Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
05-4980 (RC)
P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 r� Application "Number: • Property Address: APN: Application description Property Zoning: Application valuation: Applicant: 05-00004980 794.4 -0tH IGHWAY- -i 1-1 649-820-004- - REMODEL - COMMERCIAL REGIONAL COMMERCIAL 60000 T4ht 4 4v " BUILDING & SAFETY DEPARTMENT . BUILDING PERMIT D dOwner: LQVP4,LLC 45751 EDGEHILL DR FEB 09 PALM DESERT, CA 92260 1006 OF Architect or Engineer: Lic. No.: --------------- ----------------- LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class: 13 License o.: 466671 -Date: y� I i OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: 1 _ 1 I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.).' - 1 1 I am exempt under Sec. , B.&P.C. for this reason Date: 0�0 Owner: CONSTRUCTION LENDING AGENCY 1 hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT .VOICE (760) 777-7012~ • .'. FAX (760) 777-7011` INSPECTIONS (760) 777-7153 Date: 2/08/06 Contractor: MARTINOVICH, GEORGE., DBA MRVT 78750 SAINT THOMAS DRIVE INDIO, CA 92203 (760)360-5251 Lic. No.: 466671 a -------------------------------'---------------— WORKER'S COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier EXEMPT Policy Number EXEMPT I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I sh I with comply wit t ose a isions. Date:10Applicant: WARNING: FAILURE OO SECURE WORKERS' COAAR SATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1 . Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. certify that I have read this application and state that the above information is correct. 1 agree to comply with all. city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this county to enter upon the above-mentioned property fW inspection Ryrpons. /1— (Applicant or Agent): Application Number .. . . . . 05-00004980 Permit . . . BUILDING PERMIT Additional desc . . Permit Fee . . . . . 459.50 Plan Check Fee 298.68 Issue Date . . . . Valuation . . . . 60000 Expiration Date 8/07/06 Qty Unit Charge Per Extension BASE FEE 414.50 10.00 4.5000 - ------------------------------------------=_L THOU BLDG 50,001-100,000 -------------------------------- 45.00 Permit . . . ELECT - ADD/ALT/REM Additional desc . . Permit Fee . . . . 131.86 Plan Check Fee 32.97 ' Issue Date . . . . Valuation . . . . 0 Expiration Date 8/07/06 Qty Unit Charge Per Extension BASE FEE 15.00 5843.00 .0200 -----------7---------------------------------------------------------------- ELEC GARAGE OR NON-RESIDENTIAL 116.86 Permit . . . MECHANICAL Additional desc . . _ Permit Fee . . . . 120..00 Plan Check Fee 30.00 Issue Date . . . . Valuation . . . . 0 Expiration Date 8/07/06. Qty Unit Charge Per Extension BASE FEE 15.00 6.00 4.5000 EA MECH VENT INST/ DUCT ALT 27.00 12.00 6.5000 ---------------------------------------------------------------------------- EA MECH VENT FAN 78.00 Permit . . . PLUMBING Additional desc . Permit Fee . . . . 87.00 Plan Check Fee 21.75 Issue Date . . . . Valuation . . . . 0 Expiration Date 8/07/06 Qty Unit Charge Per Extension BASE FEE 15.00 12.00 6.0000 EA PLB FIXTURE 72.00 ---------------------------------------------------------------------------- Special Notes and Comments SHELL IMPROVEMENTS TO EXISTING BUILDING. TYPE VN CONSTRUCTION. 2001 LQPERMIT J Application Number . . . . . 05-00004980 ---------------------------------------------------------------------------- Special Notes and Comments. {`- CBC,CMC,CPC, 2004 CEC, 2005 ENERGY CODES. = ------------------------------- Other Fees -------------------------------------------- . . . . . . ACCESSIBILITY PLAN REVIEW 29.86 ENERGY REVIEW FEE 29.86 Fee summary Charged Paid Credited Due Permit Fee Total 798.36 .00 .00 798.36 Plan Check Total 383.40 .00 .00 383.40 Other Fee Total 59.72 .00 .00 59.72 Grand Total 1241.48 .00 .00 1241.48 a LQPERMff a at r TITLE 24 REPORT Title 24 Report for: La Quinta Valley Plaza Office Building #4 La Quinta, CA ` Project Designer: Report Prepared By: - Insu-form, Inc. 41-921 Beacon Hill, Suite A Palm Desert, CA 92211 ` (760) 779-0657 Job Number: CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE lklptoBY_� i., Date: or -Flee ,. 11/3/2005 4V7 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.0 by EnergySoft Job Number: User Number: 2655 TABLE OF CONTENTS Cover Page Table of Contents Form LTG -1-C Certificate of Compliance Form LTG -2-C Interior Lighting Schedule Form LTG -3-C Portable Lighting Worksheet Form LTG -5-C Interior Lighting Power Allowance Form OLTG-1-C Certificate of Compliance Form LTG -MM Lighting Mandatory Measures Lighting Inspection Checklist 1 2 3 7 9 10 11 13 14 EnergyPro 4.0 by EnergySofl Job Number: User Number: 2655 F/A CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG -1-C of 14 PROJECT NAME DATE La Quinta Valley Plaza 11/3/2005 PROJECT ADDRESS Offiice Building #4 La Quinta PRINCIPAL DESIGNER -LIGHTING TELEPHONE Builiig;Perri4#<< DOCUMENTATION AUTHOR TELEPHONE Insu-form, Inc. (760) 779-065% Eiitorceiiiert;:::: ;. e[c ;;Else;> L INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 5,841 Sq.Ft. 15 BUILDING TYPE FX� NONRESIDENTIAL HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM [X] CONDITIONED SPACES O UNCONDITIONED SPACES INDOOR & OUTDOOR SIGNS PHASE OF CONSTRUCTION NEW CONSTRUCTION ADDITION X❑ ALTERATION METHOL D OF ANCE LIGHTING COMPLETE BUILDING O AREA CATEGORY [:]TAILORED PERFORMANCE COMPCOMMON LIGHTING STATEMENT OF COMPLIANCE This Certific to of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 a 6 of the California ulations. This certificate applies only to building lighting requirements. The d9l mentation parer hereby c fies that the documentation is accurate and complete. DOC NTATION THOR SIGNAT E DATE LIA t 7 hS he Pri is f� inn certifies that the prop se building design represented in this set of construction' documents is consist nt with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146, 148 and 149 of Title 24, Part 6. Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) I hereby affirm that I am eligible under the provisions of Division 3 the Business of and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. D I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work describe s exempt purs iness and Professions Code Sections 5537, 5538 and 6737.1. P INCIPAL%LI HTING DEZ:MSIGNER R -SME O' , L SIG TURE DATE �S LIC: # 400 -fir �'j LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for datory Measures LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ©LTG -1-C, Parts 1 of 4 and 2 of 4:Certificate of Compliance. Part 1 of 4 and 2 of 4 are required for all submittals ®LTG -1-C, Part 3 of 4: Certificate of Compliance. Part 3 of 4 submittal is required only if Control Credits are claimed ®LTG -1-C, Part 4 of 4: Certificate of Compliance. Part 4 of 4 submittal is required when lighting controls are installed ®LTG -2-C: Interior Lighting Schedule ®LTG -3-C: Portable Lighting Worksheet ©LTG -4-C: Lighting Controls Credit Worksheet I]LTG-5-C: Interior Lighting Power Allowance OLTG-6-C: Tailored Method Worksheet ❑LTG -7-C: Room Cavity Ratio Worksheet ❑LTG -8-C: Common Lighting Systems Method Worksheet ❑LTG -9-C: Line Voltage Track Lighting Worksheet EnergyPro 4.0 by EnergySofl User Number- 2655 1..k..._�__. of 14 CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1-C (PROJECT NAME DATE La Quinta Valley Plaza 11/3/2005 INSTALLED INTERIOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 58 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 58 ALLOWED INTERIOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED XJ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 6,425 ALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INTERIOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 71 MANDATORY INTERIOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) Check it SPACE CONTROLLED Daylighting INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 4.005 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 4,005 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 58 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 58 ALLOWED INTERIOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED XJ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 6,425 ALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INTERIOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 71 MANDATORY INTERIOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) Check it SPACE CONTROLLED Daylighting ERTIFICATE OF COMPLIANCE (Part 3 of 4) LTG -1-C (PROJECT NAME DATE La Quinta Valley Plaza 11/3/2005 CONTROLS FOR CREDIT IN CONDITIONED AND UNCONDITIONED SPACES CERTIFICATE OF COMPLIANCE (Part 4 of 4) LTG -1- C1 PROJECT NAME La Quinta Valley Plaza DATE 11/3/2005 'Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title 24 Part 6. Test Descri tion Test Performed By: D LTG -2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing O LTG -3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing 4.0 by EnergySoft User Number: 2655 Job Number: Pape:6 of 14 INTERIOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C PROJECT NAME Plaza INSTALLED LIGHTING POWER FOR CONDITIONED SPACES DATE 11/3/2005 Luminaire Lam ps/Ballasts Installed Watts C D E F G H I J Name Type Description �m X33 p, N f� m q mv� N 3m3 d (1D ° 3-09 T.N m mn '' No 3. d V r�D @ L��� .- fA N a ((Yes ft Fluorescent T8 Energy Savings Elec F32T8 1 30 1.0 29.0 X 9 261 �4 ft Fluorescent T8 Energy Savings lec F32T8 4 30 1.0 104.0 X 36 3,744 PAGE TOTAL 4,005 BUILDING TOTAL (sum of all pages) 4, 005 PORTABLE LIGHTING (From LTG -3-C) CONTROL CREDIT (From LTG4-C) D ADJUSTED ACTUAL WATTS 4 005 I EnergyPro 4.0 by EnergySoft User Number: 2655 Job Number Page:7 of 14 INTERIOR LIGHTING SCHEDULE (Part 2 of 2) LTG - PROJECT NAME uinta INSTALLED LIGHTING POWER FOR UNCONDITIONED SPACES DATE 11 Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Name T e Description �d M�3 rye 333 IN _.� m M 0 r 3m� 'a N ��Z C d'i'm _.� m cR 0 r cv 5m� OI 1 N aI _- 0 `3 3 � 'm.�3 - r N G)� x�m a �lec ft Fluorescent T8 Energy Savings 8 30 1.0 29.0 X 2 58 PAGE TOTAL 58 BUILDING TOTAL (sum of all pages) 58 CONTROL CREDIT (From LTGd-C) C� ADJUSTED ACTUAL WATTS 58 . 4.0 by EnergySoft User Number: 2655 Job Number: PaaeS of 14 PORTABLE LIGHTING WORKSHEET LTG -3 - PROJECT NAME La Quinta Valley Plaza DATE I 11/3/2005 B BUILDING TOTAL TABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B C D ROOM # OR ZONE ID DEFAULT Is ft AREA SF TOTAL WATTS B X C TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) TOTAL 0 0 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B BUILDING TOTAL C D E F G ROOM # OR ZONE ID PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTS PER FIXTURE TASK AREA (SF) # OF TASK AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) TOTAL 0 1 0 TABLE 3 - PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # TOTAL AREA OR ZONE ID (SF) 1 TOTAL 0 BUILDING SUMMARY - PORTABLE LIGHTING Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details include luminaire types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 0 0 EnergyPro 4.0 by EnergySoft User Number: 2655 Job Number: Page:9 of 14 INTERIOR LIGHTING POWER ALLOWANCE LTG -5-C PROJECT NAME La Quinta Valley Plaza DATE 11/3/2005 ALLOWED LIGHTING POWER Choose OneMethod) COMPLETE BUILDING METHOD - CONDITIONED SPACES BUILDING CATEGORY (From Section 146 Table 146-6) WATTS PER SF COMPLETE BLDG. AREA ALLOWED WATTS AREA CATEGORY METHOD - CONDITIONED SPACES AREA CATEGORY (From Section 146 Table 14") WATTS PER SF AREA (SF) ALLOWED WATTS Comp Bldg Office 1.10 5,841 6,425 PAGE TOTAL BUILDING TOTAL 5 841 6 425 5 841 6 425 AREA WATTS TAILORED METHOD - CONDITIONED SPACES TOTAL ALLOWED WATTS (From LTG -6-C or from computer run.) CERTIFICATE OF COMPLIANCE (Part 1 of 2) OLTG-'I -C PROJECT NAME DATE La Quinta Valley Plaza 11/3/2005 PROJECT ADDRESS Office Building #4 La Quinta PRINCIPAL DESIGNER - LIGHTING TELEPHONE Building'. PerriiR#':< DOCUMENTATION AUTHOR Insu-form, Inc. TELEPHONE (760) 779-0657 C)eckgd>ti°%Date:::>z>< GENERAL INFORMATION DATE OF PLANS OUTDOOR LIGHTING ZONE ❑ LZ1 ❑ LZ2 ❑ LZ3 ® LZ4 FUNCTION TYPE © OUTDOOR LIGHTING ❑ OUTDOOR SIGNS ❑ INDOOR SIGNS PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION ❑ ADDITION ® ALTERATION [STATEMENT OF COMPLIANCE This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any othe calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6. Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. ❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE DATE LIC. # LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ®OLTG-1-C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 may be incorporated in schedules on the plans Either LTG -1 -C or OLTG-I-C may be used for signs as follows: 1. Use LTG -1 -C if the project consists solely of indoor signs. 2. Use LTG -1 -C if the project consists of indoor lighting, outdoor or in signs, but no other outdoor lighting. 3. Use OLTG-I-C if the project consists solely of outdoor signs. 4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indoor lighting. x❑OLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances (Except Signs). OOLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations. ❑OLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and extemally illuminated signs, for both indoor and outdoor signs. EnergyPro 4.0 by EnergySoft User Number: 2655 Job Number: Page: 11 of 14 CERTIFICATE OF COMPLIANCE (Part 2 of 2) OLTG-1-C PROJECT NAME DATE La Quinta Valley Plaza I 11/3/2005 Li-ghting Schedules on Plans Show that Outdoor Lighting Meets Allowed Lighting Power F] a Lighting power allowance for general site illumination on OLTG-2-C Part 1 of 4 Not Applicable nLighting ❑X power allowance for local ordinances or for security multipliers on OLTG-2-C Part 2 of 4 Not Applicable nLighting FX] power allowances for specific applications, other than vehicle service stations with canopies on OLTG-2-C Part 3 of 4 Not Applicable F] ❑X Lighting power allowances for vehicle service station canopies on OLTG-2-C part 4 of 4 Not Applicable n Sign lighting compliance on OLTG-4-C Not Applicable Mandatory Measures on Plans Show that Outdoor Liahtina Meets Outdoor Liahtina Controls And E ui ment FXJ Installed lighting power has been determined in accordance with Section 130(c)1 Not Applicable X❑ All permanently installed luminaires with lamps rated 100 Wafts either have a lamp efficacy of at least 60 lumins per Watt or are controlled by a motion sensor per Section 132(a) Not Applicable a All Luminaires with lamps rated greater than 175 Wafts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements of Section 132(b) Not Applicable a All permanently installed outdoor lighting meets the control requirements of Section 132(c)1 Not Applicable nBuilding n facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements of Section 132(c) Not Applicable MANDATORY INTERIOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) NOTE TO ;:FIELD;.::::: CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) SPACE CONTROLLED Check if Daylighting EnergyPro 4.0 by EnergySoft User Number: 2655 Job Number: Page: 12 of 14 ILIGHTING MANDATORY MEASURES LTG - PROJECT NAME DATE La Quinta Valley Plaza 1 11/3/2005 DESCRIPTION Designer Enforcement FXJ § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X] § 131(d)2 Override for Building Lighting Shut-off: The automatic building shutoff system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified; all alternate equipment shall be certified and installed as directed by the manufacturer. § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. C ❑ § 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. X] § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. X] § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 wafts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. X❑ § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.0 by EnergySoft User Number: 2655 Job Number: Page: 13 of 14 {LIGHTING INSPECTION CHECKLIST LTG -I PROJECT NAME INSPECTION DATE - La Quinta Vallev Plaza 1 11/3/2005 FIXTURE CODE TYPE DESCRIPTION LAMP TYPE LAMP QUANT. NUMBER OF FIXTURES WATTS PER FIXTURE FIELD NOTES 1 4 It Fluorescent T8 Energy Savings Elec F32T8 1 9 29.0 4 4 It Fluorescent T8 Energy Savings Elec F32T8 4 36 104.0 Type DESCRIPTION MH METAL HALIDE INC INCANDESCENT INC/LV INCANDESCENT LOW VOLTAGE CFL COMPACT FLUORESCENT FL FLUORESCENT O OTHER EnergyPro 4.0 by EnergySoft User Number: 2655 Job Number: Pane: 14 of 14