FIELD REPORT
TYPE OF WORK eINSPECTOR
❑ TECHNICIAN
AVAILABLE: SOIL REPORT (Y) (N) SPECS qD(N)
APPROVED PLANS(d�J(N) APPROVED SHOP DRAWING (Y) (N)
ARCHITECT
FOR WEEK ENDING
1Z -Z3 C'-
PROJECT. NO.
3z \ S-Oc'
ENGINEER
REPORT NO. PG OF
CONTRACTOR
C`A
U
PLAN FILE NO.
PERMIT NO.
Q -Co
SUBCONTRACTOR
PROJECT NAME
INSPECTION ADDRESS
ADDRESS OF PROJECT
REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS
IF THERE IS NON -CONFORMING WORK AT THE END OFTHE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT
WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND
SUBMIT COPY WITH YOUR WEEK'S REPORTS.
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS):
scsi
CONTRACTORS EQUIPMENT/ MANP�OWE USED:
r—•
\cLs sRn_ w 2 n �o��,ca
AREA, GRID LINES, PIECES OBSERVt—
`u
_ � �i '�'.
� \•�� G . Z . �-�., ti ���a c` `� � � � �%-\tet
STRUCTURAL NOTES, DETAIL. OR RFIS USED:
q \
REMARKS. INCLUDING MEETINGS:
v
REWORK AS PERCENT OF ALL WORK
TODAY: PERCENT PROJECT COMPI ETION•
WEATHER: �L�
TEMPERATURE:
SAMPLES TAKEN: !-
TESTS REQUIRED: _ may_
SITE TIME START: I O CJ = SITE TIME FINISH: C_- C-`_
LUNCH PERIOD:
TRAVEL TIME:
VERIFIED BY:
I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS,
AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT
0
Signature Date of Report ICBO Certification Number