Loading...
388041 (ELEC)6YILDING PERMIT PERMIT NO. DEPARTMENT OF BUILDING & SAFETY M;/j 38804-11 COUNTY OF RIVERSIDE FIELD CONSTRUCTION ESTIMATE NO. ELECTRICAL FEES Sewer Llistrict NO. PLUMBING FEES UNITS I HEREBY AGREE THAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN ACCORDANCE WITH IST FL. SQ. FT. @ 1Ff- F, (� O.5 2ND. FL. SQ. FT. @ HEREBY CERTIFY THAT THE INDIVIDUAL WHO PREPARED THE PLANS AND SPECIFICATIONS HAS DONE SO IN YARD SPKLR SYSTEM FOR. SQ. FT. @ MOBILEHOME SVC. a, F.C.C. BAR SINK GAR. SQ. FT. @ POWER OUTLET ROOF DRAINS CARR SQ. FT. @ Micro Film Fee DRAINAGE PIPING WALL SQ. FT. @ L Parcel No. � DRINKING FOUNTAIN SQ. FT. @ Ck. By Mech. Fee Obl b URINAL ESTIMATED CONSTRUCTION VALUATION $ Lot Size WATER PIPING NOTE: Not to be used as property tax valuation SWIM POOL, PVT F S FLOOR DRAIN MECHANICAL FEES SWIM POOL, COMM WATER SOFTENER VENT SYSTEM FAN EVAP. COOL HOOD SIGN Dbl $ WASHER (AUTO)(DISH) APPLIANCE DRYER Zone Restrictions Group GARBAGE DISPOSAL FURNACE UNIT WALL FLOOR SUSPENDED SMI Fee Ql.'i LAUNDRY TRAY AIR HANDLING UNIT CFM IDLE METE KITCHEN SINK ABSORPTION SYSTEM B.T.U. TEMP USE PERMIT SVC Bond Amt. $ WATER CLOSET COMPRESSOR HP POLE,TEMP/PERM Fina Date %Q r —'/Q LAVATORY HEATING SYSTEM FORCED GRAVITY AMPERES SERV ENT $ SHOWER BOILER B.T.U. SQ. FT. @ c BATH TUB Mileage Fee $ SQ. FT. @ c Witness fee $ WATER HEATER $ SQ. FT. RESID @1'/.c Tel. SEWAGE DISPOSAL SQ. FT. GAR @ 3%c HOUSE SEWER Total Fees GAS PIPING PERMIT FEE ' PERMIT FEE_gepo Zip PERMIT FEE DBL. TOTAL FEES MOB. HM. FEE MICRO FEE MECH. FEE Ilk. CK. FEE CONST. FEE ReC. FEE SMI FEE FEE PLUMB. FEE //00 LicenseN Trees require Sewage SystemY' gyp^• • Address City Zip PERMIT NO. Job Address Sewer Llistrict Space Zip Owner 38804 I HEREBY AGREE THAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN ACCORDANCE WITH r 1Ff- F, (� O.5 HEREBY CERTIFY THAT THE INDIVIDUAL WHO PREPARED THE PLANS AND SPECIFICATIONS HAS DONE SO IN Com unity ,.a Va..tion Date ' Dist. a, F.C.C. _ MH.Permit Fee b Micro Film Fee Cop $ Use of Permif Y L Parcel No. � se/Cosd No. Ck. By Mech. Fee Obl b PI. Ck. Fee $ S Bucks Lot Size Construction Fee Dbl $ Leg Description �j �E/ // �+/� 3 � F S S R Type Electrical Fee Dbl $ / r.��')•�.��'•� on Zone Restrictions Group SMI Fee $ Plumbing Fee Dbl $ Bond Amt. $ Plan No. Plan Checker Fina Date %Q r —'/Q Unit Sp. Insp. Fee $ Dental. Fee $ Const. Lender Branch Supplimentol Permit Numbers '" / (Ji✓"_'- /�i'J Registr. Fee $ Mileage Fee $ Address City Zip Witness fee $ Reinsp. Fee $ Owner/Agee-nt/. � Tel. Zip Total Fees $ Ad ess r �ti ' City - /) Zip off M.O. .C. Ccitiho Che Received by on rector Tee'.' LicenseN Trees require Sewage SystemY' gyp^• • Address City Zip T LL P THIS PERMIT SHALL BECOME VOID IF WORK IS NOT COMMENCED WITHIN 120 DAYS. CESSATION OF WORK Sewer Llistrict FOR 120 DAYS SHALL ALSO CAUSE PERMIT TO BECOME VOID. I HEREBY AGREE THAT ALL WORK IN CONNECTION WITH THIS PERMIT WILL BE DONE IN ACCORDANCE WITH THE LAWS OF RIVERSIDE COUNTY AND THE STATE OF CALIFORNIA. (� O.5 HEREBY CERTIFY THAT THE INDIVIDUAL WHO PREPARED THE PLANS AND SPECIFICATIONS HAS DONE SO IN ACCORDANCE WITH SECTION 5541 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE OF CALIFORNIA. 'Form 284-208 (Rev.B/78) P s _ verified by: IL w NO. OPERATION DATE INSPECTOR NO. OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS 1 Set Back 33 Ventilation System 2 Ftgs 8 Frms 34 Plenums 8 Ducts 2A Slab Grade 35 Furnace Comport. 3 Steel 36 Inlets 8 Outlets 4 Grout Blocks 37 Combustion Air 5 Bond Beams 38 Compressor 6 Roof Deck 39 Appl. Clearance 7 Framing 40 Fire Damper 8 Vents 41 Smoke Detection Device 9 Garage Fire Wall 42 Commercial Hood 10 Fireplace P. L. 43 Final IDA Fireplace T. 0. C] No I ADDITIONAL INFORMATION SEWAGE SYSTEM SIZE & LOCATION 11 Exterior Lath 12 Internal Lath 12A Drywall 13 Finish Grade INSULATION Thick R Value 7A Walls (Batts) 12B Ceiling (Batts) 12C Ceiling (Blown) 14 Final PLUMBING APPROVALS 15 Ground Plumb 16 Water Piping 17 Rough Plumb 18 Vents 19 Sewage Disposal 20 Sewer 21 Water Heater 22 Water Softener 23 Water Service 24 Gas Test 25 Final Tank Pit L.Line REAR OF PROPERTY LINE PSL P/ ELECTRICAL APPROVALS 26 Power Pole 27 Conduit 28 Service Entrance 29 Wiring 29A Grounding Wire 29B Bonding 30 Fixtures 31 Service 32 Final STREET NAME