UntitledAUS -19-2004 THU 06:45 AM TEAM HEATING & A/C FAX N0, 9096943803 P. 12
HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 1 of z CF -611
Site Address: 79-866 Barcelona Drive Permit Number.
Tract Number. 29323 Plan It 1 Phase= 4
Lot Number. 6 Project. Esplanade Builder. Comerstone Dev.
An Installation certificate is required to be posted at the building site or made avallble tar all appropriate inspections.
Atter completion ortina) inspection, a copy must be provldetl to the Building Department tupon request) and ttre building
owner at occupancy, per Section 10-103(b).
HVAC SYSTEMS:
Heating Equipment
Certified ame Identicle (AFUE, eco.) I Location DudLoad I Capacity
Model Name systems I (>= CF -1 R) I (attic, etc.) R -value (BTU I Hr) (BTU / Hr
—1--, .......
of Efficiency - Duct cooling Cooling
quip. a Ile irame Identicle (SEER, etc.) Location Duct Load Capacity
Type and Model Number Systems (�=CF-i R) (actio, etc.) R -value (BTU / Hr) (BTU / Hr)
TV- US Air a c
I, me underslgnea, very inat a Ipmenr urea above 16: 0 is Its euauni n4u'P"10WJL uiawucu, c) v4vivm6nl w ., ,,,v,v
efficient than that specified in a rt' 1c to o compliance (Form CF -1 R) submitted for compliance with the Energy
Efficiency Standards for resid ti ull n , a d 3 ipment that meets or exceeds the appropriate requirements for
manufactured devices (from e A a Effi i ations or Part 6), where applicable.
j• p Team Mechanical
gna ure, Date ns Ing Subconfractor(Co. Name
OR General Contractor (Co. Name) OR Owner
,MINIMUM REQUIREMENTS R DUCT LEAKAGE COMPLIANCE CREDIT
Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) -
CFA:
System r7l of Q
Indicate them -ax -mum allowable Duct Leakage and the calculation used:
0.7 x Floor Area x (0.06) for Climate Zone 8 through 15
0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16
x 400 x (Cooling Capacity in Nominal Tons) x (0.06) fen flow
21.7 x (Heating Gap
"
cit In Thousands of Output BTU per hour) x (0.06)
Measured Fan Flow x .O6
D-0 Pressurization Test Results
100 x Test Leakage / Fan Flow = % Leakage
Check Box for Pass or Fail (Pass = 6% or Less) Pass x I FaIll
PT -24 Compliance Credit was Taken for TXV TXV was Installed
m of
Indicate them" a�mum a owa le Duct Leakage and the calculation used:
0.7 x Floor Area x (0.06) for Climate Zone 8 through IS
0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16
400 x (Cooling Capacity in Nominal Tons) x (0.06) fan flow
21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06)
Measured Fan Flow I _I x.06
ME Pressurization Test Results FM (a 25 PA)
100 x Test Leakage / Fan Flow = % Leakage
Check Box for Pass or Fail (Pass = 6% or less) Pass1-2111
=T-24 Compliance Credit was Taken for TXV TXV was installed
PAGE 1
F2001-01 (4-02) Action Now T-240F6-RTD&TXV macro
All7 19-20G'4 7HU 06:45 AM TEAM HEATING & A/C FAX N0. 9096943803
P. 13
HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 2 of 2 CF -6R
Site Address: 79-866 Barcelona Drive Permit Number: 0
Tract Number. 29323
Lot Number: 6
Plan #. 1 Phase: 4
Project Esplanade, . Builder. Cornerstone Dev.
System E� of
Indicate the maximum a owa le Duct Leakage and the calculation used:
u
0.7 x Floor Area x (0.06) for Climate Zone 9 through 15
0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 &'16
400 x (Cooling Capacity in Nominal Tons) x (0.06)
21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0-06)
Measured Fen Flow
Mu Pressurization Test Results
100 x Test Leakage / Fan Flow = % Leakage
Check Sox for Pass or Fail (Pass = 60/a or Less)
�T-24 Com (lance Credit was Taken for TXV
ys em of
Indicate the maximum allowable Duct Leakage and the calculation used:
0.7 x Floor Area x (0.06) for Climate Zone 9 through 15
0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16
400 x (Cooling Capacity In Nominal Tons) x (0,06)
21.7 x (Heating Capaci in Thousands of Output BTU per hour) x (0,06)
Measured Fan Flow
Mu Pressurization Test Results
100 x Test Leakage / Fan Flow = % Leakage
Check Box for Pass or Fait (Pass = 6% or Less)
T-24 Compliance Credit was Taken for TXV
ys em Q of
Indicate the mawmum &--219 le Duct Leakage and the calculation used:
0.7 x Floor Area x (0.06) for Climate Zone 8 through 15
0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16
400 x (Cooling Capacity in Nominal Tons) x (0.06)
21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06)
Measured Fan Flow
ME Pressurization Test Results
100 x Test Leakage I Fan Flow = % Leakage
Check Box for Pass or Fail (Pass = 6% or Less)
T-24 Compliance Credit was Taken for TXV
ys em 7 of
Indicate the mawmum aowa le Duct Leakage and the calculation used:
0.7 x Floor Area x (0,06) for Climate Zone 8 through 15
0,5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16
400 x (Cooling Capacity In Nominal Tons) x (0.06)
21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06)
Measured Fan Flow E-- —
D`03 Pressurization Test Results FM P_ 25
100 x Test Leakage / Fan Flow = % leakage
Check Sox for Pass or Fail (Pass c 6% or Less)
=T-24 Compliance Credit was Taken for TXV
X.08
X.06
TXV wai
TXV was
TXV wa:
KVIrl Ir
1, the undersigned, verify that the above diagnostic test results and the work I performed associated with the test(s) is
in conformance with the requlremen o ompliance credit, (The builder shall provide the HI=RS provider a copy of the
CF -6R signed by the builder emplo 5 0 o rs ing that diagnostic testing and Installation meet the
requirements for compliance credit
Team Mechanical
eT s�Igna ure, a,- V Installing Subcontractor o, Name
Performed OR General Contractor (Co. Name) OR Owner
COPY TO: Building Department
HERS Provider (If applicable)
Building Owner at Occupancy
PAGE 2
F2001-01 (4-02) Aetlon Now T-24CF8-R70&TX1/ macro