Loading...
04-6326 (4)CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW d AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/07/2006 PROJECT NO. 311B303. ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE:' MQ Whisperweld BLW-4OOSSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Installation and puddle welding of the canopy metal roof decking. 2 Welding of the canopy facia channels from line D.5 to F.3 between line 6 & 7. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 84 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 01/05/2006 Print Name Date Of Report 0849264-85 ICBG Certification Number City La Quinta Quinta City / County Certification Number ► Inland Inspections & Testing, Inc. Welder Qualification Name: GUlermo Flores. S.S. No.: 660-014717 . Date: August 18,,1998 Invoice No.: 8417 Code: AWS 01.3 Extent of Qualification Base Metal* ASTM 446 Thickness Range: 18 Gauge Plate or. Pipe: Sheet to Pipe Diameter: WA supporting member Positions: Flat Backing: Supporting Member Vett. Progression: NIA Electrode Group: F1 Process: sMAW Other: Arc Seam Welds Inland Inspections & Testing, Inc. Welder Qualification Name:: Glllsrmo Flores S.S. No.: 660-014717 Date: August 18, 1998 ' Invoice No.: 8417 Code: AWS 01.3 Extent of Qualification Base M.etalt ASTM 446 Thickness Range: 18 Gauge Plate or Pipe: Sheet to Pipe Diameter: N/A supporting member Positions: Flat Backing: Supporting Member r Vert. Progression: N/A Electrode Group: F1 Process: SMAW Other: Arc seam welds L Western Technologies Inc. The Quality People Since 1955 Client B. P. DECKING ATTN: BOB PATRICK 5434 N. BOTH LANE GLENDALE, AZ 85303 3737 East Broadway Road Phoenix, Arizona 85040-2966 (602) 437-3737 • fax 470-1341 Welder's Name ROLAND PHILLIPS Coupons Tested By WESTERN TECHNOLOGIES/PHOENIX, AZ Welding Process SMAW WELDER / WELDING OPERATOR QUALIFICATION TEST REPORT Date of Report 11-20.96 Job No. 2166JD291 Event/ Invoice No. JD291-001 Authorized By 808 PATRICK Date 11-20-96 Qualification Administered By WT/PHOENIX, AZ Date 11.20.96 Social Security NO. 092-34-4003 Date of Test 11-20-96 Date of Weld 11.20.96 Code AWS D1.3 TEST DATA WELDING PROCEDURE SPECIFICATION NO. B. E. 92 VERTICAL PROGRESSION ' - POSITIONS FLAT ELECTRODE E7018 BASE METAL A606 THICKNESS 18 GA PLATE OR PIPE SHEET BACKING SUPPORTING MEMBER PIPE DIAMETER .. SHIELDING GAS / FLUX . . OTHER TEST RESULTS POSITION FLAT FLAT i SPECIMEN NO. 1 2 PIPE DIAMETER _ _ TYPE OF TEST TWIST TWIST F4 THROUGH F2 BACKING RESULTS ACCEPTABLE ACCEPTABLE EXTENT OF QUALIFICATION POSITIONS FLAT VERTICAL PROGRESSION BASE METAL AWS D1.3 APPROVED MATERIAL • PLATE OR PIPE SHEET STEEL PIPE DIAMETER _ _ THICKNESS RANGE 18-12 GAUGE ELECTRODE GROUP F4 THROUGH F2 BACKING SHEET TO SUPPORTING MEMBER OTHER QUALIFIED FOR ARC SPOT AND ARC SEAM WELD, SHEET TO SUPPORTING MEMBER.. Comments: • EXCEPT GALVANIZED //AWSA\ ME OBSERVATIONS AND TESTS REPORTED HEREIN ARE INDICATIVE OF CONDITIONS FOUND ATTHE EXACTLOCATION MID TIME OF OBSERVATION AND TESTING ONLY. THE Copies To: CLIENT (1) / cc�ELL ABOVE SERVICES AND REPORT WERE PERFORMED PURSUANT TO THE TEAMS AND CONDITIONS OFTHE.CONTRAGT BETWEEN WrAND CLIENT. WT WARRANTS THAT THIS ES F rC WAS PERFORMED UNDER THE STANDARD OF REASONABLE CARE APPLICABLE TO SUCH DAM11 / ERVA ATIO EXPRESSEDG'OR IM7UED STMIN W D p OAR KTAE7 E0. FIELD OBS 9203i 0961 OR REP Qc C W 1 aEVIEwm INL4ND INSPECTIONS ANf�TESTINGINC. 2323 W. MESCAL STE. 20 1. PHOENIX AZ 85089 (602044 -8403 - FAX (602)944-8a0 WELDER QUALIFICATION TEST Client: BP Decking Welder Name: Ronald J. Siegrist RR #1 x 77P Bo Boonville, NY 13309 Welder ID: 9873 Lab No. 03.05.6 Employee No.: Date Tested: August 18, 1998 Code: AWS D1.3 Date of Update: ........... .................. June 2, 2004 ....... .......... ................................. ........................ ...................... ............................................................. TEST INFORMATION . ........... Base -Metal: ASTM , A553, A570 Pipe Diameter: N/A Plate or Pipe: Sheet to supporting Type of Weld: Are Spot Positions: Flat Electrode: E7018 Vertical Progression: N/A Shielding Gas: N/A Thickness: 16 - 24 gauge Backing: Supporting Member ......................................................................................... ..................................................................................................................................................... Other: TEST RESULTS Position.; Sample No. Type of -Test Results Flat 1 Torsion Pass Flat 2 Torsion Pass I ................................................................................................................................................. 2 EXTENT OF QUALIFICATION .................................. ................ Base Metal- All AWS D1.3 approved material Thickness Range: 16 - 24 Gauge Plate or Pipe: Sheet & double to supporting Pipe Diameter: N/A member Positions: Flat Fes,Supporting Backing: Member vertical Progression; N/A '`' x'73 \ Electrode Group: F1 - F4 Process: $MAW • Other: Arc spot & arc seam. Uncoated, painted, galvanized. ..................... ................................................. . ....... ................................................. ........................................................................................ Reviewed By: Dave L.T*cl OC28 01P*8 209 suoi,4oaclsuI puejuj eeg:ao tro co unr z. � �x �Yl►At�1�t7C�/��10NiRA1SGES ` iPR�CE88 C aY'xC. )q `1s 2 �ymanN f v - A x•. ... ... - "scvxeYr '`triSl{yBTEEI''�`:�-..^:y x a: •seer,•.�:'is 'x_::� a.:,_s�::.k..s.. E., "PF a.PP'nvedye�Oat•'�.�§e{^ufela. 1BACIaNOi .. ig+x csu ss t x oto memper . 9liEETti$HiC1fNESa x �20�Ga � � ' Z q v y�tg 5 1s�tn OilWt,a QMy0:78 /iiBJ t GORE !ON.!- k ``ELEC71tODE 8� ` �fYJ2 `�a9mn`�ei ..._ ro vmtr�'iiw��n a„yon�Wease_oonlec�RNOENu lirAnoNAY ORAr--- iNC. B401S'bIJTHY7PARKt�µE,.6UjiE15 TEMPEi AZJ8528Yv PHONE B02180a?L1 IN SPHORN� NAT40"AL,�• 'IIfELDER ,. /fir t y'UBORATOfIlEB INC; CERTIFIC'ATIbN -'� •�ew5 , A+°�FA7C'807%804-1ILL ........... 180; i;,,�,..•;: „�....:.� 170 IAB?NO;: 97=22'49n5.: OA7E :5=587,;; ,:.. :WEI!DER?JattiJtiUemby . 88N 538 78 8878 ,.,_. IML400 IRS-P-ECTIONS 4MOTESTiNiCiNCm 2323 W. MESCAL. STE201. PHOENIX AZ 85029 (602) 944-8403 + FAX (602) 944-8230 WELDER QUALIFICATION TEST Client: BP Decking Welder Name: Nathan Zamora RR #1 Box 77P ' Boonville, NY 13309 Welder 1D: 5996 Lab No.: 03.05.6 Employee No.: Date Tested: August 18, 1998 Code: AWS D1.3 Date of Update, June 2, 2004 :................................. ....................... ............ ....................... ........................... . '...... ......................... .................................................................................... TEST INFORMATION Base Metal: ASTM, A653, A570 Pipe Diameter: N/A ' Plate or Pipe: Sheet to supporting Type of Weld: Arc Spot Positions: Flat Electrode: E7018 Vertical Progression: N/A Shielding Gas: N/A Thickness: 16 - 24 gauge Backing: Supporting Member Other: .................................................................................................................................................................................................................................................... TEST RESULTS Position: Sam le' o, Tyae of Tes Results Flat 1 Torsion 'Pass Flat 2 Torsion Pass 1 , 2 .................................... ..................... .................. ................................................................. _............................................. _....................................................... EXTENT OF QUALIFICATION Base Metal: All AWS D1,3 approved material Thickness Range: 16 - 24 Gauge Plate or Pipe: Sheet & double to supporting Pipo Diameter: N/A member Positions: Flat Y.•. `` g Supporting Backing: Su ortin Member Vertical Progression: N/A e.: " V. Electrode Group: F1 -174 Process: SMAW Other: Arc spot & arc seam. Uncoated, painted, galvanized. ............................................. .... ........................... . ......................-.....-...........-...-......-...........-.........................................................................-. Reviewed By: pave gT'd Oe2s bi►B 209 suoi-zoadsuj pueTuj eeg:80 jp0 co unC CORPORATE 2992 E. La Palma Ave.,.Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW' APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 12131!2005 PROJECT NO. 3116303 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO. 1 PG 1 2445 Fifth Street Suite 300 San Diego, CA 92102 OF 1 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. 04-6326 P.O. Box 2558 Little Rock, AR 72203 �P�ERMITO. SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Bed bath & Beyond 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-110 Highway 111 ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Bigt Blue 302P, Red Arc D302K AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the metal roof decking. (2) Welding of the roof joists bridging angles to connections at the block wall on lines A & I. (3) Erection of the canopy framing along line 6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 81 deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 112 Hr. TRAVEL TIME: 77;7 VERIFIED BY i nn nv nCOTcv _- - - - .. ,��•-Q0Cr%VCU ALL VV I Ht VVURK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 12/27/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n PPPrI92T Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW - - - --• - • • •• •• • • •• •-� • ..,�«.vw "' AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino -Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 12/311205 PROJECT NO. 311 B303 ENGINEER: CSSIREPORT 2445 Fifth Street Suite 300 Sen Diego, CA 92102 NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quints, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 302P, Red Arc D302K AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Puddle welding of the metal roof decking. (2) Erecting the canopy framing along line 6. Items Completed: Welding of the bridging angles for the roof joists from line 2 to 6 between lines A and I. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 72 beg. F TESTS REQUIRED: n1a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY ir,no -LL yr 1 nc vvvrcn ua i LU ACUVt ANU I HAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. � , .v� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/28/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: ' 79-110 Highway 111 La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Morena Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 12131/2005 PROJECT NO. 3118303 REPORT NO. 4 PG 1 OF 1 PLAN FILE NO. IPERMIT NO. 046326 PROJECT NAME: Bed bath & Beyond ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta. CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT ACOPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2 Lincoln Shield -Arc SA -250, Miller trailblazer 301G IAREA, GRIDLINES, PIECES OBSERVED: In Proaress: Puddle welding and seam punch locking of the metal roof decki Welding of the canopy framing alonq line 6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Warm rEMPERATURE: 73 Dea. F SITE TIME START: 7:00 AM LUNCH PERIOD: 1/2 Hr. (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 4:30 PM TRAVEL TIME: PERCENT PROJECT COMPLETION: n/a n/a D BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/30/2005 _ City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax:. 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/07/2006 PROJECT NO. 3118303 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 255E Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Ranger 275 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Torque tightening of the ASTM A325 High Strength Bolts on the canopy framing from tine B.2 to F.3 between lines 6'& 7. Completed: Welding of the canopy beam extensions from line D.6 to F.3 between lines 6 & 7. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN:I n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: IF ED BY - - - --• • • •• • • •• • • • • •• •- • - vuv nLL yr I nC vwrcn Uo 1 tU A1JUVt ANU THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature . ICBG Certification Number Steve W. Bodnar 01/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE San Diego / Imperial 9 p County 2992 E. La Palma Ave., Suite A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 ADDRESS OF PROJECT: 79-110 Highway 111 La Quints, CA FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 01/07/2006 PROJECT NO. 3116303 _T ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.. 1 7 PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quints, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Installation and welding of the channels for the canopy facia from line D.5 to F.3 between lines 6 & 7. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: Na TEMPERATURE: 75 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: R IED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPjgS WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THF BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. i Signature Steve W. Bodnar 01/04/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n QPonwr Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 01/07/2006 PROJECT NO. 311 B303 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA [ADDRESSOF PROJECT: 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/ MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Installation and welding of the channels for the canopy facia from line 0.5 to F.3 between lines 6 & 7. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: Na TEMPERATURE: 75 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: //11SRIf IED BY I n(l RV (:F:PTIFV TWAT 1 UA1 is -----------•-'--•--•---�•�----1rn�V-WMr\uoICUADVVtANUIHAITHISWORK COMPP£SWITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/04/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnPT Inland Empire 14320 Elsworth. Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 12/2412005 PROJECT NO. 311B303 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO, 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO, 04-6326 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Bed bath & Beyond 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-110 Highway 111 ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Erection the support framing for the HVAC units along lines 3&5. (2) Welding of the roof joist bridging angles. (3) Welding of the W8x10 beams and tie angles on line 5.9 from line C.9 to F.5 at roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETYNGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 80deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: fERIFIED BY I DO RY CFRTIFV THAT i WA\/C OC Oc�.w vvwm m �'Q I cLJ „Dvvt ANU I "A I I HIS VVORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. — 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/21/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: �Z�4 w 2992 E. La_ Palma'AVe�`Ste.'A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp�; 14320 ElsWbhh:Street, Ste. C101 Moreno Valley, CA 92553 Te l: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK 01INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS O(N) r APPROVED PLANSj(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING \2— PROJECT. NO. 0-0�I 3 0 ENGINEER REPORT NO. PG \ OF CONTRACTOR PLAN FILE NO. PERMIT NO. n v ` Q C SUB -CONTRACTOR PROJECT NAME u SD R 6eS� t3�w. INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: n(�-a�S1 �: r� •e R �o C�.e�.��- � Hca s t.��aat� �.`12...s• � ��� r '�� AREA, GRID LINES, PIECES OBSERVED: ( S C��w a.• \J.n �Q \ l ' �e�1S Q� G�Q� � C��..� � h�V�. C.�.-e� \ A ��� . �.. �-� w, -mo i. -i V��« �• �i�•LL �^ ►� . Q e Q. 'STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INCLUOIMa MFETIMQS: v � Cs\..�s �e � h.C2G �. � -Az REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPILE 100 WEATHER: C�@o\� SAMPLESTAKEN: TEMPERATURE: c TESTS REQUIRED: SITE TIME START:. SITE TIME FINISH: 0-s!? LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: El I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT >� Signature Date of Report ICBO Certification Number Print Name City / County Certification Number 1 Rev: 7/97 FA 4 f S S. it Corporate •�, 2992 E..La4Palma Ave-., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite' G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 r` I' 1. .r ♦ 2 fS, a{q.��f+- lr� ti...tvt'w Inland Emp1� . . 14320 Elsworth. Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK KINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) APPROVED PLANS&N) SPECS (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER REPORT NO. PG , OF ` CONTRACTOR PLAN FILE NO. PERMIT No. SUB -CONTRACTOR r� PROJECT NAME INSPECTION ADDRESS L ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC.; FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: /� *1e l I1 'V C � .,—._ .ate /� <'�1_�c..,�1tr AREA, GRID LINES, PIECES OBSERVED"—) STRUCTURAL NOTES, DETAIL, OR RFIS USED: -z�� REMARKS. INCLUDING MEE17MGS: \ \ k REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPi ETION@ WEATHER: e.��A�L TEMPERATURE: SAMPLES TAKEN: O TESTS REOUIRED: �C0 VX SITE TIME START: !).001 SITE TIME FINISH: Zzcs? LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT / Z q /13's SoRcxx�g —Ps�A Signature Dpte of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 TYPE OF WORK AffINSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANS(N) Corporate.; ` . , San DiegoAmperial County: Inland Emp10 2992 E. Lapalma Ave'�'•Ste: A 7313 Carroll Road, Suite G 14320 Elsw'OR Street, Ste. C101 Anaheim, CA 92806 ' San Diego, CA 92121 Moreno Valley, CA 92553 Tel:. 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 SUB CONTRACTOR e FIELD REPORT PROJECT NAME TYPE OF WORK AffINSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANS(N) SPECS M(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT I FOR WEEK ENDING \ -'t-- 5 PROJECT NO. JOJ_] ' SZ�_ ENGINEER +a REPORT N0. PG \ OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUB CONTRACTOR e PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT p`^ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR -A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMITA COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: QN l 'G AREA, GRID LINES;. PIECES OBSERVED: STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETINGS: C V, c e< C2 51 \ t REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION' WEATHER: C�qA 2 TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: • SITE TIME START: "N00 .,-•--•- SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: 'VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /�Zi�.�ii� . .��%t�..r,��y—.—.-- c� � Z / Z P4 / O S �08001�• 8�1 Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: • San Diego/ImperiaLCounty: 2992 E. La�Palma A - e. te. A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 0, • K ;r lr nrr r .; as, s z ,. . Inland-Emp��'�:- 14320 EISw rth'St�eet, Ste. C101 Moreno Valley,'CA 92553 '^_.• Tel: 951.653.4999 Fax: 951.653.4666 FIELD -REPORT TYPE OF WORK 'INSPECTOR O TECHNICIAN C c AVAILABLE:. SOIL REPORT (Y)(N) SPECS JD(N) APPROVED PLANS04)(N) APPROVED SHOP DRAWING (Y) (N) ' ARCHITECT FOR WEEK ENDING PROJECT. N0. ENGINEER J REPORT NO. PG ` OF ` CONTRACTOR PLAN FILE NO. PERMIT NO. O SUBCONTRACTOR PROJECT NAME INSPECTION ADDRESS o \, . M ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD'IINSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS ORA PREVIOUS INSPECTOR'S; IS CORRECTED, SO NOTE -ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED, BY CONTRACTOR (INCLUDE RESEARCH -REPORT NO. OR MATERIAL TEST REPORTS): Q. �A M N e�i�,�ea. CONTRACTORS EOUIPMENT / MANPOWER USED: ' �OC�ASZ`` `'�"��QZZ �®cY.�:.�t•' \1 i �c0� Cv���a�\ AREA, GRID LINES, PIECES OBSERVED: C1 ' c�" I�SM��.� \����1C' ��C�i�' Z'f,'�OOPSn♦ �.i' 'Liam. Osie Q��I..CQ" ll�l\QP►� 1E,L �� �♦ ��v� it Q f�--Z y STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETINGS., g-� REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIM WEATHER:C`Q'+t11� ` TEMPERATURE: SAMPLES TAKEN: ® TESTS REQUIRED: SITE TIME START:. SITE TIME FINISH: ZOO LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO'Certification Number Print Name City / County Certification Number Rev: 7/97 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G. San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax:, 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/07/2006 r.: ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G. San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax:, 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/07/2006 [PROJECT NO. 311B303 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: . WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Ranger 275 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Torque tightening of the ASTM A325 High Strength Bolts on the canopy framing from line 6.2 to F.3 between lines 6 & 7. Completed: Welding of the canopy beam extensions from line D.6 to F.3 between lines 6 & 7. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: Na TEMPERATURE: 71 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: IF ED BY 1 rlr) RV r`CCTIC TU AT 1 -----'-•--•----••-•- '-" --1 IrnswUKKGUMPLIESWITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Morena Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 12/31/2005 PROJECT NO. 31113303 ARCHITECT: Smith ConsultinArchite Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 REPORT NO. 4 PG 1 OF 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 04 6326 P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: Bed bath & Beyond SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 ADDRESS OF PROJECT: 79-110 Highway 111 INSPECTION ADDRESS: - 79-110 Highway 111 La Quinta, CA La Quints, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO, OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Puddle welding and seam punch locking of the metal roof decking. (2) Welding of the canopy framing along line 6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n1a TEMPERATURE: 73 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY Inn RY RFRTICY THAT 1 UA%1 ----'---•"--•.11-11n=vvvr%nuJIto/-J:JVVtANUTHATTHIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION nF TWP BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve vv. Bodnar 12/30/2005 Date Of Report Print Name 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number '.�jy4� .,.r. •-r wN �+"�- , r�--`:.r- .�-+�..-•-..,•.r\. ��i..r•../.'y.n•.�.-.J w ...Y•L+.'1't y:-•+, ""1'?r�.�'.r'-'y'" � �Yc�.r.... �' -a ..+.. .r .- ..�..� . . - .. . ,.w�..1 , P••yi'Y L Corporate 4tx�� ' San Diego/Imperial County: Inland Emp��' 2992 E. La Palma Ave:;Se: A 7313 Carroll Road, Suite G 14320 Elsworth'Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 CONTRACTOR c u Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 A& Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK OINSPECTOR C r A cti O TECHNICIAN " & AVAILABLE: SOIL REPORT (Y) (N) SPECS e(N) APPROVED PLANS(&N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ', ` FOR WEEK ENDING ItZ-.-13 oS PROJECT NO. 3% \ S -moo ENGINEER REPORT NO. PG \ OF \ CONTRACTOR c u PLAN FILE N0. PERMIT NO. SUBCONTRACTOR / U PROJECT NAME " INSPECTION ADDRESS 1X Q5 m ADDRESS OF PROJECT L Q P, REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED. r �C3�e sV'e � G��o. � �v...•- 2sJ,c 0� �� � Oy.i "�2`� ©'c \/�r"T. \a.mc. Z �.ti�ma rte. _.-..�c : +ti n\�.t>aL e STRUCTURAL NOTES, DETAIL, OR RAS USED: f L\r � • C —'� o\ -ter c � c 2 ` Q �� � �= c -� -� c�,� �-` � � ate• �-� REMARKS, IMCLUOIMQ MEETINGS: v ;I REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION' WEATHER: �� c �R.. TEMPERATURE SAMPLES TAKEN: �- TESTS REQUIRED: $. i SITE TIME START: CJ b - SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I UU L;tH I IVY I HAI I HAVE PEH5UNALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT a r Signature Date of Report ICBO Certification Number Print Name t City / County Certification Number Rev: 7/97 .. -Rnr - . r. • ...- '.-;o.. .-. .. ti .�1 t•, ♦-,.,' .moi � . .'-c* �\r � � . r . t _ � Corporate a �;�x San,Diego/Imperial County: Inland EmpI;; St 'C'zG , 2992 E. La Palma'Qve:; e:.A 7313 Carroll Road, Stiite G 14320 Els`wo131i`Street, Ste. C101 Anaheim, CA 92806'" San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORKINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT(Y)IN) SPECS(YjY. (N) C ' any `>Z �� (� �.�� C APPROVED PLANFOY (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING -t_ PROJECT. NO. \ — (::� ENGINEER � � � � REPORT N0. PG � OF CONTRACTOR t PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR C\ PROJECT (NAME ' INSPECTI N ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND f i° SUBMIT COPY WITH YOUR WEEK'S REPORTS. ! ie MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): C5 CONTRACTORS CONTRACTORS EQUIPMENT/ NP,OWER USED: !! A. AREA. GRID LINES, PIECES OBSERVED: ` a SCK. r \.0 © t STRUCTURAL NOTES, DETAIL. OR RFIS USED: 3 • + 7F 8 � �a�4 �t �. t� �� �� '�.Q_...w �a�� E1 � A:� ice. �r � k Z 0 � REMARKS, INCLUDING MEETINGS. �m-C.�c.O]J�.�t' OlV�S 2�'t� �M_PS_� //�..L�.�•c'c+tsyC�.�-. 1 i---3 t REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIM WEATHER: ��4;kia jZj_ SAMPLES TAKEN: © v,,.,- Q_\- - TEMPERATURE: _4�j TESTS REQUIRED: �`1 CQ�C• SITE TIME START: WO Q) SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: ii uu utn ir1 inAi i nAvt rtISJUNAL.LT UuatnvtU ALL Ur I Mt WUKK us I tU AIIUVt ANU THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION,OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT t:��.� /<-� .�.�,•-------- -- / 7 ,Signature Date of Report ICBO Certification Number Print Name City ! County Certification Number i a Rev: 7/97 FqTGq Corporate: San Diego/Imperial County: InlanIt EmpWe 2992 E. La Palma Ave.', Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK OINSPECTOR O TECHNICIAN . AVAILABLE: SOIL REPORT (Y) (N) SPECSq (N) APPROVED PLANSM(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT NO. ENGINEER S S T - REPORT NO. PG ` OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. Z — .�Z SUB -CONTRACTOR PROJECT NAME R:> INSPECTION ADDRESS ADDRESS OF PROJECT N,A ' REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS -IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO.OR MATERIAL TEST REPORTS): -A4ZA CONTRACTORS EQUIIPPMENT / MANPOWER USED: 1 \L1�� tam !�\t.Y-C� rc•o��%����c L\) ��r �N�a�s.� �\ �r'C�>c P Cl t AREA, GRID LINES,I•PIIECES OBSERVED: STRUCTURAL NOTES, DETAIL, OR RAS USED: REMARKS, INCLUDING MEETINGS. REWORK AS PERCENT OF ALL WORK TODAY:' PERCENT PROJECT COMPI ETIM ' WEATHER: �4�� ,`�" TEMPERATURE: SAMPLES TAKEN: �. TESTS REQUIRED: � SITE TIME START: CIFd Aon SITE TIME FINISH? -fin LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: J UL1 ItH I II'Y I HAI I HAvt rtHSUNALLY UUSEHVEU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO.CertHicabon Number e -11111,11 -1111I. -n -ea—, el Print Name City / County Certification Number i Rev: 7/97 • Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: . 714.632.2999 Fax: 714.632.2974 iti'Ni.'7"'i:; �`- �'o ;.+/4 J' i � Y,:,.Y. Iv..�1+-•nt w ..a--� ►-.,.." AVAILABLE: SOIL REPORT (Y) (N) SPECS OZ (N) APPROVED PLANS (N) APPROVED SHOP DRAWING (Y) (N) p�.v;" San DiegoAmperial County: Inland E 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK NSPECTOR ' ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS OZ (N) APPROVED PLANS (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. 'ENGINEER C REPORT NO. PG OF CONTRACTOR N/ c.. PLAN FILE N0. PERMIT NO. .SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): C'� P CONTRACTORS EQUIPMENT/ MANPOWER USED: _C-��1 AREA, GRID LINES, PIECES OBSERVED: i ��� �' C��r-�eS Q\ �.�e �.. c��J 2. ��,-.. -� � ccs-•-, \.�� to ' STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION* WEATHER: Ste•` `11 SAMPLES TAKEN: 'Q -- TEMPERATURE: AcS TESTS REQUIRED: _® r� SITE TIME START: ��Cl�- SITE TIME FINISH: 30os?, LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: v I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE A/PPRROV�D PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 a. � .y.. y. ,w♦ . �• ,,..L-+� ...... ..ie•i„!.. .r ,+� R.Y. .. ,',"1 . �t-�� '."`"1: "�.rr"." t t �P�.t.�r. .. J+t +,:.. .vtJ 1-., �r 'a "h..w .,.,�...k °'tea o.. a. I�, •i � Corporate: San Diego/Imperial County: .Inland Empj 2992 E. La Palma Ave. Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 r, 71rx Fax: 7.1'4:632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS '(S}P(N) APPROVED PLANSON) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ` FOR WEEK ENDING / PROJECT. NO. ENGINEER C � J REPORT NO. PG , OF CONTRACTOR PLAN FILE NO. " PERMIT NO. // Z SUB -CONTRACTOR �oINA n PROJECT NAME 6e�� INSPECTION ADDRESS ADDRESS OF PROJECT o REPORTING REQUIREMENTS:.ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERE IS NON-.CONFORMING.WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S; IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/.MANPOWEER USED: \�ht �.+yR ���^!-•@'<Cl � -TD\��'!'! \ �J TcO T'���d•\�r \L-� 1 �t..�c�4.S AREA, GRID LINES, PIECES OBSERVED: t e O C �' ti„i. `� �. +� c� \ nC I Z-� S A" STRUCTURAL NOTES. DETAIL. OR FINS USED: ss �C REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI FTION• WEATHER: Q --rt_ TEMPERATURE:/tee SAMPLES TAKEN: Q - TESTS REQUIRED: SITE TIME START: c. O SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY -THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS.'AND APPLICABLE SECTION OF'THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 City of La Quinta BUILDING & SAFETY DEPARTMENT SPECIAL INSPECTOR'S REPORT PROJECT INFORMATION CONTACT INFORMATION PROJECT NAME: INSPECTOR'S NAME: Steve W. Bodnar Bed Bath & Beyond CERTIFIED BY (AGENCY): ICBO INSPECTION ADDRESS: CERTIFICATION NUMBER: 0849264-85 79-110 Highway 111 M -'�La Quint; -CA� Permit No. 04-6326 SUPERINTENDENT:' Larry Moodv / (760) 771-5333 WEEK OF: 12/27-28-29-30/2005 TESTING LABORATORY/COMPANY: MTGL 29992 East La Palma Avenue Suite A (714) 632-2999 (714) 632-2974 (Fax) INSPECTION'S PERFORMED In Progress: (1) Puddle welding of the metal roof decking. (2) Welding of the canopy framing along line 6. Items Completed: (1) Welding of the bridging angles for the roof joists from line 2 to 6 between line A and I. (2) Welding of the canopy joists and joist tie plates from line 13.2 to C.9 between line 6 an 7. teve W. Bodnar 80-400 Camino Santa Elise Indio, CA 92203-7489 DATE: 12/30/2005 I FROM :AJSTER CEMENT FINISHING INC FAX NO. :76034337.8 Dec. 13 2005 02:06PM P1 Cec 13 05 39:52a Williatll Roy C1: I,fllnss 95`1 7899717 P.1 TAN DY'S INSPECTION SERVICES, INC. PG E3( -)X. t ::766- PALM DESERT, CA 9225C�0766 OFFICE/ FAX -951.760.D? 17 PA=R 78,0,775,3339 rir SI9°ECI�.L. fI�SPECTIOM, DAILY / WEEKLY REPORT P 0FFWMMOONPE .ED A:, @C:R TVCoO'+STfa.1CTLRF --rE--- ?JEGT fI►a�uvp�o�sarwoourassnnoarrrvnctsvw',^t5-'" PHaIECtN.WE,w.�cacaum•w;Mmlan�rauccarwwtew�l9tcc'•wus: ..—.•.• ARa1TELT EAGER GivauLC9MRA 7R ®hl OF WORK [NSP - ib 0A N:� oL.w , e' WEl.C1CJi: NAhfE CERTI F flNG AGCY NAME AND NUMI K6t P15AN7 EU CCE TIME BUPPLI`i+ SAMPLE 1 FO CES! TIGISETNUM61.p ;;KU FR AATEMP SA PIE :SLUMP WATb'R TEMP .COOED 71M�lN MIXER LOCATION TAKE NI LoCAMONTAKEN: 1 IIB1� 1mml eYPp oucw %*Ap�lft *Down 111681 LLLsw OTHO Z npt1p%u►01J,p41.&1 o 4. g11H.TW+M � .6 ♦�r11W1ilfipNL7M1A'tK AGe nv Auv •In f44a� 78-495 CALLE TAMPICO LA QUINTA, CA 92253 C4& (760) 777-7075 APPLICATION FLOOD PLAIN DEVELOPMENT PERMIT o� BUILDING SITE LOCATION FLOOD ZONE 'AO' - DEPTH .1 COMMUNITY- PANEL NUMBER 060709 0005 B C. �I �" Map Revised: SH 9!1991 APPLICANT INFORMATION SECTION APPLICANT NAME APPLICANT ADDRESS- (MAILING DDRESS'(MAILING ADDRESS, NOT THE BUILDING SITE( DAYTIME TELEPHONE NO. INSTRUCTIONS 1. A Flood -Plain Development Permit is required by LQMC Section 8.11.040(A). The Applicant should complete the Applicant Information portion of this application and submit it to the Engineering Department along, with the required documentation noted hereon at the same time the :Precise .Grading Plan is submitted to the Building and Safety Department for plan checking. 2.. Documentation required for STEP.1 OF 2 APPROVAL prior to receiving clearance for Building Permit issuance ' • Copy of the proposed Precise Grading Plan for review and approval containing all information required by the checklist shown on the back of this application. 3. Documentation required for STEP 2 OF 2. APPROVAL prior to receiving Flood Plain.Development Permit approval. . Note, this approval occurs after forms for the lowest habitable floor are set and before the Building & Safety . Department authorizes foundation construction. • Submit a completed FEMA "Elevation Certificate" form to the Engineering Department. • Submit 95% relative density soils compaction certification to the Engineering'Department. STEP 7 OF 2 APPROVAL 'STEP 2 OF 2 APPROVAL The Precise Grading Plan submitted for this application has been All requirements have been. satisfied. This Flood Plain reviewed and found to contain all data required to satisfy the Development Permit is approved. requirements of LQMC 8.11 The proposed dwelling is eligible to receive a building permit upon satisfying all other Building & Safety Department requirements. A THORIZED IGNA R D TE AUTHORIZED SIGNATURE DATE La Quinta Engineering partment La Quinta Engineering Department FILE: Upon Step 2 approval, original goes in "Flood Plain Development Permit" file; copy goes to Applicant '1`090 REV -2 7100