04-6326 (5)Corporate: 2992 E. la Palma Avenue, Suite A, Anaheim, CA 92806
Date
Tested
Permit No.:
Tel: (714) 632-2999 Fax: (714) 632-2974
Project No.:
31151303
Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121
BED, BATH & BEYOND MARKET PLACE @ LA Q
11/30/2005
Tel: (858) 537-3999 Fax: (858) 537-3990
Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 9255 I 0
3.14
Tel: (909) 653-4999 Fax: (909) 653-46
2,560
N/A
Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342
DEC X
a 2005
Tel: (818) 833-8100 Fax: (818) 833-00
8,070
2,570
Report of. COMPRESSIVE STRENGTH -MORTAR ASTM C270
VCC
4425 JAMBOREE ROAD, SUITE 180
NEWPORT BEACH, CA 92660
Client: THOMAS ENTERPRISES
Set No.: 5-6965'
File No.:
Date
Tested
Permit No.:
046-326
Project No.:
31151303
Project Name:
BED, BATH & BEYOND MARKET PLACE @ LA Q
11/30/2005
HWY 111 @ ADAMS
3.14
LA QUINTA, CA
Age
(Days)
Date
Tested
Nominal
Size
Actual Area
(Sq. Inch)
Load
(lbs.)
Strength
(psi)
Type of
Fracture
28
11/30/2005
2 X 4
3.14
8,030
2,560
N/A
28
11/30/2005
2 X 4
3.14
8,070
2,570
Cone
28
11/30/2005
2 X 4
1 3.14 1
9,050
1 2,880
Cone
Specified Strength: 1,800 PSI Sampled By DANIEL ROBERTS
Location: 2 LINE AT C LINE
Concrete Supplier: ORCO
Mix No.: N/A
Ticket No.:
Water added at Site: 0.00 gal. By
Cement Type: S Mix Time: 60 min.
Remarks: ,
Distribution: THOMAS ENTERPRISES
VCC
CITY OF LA QUINTA-BLDG & SAFETY
**LAB COPY**
ASTM C172 Date Sampled: 11/2/2005 Date Received: 11/3/2005
Concrete Temp: 73 °F ASTM C1064
Ambient Temp: °F ASTM C1064
Slump: in. ASTM C143
Tested at: Anaheim
Respectfully Submitted,
MTGL, Inc.
j'
M.B. (Ben) Lo
Chief Engineer
2670 PSI
28 -day compression test complies with the specified strength.
Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806
Tel: (714)632-2999 Fax: (714) 632-2974
Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121
Tel: (858) 537-3999 Fax: (858) 537-3990
Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553
Tel: (909) 653-4999 Fax: (909) 653-4666
Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342
Tel: (818) 833-8100 Fax: (818) 833-0085
Report of: COMPRESSIVE STRENGTH -MORTAR ASTM C270
*s
VCC
4425 JAMBOREE ROAD, SUITE 180
NEWPORT BEACH, CA 92660
Client: THOMAS ENTERPRISES
Set No.: 5-6995
n�C���Mf�n
�� DEC X 7 2005
File No.:
Permit No.: 046-326
Project No.: 31151303
Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q
HWY 111 @ ADAMS
LA QUINTA, CA
Age
(Days) _
Date Nominal Actual Area
Tested Size (Sq. Inch)
Load
(lbs.)
Strength
(psi)
Type of
Fracture
7
11/10/2005 2X4, 3.14
6,480
2,060
Cone
28
12/1/2005 2 X 4 3.14
8,400
2,670
Cone
28
12/1/2005 2 X 4 3.14 ,
8,150
2,590
Cone
Specified Strength: 2,000 PSI .Sampled By CHARLES MEEK
Location: 1 ST LIFT SOUTH WALL BETWEEN G & H
Concrete Supplier: ORCO
Mix No.: TYPE S
Ticket No.:,
Water added at Site: 0.00 gal. By
Cement Type: Mix Time: min.
Remarks:
Distribution: THOMAS ENTERPRISES
VCC
f CITY OF LA QUINTA-BLDG & SAFETY
**LAB COPY**
ASTM C172 Date Sampled: 11/3/2005 Date Received: 11/4/2005
Concrete Temp: °F . ASTM C1064
Ambient Temp: °F ASTM C1064
Slump: in. ASTM C143
Tested at: Anaheim
Respectfully Submitted,
MTGL, Inc.'
l
M.B.(Ben) Lo
Chief Engineer
2630 PSI
28 -day compression test complies with the specified strength.
Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806
Tel: (714) 632-2999 Fax: (714) 632-2974
Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121
Tel: (858) 537-3999 Fax: (858) 537-3990
Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553
Tel: (909) 653-4999 Sylmar,
Fax: (909) 653-4666
Branch: 13010 San Fernando Road, Unit 1, S Imaz, CA 91342 � � 0
• Tel: (818) 833-8100 Fax: (818) 833-008
DEC V 5 2005
Reportof: COMPRESSIVE_ STRENGTH -GROUT ASTM C1019
BY
• * * File No.:
VCC' Permit No.: 046-326
4425 JAMBOREE ROAD, SUITE 180 Project No.: 31151303
NEWPORT BEACH, CA 92660 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q
HWY 111 @ ADAMS
LA QUINTA, CA
Client: THOMAS ENTERPRISES -
Set No.: 5-7372 - -
Age
(Days)
Date Nominal
Tested Size
Actual Area
(Sq. Inch)
Load Strength
(lbs.) (psi)
Type of
Fracture
7
11/29/2005 3 X 3 X 6
10.27
18,430 1,790
N/A
28
12/20/2005 3 X 3 X 6
9.00
28
12/20/2005 3 X 3 X 6
9.00
28H LI
12/20/2005 3 X 3 X 6
9.00
Specified Strength: 2,500 PSI Sampled By MICHAEL G.
Location: 3RD LIFT LINE 2
Concrete Supplier:
Mix No.: 46511
Ticket No.:
Water added at Site: 0.00 gal. By
Cement Type: Mix Time: 40 min.
Remarks:
I
Distribution: THOMAS ENTERPRISES
VCC
CITY OF LA QUINTA-BLDG & SAFETY
**LAB COPY**
ASTM C172 Date Sampled: 11/22/2005 Date Received: 11/23/2005
Concrete Temp: 71 *F ASTM C1064
Ambient Temp: 82 °F ASTM C1064
Slump: 9.00 in. ASTM C143
Tested at: Anaheim
Respectfully Submitted,
MTGL, Inc.
l
M.B. (Ben) Lo
Chief Engineer,
°dam
4t"i1'
,rr
Corporate: '
2992 E. La Palma Ave., Ste. A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
San DiegoAmperial County:
7313 Carroll Road, Suite G
San Diego, CA 92121
Tel: 858.537.3999
Fax: 858.537.3990
Inland Empit..'
14320 Elsworth Street, Ste. C101
Moreno Valley, CA 92553
Tel: 951.653.4999
Fax: 951.653.4666
FIELD REPORT
� DEC X 5 2005
TYPI�WORK NSPECTOR O TECHNICIAN
Lb HA
AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N)
APPROVED PLANS &(N) APPROVED SHOP DRAWING (Y) (N)
AR JECTFOR
L1'_!'jLdJ4. d4
WEEK ENDING
it- 21- ®SA
PROJECT. N0.
AhT 603
E (NEER
REPORT N0. PG Of
COFt�R,A fR _
®���OY/$49-COLS/N��,T. 6CdT��OR�l
PLAN FILE NO.
P 1T 0. ��
1025 6 Lao�Se.
PJECT NAME��a f Z��� /&l�J1
��`illl� A1I
INSPECTION ADDRESS //p �(/®
_I,q ' o Ted 86�
ADDRESS 0 PROJECT
REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS
IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT
WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED_ , SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND
SUBMIT A COPY WITH YOUR WEEK'S REPORTS. ' '
CO LUDE RESEAJCH REPORT NO. OR MATERIAL TEST REPORTS):
MATERIAL USE BYR (
� �� &thia L -2 Y_ ILw `0
CONTRACTORS EQUIPMENT/ MANPOWER USED:
SLS5o12 L
zapo e cl IP`aILE�GA��
AREA, GRI,ppD LIN ES,E2SERVED:
STRUCTURAL NOTES, DETAIL. OR FIRS USED:
REMARKS, INCLUDING MEE1iNCS. �! J ✓ I
.: ®'5iEOZ 'fL �.v� L. �.t�a kI/pL
.3s' <C�-5 o 9&JAI/6J6. /w s./A.4rQN.
& 'a lbs GLSgY
REWORK AS P�RQENT OF ALL WORK TODAY4
PERCENT PROJECT COMPLETION'
WEATHER: _'&Jjy &IRE ?--e
TEMPERATURE:& S
SAMPLES TAKEN:
TESTS REQUIRED:
I
I
SITE TIME START: ' DO Ad SITE TIME FINISH:
LUNCH PERIOD: TRAVEL TIME: `�
VERIFIED BY:
I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVIES&ATION RECOMMENDATIONS,
A THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT
�cDm Lei - 8s -
Signature Date of Report ICBG Certification Number
Print Name City / County Certification Number
Rev: 7/97
Corporate:
2992 E. La Palma Ave., Ste. A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
San Diego/imperial County:
7313 Carroll Road, Suite G
San Diego, CA 92121
Tel: 858.537.3999
Fax: 858.537.3990
Inland Emp"II
14320 Elsworth Street, Ste. C101
Moreno Valley, CA 92553
Tel: 951.653.4999
Fax: 951.653.4666
FIELD REPORT
TYPE ppO--F��ORK 49INSPECTOR p TECHNICIAN
I Ltl vazaL
AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N)
APPROVED PLANSf (N) APPROVED SHOP DRAWING (Y) (N)
APIC
yC ITECT / / / n �'
MLQ.- 0 / _
�A.Lz.@-io S
FOR/ 1/�EEKK ENNDING ®_ PROJECT. V,
03
REPORT NO. PG OF
-
CONTgpcze-
AAUUtt// ,r
SU��B•��Q/pNTRRA-AC�TIOR /
X/00_1240-- L GALS 1.
PLAN FILE NO. PEjMIT 0.
PRQ�1�(CTANAME 1V CEJ ®R 9
w��
INSPEC,J{ON A® RS® . 7- 1
4 A lf I11 w�e� b•
ADDRESS OF PROJECT
REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS
IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT
WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND
SUBMIT A COPY WITH YOUR WEEK'S REPORTS.
MATERIALS USED BY NTRAC OR (INCLUD�SEARCH REPORT NO. MATERIAL TEST REPORTS): r�
oar ' b dg( -'r 4 & L -Z*z9-7F-
CONTRACT0 EQUIPMENT/ MANPOWER USED:
°) �esco� Lr,-,(- Ls 1 SM14L t;) lir ahl Ke4z t -j)l, ��or2►�RS
AREA, GRID LINES, PI CES BSERVED:
I .0 to X79`
STRUCTURAL NOTES. DETAIL, OR RAS USED:
REMARKS, INCL9MGMEETINGS:
.- D&ONE), -,(70L-- C,,d a4
_T"-li f s Jell /
A. Yb" Of 6-116
REWORK AS PERCENT OF ALL WORK TODAY: PER NT PROJECT COMPI FTIO I-
WEATHER: bdt>1LC45L SAMPLES TAKEN:
S
TEMPERATURE: TESTS REQUIRED:
SITE TIME START: TED +dhf SITE TIME FINISH: 30
LUNCH PERIOD: TRAVEL TIME: —42r VERIFIED BY:
I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVfSTIGATION RECOMMENDATIONS,
AND / ORPPROVED P NS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT
Signature Date of Report P ICBO Certification Number
Print Name-
City / Coun Certification Number
Rev: 7/97
Y
s:.
r MTG L
Corporate: (. ,
2992 E. La Palma Ave., Ste. A
Anaheim, CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
San Diego/Imperial County:
7313 Carroll Road, Suite G
San Diego, CA 92121
Tel: 858.537.3999
Fax: 858.537.3990
Inland Empin,
14320 Elsworth Street, Ste. C101
Moreno Valley, CA 92553
Tel: 951.653.4999
Fax: 951.653.4666
FIELD REPORT
Los AngelesNentura County:
13010 San Fernando Rd., Unit 1
Sylmar, CA 91342
Tel: 818.833.8100
Fax: 818.833.0085
TYPE OF WORK 0 INSPECTOR ECHNICIAN
ARCHITECT
r1W ,�s�cn�, . STs
AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N)
APPROVED PLANS (111(N) APPROVED SHOP DRAWING (Y �I)
FOR WEEK ENDING PROJECT N0.`
//-/5(- es_
r
ENGINEER
REPORT NO. PG / OF f
CONTRACTOR
SUB -CONTRACTOR
C�t/Z A13Oivri
INSPECTION ADDRESS
79 - i/o H yw ///
PLAN FILE NO. PERMIT NO.
PROJECT NAME
�W-p -AA /¢N!� --
ADDRESS OF PROJECT
79 - iio N, N gr""7w
REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS
IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT
WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND
SUBMIT COPY WITH YOUR WEEK'S REPORTS. —
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS):
SSIOEc�� Gyil� oiv�/TLS To t/6/L��� T7KE 3,Gvr/o �Rw�
CONTRACTORS EQUIPMENT / MANPOWER USED.
C/PSTlN�' Cyd o,c' cc, c..,.as /ss .b Z
7_ -
AREA.GRID LINES. -PIECES OBSERVED:
STRUCTURAL NOTES, DETAIL. OR RFIS USED:
REMARKS, INCLUDING MEETINGS.
REWORK AS PERCENT OF ALL WORK TODAY
PERCENT PROJECT rOMPI Erin I !eo •io
WEATHER:Sv,vA,
TEMPERATURE: (� O
r
SAMPLES TAKEN: y s6%s
TESTS REQUIRED: 7�Tf
TIME START: 7%O0 /�+^" SITETIMEFINISH:H PERIOD: TRAVEL TIME:
F
VERIFIED BY:
1 Ctrs 111•Y I HA HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS,
ND HE AP FICATIONS AND APPLICABLE SECTION of THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT
a✓ / /y / cy $- . .S-Zye. bo / - S/ 9
Date of Report ICBO Certification Number
Print Name
City / County Certification Number
Rev: 7/97