Loading...
UntitledAUS -19-2004 THU 06:45 AM TEAM HEATING & A/C FAX N0, 9096943803 P. 12 HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 1 of z CF -611 Site Address: 79-866 Barcelona Drive Permit Number. Tract Number. 29323 Plan It 1 Phase= 4 Lot Number. 6 Project. Esplanade Builder. Comerstone Dev. An Installation certificate is required to be posted at the building site or made avallble tar all appropriate inspections. Atter completion ortina) inspection, a copy must be provldetl to the Building Department tupon request) and ttre building owner at occupancy, per Section 10-103(b). HVAC SYSTEMS: Heating Equipment Certified ame Identicle (AFUE, eco.) I Location DudLoad I Capacity Model Name systems I (>= CF -1 R) I (attic, etc.) R -value (BTU I Hr) (BTU / Hr —1--, ....... of Efficiency - Duct cooling Cooling quip. a Ile irame Identicle (SEER, etc.) Location Duct Load Capacity Type and Model Number Systems (�=CF-i R) (actio, etc.) R -value (BTU / Hr) (BTU / Hr) TV- US Air a c I, me underslgnea, very inat a Ipmenr urea above 16: 0 is Its euauni n4u'P"10WJL uiawucu, c) v4vivm6nl w ., ,,,v,v efficient than that specified in a rt' 1c to o compliance (Form CF -1 R) submitted for compliance with the Energy Efficiency Standards for resid ti ull n , a d 3 ipment that meets or exceeds the appropriate requirements for manufactured devices (from e A a Effi i ations or Part 6), where applicable. j• p Team Mechanical gna ure, Date ns Ing Subconfractor(Co. Name OR General Contractor (Co. Name) OR Owner ,MINIMUM REQUIREMENTS R DUCT LEAKAGE COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) - CFA: System r7l of Q Indicate them -ax -mum allowable Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 x 400 x (Cooling Capacity in Nominal Tons) x (0.06) fen flow 21.7 x (Heating Gap " cit In Thousands of Output BTU per hour) x (0.06) Measured Fan Flow x .O6 D-0 Pressurization Test Results 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or Less) Pass x I FaIll PT -24 Compliance Credit was Taken for TXV TXV was Installed m of Indicate them" a�mum a owa le Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through IS 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity in Nominal Tons) x (0.06) fan flow 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow I _I x.06 ME Pressurization Test Results FM (a 25 PA) 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or less) Pass1-2111 =T-24 Compliance Credit was Taken for TXV TXV was installed PAGE 1 F2001-01 (4-02) Action Now T-240F6-RTD&TXV macro All7 19-20G'4 7HU 06:45 AM TEAM HEATING & A/C FAX N0. 9096943803 P. 13 HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 2 of 2 CF -6R Site Address: 79-866 Barcelona Drive Permit Number: 0 Tract Number. 29323 Lot Number: 6 Plan #. 1 Phase: 4 Project Esplanade, . Builder. Cornerstone Dev. System E� of Indicate the maximum a owa le Duct Leakage and the calculation used: u 0.7 x Floor Area x (0.06) for Climate Zone 9 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 &'16 400 x (Cooling Capacity in Nominal Tons) x (0.06) 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0-06) Measured Fen Flow Mu Pressurization Test Results 100 x Test Leakage / Fan Flow = % Leakage Check Sox for Pass or Fail (Pass = 60/a or Less) �T-24 Com (lance Credit was Taken for TXV ys em of Indicate the maximum allowable Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 9 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity In Nominal Tons) x (0,06) 21.7 x (Heating Capaci in Thousands of Output BTU per hour) x (0,06) Measured Fan Flow Mu Pressurization Test Results 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fait (Pass = 6% or Less) T-24 Compliance Credit was Taken for TXV ys em Q of Indicate the mawmum &--219 le Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity in Nominal Tons) x (0.06) 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow ME Pressurization Test Results 100 x Test Leakage I Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or Less) T-24 Compliance Credit was Taken for TXV ys em 7 of Indicate the mawmum aowa le Duct Leakage and the calculation used: 0.7 x Floor Area x (0,06) for Climate Zone 8 through 15 0,5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity In Nominal Tons) x (0.06) 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow E-- — D`03 Pressurization Test Results FM P_ 25 100 x Test Leakage / Fan Flow = % leakage Check Sox for Pass or Fail (Pass c 6% or Less) =T-24 Compliance Credit was Taken for TXV X.08 X.06 TXV wai TXV was TXV wa: KVIrl Ir 1, the undersigned, verify that the above diagnostic test results and the work I performed associated with the test(s) is in conformance with the requlremen o ompliance credit, (The builder shall provide the HI=RS provider a copy of the CF -6R signed by the builder emplo 5 0 o rs ing that diagnostic testing and Installation meet the requirements for compliance credit Team Mechanical eT s�Igna ure, a,- V Installing Subcontractor o, Name Performed OR General Contractor (Co. Name) OR Owner COPY TO: Building Department HERS Provider (If applicable) Building Owner at Occupancy PAGE 2 F2001-01 (4-02) Aetlon Now T-24CF8-R70&TX1/ macro