards was Dertortned using an aper Is built according to the plans -and i' fiations and p►ovlded appraed Axed and restricted e rovements are oompleted*i to the requirement zone and 000upancy type, an n Wa Certificate of Compnance.4The plana and apecificabona building zoning and physfca prepared to include aA�etgniRcant energy conservation feats conservation features are Hsted plans. itionedindar not :t 4410 t standarbulk" Indicated n t gleno. Owner. The energy conservation features and specifications indicated on this document and on the pllaanss and opeaficadors shat apply to. future alterations, unless compliance is demonstrated anew and a new Certificate of Compliance Is submitted. A copy of this Certificate will be retained and transmitted to future tenant, subsseeqquent owners or othors with responsibility for making improvement or modifications to the building. If this certificate is lost, a new Certificate may be required before a permit is issued for alterations. Unconditioned areas are indicated on the plans and, N these areas are conditioned In the future, they must be made to comply with" applicable energy' standards then in efleeL .. !L "'� ( �( --� Ent ON, Aiied build p and future Rare will comdo ply with the CaItornia Building Energy Ell ie` rte, Ss future alterations meet the repuiremenle Indicated on Ibis Ce 'ficate d an PI I* mendsrororyry meawres, at long u the build' type remains undsnged. cy Signature�k N .*ol gency . EEM Form Revised September ima mance analysis summarized below EC calculation method, with CEC ring Input for the applicable climate p an appropriate representation of guratbn. All significant energy , or on an attached syppie..ment 1-0 12\A9 s iling Rt ... G/- -3 23.3 h.F-sf/s u 13e E Floor Rt N h•F-sf/Btu. 4a Wall Rt .. �-/- S • S MF-abBa 1 a in Wan .' ' of 1 SC (Wan glazing) .1 Area in Roof O of 1 Avenge SC (Roof glazing) . ghtinp Requirsmsnts 19 Allowed TO Building LPD . —:L watts/sf 20 AltrkCcmmon Areas LPD .f -a Awattw.sf lk 21 Allowed Tenant Space LPD .. p �?.: watt/sf r2(Padc go Ughtirg Reduction . `'�, �C> watte/sf 3 411ng Controls Required? . (YM) �'` MsoMnioal Rsqufrentsnto / 24 lana Type.�C� kUhk Fan Power watt/dm Rated Coding Efficiency ... (unit) ' 2VkF ted Cooling Capachy .. 28 Rated Healing Efficiency (unit) 29 Rated Heading Capacity . .. (unit) 30 Economizer 000Ang? .... ---�— (YM) 31 CF•iXACaohed? -----1------- (YjN) Page of nta ki3,� fornix 92705 Q 7.4-261-7734 elepnone General Reference , 1 Unconditioned or Multi -tenant shell? .. . 2 CEC Oocupancy Type .... f� 3 UBC Ooc. Group/Division ... 4 5 Climate Zone ....... . Conditioned Floor Area ... vsf .6 Unconditioned Floor Area .. - sf 7 Budget Table (fr. Standards) .�- 0 All. Energy Budget (WS•1A) . - t kBa/sf• .9 Cale -Method CEC Code/Dateflk 'G K 10 Multip' . 11 CayRated vee .� / /kea,/ar-y► 12\A9 s iling Rt ... G/- -3 23.3 h.F-sf/s u 13e E Floor Rt N h•F-sf/Btu. 4a Wall Rt .. �-/- S • S MF-abBa 1 a in Wan .' ' of 1 SC (Wan glazing) .1 Area in Roof O of 1 Avenge SC (Roof glazing) . ghtinp Requirsmsnts 19 Allowed TO Building LPD . —:L watts/sf 20 AltrkCcmmon Areas LPD .f -a Awattw.sf lk 21 Allowed Tenant Space LPD .. p �?.: watt/sf r2(Padc go Ughtirg Reduction . `'�, �C> watte/sf 3 411ng Controls Required? . (YM) �'` MsoMnioal Rsqufrentsnto / 24 lana Type.�C� kUhk Fan Power watt/dm Rated Coding Efficiency ... (unit) ' 2VkF ted Cooling Capachy .. 28 Rated Healing Efficiency (unit) 29 Rated Heading Capacity . .. (unit) 30 Economizer 000Ang? .... ---�— (YM) 31 CF•iXACaohed? -----1------- (YjN) Page of Certificate Of Compliance (Part 2 of 2) Performance Compliance CF -1 B 'rMIMTroe For Enforcement Agency Use Only Pont Raymond Phuf,/ITO ENGINEERING (71 4 1 uoaxneneatwniFn•r�Ftrtn fi P 2 61 - 7 7 3 4 yPe Plan csiawa By Claw Hots. More than one Part 2 may be submitted, Out aJl must reference the same Part 1. The person r•sponsibi• for design compliance for each major building system acknowledges the following compliance stalement by signing the appropriate space below. Compliance Statement. Th• proposed building knprovrnento substantially comply with the requirements indicated on the Certificate of Compliance for this building, dead • Th• pans and specifications incfud• the significant energy conservation features and the compliance documer4o6on a consis the plans and specifications. Ughting 8 Basis of Aibwed LPD .. . Propoee0 fi LPD ............ � 0 U wattVsr 10 Package Lighting wattdsf 11 Adjusted LPD ..... , 2 -D 2, v warml 12 Lighting Conlyd Credits? ..... (YM) other "Yemenis: Mechanical ANoW" Proposed 13 Unit Fan Power ...... . / Envelope ANowed Proposed Rated cooling Efficiency • •� e-/= - (units) I . Avenge RooflC•iling Fit .. /V 23' /3 M ,sift Improvements 2 Average Exterior hues Pit .. (units) h-F-syga IOWA& S Average Opaque Wd Py . 4. Glazing Area In. Wall -� h.F4VW 'sf Cato Specs CIA190 gna re. a s ... b Average SC (Waiq .... 6 Glazktg Area in Roof 4!� Other reWirements: e ... o sr L/ L,L /.7 7 Average SC (Roof) .... ' N 3v Other "irements:. ' .PAKMD ,6 4�ocAl,GA • �i Ughting 8 Basis of Aibwed LPD .. . Propoee0 fi LPD ............ � 0 U wattVsr 10 Package Lighting wattdsf 11 Adjusted LPD ..... , 2 -D 2, v warml 12 Lighting Conlyd Credits? ..... (YM) other "Yemenis: Mechanical ANoW" Proposed 13 Unit Fan Power ...... . / wapyft 14 Rated cooling Efficiency • •� e-/= - (units) 15 Rated Cooling Capacity ^_(units) 16 'Rated Heating Efboiency , = (units) 17 18 Rated Heating Cape ft -Econornizercoding? (Wft) ...`T (YIN) 19 Simultaneous h•aVwd? .. (YM) Other reWirements: Enwament Agency ate SEA ._EI.F.CTRZCAT,DRAWINGS utent of Improvements Plans dated Specs dated Ognalure Uste Narneffille. , mpany a wftwzi P ' O TeleprWe • No. SWOMMI ry. wate Santa Ana forni 2 5 P (7141 261-7714 Nzigmg Cal. Ran" o. Energy Budgets Worksheet WS -1A trge—Fc Ti e For Enforcement Agency Use Only Bd. Phiia/ITO ENGINEERING Documentation AumoaFum Date Plan ChecWd By uste Summary Data Second Generation Standards Occupancy Types ' t Conditioned Floor Area �b 2 Total Allowed Energy Use (MMBtu are Btu x 1061 ... .. MMBtu/yr 3 Energy. Budget (Une 2 x 1000 / Line 1) (kBtu . Btu x 103).. 2 2 kBtuyr•sf First Generation Standards Occupancy Typo 4 Conditioned Floor Area. sf :................................... 6Total Allowed Energy Use (MMBtu.are. Btu x 1061 .................. ..... �— MMBtu/ r Y 6. Energy Budget (Une.b x 1000/ Dine 4) (kBtu . Btu x 1031 ........ ... ... . .. ..... �— kBtu/.yr•af Second Generation Nonresidential Standards A 8 C D E .F •• 0 H I J K L Total J First Generation Nonresidential Standards A ® C D E Occupancy Type �:• Conditioned Floor Area Energy Bine tLTyr•al) Conid.• Perim.• Rabo / i • • _ •J uT'IdiAdjusted -�g • Allowed .•• • I A Total J First Generation Nonresidential Standards A ® C D E Occupancy Type Description/ Floor a Conditioned Floor Area Energy Bine tLTyr•al) Allowed Energy (C x D)I1000 Total Allowed Energy ... . & Total Total EEM Foran Revised September ION Page of CERTIFICATE OF COMPLIANCE - 31A PERFORMANCE REQUIREMENTS CF'1>; Project Title: PAYLESS SHOESOURCE Date: 04-03-1992 N� - Architect/Engineer.: RAYMOND PH,UA Time: 17:14 Proj.ec-t Location: HWY 111 & WASHINGTON ST, City/Town: LA QUINTA Author/Fir.m: RAYMOND PHUA Telephone # .714=251-7734 .RUNCODE: 04 -03 -1992 -FY PAGE 1 OF .1. Total Zones Zone 1 #1 GENERAL_ 1 Multi --tenant'? ., , , ... , . , Y 2 CEC Occ Type ,:......... RETAIL.. 3 UBC Occ ....:.......... RETAIL ' 4 Climate Zone .........,, 15 5 Cond Floor Area (SQFT) , 3500 5A Cond Perimeter (FT) 1.18 " 5 Uncond Floor Area (SQFT) I_ 7 Budget Table .......... a:I 3 . S A11,'Eng Budget ,,,.. a 9 -Calc. Method ........... CPO -02 1.0 Multiplier , , . , , „ , , . 1.027 1.1 Calc Eng Use (KBTU/SQFT) 181.51 ENVELOPE REQUIREMENTS 12 Avg Roof R , . :'.'.. 23. 1'3 13 Avg Ext Floor R ..,,... 0.00 14 Avg. Opaque Wall .R .. , , . 7.5'4 15 Wall Glaze Area' (SQFT). 750 15 Avg SC (Wall Glaze) .,.. 0.95 15A SideFins/Overhangs .. YES 17 Roof Glaze Area (SQFT).. 0 18 Avg SC (Roof Glaze) ,... 0,00 LIGHTING'REQUIREMENTS 19.Mode.led Zone LPD .....,, 2 20 Common area LPD :_,,.,•,,. N/A 21 Tenant Space L_.PD. ....,, N/A 22 Package Light Reduction.'" .. 23 Light Controls. R.egyired? NO MECHANICAL REQUIREMENTS 24 . System Type-.* , .. , . , , , ... GF/AC/EW 25 Unit Fan Power (W/SQFT). .0.75 25 Rated Cooling EER.,,.,., £3.20 27 Rated Cooling Capacity 141900 28 Rated Heating EF,F :.,,,, 29 Rated Heating Capacity:. 0,51 •30 Economizer Cooling ..,.. YES GF M Gas�Furnace, ER = Electric Resistance, HP = Heat. Pump, OF = Oil Furnace AC = Air Conditioning, EC = Evaporative Cooler rW = Gas Water Heater, EW = Electric Water, Heater SCM SUMMARY OF ENVELOPE INPUTS (PART 1 OF 2 ) CF --2X Project Title: PAYLESS SHOESOURCE Date 04-03--1992 •. Time 17:14 • Plan Checked fay Date. Author/Firm: .RAYMOND PHUA RUNCODE: 04• -03 -1992 -FY Roof Roof Design Area/ Ceiling Zone Type Abs. Area R -value R -Value Height : J. ROOF1 0.70 3500 23.1.3 151.31. 11.0.j- 1.0.;•.Totals Totals 3500 151.3• --------__ Avg. R -vat 23..13 OPAQUE EXTERIOR WALLS AND DOORS Wall Wall Door Heat;Wall Zone Type. Area Area Cap..;Abs. R -Value At/Rt. 1 EXT WALL ]•602 0 1.50;0,70 7..5 212.44.„ . Totals 16.02• 0 212.44' Weighted Average R -Value 7.54 GLAZING IN.ROOF Horizontal Design Modeled- odeledZone ZoneType-. Area U -Value SC 1 NONE 0.0 N/A 0.00 ----------------- Tbtal 0 EXTERIOR SURFACE AREA - 2352 SCM - SUMMARY OF ENVELOPE INPUTS (PART 2 OF 2 ) CF -2X Project Title: PAYLESS SHOESOURCE Date 04-03~1992 Time 17:14 Plan Checked By Date p Author/Firm: RAYMOND PHUA RUNCODE:'04-03-1992-FY FLOOR AREA/SOFFITS Floor Design Area .Zone Type Area -------------------------------------- R -value R -Value ' 1 SLAB 3500 Totals 3500 -------------------------- 0 Avg. R-val N/A Azimuth=. 0 GLAZING IN WALLS - Area;Shading Coefficient(sc) Zone Glazing N;sc E;sc S:sc W;sc Total 1 WINDOW 0;0,95 0;0.95 320;0.95 430;0.95 7SO Totals � 0 0 320- _-430 _---------750 GLAZING CHARACTERISTICS AND WEIGHTED AVERAGES -"Zone-- ^Total West ========Total __ Avg_ Area X . Area X Area X Zone Glazing U -Value SC U -Val. SC SC 1 WINDOW. 1.11 0.95 832 408, SO 712.50 Totals X334- ~-408,50 ^---712.50_- Building Area -Weighted Averages 1.1 0.95 0.93 ****-'SCM ENERGY ANALYSIS MODEL VERSION 3.1A *** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARDS *** DATE: 04-03-1992 TIME: 17:14 PAGE: 1. . CLIMATE ZONE 15 ASHRAE SDT 112 RUN TYPE COMPLIANCE TOTAI... ZONES . 1 RUNCODE: 04-03--1992-FY ANNUAL SITE ENERGY REQUIREMENTS (MBTU'S) Zone 1 BUILDING __-- SITE HEATING 0.8 0.8 SITE COOLING 65.3 65.3 SITE LIGHTING 78.0 78.0 SITE RECEPTACLE 19.5 19,5 SITE FAN 40.2 40.2 SITE HOT WATER 5.7 ':5.7 'ANNUAL SOURCE ENERGY USE ESTIMATE (KBTU/SQ.FT.) Zone 1 BUILDING SOURCE HEATING 0,2 0.2 SOURCE COOLING, 55.9 55.9 SOURCE. LIGHTING 66.9 66.9 . SOURCE RECEPTACLE 16.7 16.7 SOURCE FAN 34.4 34.4 SOURCE HOT, WATER. 4.9 4.9 BUILDING ANNUAL SOURCE ENERGY USE ESTIMATE IS 181.5 KBTU/SQ:FT. ( NOTE: I KWH = .10.239 KBTUS OF SOURCE ENERGY ) ZONE# ZONE.FILE OCCUPANCY TYPE WATTS/SF. DAYLIGHTING ------------------------ 1 PSS RETAIL 2.00 - .CERTIFICATE OF COMPLIANCE 31A SPECIAL .ZONE FEATURES CF -1X ----- --- ----------- ----.... Project Title: RAYLESS SHOESOURCE Date: 04 03--1.99.2 Architect./Engineer: RAYMOND PHUA Time: 17:14 Project Laotian: HWY 111 & WASHINGTON ST. City/Town:. LA QUINTA Author/Firm: RAYMOND PHUA Telephone #.714-261-7734 -RUNCODE: 04-03--1992-FY Zane File: PSS ZONE 1 OF 1 (JVERHANG CHARACTERISTICS (FT.) NORTH/NORTHEAST WINDOW HEIGHT ............................. 0 OVERHANG HEIGHT FROM BASE OF WINDOW .,.., 0 .. OVERHANG EXTENSION FROM WINDOW 0 ..... :E.'AST /SOUTHEAST WINDOW HEIGHT ....... , . .... .. , ........., : 0 OVERHANG HEIGHT FROM BASE OF WINDOW ....... 0 OVERHANG EXTENSION FROM WINDOW 0 SOUTH/SOUTHWEST: WINDOW HEIGHT ....................:..... 10..... OVERHANG HEIGHT FROM BASE OF WINDOW 10 OVERHANG EXTENSION FROM WINDOW 12 WEST /NORTHWEST WINDOW HEIGHT ................ ___ ....... 10 OVERHANG HEIGHT FROM BASE OF. WINDOW ....... 10 - OVERHANG EXTENSION FROM WINDOW ............ 12 -�fCk Cnvu'upe-%z.-)ummary t-orm. t : Workshe'et,(Part 1 of 2) CF -2 —. For Enforcement A " Use Only a plan By Roof i Floor Area/Soffits A B C D A B c C MFboc/Soffit Proposed Area/ Type Area R.value wvalue Glazing .in Roof A B C Col B / col D D E TOW Total Average R -value COB/COID F d u Exterior Wall Area B c D E F TOW L,__� Surfew Ana ` North East South West TOW . FT7TJ E3E�� Glazing .in Roof A B C Col B / col D D E TOW Total Average R -value COB/COID F d u Exterior Wall Area B c D E F TOW L,__� Surfew Ana ` North East South West TOW . FT7TJ EEM Form Revised September 1088 Nil • .Page of