11503 (RC)Building
Owner
'78-910 Highwav
Payless Shoest6re
aw
• P.O. BOX 1504 o. 11543
78-105 CALLE ESTADO \
LA QUINTA, CALIFORNIA -92253
Mailing BUILDING: TYPE CONST. OCC: GRP.
Address 3231 Easy: 6th Street
City Zip Tel. Tim JOnes
opeke, ,Hansas 66603 1 714-937-396
Contractor
City lziji I Tel.:
State Lic. I City
& Classif. Lic. #
rucn:, cttyr.,
Designer Double D Development Services
Address Tel.
,34 Caaous Drive 714-252-0170
CityZip State
'Newport.. Bch 1 92660 Lic. # C13972
LICENSED. CONTRACTOR'S DECLARATION
I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions Code, and my license is in full force and
effect.
1GNATURE DATE
OWNER -BUILDER DECLARATION
I hereby affirm that 1 am exempt from the Contractor's License Law for the following
reason: (Sec. 7031.5,Business and Professions Code: Any city or county which, requires a
permit to construct, alter, improve, demolish, or, repair any structure, prior to its Issuance also
requires the applicant for such permittorile a signed statement -that he is licensed pursuant to
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) or
Division 3 of the Business and Professions Code, or that. he is exempt therefrom, and the basis
for the alleged exemption. Any violation of Section 7031.5 by. 'any applicant for a permit
subjects the applicant to's civil penalty -of not more than five hundred dollars.($500).
❑ I, as, owner of the property, or my employees with wages as their.sole compensation, will
do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and
Professions Code: The Contractor's License Law does, not apply to an owner of property who
builds or improves thereon and who does such work himself or through his own employees,
provided that such, improvements are not intended or offered for sale. If, however, the building
or improvement is sold within one year of completion, the owner -builder will have the burden
of proving that he did not build. or improve for the purpose or sale.)
❑ I, as owner of the property, am exclusively contracting with licensed contractors to con-
struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law
does not apply to an owner of property who builds or improves thereon, and who contracts for
such projects with a contractors) licensed pursuant to the Contractor's License Law.)
❑ 1 am exempt under Sec. B. & P.C. for this reason
Date Owner
WORKERS' COMPENSATION DECLARATION -
I hereby affirm that I have a certificate of consent to self -insure, or a certificate of
Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)
Polic No. Company
Copy is filed:with the city. ❑ Certified copy is hereby furnished.
CERTIFICATE OF EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section need not be completed if the permit -is for one hundred dollars ($100) valuation
or less.)
I certify that in the -performance of thg work for which this permit is -issued, I shall not
employ anyperson in any manner so as to become subject to the Workers' Compensation
Laws of California.'
Date Owner
NOTICE TO APPLICANT: If, after making this Certificate or Exemption you should become
"subject to the Workers' Compensation provisions of the Labor Code, you must forthwith
complywith such provisions or this permit shall be deemed revoked. '
CONSTRUCTION LENDING AGENCY.
I= affirm that there is a construction lending agency for the performance of the
work for which this permit is issued. (Sec. 3097, Civil Code.)
Lender's Name
Lender's Address
This is'a building permit when properly filled out, signed and validated, and is subject to
expiration if work thereunder is suspended for 180 days.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives of this city to enter the above-.
mentioned property for inspection purposes.
Signature of applicant Date'
Mailing Address
City, State, Zip
A.P. Number
,Legal Description
Project Description `.i'enhzit Tmnrov6nTnp:1f-g
Sq. Ft.
Size
No.
Stories
No. Dw.
Units
New ❑ Add ❑
Alter
Repair ❑ Demolition ❑
Estimated Valuation
p 000 •,00
PERMIT
AMOUNT
Plan Chk. Dep.
50-0 •To-.Z,
72TU —.4
Plan Chk. Bal.
Const.
U . 5 0
Mech.
Electrical
9.66
Plumbing
S.M.I.
Grading
Driveway Enc.
Infrastructure
TOTALs3�•b7
j ta4f.bJ
REMARKS
�\
ZONE: BY:
Minimum Setback Distances:
Front Setback from Center Line
Rear Setback from Rear Prop. Line
Side Street Setback from Center Line
Side Setback from. Property Line
FINAL DATE INSPECTOR
Issued by: Date Permit
Validated by:
Validation:
J I
1
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
1ST FL. SQ. FT. ® $
2ND FL. SQ. FT.
POR. SQ. FT. ®
GAR. SQ. FT. ®
CARP. SQ. FT.
WALL SO. FT. ®
SQ FT ®
ESTIMATED CONSTRUCTION VALUATION $
UNITS
MOBILEHOME SVC.
POWER OUTLET
YARD SPKLR SYSTEM
BAR SINK
ROOF DRAINS
DRAINAGE PIPING
DRINKING FOUNTAIN.
URINAL
WATER PIPING
NOTE: Not to be used as property tax valuation
BONDING
FLOOR DRAIN
MECHANICAL FEES
FORMS
WATER SOFTENER
VENT SYSTEM FAN EVAP.COOL HOOD
SIGN
WASHER(AUTO)(DISH)
APPLIANCE DRYER
GAS (ROUGH)
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
OTHER APP./EQUIP.
LAUNDRYTRAY
AIR HANDLING UNIT CFM
TEMP. POLE
KITCHEN SINK
ABSORPTION SYSTEM B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET'
COMPRESSOR HP
POLE,TEMIPERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER, B.T.U.
SQ. FT. ®c
BATH TUB
SQ. FT. ®c
WATER HEATER
MAX. HEATER OUTPUT, B.T.U.
SQ. FT. RESID ® 1% c
SEWAGE DISPOSAL
SQ.FT.GAR ® 8Lc
HOUSE SEWER
REMARKS:
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FEE
DBL
TOTAL FEES
MICRO FEE
MECH.FEE PLCK.FEE
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR
SETBACK
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL. AREA
SLAB GRADE
ROUGH PLUMB.
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING,
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH)
METER LOOP
HEATING (FINAL)
OTHER APP./EQUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
FINAL INSP.
BOND BEAM
WATER SYSTEM
GRADING
cu. yd.
$ plus x$
=$
LUMBER GR.
FINAL INSP.
FRAMING
FINAL INSP.
ROOFING
REMARKS:
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING
MESH
INSULATIONISOUND
FINISH GRADING
FINAL INSPECTION -
CERT. OCC.
FENCE FINAL
INSPECTOR'S SIGNATURESIINITIALS
GARDEN WALL FINAL :d
T, "it 4 4 Q"
P.O. BOX 1504 APPLICATION ONLY
Building11i'��))' 7&105 CALLE ESTADO
AddressAwl-(_ " u%�},C(G��Pro%� LA QUINTA, CALIFORNIA 92253
Owner
�����
Mailing BUILDING- _TYPE CONST. OCC. GRP.
Address 1�;> 1:1( I=,- I lo -T 11'X G,f A.P. Number
Ciy Zip
&eI.'(1
_ .I 11J Q ( 4 f (o If Legal,Description
Contractor
_ Project.Description
Address
ity lZip Tel..
State Lic. City
& Class if. Lice. p#
Designer
Engr U�jLE
Address_j / Tel
7i4 c>
City � Zips( State t{
eWFOPT 01=9t Lic. #G� { 7 Z
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions Code; and my licenseis'in full force and "
effect. r
OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for the following
reason: (Sec. 7031.5,Business and Professions Code: Any city or county which 'requires a
Permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also
requires the applicant for such permit to file a signed statement that he is licensed pursuant to
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of
Division 3 of the Business and Professions Code, or that. he is exempt therefrom, and the basis
for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars ($500).
❑ I, as owner of the property, or my employees with wages as their sole compensation, will
do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and
Pro/essions Code: The Contractor's License Law does not apply to an owner of property who
builds or improves thereon and who does such work himself or through his own employees,
provided that such improvements are not Intended or offered for sale. If, however, the building
orimprovement is sold within one year of completion, the owner -builder will have the burden
of proying that he did not build or improve for the purpose of sale.).
❑ I, as owner of the property, am exclusively contracting with licensed contractors to con-
struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law
does not apply to an owner of property ,who builds or Improves .thereon, and who contracts for
such projects with a contractor(s) licensed pursuant to the Contractor's License Law.)
I
0 1 am exempt under Sec. B. & P.C. for this reason
Date Owner
WORKERS' COMPENSATION DECLARATION
I hereby affirm that I have a certificate of consent to self -Insure, or a certificate of
Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)
Policy No. Company
❑ Copy is filed with the city. ❑ Certified copy is hereby furnished.
CERTIFICATE OF EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section need not be completed If the permit is for one hundred dollars ($100) valuation
or less.)
I certify that in the performance of thq work for which this permit is issued, I shall not
employ any person in any manner so as to become subject to the Workers' Compensation -
Laws of California.
Date Owner
NOTICE TO APPLICANT: If, after making this Certificate of Exemption you should become
subject to the Workers' Compensation provisions of the Labor Code, you must -forthwith
comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the
work for= this permit is issued. (Sec. 3097, Civil Code.)
Lender's 'Name
Lender's Address
This is a building permit when properly filled out, signed and validated, and is subject to
expiration if work thereunder is suspended for 180 days.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives -of this city to enter the above-.
mentioned property for Inspection purposes.
Signature of applicant Date
.Mailing Address
City, State, Zip 4
BUILDING DIVISION
Sq. Ft.
Size
No. No. Dw.
Stories Units
New ❑ Add ❑
Alter Repair ❑ -Demolition ❑
r
Estimated Valuation` �� �QO
y
PERMIT
AMOUNT
Plan Chk. Dep.
N7
Plan Chk. Bal.
Const.
Mech.
Electrical
Plumbing
S.M:I.
-
Grading
Driveway Enc.
Infrastructure
TOTAL
IY A ` ra - VS Ui T 41 w 1_`` 500. 00
Q,
REMARKS
ZONE: BY:
Minimum Setback Distances:
Front. Setback from Center Line
Rear Setback from Rear Prop. Line
Side Street Setback from Center Line
Side Setback from Property Line
FINAL DATE INSPECTOR
Issued by: Date Permit
Validated by:
Validation:
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
IST FL. SQ. FT. ® $
UNITS
f
2ND FL. SQ. FT.
YARD SPKLR SYSTEM
POR. SQ. FT. ®
MOBILEHOME SVC.
BAR SINK
GAR. SQ. FT. ®
POWER OUTLET
ROOF DRAINS
CAR P. SQ. FT. ®
I
DRAINAGE PIPING
WALL SO. FT.
STORAGE TANK
DRINKING FOUNTAIN
SQ FT ®
ROUGH WIRING
URINAL
ESTIMATED CONSTRUCTION VALUATION $
FOUND. REINF.
WATER PIPING
NOTE: Not to be used as property tax valuation
HEATING (FINAL)
FLOOR DRAIN
MECHANICAL FEES
GAS (FINAL)
WATER SOFTENER
VENT SYSTEM FAN EVAP.COOL HOOD
SIGN
WASHER(AUTO)(DISH)
!APPLIANCE DRYER
SERVICE
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
BOND BEAM
LAUNDRYTRAY
UR HANDLING UNIT
GRADING
cu. yd.
$ plus x$
=$
CFM
KITCHEN SINK
t3SORPTION SYSTEM.
FINAL INSP.
B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET
)MPRESSOR HP
POLE, TEMIPERM
LAVATORY
iATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
ILER, B.T.U.
SQ. FT. ® c
BATH TUB
SQ. FT. ® c
WATER HEATER
�. HEATER OUTPUT, B.T.U.
SQ. FT. RESID ® 11/4 c
SEWAGE DISPOSAL
SQ.FT.GAR ® 3/ac
HOUSE SEWER
M
GAR. FIREWALL
GAS PIPING
MIT FEE
PERMIT FEE
PERMIT FEE
MESH
TOTAL FEES
MICRO FEE
MECH.FEE PL.CK.FEE
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
STRUCTURE
PLUMBING
ELECTRICAL
HEATING R AIR COND.
SOLAR
f
SETBACK
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL. AREA
SLAB GRADE
ROUGH PLUMB. .'
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH)
METER LOOP
HEATING (FINAL)
OTHER APP./EQUIP.
IREINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
FINAL INSP.
BOND BEAM
WATER SYSTEM
GRADING
cu. yd.
$ plus x$
=$
LUMBER GR.
FINAL INSP.
FRAMING
FINAL INSP.
ROOFING
REMARKS:
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING
MESH
INSULATIONISOUND
FINISH GRADING
FINAL INSPECTION
CERT. OCC.
FENCE FINAL
INSPECTOR'S SIGNATURESIINITIALS
GARDEN WALL FINAL
Cate, Of° 6mpllah' o (Part 1 bf'2) Performance Requirements CF -1 B
srar,E oto_.&
For Enforcement Agency Use Only
req a
,RaymaW Phip 714-261-7734
uocvmentaaon Auvw/Frm Telephone Approved
Principal Designer. The proposed building will be In substantial Energy Analyst The energy performance analysis summarized below
comppliance with the Callfomla BuAding Energy Etfidency Standards was Pcf6m+ed Using an aP CEC calculation method, with CEC
pprovided h le built according to die s ands fications and ided approved Axed and restricted ern ineer(np Inputs for the applicable climate
future Improvements are come soon rg to the requirements tone end occupancy ty an ousts an
�� build zoning end ppee dconfiguration. �P��a� representation of
..
In on this 0016110//9 of Compliance. The plans and a ficedons ng 0 ph etcal All significant energy
have bean prepared to include AN significant anergy conservation features conservation features are Ns , or on an attached pple ent.
required for compliance wilt the Standards. Building areas that are
unconditioned ands not subject 10 the standards are Indicated on the
plans.
sighature Iv oats
Rihvmow k. Phua
ame.. e..
Plans 5 e IM ENGINEERINGgn a �' Warner Ave. SIE. 1-0
L ss
WarneiapaiataAm, 1alifOs lia 92705
��� e � 5 /�j Liu -State✓ap
4S� 7 4-261-7734
Telephone
General Reference
1 Unconditioned or Mudd -tenant shell? .. .
2 CEC Occupancy Type. (�
1919phone se o. 3 UBC 000. Group/Divislon
Owner. The energy conservation features and performance 4 Climate tone .. , .... .
specifications indicated on this document and on the plans and 5 Conditioned Floor Area .... sf
speciffeadons shah appy to future alterations, unless compliance is , s Unconditioned Floor Area ... sf
onstrated anew and a new Certificate of Compfianoe is submitted. A
C opy of this Certificata will be retained and transmitted to future tenants, T Budget Table lire Standards) .
subsseeqquueent owners or others with res
PonsiDifi y for Making improvements 8 AM. Energy Budget (WS•1A) . 22 kBtu/sf-yr
-or modificedons to the building. II tido certificate is lost, a new Certificate
may be required before a permit Is Issued for alterations. Unconditioned 9 Calo.Method CEC Code/Date
areas are Indicated on the plans and. H these areas are conditioned M the 10 Multiplier , , .. . _
future, they must be made comp the applk a energy standards
then 11 Calculated Energy Use ...� Z kBtu►sf-yr
Envelope Requirements
gna a s, � 12 Average RoollCe11ing At.
y' _3 23 3 h-F-sf/Btu
(< 4E:-1. M13 Average Exterior Foot Rt'. 981
h-F-sVBtu.
14 Average Opaque Wan Rt ... 777Th-F-al/Btu
Company �S �-- 15 Glazing Area in Wan ..... - L
C� t o -(a 18 Average Be (Wan glazing)
/A q Z t I I Glazing Area M Roof .... O. s f
C�ryi�tate�cip ► 18 Average SC (Root glazing) .
Ughting Requirements
.. , EnrorOetti A .
art p nqy ante p' ;posed bundnp, and'h6ri alterations win . 19.. Alklavetl Whol Euildino LPD'. /� : ' watts/sf
comply with a CeAtornla Buildurg Energy Efficiency Standards. provided
future alterations 20 Allowed Common Areas LPD . wetwal
cite requirements on this Certificate and
ON applicable mandatory measures, as long as the building occupancy 21 Allowed Tenant Space LPD .. watmf
type remains unchanged. 22 Package Ughdmg Reduction . watts/sf
23 Lighting Controls Required? .. _� (Y/N)
Sgnature DateMechanlesl RequirementsNamwMe ;
24 System Type ... • .. �/!
`25 Unit Fan Power ... , .. watts/dm
Ag" 28 Rated Cooling Efficiency... /
---�5 �` (anile)
to 21 Rated Coding Capeclty . . .�/� �.� (units)
28 Rated Heating Efficiency ... (units)
P 29 gated Heating Capacity... (units)
30 Economizer cooing? .... (yin)
31 CF-WAdached? ........... _ (yin)
EEM Form Revised September lose Page of
[Number
Hold
ChodW
By-
vile
uocvmentaaon Auvw/Frm Telephone Approved
Principal Designer. The proposed building will be In substantial Energy Analyst The energy performance analysis summarized below
comppliance with the Callfomla BuAding Energy Etfidency Standards was Pcf6m+ed Using an aP CEC calculation method, with CEC
pprovided h le built according to die s ands fications and ided approved Axed and restricted ern ineer(np Inputs for the applicable climate
future Improvements are come soon rg to the requirements tone end occupancy ty an ousts an
�� build zoning end ppee dconfiguration. �P��a� representation of
..
In on this 0016110//9 of Compliance. The plans and a ficedons ng 0 ph etcal All significant energy
have bean prepared to include AN significant anergy conservation features conservation features are Ns , or on an attached pple ent.
required for compliance wilt the Standards. Building areas that are
unconditioned ands not subject 10 the standards are Indicated on the
plans.
sighature Iv oats
Rihvmow k. Phua
ame.. e..
Plans 5 e IM ENGINEERINGgn a �' Warner Ave. SIE. 1-0
L ss
WarneiapaiataAm, 1alifOs lia 92705
��� e � 5 /�j Liu -State✓ap
4S� 7 4-261-7734
Telephone
General Reference
1 Unconditioned or Mudd -tenant shell? .. .
2 CEC Occupancy Type. (�
1919phone se o. 3 UBC 000. Group/Divislon
Owner. The energy conservation features and performance 4 Climate tone .. , .... .
specifications indicated on this document and on the plans and 5 Conditioned Floor Area .... sf
speciffeadons shah appy to future alterations, unless compliance is , s Unconditioned Floor Area ... sf
onstrated anew and a new Certificate of Compfianoe is submitted. A
C opy of this Certificata will be retained and transmitted to future tenants, T Budget Table lire Standards) .
subsseeqquueent owners or others with res
PonsiDifi y for Making improvements 8 AM. Energy Budget (WS•1A) . 22 kBtu/sf-yr
-or modificedons to the building. II tido certificate is lost, a new Certificate
may be required before a permit Is Issued for alterations. Unconditioned 9 Calo.Method CEC Code/Date
areas are Indicated on the plans and. H these areas are conditioned M the 10 Multiplier , , .. . _
future, they must be made comp the applk a energy standards
then 11 Calculated Energy Use ...� Z kBtu►sf-yr
Envelope Requirements
gna a s, � 12 Average RoollCe11ing At.
y' _3 23 3 h-F-sf/Btu
(< 4E:-1. M13 Average Exterior Foot Rt'. 981
h-F-sVBtu.
14 Average Opaque Wan Rt ... 777Th-F-al/Btu
Company �S �-- 15 Glazing Area in Wan ..... - L
C� t o -(a 18 Average Be (Wan glazing)
/A q Z t I I Glazing Area M Roof .... O. s f
C�ryi�tate�cip ► 18 Average SC (Root glazing) .
Ughting Requirements
.. , EnrorOetti A .
art p nqy ante p' ;posed bundnp, and'h6ri alterations win . 19.. Alklavetl Whol Euildino LPD'. /� : ' watts/sf
comply with a CeAtornla Buildurg Energy Efficiency Standards. provided
future alterations 20 Allowed Common Areas LPD . wetwal
cite requirements on this Certificate and
ON applicable mandatory measures, as long as the building occupancy 21 Allowed Tenant Space LPD .. watmf
type remains unchanged. 22 Package Ughdmg Reduction . watts/sf
23 Lighting Controls Required? .. _� (Y/N)
Sgnature DateMechanlesl RequirementsNamwMe ;
24 System Type ... • .. �/!
`25 Unit Fan Power ... , .. watts/dm
Ag" 28 Rated Cooling Efficiency... /
---�5 �` (anile)
to 21 Rated Coding Capeclty . . .�/� �.� (units)
28 Rated Heating Efficiency ... (units)
P 29 gated Heating Capacity... (units)
30 Economizer cooing? .... (yin)
31 CF-WAdached? ........... _ (yin)
EEM Form Revised September lose Page of
Certificate of Compliance (Part 2 of 2)
Performance Compliance C F-16
--s/3-x— s For Enforcement Agency Use Only
FrolocsT e a e oortiftate Ccr4pr .
Raymond Phua/ITO ENGINEERING (7141
uoaxrwMDOn AUvnonrsm P 2 61— 7 7 3 4 Utu Uco- We ^ CNOR By oafs-
Note.
a sNote. More than one Part Z may be submMted, but all must reference the acme Pan 1. The person responsible for design compliance for each
major building system ocknowledges to following compliance statement by signing the appropriate spill below.
Compllanoe statement. The proposed bulding knpoveMonte substantially compy with the requirements Mooted on the Certificate of
Compliance for this building, datedTM plans and spedBcatbM kidude the significant energy conservation features and the
compliance docurnentallon r consistent with the p aro and specifications.
Envelope Allowed Prepeeed
1 _ Average Roofs Ing.Rt . .173' / h-F411ftk"ni,of improvemen
ts
Z Average Exterior Floor Rt MF-eNBtu
. PIM dated dated
3 Average Opaque Wal Rt . h-F411/80j
4 Gluing Area In, Wall ... � of lima re ale
5, AVOM90 so (Wall) N
8 (leasing Area In Roof 4 sf L,L� /.% �s�Go�'Y1�j�%�,�"l�✓��E+
7 Average sC (Root) .... Uo
3v O Cls /� ,...�f 4Z
Other requkements: � .
X77
P 2 -0170
Lighting
8 Basis or Allowed LPD
IUwed . Proposed
.. o LPD
10 Paekage Lighting Rsductlon waftahf
11 Ac;ustedLPD .......2-C� wattshl
12 Lighting Control Credits? . (YM)
Other requirements:
Mechanical Allowed Proposed
13 Unit Fan Power. /� wstts/efrm'
14 Rated cooling Efficiency .. ✓ . tfi — (units)
15 Rated cooling capacity ^_(units)
18 - Rated Head" Ef derrey .. (units)
17 Rated Healing Capacity'(units)
to !Economtser cooling? ....._T (Y/N)
19 simultaneous heWood? ..— 44 (YM)
Other requirements:
11
Enforcement enry ID819
xtent ol Improvemen
Plans dated specs dated
Ognalu Date
mPa^y
Address
1 is p
Telephone r.W. License No.
Intomement Agency . veto
Santa Ana/California/92705
citylatiVE
P
License No.
vote
,Energy Budgets Worksheet WS -1A
For Enforcement Agency Use Only
C�. Frolect I Itle.,
Raymond phtia/ITO ENGINEERING
.., . ' " Vo' mentation u r irm ete•.. ,... .. ....... Checksate
Summary Data
Second Genantlon Standards Ooeupeney Types
IConditioned Floor Area ................................. ...... sf
2 Total Allowed Energy Use (MMStu are Btu x 1061 .. ............ .. Z MMBtuiyr
3 Energy Budget (Una 2 x 1000 / Line 1) (kStu • Btu x 1031.. ......... ... '22. k8tuyr-sf
First Generation Standards Occupancy Types
4 Conditioned Floor Area .: ..... ................... ......... sl
'S Total Allowed Energy Use 'jMMBtu are Btu x 1061 .. ................ ... . . .... �— MMBtuyr
-• 6 - Energy Budget (Una 5 x 1000/ Una 4) (k8tu • Btu x 1031 ......... k8tuyr-sl
r
Second Generation Nonresidential Standards
A B C D E F G H 1 J K L
•DescriptiorV
0
Conditioned
Floor
Area
Perimeter
by
Story
Area to
Perim.
Ratio
Energy
Budget
Adj
orgy
BudgetFloor
IG J)
.
L.,.Pkg.
(CF -5)
A
LPD Rqt.
Total Per
Total
First Generation Nonresidential Standards
A B......,.... .0 13- -----E
Otx;upancy
Type
DescriptioN
Floor A�
Conditioned
Floor
Area
Energy
But�d�ef/
(kBtGTyr-ef)
Allowed
Energy
(C x Dy1000
Total Total
Total Allowed Energy 75�
EEM Forth Revised September 1988 Page of
*CERTIFICATE OF COMPLIANCE _ 31A PERFORMANCE REQUIREMENTS CF -1X
---------------------------------------7------------7----------------------
Project Title: PAYLESS SHOESOURCE Date: 05-12-1992
Architect/Engineer: RAYMOND PHUA Time: 16:22
Project Location: HWY111 & WASHINGTON ST.
City/Town: LA QUINTA
Author/Firm: RAYMOND PHUA Telephone # 714-261-7734
RUNCODE: 05 -12 -1992 -IF
PAGE 1 OF 1
------------=--------------------------------------------------------------
Total Zones
Zone
1
#1
---=---=-------=-----------------------------------------------------------
" GENERAL
.... ..N_/A ...........,.-: ........ I-- ..... , ......__ ........: ............. . ... .
1 Multi -tenant ?..........
Y
2 CEC Occ Type ...........
RETAIL
3 UBC Occ ...............
RETAIL
4 Climate Zone ...........
15
5 Cond Floor Area (SQFT)
3349.
5A Cond Perimeter (FT) ..
117
6 Uncond Floor Area.(SQFT)
4
:....,., 7....Budget .Table. .......,...._ . ...
-
2.....5,3 ._.. ....... ...,....._.... ...
:.....B..All:.'Eag. Budgett..._..........
9 Calc. Method 4.........
CPO -02
10 Multiplier .............
1.027
11 Calc Eng Use (KBTU/SQFT)
184.83
ENVELOPE REQUIREMENTS
12 Avg Roof R ............
23.13
13 Avg Ext Floor R .......
0.00
14 Avg Opaque Wall R .....
7.54
15 Wall Glaze Area (SQFT).
750
16 Avg SC (Wall Glaze) ....
0.95
16A SideFins/Overhangs ...
YES
17 Roof Glaze Area (SQFT)..
0
18 Avg SC (Roof Glaze) ....
0.00
LIGHTING REQUIREMENTS
19
Modeled
Zone LPD .......
2
_20,..
Common .....ar.
ea....LPD......,., .,,.,...,....
.... ..N_/A ...........,.-: ........ I-- ..... , ......__ ........: ............. . ... .
21
Tenant
Space LPD. ......
N/A
22
Package
Light Reduction.
$
23
Light Controls
Required?
NO
MECHANICAL REQUIREMENTS
24 System Type * .......... GF/AC/EW
25 Unit Fan Power (W/SQFT). 0.79
26 Rated Cooling EER....... 8.20
27 Rated Cooling Capacity . 141900
28 Rated Heating EFF .... 0.81
29 Rated Heating Capacity.. 16,21¢¢e!p
30 Economizer Cooling ..... YES
*
GF = Gas Furnace, ER = Electric Resistance, HP = Heat Pump, OF = Oil Furnace
AC = Air Conditioning, EC = Evaporative Cooler
GW = Gas Water Heater, EW = Electric Water Heater
91,
SCM - SUMMARY OF
ENVELOPE INPUTS (PART
1 OF 2 ) CF -2X
Project Title: PAYLESS SHOESOURCE Date
05-12-1992
Time
16:22 Plan
Checked
By Date
Author/Firm: RAYMOND PHUA
RUNCODE: 05 -12 -1992 -IF
----------------------------------------------------------------=---------------
ROOF
Roof
Roof
Design
Area/
Ceiling
Zone Type
Abs. Area
R -value
R -Value
Height
1 ROOF1
-----------------------------------------------------------------------------
0.70 3349
23.13
144.78
11.0
Totals
3349
144:8
Avg:"R-Val 23:13
OPAQUE EXTERIOR
WALLS AND DOORS
Wall
'Wall Door
-------------------------------------
Heat Wall
Zone Type
Area Area
Cap. Abs. R -Value
-------------
At/Rt
1 EXT WALL
-----------------------------------------------------------------------------
1602 0
1.500.70
7.5
212.44
Totals
1602 0
212.44
Weighted Average
R -Value
7.54
GLAZING IN ROOF
Horizontal
Design
------------
Modeled
Zone Type
Area
U -Value
SC
1 NONE 0.0 N/A 0.00
-----------------
Total 0
EXTERIOR SURFACE AREA :2..3.52. _.......,:.,
SCM — SUMMARY OF ENVELOPE INPUTS (PART 2 OF 2 ) CF -2X
Project Title:'PAYLESS SHOESOURCE Date 05-12-1992
Time 16:22 Plan Checked By Date
Author/Firm: RAYMOND PHUA
RUNCODE: 05-12-1992-IF
-----=--------------------------------------------------------------------------
FLOOR AREA/SOFFITS
Floor Design Area/
Zone Type Area R -value R -Value
, ......1...... .........,...:SLAB....._. ...: ............... 3`34'9'.::. ; ...: �...`...,'..::�_ .. ...: ,.:..'.:,........._..,.. :. ...., . . ' .�...... .
-----------------------------------------------------------------------------
Totals 3349 0
Avg. R-val N/A
Azimuth= 0 GLAZING IN WALLS - ArealShading Coefficient(sc)
Zone Glazing Nlsc Elsc. Slsc Wlsc Total
1 WINDOW 010.95 010.95 32010.95 43010.95 750
------------------=----------------------------------------------------------
Totals 0 0 320 430 750
GLAZING CHARACTERISTICS
AND WEIGHTED
AVERAGES
Zone
Total
West
Total
Avg.
Area X
Area X
Area X
Zone
Glazing U -Value SC
U -Val.
SC
SC
----
1
-----------------------------------------------
- - ---------------------------------------------------
WINDOW 1.11 0:95
832
408.50
712.50
Totals
-------------------------------
832
408.50
712.50
Building
Area -Weighted Averages
1.1
0.95
0.95
*** SCM ENERGY ANALYSIS MODEL VERSION 3.1A **** DATE: 05-12-1992
*** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARDS *** TIME: 16:22
******************************************************
PAGE: 1
CLIMATE ZONE : 15 ASHRAE SDT 112
RUN TYPE : COMPLIANCE
TOTAL ZONES 1 RUNCODE: 05-12-1992-IF
*******************************************************************
ANNUAL SITE ENERGY REQUIREMENTS (MBTU'S)
Zone 1 BUILDING
SITE HEATING 0.8 0.8
SITE COOT ING. ............ ..,64..E ..._....... ...... ..... ........... ,,...._ ....., . 64.0
SITE LIGHTING 74.7 74.7
SITE RECEPTACLE 18.7 18.7
SITE FAN 40.5 40.5
SITE HOT WATER 5.4 5.4
ANNUAL SOURCE ENERGY USE ESTIMATE (KBTU/SQ.FT.)
--------------
----------------------------------------------------------------------
BUILDING ANNUAL SOURCE ENERGY USE ESTIMATE IS 184.8 KBTU/SQ.FT.
( NOTE: 1 KWH = 10.239 KBTUS OF SOURCE ENERGY )
ZONE#
ZONE FILE
Zone 1
BUILDING
SOURCE
HEATING
10.2
0.2
SOURCE
COOLING
57.3
57.3
SOURCE
LIGHTING
66.9
66.9
SOURCE
RECEPTACLE
16.7
16.7
SOURCE
FAN
36.3
36.3
SOURCE
HOT WATER
4.9
4.9
--------------
----------------------------------------------------------------------
BUILDING ANNUAL SOURCE ENERGY USE ESTIMATE IS 184.8 KBTU/SQ.FT.
( NOTE: 1 KWH = 10.239 KBTUS OF SOURCE ENERGY )
ZONE#
ZONE FILE
OCCUPANCY TYPE
WATTS/SF DAYLIGHTING
-------------
1'
PSS
RETAIL
.a .
2.00 -
CERTIFICATE OF COMPLIANCE - 31A SPECIAL ZONE FEATURES CF -1X
Project Title: PAYLESS SHOESOURCE Date: 05-12-1992
Architect/Engineer: RAYMOND PHUA Time: 16:22
Project Location: HWYlil & WASHINGTON ST.
City/Town: LA QUINTA
Author/Firm: RAYMOND PHUA Telephone # 714-261-7734
RUNCODE: 05 -12 -1992 -IF Zone File: PSS ZONE 1 OF 1
OVERHANG CHARACTERISTICS (FT.)
NORTH/NORTHEAST
. WINDOW HEIGHT .............................
OVERHANG HEIGHT FROM BASE OF WINDOW .......
0
0
OVERHANG.. EXTENSION. -FROM. WINDOW._............................0........
....
EAST./SOUTHEAST
WINDOW HEIGHT .............................
OVERHANG HEIGHT FROM BASE OF WINDOW .......
0
0
OVERHANG EXTENSION FROM WINDOW ............
0
SOUTH/SOUTHWEST
. WINDOW HEIGHT .............................
OVERHANG HEIGHT FROM BASE OF WINDOW .......
10
10
OVERHANG EXTENSION FROM WINDOW ............
12
WEST /NORTHWEST
. WINDOW HEIGHT .............................
OVERHANG HEIGHT FROM BASE OF WINDOW .......
10
10
OVERHANG EXTENSION FROM WINDOW
12
Envelope Summary Form & Worksheet (Part 1 of 2) CF -2
For Enforcement AWcy Use Only
DoWnefftflon ftftffft Date
Roof Floor Area/Soffits
A B c D A B C D
FbTr ypeArea Pa U.d Area
R-velue
i
cod B I cot o
Glazing in Roof
A B c D
i
Exterior Wall Area
r
B c
D E F
TOW L r�
6x%w Area
North
East
S"
West
TOW
cod B I cot o
Glazing in Roof
A B c D
i
Exterior Wall Area
r
B c
D E F
TOW L r�
6x%w Area
North
East
S"
West
TOW
Exterior Wall Area
r
B c
D E F
TOW L r�
6x%w Area
North
East
S"
West
TOW
L-L7L
EEM Foran Rw4w Septsmt►er 1088 Page of
Envelope Summary Form & ;Worksheet (Part 2 of 2)
Opaque Exterior. Walls and Doors
A B C D E F a M
CF -2
For Enforosrtwm .. .
A9" Use Onl
MW Uwe
WNphled AwW9 R -Value � -
Glazing in Walls 001F/Coll
A B. c D E F a u
J K
Col F I Col K
t
�.
SC Adjustment Notes:
AvemW
Coll/COIF CWJ/CWE CWKICOIF,..
EEM Form Fbvbw September 1989
Pape of _
construction Assembly compi- nc0 f=orm CF -3
PrQjW Tide For Enforcement Agency Use Only
Documentation rum DatePlan ChOCW By Date
General Information
''I Assembly Type and Number .. . . ............ . .... .. ...
2 Framing Type-..'.. . '... ............. ... ... a�Q
9 Framing Size ............ ...................... . ... ... .
4 Framing g .......... ............................ . .. inches
6 Insulation in Cavity . ........ ... ... .... F-ef-hr/Bw
6 Effective R -value of Cavity/Framing..................................F-ef-hr/Btu
.Sketch of Construction Assembly.
List of Construction Components
EEM Form Revised September 1998 Page of
A
B C D
Description
wan Sppae a-fic HC
(b 0ht (BW%F4b Col C x Col D
R -value ) (Btu✓F-sf)
' 6
C=-) U fJG Ti L
6
7
8
Total R -Value w/o films ...............
Total HC
9
Inside surface air films.,. ... ... ... .....
Cj , � �
10
Outside surface air film .. ......
O
.11
Total thermal resistance (Rd ...........
2
12
U,value (1 / Une 11) .... ".. ...
O .
EEM Form Revised September 1998 Page of
Construction Assembly Compliance Form CF -3
Project a For Enforcement Agency Use Only
Kanngth H_ T n/TTO ENCTNPPg1H6
vvwmenalOn AUPu7APlmt- wage Plan Chocked Uy Date
General Information
1 Assembly Type and Number ........................••..14�L(/
2 Framing Type.........:... ....:.................,.•.....•...... 1 V
3 Framinq Size ..... . .. : . : . . . . . . . . . . . . . . . . . . . . . . ...
I Framing Spacing .................:...... .............. . . ..inches
aInsulation in Cavity ...:........ 0 ............ 0 ............. .• I 1 ��O F•st•hr/Stu
Effective
a FI -value of Cavity/FM"mq ...................... F•til•hn9tu
Sketch of Construction Assembly
. C
List of Construction Components
8 Total R•Value w/o tfims ............. r G. CO I Total HC I -
9 Inside .surface air film ' ............... 49. (p
10 Outside surface as film
........ ....
11 Total Thermal resistance (Rt) ............
12 U•value (1 / line 11) .. m.
EEM Form Revised September 1988 .
Page __ of MOMMOMW
�. A
B
C
wall
0
Speatiie
E
HC
II Oesuiptgn
�/$ ��O
FI•valus
weight
(Idaf)
Heat
(9tu/F•Ib)
Cot C x Col 0
(BtWF•a1)
1
_ r I
2
_N17L LA -Te. -W....
._
._
3—
I e -AJ .+�c-n
)'i .
a
6
7 ..
8 Total R•Value w/o tfims ............. r G. CO I Total HC I -
9 Inside .surface air film ' ............... 49. (p
10 Outside surface as film
........ ....
11 Total Thermal resistance (Rt) ............
12 U•value (1 / line 11) .. m.
EEM Form Revised September 1988 .
Page __ of MOMMOMW
HVAC Summary(Part , of 2)
�s
vu
CF -4
For Enforcement Agency Use Only
r r vrvv� � wv
/ITO ENGINEERING
0.ocumentation u r stn• Vate
Plan Chocked By Date
Required Measures Checklist (Prescriptive Approach)
/Economizer Requirement'. eq I►ement. List each cooling fan/coil system. List the reference In the constriction documents indicating that an integrated air'or -
water economizer has been specified, or, if an economizer is not included, list applicable exceptions 1 to 6 per Section 2.5342(e)1.A.
Description jo r, / / T, 1, .
of rence
t _4Z t-
2 2
3
5
6
tZIndependent thermoitatic control of each zone. If an Independent perimeter system (� . baseboard or fan coil) is specified, indicatereference'
that shows zoningand controlrequirements have been met per 2-5342(e)1.B.
1 Cooling S tem Dcrl tion Z Refer rice
3
5
6
❑ Simultaneous heating or cooling. List each central fan system which uses reheat, retool, mixing of hot and cold air streams, or other
simultaneous operation of heating and cooling for zone temperature or humidity control. Also indicate if VAV is required per 2.5342(e)t .C., and that
it meets zone minimum air Now setpoint requirements. Reference location in construction documents where supply air reset controls have been
specified.
VAV min.set. Reset
VAV req'mt.(Y/N) Control
System Description Required? (Att. WS -4C) Reference
1
2
:.
3 -
4
5
6
❑ Variable air volume performance. List each variable air volume fan system, fan type (eg. airfoil centrifugal, vane -axial). VAV control device (eg.
inlet vanes, variable pitch blades), and system reference in construction documents. For airfoil or backward inclined oentntugai fans, attach
manufacturer's tan performance data showing that part load performance meets 2.5342(e).1.b.2.
VAV Constrction
Fan Control Document
Type Device Reference
HVAC Surnmary (Part z of 2) L�-4
For Enforcement Agency Use Only
Raymond Phua/ITO ENGINEERING
Documentation AUM M-Irm Plan Chocked Uy Usle
Whole Building HVAC Approach .(attach WS -4A)
This approach me on be used for whole buildings, not individual
. y y no systems. See Section 2=5342(9)2.
HVAC Power Index Set Selected from CF -11, Part 1 ..
- Allowed Proposed .
1 Fan Wattage Index (WS -4A, Line 3) .. .................... .. . wattNh2
' i.
2 Cooling Power Index (WS -IA, Line 5) ..... ... . BtWhr-h2
3 Heating Power Index (WS -4A, Line 7) . , .. .... .. Stulhr-112
Tailored HVAC Approach (attach one WS -4B for each system).
When this approach is used, it must be applied to each HVAC system individually. See Section 2.5342(9)3.
'
! •
Allowed
Proposed
Load
L oad
1
Cooling S st m as Ipt n
Rrl// �/ '�G.�'Z'�
(25a WS -48)
2��•O�
(26a 8) FPI
5
Allowed
Proposed .
•
Load
Load
Healing System . s 1ptxl L
(2� ,WS B)
(26b, B FPI
2
r
3
5
8
z
Attach additional summary shied ss nicessary.
Tailored HVAC Worksheet (Equipfneni loads)
vM-:>0 -C-,
WS -4B
For Enforcement Apenoy use only
Kan Roclied By OsloOne of these tonin must be Completed for each heating and/or 000lfng primary pant (eg. Hitler, air conditioner unit in the bui
tand general
ACmaries (hand or computer calaAated). and equipment catslop performance data This approach d06 rrot exemch pt
req Wwwjs of Bea 2.6342(9)1.
GENERAL INFORMATION i DESIGN CONDITIONS
1. System n 0w (ArvAde brief descriptor as referenced in plans)
-----COp G-----
----1iEATWG-----
K 7 �
2. Flow area served
,� . rG' h2
O h2
3. Oudoor drybulb MMP*mk n (per ASHRAE SPCOX)p
_ 'F
4. Outdoor w91bdb tsmpsratun (per ASHRAE SPCDX)
F
F
6. Indoor drybulb t fWatute (per ASHRAE Sta WW 66.1981)
F
72 F
6. indoor relative humidity (per ASHRAE Standard 56.1981)
RH
__ RH
LOAD CALCULATION SUMMARY
Area
Design
R2
Parameter
Value
7.
Glass conduction
Ave. U•value:
Bw/M1t3-F
8.
Glass $olar pain
Ave. SC:
9.
Wall Cortdu IIN _
Ave. U -value:
BtWh-0*
10.
Roof conduction ..
Ave. U-vak+e:
Bb06-0-F
11.
Floor conducilan -__
Ave. U -value:
BKA-ft2-F
12.
People __.
Aw. density:.
_ ft2"rson
13.
Ughts
Pwr. density:
W/ft2
14..
Miss equipment
Pwr. danaIV:
Wgt2
15.
Infiltration
. C%ftW area:
drvlt2
16.
Ventilation
C" area:
drA2
17.''
Fan feat
Fan stado:
in. H2O
16.
Pump heat
Pump Mad:
_,_,_ It, H2O
19. Ductlolping lam
20. Otey
21. Ot w
22. Oder:__
23... Total Load (win knee 7 b 22):
24. Safely/Warmup Factor (max of 160% cooling, 160% heating):
25. Maximum Adjusted Load (lane 23 x Ike 24/ 100):
26. Installed Equipment Cape* at Design Conditions:
.-----COOLING----- -HEATING-----
Sensible Load Sensible Load
kBOA kBDA
See attached load Gals.
Line 26a must b9 Nes than Or equal b Line 26a Line 26b must be less than or equal Is Una 25b.
0 not, reference exosptlon:
FAN POWER DEMAND-_-0000NG-----
(Unes 27 trough 30 may be left blv* for lowiss buildings with Nae than 4 stories.)
27. Fan supply air gw ft
26. Fan total preeaun drop ch
H2O
29. A4wl men t for VAV systms (-a 1.0 for constant volume systems) _
30. Adjustsd Fan perforrtartoe Index (1196 27 x Ike 28 x Ikw 29/Ike 2) FPI
Buikting average of 119680 mutt be Im ow 8.0 dm4w' e
If not 'reference
-----HEATING-----
ch
in. H2O .
FPI
�� �/•SGS a✓�}7rs/tTZ-�/•�ua1.1b) y7�� •i�
EEM Form Rw sed September. 1988
• Page of
~
. ZONE DESIGN COOLING
LOAD SUMMARY
`
, Location � CZ -15 LA QUINTA, California
04-03-92
Prepared By ITO ENGINEERING
6100190202
Carrier Hourly Analysis Program
��
..Page l of 2
*��*�*���**����*������*���*���������m�*������*�**��*�*������������
CALCULATION DATA:
'
' Zone Name PAYLE8S SHOESOURCE
Calc Time: Jul 1.500h
Al' Job Name PAYLESS SHOESOURCE
Amb db/wb: 112'0/ 73'0 F
' LOAD INFORMATION
'' ' ------------------__---_-_----------~------------_---_-----_
SENSIBLE
LATENT,
LOAD COMPONENT
--_------_----------_-_--------_--------------_--�--�_--�-�-
(BTU/hr) (BTU/hr)
SOLAR LOAD
19,495
O
TRANSMISSION
26"1'36
WALL TRANSMISSION
2,851
O
�ROOF TRANSMISSION
12,150 '
'O
. PARTITION TRANSMISSION
0
O
.LIGHTING / 7,000 W TOTAL)
23`834
� b. -
OTHER ELEC. ( 1`,75O -W TOTAL)
5,967
O
' PEOPLE ( ` 35.00 PEO-PLE TOTAL)
8,562
7/17S
MISCELLANEOUS LOADS
O
_
0 .
_ COOLING INFILTRATION
O
0
PULLDOWN/WARM-UP
781
D
COOLING SAFETY LOAD
----------------
0
O
SUB - TOTALS �
�9,7�6
7,l75 `
NET VENTILATION LOAD ( 7.00 CFM)
27,961
-1~429
SUPPL'Y FAN LOAD'(BHP= 1`7)
4,282
O `
_ WALL LOAD TO PLENUM
O
0
ROOF LOAD TO PLENUM
8
.0
. LIGHTING LOAD TO PLENUM � .� �
` .
--_----------_---_--_-----_-----_--_-_--_---_----------_-_--
0
� 0
.' TOTAL COOLING -LOADS
132,018
5''-746,
COIL SELECTION PARAMETERS:
'. COIL ENTERING AIR TEMP' (.D8/WB)
80.6/ 63,8
deg F
.COIL LEAVING AIR TEMP' (D8/W8)
54.1/ 53,4
deg F
~ COIL SENSIBLE LOAD
� 132,018
BTU/hr
' -COIL TOTAL LOAD
� 137.764
BTU/hr
^ COOLL�� SUPPLY AIR TEMPERATURE
S5.0
deg F
' TOTAL COOLING CFM (actual)
4,621
CFM
' TOTAL COOLING'CFM (atiJ' air)
4`619
CFM
RESULTING ROOM REL. HUMIDITY '
� 47'2
�
^ COIL BYPASS FACTOR
`
� 0'06O
COIL APPARATUS'DEWPOINT '
� S2'7
deg F
' REHEAT REQUIRED
0
BTU/hr
GENERAL INFORMATION.
'
TOTAL COOLING LDAD
� 11'48
Ton*a
� 304.87
sqft/Tons
. TOTAL FLOOR*AREA '
� 3,SOO'00
aqft
OVERALL U FAC R
� � /u
� 6'208
BTU/hr/sqft/F
. COOLING CFM/sqft'
1'32
CFM/sq. t
_,*�*�***
98L 9Lb N
0 0 MN
- 09L`T OL6 M
_ 0 0 ms
S02 9ST S"
0. 0 SS
_ .. 0. 0 3 ,
0 0 _3 N SOdO`1 'VIVM
0 ... 0 0 H
Q.. 0- 0 N
0 0 0 MN
'OtbO`,ZT S86`tbT 02t, "M
0 0 0 MS
SSb`L TST`TT OZ2 S
:0 0 0 3S
0 0 0 .3
.0 0 0 3 N " SOVOI SSV•lo
avol ldvios NOIS8IWSNV81 d3bd 1N3NOdWOO gd0I
NMOCJ W3b8 OVOI SSOIS ON'V -I-IVM
J 0' 2L... /0' ZT T r qM/qP .qwd 3obnOS30HS SS3_1AVd : aweN qor
uOOST Tnf : awtl OTeO 3obnOS30HS SS3-lAVd = aw'eN.. aunt
:Vida NOIld-ino"Ido
Z 4.0 Z a5ed weJ6oJd sTsATeud AjjnhH jaTijeo
ZOZ06TOOT9 SNIb33NION3 Ol.z : A8. •pajvdGJd
Z6. -20-b0,.. eTuJo..TTeo `ViNlni) d-1 ST -70 UOT-
AbdWWnS Od0`1.9NI1003 NOIS30 3NOZ '
ZONE DESIGN HEATING LOAD SUMMARY
Location CZ -15 LA QUINTA., California
04-03-92
Prepared By ; ITO ENGINEERING
:6100190202.
u. Carrier Hourly Analysis Program'
Page 1. of 1
:kWY�-K*9K:K;k��c;k*-k:k�**�K*�:k�c%K.:k*%K%K-k*W�;K=K=k:k>K�****:K�Yt�c��;k:k****�c*�c:k-K-k�c**�:k*�c:K:k-K*:kyc
CALCULATION DATA:
Zone Name : PAYLESS SHOESOURCE
Calc Time: Winter design
Job Name : PAYLESS SHOESOURCE
Amb db 3,5_6 'F.
r LOAD COMPONENT
LOAD (BTU/hr)'
' WALL TRANSMISSION
4,149
ROOF TRANSMISSION
10,360
GLASS- TRANSMISSION •
30,525
TRANSMISSION LOSS TO UNCOND. SPACES
0
' INFILTRATION'LOSS
0.
SLAB . F,L.00R
0
HEATING SAFETY BTU/hr
-------------
O
SUB-TOTAL
45,034
NET- VENTI LOTION LOSS
27,96.1
TOTAL HEATING LOAD
72.,995
' HEATING SUPPLY CFM
1,098 CFM
HEATING SUPPLY AIR TEMPERATURE
110.0 deg F
HEATING VENTILATION AIR CFM
700 CFM
HEATING THERMOSTAT SETPOINT TEMP
72.0 deg F'
7
nnanawory
ures Checklist
MF -1
For Enforcement Ag" We Only
This Checklist is applicable to both First and Ssoond Gweration Nonresidential Standuds Compliance..
Reference in
Constriction
Documents
Envelope Measures .
( I CertiNed insulation materiels per 2-6311(.> ...... .
I 1 Insulation Installed m most Name spread and smoke
density requirements of 2-6311(b) ........... .
( ) Urea formaldehyde foam insulation Is Installed
per 2.6311(c) .......... ' ...... ... .
I 1 Retrofit insonation 5pecf8ed as per 2.6313 ... .. .
I 1 Air Miration is minimized by spedflcation of tested
marxrtacuued dopa and windowsnts and . proper sealing
and d wea� trrpof q'rg as per NOW 2-533117 .or walls.. .
Lighting System Measures
I I CvrtfAed iuminaireakellasts per 2-6314(b) ........
I I lndeperhdent control w/ an GlOsed areas per 2.5319(a) . .
j) Manual switching readily aooessible per 2-6319(b) .. .
I 1 Reduction of fighting bad to as least one half per
2-6319(c). occupancy sensors or programmable timers
meeting CEC arteria may substitute ......... .
I 1 69Panme switching of daylit arses per 2.5319(d) ... .
Separate witch
I 1 lighting
in retail and wholleesals s per 2of display and166311 Wh) ..... .
l 1 � wholesale storestic control Of �par" 2-6319(hh i. retail... ... .
I 1 Tandem wiring of ora and three -lamp luminaires
W2.6919(1).... .............. .
Daylighting and Lumen Maintenance
Controls (when applicable)
Uniform* illumination reductlon b one-half �//j5,.
W2.6319(9)1 ........... 0 .. 0 ... 0 .
Flicker fres operation and no premature lamp Wure
W2-31 )2 .................. .
delays ung
v 2.6319(9)3 ...M urhd� ............ .
Step switching devto9s with separation between
OfM aettinps per 2.6319(e)4 . ; .
Relerence in .
Construction
Doom is
t 1 Photocell sensors with a diffusingcover and
no opaque cover per 2.6319(e).......... .
(I Manufacturer's instructions provided for Installation
and calibration per 2.63/9(e)o ........ . . .
I 1 Proper installation of controls Including sensor location,
�tl =n of initial calibration and control of luminaires
only within daylit area per 2.6319(e)8 ...... . . . T.
t 1. Visible or audible malfunction alarms per 2-63/9(9)
Occupancy Sensing Devices (when
applicable)
I 1 Visible or audible malfunction alarms per 2-5319(8)
j) Units on emissions per exception* to 2-5319(x) . ; • .. ""
HVAC and Plumbing System Measures
(I Piping Insulated as required by 2-6312 . .. . . . .
()
Certified HVAC equipment per 2-5314(a) .... ... .
t 1 Certified plumbing equipment per 2-5314(a) :.. .. .
I 1 Heating and cooling equipment efficiency per 2-5314(b) .
I 1 Pilotless ignition of gas appliances per 2-5314(c) ... .
t 1 Automatic controls for oil -hours per 2.5315(a)l ...
t 1 Thermostat set point requirements per 2-5316(a) ... .
11Sequendal control of heating and cooling per 2-631 5(a)3
I 1 Autornatio exhaust fan dampers per 2.5316(b) .... .
Thermostat controls for each zone per 2-5315(b) ... .
Ventilation provided per 2.6318 and 2-5343 ..... .
Ventilation and recirculation air quarhtlty
Information provided per 1403(b� .: ..... ... .
Heaters Our domestic not water ardor pools per 2-5316 ,
W-- l M. I
EEM Foran Revised, September 190 Page of
Certificate df, Compliance, � - -pe ' `�' �
8, Partr1 of 2) -pe Requirements CF -18
S S/7i4Gs-'ux:. C'4c-
Sid/4E # </a-&
Ravmonr�Phia 714-261-7734
uoixunentatton Author peTe Fano
For Enforcement Agency Use�Ony
Building Few Number ----- --
Dam
Da{�nw• The proposed building Ig be) in substildaf �--WWAnalyaL The energy
I witfi the California Building EnergyUfAdv-K Standards was Dertortned using an aper
Is built according to the plans -and i' fiations and p►ovlded appraed Axed and restricted e
rovements are oompleted*i to the requirement zone and 000upancy type, an
n Wa Certificate of Compnance.4The plana and apecificabona building zoning and physfca
prepared to include aA�etgniRcant energy conservation feats conservation features are Hsted
plans. itionedindar not :t 4410 t standarbulk" Indicated n t
gleno.
Owner. The energy conservation features and
specifications indicated on this document and on the pllaanss and
opeaficadors shat apply to. future alterations, unless compliance is
demonstrated anew and a new Certificate of Compliance Is submitted. A
copy of this Certificate will be retained and transmitted to future tenant,
subsseeqquent owners or othors with responsibility for making improvement
or modifications to the building. If this certificate is lost, a new Certificate
may be required before a permit is issued for alterations. Unconditioned
areas are indicated on the plans and, N these areas are conditioned In the
future, they must be made to comply with" applicable energy' standards
then in efleeL ..
!L "'� ( �( --�
Ent ON, Aiied build p and future Rare will
comdo
ply with the CaItornia Building Energy Ell ie` rte, Ss
future alterations meet the repuiremenle Indicated on Ibis Ce 'ficate d
an PI I* mendsrororyry meawres, at long u the build'
type remains undsnged. cy
Signature�k
N
.*ol
gency .
EEM Form Revised September ima
mance analysis summarized below
EC calculation method, with CEC
ring Input for the applicable climate
p an appropriate representation of
guratbn. All significant energy
, or on an attached syppie..ment
1-0
12\A9
s iling Rt ... G/- -3 23.3 h.F-sf/s u
13e E Floor Rt N h•F-sf/Btu.
4a Wall Rt .. �-/- S • S MF-abBa
1 a in Wan .' ' of
1 SC (Wan glazing) .1 Area in Roof O of
1 Avenge SC (Roof glazing) .
ghtinp Requirsmsnts
19 Allowed TO Building LPD . —:L watts/sf
20 AltrkCcmmon Areas LPD .f -a Awattw.sf
lk
21 Allowed Tenant Space LPD .. p �?.: watt/sf
r2(Padc go Ughtirg Reduction . `'�, �C> watte/sf
3 411ng Controls Required? . (YM)
�'` MsoMnioal Rsqufrentsnto /
24 lana Type.�C�
kUhk Fan Power watt/dm
Rated Coding Efficiency ... (unit)
' 2VkF ted Cooling Capachy ..
28 Rated Healing Efficiency (unit)
29 Rated Heading Capacity . .. (unit)
30 Economizer 000Ang? .... ---�— (YM)
31 CF•iXACaohed? -----1------- (YjN)
Page of
nta ki3,� fornix 92705
Q
7.4-261-7734
elepnone
General Reference
,
1
Unconditioned or Multi -tenant shell? .. .
2
CEC Oocupancy Type ....
f�
3
UBC Ooc. Group/Division ...
4
5
Climate Zone ....... .
Conditioned Floor Area ...
vsf
.6
Unconditioned Floor Area ..
- sf
7
Budget Table (fr. Standards) .�-
0
All. Energy Budget (WS•1A) .
- t kBa/sf•
.9
Cale -Method CEC Code/Dateflk
'G K
10 Multip' .
11 CayRated vee .�
/ /kea,/ar-y►
12\A9
s iling Rt ... G/- -3 23.3 h.F-sf/s u
13e E Floor Rt N h•F-sf/Btu.
4a Wall Rt .. �-/- S • S MF-abBa
1 a in Wan .' ' of
1 SC (Wan glazing) .1 Area in Roof O of
1 Avenge SC (Roof glazing) .
ghtinp Requirsmsnts
19 Allowed TO Building LPD . —:L watts/sf
20 AltrkCcmmon Areas LPD .f -a Awattw.sf
lk
21 Allowed Tenant Space LPD .. p �?.: watt/sf
r2(Padc go Ughtirg Reduction . `'�, �C> watte/sf
3 411ng Controls Required? . (YM)
�'` MsoMnioal Rsqufrentsnto /
24 lana Type.�C�
kUhk Fan Power watt/dm
Rated Coding Efficiency ... (unit)
' 2VkF ted Cooling Capachy ..
28 Rated Healing Efficiency (unit)
29 Rated Heading Capacity . .. (unit)
30 Economizer 000Ang? .... ---�— (YM)
31 CF•iXACaohed? -----1------- (YjN)
Page of
Certificate Of Compliance (Part 2 of 2) Performance Compliance CF -1 B
'rMIMTroe
For Enforcement Agency Use Only
Pont
Raymond Phuf,/ITO ENGINEERING (71 4 1
uoaxneneatwniFn•r�Ftrtn fi P 2 61 - 7 7 3 4 yPe Plan csiawa By Claw
Hots. More than one Part 2 may be submitted, Out aJl must reference the same Part 1. The person r•sponsibi• for design compliance for each
major building system acknowledges the following compliance stalement by signing the appropriate space below.
Compliance Statement. Th• proposed building knprovrnento substantially comply with the requirements indicated on the Certificate of
Compliance for this building, dead • Th• pans and specifications incfud• the significant energy conservation features and the
compliance documer4o6on a consis the plans and specifications.
Ughting
8 Basis of Aibwed LPD .. .
Propoee0
fi LPD ............ � 0 U wattVsr
10 Package Lighting wattdsf
11 Adjusted LPD ..... , 2 -D 2, v warml
12 Lighting Conlyd Credits? ..... (YM)
other "Yemenis:
Mechanical ANoW" Proposed
13
Unit Fan Power ...... . /
Envelope ANowed
Proposed
Rated cooling Efficiency • •� e-/= -
(units)
I . Avenge RooflC•iling Fit .. /V
23' /3
M ,sift
Improvements
2 Average Exterior hues Pit ..
(units)
h-F-syga
IOWA&
S Average Opaque Wd Py .
4. Glazing Area In. Wall
-�
h.F4VW
'sf
Cato Specs CIA190
gna re. a s
...
b Average SC (Waiq ....
6 Glazktg Area in Roof
4!�
Other reWirements:
e
...
o
sr
L/ L,L /.7
7 Average SC (Roof) ....
'
N
3v
Other "irements:. '
.PAKMD
,6 4�ocAl,GA • �i
Ughting
8 Basis of Aibwed LPD .. .
Propoee0
fi LPD ............ � 0 U wattVsr
10 Package Lighting wattdsf
11 Adjusted LPD ..... , 2 -D 2, v warml
12 Lighting Conlyd Credits? ..... (YM)
other "Yemenis:
Mechanical ANoW" Proposed
13
Unit Fan Power ...... . /
wapyft
14
Rated cooling Efficiency • •� e-/= -
(units)
15
Rated Cooling Capacity
^_(units)
16
'Rated Heating Efboiency , =
(units)
17
18
Rated Heating Cape ft
-Econornizercoding?
(Wft)
...`T
(YIN)
19
Simultaneous h•aVwd? ..
(YM)
Other reWirements:
Enwament Agency ate
SEA ._EI.F.CTRZCAT,DRAWINGS
utent of Improvements
Plans dated Specs dated
Ognalure Uste
Narneffille. ,
mpany
a
wftwzi
P
' O
TeleprWe • No.
SWOMMI ry. wate
Santa Ana forni 2 5
P
(7141 261-7714 Nzigmg
Cal. Ran" o.
Energy Budgets Worksheet WS -1A
trge—Fc Ti e
For Enforcement Agency Use Only
Bd. Phiia/ITO ENGINEERING
Documentation AumoaFum Date Plan ChecWd By uste
Summary Data
Second Generation Standards Occupancy Types '
t Conditioned Floor Area �b
2 Total Allowed Energy Use (MMBtu are Btu x 1061 ... .. MMBtu/yr
3 Energy. Budget (Une 2 x 1000 / Line 1) (kBtu . Btu x 103).. 2 2 kBtuyr•sf
First Generation Standards Occupancy Typo
4 Conditioned Floor Area.
sf
:...................................
6Total Allowed Energy Use (MMBtu.are.
Btu x 1061 .................. ..... �— MMBtu/ r
Y
6. Energy Budget (Une.b x 1000/ Dine 4) (kBtu . Btu x 1031 ........ ... ... . .. ..... �— kBtu/.yr•af
Second Generation Nonresidential Standards
A 8 C
D E .F •• 0 H I J K L
Total J
First Generation Nonresidential Standards
A ® C D E
Occupancy
Type
�:•
Conditioned
Floor
Area
Energy
Bine
tLTyr•al)
Conid.•
Perim.•
Rabo
/
i • • _ •J uT'IdiAdjusted
-�g •
Allowed
.••
•
I A
Total J
First Generation Nonresidential Standards
A ® C D E
Occupancy
Type
Description/
Floor a
Conditioned
Floor
Area
Energy
Bine
tLTyr•al)
Allowed
Energy
(C x D)I1000
Total Allowed Energy
... . &
Total Total
EEM Foran Revised September ION Page of
CERTIFICATE OF COMPLIANCE -
31A
PERFORMANCE REQUIREMENTS CF'1>;
Project Title: PAYLESS SHOESOURCE
Date: 04-03-1992 N� -
Architect/Engineer.: RAYMOND
PH,UA
Time: 17:14
Proj.ec-t Location: HWY 111 &
WASHINGTON ST,
City/Town: LA QUINTA
Author/Fir.m: RAYMOND PHUA
Telephone # .714=251-7734
.RUNCODE: 04 -03 -1992 -FY
PAGE 1 OF .1.
Total Zones
Zone
1
#1
GENERAL_
1 Multi --tenant'? ., , , ... , . ,
Y
2 CEC Occ Type ,:.........
RETAIL..
3 UBC Occ ....:..........
RETAIL
' 4 Climate Zone .........,,
15
5 Cond Floor Area (SQFT) ,
3500
5A Cond Perimeter (FT)
1.18
" 5 Uncond Floor Area (SQFT)
I_
7 Budget Table ..........
a:I 3 .
S A11,'Eng Budget ,,,..
a
9 -Calc. Method ...........
CPO -02
1.0 Multiplier , , . , , „ , , .
1.027
1.1 Calc Eng Use (KBTU/SQFT)
181.51
ENVELOPE REQUIREMENTS
12 Avg Roof R , . :'.'..
23. 1'3
13 Avg Ext Floor R ..,,...
0.00
14 Avg. Opaque Wall .R .. , , .
7.5'4
15 Wall Glaze Area' (SQFT).
750
15 Avg SC (Wall Glaze) .,..
0.95
15A SideFins/Overhangs ..
YES
17 Roof Glaze Area (SQFT)..
0
18 Avg SC (Roof Glaze) ,...
0,00
LIGHTING'REQUIREMENTS
19.Mode.led Zone LPD .....,,
2
20 Common area LPD :_,,.,•,,.
N/A
21 Tenant Space L_.PD. ....,,
N/A
22 Package Light Reduction.'"
.. 23 Light Controls. R.egyired?
NO
MECHANICAL REQUIREMENTS
24 . System Type-.* , .. , . , , , ...
GF/AC/EW
25 Unit Fan Power (W/SQFT).
.0.75
25 Rated Cooling EER.,,.,.,
£3.20
27 Rated Cooling Capacity
141900
28 Rated Heating EF,F :.,,,,
29 Rated Heating Capacity:.
0,51
•30 Economizer Cooling ..,..
YES
GF M Gas�Furnace, ER = Electric
Resistance,
HP = Heat. Pump, OF = Oil Furnace
AC = Air Conditioning, EC =
Evaporative Cooler
rW = Gas Water Heater, EW =
Electric Water,
Heater
SCM SUMMARY OF ENVELOPE INPUTS (PART 1 OF 2 ) CF --2X
Project Title: PAYLESS SHOESOURCE Date 04-03--1992
•. Time 17:14 • Plan Checked fay Date.
Author/Firm: .RAYMOND PHUA
RUNCODE: 04• -03 -1992 -FY
Roof
Roof
Design
Area/
Ceiling
Zone Type
Abs.
Area
R -value
R -Value
Height
: J. ROOF1
0.70
3500
23.1.3
151.31.
11.0.j-
1.0.;•.Totals
Totals
3500
151.3•
--------__
Avg. R -vat 23..13
OPAQUE
EXTERIOR
WALLS AND DOORS
Wall
Wall
Door
Heat;Wall
Zone Type.
Area
Area
Cap..;Abs.
R -Value
At/Rt.
1 EXT WALL
]•602
0
1.50;0,70
7..5
212.44.„
. Totals
16.02•
0
212.44'
Weighted
Average
R -Value
7.54
GLAZING IN.ROOF
Horizontal
Design
Modeled-
odeledZone
ZoneType-.
Area
U -Value
SC
1 NONE
0.0
N/A
0.00
-----------------
Tbtal 0
EXTERIOR SURFACE
AREA - 2352
SCM - SUMMARY OF ENVELOPE INPUTS (PART 2 OF 2 ) CF -2X
Project Title: PAYLESS SHOESOURCE Date 04-03~1992
Time 17:14 Plan Checked By Date
p
Author/Firm: RAYMOND PHUA
RUNCODE:'04-03-1992-FY
FLOOR AREA/SOFFITS
Floor
Design
Area
.Zone
Type
Area
--------------------------------------
R -value
R -Value
' 1
SLAB
3500
Totals
3500
--------------------------
0
Avg. R-val
N/A
Azimuth=.
0
GLAZING IN
WALLS - Area;Shading
Coefficient(sc)
Zone Glazing
N;sc
E;sc
S:sc
W;sc
Total
1 WINDOW
0;0,95
0;0.95
320;0.95
430;0.95
7SO
Totals
�
0
0
320-
_-430 _---------750
GLAZING CHARACTERISTICS
AND WEIGHTED
AVERAGES
-"Zone--
^Total
West ========Total
__
Avg_
Area X .
Area X
Area X
Zone
Glazing
U -Value
SC
U -Val.
SC
SC
1
WINDOW.
1.11
0.95
832
408, SO
712.50
Totals
X334- ~-408,50
^---712.50_-
Building
Area -Weighted Averages
1.1
0.95
0.93
****-'SCM ENERGY ANALYSIS MODEL VERSION 3.1A
*** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARDS ***
DATE: 04-03-1992
TIME: 17:14
PAGE: 1. .
CLIMATE ZONE 15 ASHRAE SDT 112
RUN TYPE COMPLIANCE
TOTAI... ZONES . 1 RUNCODE: 04-03--1992-FY
ANNUAL SITE ENERGY REQUIREMENTS (MBTU'S)
Zone 1 BUILDING
__--
SITE HEATING 0.8 0.8
SITE COOLING 65.3 65.3
SITE LIGHTING 78.0 78.0
SITE RECEPTACLE 19.5 19,5
SITE FAN 40.2 40.2
SITE HOT WATER 5.7 ':5.7
'ANNUAL SOURCE ENERGY USE ESTIMATE (KBTU/SQ.FT.)
Zone 1 BUILDING
SOURCE HEATING 0,2 0.2
SOURCE COOLING, 55.9 55.9
SOURCE. LIGHTING 66.9 66.9 .
SOURCE RECEPTACLE 16.7 16.7
SOURCE FAN 34.4 34.4
SOURCE HOT, WATER. 4.9 4.9
BUILDING ANNUAL SOURCE ENERGY USE ESTIMATE IS 181.5 KBTU/SQ:FT.
( NOTE: I KWH = .10.239 KBTUS OF SOURCE ENERGY )
ZONE# ZONE.FILE OCCUPANCY TYPE WATTS/SF. DAYLIGHTING
------------------------
1 PSS RETAIL 2.00 -
.CERTIFICATE OF COMPLIANCE 31A SPECIAL .ZONE FEATURES CF -1X
----- --- ----------- ----....
Project Title: RAYLESS SHOESOURCE Date: 04 03--1.99.2
Architect./Engineer: RAYMOND PHUA Time: 17:14
Project Laotian: HWY 111 & WASHINGTON ST.
City/Town:. LA QUINTA
Author/Firm: RAYMOND PHUA Telephone #.714-261-7734
-RUNCODE: 04-03--1992-FY Zane File: PSS ZONE 1 OF 1
(JVERHANG CHARACTERISTICS (FT.)
NORTH/NORTHEAST WINDOW HEIGHT ............................. 0
OVERHANG HEIGHT FROM BASE OF WINDOW .,.., 0 ..
OVERHANG EXTENSION FROM WINDOW 0
..... :E.'AST /SOUTHEAST WINDOW HEIGHT ....... , . .... .. , ........., : 0
OVERHANG HEIGHT FROM BASE OF WINDOW ....... 0
OVERHANG EXTENSION FROM WINDOW 0
SOUTH/SOUTHWEST: WINDOW HEIGHT ....................:..... 10.....
OVERHANG HEIGHT FROM BASE OF WINDOW 10
OVERHANG EXTENSION FROM WINDOW 12
WEST /NORTHWEST WINDOW HEIGHT ................ ___ ....... 10
OVERHANG HEIGHT FROM BASE OF. WINDOW ....... 10 -
OVERHANG EXTENSION FROM WINDOW ............ 12
-�fCk
Cnvu'upe-%z.-)ummary t-orm. t : Workshe'et,(Part 1 of 2) CF -2
—. For Enforcement A " Use Only
a
plan By
Roof i Floor Area/Soffits
A B C D A B c C
MFboc/Soffit Proposed Area/
Type Area R.value wvalue
Glazing .in Roof
A B C
Col B / col D
D E
TOW Total
Average R -value
COB/COID
F d u
Exterior Wall Area
B c D
E F
TOW L,__�
Surfew Ana `
North
East
South
West
TOW .
FT7TJ
E3E��
Glazing .in Roof
A B C
Col B / col D
D E
TOW Total
Average R -value
COB/COID
F d u
Exterior Wall Area
B c D
E F
TOW L,__�
Surfew Ana `
North
East
South
West
TOW .
FT7TJ
EEM Form Revised September 1088 Nil
• .Page of