Loading...
0107-124 (BLCK)I� (V Cl) W O M W r o Z (Do ! INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE 7 INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K.to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final POOLS - SPAS BLOCKWALL APPROVALS Std Set Backs Footings Bond Beam -��j- o ( S T n Q � Z 07 ���� Electric Bond Main Drain Approval to Cover Equipment Location Underground Electric t / Final �` OZ/ PLUMBING APPROVALS Underground Plbg. Test Gas Piping Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final COMMENTS: Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm)