Loading...
001054 (SFD)PERMIT APPLICATION F(AJL6City of La Ouinta ' 1 Department.of Building and Safety This permit becomes void if work not commenced within 180 days from date of issuance. OR, if work has been suspended or abandoned fora period of 180 days.! r - LICENSED CONTRACTORS DECLARATION: I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. j 1 ,1 i 1 C, License Class Lit. Number ' r Date `1 ! • ? • Contractor ' If OWNER -BUILDER DECLARATION: I hereby affirm that I am exempt from the Contractor's License Law for the following reason (Sec. 7031.5. Business and Professions Code: Any city or county which requires a permit to construct• alter, improve, demolish, or repair any structure; prior to its issuance, also requires the applicant for. such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor,'s License Law (Chapter 9 (commencing.with section 7000) of Division 3 of the Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption. Any,vjolation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than, five hundred dollars ($SOD.): - . O I, as owner of the property. or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044,.Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds, or improves thereon, avid who does such work himself or through his own employees, provided that such improvements are'not intended'or offered for sale. If, however, the building or improvemnt is sold within one year of completion, the owner -builder will have the burden of proving that he,did not build or improve for the purpose of sale.). ,❑ 1, as owner of the property, am exculsively contracting with licensed contractors to construct the project (Sec. 7044. Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects with a'contractor(s) licensed pursuant to the' Contractor's License Law.). - 17.1 am exempt under Sec. B.'8 P.C. (Attached Certificate). Date Owner WORKERS' COMPENSATION DECLARATION: I hereby affirm that I have a certificate of consent to self -insure, or a certificate of Workers' Compensation Insurance .or - a certified copy thereof (Sec. 3800. Lab. C.): . Policy No. Company ❑ Certified copy is hereby furnished. - ❑ Certified copy is filed with the City Building Inspection Department or City Department. Date Applicant APPLICANT NAME (L. F. MI) Fdzk Johnson ADDRESS P.O. Flom 2288' CITY/COMMUNITY/STATE/ZIP ` Indio, CA 92201 JOB SITE ADDRESS/SPACE 54_645 Avenida Rubio CITY/COMMUNITY/STATE/ZIP La duihia' CA 92253 BOK 774,271 PAG PRC 019 C TWN PING SE S TRACT I LOT oomt. Fee 376.00 MOD so SMI Fee TRACT NAME OWNER NAME (L. F, MI) Pd& Johnnsm Ctinst. CONTRACTOR -FIRM NAME Ri&nn'' yy +� may. - U0 �. ADDRESS abme CITY/COMMUNITY/STATE/ZIP M - aboV e PHONE • 347-7171 LICNC 0 ARC/ENG FIRM NAME ADDRESS CITY/COMMUNITY/STATE/ZIP PHONE M TOTAL FEE LICNC 11 USE OF PERMIT S.F.D.- BIL ZON FSB I SSB SSB RSB OFC ZONE .ORD t o LOT SZ END , SIDE CERTIFICATE OF EXEMPTION FROM WORKERS`COMPEN ;ATION INSURANCE: This section need not be completed if the permit is.for one hundred ($100) o, less. I certify -that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so Fsto become subject to the Workers' Compensation Laws of California. Date Applicant NOTICE TO APPLICANT: IL after making this Certificate of Exemption, you should become subject to the Workers'' .Compensation provisions of the Labor Code, you must -orthwith comply with such provisions,or this permit shall be deemed revoked. DIVISION OF INDUSTRIAL SAFETY PERMIT CERTIFICAT'ON: O I hereby certify that no excavation five (5) or more fee' in depth into which a person is required to descend, will be made in connection with work authorized by this permi , and that no building structure; scaffolding, falsework, or demolition or dismantling thereof, will be more than thirysix (36) feet high. (Chap 3.2, Grp 2, Art 2; Sec 341• Title 8, C.A.C.) O As owner -builder, I will not 'employ anyone to do -work which would require a permit from the -Division of Industrial Safety, as noted above, unless such person -ias a permit to do such work from that division. O Division of Indusj:,rial Safety Permit No. , ._ Date Applicant " CONSTRUCTION LENDING AGENCY: I hereby affirm that :here is a construction lending agency for the performance of the'work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name Lender's Address I certify that,I have read this application and state that -he above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction: and hereby authorize representatives h of this county tenter uponpon the 1 above -'mentioned property for inspection purpose. Signature of Applicant or Agent Date CERTIFICATE OF COMPLIANCE AND AUTHORIZATION OF ENTRY: I certify l have read this application and state that the information given is correct. Iagree to comply with all state laws and county ordinances relating to buidling construction, and authorize a representative of the CiLv of La Ouinta Department of Building and Safety to enter upon the property for which I have applied for this pewnit.for the purpose of making. inspections. Signature'df Applicant or Agent Date / Ir rfry Print Applicant/Agent Name / APPVPRMTOnt „rim 4 17T 2i"84 S.F.D. Pexmit to constrict 1592 sq. ft. of S.F.D., 91 sq. ft. of pore and 430 sq. ft. of garage as per approved Plans. Mech. Fee 22.00 Plan Check Fee 244.40 oomt. Fee 376.00 Effect. Fee SMI Fee 5.64 Plunbing Fee 50.50 Prop. Deva. Flee 450.00 TOTAL FEE 1,191.67 BLDG. DEPT. VALUATION 80,628.80 NO. OPERATION DATE INSPECTOR NO. OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS 1 Set Back 33 Ventilation System 2 Ftgs & Frms • 34 Plenums.&.Ducts 2A Slab Grade 35 Furnace Compart. 3 Steel . j 36 Inlets & Outlets 4 Grout Blocks 37 Combustion Air 5 Bond Beams 38 Compressor 6 Roof Deck 39 Appl. Clearance 7 Framing 40 Fire Damper 8 Vents 41 Smoke Detection Device 9 Garage Fire Wall 42 Commercial Hood 10 Fireplace P. L. ❑ 43 Final 10A fireplace T.O. ❑ OP'N ADDITIONAL INFORMATION NO. d� SEWAGE SYSTEM SIZE &.LOCATION 11 Exterior Lath§Value 12 Internal Lath12A Dr wally 13 Finish Gradev�INSULATION Thick/��� 7A Walls (Batts) 12B Ceiling (Batts) 12C Ceiling (Blown) 14 Final PLUMBING APPROVALS 15 Ground Plumb �' p 16 Water Piping 17 Rough Plumb 18 Vents 19 Sewage Disposal 20 Sewer 21 Water Heater 22 Water Softener 23 Water Service 24 Gas Test 25 Final Tank Pit L. Line ELECTRIC APPROVALS REAWOF PROPERTY P/L STREET NAME LINE P/1 26 Power Pole 1 , 27 Conduit 28 Service Entrance 29 Wiring 29A Grounding Wire 29B Bonding 30 Fixtures 31 Service 32 Final ,%F I E S o Desert Unihed.* S: pool District y BERMUDA DUNES r .Sands RANCHO MIRAGE,CF 82-879 HIGHWAY 111 O INDIO,'CALIFORNIA 92201-5678 *_-619) 347-8631 INDIAN WELLS ' H PALM DESERT -November 26, 1984 %P - LA OUINTA 'JQ _ INDIO 1� _City of La Quinta. Department'of Community"Development . 78-105 Calle Estado • La Qui7nta, CA 92253 `. Re: Lot 7, Block 270,,'Santa Carmel ita at Vale La Ouinta, Jnit: No. 2.5 Gentlemen: The developer of.the above: referenced lot has mitigated its iJnpacts on our overcrowded schools by-payment of the amount of $628 per, unit to be applied toth.e cost-of district educational facilities made necessary,by such. new development. Sincerely, John D.'Brooks Assi Stant Supe.ri ntende.nt, - ' Business Services JDB/crm A . � � . R_E.�:I_D_E_L� T LA_�:._ . _T_I T L•_E� � :2 a i -.0 ay c.Ll:La.t e;th;o 11641 url.6 G.. . � �- N�� �-✓� �N�J 1.6.T1oN MECHANICAL-. SYSTEMS DESIGN 134 SOUTH GLAS.SELL STREET ORANGE, CALIFORNIA 92666 (714) 643-6571 --.__...-Hoi�_ -- 058:10 R2• _,28/84 VH/dr Attachment D Form 2 (Revised 3/84) Climate Zones. 2, 4, 6, and 8-15 COMPLIANCE,CHECKLIST t*' For Low -Rise Residential'Buildings - (except hotels and motels). Step 1: Enter on the form the values for each measure from your building plan ' and specifications sheet. Step 2: Enter points on".this page while working through the point system Building Shell Measure Points F, *Total Floor Area �ft2 1. Slab -on -Ground; Perimeter ft.,�Depth � in. R- . -n. 2. Raised Floor R -Value. R- t. 3. Ceiling Insula.tion or Construction*Assembly R- x Attic, Percent of Roof Over Conditioned Space LL ft2 Z #.. 4. Wall Insulation or Construction Assembly. . . . . . . . . . . . R- ? Glazing; Total % Floor Area Single Double' Triple 5. North -Facing.' ft; ft2 ft2 6. East -Facing . .ft2 ft2 ft 2 .. 7. South -Facing.'.... % ft2ft2 ft 2 8. West -Facing % ft �ft ft 9. •Skylight. X -ft 2 -ft 2 ft 2 x 10. Shading Coefficient (excluding overhan ) a. East L� Q�i�05C . b. South. SC . . . . . . . . . . . . c. West . . . . . . . . . . . . . SC . . . . . . . . . . . . . d. North. . . . . . . SC . . . . . . . . . . . e. Skylight SC . . . . . . . . . . 11. Horizontal South �Overhang Length. ft . . . . . . 12. Movable Insulation, % Floor Area. % . . . . . . . . . . . . . 13. Infiltration (indicate Standard, Medi di or ig t) 14. Thermal Mass Exterior Wall Thermal Mass Area, Heat Capacity, R -Value . . . . . . . ft2, HC; R- Interior Thermal Mass �1 Area, Heat Capacity, R -Value . . . . . .ft2, AHC.TZI HVAC System•* 15. Gas Furnace without Refrigeration -Cooling (Seasonal Efficiency). . . . . . . . . . .. SE ',. 16. Heat Pump (Energy Effic.iency�Ratio) . . . . . . . . . . SEER •°1% 17. Gas Furnace with Refrigeration Cooling Seasonal Efficiency and Seasonal Energy Efficiency •Ratio... . . . . . . . . SE SEER 18. Active Solar (Net Solar Fraction, %). . . . . . . . . %NSF 19. Zonally Controlled Electric Resistance Space Heating . . . . . . . . . . . . . (Yes/No) Domestic Water Heating•* 20. Solar With -Gas Backup (Net Solar Fraction, %) . . . . . . . . %NSF 21. Other Water Heating (Describe type) i Point System Compliance Total. . . . . . . . . . . + 'Checklist items;. not a point system measure. ,'' "Attach documentation for efficiencies and NSF. i.6 • A "HEAT TRANSFER COEFFICIENT Form PROPOSED CONSTRUCTION ASSEMBLY. (eiet) Enforcement Agency Use Only F2�I ��o h r►so n' I� ! �: ow�� owner project -title Dalloln0 permit number • r L ITS 0r01eCt 10utlon CneCkeC by r` ( t- ter OOCumentation author dale eeeeee>,�ae . Sketch of Construction Assembly List of Construction Components R (for section between framing,members) (from Table }11 ' ^�1. _V�e �-rrl-� n 2.��f'IIN` 3 l _ q. 5. Framing Size : 6. n'_. Framingc Soacin '�" D.C. 7. Check one: 8. Inside Surface Air Film (from Table J-18). ........... ���) Ceiling/Roof Floor 9. Outside Surface Air Film (from Table 3.18)..:. . Wall Total Thermal Resistance (RT) — — ,. 11 'Nall. Check the � - tum o/ the aDa ve apW00r+ate weight: less than 25 Ib/h2 25 to aQ ID/ft2 AVERAGE U VALUE OF ASSEMBLY ;rester ;^an 40 :bih2 Btu/(hr .h2 ',FI Framing - AT from above 1 Pa:tor from f Table 3.6 Use this U value for hut. load • 4lculatior, or Code comparison - 0 HEAT TRANSFER COEFFICIENT FOri1l R :.` PROPOSED CONSTRUCTION ASSEMBLY (alai) Enf3rcement Agency Use Only owner - ..project title .3ullding permit number project location chacke0 by aocumentallon author pate Sketch of Construction Assembly List of Construction Component3 R (for section between framing members- (from Table 3-1) /,d-- .2. —31 3.F( 4. 5. I // ,� Framing Size 6. ��•• " x S!G_" ' Framino Sbacin o.c. %. Check one: 8. Inside Surface Air Film (from Table'3.18)...... Ceiling/Roof Floor 9. Outside Surface Air Film (from Table 3.18).. Wall Total Thermal Resistance (RT) 11 Wall• check the sum of the above appropriate weight: - less than 25 Ib/ft2 25 to 40 lb/ft2 AVERAGE U VALUE OF.ASSEMBLY greater than 40 Ib/ft2' /� Btu/(hr . ft2 •eF) ,Framing. 'RT from above factor from Table ]•6 Use this U value for hast load . cslculatior or Code comparison ZONE: ENGINEER: DATE: PROJECT:r SHEET. - ENGINEER: ��- DATE: OF ?enc: -- Irl Ft's Volume: Ft3 Time: SUM?iARY L 0 A D S COOLING; MU/IIR IMEAT INr, MT.�1 SENSIBLE, L1TE11T I B'IU/I IR err,, WALLS- RX)r•/CSILItIr. ' FIZOR TOTAL ' LIQ rTS -PMI)LE cep ?'ISlS p TOTAL Sensible T Cr-Tt . 1.I RS,IR Sensible Sens. V771-r-ILATION do0 nIFILTRATIO"I T rAL . TSAR � . srs.ecTlcr,: To�gsp . r