Loading...
04-6326 (3)MTG`.. Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK eINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS qD(N) APPROVED PLANS(d�J(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING 1Z -Z3 C'- PROJECT. NO. 3z \ S-Oc' ENGINEER REPORT NO. PG OF CONTRACTOR C`A U PLAN FILE NO. PERMIT NO. Q -Co SUBCONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OFTHE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): scsi CONTRACTORS EQUIPMENT/ MANP�OWE USED: r—• \cLs sRn_ w 2 n �o��,ca AREA, GRID LINES, PIECES OBSERVt— `u _ � �i '�'. � \•�� G . Z . �-�., ti ���a c` `� � � � �%-\tet STRUCTURAL NOTES, DETAIL. OR RFIS USED: q \ REMARKS. INCLUDING MEETINGS: v REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION• WEATHER: �L� TEMPERATURE: SAMPLES TAKEN: !- TESTS REQUIRED: _ may_ SITE TIME START: I O CJ = SITE TIME FINISH: C_- C-`_ LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT 0 Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97