Loading...
04-6326 (8).�.•.s..,.c^rtY:wh-..rr+�'4trwjl�`�O1Vi+�+4+`'Af'rY1Af'!p+�l'��°n`�"�'�""^r..... Corporate: .171 Ufa, San Diego/Imperial County: 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 A Inland Emp 14320 Elswo i Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK /INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS r(n(N) APPROVEDPLANSRY,(N) APPROVED SHOP DRAWING (Y) IN) ARCHITECT A� p ` �. \. \IVS `S ri '.�-C...�.� FOR WEEK ENDING /�\ �w\ \ ~ ` cr . 1 PROJECT NO. ` tiny � e - l. - O'(-) _ ENGINEER C "S � REPORT NO. PG \ OF ` CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR ` f� PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT ��\�� vim\ \\ � v'��..i�•�. , � VJ\ l.� �.�t4-���1�°A. REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): \ CONTRACTORS EQUIPMENT / MANPOWER USED: Ccs , ♦ P� `� cDl+1 ^� �sa�1 A i7r`1 w a SZ � !ice � AREA, GRID LINES, PIECES OBSERVED: I a �`p�.�.5 � e..� �\c\,C e...c�• , n,._.� \°, e..I 2�, cam, \ �•--Z J s, 20 a •Le \s \ P e C lk-as 1Z N.0 STRUCTURAL NOTES. DETAIL. OR RAS USED: REMARKS, IMCLUDIND AlEERNGS. 1 L=A, CJ X . ":. S V ,� •S c\ ` � f;= Q��az�a.'l �.•✓�°� k li ink � � Z S �©O e ` REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION• WEATHER: �\ e 4 SAMPLES TAKEN: TEMPERATURE:-� �6 ` TESTS REQUIRED: SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: _-ja, Sz,<N n TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL NVESTIGATION RECOMMEND TA •IONS, �.a AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT r Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 FRITCL Corporate: �•; San Diego/Imperial County: .... 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego,'CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 ?F Inland Empi; 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK XINSPECTOR ❑ TECHNICIAN lCv. ae.r► c t F� c'. p,��APPROVED AVAILABLE: SOIL REPORT (Y) (N) SPECS QY))(N) PLANS (YNN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER --1 REPORT NO. PG OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR ` PROJECT NAME ` INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): / /r \ t 1 t0 . M.LI . d � �� � � ^q0 l 1 � f "CVG e.. � �'�[�Cye..(i l i7r CONTRACTORS EQUIPMENT/ MANPOWER USED: >hoC�A.SL M'.�I•.eA f ��c��`.�1. L �? �-c�c�.���J l CR 't `�^�..aA�r�a� AREA, GRID LINES, PIECES OBSERVED: �'_CS�s 5e G� i�a•e_e�c�` cae..J C., 1'.... (\ � :��...w a1' 'R•, Ca �. ��"' `'��"C CJ C E~ � F Ulnl � ti C d `s. c,, f�1V e St STRUCTURAL NOTES, DETAIL. OR FIRS USED: oo x REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPI ETIOW WEATHER: °.. f 4 SAMPLES TAKEN: -�-r- TEMPERATURE: TESTS REQUIRED: SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: -1--op C= `r— TRAVEL TIME: VERIFIED BY: Le r-1 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION REGOMMENDATION3�` AND / OR THE APP/ROVED PLANS, SPECIFICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT VIL- Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 XfN" ..�1 ' , it ,fes. r�� arm �v ,r Corporate_ � wi 2992 E. La Palma A ;'''Ste.'A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San, Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Ep .a'`,:r 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ,O'INSPECTOR' p TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECSC(7�(N) , P,r� :, i i\ 1 APPROVED PLANS(Q (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT S C'l' c�� �s�z�. tt;c, FOR WEEK ENDING \'t -R -os PROJECT. NO. _�\\S-moo' ENGINEER F� REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. / SUBCONTRACTOR PROJECT NAME a INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWE USED: AREA, GRID LINES, PIECES OBSERVED: !�->c• C�\ate c r- \ Q ,.� L r.- 1�•r'=•. � `t" h' ,�c 'fir'. a�.J a.,\ -�, �. � �• Pe \� STRUCTURAL NOTES, DETAIL, OR RAS USED. J REMARKS, INCLUDING MEETINGS: rev c� REWORK AS PERCENT OF ALL WORK TODAY PERCENT ENT PBOJECT COMPI FTION• WEATHER: C�\-c. '� - SAMPLES TAKEN: TEMPERATURE: �� s�, �„ _ TESTS REQUIRED: A / � SITE TIME START: F1 '' �' n- -- SITE TIME FINISH: -Z��o �— _ LUNCH PERIOD: TRAVEL TIME: I �•r s VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT -� 3 Signature � f Print Name Date of Report ICBO Certification Number City / County Certification Number Rev: 7/97, u„_ r� •++�tic••-+�•-••�r.�-,U�S.Acr.2ti�'%K#1kS"�4,�"_y:•..,�W p? A& Corporate: :• 2992 E. La Palma Ave ,Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emr, 14,320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK j9INSPECTOR O TECHNICIAN �la�- +aha \piggy rat\ i AVAILABLE: SOIL REPORT (Y) (N) SPECS !(Y)(N) APPROVED PLANS(' (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT NO. ENGINEER ` � REPORT N0. PG ` OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT .�. REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAI/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 1ml).k, CONTRACTORS EOUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: C"\ C P,t � � . , •vim \ �. �-moo...._ � CJ � \\ �� e`.� \ �- J STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, IMaUO/NO MEEIINCS. REWORK AS PERCENT OF ALL WORK TODAY• PERCENT PROJECT COMPI ETION• WEATHER: �l SAMPLES TAKEN: - TEMPERATURE: TESTS REOUIREO: SITE TIME START: h c1 +^ - -• SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED y:. I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT - - c \Z / � / O!; Signature Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Wrl Rev: 7/97 i Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -GROUT ASTM C 10 19 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7372 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA .Age (Days) Date ; • Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/29/2005 . 3 X 3 X 6 10.27 18,430 1,790 N/A 28 12/20/2005 3 X 3 X 6 10.30 34,810 3,380 N/A 28 12/20/2005 3 X 3 X 6 10.17 1 33,260 1 3,270 N/A 28H 12/20/2005 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 3RD LIFT LINE 2 Concrete Supplier: . f Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: 40 min.' Remarks:' Distribution: THOMAS ENTERPRISES VCC . CITY OF LA QUINTA-BLDG & SAFETY **LAS COPY** A ASTM C172 Date Sampled: 11/22/2005 Date Received: 11/23/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 82 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo 'Chief Engineer 3320 PSI 28-daytcompression test complies with the specified strength. MTG Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632:2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empt- 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK XINSPECTOR OTECHNICIAN S� C.. a►S �� `�O a iti AVAILABLE: SOIL REPORT (Y) (N) SPECS®(N) APPROVED PLANS6(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER` S � REPORT NO. PG OF \ CONTRACTOR v c PLAN FILE NO. PERMIT N0. ew - SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS I �Or i lbw L A a ADDRESS OF PROJECT t1G1 \\ Cs \mow REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUALIMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTNS EQUIPMENT / MANPOWER USE . ` AREA, GRID LINES, PIECES OBSERVED: If \ ` we�a�� \y�.S•�12 C� L"iv"S �C_"'� Q��.'� � +L�� C'� �7 O � ` � � . ,, STRUCTURAL NOTES, DET RFID: Z Z to REMARKS. INaUDING MEERN REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION* WEATHER: (�� Q �j� SAMPLES TAKEN: TEMPERATURE: `� �y�w TESTS REQUIRED: SITE TIME START: ©+-- SITE TIME FINISH: y�> LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVEVGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND. APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/97 <r MTG Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp'h..' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK KINSPECTOR D TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS®(N) APPROVED PLANSQ(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ':S FOR WEEK ENDING "Z—Z --OS PROJECT. NO. I 3\\"� — ©� ENGINEER 1 REPORT NO. PG \ OF i CONTRACTOR a / PLAN FILE N0. PERMIT N0. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS Q.,`. ADDRESS OF PROJECT �g ��a LAN LN REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EOUIPMENT / MANPOWER USED: A S AREA, GRID LINES, PIECES OBSERVED: e— V STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY' PERCENT PROJECT COMPI ETIO I• WEATHER:' �� C� SZ _ SAMPLES TAKEN: E,_ TEMPERATURE: TESTS REQUIRED: 17 SITE TIME START: �'� SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WIT THE SOIL INV TIGATIDN RECOMMENDATIO , AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number 1 Print Name City / County Certification Number Rev: 7/97 Corporate: - 2992 E. La Palma Ave., Ste_. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoPmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 /I _\ Inland Emp11. . 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (D(N) APPROVED PLANSw(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER S �' REPORT NO. PG ` OF CONTRACTOR PLAN FILE No. PERMIT NO. SUB -CONTRACTOR �� �'C�SrJ�V � PROJECT NAME d �A��+� =�•- Fad Qua INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): � ti� � � � Mix f p.S'T M � - �� r � 8" � -�c "o e � • �.�� ocZ CONTRACTORS EQUIPMENT/ MANPOWER USED: te>�aa�iS AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, IMCLUG/MG MEE77MGS: %"-, SZ c_tib m cZ CSC cam. REWORK AS PERCENT OF ALL WORK TODAY. PERCENT PROJECT COMPLETION' WEATHER: C\p c� fly SAMPLESTAKEN: Q SAC oat S(�, TEMPERATURE: TESTS REQUIRED: SITE TIME START: O ��---- SITE TIME FINISH: LUNCH PERIOD TRAVEL TIME: VERIFIED BY: �) I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL 1 VESTIGATION RECOMMENDATI AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report Print Name ICBO Certification Number City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Eml 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF, WORK OINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (2)�N) APPROVED PLANS (MN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT �c"s`.\-�`:� FOR WEEK ENDING PROJECT. N0. ENGINEER: SST REPORT NO. PG \ OF CONTRACTOR PLAN FILE NO. PERMIT N0. SUBCONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS 1F THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): �A ��� h� (I -Ci CZ 2L, 1CL N) CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBVERVED: Cl) c� "-S STRUCTURAL NOTES. DETAIL. OR RFIS USED: r� REMARKS, INCLUDING MEETINGS: Ce REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPI ETION• WEATHER: �`� TEMPERATURE: SAMPLES TAKEN: _ 4;;) TESTS REQUIRED: SITE TIME START: t, �d +A� SITE TIME FINISH: �n�i✓s LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVES TION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number ' Print Name City / County Certification Number Rev: 7/97 ' A MTG Corporate: 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax:' 858.537.3990 FIELD REPORT Inland Empire: 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 909.653.4999 Fax: 909.653.4666 TYPE OF -WORK INSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORT4MN) SPECS ) APPROVED PLANS ON) APPROVED SHOP DRAWING (Y) (N) ARCHITECT S � � ^ tv �� FOR WEEK ENDING L ---t- PROJECT. NO. 7�vk _ ENGINEER REPORT NO. PG OF CONTRACTOR' PLAN FILE NO. PERMIT NO. C.o3- SUB-CONTRACTOR PROJECT NAME INSPECTION ADDRESS `1ck\\O w \\ LIQ Q.a.�,°��- ADDRESS OF PROJECT �ck \\© \w 1 A REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EOUIPMI_NI/MANPOWER USED: �o c57;Nk- " ` *rc�s��Rw a.a�r �n L caLicti r s AREA, GRID LINES. PIECES OBSERVED: N:, \eCl �-\\,� sem, r-��-.� � �-\�.= \^ s-� \�•-�.��� STRUCTURAL NOTES, DETAIL. OR RFIS USED: "C V C4 REMARKS, INCLUDING MEETINGS: C`-'� '�;22, e_%� <-I Q LcCuAz- L1LS\\ T ZSQy PS` 61 ��� Sd\,ic�10.� r G,ir.� �\�C� �����_.aJ � b�•2:� c�S�SC�=S.. REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Q, _ �KZ TEMPERATURE: �� . � SAMPLES TAKEN: 1!� •i T oma+ O S G� TESTS REQUIRED: SITE TIME START: SITE TIME FINISH: kA aC-- ti:-_ LUNCH PERIOD:— TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INSTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCYREPORT so Signature Date of Report ICBO Certification Number . �( ,qCl (22/it i� 4 G Print Name City / County Certification Number Rev: 7/97. Corporate: ' 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diegopmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empil.:" 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR ❑ TECHNICIAN 3\r1k �#. G AVAILABLE: SOIL REPORT (Y) (N) SPECS 4M(N) APPROVED PLANS&N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEKENDING PROJECT. NO. ENGINEER REPORT NO. PG ` OF \ CONTRACTOR PLAN FILE N0. PERMIT NO, SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS \� w r : ��. •�. ADDRESS OF PROJECT O REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALIMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): iV C_, C".q� QCeL�C.Ye-� CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES. PIECES OBSERV : r \-LhC�L-A�Il �nc�c� c. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETINGS: P. O P � X � S �e 4z".z'X_ L` t G�L�� V.���1� �E�o� \ � Z jL.O P S: � td Il 1. e- 0A, 0 _k'_ t_l REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION• WEATHER: �� ' TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: ROCS r�� LUNCH PERIOD: SITE TIME FINISH: __:�,04 !? TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIVNVESTIGATION RECOMMENOA7 AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT LL ✓✓ r Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 4 k F -r Iqa MTG l —) Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 t Inland Empil.: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK eINSPECTOR O TECHNICIAN S�C AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANS ON) SPECS lb(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER REPORT NO. PG OF i CONTRACTOR PLAN FILE NO. PERMIT NO. SUBCONTRACTOR PROJECT NAME INSPECTION ADDRESS �y o ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): f \ OZ. y C_'tAo_kAsS"t YN CONTRACTORS EQUIPMENT / MANPOWER USED: kA'o C�Aj� AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INCLUDING NEETINGS: REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETION* WEATHER: �� SAMPLES TAKEN: -�- TEMPERATURE: c1T TESTS REQUIRED: SITE TIME START: "1 --- LUNCH PERIOD: SITE TIME FINISH: 3�© i> TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVEVTIGATION RECOMMENDATION'S, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/97 MTG L Corporate: ' 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empil.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (N) APPROVED PLANS(M(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING \ "I--Q.=os PROJECT. No. I 3 - 60 ENGINEER REPORT NO. PG \ OF ` CONTRACTOR PLAN FILE NO. PERMIT NO. Q SUB -CONTRACTOR Aa � PROJECT NAME � � �3 o►�i.� a. � o INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK.AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE.ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 9— clx CONTRACTORS EQUIPMENT / MANPOWER USED: AREA. GRID LINES, PIECES O�VEO: STRUCTURAL NOTES. DETAIL. OR RFIS USED: ` REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION* WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START:. SITE TIME FINISH: -Q ? 1 — LUNCH PERIOD: TRAVEL TIME: VERIFIED I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL FNASTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 r --" Inland Empl.,.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ,91NSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS(aNN) APPROVED PLANS(3(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEKENDING PROJECT NO. ENGINEER REPORT NO. PG OF CONTRACTOR \! PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME i3 6-'� Ne�.� INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: 1CBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW.PREVIOUS REPORTS AND LISTS 1F THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND — SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): -X\,R -Q-- Q (! � z sdC;-�sz-�: CONTRACTORS EQUIPMENT/MANPOWE USED: AREA, GRID LINES, PIECES OBSERVED: C9`� O�Li \ o �� L 9•Pc� C `i'`� A.- cSTRUCTURAL STRUCTURALNOTES, DETAIL, OR FIRS USED: ` W\ REMARKS, INCLUDING MEETINGS. REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION• WEATHER: ��tSy�Z TEMPERATURE: ���js.��_ SAMPLESTAKEN: TESTS REQUIRED: SITE TIME START: \1 ECS t� .- SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: V�� I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES W H THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E: La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974D I-I Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 046-326 Tel: (858) 537-3999 Fax: (858) 537-3990 N0 V 2005 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 BED, BATH & BEYOND MARKET PLACE @ LA Q Tel: (909) 653-4999 Fax: (909) 653-4666 HWY 111 @ ADAMS Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 LA QUINTA, CA Tel: (818) 833-8100 Fax: (818) 833-0085 Q„ Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 s* VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 11/7/2005 HWY 111 @ ADAMS 28.37 LA QUINTA, CA ` - ` • Set No. `5=6897 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/7/2005 6X 12 28.37 53,500 1,890 Cone 28 11/28/2005 6X 12 28.37 85,700 3,020 Cone 28- 11/28/2005 6X 12 28.37 86,400 3,050 Cone 28 H 11/28/2005 6X 12 28.27 28 H 11/28/2005 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By CHARLES MEEK Location: Concrete Supplier: ASSOCIATED READY MDC Mix No.: 15336 Ticket No.: Water added at Site: 0.00 gal. By Ccrnent Type: 1I Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 10/31/2005 Date Received: 11/1/2005 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.25 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B.(Ben) Lo Chief Engineer 1\ ,s 3040 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Nominal Size Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 D Tel: (858) 537-3999 Fax: (858) 537-3990 Strength (psi) Branch: 14320 ElswortkStreet, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 A' g NOV 3 ® 2005 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 58.60 Tel: (818) 833-8100 Fax: (818) 833-0085 3,920 Report of: COMPRESSIVE STRENGTH -MASONRY PRISM ASTM C1314 * * File No.: VCC Permit No.: 046-326 4425 JAMBOREE ROAD, SUITE 180 Project No.: 31151303 NEWPORT BEACH, CA 92660 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES A Set No.: 5-7316 Age Date _ (Days) Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/24/2005 8 X 8 X 16 58.60 229,990 3,920 N/A 28 12/15/2005 8 X 8 X 16 64.00 28 •12/15/2005 8 X 8 X 16 64.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G Location: 2ND LIFT LINE 6 Concrete Supplier:. ASSOCIATED READY MIX Mix No.: 46511 . .Ticket No.: 3579503 Water added at Site 1 0.00 gal. By -Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/17/2005 Date Received: 11/21/2005 Concrete Temp: 72 °F ASTM C1064 Ambient Temp: 82 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974FFNOV,3 Branch: X7313 Carroll Road, Suite G, San Diego, CA 92121Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 9255311 2005 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 *s VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES Set No.: 5-7315 File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 10.43 21,930 HWY 11 l @ ADAMS 28 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 11/24/2005 3 X 3 X 6 10.43 21,930 2,100 N/A 28 12/15/2005. 3 X 3 X 6 9.00 28 12/15/2005 3 X 3 X 6 9.00 28 H 12/15/2005. 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. ASTM C172 Date Sampled: 11/17/2005 Date Received: 11/21/2005 Location: 2ND LIFT LINE I Concrete Supplier: ASSOCIATED READY MIX Concrete Temp: 72 °F ASTM C1064 Mix No.: 46511 Ambient Temp: 82 °F ASTM C1064 Ticket No.: 359503 Water added at Site: 0.00 gal. By Slump: 9.00 in. ASTM C143 Cement Type: Mix Time: 50 min. Tested at: Anaheim Remarks: Respectfully Submitted, Distribution: THOMAS ENTERPRISES MTGL, Inc. VCC 1 CITY OF LA QUINTA-BLDG & SAFETY + **LAB COPY** M.B. (Ben) Lo Chief Engineer "I r& t Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ss VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A - Set No.: 5-7179 ' NOV 2 gfl 2005 File No.: Actual Area (Sq. Inch) Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 3,260 HWY 111 @ ADAMS 7 11/21/2005 6X 12 LA QUINTA, CA Age Date Nominal (Days) Tested Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 92,410 3,260 Cone 7 11/21/2005 6X 12 28.37 92,410 3,260 Cone 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: 'Mix Time: Remarks:' Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B.(Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-29AiI Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-39 0 Branch: 14320 Elsworth Street, Suite C10], Moreno Valley, CA 9255 Tel: (909) 653-4999 Fax: (909) 653-46 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM 69 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7178 �l NOV 2 8 2005 I U File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age Date (Days) Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 100,340 3,540 Cone 7 11/21/2005 6X 12 28.37 100,340 3,540 Cone 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 65 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342nn Tel: (818) 833-8100 Fax: (818) 83 110 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7177 l—U1 NOV 2 8 2005 File No.: Date Tested Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 100,420 3,540 HWY 111 @ ADAMS 7 LA QUINTA, CA Age (Days) Date Tested Nominal Actual Area Size (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 100,420 3,540 Cone 7 11/21/2005 6X 12 28.37 100,420 3,540 Cone 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: ,THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 4�1 40�ZX46 M.B. (Ben) Lo Chief Engineer Corporate: Branch: Branch: Branch: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714)632- 74 7313 Carroll Road, Suite G, San Diego, CA 92121 U Tel: (858) 537-3999 Fax: (858) 537- 990 14320 Elsworth Street, Suite C101, Moreno Valley, CA 9 y. Tel: (909) 6534999 Fax: (909) 653-4666 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7176 File No.: Nominal Size Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 105,380 3,710 HWY 11 I @ ADAMS 7 11/21/2005 LA QUINTA, CA Age Date (Days) Tested Nominal Size Actual Area (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 4 11/18/2005 6X 12 28.37. 105,380 3,710 Cone 7 11/21/2005 6X 12 28.37 105,380 3,710 Cone 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks Distribution: THOMAS ENTERPRISES VCC CITY OF LA OUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 *F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. j M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (859 U Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, 3& Tel: (909) 653-4999 Fax: (909 666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 9134 `AV 2 9 2005 Tel: (818) 833-8100 Fax: (818)i 005 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C 1019 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A ..Set No.:. 577250 Age' Date No File No.: Size Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 13,500 1,270 HWY 111 @ ADAMS 28 12/13/2005 LA QUINTA, CA (Days) Tested Size Actual Area (Sq. Inch) Load Strength (lbs.) (psi) Type of. Fracture 7 11/22/2005 3 X 3 X 6 10.63 13,500 1,270 N/A 28 12/13/2005 3 X 3 X 6 9.00 28 12/13/2005 3 X 3 X 6 9.00 28 H 12/13/2005 1 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 1ST LIFT LOADING DOCK Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3576873 Water added at Site: 0.00 gal. By Cement Type: Mix Time: 36 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/15/2005 Date Received: 11/17/2005 Concrete Temp: 70 OF ASTM C1064 Ambient Temp: 86 OF ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer MTGL Corporate ' r}�,;}`� .� San DiegoArnperial County: Inland b 0 .,FP` 2992 E. La Palma Ave ;=Ste rA 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 "'' San Diego, CA 92121 Moreno Valley,'CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPWORK INSPECTOR 0 TECHNICIAN X-Lhil.�(a AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N) APPROVED PLANSIV) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECTFOR �1 5HITH L A150/77ra ;3Gr. WEEK ENDING I'L. o4. o, PROJECT. NO. 3�I5 ENGINEER� VSCAA L(1A16s REPORT NO. PG OF COM?PLAN I! L FILE NO. PERM)T NO. DA • (o32(m SUBf ONTRACTOR Xao_ -rola! s i , PROJE NAME 06 j7A,V- t- A5 7't.1 D INSPECTION ADDRESS q ' a so XL1f 1d Y. Iff La ���T� ADDRESS OF PROJECT � — h£ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A'DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EOUIPMENT /MANPOWER USED: Q) is DP L.IrI iii e,:W7N:1Q -!- MIG1145 Sy Y77, 4 AREA, GRID LINES. PIECESBSERVED: �.�5 : 3 is tTo J4 %lon:= tyle U STRUCTURAL NOTES. OR RFISSED: 2D a( (�1(t--o- �s T.I REMARKS. INCLUDING MEETINGS: �. Id / (iciKl.r` f��i �/r �` A %G rad %S IId14C _411 REWORK AS PERCENT T OF ALL WORK TODAY: PERCENT PROJECT COMPLETION* L WEATHER: A N. l /tail S C - i LLf )54'aL SAMPLES TAKEN: TEMPERATURE: A4 40 • III`L b S TESTS REOWRED: ' SITE TIME START: 1.CQ AN LUNCH PERIOD: I L0011 V. NO SITE TIME FINISH: TRAVEL TIME: VERIFIED BY: /51—' ',X/*' ' I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, A7,O HEEAAP-PROO/V€D PLANS; SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT 11 z � o a I-) &Q 24 1) Is s Signature Date of Report ICBO Certification Number 3r=fl.'; ` _..�„�!.c�G"C �,ve.>�inE 1�r6�i 2�0• fi Print Name City / County C,ortitication Number Rev: 7/97 .� eh Corporate. Al 2992 E. La Palma Ave'; Ste. Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPEJOWORK] INSPECTOR ❑ TECHNICIAN C Wk� AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (9) (N) APPROVED SHOP DRAWING (Y) (N) ARC ECT //r� Jrtt�r Com, sd rIA .�nc��. FOR WEEK ENggING 11 • D,- .03 PROJECT. NO. 1 *i//S b0i ENGINEER/� (( LO564tL /'ToAtz/j1c,S REPORT NO. PG OF CO TRACTOR L,C. .. PLAN FILE NO. P ERMffN0.o• fA32C,o SUB)JCONTRACTOR n 70`2.7.01.,1 l o�)t i. PROJECT NAME 8G `�. / �t�1 'TiF h INSPE TION ADDRESS I � ��• D��12� �.►tl r. 111 �t rJ/ Til ADDRESS 0 PROJECT �Flhtc REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE, RE/SEARCH REPORT NO. OR MATERIAL TEST REPORTS): n �rj ur"1s Swsl`y e [hauls L j_*7-4-yz" PIA 7 CONTRACTORS EQUIPMENT/ MANPOWER USED: C31 tl lciGy.l.�6 t��ca,.�CS (t l �'�r�rt<�r`Iy, ���t.nc►2S Lai2r( AREA, GRID LANES. PIECES /PBSNERVED: A ll, ,=S : 3 717 STRUCTURAL NOTEScDETAIL, Rf�FI ED:y�Q /ICC REMARKS.IMCLUD/NDMEETINCS. '' II+,` rr I hIiS 2t1� `I tr 0,�Jrp •yrs_ L!l�L. tJ& D/ �; � 3 XL0t lV r,, i.')P TQ5%t 4c2 3/c, //r_I 11&_2 f..)# -A �n_PI A To To?0`c pp I J,�iSi� . L_c rtF�G'h 1•i�t1 J43�S . Li51ct —7, d. S. M , I. Ij. I;�OaSc 1j, 1/@�r Y' E-DIb az C/" REWORK 5 PERCENT OF ALL TODAY: PERCENT PROJECT COMPLETION" WORK WEATHER: ,4 N TEMPERATURE:, -i99. . 40`' /h -70 SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: "I SITE TIME FINISH: r ;N f 1. LUNCH PERIOD, 12' 1L TRAVEL TIME: �� VERIFIED BY: I UU CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THEE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature / Date of Report ICBG Certification Number Print Name �i I&biki� , ;0&9 2-1-0 93 City / County Certification Number Rev: 7/97 Corporate: ','_+ San Diego/Imperial County: Inland Emp MF.r 2992 E. La Palma'Ave:`Ste: A 7313 Carroll Road, Su e G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 .Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 ', FIELD REPORT TYPE OF WORK 91NSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS MIN) APPROVED PLANS (YMN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ` FOR WEEK ENDING PROJECT. NO. ENGINEER J S SZ REPORT NO. PG OF ` CONTRACTOR n PLAN FILE NO. PERMIT N0. SUB -CONTRACTOR Ccv."� a.Sot,+ PROJECT NAME 6erJ �o.�� � .��. oa.•,a INSPECTION ADDRESS 4'_ �. Glv.•. i� ADDRESS OF PROJECT n1 cs vt� V \\\ �� CZL:\ r•o�! Ora REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL•= REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: M�c•� o cz N\: v f c:, �oc�\ �� �cc �N�aa►a l o��oc �r� , C � 1 `�\Q'�.� •lel �Y r �. L�.� � Q C] \J�: � 'f'c�_�`�� � AREA, GRID LINES, PIECES OBSERVED: �i tv 2— o STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS. INCLUGIMGMEERNGS: .. \i �.r'T. •1c �.-� c\C . 'Z.� • �gpC� '�1 moi' Li\� �: 't..6 e iV\•A C -Q- . as REWORK AS PERCENT OF ALL WORK TODAY' PERCENT PROJECT T COMP) ETION• WEATHER: t`\ epg2 SAMPLES TAKEN: TEMPERATURE: ` TESTS REQUIRED: /1 SITE TIME START: C�C'_N a--- SITE TIME FINISH: /,/00e." /� t LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVE613 TION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature �v Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 ,ry W y� Corporate � San Dieg6ftperial County. Inland Emp �` Y 2992 E. La Palma'Ame ,Ste: A 7313 Carroll Road, Suite G 14320 El:S'ArtStr6et, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE 0 W RK ��� �,)� ( INSPECTOR O TECHNICIAN G AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (or/ f (N) APPROVED SHOP DRAWING (Y) (N) ,KT /�! ARC -J M/ i� 1 oal�J 1 i�..[t /lC /✓. FOR WEE 12-,KD T GOJ -3/� S 0 J5 V 1 EyGIN_ ,EER 411 ! ( REPORT NO. PG OF COT COR, PLAN FILE N0. PERMIi]N0. ��� SUB CO CTOR �j //S PROJE�T NAME� INSPECTIONAD�DRES�IQ AD�RESSOFPROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE SEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTO S EQUIPMENT/ MANPOWER USED: AREA, GRID INES, PIECES OBSERVED: STRUCTUROL NOTES, DETAIL OR FIRS USED: 1 / rJ b7 I L I2.. REMARKS, INaUDOU.MFETIMDS: A- ,1442 A--Va-1el S. lel. I c . oGc55 do o S v 5':� Id, -,7i �8'' E 2)lb �r`CJ71D1� S REWORK AS PERCENT OF ALLWORKTODAY' PERCENT PROJECT COMPLETION* WEATHER: '�l 41W / FA fl! f H SAMPLES TAKEN: ' 5 S_ TEMPERATURE: 30.461 I(�D TD )b GM TESTS REQUIRED: SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: /LOD . (Z% 31) TRAVEL TIME: VERIFIED BY: - 41/b11g` t17/• • c, I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND GO THE APPRROVV 6 PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT r, `' !� Signature Date of Report ICBO Certification Number Print Name City / CounCertification Number Rev: 7197,,,' y= ,.• r ,�•: i`r-•Yf+r+��V'A'11,1/N'+r•.arcfdnr/..�(Yr � .:1 ' .I.• Corporate: Ehlt Y,, San Diego/Imperial Count ,., "P�l2992 E. La Palma Ave Suite A 7313 Carroll Road, Suite G Anaheim, CA 06't' San Diego, CA 92121 Tel:' 714.632.2999 Tel: 858.537.3999 A& Fax: 714.632.2974 Fax: 858.537.3990 FIELD REPORT Inland Empire: 14320 Elsworth Street,°Suite C101 Moreno Valley, CA 92553 Tel: 909.653.4999 Fax: 909.653.4666 TYPE OF WORK INSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORTOYN) SPECS(6N) APPROVED PLANS®;(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT NO. S tso" 0� \ "L--�� - Q ENGINEER REPORT NO. PG OF CONTRACTORPLAN FILE NO. PERMIT N0. SUB -CONTRACTOR PROJECT NAME c �\�. �, o.�R\ Q!> Q_a INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): ""C \Io 2nc-,� R g ` M e c L.,►tt Q z�Q•.; �P_ \r 3�R Ca�rchk_" - CONTRACTORS EOUIPM N7 /`M^ANPOWER USED: / C' \OC��sS1. �q'y. ZL,� �r a C\,e�, � �1- \'� \ T e� t �.flt� a.ttill,�. �C�_► s�eo r � e C� , AREA. GRID LINES, PIECES OBSERVED: + l ' i1Y.`� t` fit•' �'� C1 \ .� C f1 �\ \ Q_ 9=4ti_ Yom[ •+.�\� .rV L�"� �\�\+ •>,a �r �•-�. q\�+C STRUCTURAL NOTES. DETAIL. OR FINS USED: X� REMARKS, INaUGING AIEE17MGS. S1t"L'11L t CCh�-NdVkc1k3L1tA->!_' CG..�c, Q\aacQL 1 �.,r\'.aJ Lc�\C41na.1CC^�2 y r REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMP) FTION4 WEATHER: \�y=� SAMPLESTAKEN: TEMPERATURE: \j,.!, 9�, v� Ii TESTS REOUIREO: Cv"e SITE TIME START: - '�') (Z)n SITE TIME FINISH: OCA N� LUNCH PERIOD: "�` TRAVEL TIME: VERIFIED BY: / f DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVtr TIGATION RECOMMENDATIONS AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 � .. ... ^rr•�tFK .,,�-�' 'o"' _•,,,pit, n-.�j?kv„�«: tJ'y..4�,-Mi�""''�.t. �'-e--.^..--. v - a' � Corporate: �'j San Diego/Imperial County: Inland Ernp 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK XINSPECTOR O TECHNICIAN SST -*_\� w.Sc»� AVAILABLE: SOIL REPORT (Y) (N) SPECS ®(N) APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT i �s�w : FOR WEEK ENDING \ Z - "I— - 0 S PROJECT NO. "!'! - a0 ENGINEER � S S�- REPORT N0. PG ` OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. SUBCONTRACTOR r� M'P.aaAIV CZ PROJECT NAME d �A�� a. i3, wa INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND e SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): —5, vo N C. M .�a _ AS's M c� N - Qct P"� -r.,!R e f> NNPa� a.ci " f t CONTRACTORS EOUIPMENT / MANPOWER USED: • oct Me•,,�� t�.,��� � \ � �.�.� �.. �o,..� , (<'1 –� a .�.a�st c. RC1 �M���-\ lC] I t'\�.�c�s�C r �h+a�aci Oo�1�•Y� -tmr.\� AREA, GRID LINES, PIECES OBSERVED: k4tti2 STRUCTURAL NOTES, DETAIL, OR RAS USED: REMARKS, INaUDING MEETINGS: V.4 -,z- c o X. Z.c� v a. c �s �,� C`.$.��y n►•.ti'� 4( t\ R ZT cc�o1 ; �A\\ �A-30r\ Qcct REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI FTIM WEATHER: C\t p sL TEMPERATURE: 11 SAMPLES TAKEN: Q SAT oro S C� , TESTS REQUIRED: SITE TIME START-.*,)Ogy SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: � VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL I11VESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature / Print Name Date of Report ICBO Certification Number City / County Certification Number Rev: 7197 i�' Al 7fr ►v..f„�'�:�v •.w�.r,?pi:`::;t��7!:X'pa`^.'e�ha.',,.z.�...++r�.•«R'++`��•r.^N- .,,,�•yr�,r,�.., Corporate: San Die o/Irn erial Count : Inland EP :., , 9 P Y P. 2992 E. La Palma 'AV6. Ste. A 7313 Carroll Road, Suite G 14320 Els' '0 Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK KINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS((, j)` (N) APPROVED PLANS<)(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER C REPORT NO. PG \ OF ` CONTRACTOR �rcc PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR ^ PROJECT NAME INSPECTION ADDRESS ; ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): --C \l0 t\t C� .. t��..� �; _ , %r\SZ e: CONTRACTORS EQUIPMENT/ MANPOWER USED: �oT�.Mc..ct !•\• xe ti Fick\�� i I \P�SmtiyC f Nr�w�N�. �ay.> �s� ca-8� AREA, GRID LINES, PIECES OBSERVED: J STRUCTURAL NOTES, DETAIL, OR RFIS USED: i REMARKS. INCLUDING NEERNGS: --� `;:�- S �Q REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIOW WEATHER: C\$_f+.SZ SAMPLES TAKEN: $- TEMPERATURE: �� TESTS REQUIRED: �- i s i SITE TIME START: 0 3 `8`g '"'— SITE TIME FINISH: �r-m �---r .. LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: (/ v I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WIT THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Print Name Date of Report ICBO Certification Number City / County Certification Number j.x °;YztiT` Rev: 7/97 •�r Corporate: �: i San Diego/Imperial County: Inland Em 2992 E. La Palma .AV rSte. A 7313 Carroll Road, Suite GY 14320 Elslwp Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK �i] INSPECTOR ❑ TECHNICIAN S� C v.0 s o.N, -:.O i.J LL AVAILABLE: SOIL REPORT (Y) (N) SPECS(O(N) APPROVED PLAN4 (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER SSS REPORT NO. PG ` OF \ CONTRACTOR PLAN FILE No. PERMIT NO. SUBCONTRACTOR PROJECT NAME INSPECTION ADDRESS "Y�A ADDRESS OF PROJECT vim.\ \� Q.,:,.a���►- REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): k'L Ci . N�, \ , '" t-" C 7q0 1 S" i -V N n P__ S ��t .•..� CONTRACTORSEQUIPMENT/ MANPOWER USE :- \- \OC�c.O.�_ t^.XeSZ . �oC�E.� �r-�c d Lam\ �oC w�1�1 r C., 1 �T��]�+�ia•a AREA, GRID LINES, PIECES OBSERVED: IF`` STRUCTURAL NOTES, DET/AIL OR RFIS U\SED: REMARKS, IBaumma MEEiIMOSJ a= REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETION* WEATHER: tom\ Q y �� TEMPERATURE: SAMPLES TAKEN: 4;0, TESTS REQUIRED: SITE TIME START: !,on SITE TIME FINISH:.©� LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVF�&TIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 MTGL Corporate: ' 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emlii,..' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYP WORK NSPECTOR O TECHNICIAN 209 L.b Q A AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS gr(N) APPROVED SHOP DRAWING (Y) (N) AR ECT L&0LVj. FOR WEEK ENDING 11-11.0s, 1 PROJECT. N0. 3a15' 603 E (NEER O REPORT N0. PG OF COKJRA�TOR _ PLAN FILE N0. T - 2_74 CTOR o -CONT, ��S% P JECT NAME ac2z ��i E� INSPECTION ADDRESS / �% �q B8ie t� l 6� ADDRESSO PROJECT __SAt REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BYQCONTRACTOR (I LUDE RESEAJCH REPORT NO. OR MATERIAL TEST REPORTS): ( a CONTRACTORS EQUIPMENT / MANPOWER USED: A AREA, GRI g LINES. TECOBSERVED: L�zB�iL�/ —5 0 STRUCTURAL NOTES, DETAIL. OR RIPS USED: REMARKS, INCLUDING MEETINGS. ®G271t:/'c.9gG0� �stE! a /r/iaci�lC�.(G���r/�/4n//�� V�i.tT�P�GS —11A&. % ./LSt-z !�� E/1zl.dTiALC. f�l%m i1 4E•rzd�` l�(c�(�,1d S�. 6-,f a�Pf�l e6.-iu REWORK AS P�RQENT OF ALL WORK TODAK PERCENT PROJECT COMPLETION4 WEATHER: —C-JJLL? �� �� TEMPERATURE 5 SAMPLES TAKEN: TESTS REQUIRED: i SITE TIME START: IDD rDD Ad SITE TIME FINISH: LUNCH PERI00: CZ;� — A� TRAVEL TIME: `� VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL IN \ kIGATION RECOMMENDATIONS, A THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE D/� E�FICIIENsCY REPORT Signature Date of Report ICBO Certification Number Print Name. City/ County Certification Number Rev: 7/97 MTG�� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Ern ih.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE �O�F/%CORK J �1NSPECTOR OTECHNICIAN ULdI~I�BAL AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANSO(N) APPROVED SHOP DRAWING (Y) (N) ARC ITECT �dC �rLLSf/GO� �AC6:�P. FORJEK ENDING _ I6' 0.011. PROJECT, V. oJ'0 L 05 EN NEER &.1n7 4. S APN REPORT NO. PG OF CONpTf�jAC�TpR n Vf L . C_ d SUB- NTRACTOR o�RA� L&I% PLAN FILE NO. PE(MIT 0. 6�, 2 PR CT NAME r INS7PECj{ON ADDRESS.� I ADDRESS OF PROJECT c REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED q BY NTRAC OR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): a �CV6A �Q,r _l�TtSi ` &r2yLS L _*2_X_76 CONTRALCTOF EQUIPMENT/MANPOQW�ERN�USED: ef$XCDL �lL��dpl— ®L IpI�IG.KG-a AREA, GRID LINES. PI CES BSERVED: STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, IMCLL G MEETINGS: �s a 9Red rssx —aoi;c -b4— P� I&S Low A. REWORK AS PERCENT OF ALL WORK TODAY' PERCENT PROJECT COMPI ETION• WEATHER: DaA@LC459 SAMPLES TAKEN: S TEMPERATURE:TESTS REQUIRED: f SITE TIME START: �•� �� SITE TIME FINISH: 30 LUNCH PERIOD: -� TRAVEL TIME: —42'/ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL IN STIGATION RECOMMENDATIONS, AND / OR PPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / Coun Certification Number Rev: 7/97 Corporate: (` , 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi'' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK 0 INSPECTOR ECHNICIAN AVAILABLE: SOIL REPORT(Y)IN) SPECS (Y)(N) ARCHITECT APPROVED PLANS ('4 (N) APPROVED SHOP DRAWING (Y I) ^Tf/ N S 4,94W, 7V FOR WEEK ENDING O� PROJECT. N0.' t ENGINEER REPORT NO. PG / OF / PLAN FILE NO. PERMIT N0. CONTRACTOR G•G (/ • • SUB -CONTRACTOR OV -&.3 Zip Cif/ Z �o3e...rt PROJECT NAME QED /41J� -zoON'b INSPECTION ADDRESS ADDRESS OF PROJECT Hw -0,/ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE SUBMIT A COPY WITH YOUR WEEK'S REPORTS. -- — ON THE ORIGINAL DEFICIENCY REPORT AND - —• -- - -- ^ MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): -T SiOEcTo2 �,y�S oiv�iTE To t/E� 'i7�/E SiLyr+ro �wt� CONTRACTORS EQUIPMENT /MANPOWER USED Cr►s�.vc a^>�' (y� 573 o Tor AREA GRID LINES PIECES OBSERVED STRUCTURAL NOTES, DETAIL, OR FIRS USED: REMARKS, INCLUDING NEEANGS. �l REWORK AS PERCENT OF ALL WORK TODAY' / PERCENT PROJECT OMPLETION /eo WEATHER:svrvA,> SAMPLES TAKEN: TEMPERATURE: (� S O TESTS REQUIRED: SITE TIME START: C'0 Ilfw� SITE TIME FINISH: LUNCH PERIOD: / TRAVEL TIME: / VERIFIED BY: I ami nAvc rtMoUNALLY UtIStHVEU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, NO HE AP FICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Date of Report ICBO Certification Number Print Name City/ County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel:(818)833-8100 Fax:(818)833-0085 Report of. COMPRESSIVE STRENGTH -MORTAR ASTM C270 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-6965 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area (Sq. Inch) Load (lbs.) Strength . (psi) Type of Fracture 28 11/30/2005 2 X 4 3.14 8,030 2,560 N/A 28 11/30/2005 2 X 4 3.14 8,070 2,570 Cone 28 11/30/2005 2 X 4 3.14 9,050 2,880 Cone Specified Strength: 1,800 PSI Sampled By DANIEL ROBERTS Location: 2 LINE AT C LINE Concrete Supplier: ORCO Mix No.: N/A 'Ticket No.: Water added at Site: 0.00 gal. By Cement Type: S - Mix Time: 60 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY - **LAB COPY** ASTM C172 Date Sampled: 11/2/2005 Date Received: 11/3/2005 Concrete Temp: 73 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. j M.B.(Ben) Lo Chief Engineer 2670 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653A999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -MORTAR ASTM C270 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE -TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-6995 A File No.: Date Tested Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 11/10/2005 HWY I 1 I @ ADAMS 3.14 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/10/2005 2 X 4 3.14 6,480 2,060 Cone 28 12/1/2005 2 X 4 3.14 8,400 2,670 Cone 28 12/1/2005 2 X 4 3.14 8,150 2,590 Cone Specified Strength: 2,000 PSI Sampled By CHARLES MEEK Location: 1ST LIFT SOUTH WALL BETWEEN G & H Concrete, Supplier: ORCO Mix No.: TYPES Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** U ASTM C172 Date Sampled: 11/3/2005 Date Received: 11/4/2005 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer 2630 PSI 28 -day compression test complies with the specified strength. n Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 File No.: Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: 5-7372 Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 11/29/2005 3 X 3 X 6 10.27 18,430 1,790 N/A 28 12/20/2005 3 X 3 X 6 9.00 28 12/20/2005 3 X 3 X 6 9.00 28H 12/20/2005 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 3RD LIFT LINE 2 Concrete Supplier: Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: ' Mix Time: 40 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/22/2005 Date Received:' 11/23/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 82 °F ASTM C1064 Slump: 9.00 in.. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100. Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ** CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-6897 x�oA�fiir File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 11/7/2005 HWY 111 @ ADAMS 28.37 LA QUINTA, CA A Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/7/2005 6X 12 28.37 53,500 1,890 Cone 28 11/28/2005 6X 12 28.31 85,700 3,020 Cone 28 11/28/2005 6X 12 28.37 86,400 3,050 Cone 28 H 11/28/2005 6X 12 28.27 28H 11/28/2005 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By CHARLES MEEK Location: Concrete Supplier: ASSOCIATED READY MIX Mix No.: 15336' Ticket No.: Water added at Site: 0.00' gal. By ' Cement Type: II Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 10/31/2005 Date Received: 11/1/2005 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.25 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer ' 3040 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -MASONRY PRISM ASTM C1314 r * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 046-326 78495 CALLE TAMPICO Project No.: 31151303 LA QUINTA, CA 92253 Project Name: . BED, BATH & BEYOND MARKETPLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: -5-7316. Age (Days) Date Nominal Actual Area Tested • Size (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 7 11/24/2005 8 X 8 X 16 58.60 229,990 3,920 N/A 28 12/15/2005 8 X 8 X 16 64.00 28 12/15/2005 8 X 8 X 16 64.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 2ND LIFT LINE 6 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3579503 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** �1 ASTM C172 Date Sampled: 11/17/2005 Date Received: 11/21/2005 Concrete Temp: 72 °F ASTM C1064 Ambient Temp: 82 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 s* CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7315 File No.: Date Tested Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 10.43 21,930 HWY 111 @ ADAMS 28 LA QUINTA, CA A .Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 11/24/2005 3 X 3 X 6 10.43 21,930 2,100 N/A 28 12/15/2005 3 X 3 X 6 9.00 28 12/15/2005 3 X 3 X 6 9.00 28 H 12/15/2005 1 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 2ND LIFT LINE I Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 359503 Water added at Site: 0.00 gal. By Cement Type: Mix Time: 50 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/17/2005 Date Received: 11/21/2005 Concrete Temp: 72 °F ASTM C1064 Ambient Temp: 82 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer R Corporate: 94Q9 F I a_ Palma Ava Ctn A Anahoi— rA•r10Qnc.'_ Tel_714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: • � VI V . -9 , -JL ILI Tel: 858.537.3999 Fax: 858.537.3990 Inland Empit.. I�JLU LL, VVIII III .IIIrF.I IY. 1.1111 iviulcllu valley, UTA Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK iNSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORT Y N .� (1( 1 SPECS N) `',� ` `"'`� -T"�� =6i• APPROVED PLANS(DN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT _ FOR WEEK ENDING PROJECT. NO. ENGINEER ' Z z- G a ;I, j- r� REPORT NO. PG ` OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR e+ PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: IC130 FIELD INSPECTION MANUAUMTGI. SOILMANUAL— REVIEW PREVIOUS REPORTS AND LISTS 11' THERE IS NON -CONFORM WG WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS, ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIJ'_NCY. YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUHI\,ITA COI'Y WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUI PMENT/ MANPOWER USED: AREA. GRID LINES, PIECES OBSERVED: t STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY. p RrENT PRn IFrT rn nc1 FTION WEATHER: SAMPLES TAKEN: TEMPERATURE: �1 TESTS REQUIRED: SITE TIME START: SITE _--- SITE TIME FINISH: LUNCH PERIOD: _ TRAVEL TIME: --_ _ VERIFIED BY: (/ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INSTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE UNLESS OTHERWISE NOTED I n , Signatute N TH DEFICIENCY REPORT Date of Report Print Namc ICBG Certification Number City / County Certification Number Rev: 7/97 Corporate: ,)nnn C 1 ., nnl.• _ A..., V. A r"IIIUIItiII V, VII :/LVVV fel: 714.632.2999 Fax: 714.632.2974 - .3..A'•..y San Diego/Imperial County: nan n____n n_ n •. n vlu vun un lu/nu. ..niilc u Jml ulcyu, Tel: 858.537.3999 Fax: 858.537.3990 Inland Empit.. IY.l i.11 f-I\VIII 11111 .\IIMY.I .\IN 1.1111 iviulenu Vaiiey, 6A 9i?55,5 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS 0 (N) ARCHITECT APPROVED PLANSC(N) APPROVED SHOP DRAWING (Y) (N) FOR WEEK ENDING PROJECT. NO. ENGINEER - L^ REPORT NO. PG \ OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUBCONTRACTOR PROJECT NAME � INSPECTION ADDRESS ADDRESS OF PROJECT �^ REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGr. SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK ATTHE* END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHF..N A DEFICIENCY. YOURS OR A PREVIOUS INSPECT'OR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPYWITH H YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): T ,�Q � u (1. M _X � !7' X_ c� -� C - � - _"� C— S � CN r N R -" ., . CONTRACTORS EOUIPMENT/ MANPOWER USED: AREA. GRID LINES, PIECES OBSERVED' STRUCTURAL NOTES DETAIL OR RAS USED REMARKS. INCLUDING NEETINGS. i flEWORKAS PERCENT OF ALL WORK TODAY P RrFNr PRn IFrT COMPLETION- n /IPI cTInAIWEATHER: WEATHER: �� SAMPLES TAKEN: �> a •s:� BSc � S C� .. TEMPERATURE: TESTS REQUIRED: ` SITE TIME START: SITE r �'—=� —__ SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: ---- VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S�INE TIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED FICIENCY REPORT Signature Print Name Dale of Report ICBO Certification Number City / County Certification Number :) Rev: 7/97 Y MTGL Corporate: I.Ulm luinl, VH yLOUO Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial Qount'V: inland Empii.. .\Ir'. N 1 .11.11.A111111 r,I lAll .11 I11 V. 1> ILL.1/II rl\,1,1111111 .\ YYI \IY SGII UIegu, 6A yL i2 I Moreno vaney, UA yZ593 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK _ INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT(Y)IN) SPECS(gTjN) iti p APPROVED PLANSgMN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT P 1 FOR WEEK ENDING PROJECT N0. ENGINEER \ l — Z- O `` , �- REPORT NO. PG ` OF ONTRACTOR • :-U'B-CONTRA PLAN FILE N0. PERMIT N0. C OR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIRENIEN'TS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS ANI.) LISTS IFTHERE HERE IS NON-CONFORNIING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): c - CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED. c L�1 `��\ NCS• S � �-\'` � ��� ��.-�.yg�r�� STRUCTURAL NOTES, DETAIL. OR FIRS USED. �y REMARKS, INCLUDING MEETINGS: VA;—, C�AAC�\�JL ♦�`- REWORK AS PERCENT OF ALL WORK TODAY- PER FNT PROJECT CO Cpl ETION WEATHER: Com- 2 SAMPLES TAKEN: -$.- TEMPERATURE: - TESTS REQUIRED: >ti SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: _ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL VESTIGATION RECOMMENDATIONS, AND/OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN HE DEFICIENCY REPORT Z/ Signature /s� d Date of Report ICBO Certification Number Pnn! 'dames City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel:(818)833-8100 Fax:(818)833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 s* CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A - 'Sc;tNo.:- 5-7250 File No.: Date Nominal Actual Area Tested Size (Sq. Inch) Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 1,270 HWY 111 @ ADAMS 28 LA QUINTA, CA Age (Days) Date Nominal Actual Area Tested Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/22/2005 3 X 3 X 6 10.63 13,500 1,270 N/A 28 12/13/2005 3 X 3 X 6 9.00 28 12/13/2005 3 X 3 X 6 1 9.00 28 H 12/13/2005 3 X 3 X 6 1 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 1 ST LIFT LOADING DOCK Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3576873 Water added at Site: 0.00 gal. By Cement Type: - Mix Time: 36 min. Remarks: _ .. r Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/15/2005 Date Received: 11/17/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 86 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 4�1 40;'JX46 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 5-7179 File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 11/18/2005 HWY 111 @ ADAMS 28.37 LA QUINT& CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 92,410 3,260 Cone 7 11/21/2005 6X 12 28.37 92,410 3,260 Cone 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00. gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY ' **LAB COPY** min. ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 Ambient Temp: °F ASTM C1064 °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 s* CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7178. File No.: Date Nominal Actual Area Tested Size (Sq. Inch) Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 3,540 HWY 111 @ ADAMS 7 LA QUINTA, CA Age (Days) Date Nominal Actual Area Tested Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 100,340 3,540 Cone 7 11/21/2005 6X 12 28.37 100,340 3,540 Cone 28 12/12/2005 6X 12 1 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA OUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 *s CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.:. 5-7177 File No.: Nominal Size Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 100,420 HWY 1 I 1 @ ADAMS 7 11/21/2005 LA QUINTA, CA Age Date (Days) Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 4 11/18/2005 6X 12 28.37 100,420 3,540 Cone 7 11/21/2005 6X 12 28.37 100,420 3,540 Cone 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A . Set No.: 5-7176 File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 105,380 HWY I I I @ ADAMS 7 LA QUINTA, CA Age (Days) Date Tested Nominal Actual Area Size (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 4 11/18/2005 6X 12 28.37 105,380 3,710 Cone 7 11/21/2005 6X 12 1 28.37 1 105,380 1 3,710 Cone 28 12/12/2005 6X 12 1 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 r/. 9z r M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7190 File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 10.27 26,000 HWY 111 @ ADAMS 28 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 11/16/2005 3 X 3 X 6 10.27 26,000 2,530 N/A 28 12/7/2005 3 X 3 X 6 9.00 28 12/7/2005 3 X 3 X 6 9.00 28H 12/7/2005 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By: MICHAEL G. Location: 1 ST LIFT LINE 6 Concrete. Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: 50 min. Remarks: (,1 , Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A Date Sampled: 11/9/2005 Date Received: 11/15/2005 Concrete Temp: 70 °F Ambient Temp: 81 "F Slump: 9.00 in. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. . XA& M.B. (Ben) Lo Chief Engineer MTG, 'orporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp,.__ 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) ARCHITECT / APPROVED PLAN Y N) APPROVED SHOP DRAWING (Y) (N) FOR WEEK EN i PROJECT. NO. Q IOF ENGINEER 2 l�/� ' REPORT N0. PG -tel CONTRACTOR A L PLAN FILE NO. PER IT NO. OR !U ::SU:B-CON PROJECT NAME 1 INSPECTION ADDRES DRESS OF PROJECT i REPORTING REQUIREMENTS: ICBG IELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORTT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: �- � f/r��{ __�/! �w AREA, GRID LINES, PIECES OBSERVED: L,� r STRUCTURAL OTES, DE AIL. 0 FINS USED: REMARKS, INCLUDING MEETINGS:. p) 15 / 1 IZL u WEATHER: %¢ a14nA SAMPLES TAKEN: .` e�k TEMPERATURE: 091 TESTS REQUIRED: ►� SITE TIME START: t SITE TIME FINISH: p� ► LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: i vU Un nrT , nn, , HAVE PERSONALLY 0BSEHVEU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITVHE SOIL INSTIGATION RECOMMENDATIONS, AND / T APPROVED PLANS, SPECIFICATIONS A APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number 01 Print Name City / County Certification Number Rev: 7/97 mar[�u ry hwncaa AUUM -, Y YRUJt�I' � / / - REPORTING REQUIREMENTS: ICBO FIELD INSP CTION MANUAUMTGL SOIL MANUAL -REVIEW PREVIOUS REPORT§ AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INC UpE RESEARCH REPOR O. QA MATERIAL TEST PO ) t Corporate: San Diego/Imperial County: Inland Emp�... i 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 A& Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT (l Fini .61112wwww, TYPE OF WORK PECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPEC (Y (N) APPROVED PLAN (Y) ) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ,REWORK AS PERCENT OF ALL WORK FOR WEEK E D1145--� PROJECT. NO. WEATHER: e_/y_, TEMPERATURE: //� ENGINEER ` REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERM NO / SUB-CONTCTOR - /T _ ^� - - PgOJECTNAIll mar[�u ry hwncaa AUUM -, Y YRUJt�I' � / / - REPORTING REQUIREMENTS: ICBO FIELD INSP CTION MANUAUMTGL SOIL MANUAL -REVIEW PREVIOUS REPORT§ AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INC UpE RESEARCH REPOR O. QA MATERIAL TEST PO ) t SITE TIME START: _ SITE TIME FINISH: Y ' w� v LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: 44'M17&v_D I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITHV4E SOIL I STIGATION RECOMMENDATIONSr. AN 0 HE APPROVED PLANS, SPECIFICAT NS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED INT DEFICIENCY REPORT I ' Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 i ' STRUCTURAL NOTES, DETAIL. FIRS USED: REMARKS. INCLUDING NEE17NGS: Fini .61112wwww, VM.0 rMe ,REWORK AS PERCENT OF ALL WORK TQIDAYPETLE-111 ENJECT CID py- WEATHER: e_/y_, TEMPERATURE: //� SAMPLES TAKEN: .' v ` SITE TIME START: _ SITE TIME FINISH: Y ' w� v LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: 44'M17&v_D I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITHV4E SOIL I STIGATION RECOMMENDATIONSr. AN 0 HE APPROVED PLANS, SPECIFICAT NS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED INT DEFICIENCY REPORT I ' Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 a" MTG L (� 1 Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp1,,,: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLAj (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PRO4CT. N0 � � •., f/ V t/✓l ENGINEER REPORT NO. PG OF / CONTRACTOR V c_ PLAN FILE NO. PERMIT NO. - - 3 SUB -CONTRACTOR PROJECT NAME J INSPECTION AD ESS ADDRESS OF PROJEC /1- r ' REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALIMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT N0/. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: / , AREA, GRID LINES, PIECES OBSERVED: I�r C:S i -'; I L.I:� hc��ii;.//d_ee 67: , 13,6� 'E'�C-� f��:fF.I�� %ctinilL.2 �,� 15t"L� sc, —Qlf" ��OLtir�y'IC1G V / cAnC�, d7 C,� Z`/ 7 6 LiAd, 11 - C, 1 6ak /G a6 l(o a4 't�i1c f -2y' O(� STRUCTUIkAL NOTES, DETAIL. OR RFIS USED/ REMARKS, INCLUDING MEETINGS: Db,`;E' C� TGtr"/'e✓1 �n:f� �� x �3 �t %(., C �� u. t S rL i n '—r /r1� r / e REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: G f ea f•— TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: ' C_ SITE TIME START: '7()u SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIEII BY: zvl)<" 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES %," THE SOILLfNVESTIGATION RECOMMENDATIONS, A7'/ OR 1' E APPROV�SECIIICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature !/ Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 MTGL Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empl..' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK P14NIPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) APPROVED PLAN (N) SPE (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT S FOR WEE �NDI D PROJECT N0._ ENGINEER CTO REPORT NO. PG OF PLAN FILE NO. PERMIT N . TR TOR u [INSPECTION PROJECT NAME e ' ADDRES � ADD SS PRO ECT / c of REPORTING REQUIREMENTS: 1CBO FIEL INSPECTION MANUAUMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. R (INCSEARCH REPORT NO. OR M ERIAL TEST REPORTS): MATERIALS USED BY CO C OZMA1.r ` CONTRACTORS EQUIPMENT/ MANPOWER U ED: _ s AREA. GRID L , PIEC _ E VED'- _ STRUCTURAL NOTES, DETAIL. 9P R F I S USE 1 REMARKS, INCLUDING MEETING / t Ae- In 0111=7Z I'd REWORK AS PERCENT OF ALL WORK TODAY* PERCENT PROJECT COMPLETION* WEATHERNewr- TEMPERATURE: �1O SAMPLES TAKEN:�� TESTS REQUIRED: SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: TRAVEL TIME: VERIFIED BY: 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / R E APPRO ED PLANS, SPECIFICATIONS AN APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT / / B 1,05—/O X03 Signature Date of Report ICBG Certification Number Print Name City/ County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp,.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Te I: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE:OIL REPORT (Y)(N) SPEC(go) APPROVED PLA (Y) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK E DING PROJECT. N0. r ENGINEER �I S REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUB-CONTR OR PROJECT NA I r / INSPECTION ADDRESS ADDRESS FPROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPE TION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, 1S CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BYCONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATE AL TEST REPORTS : ya c CONTRACTORS EQUIPMENT / MANPOWER USED: gqwA6 �sgns AREA, GRID LINES, PIECES OBSERVED: t l - STRUCTURAL NOTES, DETAIL, OR RAS USEG:.�J/�� {I)I Gl► ��-S C�I REMARKS. INCLUDING MEETING • . 1 �r 1 ® �� AOEWORKAS ` T PERE OF ALL W0IjK TODAY- PFRCFNT PROJECT COMP[ FTinNr WEATHER: 9104"% �'^ SAMPLES TAKEN: ;/X q [may s _ TEMPERATURE: TESTS REQUIRED: r SITE TIME START: SITE TIME FINISH: 3 LUNCH PERIOD: TRAVEL TIME: VERIFIED 6 . v 1 DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES 61TH THE S1 INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFIC IONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED THE DEFICIENCY REPORT Signature Date of Report D ICBO Certification Number Print Name City / County Certification Number IRM Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ss CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 5-7179 File No.: Date Nominal Tested Size Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 92,410 HWY 111 @ ADAMS 14 LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 4 11/18/2005 6X 12 28.37 92,410 3,260 Cone 14 11/28/2005 6X 12 28.27 28 12/12/2005 6X 12 1 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ** CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7178 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load Strength (Sq. Inch) (lbs.) (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 100,340 3,540 Cone 14 11/28/2005 6X 12 28.27 28 12/12/2005 6 X 12 1 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005. Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: .7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 53773990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road', Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7177 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 4 11/18/2005 6x 12 28.37 100,420 3,540 Cone 14 11/28/2005 6X 12 28.27 28 12/12/2005 6X 12 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY**' A ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7176 File No.: Nominal Actual Area Size (Sq. Inch) Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 14 11/28/2005 HWY 111 @ ADAMS LA QUINTA, CA A Age Date (Days) Tested Nominal Actual Area Size (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 4 11/18/2005 6X 12 28.37 105,380 3,710 Cone 14 11/28/2005 6X 12 28.27 28 12/12/2005 6X 12 1 28.27 Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ss CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-6704 ` File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 10/28/2005 HWY 111 @ ADAMS 28.37 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq.Inch) Load (lbs.) Strength (psi) Type of Fracture 7 10/28/2005 6X 12 28.37 73,500 2,590 Cone 28 11/18/2005 6X 12 28.37 121,290 4,280 Cone 28 11/18/2005 6X 12 1 28.37 1 117,210 1 4,130 Cone Specified Strength: 3,000 PSI Sampled By GEORGE CHAVEZ Location: COLUMN FOOTING- GRIDS 3 & C Concrete Supplier: ASSOCIATED READY MIX Mix No.: 15336 Ticket No.: 3557420 Water added at Site: 0.00 gal. By Cement Type: IVV Mix Time: 75 min. Remarks: ADMIX- WRDA-64 Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 10/21/2005 Date Received: 10/24/2005 Concrete Temp: 80 °F ASTM C1064 Ambient Temp: 89 °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer 4200 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 nJ] D L� Tel: (714) 632-2999 Fax: (714) 632-2974 u Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 ^lo ' 21 2005 Branch: 14320 Elsworth Street, Suite C 101, Moreno Valley, CA 92553 6X 12 28.37 Tel: (909) 6534999 Fax: (909) 653-46668y a Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 I Tel: (818) 833-8100 Fax: (818) 833-0085 `----��_ Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY. OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 5-6638 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age Date (Days) Tested Nominal Actual Area Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 3 10/17/2005 6X 12 28.37 45,000 1,590 Cone 7 10/21/2005 6X 12 28.37 60,500 2,130 Cone 28 11/11/2005 6X 12 28.37 95,390 3,360 Cone 28 11/11/2005 6X 12 '28.37 92,330____+_ 3,250 Cone 28 H 11/11/2005 1 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By: JEREMY JOHNSON Location: FOOTING SOUTH SIDE OF BLDG LINE 6 E+G Concrete Supplier: ASSOCIATED READY MIX Mix No.: 15336 Ticket No.: Water added at Site: 0.00 gal. By - Cement Type:'. Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** Date Sampled: 10/14/2005 Date Received: 10/17/2005 Concrete Temp: 82 °F Ambient Temp: °F Slump: 4.00 in. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 3300 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -MORTAR ASTM C270 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 5-6995 File No.: Nominal Actual Area Size (Sq. Inch) Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 2,060 HWY 111 @ ADAMS 28 12/1/2005 LA QUINTA, CA Age Date (Days) Tested Nominal Actual Area Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/10/2005 2 X 4 3.14 6,480 2,060 Cone 28 12/1/2005 2 X 4 3.14 28 12/1/2005 2 X 4 3.14 Specified Strength: 2,000 PSI Sampled By: CHARLES MEEK Location: 1 ST LIFT SOUTH WALL BETWEEN G & H Date Sampled: 11/3/2005 Date Received: 11/4/2005 Concrete Supplier: ORCO Concrete Temp: °F Mix No.: TYPES Ambient Temp: °F Ticket No.: Water added at Site: 0.00 gal. By Slump: in. Cement Type: Mix Time: min. Tested at: Anaheim Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer CITY OF LA QUINTA BUIMING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE_l I t &O BY. BASED ON GA FILE NOS. FC 5406 AND RC 2601 �,.� ,. .. ., I ED AT R I GHT ANGLES TO CEILING FRAMING (STEEL JOISTS AT 24" O.C.) ATTACHED W/ 1" TYPE 5 OR 5-12 DRYWALL SCREWS 24" O.C. FACE LAYER - 5/8" TYPE 'X' GYPSUM WALLBOARD APPLIED AT RIGHT ANGLES TO JOISTS W/ 1 5/8" TYPE 5 OR 5-12 DRYWALL SCREWS 12" O.C. AT END JOINTS & INTERMEDIATE JOISTS AND 1 1/2" TYPE G SCREWS 12" O.C. PLACED 2" BACK FROM EITHER SIDE OF END JOINTS. JOINTS OF THE FACE LAYER ARE OFFSET 24" FROM.BASE LAYER JOINTS. FACE LAYER JOINTS AND FASTENERS ARE FINISHED TO LEVEL 1 AS SPECIFIED IN GA -214, LEVELS OF GYPSUM BOARD FINISH. CEILING SCALE: 3" - 1 HOUR FIRE - ALTERNATE 1' -0" A PHASE I TENANT IMPROVEMENT FOR: COL EDOG o INC. FIELD REVISION 7-9'-41 0—HWY-1-1.1 All -4-05 LA QUINTA, CALIFORNIA ROBERT PITCHP'ORD ARCHITECT 74-835 FOX HILLS CT. PALM DESERT, CALIFORNIA (760) 346-8776 FAX (760) 340-5352 LIC. # C12318 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel.: (714) 632-2999 Fax: (714) 632-2974 Branch: •7313 Carroll Road, Suite G, San Diego, CA 92121 NOV 4 2005 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 BY Branch: 13010 San Fernando Road, Unit 1, Sylmar; CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ** CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 R File No.: Permit No.: 046-326 Project No.: . 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY I I 1 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES - - -Set No.:" -5-6704 Age (Days) Date Nominal Actual Area Tested Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 10/28/2005 6X 12 28.37 73,500 2,590 Cone 28 11/18/2005 6X 12 28.27 28 11/18/2005 6X 12 1 28.27 Specified Strength: 3,000 PSI Sampled By: GEORGE CHAVEZ Location: COLUMN FOOTING- GRIDS 3 & C Concrete Supplier: ASSOCIATED READY MIX Mix No.: 15336 Ticket No.: 3557420 Wates added at Site: 0.00 gal. By Cement Type: IIN Mix Time: 75 min. Remarks: ADMIX- WRDA-64 Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** Date Sampled: 10/21/2005 Date Received: 10/24/2005 Concrete Temp: 80 °F Ambient Temp: 89 °F Slump: 4.50 in. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l r M.B. (Ben) Lo Chief Engineer Corporate: •' 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 f Fax: 714.632.2974 San Diego/Imperial Count" 7313 Carroll Road, Suite IS San Diego, CA 92121 Tel: 1858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire: 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 909.653.4999 Fax: 909.653.4666 TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS Y}'(N) .a, APPROVED PLANS(M(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT NO. ENGINEER I REPORT NO. PG OF CONTRACTOR PLAN FILEAO. PERMIT N0. SUB -CONTRACTOR PROJECTNAME INSPECTION ADDRESSADDRESS Of PROJECT I REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): "'''C� \IC S P � it . \.*-L' .\ l� 'A'`� �+.•.. C � di C� \ Q��� � �"C 11 S� C' �'� �� c�<� ,�' CONTRACTORS EQUIPMENT / MANPOWER USED: N. AREA, GRID LINES, PIECES OBSERVED: �A.y E+ _ ' �. �.c` ��_i1 a' Ctiyt _ \ ,r� ,� � �c'�� •�� � C� tin e� � STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INCIUOINO MEETINGS: ; )'Ze_R w —_=% 1 �..�� �I �..5 tae �'�'?,0..�. 'mow. �.G� ��.i�►. C" �.. r REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIONe WEATHER: C\ rr_ SAMPLES TAKEN: -@.. TEMPERATURE: TESTS REQUIRED: A SITE TIME START: ^�` SITE TIME FINISH:» �a _ LUNCH PERIOD: TRAVEL TIME: VERIFIED BY:"�,14.�l I A I' I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIAINVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT ,mss Signature Date of Report ' ICBO Certification Number Print Name V City / County Certification Number Rev: 7/97 A .3�:A�':'�"v'?rr` �vdc'1'x`�_#�h'+s39v�'•1wtF;�7.i-i`1it�IF.�S9'�• ,4v+'��. Corporate: . , San DiegoAmperial County: 2992 E. La Palma Ave:;'Ste. A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 Inland Emj 14320 Elsworth Street, Ste Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: C101 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF``WORK INSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORTdY);�N)' SPECS((Y)(N) APPROVED PLANS (Y(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT �t a\�r\ry ♦:. 211 _a_r.\��a ,�C�' FOR WEEK ENDING \ \ - \ \ - .Q j PROJECT. NO. I ­�s \ tc�, "V��j ENGINEER 4 J c REPORT NO. PG , OF \ CONTRACTOR e_ PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME` INSPECTION ADDRESS ADDRESS OF PROJECT ' G \ \73 \-\w \\ \ `-'. Q, , REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAIIMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: qC e. �i°• �c SL oC\�\°� c S.c / l �r u r �.M;'Ilt 1 ` I \ �� •�i� e CL`t� �Z-� 1 �w r AREA, GRIDVINES. PIECES OBSERVED: , _ 7�Y A,C.`� ckv yc 4.. �� i�„r�, . 4�Gs S\� 1_1 _SC> CJ, _Z1 �c d2. �. cam � 4�sc� c�.,...._ e .��- t �� �... �-- ��•�.� � �%i- �c- \�. r. � � � -i' � Z STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS. INCIUDINO KEERNDS: �"f iCa�.a �r �'\E'..L`.\t�� � c���"?�.E?�`��4a�.�e•�c`� 4��.�1./C' \�r�C.C.� �a-)���\.:� V "^'a\ v..,-.,.�-� . - �`•� ....,�_.� I sem. �. �v...c� . �®\sus G e.-��? �. l ' C1�! +t e �.+�.e'+'":-a Vis- 4. �{ `` s REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION• WEATHER:\$ 4'i `M\t�`C SAMPLES TAKEN: TEMPERATURE: dD v - .-_� _ ��' TESTS REQUIRED: SITE TIME START: "A z7-, " ^ — SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: s I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL IVESTIGATION RECOMMENDATIONS, -AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABL=E SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT / / / 9 / C`, M) `=+flpC"_r", ri—R!Z Signature Date of Report ICBO Certification Number •"l1 %'�-�f/ ('- i is /ff✓� iii Print Name City / County Certification Number Rev: 7/97 r:!►:il'ei' ,S �; .n[rR•t �"yi+..1::.-_„'rtiC ',! ! =�r*rint'?Sg/b:.!#I+�.'�:.�+,�iT'+.s,.:�' ��''�a=::='wtL7 s�. .- .,, •�` ARCHITECT i 1 .r._ • Corporate: r.\ San Diego/Imperial County: Inland Em - 2992 E. La Palma Ave.' Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 RA14-L W^ Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 CON CTORS EQUIPMENT / MANPOWER USED: FIELD REPORT Los AngelesNentura County: C101 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK �,ZriNSPECTOR O TECHNICIAN S. tt,` �`�4�: Fy `� gam\( AVAILABLE: SOIL REPORTE(Y) (N) SPECS tlfY (N) APPROVED PLANS!(_I(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT i FOR WEEK ENDING PROJECT. NO. t ENGINEERr ' G.. REPORT NO. PG ` OF CONTRACTOR J PLAN FILE NO. PERMIT NO. I SUB -CONTRACT rR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS- ICBO FIELD INSPECTION MANUALIMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): l .• V�-�. , l .\ , � "'C'\I� e, �'+ �lCa< "�: •C+*. S'� C � ca,. � 'tc.,_. �„ �+ s, tip-: r - +R..� �. CON CTORS EQUIPMENT / MANPOWER USED: \1'l_. � 1��ac�iCL""c�ic:'G^a l \�1 \.�., s��- •e...S� ""`� -fi w.. ¢ \,G.. AREA, GRID LIJES>PIECES OBSERVED: SON.. STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INaUDING AfEEIIMDS. t`(��'e�:.'ti'�i-�cn�.•->•--�c�•-\c». n`.,.e;. a..��e+_,�� c..�,....a.•.a �� tom\\,�•.e_et\.� "'�e�,..c� sty... ``a.-C).�-e T�GI �.\�— Cie`!/ -ri.�.�i`���e-��—tic_. 'G�`�..ti.,�\ G�i.r...C3�. �'Gs�!�.'C_`ec"+Tw".,s"i'.��/y. 6(jj ((f\y.©C.>C�,�qS°>•w'.� R f � fS' � ";� i'�;,- \�+�.i Q..\� 1i�-'d`:. �'4...C`•w \.i�.1 I � ��C' . .! /- 'C:T �C,. , , � T�.� REWORK AS'PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMP[ ETIM � I WEATHER: �;5�SAMPLES TAKEN: rs TEMPERATURE: _ r C a TESTS REQUIRED: SITE TIME START:. SITE TIME FINISH:r''`�^ v �- LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH AE SOIL INVEST[TION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEW IENCY REPORT Signature Data of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 MTG� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland ENO 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel- 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK An INSPECTOR ❑ TECHNICIANN Ct t�a as c_2� csr=:C •, h AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (Yj (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT <,M`.\.. FOR WEEK ENDING PROJECT N0. ENGINEER REPORT NO. PG OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. / ! C)LA' SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFiS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): Q y a �� c�� �,�.ac� e �. L �..��'' 1'1 Z CONTRACTORS EQUIPMENT / MANPOWER USED: C� �r c5� C...e.. �. !.1 J � � : *,.� 6 � �\...aa S- `�s��•.. �.`C ,,,_GC�C.T '�'-,a � �C ti.�...,- .. L. � �,�'-.4' �iL SC. 4 a t� AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES, DETAIL. OR RFIS USED: \ REMARKS, IMCLUDIMQ MEE7IMQS., ����CC,_�GQCa/ U�(Q"2: �\\'G-r REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION* < ` SAMPLES TAKEN: C C G Q 1 i t TEMPERATURE: TESTS REQUIRED: SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: A 20ct'Rt -- TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S011r V�ESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED " HE DEFICIENCY REPORT Signature �y Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 FMITGL Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Em 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK ,O INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (Yp (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT i FOR WEEK ENDING PROJECT. NO. ENGINEER REPORT NO. PG , OF \ CONTRACTOR CL PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR C'_Cv PROJECT NAME v-, c--\. ter• INSPECTION ADDRESS 1 \\Z,� \ \ 1. ��_:.. aa.v�. ADDRESS OF PROJECT �� \\C� \�.. �1 i\ L REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 2, CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED:VN r \ Y STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS. IMaUO/MG MEETINGS. \ Z. \ C.?4"� A "� \ � �. k < i+•.� C'�,S'.r �� 9... C. •�...... - Q..__�h� � �. ! irk., � � �..�� �.' �-. �.- 1'' C'1\.N[�.��.. C-, .ate. tom.., C..]•-i�61`._ < �r� \� c �c�0.. 1 "•a. c� 5. c�� Sc�.\ A C - , REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI FTION• WEATHER: Q TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: C-- C Oma_+'•'C �' SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: n 't TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTMON RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 IT -G -L Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp�. .' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE 0 WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLAN Y) ) APPROVED SHOP DRAWING(Y)IN) ARCHITECT/ FOR WEEK ENDIN ®— = PROJECT. NO 1'\r ` ENGIN r REPORT NO. PG OF CON MOR PLAN FILE NO. PERMIT NO. —� S SUB -CONTRACTOR PROJECT NA r INSPECTION ADDRESS t ADDRESS FP JECT01 REPORTING REQUIREMENT : ICBO FI LD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AAD LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS US5P BY CONTRACTOR INCL DE RESEARCH REPOR 4O. OR TERIAL TEST REPORTS): 7/r57 Co CT RS ED 11 ENT /MANPOWER USED f ' AREA, GRID LINES. PIECES OBSERVED: t t r STRUCTURAL DETAIL, OR FINS USED: REMARKS. INCL11DIMEETING 1 t - t 1 REWORK A5 PERCENT OF ALL WORK TODAY6 PERCENT PROJECT COMPLETION* WEATHER: TEMPERATURE: l% SAMPLES TAKEN: TESTS REQUIRED: o59 SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: � e TRAVEL TIME: VERIFIED BY: 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL 10STIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIOWS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT / Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 MTM r ' Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp,_ _. f 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE F WORK INSPECTOR ❑ TECHNICIAN CAPPROVED AVAILABLE:SOIL REPORT (Y) (N) PLA (Y (N) SPECS (Y) (N) APPROVED SHOP DRAWING (Y) ARCHITECT & i14& (l' ^�� ( t FOR WEEK ENDING — PROJECT. N0�>� ENGI ER. REPORT NO. PG OF CONTRACTOR V PLAN FILE NO. PERMIT NO. SUB -CO CTOR PROJECT NAKAU INSPECTION ADDRESS ADDRESS OF PROD T REPORTING REQUIREMENTS: ICB FIELD INSPECTION MANUAUMTGL SOIL MANUAL – REVIEW PREVIOUS REPORTS A LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED CONTRACTOR (I LUDE RESEARCH REPORT NO. MATERIA TE T REPORTS): a. i' CONTRA ORS EOUIPME / ANPOWER USED: sZZ ARFf. GRID LI S, PI SOB VEQ: 411 I 6941 7T gF�A A=TES. NOTES, DETAIL, OR IS US : t r REM RKS. NCiUDING GS: r i , REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHEROGr TEMPERATURE: Q�'� 0 SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: ©�� SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICA ON AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT t /Q 77e.V- ignature _ Date of Report ICBO Certification Number Print City / County Certification Number Rev: 7/97 mrc� ni _ ..') Corporate: San DiegoAmperial County: Inland Emp,.__. 2992 E. La Palma Ave., Ste. A . 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: APPROVED PLANS. SOIL REPORT (Y) (N) (N) SPECS (Y) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER REPORT NO. PG OF CONTRAC OR^ (/// PLAN FILE NO. PERMIT N0. i 10 SUB•CONTRA R PROJECT NAME 7 / INSPECTION ADDRESS ADDRESS OF PRO CT REPORTING REQUIRE ENTS- IC O FIELD INSPECTION MANUAL/MTGL SOIL MANUAL —REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RES CH REPORT NO.OR ERI TEST REPORTS): CONTRACTOR UIPMENT/MA WER USED: r':C&� AREA, TIO LINES, PIE OBSERVED: S /—. 1 l Ve e -?a [2 og STRUCTURAL NOTES, DET IL, OR FIS USJO: 1 1 / MARKS. /NaUD/NG MEETINGS: I � 1 I REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIONg WEATHER:e TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START:. !0(q SITE TIME FINISH: 3r/ Xe2 LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / 0A TF E APPROVED PLANS, SPECIFICATMS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Print Name l8/ /2 /cQ5 Date of Report azz7 2 � ICBO Certification Number City / County Certification Number Rev: 7/97 I Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT , ts_6y'__) TYPE Of WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N) APPROVED PLANS (Y) (N) APPROVED SHOP DRAWING (Y) (N) A CH ITECTFOR AA 1 / WEEK ENDING -- r PROJECT NO. ENGINEE REPORT NO. PG OF CONTRACTO PLAN FILE NO. PERMIT N0. SUB -C TRA TOR PROJECT I i INSPECTION ADDRESS t ADDRESS OFPRO CT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS ANEf LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS U BY CONTRACTOR (INCLUDE RESEARCH REPORT%�.OR MATERIAL TEST REPORTS �D CONTRACTO EQUIPMENT/ M WER USED: AREA, 101 LINES, PIECES BS V k lut5as 4", j f 1 � STRUCTURAL NOTES ETAIL,OR RFIS USED: / ' I 0 019 REMAR ,IN NG NE a V ( t I T Lle KAD( r — l WEATHER: Or rr j/` TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND /AR T E APPROVED PLANS, SPECIFICATIONS A APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT 13 nature Date of Report ICBO Certification Number �. ► t, Print City / County Certification Number 7/" Rev: 7/97 MTG L Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 I , Inland Emp,.._. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT PE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) ARCH ARCH CT APPROVED PLAN Y (N) APPROVED SHOP D ING(Y)(N) FOR WEEK ENDIN PROJECT. N0. ENGINEE REPORT NO. PG OF CONTRACTOR , re c PLAN FILE NO. PERMIT NO. SUB -CON TOR PROJECT N i t INSPECTION ADDRESS /V / ADDRESS OF PRO CT ' REPORTING REQUIREM NTS: ICB FIELD INSPECTION MAN AUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AN LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY NTRACTOR (INCLUDE RE RCH EPORT NO. OR MA IAL TEST R TS): ♦ l'f_ �. r CONTRACTORS EOUI ENT/ MANPOWE SED: ' t AREA, GRID LINES, PIECES OBSERVED: � STRUCTURAL NOTES, DETAIL, OR RFIS USED q REMARKS, IN UDING Nffi7NrGS I I t ! / te? )� -, REWORK ASTERCENT OF ALL WORK TODAY- PERCENT PROJECT COMPLETION* WEATHER: Cl eo `rf- v� SAMPLES TAKEN: ^ /^611V1':5'; TEMPERATURE: TESTS REQUIRED: SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND /,"E APPROVED PLANS, SPECIFICATIONrND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Print Name N /277©:zo_ Date of Report ICBG Certification Number City / County Certification Number Rev: 7/97 :'� r- R'S , ; r 7,,.., � f. +.c�w,awra{..b�„�, R,x• � r'�'"4fP!':. �,�'P , ahi '14'rir':ti:k`R `..l`�``�S-�«iT''''syl�lYk`Y%.: j. ,moi, ,,,,,, �'r � ��,sL{ T •_ , • t.. , r, `Corporate: q!�'# ; San Diego/Imperial Count ,:L,' Inland Empire: •` r „ 2992 E:'La Palnidl v' SuiteA 7313 Carroll Road, Suite G 14320 Elsworth Street, Suite 0101 Anaheim, CA 92806 San Diego, CA 92121' Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 909.653.4999 Favi: 714.632.2974 Fax: 858.537.3990 Fax: 909.653.4666 FIELD REPORT TYPE OF WORK MINSPECTOR p TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (�Y (N) C��C p�C„ w APPROVED PLANSOY (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEKENDING PROJECT. NO. ENGINEER REPORT NO. PG \ OF S CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME 14 V e e lizs"so INSPECTIONDRESSADDtRESS OF PROJECT RE REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): Urs H/ e .v%A _ �. � .� tv, % CONTRACTORS EQUIPMENT / MANPOWER USED: ib r -N. .� i� 11 sL_ e ` roc (� �� Sri- g `4` , ��.rca v.. A-1 Nn W, Univ LINES, PIECES 065,mv tu' *� _�� � �., '@_.�,• OQ� � \. r.. ` \--Seg �.r++► �♦ ��. � � �Li wZ_. \ QOS;� er eg !� E STRUCTURAL NOTES, DETAIL, OR FINS USED: J c + + REMARKS, IMXUDIMO MEETINDS: / r 0 vvn�. rE_nIiCIV I rnUjF_U I UUIVIrl C I jU1U" WEATHER: SAMPLES TAKEN: TEMPERATURE: Q `Y� i= C �4�. TESTS REQUIRED:r . n f SITE TIME START: C:.I Q.., '+- SITE TIME FINISH: �® Q t, s / LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: - / 4 I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL 19VESTIGATION RECOMMENDATIONS, ANDOR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN/HE DEFICIENCY REPORT it Siginature ® sz 150800eaT+-�V Date of Report ICBO Certification Number Print Name City! County Certification Number Rev: 7/97 MTGL »� h i Corporate �r ,y 2992 E. -La"Palma Aver, Ste. A Anaheim, CA 92806 Tell' 714:632.2999 Fa' 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Er�np�! 14320 EISvu R Street, Ste: C101 Moreno Valley, CA 92553 �y Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (Y (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT / if cJ /� FOR WEEK ENDING -.S"- PROJECT. NO. ENGINEER REPORT NO. PG OF / CONTRACTOR !/c,G PLAN FILE NO. PERMIT NO. y� 3 SUB -CONTRACTOR PROJECT NAME r 7 INSPECTION ADDRESS ADDRESS OF PROJECT 1 �� / 4. 1 A 2� Z11 REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): Inc CONTRACTORS EQUIPMENT / MANPOWER USED: 1 , AREA, GRID LINES. PIECES OBSERVED: �I I r1S P.5 / '- / Lr�,� �P-/-t .r�.an�-�''_l% , S'� l� !' , G' /-�� 6r 1,►.P� /a, <,� 2 L.,�_ (V) C,.OfA 5e.6 STRUCTURAL NOTES. DETAIL, OR FIRS USED/ REMARKS, INCLUDINO MEERNDS. ,a A. 1 �� n Q4 end, ,n:6�rana(_ - o _C4'd REWORK AS PERCENT OF ALL WORK TODAY" PERCENT PROJECT COMP) ETIOW WEATHER: f"` leo j-- SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: TRAVEL TIME: 0 I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES W-ITH6THE SOIL16INVESTIGATION RECOMMENDATIONS, AND11011 OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 JE kk Corporate'W MOWN", San Diego/Imperial County: Inland E' �s. 2992 E. La Palma Ave°"Ste. A 7313 Carroll Road, Suite G 14320 ElsworthrStreet, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 MaxTel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 . Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK & INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS!(Y)(N) APPROVED PLAN�i(Y) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT "' r FOR WEEK ENDING'' PROJECT. NO. ENGINEER/ REPORT NO. PG OF CONTRACTOR f PLAN FILE NO. PERMIT N0. q SUB -CONTRACTOR �� f PROJECT NAME j' INSPECTION ADDRESS' i 7 / +�.-'/,�� �,-�/�f''�lz' l'>z��"sr'6,�rT-� ADDRESS OF PROJECT ;a��,�"•, �' �v R- rI !' c -t l=r�.� »r' REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR(INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: l %�O/� K% /s' illl i �i� t�' I:' l�T`f ! i1 j; :C:'l/%if7 ►d% 1 J rr'I r;t i 4? T .)` Vii. �� IJ t )._� tr'✓ r { /cr T AREA, GRID LINES, PIECE50BSERVED w � � � _. I ` 1 i � �,',i `�j TrY1� l .•$ •^ i.ti � .� i .e•:? ..j N .,i 1'Yi r�>. "r) ! !i, t 'tl p'� % � ,) ,� 1 � STRUCTURAL NOTES, DETAIL, OR RFIS USED: Y REMARKS, 1MaUDINQ AIEE11NQS: 1 49t--/ 114 4 REWORK/AS PERCENT OF ALL WORK TODAY' PERCENT PROJECT COMPLETION' WEATHER: t�' SAMPLES TAKEN: TEMPERATURE: ,fi� TESTS REQUIRED:, SITE TIME START: SITE TIME FINISH:—✓ LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: 'I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT ;':' Signature Date of Report ICBO Certification Number / Print Name City / County Certification Number Rev: 7/97 d Corporate: ',K •'= San Diego/Imperial County: Inland Emp 2992 E. La Palma A e ;'Ste` A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK [),INSPECTOR p TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) 7 rte: ., APPROVED PLANS'(Y) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ,. t't/� FOR WEEK ENDING PROJECT. N0. ...�,•.--* t ENGINEER.! REPORT NO. PG OF CONTRACTOR, /� ., PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR f ✓ ,# / �''// .' PROJECT NAME,, C,` J vt;>'%''/`r �'././!//I"�-i/z"✓��"� rl/,.� N'a',;� �t ,•r,try.. f` :� s A ! ' ��"•fir INSPECTION ADDRESS ! _ _/J J ADDR ESS OF PROJECT �' i7�.i• .f ijw/M� ii 1;_- / pf X I }/ ;>_-;j REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FELL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT. NO. OR MATERIAL TEST REPORTS): 4 I ..1'� � ��/ Y.• j_ ,...- ,r 7 , 1. .� i_ 1,� (. , J,c':� : • ;: " // ^'/.' � ,"�' t {,..r/- .,, , / t•. 'CONTRACTORS EQUIPMENT/ MANPOWER USED ^ AREA, GRID LINES, '1'PIECES OBSERVED:' l•J, '`'r' ",. .r•,.%:11r",r '`'".r/..j ,�/' '`!` ''r' .{, !%..>;f,: .1:. .��'.t:r' h- S' °_/./�`� -. �1��� / ryry STRUCTURAL NOTES, DETAIL, OR FIRS USED:'--.- , I REMARKS, INCLUDING MEETINGS 1/ /'_'"����'=' � )µr t�,r r,; _ `,`T" .! ;;�•f "1I`'S', :%' r, ice,?:' ,�rr" i'%' >�• �r7 REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETION* WEATHER: i ! A "t SAMPLES TAKEN: �p�WI J 5n TEMPERATURE: Cir t 1 r is TESTS REQUIRED: i SITE TIME START: SITE TIME FINISH: ✓/' "/ ` '; J /// + l LUNCH PERIOD:TRAVEL TIME: VERIFIED BY: ' ,/I •� �' � e �I1 I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH:THE SOIL INVESTIGATION RECOMMENDATIONS, ANDr/ OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name �T•' 1 City / County Certification Number Rev: 7/97 by r -±t, NN - AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y),(N) APPROVED PLANS_(Y)(N) APPROVED SHOP DRAWING(Y)IN) ARCHITECT}} /1ry Ally Corporate. San Diego/Imperial Countya Inland Emp;' M. H• . 2992 E. La Palma'96. Ste.,A 7313 Carroll Road, Suite G 14320 Elswortli Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK /p INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y),(N) APPROVED PLANS_(Y)(N) APPROVED SHOP DRAWING(Y)IN) ARCHITECT}} /1ry Ally FOR WEEK ENDING— f /µ a',� I PROJECT. N0. _� .a_ g f 1� :I..aC ,l ENGINEER r�7 yi r1'i ylf' `1 Vie'` REPORT NO. PG OF CONTRACTOR t ? PLAN FILE NO. PER�MgIT NO/. SUB -CONTRACTOR /� f ` /}({},� y PROJECT NAME_Jy[�� /1 INSPECTION ADDRESS ,„ ADDRESS OF PROJECT 1f .,4- 11/14 �f /l! 7 REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RIFTS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: yin �' Ir I f ✓ �^ A, -Y/ AREA, GRID LINES. PIECES OBSERVED: /,I'- c� r-1` : /,I'- ff , , STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INCLUDIND XFERNDS: � f y~�.(f)if if All /I i ff'.�A�l�i3lf�/t 'd f!^•1.}'!� /::t:` i�iXi f!``• G� • r t T1t1P -rh REWORK,AS%PER EENJ�pT OF -ALL WORK TODAY: PERCENT PRfJECT� COMPI ETIOW WEATHER: {%�� �`Y/GI f%1"P SAMPLES TAKEN: �w..wI. TEMPERATURE: TESTS REQUIRED: SITE TIME START: ! '/v/ SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BYE I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND.THAT THIS WORK COMPLIES ITR THE S01 INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED SO] DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 4�� '+.s yea -!wµ �-. avr-sem• .r t "r.. .. ,,�,.� . �. Gt+!'"�" ����� .�i'c ..,his :tyti+f i'�iY+^+is.s' • s :+ Corporate. _z.` San Diego/Imperial County: Inland Empr 2992 E. La Palma Ave. Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley,'CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK Y,] INSPECTOR ❑ TECHNICIAN �r/rf% J'' r"3i,Kf AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS V_)I(N) APPROVED SHOP DRAWING (Y) (N) ARC9CTr rt J f ffy` / / f f sr�r� rl / FOR WEEK ENDING1 PROJECT NO. ENGIN�ErER )`^ / REPORT NO. PG OF CONTNACTOR PLAN FILE NO. PERMIT NO. SUB-CONTRACTOR r— PROJECT NAMAll. INSPECTION ADDRESS �) r 6jADDRESS OF PROJECT / VERIFIED BY: REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGi- SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BBY/CONTRACTOR (INCLUDE RESEARCHREPORT NIB. OR MAj{TERIAL TEST REPORTS): %;I .GFS✓ CONTRACTORS EQUIPMENT / MANPOWE'g USED:' AREA, GRID LINES, PIECES OBSE VEO: ( 71 y t _.. 7� o/ti/_ �� .J. • i' / / 11�. d i �� T /.r!! t.!1 , i.... n- �/l f.+i./t ~!- fel �'� F���/� h. i(/ ai f'` 7" (ii . +/ / 1 STRUCTURAL NOTES, DETAIL, OR RFIS USED: - ,�`/ (= .•:. I�F l•,11, -,�r� r r'_ 111 f �l/r'/i /y' f "" ��'�.-"i�" 1 r' ,i s ry/!5. REMARKS, IMaUDING MEETINGS" I t 10, (19 /e .=r i�— "'Y 11 ll 1 �/=!/�'7 /.-''s �7�•-/.� r'�7 // ice"/ � � ,� ��,✓71�.D�`F': � %�/,fl�� f�.� ^'/l : , !�'//./� !/`l �. 1 `/ //i, �'`,1%/ .�� / �.{� ! Z �' F-'"•� 5_///_f71 �•s''�,/i _f//f !3•I�7'/%A�:=��.17 .rte :.� rl0�s!b"1�i°�/'. �.� G / �y r"G�f,/� �..%�:'7%/'1`'/Iird`r'r`/ �� I 1 � � l � '� / , • 1 REWORK AS'PERCENT OF ALL WORK TODAY:. PERCENT PROJECT COMPI ETIOM /) WEATHER: SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: r' SITE TIME START: ' JC.�' •��' ZN SITE TIME FINISH: r LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: nnrs_ r cn V.VMLLs vooLnvcv MIL ur i nr rrunn LwiCu novvE Hnu IMAI i nw vvumr% l.ulvlrLltJ Wl IN IMt SUIL INVtSI IUAI IUN HLGUMMLNUAIIUN5, AND /.OR THE APPROVED PLANS, SPECIFICATIONSAND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT f 1 2 I e! Signature " �! Date of Report ICBO Certification Number Print Name / City / County Certification Number Rev: 7/97 (' l,+\;Vrc�r�}-,4�; c.. .»>w �+LV`•" ,ar*wser..ar�'wgi...•�.��q'i �>A.•u i'}!'�>. xR.A-..,� .\. of �'.67.::.#ts s*'+�c�ti* #N� 3' • l., Corporate: San Diego/Imperial County: Inland Em`, 2992 E. La -Palma Ave Ste. A 7313 Carroll Road, Suite G 14320 Elsworth`Street, Ste: C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT 9 TYPE OF WORK 'INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (Y) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT�] J FOR WEEK ENDING PROJECT. N0. ENGINEER p rte: 5 5_ REPORT NO. PG OF CONTRACTOR./PLAN FILE NO. PERMIT N0. �f SUB -CONTRACTOR PROJECT NAMEi-1 INSPECTION ADDRESS /� / ///.+' / / :�✓�� fl , /"�r5 i /�l'/. %`-!& / �fii ADDRESSS OF PROJECT E/.'."�i.-� 1l F.G'T/" /yr' REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS -USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR�MATERIAL TEST REPORTS);. CONTRACTORS EQUIPMENT / MANPOWER USED: r- AREA, GRID,LINES, PIECES OBSERVED: / rc/� % .��/��� J \ elf,�Y, f4 f//.',/ •x� STRUCTURAL NOTES. DETAIL, OR RFIS USED: �^ Y , fI ? 4—T ,tea-► , 1 � / /�%Cf �l ►' c / �'` ���>' � T� 2 'A �. f'/�'/'. Ir A ,r%%'� )i l�% 1'rf/!l %1 !��j %.1.±'i' J '"ev .1't /l REMARKS, IMCLUGINGMEEIIMGS:.jr�l J, lf�'/l t"! ' � .. � i:=�it'��,(.�� r /!/ir.� p ��lf--.i �� � �',n/ !�l'"-'/ %% �� Nr! r\ C'•. /t/' ./�it a "r�l�l� l'"/%T �`•'I! 3�~/�/✓%f�'" dmf" /%// �6^ �Y �V"� !�� s"'"(/i/` �� �%/ `'/ t{� . i' � >�1 't r'� l +� �f.<i •�" ; �(" .%�%,7',r•i ii �rFi' id'Ti�/i� /t ''.%'��`� i,�1' ,F�+l t `� / i l �� ! �:P'0// � •�/ t fe % t°� r"V f" ./I/t /•l t� / `.? �- t �/�i''' r" r��' r/ �'�= N' !!_ r•� ��A`/1''� � /it%.s'71.w 'r/ y Irl �'. ! 1 REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJEC rnMPl FTInN WEATHER: j L i ^1 J SAMPLES TAKEN: •- TEMPERATURE: TESTS REQUIRED: SITE TIME START: 1/•L.+ SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE_ SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT 4.4 ighatuu3re / Date of Report ICBG Certification Number (.µ N / / • ��/ � Grp V. �•r _ V Print Name l ( City / County Certification Number Rev: 7/97 Corporate: ` • '' San Diegolmperial County: Inland Ern F`r - 2992 E. La Palma Ave:; Ste. A 7313 Carroll Road, Suite G 14320 Elswo'rth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 • Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 t FIELD REPORT TYPE OF WORK1Q INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N) APPROVED PLANS:IY) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT- FOR WEEK ENDING PROJECT. NO. ENGINEERr REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT N0.'% SUB -CONTRACTOR . PROJECT NAME 1�kalo leInlt INSPECTION ADDRESS / I J _ �! 1•-IY ADDRESS OF PROJECT f i REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS 1F THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS)/: 11-10 ;?o CONTRACTORS EQUIPMENT/ MANPOWER USED: IrJ! T lCl� 75" i`1 1.+ r/ / A' � I r 11 - �i /� / a .`(�• / A, i r ! AREA, GRID LINES, PIECES OBSERVED: h r e+ .-' L" /t- /r/yfr fir, '41.� l �'1 �.iet a j-f•�/r ` ff 1 if' ?i `'; �•��`71r11 11 mfr tt /-I a:f %lr /:r�t�af/f. r�jfr.` 7 f l,r r, F' / �! =- �•� f $STRUCTURAL NOTES, DETAIL, OR RFIS USED: + / • /1.'.4:+ -ice I � l r� 7;/1"'i)/fl''•;,%'''i �, . �filf?�� �'� I'�f'l�' ��f'�/�1 % ! .,�' //Na�% f //�//// % /j/�/r REMARKS. INCLUDING MEETINGS: K i j, REWORK AS PERCENT OF ALL WORK TODAY* PERCENT PROJECT COMP$ ETIOW WEATHER:!f , L. %t `�t•'C �j!`/1'�- SAMPLES TAKEN: •�^;Y` TEMPERATURE: TESTS REQUIRED: SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I UU GLHI IFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT / r .'%�'" lr,,( _✓ ( �%F r. r rr. n 'X � Signatu re % Date of Report ICBO Certification Number Print Name --- City / County Certification Number Rev: 7/97 Corporate xI San DiegoAmperial County: Inland Emp f ' 2992 E. La Palma Ave:', Ste: A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 4' FIELD REPORT TYPE OF WORK ;p INSPECTOR ❑ TECHNICIAN (j!4; AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (Y)'(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECTj j .< 1 j FOR WEEK ENDING _ PROJECT. NO. ENGINEER :'X, l ✓ REPORT NO. PG OF CONTRACTOR y �, 1 PLAN FILE NO. PERMIT NO. SUBCONTRACTOR r f/. ��rx i!1 `! r� 'S�ir2j` % , INSPECTION ADDRESS • �>� !�%' Hi i"�,�i/.i.1.rz t/ /�✓! �,� C::� �'ri/! � ��� PROJECT NAME �%f.1 fi" C r1 L'; l i.ri �t F �r r✓i✓�7i'i ADDRESS OF PROJECT y ' 13 r'.•�� - �.� 7� -"�' �i'�-�,y'�",�/l:#' REPORTING REQUIREMENTS: ICBO/FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BYCONTRACTORCONTRtACCTOR (INCLUDE (RESEARCH REPORT /NO. {OR MATERIAL,TESy REPORTS): y It- F";.++'✓E_ I f F 1r.1: f'�.% �Cr :l�"'.�Fri( :J! •� ! W/ CONTRACTORS EQUIPMENT i. ANPOWER USED: u-•// .:,�' i��ri �'�` AREA, GRID LINES, PIECES OBSERVED: _% i ,r-,' ...L // lj I. 1 / / ? 7 z. JJ ' /til tit (.It -i ��.1, I •off -ter` F ��:4- /a; i1f�',r ��J.ir �`•�a ,STRUCTURAL NOTES, DETAIL, OR RFIS USED: 9? REMARKS, INCLUDING I&ETINDS: REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMP) FTIOW WEATHER: f1* SAMPLES TAKEN:. TEMPERATURE: ✓✓ TESTS REQUIRED: SITE TIME START: �l� SITE TIME FINISH: 4/•, LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: t:- 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT ,( E.t IV-1`.Lf�l /� i�'l /� t�'j /x? "7 G' , VSignature ` / a Date of Report ICBO Certification Number %-/ Y Print Nam'e City / County Certification Number 1V/ Rev: 7/97 ' Corporate: 2992 E. La Palma Ave: Ste: A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 7 FIELD REPORT TYPE OF WORK 10INSPECTOR OTE CHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N) SITE TIME FINISH: San Diego/Imperial County: Inland Empllk:: 7313 Carroll Road, Suite G 14320 ElSworth'Street, Ste. C101 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK 10INSPECTOR OTE CHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N) SITE TIME FINISH: APPROVED PLAW(—Y)(N) APPROVED SHOP DRAWING (Y) (N) ARCHHIIITTECT _71! !J1 1 J/ i 4 A// FOR WEEK ENDING PROJECT. NO. ENGINEER {` J// REPORT NO. PG OF VERIFIED BY: G '�'�-ij CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME / INSPECTION ADDRESS / f _ Ile ADDRESS O PROJECT / REPORTING REQUIREMENTS' ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT/NO.OR MATERIAL TEST REPORTS): CONTRACTORS 1 � / s✓!hr/� EQU%IlP�MENT/MrNPOWER USED: tl►'1/ C?re" i P�✓ AREA, GRID LINES, PIECES OBSERVED:Jjr ) 1> l� �,,�, �t�J<1 '' t 5 d? /.� 1{R rlr 5 %G- ��� ��� rr1�// ,t ltr) ' _%%>YJ �. Id / fy 7`✓ j;d, yJ /� .l y�^i-^^d'!�!Fj •' �' 'i I '.r- 1/ �tl� I /� i/'i a"�/t!'.� //'"'.. ( / 4.,r:,.. l��e✓,��../,�.��i!''i" Ji /fG�Y, % , 3 1.J / .STRUCTURAL NOTES, DETAIL. OR RAS USED: r�{1! ew-L ..� rr f "Wi REMARKS, INCLUDING MEETINGS' �i �J / 1 �- %(/ /'�`71a� ,'i.Jt� 17/10 �/ X%}7f/ W ��`%.�fr,�4 !�•'%fi % ./.lf' f/ '� •�!7 iI%-f y C•-t`.'/�/ �I - l .t'�i%•'��.���%.i {�/�t1~�Gh� Y l (•�r )��i REW_QRK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIOW IWEATHER: . �I'-- �s „ SAMPLES TAKEN: TEMPERATURE: . TESTS REQUIRED:'Y —„ SITE TIME START:` 'I ���/ SITE TIME FINISH: �r LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: G '�'�-ij , )VZ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED`ABOVE AND THAT THIS WORK COMPLIES -WITH THE SOIL IN,,V STIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT \/� ir..-f 'f.� _ �f r%�fz ',r(.. �' • /� l �"%�' 1, �✓j �{` /% f ..i .� • 't7J i� 1 Signature Date of Report ICBO Certification Number - - Print Name �y,,,�" ... •� - °`-.. ., •.; -. ,. '.'.. -.. yr s : City / County Certification Numbei Rev: 7/97 A:4Y • � t�f %f7 .�~�I,d �"' fJi1((fi'4 c w+ti Corporate:, San Diego/Imperial County: Inland Empii 2992 E. La Palma Ave:, Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 -Tel: 9516 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK G INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)•(N) SPECS JY) (N) APPROVED PLANS (•Y) (N) APPROVED SHOP DRAWING (X) (N) ARCHITECT ��;/1 FOR WEEK ENDING PROJECT. NO. 7—t 'Ai /'/,)"V� ,1 [:3 l 0 - ENGINEER EPORT N0. PG OF CONTRACTOR PLAN FILE NO.MIT NO. PER SUB-CONTRACTOR PROJECT NAME l INSPECTION ADDRESS ADDRESS OF PROJECT / II �D — J//) i I' "l',ylAm /s L L /_ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): P'- /n J'" ZI_- `S' JVd/)Z;21) CONTRACTORS EQUIPMENT/ MANPOWER USED: 1 f STRUCTURAL NOTES, DETAIL, OR RFIS USED: '1s'7 -R///'77/ N /_ REMARKS, INCLUDING MEETINGS: rJF%= T ( /1 /3 r 9l ?///S it//'/.1N/Ai �'7�i-G.;=- !'%. �.M r , �/=' /',�'/'->T5';•.,si;/% iilr'.yi` lt'la// / WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: 7100 SITE TIME FINISH: LUNCH PERIOD: -^— TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL.INVESTIGATION RECOMMENDATIONS, AND / OR THE -APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification NumberN Print Name City / County Certification Number I Rev: 7/97 0 � I O 1 0 S Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 r �— it lw�/ v"'. San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empirt.' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT,('RI (N) SPECS tN (N) APPROVED PLANS.(*,) (N) APPROVED SHOP ORAWINGhV (N) ARCHITECT FOR WEEKENDING PROJECT. NO. ENGINEER REPORT NO. PG/ OF CONT CTO PLAN FILE NO. PERMIT NO. SUBCONTRACTOR J s' PROJECT NAME i f' INSPECTION ADDRESS — ZA ADDRESS OF PROJECT REPORTING REQUIREMENTS: 1 740 I-IFLD INSPECTION MANUAUMTGI. SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORiNIING WORK .AT TIIE END OF THE WORK DAY. OR NIISSING MTRS. AND RFIS, ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WI IEN A DEFICIENCY. POURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORTAND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EOUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: ,N42 a2d2 1/ TJJ-V,�l ZLZ r %o ilii6'11T S.. /_ ` V2'_1? 9 (27_6 /2 T! j le -ILS -LI -12--c- c- - I 4 / N Ti c� n� STRUCTURAL NOTES, DETAIL. OR FIRS USED: REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY% PERCENT PROJECT COMPI ETION• WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME S1ART: LUNCH PERIOD: SITE TIME FINISH: TRAVEL TIME: VERIFIED BY: I DO CERTIFY T AT�,HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH rfHE SOIL ESTIGATION RECOMMENDATIONS, AND / OR OVED PLANS, SP IC I NS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED INT E DEFICIENCY REPORT �1511�v�7 �— ignature ' Date of Report ICBO Certifi cation Number Print Name City / County Certification Number Rev: 7/97 FrAIT-GL Corporate: •µ 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK OO INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (.Y) (N) APPROVED PLANS (d() (N) SPECS (Yj (N) APPROVED SHOP DRAWING (Y),(N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER ev,S S' .... #E NO. LLff PG OF / L_ CONTRACTOR / /rYc'- PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME W INSPECTION ADDRESS LLL ADDRESS OF PROJECT / REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: A J 'CA J T " //v alc � x^-enT/A.,-es civ %raIrl �n/rlt F'nor r<i. /! 7- W <7 X � A! rd s; AQ JC a r4 Fr'11-1-/ N C` STRUCTURAL NOTES. DETAIL. OR RFIS USED: rir^ Ti//2 i� r rt/n T/= c - S e- s ' 7-10 n/ P/ ii rt/ REMARKS, INCLUDING MEETINGS., /'I r t� t / e�' ,�/ / P7rys� n7 n T n K !; A� �2 C / a 1�.�,r�T/�✓ �7 /� .t'nn Ti ev'r" c 17, /47/nAl mo 7e; // REWORK AS PERCENT OF ALL WORK TODAY: PROJECT COMPI ETION7 WEATHER: TEMPERATURE: .�3 ._.,PERCENT SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: ['O 0 SITE TIME FINISH: Al'i6 a LUNCH PERIOD: " " TRAVEL TIME: ­4� VERIFIED B' •Y,:. I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES W AND / ORTHE- ROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWI ,/Signature fi"""r' Date of Report Print Name fH•THE SOIL/INsVESTIGATION RECOMMENDATIONS, E NOTED IN'THE DEFICIENCY REPORT -6!r 9 ICBO Certification Number' City / County Certification Number ' Rev: 7/97 Corporate: "F 2992 E. La Palma Ave., Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 +k�,.�--r.:tn=/.�r,,Y�-.-3tiv's^•"+WS..•'V'�`•RiYi�i V/� 1 Inland Em�w 14320 Elsworth Street, Ste, C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK�jc INSPECTOR ❑ TECHNICIAN SITE TIME FINISH: AVAILABLE: SOIL REPORT (,Y) (N) SPECS (.Y) (N) _llyC4 /C �f� APPROVED PLANS.JV) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT �� 19117'1-'��v /// rife FOR WEEK ENDING Jl � � .°1f}r� 5�" PROJECT NO. I 2-3/ �"- R6 _R ENGINEER -7�* lit. .Ci. moi. -.L � REPORT N0. PG 1 OF G_."G7 CONTRACTO PLAN FILE N0. PERMIT NO. ' SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT 74 --/lel-- REPORTING REQUIREMENTS: /CBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): , kchdv MIX' CONTRACTORS EQUIPMENT/ MANPOWER USED: /'C X,4 -,?P �.-. ;MvC AI A 7 M Ov"Al t , AREA, GRID LINES, PIECES OBSERVED: A/ /�F'r� !/F 4/�fT/�.� /4610 �" �'nn?i/v�i AT l 'A;i�c /�� G(./ S�nr71"IV4 Al Amid 1� Awd R a Ir�ART AIIA /1 ,r1i,/1W41)% �n/i?�/A/� /3/\/e-VA,01115 V!7S fes/ /7PAd STRUCTURAL NOTES, DETAIL, OR RFIS USED: / �iLMT'//.14/ /Vt)7S• Sde!'7'7e)M /fi47i1/ /'n0i✓rlrr7 /-;:I'lTiwr/�a�✓rr� T REMARKS, INCLUDING MEETINGS: eViso o -'-d P./ P"MxM r n ,Or RA -'e j) p ii Nd "/A14A q lV /; ivn/ P/Ar;/q Q, Q,O - V171) n 'n Al 0 Pel_S; TFcY R Y s 7_4,/ &9 7'X 1 A// APPRnuz:- c/ /,�qrvs ;g�, RRdcp7/e3 Vs ,en J0 nA/ % 6 -7;;,o/,qREWORK .•� AS PERCENT OF ALL WORK T06AY:OMPLETION7 N WEATHER: 4 7° f�F 3 G o/vC, S'P�C:/�Yi SNS SAMPLES TAKEN:/S' TEMPERATURE: TESTS REQUIRED: SITE TIME START:,J4, 00 O SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /Signature Date of Report ICBO Certification Number Print Name City/ County Certification Number t Rev: 7/97