Loading...
04-8310 (SFD)9&4 4.4- a" BUILDING & SAFETY DEPARTMENT P.O. Box 1504 (760).777-7012 78-495 CALLE TAMPICO FAX (760) 777-7011 LA QUINTA, CALIFORNIA 92253 INSPECTION REQUESTS (760) 777-7153 Application Number Property Address APN: Application description Property Zoning . . . . Application valuation . BUILDING PERMIT. . . . \04-00008310` Date 3/22/05 79929 BARCELONA DR 609-380-999-57 -293234- . . . DWELLING - SINGLE FAMILY DETACHED . . . LOW DENSITY RESIDENTIAL . 130681 Owner ------=----------------- LENNAR HOMES OF CALIFORNIA 78401 HIGHW l�STE LA QUINTA,} d LA QUINTA 922 ArK 011005 Contractor ------------------------ LENNAR HOMES OF CALIFORNIA INC 78401 HIGHWAY 111, SUITE.0 LA QUINTA CA 92253 JI WCC: AON RISK SRVC WC: MWC11114500 11/01/05 CITY OF LA QUINTA FINANCE DEPT. CSLB: 728102 09/30/06 CCC: B -------------------------- Structure Information -------------------------- Construction Type.. . . . . TYPE V - NON RATED Occupancy Type . . . . . . DWELLG/LODGING/CONG <=10 Flood Zone . . . . . . . . NON -AO FLOOD ZONE Other struct info . . . . . CODE EDITION 2001 CRC # BEDROOMS 4.00 FIRE SPRINKLERS NO GARAGE SQ FTG 447.00 -'PATIO SQ FTG 45.00 NUMBER OF UNITS 1.00 1ST FLOOR SQUARE FOOTAGE 2121.00 ---------------------------------------------------------a--------------------- Permit . . . . . . BUILDING PERMIT Additional desc Permit Fee 748.00 Plan Check Fee 486.20 Issue Date . . . . Valuation . . . . 130681 Qty Unit Charge Per Extension BASE FEE 639.50 31.00 3.5000 THOU BLDG 100,001-500,000 108.50 ---------------------------------------------------------------------------- Permit . . . . . . ELEC-NEW RESIDENTIAL Additional desc Permit Fee . . . . 98.18 Plan Check Fee 24.55 Issue Date . . . Valuation . . . . 0 Qty Unit Charge Per Extension BASE FEE 15.00 2121.00 .0350 ELEC NEWRE•S '-,l OR 2 FAMILY 74.24 447.00 .0200 ELEC GARAGE OR NON-RESIDENTIAL 8.94 P.O. Box 1504�� VOICE (760) 777-7012 Tilf 78-495 CALLS TAMPICO FAX (760) 777-7011 LA QUINTA, CALIFORNIA 92253 INSPECTIONS (760) 777-7153 BUILDING & SAFETY DEPARTMENT Application Number: O �-- J3/D Applicant: Applicant's Mailing Address: &)NTle,4 C170 tf Date: �3'31.OS Archite Engineer: W,,�y Architect or Engineer's Address: Lic. No.: BUILDING PERMIT DECLARATIONS LICENSED CONTRACTOR'S DECLARATION .I h reby affirm underMalty of perjury that I am licensed under provision f Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals de, and my License i ' ull force and effect. License Class / License No. VV ate Contractor v 61 OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).): U I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself or through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). U 1, as owner of the property,, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). U I am exempt under Sec. , BA P.C. for this reason Date WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and ill maintain workers' compensation insure e, as required by Section 3700 o the Labor Code, for the performance of the work for which this permit is A jou d. My workers' compensation insurance car'61M r j�¢tppljGl(ny$r ��I (( .Carrier �VU PolicyNumb;?" umb r I( Y PW � i \(((JJJIIIJJJ V _ I certify that, in the performance of the work for which this permit is issued, I shall rote ploy any person in any manner so as to become subject to the workers' compensation laws of Califomia, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall 2 forthwith comply with those provisions. LI/late 1 Applicant WARNIN : FAILURE TO SECURE WORKE S' OMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUS D DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name Lt 44 r/, Lender's Address APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall, defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building �coonnstruction, and hereby authorize representatives of thi count to enter upon the above-mentioned property for inspection purposes. r'Date /Signature (Applicant or Agen y Page 2 Application Number . . . . . 04-00008310 Date 3/22/05 ---------------------------------------------------------------------------- Permit . . . GRADING PERMIT Additional desc Permit Fee . . . . 15.00 Plan Check Fee ..00 Issue Date Valuation . . . . 0 Qty Unit Charge Per Extension BASE FEE 15.00 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL Additional desc . . Permit Fee . . . . 39.50 Plan Check Fee 9.88 Issue Date . . . . Valuation . . . . 0 Qty Unit Charge Per Extension BASE FEE 15.00 1.00 9.0000 EA MECH FURNACE <=100K 9.00 1.00 9.0000 EA MECH B/C <=3HP/100K BTU 9.00 1.00 6.5000 EA MECH EXHAUST HOOD 6.50 -------------7------------------7------------------------------------------- Permit . . . . . . PLUMBING Additional desc Permit Fee . . . . 152.25 Plan Check Fee 38.06 Issue Date . . . . Valuation . . . . 0. Qty Unit Charge Per Extension BASE FEE 15.00 14.00 6.0000 EA PLB FIXTURE 84.00 1.00 15.0000. EA PLB BUILDING SEWER 15.00 1.00 7.5000 EA PLB WATER HEATER/VENT 7.50 1.00 3.0000 EA PLB WATER INST/ALT/REP 3.00 1.00 9.0000 EA PLB LAWN SPRINKLER SYSTEM 9.00 5.00 .7500 EA PLB GAS PIPE >=5 3.75 1.00 15.0000 EA PLB GAS METER 15.00. ---------------------------------------------------------------------------- Special Notes and Comments SFD - LOT 57. PLAN 3, 2121 SF. PERMIT DOES NOT INCLUDE BLOCK WALL, POOL, SPA OR DRIVEWAY APPROACH. ----------------------------------------------------------------------------' Other Fees . . . . . . . . . ART IN PUBLIC PLACES -RES .00 DIF COMMUNITY CENTERS -RES 97.00 DIF CIVIC CENTER - RES 366.00 ENERGY REVIEW FEE 48.62 DIF FIRE PROTECTION -RES 97.00 GRADING PLAN CHECK FEE ..00 Page 3 Application Number . . . . . 04.-00008310 Date 3/22/05 ------------------------------------- Other Fees . . . . -------------------------------------- DIF LIBRARIES - RES 225.00 DIF PARK MAINT FAC - RES 5.00 DIF PARKS/REC - RES 502.00 STRONG MOTION (SMI) - RES 13.06 DIF STREET MAINT FAC -RES 15.00 DIF TRANSPORTATION,- RES 1098.00 Fee summary Charged Paid Credited Due Permit Fee Total 10*52.93' .00 .00 1052.93 Plan Check Total 558:69 .00 .00 558.69 Other Fee Total 2466.'68 .00 .00 2466.68 Grand Total 4078.30 .00 .00 4078.30 SEP 21,2005 16:55 BCI*TESTING,ril 000-000-00000 Page 13 r - CaICERTS Certified Rating September, 27 2005 This Compliance rating is for the home located at: 799,9 Barcelona Drive �La Qulnta CA, 92253 - Certificate Number: CC3-1798350699 Date Inspected: September, 27 2005 1 A Ca1C ER,i S Rater: William .l Icnson R Value U I Factor CC2004076 l HERS Analyst: N/A Builder/Developer: Lennar Homes T Project: Tapestry @ Fsplanade s_ Plan Name: Plan 3 Lot Number: 057 - 12 Specifics about this home: General Deformation Conditioned Floor Area: 2121 Square Feet Conditioned Volume: 0 Cubic Feet Front Orientation: N/A. Number of Stories: 1 Healing and ('ooling Systems Healing Equipment: Fumace: 0.8 Cooling equipment: AC_ 12 MAC Air M.virihulion Duct Location: Attic Duct Leakage Target: 6.0 Duct Insulation R -Value: 4.2 Air Infillralion Blower Door Target: 120.0 Water lleaiin g S Siem Pro a ved TY I Size I Fuel I EF I Distribution Waler Hl:alin r S stem Aclual TY I Size I Fuel I EF I Distribution Building I ;'nvelope Surface Area Proposed Actual K U Value Factor R Value U I Factor Windows Orientation ArcaSHGC Posed Actual ll Value SHGC U Value F-1TESTM . 0ZJ7R0VW M PART OF SAMME QIWUP FIM BGI TESTING AooRIM: Ti 780 COMM CIM oMF- eUITE I PALM OST, CA. VM1 ceRtfr.M 5011 ATURE DATE 7e.vfing IL'esylltl Associated to Group 1/10107 71c cncrgy clliciuncy rating ur tbis hums is dulurmioud fixing Califumia Ilumc pncrgy Rating 3yxlcm (C-IIP.RS) ndcx. The rating conxidarx healing, aunling and walur hualing and axxumw awragu wunt6T, UiuimumUt stAtings, and yunnliliw of but watuT for atypical household. Actual --gy usu will vary; ul:ording to uccupanl hchaviim Thix Rating Curnpldiun Summary in pnwidcd nnly allor the ruaturus lixlud havu hucir vurirtud and alrpmved by the CAWT RTS Ckrlificd Rater xhuwn slave. IF ynu haw a umnuum ur cumplamt nogardiny, this nqmrl of lhu servieux uxud in obtaining it, yrm may cmntaw • CACERTS - t.'uetOnla SEP 27,2005 16:55. BCI*TESTING,ril 000-000-00000 610ERTS Certified Rating . September, 27 2005 This Compliance rating is for the home located at: 79929 Barcelona Drive La Quinta CA, 92253 Certificate Number: CC3-1798350699 it U Value I Factor Date Inspected: September, 27 2005 11 Value CalCERTS Rater: William ]-Jenson ice' CC2004076 HERS Analyst: N/A R Builder/Developer: Lennar Homes L. Project: Tapestry @ esplanade Plan Name: Plan 3 s_ Lot Number: 057 - phu v-. I --L_ Specifics about this home: General Infurmation Conditioned Floor Area: 2121 Sgtuarc Feet Conditioned Volume: U Cubic Feet Front Orientation: N/A. Number of Stories: l Heating and Cooling, yslems .Heating Equipment: Fur lace: 0.8 Cooling Equipment: AC: 12 HVAC Air Disiribution Duct Location: Duct leakage 'Target: Duct I»sulation R -Value: Air Infillrawn Blower Door Target: Attic 6,0 4.2 Kudding l r n velope Surface Area Proposed Actual it U Value I Factor R Value U Factor Windows Orientation Arca Proposed I Actual SHGC 11 Value SHGC 11 Value QTesn:n 120.0 �APPRIYVW AS PART CF LAN KE ar&W FIM' BCI TESTING Water Hewing, S stem Pro x sed TY I Size Fuel I EF Distribution Water Hearin ►,S stem Aclual TY I Size I Fuel I EF Distribution AMRS": n 7W COUNTRY coos DMM SWE tI PAI Al MEWT, C& Vwl CStnFYM=MATURE CIATE besting Reswitr Associated to Group 1110107 j 71w imurgy clricicncy rating, athis home is dutuminud -.rime C:alifumia Ilumc P.nugy Ratiny, Syslcm (t` IIf?iIS) rutcx. Thr, rating, coruidars heating, auilinb and wahx "-ling and asaumuy avuraKu wwtlitr, duamuatat su"nyx, and yuantiliu of hul wOLT, fin a typical huuauhotd. Aultut LnLrgy uau will vary awarding hr uccupanl hehaviar. This Rating ('umplulion Summary, is provided imly aNT, lhu f -tains tidal have hwr vurifimd and approved by the Cal(TWI} C.," illcd Ralar shown above. Iryou have a utmuum or oumplaini rugardine, this rupial orthu zwvicux uxed in obtaining it, you may ennlau• r;1lCERTS - 61stuma Page 13 SEP -23-2005 FRI 07;09 AM TEAM HEATING & A/C FAX N0, 9516943803 P. 22 HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 1 of . CF -6R ■wr, , , wi ■n■ nwr Site Address: 79-929 Barcelona Drive, La Quinta, Ca 92253 Permit Number. Tract Number: 29323 Plan #: 3 Phase: 12 Lot Number: 57 Project Esplanade Builder Lennar Homes An installation certificate is required to be posted at the building site or made avalible for all appropriate inspections. Atter completion of final Inspection, a copy must be provided to the Building Department (upon request) and the puilding owner at occupancy, per Sectlon 10-103(b). HVAC SYSTEMS: Heating Equipment e ienc u Heating Heating Equip. a ame Id#notlfcAFUE, eta) Location Duct Load Capacity and Model Name Systel— CF -1R) (attic, etc.) R -value BTU / Hr) (BTU / Hr) Bryant ---a3r0-- Gooung Equipment of Efficiency Duct Cooling cooling quip. CEC Certifledr Name Identicle (SEER, etc.) Location Duct Load Capacity e and Model Number Systems (>=CF -1R) (attic, etc) 11 -value (BTU / Hr) (BTU I Hr) Bryant —501—C e un erslgne , veft thatequipment is e a ove Is: s Ine actual equipment ins e , equivalent o or more efficient than that specified in theat of complian Form CF -1 R) submitted for compliance with the Energy Efficiency Standards for residential II In s a ip ant that meats or exceeds the appropriate requirements for manufactured devices (from the Iia rre ftcie eg ons or a 6f, re applicable, -�j Team Heating & Air, Inc signature, Date Installing 5uticwtractorNoma OR General Contractor (Co. Name) OR Owner MINIMUM REQUIREME�FORTEAKAGE COMPLIANCE= CREDIT . duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) CFA; System Ei� of r i Indicate the maximum a wab le Duct Leakage and the calculation used; 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 x 400 x (Cooling Capacity In Nominal Tons) x (0.06) 21.7 x (Heating Capacity In Thousands of Output BTU per_hour) x (0,06) { Measured Fan Flow D—uff Pressurizatlon Test Resu { 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or Less) WT -24 Compliance Credit was Taken for TXV 1 ys em of Rowe � i Indicate the maximum aRIs Duct Leakage and the calculation used: i 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0,06) for Climate Zones 1 through 7 & 16 i 400 x (Cooling Capacity in Nominal Tons) x (O.W) 21.7 x (Heating Capaclty in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow D—Qff Pressurization Test Results 100 x Test Leakage / Fan Flow = °/a Leakage Check Box for Pass or Fail (Pass = 6% or Less) MT -24 Compliance Credit was Taken for TXV X.06 TXV was TXV wet PAGE 1 F2001-01 (4-02) Action Now T-24CF6-RTD&TXV macro SEP -23-2005 FRI 07:10 OM TEAM HEATING &'A/C FAX N0, 9516943803 P. 23 HVAC INSTALLATION CEE41FICATE for Tested Duct Leakage $ TXV Page 2 of CF -6R Site Address: 79-929 Barcelona Drive, La Quinta, 'Ca 92253 Permit Number: 0 Tract Number: 29323 Plan #: 3 Phase: 12 Lot Number: 57 Project: Esplanade . Builder: I-ennar Homes System`0axi of Indicate them—ax7mum aowa is Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 6 through 15 0.5 x Floor Area x (0.06) for Climate Zones t through 7 & 16 400 x (Cooling Capacity in Nominal Tons) x (0.06) 21,7 x (Heating Capacity in Thousands of Output BTU ear hour) x (0,06) Measured Fan Flow DUE Pressurization Test ReSU i 100 x Test Leakage / Fan Flow= % Leakage Check Box for Pass or Fail (Pass = 6% or Less) �T-24 Com Ilanee Credit was Taken for TXV ys em of owa Indicate the maximum a le Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0,06) for Climate Zones 1 through 7. & 16 400 x (Cooling Capacity in Nominal Tons) x (0.06) 21.7 x (Heating Capacity In Thousands of output BTU per hour) x (0.06) Measured Fan Flow DUO Pressurization Test Resu 100 x Test Leakage / Fan Flow a DA Leakage Check Box for Pass or Fail (Pass = 6% or Less) �24ys e Compliance Credit was Taken for TXV mof Indicate the In um avowable Dud Leakage and the calculation used: 0.7 x Floor Area x (0,06) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Gaoling capacity in Nominal Tons) x (0.06) 21.7 x (Heating Capacity in Thousands of Output BTU, per hour) x (0.06) Measured Fan,Flow F11— I iMuff Pressurization Test Results 100 x Test Leakage / Fan Flow = % Leakage I Check Box for Pass or Fail (Pass = 6% or Less) SPT -24 Compliance Credit was Taken for TXV ys em � of Indicate the maximum a owa le Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0,116) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity In Nominal Tons) x (0.06) 21.7 x (Heating Capacity In Thousands of Output BTU per hour) x (0.06) Measured Fan Flow u Pressurization Test Resu ' 100 x Test Leakage / Fan Flow = % Leakage 1 Check Box far Pass or Fall (Pass = 6% or Lass) QT -24 Compliance Credit was Taken for TXV X.08 X .06 X.06 TXV. was TXV wa: TXV war TXV war :I, the undersigned, verify that the a bovp4jagnostle test results and the work 1 performed associated with the test(s) is in conformance with the requiremen for liance Itbuilder shall provide the HERS provider a copy of the CF -6R signed by the builder employ s or u n certl Ing that diagnostic testing and Installation meet the :requirements for compliance credit-) i �. Z� Team Heating & Alr, Inc es rg—nature, InstallingSubcontractor Name Performed OR`General Contractor (Co. Name) OR Owner :COPY TO: Building Department HERS Provider (If applicable) Building Owner at Occupancy PAGE 2 F2001.01 (402) Action Now T-24CF6-RTD&TXV macro T U) V) N M m 0 00 v M M LD tv U) U z N 0 U z 0 H Cr J Z N �7 0 E 0 X N V) m N M rll i Q_ W U) Certificate of Insulation Your Home has been insulated with,CertainTeed Fiberglass Insulation products, which are designed for today's safety standards and tomorrox%?s energy requirements. Fiberglass is inorganic and.therefore permanently noncombustible, so it does not have to be treated with fire -retardant chernicals that will likely lose their effectiveness over time. lt.has not been treated .with chemicals that can corrode ~tiring or metal. Fiberglass will not absorb moisture.nor will it' settle overtime as may other insulation materials. This also ceitifies that CerrainTeed Fiber Glass Insulation has been professiorially installed in this home to provide the following thermal performance: Job Name: Tapestry Q Esplanade Tract: 29323 Phase: 12 Lot #: _ {� Plan: 4YA Bldg. #: _ Address: 79-913 Barcelona Drives La Quintan CA _ _ Attic Area: R-38 Sloan --- -- --- --- Bedroom Option: nee Walls: --------------- Overhangs- Exterior Walls- R 13 Unfaced Batts CantiteveredFloors: Garage Ceiling: _ Party'Walls: Title 2.4 Caulking Included {Exterior Doors, Windows and sill plates} Subcontractor- OJ Insulation Co., Inc. 600 S. Vinmat, A2u a 91702 (026)$12-6030 Lteen se #465709 Signed Conclaita Ortiz, SecretarylTreasurer —or—.R. Scott Jenkins, President -=or -- Lou Merola, Director of Operations Officer R- means resistance to heat flow. The higher the .R= value, the greater the insulating power. Ask your builder for the.. fact sheet on R= values. Keep this certificate with your other. valued paper,. If you ever sell this home, this certificate should` be passed on to the buyer, ' SEP -23-2005 FRI 07;09 AM TEAM HEATING & A/C FAX N0, 9516943803 P. 22 HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 1 of 2. . CF -6R Tract Number: 29323. F Plan #: 3 Phase: 12 Lot Number: 57 ; Project Esplanade Builder. Lennar Homes An installation certificate Is required to be posted at the building site or made avalible for all appropriate inspections. After completion of final Inspection, a copy must be provided to the kluilding pepartittent (upon`raquaso and the builalng owner at occupancy, per sermon 10-103(6). HVAC SYSTEMS: Heating Equipment — o Efficiency u ea ng ea ng Equip. a Name Identicle (AFUE, eta) Location putt Load Capacity and Model Name Systems. (>= CF -:1 R) ettio, etc.) R -value BTU/ H Bryant (BTU / Hr) i Cooling Equipment #.Of Efficiency ' Duct Cooling. Cooling Equip, C&L; COMI'l6d Mtr Name Idendole. (SEER, etc.) Location Duct Load Capacity e and Model Number Systems (?=CF -1 R) (attic, etc.) R -value (BTU / Hr) (BTU / Hr) n a isMIX , ,, u,ri 4.4u,a�Id11V M1 YVllly IIIWL VyY1rII11G111 I,.71Gy gYVY91O. 1'J 10 {I.10 [IIYIYQI 0{'u1F/Il1011l'III.7{41i�1fJ QCiW IYiIIGfIL lW Wr jTlWffi efficient than that specified in theGe t of complian Form CF -1f) submitted for compliance with the Energy Efficiency Standards for residential II In s a ip nt that meets or exceeds ft appropriate requirements for manufactured devices (from the Iia ce fide eg ns or art re; applikble. Team Heating & Air; Inc Signature, Date Insralli g u con rName OR General. Contractor -(Co. Name) OR Owner MINIMUM REQUIREMENTS FOR T LEAKAGE COMPLIANCE CREDIT Duct Diagnostic leakage Testing Results (Maxlm* urn 6% Duct Leakage) CFA; System I—i1 of 1—iI Indicate the -max 'mum a wa le Duct Leakage and the calculation used; 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for Climate zones 1 through'7 & 16 x. 400 x (Cooling Capacity In. Nominal Tons) x (0.06) fan flow 21.7 x (Heating Capacity In Thousands of Output BTU r.hour) x (0,06) Measured Fan Flow I X.05 D_uff Pressurization Test Results PAT - 100 x Test Leakage / Fan Flow T % Leakage Check Box for Pass or Fail -Mass = 6% or Less) . Pass x ai I WT-24 Com liance Credit was Taken for TXV TXV was Inste x m of i Indicate the maramum allowable Duct Leakage and the calculation used: E0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x FloorArea x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity in Nominal Tons) x (0.06) fan flow 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow X'06 u Pressurization Test Resume 100 x Test Leakage /Fan Flow - OA Leakage i Check Box for Pass or Fall (Pass = 6% or Less) Passi. Fall I[=T-24 Compliance Credit was Taken for TXV TXV was installed PAGE 1 F2001-0144-02) Action .Ww T-24CF6 . TD&TXV macro ' SEP -23-2005 FRI 0710 kM TEAM.HEATING & A/C FAX N0. 9516943803 HVAC INSTALLATION CER IFICATE for Tested Site Address: 79-929 Sart lana Drive, La Quihta, Tract Number. 29323 Lot Number. 57 P. 23 $ TXV Pace 2 of 2 . Plan #: 3 Phase: 12 Project: Esplanade.. Builder. Lennar Homes Systemof Indicate the maxlrnum aowa le Duct Leakage and the calculation used: 0.7 x Floor Area x (0.08) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for -Climate Zones 1 through 7 & 16 400 x (Cooling Capacity In Nominal Tons) x (0.08) 21.7 x (Heating Capacity in Thousands of Output BTU Eer hour) x (0.06) Measured Fan Flow !DORF Pressurization Test Results i 100 x Test Leakage / Fan Flow = % Leakage , . Check Box for Pass or Fsil (Pass = 6%or Less) ," .: iT 24 Com llama Credit was Taken for TXV ys em of Indicate the maximum aGable Duct Leakage. and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.6,x Floor Area x (0.06) for Climate Zones 1 through 7 &.16 400 x (Cooling Capacity in Nominal Tons) x (0.06) 21.7 x (Heating Capacity In Thousands of Output BTU per hour) x (0.06) Measured Fan'Flow u ressuriization Test Results 5 j 100 x Test Leakage / Fan Flow = °% Leakage Check Box for Pass or Fail (Pass = 6% or Less) I �T;24 Compliance Credit was Taken for TXV ys em of . i Indicate the maximum a'ilowabie Duct Leakage and the calculation used,- 0.7 sed:0.7 x Floor Area x (0.08) for Climate Zone 8 through 15 0.5 x Floor -Area z (0.06) for Climate Zones' -1 through 7 & 16 I .400 x (Cooling Capacity In Nominal Tons) x (0.06) 21.7 x (Heating Capacity in Thousands of Output aTU_ per hour) x(0.06) Measured Fan Flow L-� D_uff Pressurization Test Results (17191,(8 25 PA) 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass c 6% or Less) SPT -24 Compliance Credit was Taken for TXV i ys em = of' Indicate the maximum 161=111a Duct Leakage and the calculation used: FE0.7 x Floor Area. x (0,06) for Climate Zone 8 through 15 0.5 x Floor Area'x (0,06) for Climate Zones 1 through 7 & 16 , 400 x (Cooling Capacity In Nominal Tons) x (0.06) 21.7 x (Heating Capacity in Thousands of Output STU per hour) x.(0.06) Measured Fan Flow u Pressurization Test Resu 100 x Test Leakage / Fan Flow = % Leakage I Check Box for Pass or Fall (Pass = 6°/a or Less) =.T-24 Compliance Credit was Taken.1br TXV . X.05 X.08 X.08 TXV. wa P TXV was TXV was TXV wei I, the undersigned, verify that the abo . iagnostlo test results and the work I performed associated with the tests) Is in conformance with the requlrernen for fiance k builder shall provide the'HEIRS provider a ropy of the !CF -6R signed by the builder employ s or u n certl ng that diagnostic testing and Installation rrteet the requirements for compliance credit.) . �.. Z� Team Heating & Air, Inc i es igna um,, installingsubcontractor Name Performed OR --General Contractor (Co. Name) OR Owner 'COPY TO: Building Department HERS Provider (If applicable) Building Owner at Occupancy PAGE 2 F2001.01 (402) Adtlon Now T-24CF6-RTD&TXV a 44 • 2 Bin. # ,•; j IG Permit # Project Address: A. P. Number. Legal Description: Contractor. Address: 74-.-3 2,f City, ST, Zip: 1 Telephone:rLl f`� State Lic. #: Arch, Bngr., Designer J Address: City of La Quinta Building 8r Safety Division P.O. Box 1504,78-495 Caffe Tampiclo La.Qnlnta, CA 92253 -:(760) 777-7012 Building Permit Application and Tracking Sheet L Owner's Name:. Address: City, ST, Zip:i G,-lv/4 CSIrV - elephone: PJ! lJf 2e-5 Project Description: Lic. #, City., ST, Zip: Telephone: �q�2- ; Construction Type:. Occupancy: State Lic. #:: � � `� �, w 7�� Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person: lie �c'd7 'ic D Sq• Ft.: # Stories: # Units: Telephone # of Contact Person: 7c",q . Z 6 7- Estimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE # Sobmittal Req'd Recd TRACENG J PERMrr FEES Plan Sets Plan Check submitted 1 - item Amount Structural Cales. Reviewed, ready forte lsSVF- Plan Check Deposit. . Taus Calcs. Called Contact Person Plan Check Balance Title 24 Calcs. Plans picked up Construction Flood plain plan Plans resubmitted.. MechaliiCal Grading plan 2'j Review, ready for correctiousfissue Electrical Subcoatactor I. st Called Contact Person Plumbing Grant Deed Plans picked up S.M.L H.O.A. Approval Plans resubmitted Grading IN HOUSE:- '"' Review; ready for corrections/issue Developer Impact Fee Planning Approval. Called Contact Person A.LP.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees Page 1 of 1 Esplanade c/o Desert Resort Management, Inc. Palm Desert, CA 92211 Customer Care: 760-346-1161 Fax: 760-346-9918 Website: wNvw.drm.internet.com Date: November 19, 2014 Project Ref: [34158377] 79929 Barcelona Dr Tadros Real Estate Holdings 79605 Cortez Lane La Quinta CA 92253 Dear Tadros Real Estate Holdings, I am pleased to inform you that the Esplanade Architectural Committee has approved your application for the listed project item(s): Pool & Spa with rear yard landscaping. The approval is contingent upon compliance with the specifications set forth in the approved application. If your change or addition requires a county, city or state permit, it is the responsibility of the homeowner to obtain this before starting construction. Please retain this letter in your files. If you have any questions regarding this matter, please contact Customer Care at 760-346-1161 or e-mail us at. Sincerely, Esplanade ***ESTE DOCUMENTO ES MUY IMPORTANTE. SI USTED NO PUEDE LEER INGLES, POR FAVOR CONSIGA A ALGUIEN PARA QUE LE TRADUZCA ESTE DOCUMENTO*** httn-//www hnnnrr. rom/Arr.C'.nmmnnRecrnirce.R/Docnment.,;/ProiectDocuments/94/h5719... 11/19/2014 NO'l 2 q 2014 CiN Or LA QUINTA COMMUNITY DEVELOPMENT ISTED EQUIPMENT INCORPORATING AN APPROVED SYSTEM FO DOUBLE INSULA i IUiN lb Nu i rcLQuii\L-u jkj _ DUMPS MOTORS. WHERE A DOUBLE—INSULATED WATER—PUMP MOTOR IS INSTALLED, A SOLID 8 AWG COPPER CONDUCTOR FROM THE DED FOR A REPLACEMENT MOTOR. 9L WATER HEATERS SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH EQUIPMENT INSTRUCTIONS. 1D EQUIPMENT. METAL—SHEATHED CABLES AND RACEWAYS; METAL PIPING, AND ALL FIXED METALS PARTS SHALL BE BONDED TO THE \RATE FROM THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUNB STRUCTURE BY A PERMANENT BARRIER. -D MORE THAN 5 FT HORIZONTALLY OF THE INSIDE WALLS OF THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB STRUCTURE. aTED MORE THAN 12 FT MEASURED VERTICALLY ABOVE .THE MAXIMUM WATER LEVEL. ;ONDUCTIVE SURFACE AREA OF 9 SQ. IN, SHALL BE INSTALLED IN CONTACT WITH, THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB R BIND IS PERMITTED TO CONSIST OF METAL PARTS THAT ARE BONDED IN 680.26(B). ment Wall CITY OF LA QUINTA - ... -. i� BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION• / A gw 031 ,�y�yp�;,v �,j���,�,�='.�j �vj��_ �ii�iir���,�aja3�I��:�a,'�3�i�♦��A�►� i i-A,'i�.' ,�,i k.I % `+t i i 00.1- .0; b+y,gs �,.y �,�,� 1. i `,,i,�i,�, �,i�@,��,i bey,-„��'31�yi ��,, iy ,i r+,yy3y��,iZy,� ,,�� S,�,i � ,,� ��,,,•����i ��� �.y� , ,• �3,• �i' ��i� 01 .COZZI .Z�,`i�.Z�::,�,�Z �rt -------------------------- ------------- �. 79921 _Spa Raised +18"% Gray Color Concrete Couping Stack Stone Spillway 8A*C41-01VA DA \5'- 0" Set Back From Property Wall to Edge of Couping 0MC06 W ed 11'- 0” Set Back From Property Wall t Edge of Couping �13 GENERAL NOTES VI. 7 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH STANDARD PLANS OF THE CITY OF LA QUINTA MANDATOR) THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION, AND THE 114(A): At RIVERSIDE COUNTY STANDARD PLANS. EFFICIENCY MOUNTED C 2. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/OWNER OR CONTRACTOR TO APPLY TO OPERATING THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT FOR THE NECESSARY PERMITS AND TO BE 114(B)1: f RESPONSIBLE FOR SATISFACTORY COMPLIANCE WITH ALL CURRENT ENVIRONMENTAL REGULATIONS PIPE BETWE DURING THE LIFE OF CONSTRUCTION ACTIVITIES FOR THIS PROJECT. ADDITIONAL STUDIES AND/OR CONNECTIO1 PERMITS MAY BE REQUIRED. 114(8)2: c COVER. 3. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER OF CONTRACTOR TO APPLY TO THE 114(B)3: P, CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) FOR AN ENCROACHMENT PERMIT FOR TIME SWiTC ALL WORK PERFORMED WITHIN THE STATE RIGHT OF WAY. OFF—PEAK RE 115(P4. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AS REQUIRED BY THE CITY OF LA QUINTA OR PIPING, FIL OTHER GOVERNING AGENCIES. , SECTION 1 5. THE CONTRACTOR SHALL NOTIFY THE CITY PUBLIC WORKS DEPARTMENT 48 HOURS PRIOR TO CERTIFICATI INSTALLED ANY GRADING, BRUSHING OR CLEARING AND EACH PHASE OF CONSTRUCTION AND 48 HOURS PRIOR OF THE FO TO REQUIRING INSPECTIONS. A: EFFICIEP 6. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY REGULATIOt ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE B: ON—OFF COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH HEATER TH AND MIGHT BE OCCASIONED BY THIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL C: INSTRU( UTILITIES. GIVES INST 7. APPROVED TEMPORARY SANITARY FACILITIES (I.E. CHEMICAL TOILETS SHALL BE ON THE FOR THE F D: ELECTRI CONSTRUCTION SITE PRIOR TO REQUEST FOR FIRST INSPECTION). (HEALTH AND SAFETY CODE, EXCEPAND TION SECTION 5416). ON TH EXCEPTION 8. CONTRACTOR AND/OR OWNER SHALL PROVIDE A TRASH BIN TO INSURE PROPER CLEAN—UP OF ANNUAL HIE. ALL BUILDING MATERIALS. (ORDINANCE OF THE CITY OF LA QUINTA MUNICIPAL CODE) BE INSTALL MAINTAINED IN A CLEAR CONDITION AT ALL TIMES. FOLLOWING 1. PIPING. 9. STORAGE OF BUILDING MATERIALS OR DEBRIS SHALL BE CONFINED TO THE LOT FOR WHICH THE HEATER Of PERMIT IS ISSUED. ADJACENT VACANT PROPERTIES MAY NOT BE UTILIZED FOR THIS PURPOSE SHALL BE UNLESS WRITTEN PERMISSION OF THE OWNER IS ON FILE WITH THIS OFFICE. THE PUBLIC RIGHT OF 2. COVERS WAY SHALL BE MAINTAINED IN A CLEAR CONDITION AT ALL TIMES. PUMP OR DIRECTION/ CONSTRUCTION HOURS: POOL: OCTOBER 1ST TO APRIL 30TH: MONDAY — FRIDAY 7:OOAM TO 5:30PM A.THE POC SATURDAY 8:OOAM TO 5:OOPM B. A TIME SUNDAY NOT ALLOWED WATER CIF TO RUN 0 MAY 1ST TO SEPTEMBER 30TH: MONDAY — FRIDAY 6:OOAM TO 7:OOPM NECESSAR SATURDAY 8:OOAM TO 5:OOPM STANDARD SUNDAY NOT ALLOWED 2008 LOW GOVERNMENT CODE HOLIDAYS NOT ALLOWED EQUIPMEN- VIOLATION OF THE ABOVE WORK HOURS IS A CITABLE OFFENSE UNDER THE CITY OF LA QUINTA ANY RESIE MUNICIPAL CODE REQUIREME WORK SHALL BE PROHIBITED ANY TIME ON SUNDAYS OR ON FEDERAL HOLIDAYS. THE CITY PUMP SIZI RESERVES THE RIGHT TO APPLY FURTHER TIME RESTRICTIONS AS NEEDED TO WORK OCCURRING ON I. ALL PUD ARTERIAL AND COLLECTOR STREETS DURING HIGH TRAFFIC VOLUME HOURS. CERTIFIED II. ALL PU II CODE DESCRIPTION: EQUATION: H=C X F2 BUILDING CODE: 2010 C.B.C. (2010 CRC/2009 IRC) FFISRTHEH MECHANICAL CODE: 2010 C.M.C. (2009 UMC) C 1S A CC PLUMBING CODE: 2010 C.P.C. (2009 UPC) 0.0167 FC 0.0082 FC ELECTRICAL CODE: 2010 C.E.C. (2008 N.E.C.) . III FILTRAI ENERGY CODE: 2010 ENERGY STANDARDS THE FILTR WATER VC III POOL SHELL VESSEL CONSRUCTION IV. PUMP MULTI—SP NOTE: ANY STRUCTURAL NOT INCLUDED IN THE "BOILER PLATE" ENGINEERING V. EACH , SHALL BE SHEET MUST BE SPECIFICALLY ADDRESSED BY THE ENGINEER/ARCHITECT OF THAN 1HF RECORD. VI. MULTf- WHEN NO IV ELECTRICAL PLUMBING -AND MECHANICAL SETTING il � REQUIREMENTS A�ENG 1. SHALL BE 1. ALL OUTLETS SUPPLIED BY SINGLE-PHASE, UITS FOR 15A AND 20A, 125V OR 240V BRANCH CIRC II. POOL F SWIMMING POOL. PUMP MOTORS ARE REQUIRED TO HAVE GFCI PROTECTION. IT SHOULD BE NOTED THAT AUXILIAR) 680.22(8) APPLIES TO THESE OUTLETS REGARDLESS OF THEIR PROXIMITY TO THE SWIMMING POOL AND PER . SECC THAT IT APPLIES TO CORD-AND-PLUG CONNECTED AND DIRECT CONNECTED (HARD-WIRED) SWIMMING III. ALL EI POOLS PUMP MOTORS. (CALIFORNIA ELECTRICAL CODE 680.22(B)) THAT THE 2. THE EQUIPOTENTIAL BONDING GRID SHALL EXTEND UNDER PAVED OR UNPAVED SURFACE FOR 3 FEET IV. 'FILTER HORIZONTALLY BEYOND THE INSIDE WALLS OF THE POOL. SPECIFIC THE METHOD TO BE UTILIZED PER INTENDED CALIFORNIA ELECTRICAL CODE 680.26(13);,(2). ALL METAL-SHEATED CABLES AND RACEWAYS, METAL V. VALVE' PIPING, AND ALL FIXED METAL PARTS THAT ARE WITHIN THE FOLLOWING DISTANCE OF THE POOL, THE RETL EXCEPT THOSE SEPARATED FROM THE POOL BY A' PERMANENT BARRIER, SHALL BE BONDED. A. WITHIN 5 FEET HORIZONTALLY OF THfi3INSIDE WALLS OF THE POOL. B. WITHIN 12 FEET. MEASURED VERTICAL'L'(; ABOVE THE MAXIMUM WATER LEVEL OF TEH POOL, OR ANY VII .�� r Nllkir nrnn:onc cTr ;�'';.' . 680.26 EQUIPOTENTIAL BONDING THE BONDING RULES FOR REDUCING VOLTAGE GRADIENTS AROUND PERMANENTLY INSTALLED POOLS, OUTDOOR SPAS, OR OUTDOOR HOT TUBS ARE CHANGED AGAIN. HERS'S A SUMMARY OF THE ENTIRE SECTION. (A) PERFORMANCE. EQUIPOTENTIAL BONDING IS INTENDED TO REDUCE VOLTAGE GRADIENTS IN THE AREA AROUND PERMANENTLY INSTALLED POOLS, OUTDOOR SPAS, OR OUTDOOR HOT TUBS BY THE USE OF A COMMON BONDING GRID IN ACCORDANCE WITH 680.26(8) AND (C). (B) BONDED PARTS. THE PARTS OF A PERMANENTLY INSTALLED POOL, OUTDOOR SPA, OUTDOOR HOT TUB IN (B)(1) SHALL BE BONDED TOGETHER WITH A SOLID COPPER CONDUCTOR NOT SMALLER THAN 8AWG WITH LISTED PRESSURE CONNECTORS, TERMINALS BARS, EXOTHERMIC WELDING, OR OTHER LISTED MEANS [250.8(A)]. EQUIPOTENTIAL BONDING IS NOT REQUIRED TO EXTEND TO OR BE ATTACHED TO ANY PANEL BOARD, SERVICE EQUIPMENT, OR GROUNDING ELECTRODE. (1) CONDUCTIVE POOL, OUTDOOR SPA, AND OUTDOOR HOT TUB SHELLS. (A) STRUCTURAL REINFORCING STEEL. UN -ENCAPSULATED STRUCTURAL REINFORCING STEEL SECURED TOGETHER BY STEEL TIE WIRES IS CONSIDERED BONDED. (2) PERIMETER SURFACES. AN EQUIPOTENTIAL BONDING GRID SHALL EXTEND 3 FT HORIZONTALLY BEYOND THE INSIDE WALLS OF A POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB, INCLUDING UNPAVED, PAVED, AND POURED CONCRETE SURFACES. THE BONDING GRID. SHALL COMPLY WITH (A) OR (B) AND BE ATTACHED TO 'THE CONDUCTIVE POOL REINFORCING STEEL AT A MINIMUM OF FOUR POINTS UNIFORMLY SPACED AROUND THE PERIMETER OF THE WALLS OS A POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB. (A) STRUCTURAL REINFORCING STEEL, STRUCTURAL REINFORCING STEEL [680.26(B)(1)(A)]. (B) ALTERNATE MEANS. EQUIPOTENTIAL BONDING CONDUCTOR MEETING THE FOLLOWING: (1) 8 AWG BARE SOLID COPPER BONDING CONDUCTOR. (2) THE BONDING CONDUCTOR SHALL FOLLOW THE CONTOUR OF THE PERIMETER SURFACE. (3) LISTED SPLICING DEVICES. (4) BONDING CONDUCTOR SHALL BE 18-24 INCHES FROM THE INSIDE WALLS OF THE POOL. (5) BONDING CONDUCTOR SHALL BE SECURED WITHIN OR OR UNDER THE PERIMETER SURFACE 4 TO 6 INCHES BELOW THE SUBGRADE (3) METALLIC COMPONENTS. METALLIC PARTS OF THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB STRUCTURE SHALL BE BONDED TO THE EQUIPPOTENTIAL GRID. (4) UNDERWATER METAL FORMING SHELLS. METAL FORMING SHELLS 'AND MOUNTING BRACKETS FOR LUMINAIRES AND SPEAKERS SHALL BE BONDED TO THE EQUIPOTENTIAL GRID. r (5) METAL FITTINGS. METAL FITTINGS SIZED 4 INCHES AND LARGER THAT PENETRATE INTO THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB STRUCTURE, SUCH AS A LADDERS AND HANDRAILS SHALL BE BONDED TO THE EQUIPOTENTIAL GRID. (6) ELECTRICAL EQUIPMENT. METAL PARTS OF ELECTRICAL EQUIPMENT ASSOCIATED WITH THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB WATER CIRCULATING SYSTEM, SUCH AS WATER HEATERS, PUMP MOTORS, AND METAL PARS• OF POOL COVERS SHALL BE BONDED TO THE EQUIPOTENTIAL GRID. EXCEPTION: METAL PARTS OF LISTED EQUIPMENT INCORPORATING AN APPROVED SYSTEM FO DOUBLE INSULATION IS NOT REQUIRED TO BE BONDED TO THE EQUIPOTENTIAL GRID. (A) DOBLE-INSULATED WATER PUMPS MOTORS. WHERE A DOUBLE -INSULATED WATER -PUMP MOTOR IS INSTALLED, A SOLID 8 AWG COPPER CONDUCTOR FROM THE BONDING GRID SHALL BE PROVIDED FOR A REPLACEMENT MOTOR. (B) POOL WATER HEATERS. POOL WATER HEATERS SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH EQUIPMENT INSTRUCTIONS. (7) METAL WIRING METHODS AND EQUIPMENT. METAL -SHEATHED CABLES AND RACEWAYS, METAL PIPING, AND ALL FIXED METALS PARTS SHALL BE BONDED TO THE EQUIPOTENTIAL GRID. EXCEPTION NO. 1: WHERE SEPARATE FROM THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUNB STRUCTURE BY A PERMANENT BARRIER. EXEPTION NO. 2: WHERE LOCATED MORE THAN 5 FT HORIZONTALLY OF THE INSIDE WALLS OF THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB STRUCTURE. EXCEPTION NO. 3: WHERE LOCATED MORE THAN 12 FT MEASURED VERTICALLY ABOVE THE MAXIMUM WATER LEVEL. (C) POOL WATER. A MINIMUM CONDUCTIVE SURFACE AREA OF 9 SQ. IN. SHALL BE INSTALLED IN CONTACT WITH THE POOL, OUTDOOR SPA, OR OUTDOOR HOT TUB STRUCTURE WATER. THIS WATER BIND IS PERMITTED TO CONSIST OF METAL PARTS THAT ARE BONDED IN 680.26(8). r'�c hAntar W U Z W 0 55 w M N U C4, 4 VI. TITLE 24 -ENERGY REQUIREMENTS f MANDATORY MEASURES (MF -1k) POOL AND SPA HEATING SYSTEMS AND EQUIPMENT: 114(A): ANY POOL OF SPA HEATING SYSTEM SHALL BE CERTIFIED TO HAVE: A THERMAL EFFICIENCY THAT COMPLIES WITH THE APPLIANCE EFFICIENCY REGULATIONS; AN ON-OFF SWITCH MOUNTED OUTSIDE OF THE HEATER; A PERMANENT WEATHERPROOF PLATE OF CARD WITH OPERATING INSTRUCTION; AND SHALL NOT USE ELECTRIC RESISTANCE HEATING OR A PILOT LIGHT. 114(8)1: ANY POOL OR SPA HEATING EQUIPMENT SHALL BE INSTALLED WITH AT LEAST 36" OF PIPE BETWEEN FILTER AND HEATER, OR DEDICATED SUCTION AND RETURN LINES, OR BUIT-UP CONNECTIONS FOR FUTURE SOLAR HEATING. 114(B)2: OUTDOOR POOLS OR SPAS THAT HAVE A HEAT PUMP OR GAS HEATER SHALL HAVE A COVER. 114(8)3: POOLS SHALL HAVE DIRECTIONAL INLETS THAT ADEQUATELY MIX THE POOL WATER, AND A TIME SWITCH THAT WILL ALLOW ALL PUMPS TO BE SET OR PROGRAMMED TO RUN ONLY DURING OFF-PEAK ELECTRIC DEMAND PERIODS. 115(P) RESIDENTIAL POOLS SYSTEMS OR EQUIPMENT MUST MEET THE PUMP SIZING, FLOW RATE, PIPING, FILTERS, AND CALVE REQUIREMENTS OF 150(P). SECTION 114-MANDTORY REQUIREMENTS FOR POOL AND SPA SYSTEMS AND EQUIPMENT: CERTIFICATION BY MANUFACTURERS. ANY POOL OR SPA HEATING SYSTEM OR EQUIPMENT MAY BE INSTALLED ONLY IF THE MANUFACTURER HAS VERIFIED THAT THE SYSTEM OR EQUIPMENT HAS ALL OF THE FOLLOWING: A: EFFICIENCY. A THERMAL EFFICIENCY THAT COMPLIES WITH THE APPLIANCE EFFICIENCY REGULATIONS; AND B: ON-OFF SWITCH. A READILY ACCESSIBLE ON-OFF SWITCH, MOUNTED ON THE OUTSIDE OF THE HEATER THAT ALLOWS SHUTTING OFF THE HEATER WITHOUT ADJUSTING THE THERMOSTAT SETTING; AND C: INSTRUCTIONS A PERMANENT, EASILY READABLE, AND WEATHERPROOF PLATE OR CARD THAT GIVES INSTRUCTIONS FOR THE ENERGY EFFICIENT OPERATION OF THE POOL OR SPA HEATER AND FOR THE PROPER CARE OF POOL OR SPA WATER WHEN A COVER IS USED; AND . D: ELECTRIC RESISTANCE HEATING. NO ELECTRIC RESISTANCE HEATING; AND EXCEPTION 1 TO SECTION 114(A)4: LISTED PACKAGE UNITS WITH FULLY INSULATED ENCLOSURES, AND WITH TIGHT FITTING COVERS THAT ARE INSULATED TO AT LEAST R-6. EXCEPTION 2 TO SECTION 114(A)4: POOLS OR SPAS DERIVING AT LEAST 60 PERCENT OF THE ANNUAL HEATING ENERGY FROM SITE SOLAR ENERGY OR RECOVERED ENERGY. .E. INSTALLATION. ANY POOL OR SPA SYSTEM OR EQUIPMENT SHALL BE INSTALLED WITH ALL OF THE FOLLOWING: 1. PIPING. AT LEAST 36 INCHES OF PIPE SHALL BE INSTALLED BETWEEN THE FILTER AND THE HEATER OR DEDICATED SUCTION AND RETURN LINES, OR BUILT-IN OR BUILT-UP CONNECTIONS SHALL BE INSTALLED TO ALLOW FOR THE FUTURE ADDITION OF SOLAR HEATING EQUIPMENT; AND' 2. COVERS. A COVER IS REQUIRED FOR OUTDOOR POOLS OR OUTDOOR SPAS THAT HAVE A HEAT PUMP OR GAS HEATER. SPECIFY TYPE ON THE PLAN. DIRECTIONAL INLETS AND TIME SWITCHES FOR POOLS. IF THE SYSTEMS OR EQUIPMENT IS FOR A POOL: A.THE POOL SHALL HAVE DIRECTIONAL INLETS THAT ADEQUATELY MIX THE POOL WATER; AND B. A TIME SWITCH OR SIMILAR CONTROL MECHANISM SHALL BE INSTALLED AS PART OF THE POOL WATER CIRCULATION CONTROL SYSTEM THAT WILL ALLOW ALL PUMPS TO BE SET OR PROGRAMMED TO RUN ONLY DURING THE OFF PEAK ELECTRIC DEMAND PERIOD, AND FOR THE MINIMUM TIME NECESSARY TO MAINTAIN THE WATER IN THE CONDITION REQUIRED BY APPLICABLE PUBLIC HEALTH STANDARDS. 2008 LOW-RISE RESIDENTIAL MANDATORY FEATURES AND DEVICES POOL AND SPA SYSTEMS AND EQUIPMENT INSTALLATION: ANY RESIDENTIAL POOL SYSTEM OR EQUIPMENT INSTALLED SHALL COMPLY WITH THE APPLICABLE REQUIREMENTS OF SECTION 114, AS WELL AS THE REQUIREMENTS LISTED IN THIS SECTION. PUMP SIZING AND FLOW RATE. I. ALL PUMPS AND PUMP MOTORS INSTALLED SHALL BE LISTED IN THE.COMMISSION'S DIRECTORY OF CERTIFIED 11. ALL PUMP FLOW RATES SHALL BE CALCULATED & NOTED USING THE FOLLOWING SYSTEM EQUATION: H=C X F2 WHERE: H IS THE TOTAL SYSTEM HEAD IN FEET OF WATER. F IS THE FLOW RATE IN GALLONS PER MINUTE (GPM). C IS A COEFFICIENT BASED ON THE VOLUME OF THE POOL: 0.0167 FOR POOLS LESS THAN .OR EQUAL TO 17,000 GALLONS OR 0.0082 FOR POOLS GREATER THAN 17,000 GALLONS. III FILTRATION PUMPS SHALL BE SIZED, OR IF PROGRAMMABLE, SHALL BE PROGRAMMED, SO THAT THE FILTRATION FLOW RATE IS NOT GREATER THAN THE RATE NEEDED TO TURN OVER THE POOL WATER VOLUME IN 6 HOURS OR 36 GPM, WHICHEVER IS GRETER; AND IV. PUMP MOTORS USED FOR FILTRATION WITH A CAPACITY OF 1HP OR MORE SHALL BE MULTI -SPEED; AND V. EACH AUXILIARY POOL LOAD SHALL BE SERVED BY EITHER SEPARATE PUMPS OR THE SYSTEM SHALL BE SERVED BY A MULI-SPEED PUMP; AND EXCEPTION TO SECTION 150(P)1E: PUMPS IF LESS THAN 1HP MAY BE SINGLE SPEED. VI. MULTI -SPEED PUMPS SHALL HAVE CONTROLS WHICH DEFAULT TO THE FILTRATION FLOW RATE WHEN NO AUXILIARY POOL LOADS ARE OPERATING; AND VII. FOR MULTI -SPEED PUMPS, THE CONTROLS SHALL DEFAULT TO THE FILTRATION FLOW FLOW RATE SETTING WITHIN 24 HOURS AND SHALL HAVE AN OVERRIDE CAPABILITY FOR SERVICING. 2. SYSTEM PIPING. 1. A LENGTH OF STRAIGHT PIPE THAT IS GREATER THAN OR EQUAL TO A LEAST 4 PIPE DIAMETERS SHALL BE INSTALLED BEFORE THE PUMP; AND 11. POOL PIPING SHALL BE SIZED SO THAT THE VELOCITY OF THE WATER AT MAXIMUM FLOW FOR AUXILIARY POOL LOADS DOES NOT EXCEED 8 FEET PER SECOND IN THE RETURN LINE AND 6 FEET PER SECOND IN THE SUCTION LINE; AND III. ALL ELBOWS SHALL -BE SWEEP ELBOWS OR ELBOW -TYPE THAT HAS A PRESSURE DROP OF LESS THAT THE PRES-SURE DROP OF STRAIGHT PIPE WITH' A LENGTH OF 30 PIPE DIAMETERS. IV. FILTERS. FILTERS SHALL BE AT LEAST THE SIZE SPECIFIED IN NSF/ANSI 50 FOR PUBLIC POOL INTENDED APPLICATIONS: V. VALVES. MINIMUM DIAMETERS OR BACKWASH VALVES SHALL BE 2 INCHES OR THE DIAMERER OF THE RETURN PIPE_WHICHEVER WHICHEVER IS GREATER. VII. POOL SHELL )VESSEL) CONSTRUCTION m