10-0402 (RC)P.O. BOX 1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
Application Number: 10-00000402
Property Address: 79410 HIGHWAY 111 STE 112
APN: 649-820-006- - -
Application description: REMODEL - COMMERCIAL
Property Zoning: REGIONAL COMMERCIAL
Application valuation: 30000
- --- - -Applicant
arum ke
I T4ht 4
BUILDING & SAFETY DEPARTMENT
BUILDING PERMIT
Owner:
E & DD
2114 ARI IN
LOS ANGELES,
_Contractor:
Architect or Engineer: Owner
4 :*3>%An
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect.
License Class: License No.:
Date: Contractor:
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the
following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to
construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State
License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or
that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by
any agOicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).:
( I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and
the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The
Contractors' State License Law does not apply to an owner of property who builds or improves thereon,
and who does the work himself or herself through his or her own employees, provided that the
improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner -builder will have the burden of proving that he or she did not build or
improve for the purpose of sale.).
(_) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.
7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of
property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed
pursuant to the Contractors' State License Law.).
(_) I am exempt under Sec. _ , B.&P.C. for this reason
M Date: 0 /0404-:�' Owner:
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the
work for which this permit is issued (Sec. 3097, Civ. C.).
Lender's Name: _
Lender's Address:
LQPERN11T
VOICE (760) 777-7012
FAX (760) 777-7011
INSPECTIONS (760) 777-7153
Date: 6/16/10
CA 90049
Ibul"ef-
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
_ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided
for by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued.
_ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor
Code, for the performance of the work for which this permit is issued. My workers' compensation
insurance carrier and policy number are:
Carrier Policy Number
I certify that, in the performance of the work for which this permit is issued, I shall not employ any
person in any manner so as to become subject to the workers' compensation laws of California,
and agree that, if I should become subject to the workers' compensation provisions of Section
3700 of the Labor Code, I shall forth ' com ith those provisions.
Date: Applicant: _�-• C�
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL
SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND
DOLLARS (5100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
APPLICANT ACKNOWLEDGEMENT
IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the
conditions and restrictions set forth on this application.
1 . Each person upon whose behalf this application is made, each person at whose request and for
whose benefit work is performed under or pursuant to any permit. issued as a result of this application,
the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City
of La Quinta, its officers, agents and employees for any act or omission related to the work being
performed under or following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is not commenced
within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject
permit to cancellation.
I certify that I have read this application and state that the above information is correct. I agree to comply with all
city and county ordinances and state laws relating to building construction, and hreeuthorize representatives
_ this county to enter upon the above -mentioned property for inspects rt purp
II Date: t5, �o.Signature (Applicant or Agent):
Application Number 10-00000402
' ------ Structure Information' 1,680SF DININGROOM REMODEL
-----
Other struct info . - . . . CODE EDITION
2007/2008
FIRE SPRINKLERS.
FULLY
MIXED -USE OCCUPANCY
A3
OCCUPANT LOAD
93.00
1ST FLOOR SQUARE FOOTAGE
----------------------------------------------------------------------------
1680.00
Permit . . . BUILDING PERMIT
Additional desc .
Permit Fee . . . . 284.50 Plan Check Fee
184.93 -
Issue Date . . . . Valuation
30000
-- - --- .•-__._-. �_; _ —Expiration Date'-.- 7.12/13/10 __�___.
_ - ._. .. _.. - . •_ •_.•...._.. --- —
Qty Unit Charge Per
Extension
BASE FEE
252.00
5.00 6.5000 THOU BLDG 25,001-50,000
---------------=--------------------------------------------
.32.50
----------------
Permit ELECT - ADD/ALT/REM
Additional desc .
Permit•�Fee . . 39.00 Plan Check Fee
9.75
Issue Date Valuation . .
. . 0
- Expiration Date 12/13/10
Qty Unit Charge Per
Extension
BASE FEE
15.00
20.00 .7500 PER ELEC DEVICE/FIXTURE 1ST 20
15.00
20.00 .4500 EA ELEC DEVICE/FIXTURE >20
9.00
-------------------------- -------------------------------------------------
Special Notes and Comments
1,680SF DINING ROOM REMODEL AT EXISTING
IMPROVED 4,120SF RESTAURANT TENANT
SPACE/VB/A-3/93-OL/FULLY SPRINKLED [0
SUSHI] THIS PERMIT DOES NOT INCLUDE
ALTERATIONS TO THE EXISTING KITCHEN,
MECHANICAL OR PLUMBING SYSTEMS OR
BUILDING SIGNAGE. 2007 CALIFORNIA
BUILDING CODES/2008 ENERGY CODE.
June 16, 2010 12:44:58 PM AORTEGA
----------------------------------------------------------------------------
Other Fees . . . . . . ACCESSIBILITY PLAN REVIEW 18.49
BLDG STDS ADMIN (SB1473)
2.00
ENERGY REVIEW FEE
18.49
Fee summary Charged Paid Credited
----------------- ---------- ---------- ----------
Due
----------
I
LQPERMIT
-Application Number
10-00000402
Permit Fee Total
323.50
.00.
1.00
323.50
Plan Check Total
194.68
.00
.00
194.68
•Other Fee Total
38.9,8
.00
.00
38.98
Grand Total
557.16
.00
.00
557.16
LQPERMIT -
Bin # '
City of La Quinta
Building 8T Safety Division
P.O. Box 1504, 78-495 Calle Tampico
La Quinta, CA 92253 - (760) 777-7012
Building Permit Application and Tracking Sheet
+•
Permit #
`D
• Proj�,/%�'aHl/
-Owner's Name: O�At�s/7�, /•t/C
Address: % 9r/ d /-/W/v /// u',/7
A. P. Number:
Legal Description:
-City, ST, Zip: &!!69 C.4-4 N et/7 A , C,,4 9a 2-f�?
Contractor: 0GU.LF-7C
Telephone: d1ov-00
Address:
City, ST, Zip:
Project Description: /lam �u
Telephone:
State Lic. # :
City Lie. M.
Arch., Engr., Designer:
Address:
City., ST, Zip:
Telephone:'
State Lic. #:>•
Name of Contact Person: c7/
..�
>.' '•u
Construction Type: Occupancy:
Project type (circle one): New Add'n Alter Repair Demo
Sq. Pt;
#Stones:
#Units:
Telephone # of Contact Pe on:
21 Z
mated Value of Project:�—
# Submittal Req'd
APPLICANT: DO -NOT WRITE BELOW THIS LINE
Rec'd TRACKING PERMIT FEES
Plan Sets
Plan Check submitted
Item
-Amount
Structural Cafes.
Reviewed, ready for corrections
t6
Plan Check Deposit
--�
Tress Cates.
Called Contact Person 5
Z.
Plan Cheek Balance.
---
Title 24 Cafes.
Plans picked up
/�!�
Construction
Flood plain play
Plans resubmitted
Mechanical
.ram
Grading plan
Subcontactor List
2" Review, ready for corrections issue
Called Contact Person
Electrical
Plumbing
� •�
Grant Deed
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
•►�'
IN HOUSE:-
''' Review, ready for correctionstissue
Developer Impact Fee
..—.
Planning Approval
Called Contact Person
A.I.P.P.
...�
Pub. Wks. Appr
Date of permit issue
ter
Z 00
School Fees
mil
Total Permit Fees
:b
NS p{t �AR4u►rr Crru.Ef�
b�� 2,xo _ Vcwa�+"Tre6D
Llib 2ao - PLA+a A�Po✓�b3r��t
CITY OF LA QUINTA SUB -CONTRA TOR LIST
-JOB ADDRESS li-q&0 &e Ilu a S76 (11L PERMIT NUMBER IO- 0 0?2 OWNER &3 M BUILDER '
This form shall be posted on the job with the Building Inspection Card at all times in a conspicuous place. Only persons appearing on this list or their employees are authorized to work
on -this job. Any changes to this list must be approved by the Building Division prior to commencement of work. Failure to comply will result in a stoppage of work. and/or the voidance
of building permit. For each applicable trade, all information requested below must be completed by applicant. "On File" is not an acceptable response.
Trade ! Classification :::
.. .. .....: Contractor
Lic nse:::...::....:.....
State::Contractor.s e
Wockers..Com ensat�on .Insurance...:Business
_. _ ..... ...._.. _.._. _......p
License
'Company Name
Classification
(e.g. A, B, C-8)
License Number
(xxxxxx)
Exp. Date
(xx/xx/xx)
-Carrier Name
(e.g. State Fund, CalComp)
Policy Number
(Format Varies)
Exp. Date
(xx/xx/xx)
License Number
(xxxxl
Exp. Date
(xx/xx/xx)
EARTHWORK (C 121
CONCRETE(C 8) .
FRAMING C 5)
STRUCT STEEL
MASONRY (C-29)' '
PLUMBING.(C 36) '
LATH PLASTER
:DRYWALL (C-9)
HVA. C (C-20) ,'.
LECTRICAL (C 10)
iAly P-I C' (NL
ri l0
(0 b 6
Ph I
G"w
IWci 1,1
y1�
0 03/%'v(1
10141,0
i
3{ tilt
ROOFING'(C'-39).
SHEET METAL (C-4 )
FLOORING (C 15Y..
GLAZING:IC=17)
INSULATION (C-2)
SEWAGE DISP (C42)
PAINTING IC733)
CERAMIC TILE:(C-54)
CABINET$.',('C 6)
FENCING.(C-13)
LAN.DSCAP,ING (.C-27)
POOL (C 53)
John R. Hawkins
Fire Chief
Proudly serving the
unincorporated
areas of Riverside
County and the
Cities of -
Banning
Beaumont
4.
Calimesa
Canyon Lake
Coachella
Desert Hot Springs
Indian Wells
.
4.
Indio
'Lake Elsinore
4.
La Quinta
Moreno Valley
Palm Desert
. 4.
Perris
;.
Rancho Mirage
4.
Rubidoux CSD
4.
San Jacinto
4.
Temecula
Board of Supervisors
Bob Buster,
District I
John Tavagh6ne,
District 2
Jeff Stone,
District 3
1ohn.Benoit,
District 4
Marion Ashley,
District 5
RNERSIDE COUNTY l
FIRE DEPARTMENT
- In cooperation with the
California Department of Forestry and Fire Protection
77-933 Las Montanas Rd STE 201 • Palm Desert, CA 92211 . (760) 863-8886 • Fax (760) 863-7072
June 22, 2010
RE: TENANT IMPROVEMENT PLAN CHECK
LAQ-IO-TI-020 O-Sushi Japanese 79-410 Hwy I I I #112 La Quinta, CA
You have been issued a release for a tenant improvement on an existing building. THIS IS NOT AN
OCCUPANCY PERMIT.
It is prohibited to use/process or store any materials in this occupancy that would classify it as an "H"
occupancy per Sec. 307 of the 20007 CBC.
THE FOLLOWING CONDITIONS MUST BE MET PRIOR TO INSPECTION:
Install door hardware and exit signs as per Chapter 10 of the 2007 CBC.
A minimum 2AIOBC Fire Extinguisher, (State Fire Marshal Approved) must be mounted in a visible
location within 75' walking distance from any point in your building or suite. Fire extinguishers can
be installed by a licensed extinguisher company with a State Fire Marshal service tag attached to the
extinguisher, or purchased from a retail store with a sales receipt attached. A licensed fire extinguisher
company must service extinguisher yearly.
All breakers must be labeled and a clearance of 36 inches must be maintained around the panel at all
times.
A durable sign stating "This door to remain unlocked during business hours" shall be placed on or
adjacent to the front exit door. The sign shall be in letters not less than one inch high on a contrasting
background.
Provide key(s) to the tenant space for inclusion in the main building Knox Box. Key(s) shall have
durable and legible tags affixed for identification of the correlating tenant space. Key(s) shall be
provided at time of final inspection.
As may be necessary to maintain proper fire sprinkler protection due to constructions changes, fire
sprinkler system plans for the tenant improvement area are required to be submitted to the Fire
Department for review. ,
Approved suite address shall be placed in such a position to be plainly visible and legible from the
street. Said numbers shall contrast with their background.
Each room with an occupancy load of over fifty people shall be posted in a conspicuous place on an
approved sign near the main exit from the room.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections.. A re -
inspection fee will be required if more than one (1) inspection is necessary. Requests for inspections
are to be made at least 72 hours in advance and may be arranged by calling (760) 863-8886.
All questions regarding the meaning of these conditions should be referred to the Fire Department
Planning & Engineering Staff at (760) 863-8886.
Sincerely,
By:
Jason Stubble
Fire Safety Specialist
RIVERSIDE COUNTY COMMUNITY HEALTH AGENCY
DEPARTMENT OF ENVIRONMENTAL HEALTH
FOOD ESTABLISHMENT PLAN APPROVAL NOTICE
Plan Check # 18714 Date 7/1/10
Project Name O Sushi Japanese Address 79-410 Highway 111 Bid. G unit 112 La Quinta
Restaurant
Plans Submitted by Jin Kook Kim Phone 818-723-0172
Owner Jin Kook Kim Address 345 S. Mountain Ave. Upland CA 91876 Phone 818-723-0172
The plans are now approved subject to the conditions listed below and the attached compliance sheet.
This is a remodel of an existing facility.
1. Must provide 3/8" radius cove base tile (flush with floor tile) at the new sushi area.
2. Provide a certified air balance report for the exiting hood and make up air.
3. This facility is required to have 32 .linear feet (min) of back up dry storage and 16 linear feet
back up dry storage for the bar (metro type rack 18"wide 3 tiers high).
4. Provide a grease interceptor letter from the sewer agency.
Note: All existing equipment and finishes must be in GOOD REPAIR (and NSF -
approved). These will be evaluated at the first on -site inspection and will be subject to
REPAIR OR REPLACEMENT if not found in good repair.
CONSTRUCTION INSPECTIONS: Contact the Plan Checker for a Preliminary Inspection when construction is
approximately 80% complete, with plumbing, rough ventilation, and rough equipment installed. Request for
inspection should be made at least five (5) working days in advance.
A FINAL INSPECTION MUST be made upon completion of ALL work including finished details. APPROVAL to
operate shall not be granted, or remodeled areas approved to operate, until the facility has passed the FINAL
INSPECTION, and "APPLICATION TO OPERATE" has been completed and PERMIT FEES have been paid.
Request for inspection should be made at least five (5) working days in advance.
PLANS CHECKED BY --\- Fp(? Phone Y 6a —go3
I acknowledge the corrections noted herein and as indicated on the plans and agree to incorporate them during
construction:
Signature
Date
Company Name
DEH-SAN-178 (Rev 2/06)
E & DD, LLC.
3701 Wilshire Blvd, Suite 880
Los Angeles, CA 90010
Tel:213-252-0073 Fax:213-252-0846
r
June 17, 2010
City of La Quinta
Building and Safety Department
P.O. Box 1504
La Quinta, CA 92247
Re: 79-410 Highway 111; Suite 112, La Quinta, CA 92253
Dear Building and Safety Department,
We have been informed by our new tenants,.Omashita, LLC dba 0! Sushi, who will be occupying the
above referenced premises, that, the city was requiring a letter from the landlord to allow them to
access certain information or to submit certain permits, in regards to building a demising wall in the
foyer of Suite 112 for the above mentioned site. E & DD, LLC is the owner of the building 79-410
Highway 111, building 6, La Quinta, CA 92253. We respectfully submit this letter to you, to formally
state that the owner of the building gives authorization for Omashita, LLC to do such, as long as they are
within all governing codes.
Warmest Regards,
E & DD, LLC.
,c/ ealtyland Co., Inc. r
Edward Kim
Property Manager
To whom it may concern,
I, Change Hee Kim, the landlord of LA Quinta Valley Plaza buildings located at 79410
Highway 111 give permission for the new tenant at unit 112, Jin Kook Kim, to build a
dry wall in the foyer area, located inside the premises.
If you have any questions or concerns, contact will be available at (213) 434-7535
Sincerely,
. 1
i
ang Hee ord
4
1
y
P.O. Box 1504
78-49.5 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
i
i
To: Greg Butler, Building & Safety Manager
From: Les Johnson, Director-PDD
BUILDING & SAFETY DEPARTMENT
(760) 777-7012
FAX (760) 777-7011
To PD: May 6, 2010
Due Date: MAY 13, 2010
Permit #: 10- 402 Status: 1ST REVIEW
Building Plans Approval
(This is an approval to issue a Building Permit)
The Planning Department has reviewed the Building Plans for the following
project:
Description: TENANT IMPROVEMENT / OMASHITA
i
Address or General Location: 79410 HWY 111 UNIT 112
i
Applicant Contact JIN KOOK KIM (818)-723-0172
r
The Planning Development Department finds that:
i
❑ ...these Building Plans do not require Planning Department approval.
...-these Building Plans are approved by the Planning Department.
❑ ...these Building Plans require corrections. Please forward a copy of the
attached corrections to the applicant. When the corrections are made
please turn them to the Planning Department for review.
Les Johns irector-l?D ; _ Date
MAY X 6
041 ofto ntv
'PlMning D`Po�ment
• i �
H
r,rry rJF LA QUINTA
G & SAFETY DEPT.
PROVED
;ONSTRUCTION
BY
A�=
. N 0 -r�t'D -
t_A tA 1 f A c
wno
rn
sushi bar partial floor plan,
scale ; 1 / 4" - 1' -0"
a
rn
. 1 ( - -T- L % 6A.-
zL&4
��� ;;i:X_� --�_
N
W-q n
trornt ie� ,.
SEE:
CITY OF LA QUANTA
BUILDING & SAFETY DEPT
1l,,��
APPROVED
4F6�ONSTRUCTION
t7-t
i
0
sc
c
7—o
-CIO
Jc
CITY OF LA'QUINTA
-BLIfLDING-&-S-A-FET-Y-,-DEP[TT-
-P
A PROVEDi
i
ION
'FOR CONSTRUCTION
DATE BY
CERTIFICATE OF COMPLIANCE (Pap 1 of 4), LTG-1C
Project Nanie:
O su sh,
Date:
0 6/a 91�
Project Address: 4/Qy ! /2
Climate Zone:
Building CFA :
L A �U f .r+ �a C. �7 1 Z S 3
Unconditioned Flo r Area:
General Information
Building Type:. Nonresidential ® High -Rise Residential E . Iiotel/Motel.
Schools Relocatable Public
r3 Schools ® .Conditioned Spaces ®. Unconditioned Spaces
Phase of Construction: ® New Construction ® Addition Alteration
Method of Compliance: Complete Building Area Category 13 Tailored
Documentation Author's Declaration Statement
• I certify that this Certificate of Compliance documentation is accurate and complete.
Name: T110 ko 44C � GM
I
Signature:
Company:
Date
Address: % 7C/ o A1/6yW,g Y /// -' // 2
If applicable:
C� DwNZ.D ( , q 2 J
CEPE#
City/State/Zip
Phone:
Principal Lighting Designer's Declaration Statement
• I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the lighting design.
• This Certificate of Compliance identifies be lighting features and performance specifications required for compliance with
Title 24, Pages 1 and 6 of the California Code of Regulations.
• The design features represented on this Certificate of Compliance are consistent with the information provided to document this design
on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for
approval with this building permit application.
Name:
,
a
Signature:
Company:
Phone:
G,
Z
Address:
License #
f�
City/State/Zip:
Date:
t. . ei
Lighting Mandatory Measures
Indicate location on building plans of Mandatory Measures Note Block:
LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual
published by the California Energy Commission.
Nil LTG- 1C Pages 1 through 4 Certificate of Compliance. All Pages required on plans for all submittals.
® LTG-2C Lighting Controls Credit Worksheet
LTG-3C Indoor Lighting Power Allowance
" LTG-4C Pages 1 through 4 Tailored Method Worksheet
BUILDING & SAFETY DF=PT.
® LTG-5C Pages 1 and 2 Line Voltage Track Lighting Worksheet
100
Arr"VYM u
FOR CQNSTRU
�Vi
2008 Nonresidential Compliance Forms
-1q-4co 111
1
LM
CERTIFICATE OF COMPLIANCE (Page 2 of 4) LTG- 1C
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Project Name:
Date:
Installation Certificate, LTG-I-INST (Retain a copy and verify form is completed and signed.)
® Field Inspector
Certificate of Acceptance, LTG-2A (Retain a copy and verify form is completed and signed.)
[3 Field Inspector
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for: 0 CONDITIONED SPACE [3 UNCONDMONED SPACE
® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with 146 a
® Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
calculation of actual indoor lightingpower density in accordance with the Exception to §146(a). Allportable lighting in
excess of 0.2 watts per s uare oot is totaled below.
Luminaire Schedule e, Lamps, Ballasts
Installed
Watts
A
B
C
D
E
F
G
H
Complete Luminaire Description
(i.e, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic b ast
_
y
E
cri '
How wattage was
determined
E E
' '
w
Vz
A ii
Field
Inspector Z
CEC
Default
from
NA8
According
to
§130
d or e
o
m
J tACV
10
�W-' F, Ai D
rF
INSTALLED WATTS PAGE
TOTAL:
.
Building total number of pages ' Installed Watts Building Total
(Stun of all pages)
Enter into
' 6
LTG -IC Page 4 of 4
1. Wattage shall be determined according to Section 130(d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. I Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans i necessa .
AVOM
s-- August 2009
�� Wp
CERTIFICATE OF COMPLIANCE (Page 2 of 4) LTG -IC
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Project Name:
Date:
Installation Certificate, LTG-I-INST (Retain a copy and verify form is completed and signed)
❑ Field Inspector
Certificate of Acceptance, LTG-2A (Retain a copy and verify form is completed and signed)
Q Field Inspector
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for: 0 CONDMONED SPACE 0 UNCONDITIONED SPACE
13 The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with 146 a
Only for ofl?ces: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in
excess of 0.2 watts per s uare oot is totaled below.
Luminaire Schedule a Lamps, Ballasts
Installed
Watts
A
B
C
D
E
F
G
H
F
Z(i.e,
Complete Luminaire Description
3 lamp fluorescent troffer,
F32T8, one dimmable electronic bWlast
y .0
'E
-3'
How wattage was
eter�m n—ed
e
E E
' '
_
w
" A
S
Field
Ins ctor 2"- -
CEC
Default
from
NA8
A tordmg
§130
d or e)
°'
u
.. f
137
INSTALLED WATTS PAGE
TOTAL:
Building total number of pages I Installed Watts Building Total
(Stun of all pages)
Enter into
1 r
LTG- IC Page 4 of 4
1. Wattage shall be determined according to Section 130(d and e). Wattage shall berating of light fixture, not rating of bulb.
2. ff Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify buildin plans i necessa .
' vci-,-a1i. 1 r'"
" M
August 2009
Vito aI1 O)-
INDOOR LIGHTING POWER ALLOWANCE LTG-3C
Project Name:
Date:
ALLOWED LIGHTING POWER Chose One Method
A Separate LTG-3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on
this page are only for: El CONDITIONED spaces ❑ UNCONDITIONED spaces
COMPLETE BUILDING METHOD
WATTS COMPLETE ALLOWED
BUILDING CATEGORY(From § 146 Table 146-E PER (if) BLDG. AREA = WATTS
TOTALS
AREA WATTS
AREA CATEGORY METHOD — Part A
A B C D
WATTS ALLOWED
AREA CATEGORY rom§ 146 Table 146-F PER ft X AREA f = WATTS
Sum of Additional Allowed Watts from Area
Method — Part B from table below
TOTALS �O
AREA WATTS
AREA CATEGORY METHOD
— Part
B Additional
Wattage Allowance from Table 146-F Footnotes
A
B
C
D
E
F
G
Primary
Function
Sq Ft
Additional
Watts
Per ftZ
Allowed
Wattage
Allowance
x C
Description(s) and Quantity of Special
Luminaire Z Types in each Primary Function Area
Total
Design
Watts
ALLOWED
WATTS
Smaller of
D or F
TOTALS — Enter into Area Category Method — Part A (table above)
" ' Additional watts available only when allowed according to the footnotes on bottom of Table. 146-F for chandelier:or sconce;
art, craft, assembly or manufacturing specialized task work; precision commercial/ industrial work; or lab specialized task work.
z. Special luminaires are light fixtures described in the Table 146-F Footnotes that are subject to an additional wattage
allowance.
TAILORED METHOD
Total Allowed Watts using the Tailored Method taken from LTG=4C (Page 1 of 4) Row 3 F��9
The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG-4C set
of forms. A separate set of LTG4C forms shall be filled out for CONDITIONED and UNCONDITIONED soaces
2008 Nonresidential Compliance Forms August 2009
CERTIFICATE OF COMPLIANCE (Page 3 of 4 LTG -IC
Project Name:
Date:
INDOOR LIGHTING SCHEDULE and FEELD INSPECTION ENERGY CHECKLIST
Fill in controls for all spaces: a) area controls, b) multi -level controls, c) manual daylighting controls for daylit areas > 250 ,
automatic daylighting controls for daylit areas > 2,500 ft�, d) shut-off controls, e) display lighting controls, fi tailored lighting
controls - general lighting controlled separately from display, ornamental and display case lighting and gj demand responsive
automatic controls or retail stores > 50, 000ft2, in accordance with Section 131.
MANDATORY LIGHTING CONTROLS - FIELD INSPECTION ENERGY
CHECKLIST
Field
Inspector
Type / Description
Number
of Units
Location in Buil mg
Pass
Fail
i sin CM p�^
� -
aNt'w
®
E3
Z to 6 -- LAO00�o
0
El
1:3
®
1:3
0
0
Field Inspector's Notes or Discrepancies:
2008 Nonresidential Compliance Forms August 2009
INDOOR LIGHTING POWER ALLOWANCE LTG-3C
Project Name:
Date:
ALLOWED. LIGHTING POWER Chose One Method
A Separate LTG-3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on
this page are only for: [3 CONDITIONED spaces ® UNCONDITIONED spaces
COMPLETE BUILDING METHOD
WATTS COMPLETE ALLOWED
BUILDING CATEGORY(From § 146 Table 146-E PER(fX BLDG. AREA = WATTS
TOTALS
AREA WATTS
CATEGORY METHOD — Part A
A
AREA CA'
146 Table 1
Sum of Additional Allowed Watts from Area
WATTS ALLOWED
C D
PER (ftt) X AREA (ft) = WATTS
Method — Part B from table below
TOTALS JB 2J 1�j
AREA WATTS
AREA CATEGORY METHOD
— Part
B Additional
Wattage Allowance from Table 146-F Footnotes
A
B
C
D
E
F
G
Primary
Function
S Ft
Additional
Watts
Per ft2
Allowed
Wattage
Allowance
x C
Description(s) and Quantity of Special
Luminaire Z Types in each Primary Function Area
Total
Design
Watts
ALLOWED
WATTS
Smaller of
D or F
TOTALS — Enter into Area Category Method — Part A (table above)
Additional watts available only when allowed according to the footnotes on bottom of Table. 146-F for chandelier:or sconce;
art, craft, assembly or manufacturing specialized task work; precision commercial/ industrial work; or lab specialized task work.
2. Special luminaires are fight fixtures described in the Table 146-F Footnotes that are subject to an additional wattage
allowance.
TAII.ORED METHOD
Total Allowed Watts using the Tailored Method taken from LTG=4C (Page I of 4) Row 3
The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG-4C set
of forms. A separate set of LTG-4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces
2008 Nonresidential Compliance Forms August 2009