Loading...
0110-293 (RR)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class J Exp. Date /��' I.. Date/ �� /Signature Signature of Contractor I. „ r OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( -) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business.& Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section , B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit. is issued. (,)p I have and will maintain workers' compensation insurance, as required by Skcvtion 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carrier ff,&°Yj? BUND Policy No. (This section need not be completed if the permit valuation is for $100.00 or less). ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code,1 shall forthwith comply with those provisions. Date: r i �i')/Applicant Warning: Failure to secure Workers' Compensation coverage is unlawful and shall subjec{an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued'as a result of this application becomes null and void if work is not.commenced within 180 days from date of issuance of such permit, or cessation -of work for 180 days will subject permit to cancellation. I certify that I have read this applit correct. I agree to comply with all construction, and hereby authdriz the above=mentioned propert for, Signature (Owner/Agent); L, :at+on and state that the above information is p and State laws relating to the building resWintatives of this_City to enter upon cti�iurpo.ses~' /. Date '�< 2_ ,( t BUILDING PERMIT PERMIT# DATE of VALUATION LOT e r TRACT ;;�i°4aMUMtom, IDSA RkiiZ M7. OWNER 'RODEP.! EDttIKE, LA QW -ITA I'— CIA 92233 USE OF PERMIT GEM. LHU1#:,DING R%RO:'71; APN 774 -12Y2 -W4 CONTRACTOR/DESIGNER/ eta?f3FTEX RP-':°] AIZY 74-980 RUNAWAYBAY DX BERMUDA DIMES CA 9 a 211 C/60)200cnsx < CS0 1420 'a"yD7:i.p 3 a A �r �ygg yy��gg �fsq y; ��gI':.��+ry�••p�y�,,qq .9ytipma '��.) com., of f„ C?3Y�r'1:.1�u't�°.�7.�x'� .L .b+�'[.LY1l.4J!'1 �Y= sR.7.Y'i7A.ft�i -7i It n00171?p. 1.01-000-418-000 53t3.fs0 5 M1 is r TA L "ES PRE -PAM RMS $0100 ,r. • � C 1 RECEIPT DATE f / BY DATE FINALED INSPECTOR INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck O.K. to Wrap CO_� �� C Exhaust Fans F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final ll� �� BLOCKWALL APPROVALS Final POOLS - SPAS Steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping " Gas Test Appliances Final COMMENTS: Final Utility Notice (Gas) f, ELECTRICAL APPROVALS T6mp. Power Pole _Underground Conduit ,Underground Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) 1%. C) I t Z, -12_� 5 ' �6 1�� CONTRACTORS STATE LICENSE # 636391 P.O. BOX 11257 Pam Desert CA 92255 760-200-0811 A proposal submitted to: ROBERT & NANCY ENGEL . Mailing Address:53580 RAMIREZ LA QUINTA, CA Job Address:SAME AS ABOVE Phone:564-7264 Description of Work to Be Performed: OBTAIN ALL REQUIRED CITY PERMITS. REMOVE EXISTING ROOF AND DISPOSE. NAIL ONE LAYER 40# TILE LINER. INSTALL NEW ROOF JACKS AROUND PENETRATIONS (H.V.A.C.& PLUMBING).. REPLACE ALL ROOF TO WALL SHEET METAL. INSTALL LIGHT WEIGHT ROOF TILE (U.S TILE- VALLEJO) TO MANUFACTURES SPECIFICATIONS. CLEAN ROOF AND GROUND AREAS. IF NOT ACCEPTED IN 30 DAYS THIS PROPOSAL IS NULL AND VOID Notes: In Keeping with Industry standards: 1. This guarantee does not cover any damage to the interior or exte- rior on which the roof is applied or damage to any contents therein. This guarantee does not cover damage to roof due to any cause beyond our control, including, but not limited to: fire, lightning, windstorm, hEilstorm, an- tefinas or other equipment, foot traffic on roof, structural fault or settlement, cracking or other failure of the roof dei k, walls or foundation of the building on which the roof is applied. 2. Should it become necessar- for the roof- ing contractor to remove and/or reinstall any antennas, cooling or heating appliances or other equipment, whether or not an additional charge is made for such work, the customer understands that neither Roof Tile Specialty nor the installer ass sponsibility for the performance of said equipment. 3. Roof Tile Specialro, does not ssume any 0 sibility corrections of existing code violations or for the repair of any existing defects un - le eci m estimate an proposal. Total t: $7,075.00 Te s paid on completion unless otherwise specified in the contract. If not acceptance in thirty d this proposal ' invalid. Extra $35.00 per sheet of plywood if needed. Acceptance: ereby authorized to furnish all contents written in the contract to complete work mentioned in the proposal contract for which Uwe agree to pay the amount mentioned, in said proposal, and according to terms thereof, . (Initial). If a leakage, caused by defects in workmanship, occurs within FIVE years from date of application, we will repair it free of charge. Installation: it is understood that by the acceptance of this proposal you authorize Roof Tile Specialty to make the installation; to issue work order with specifications shown herein and to pay our charge for such installation. You agree to pay the amount the specified herein, which will cover the price of said materials and labor charge. This estimate. is based on a complete job and any surplus material remains property of Roof Tile Specialty. Verbal understanding and agreements with representatives'shall not be binding unless set forth herein. There shall be no liabilities for delays in, or failure to complete, deliver or installation of aJI-9T any of the herein mentioned mer- chandise, if due to fire, strikes, war, government regulations, or any cause beyond our contract. Any changes made by you in specifications herein, necessitating additional materials or labor shall not be included or covered by this proposal, but shall be provided for under separate and additional order from you. ( Initial). Arbitration of disputes: Any controversy or claim arising out of or relating to this contract, or the breach thereof shall be settled by arbitrator in accordance with the applicable.Construction Industry Arbitrator Rules of the American Arbitration Association which are in effect at the time the demand for arbitration is filed. A judgement upon the award rendered by the arbitrator(s) maybe entered in court. having jurisdiction thereof. Any arbitration The award shall be subject to correction and/or vacation for the reasons stated in the code of civil Procedure. ar- bitration shall award reasonable attorneys fees and expenses to.the prevailing party. After being given due n tire, should any party fail to appear at or participate in the arbitrator proceedings, the arbitrator shall male an aw based upon the evidence presented by the party(ies) who do (does) appear and participate.- Notwithstanding Con -