11-1093 (SOL)P.O. BOX 1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
Tjbf 4 -4 Q"
BUILDING & SAFETY DEPARTMENT
BUILDING PERMIT
VOICE (760) 777-7012
FAX (760) 777-7011
INSPECTIONS (760) 777-7153
Date: 11/17/11
Application Number: 11-00001093 - Owner:
Property Address: 54038 AVENIDA BERMUDAS OWEN ROBERT J
APN: 774-225-018-4 -000000-. 54038 AVENIDA BERMUDAS
Application description: SOLAR LA QUINTA, CA 92253 ID
Q
Property Zoning: COVE RESIDENTIAL
Application valuation: 95680
g :
Contractor: 6.� aid ` 2011, (�
Applicant: Architect or Engineer: HOT PURPLE INC _
870 RESEARCH DRIVE; #6 Ci'!'XO l..AOUil TA
PALM SPRINGS, CA 92262 0r -p -r
(760)322-4432
�I/� LiC. No.: 940550
------------------------------'-------------------------------------------------------------------
LICENSED CONTRACTOR'S DECLARATION WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with I hereby affirm under penalty of perjury one of the following declarations:
Section 7000) of Division 3 of the Busin and Professionals Cod and my License is in full force and effect. _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided
Licens ss: -C46 Licens 940550 for by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issu
ed.
ate: ntractor: _ I. have and will maintain workers' compensation. insurance, as required by Section 3700 of the Labor
I U I I .Code, for the performance of the work for which this permit is issued. My workers' compensation
OWNER -BUILDER DECLARATIO insurance carrier and policy number are: -
I hereby aXTpenalty of perjury that I am exempt from the Contractor's State License Law for the Carrier STATE FUND Policy Number 2380013903
following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to _ I certify that, in the performance of the work for which this permit is issued, I shall not employ any
construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the person in.any manner so as to become subject to the workers' compensation laws of California, .
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State and agre5th
ifIshoal ecome subject to the workers' compensation provisions of Section
License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or 3700 of abor C , I comply ose provisions.
that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by
any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: ta: plicant:
(_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and
the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The WARM G: FAILURE TO SECURE WORKERS' COMPENSATION OVERAGE IS U AWFUL, AND SHALL
Contractors' State License Law does not apply to an owner of property who builds or improves thereon, SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND
and who does the work himself or herself through his or her own employees, provided that the DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
improvements are not intended or offered for sale. If, however, the building or improvement is sold within SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
one year of completion, the owner -builder will have the burden of proving that he or she did not build or
improve for the purpose of sale.).
1 _ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.
7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of
property who builds or improves thereon, and who contracts for the projects with a contractoi(s) licensed
pursuant to the Contractors' State License Law.).
(_) I am exempt under Sec. , BAP.C. for this reason
Date- . Owner:
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the
work for which this permit is issued (Sec. 3097, Civ. C.).
Lender's Name:
Lender's Address:
LQPERMIT
APPLICANT ACKNOWLEDGEMENT
IMPORTANT Application is hereby made to the Director -of Building and Safety for a permit subject to the
conditions and restrictions set forth on this application.
1. Each person upon whose behalf this application is made, each person at whose request and for '
whose benefit work is performed under or pursuant to any permit issued as a result of this application,
the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City
of La Quinta, its officers, agents and employees for any act or omission related to the work being
performed under or following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is not commenced
within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject
permit to cancellation.
I certify that I have read this application and state that the above information is correct. I agree to comply with all
city and county dinances and state laws relating t i 'ng construction, and hereby authorize representatives
of this cp ty to enter upon above-mentioned pr art for i ett0tl'pe�poses
gnature (Applicant or Agent):
Application Number . . . . . 11-00001093
Permit . . . ELEC-MISCELLANEOUS INV FEE
Additional desc . .
Permit Fee . . . . 60.00 Plan Check Fee 7.50
Issue Date . . . . Valuation . . . . 0
Expiration Date . . 5/15/12
Qty Unit Charge Per Extension
BASE FEE 30.00
1.00 30.0000 EA ELEC PWR APP >10 TO <=50 30.00
----------------------------------------------------------------------------
Permit . . . SOLAR PERMIT INV FEE
Additional desc .
Permit Fee . . . . 63.00 Plan Check Fee 7.88
Issue Date . . . . Valuation . . . . 95680
Expiration Date . . . 5/15/12
Qty Unit Charge Per
Extension
BASE FEE
30.00
. 1.00 15.0000 EA SOLAR COLLECTOR
1,001-2000
15.00
3.00 6.0000 EA SOLAR EQUIP MISCELLANEOUS
18.00
------------'----------------------------------------------------------------
Special Notes and Comments
22.8kW SOLAR ARRAY - (95) 240W SUNPOWER
PANELS W/ (3) FRONIUS.INVERTERS - (2)
6.0-1 & (1) 10.0 [1,615SF) THIS PERMIT
DOES NOT INCLUDE 400 AMP SERVICE PANEL
UPGRADE REQUIRED FOR SYSTEM APPROVAL.
***INVESTIGATION FEE ASSESSED PER 2010
CALIFORNIA RESIDENTIAL CODE CHAPTER 1
§108.6 FOR WORK COMMENCING BEFORE PERMIT
ISSUANCE*** 2010 CALIFORNIA BUILDING
CODES.
November 16, 2011 7:45:28 AM AORTEGA
--
------------------------------------------------------------
Other Fees . . . . . .. . . . BLDG STDS ADMIN (SB1473)
--------------
4.00
Fee summary Charged Paid
-------------------------------------
Credited
--------------------
Due
Permit Fee Total 123.00 .00
.00
123.00
Plan Check Total 15.38 .00
.00
15.38
Other Fee Total 4.00 .00
.00
4.00
Grand Total 142.38 .00
.00
142.38
LQPERMIT
P.O.TWY
Box 1504
LA QUINTA, CALIFORNIA 92247-1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
BUILDING & SAFETY DEPARTMENT
RESIDENTIAL PLAN CHECK CORRECTION LIST (SOLAR)
DATE: OCTOBER 14, 2011.
STATUS: FIRST REVIEW
(PLANiCHECI b Be' . EY T19G * ' k`
ITEL_ fiON> �1U_Thft: (�'7 WIP-7418'
(760) 777'7012
FAX (760) 77777011
ADDRESS: 54-038 AVENIDA BERMUDAS
DESCRIPTION: PV SOLAR SYSTEM
r' �:-APPLYCA�NT:a ROBrR'i'=O-WET4
F-hWeiffiCK #: 11-1093
r
This submittal has been checked for compliance with the 2010 California Residential, Mechanical, Electrical,
Plumbing, Energy, and Green Building Codes, and the City of La Quinta Municipal Code.
APPLICANT:
The following items are being returned to you for
correction:
1- SOLAR (REDLINED) PLAN
2- UNMARKED PLAN SET
3- SPECIFICATION SHEETS
1- CORRECTION LIST
BUILDING DEPARTMENT STAFF:
DO NOT accept any resubmittal unless ALL of the
following items are included: ,
1- SOLAR (REDLINED) PLAN
1- CORRECTION LIST w/responses
2- REVISED PLAN SETS
1- ASSESSORS SITENLOOR PLAN
INSTRUCTIONS TO APPLICANT:
1) Provide a written response to each comment on the following pages, noting specifically where the correction
can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not
acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses
such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check.
2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or
Calculations as necessary.
3) Return all red -marked Plans and/or Calculations with your resubmittal.
4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number
and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents
prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and
Professions Code Section 5536. Resubmittals will not be accepted with signatures missing.
5) Return this list; your written responses, and all documents listed above with your resubmittal.
Residential Plan Check Correction List (SOLAR) Page 1 of 3
SECTION A -.GENERAL
Provide Assessor's Parcel Number (APN) and a Complete Legal Description on the first sheet of Plans.
Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and
telephone number and wet -signature. If the preparer is a licensed architect or engineer, all documents
prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and
Professions Code'5536. Resubmittals will not be accepted with signatures missing.
3) A building or other structure served shall be supplied by only one service., (CEC §230.2) Multiple meters not
allowed, revise drawings for single service only. ,,I'
l Wrl
"Am O&W TD ?too V
SECTION B -SOLAR 0 '
I. General
P
econcile noted information shown on single line diagram. See 1S' review redlined plan. Please provide a
response for each item, either on returned redlined plan or in letter.
H. Circuit Requirements
del)eIn a do photovoltaic source circuit or output circuit, the maximum photovoltaic system voltage for that circuit
shall be calculated as the sum of the rated open -circuit voltage of the series -connected photovoltaic modules
corrected for the lowest expected ambient temperature. (CEC §690.7) The size of conductor specified on
plan is not being shown as corrected per factors in Table 690.7. (31 to 23 Degrees —1.12) Please provide
conductor sizing schedule showing all NEC adjustment factors.
?The Circuit conductors and Overcurrent devices shall be sized to carry not less than 125% of the maximum
L currents as calculated in 690.8(A). (CEC §690.8(B)1) Please see above correction for required information
to be shown on plan.
M. Disconnecting Means
Means shall be provided to disconnect all current -carrying conductors of a photovoltaic power source from all
other conductors in a building or other structure. (CEC §690.13) provide AC Disconnect per 690.17 -
Disconnect shall be readily accessible, externally operable, plainly indicating whether open or closed
and rating sufficient for the nominal circuit voltage and current.
IV. Wiring Methods
W( I All PV system wiring must be made using one of the specific instal lation/materials methods included in the
C� All
§690.31, Chapter 3) Run locations not specified on single line diagram, please show locations on
site plan or specify on single line diagram. Add de -rating and adjustment factors to wiring and conduit
/schedule — Conduit Fill/Conduit Location/Temperature.
'j Where direct current photovoltaic source or output circuits of a utility -interactive inverter from a building -
integrated system are run inside a building, they shall be contained in metallic raceways or enclosures. (CEC
§690.31 (E)). Adjust accordingly.
3 Where the number of current -carrying conductors in a raceway exceed three (3) the allowable ampacity of
each conductor shall be reduced as shown in Table 310.15(B)(2)(a). (CEC §310.15(B)(2)) Adjust
accordingly.
Residential Plan Check Correction List (SOLAR) Page 2 of 3
City of La Quinta
4, Conduits. exposed to sunlight on rooftops, where conductors or cables are installed, the. adjustments shown -in
Table 310.15(B)(2)(c) shall be added to the outdoor temperature to determine the applicable ambient
temperature for application of the correction factors in Table 310.16. (CEC §310.15(B)(2)(c)) Adjust
conductor sizes accordingly.
5t'C� �t 'ytw�. uw�,�ri '" �r -r tt�b Ce��O►�n'LS Ol►.PDertfd � ��
V. Grounding
E)Grounding information not shown on plans. System grounding, Equipment grounding, Equipment bonding
nd Array grounding shall be designed and specified on plan per California Electrical Code Article 690, Part
V. Fully specify all required information and design on plans.
&AKecify
a size for do grounding electrode conductor per CEC §250.166, 690.41. Conductor not shown.
VI. Marking, Connection to Other Sources, Storage Batteries and Systems Over 600 Volts
I Provide schedule with the location of all required markings and labels for the proposed photovoltaic system.
CEC §690) Please update signage sheet per 2010 California Electrical Code requirements.
2 The output of a utility -interactive inverter shall be permitted to be connected to the load side of the service
disconnecting means of the other source at any distribution equipment on premises. Where such a connection
is made, the interconnection provisions of CEC Section 690.64(B)(1) through (13)(7) shall apply. Verify main
service and equipment busbar ratings and provide evidence of 200amp service with 225amp bus.
If' ��#M1•�UC .. �. l�� C,Are.�� Qi:iy,�f�
CTION C - STRUCTURAL
1) No corrections apply.
SECTION D - MISCELLANEOUS COMMENTS
1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise
Plans as necessary and provide written response, noting where correction can be found.
2) Provide one copy each of the Site Plan and Floor .Plan for the County Assessor's office. While not required
for resubmittal; this administrative item must be addressed prior to issuance of building permit.
END CORRECTION LIST
As further information is provided and reviewed, additional corrections may be required.
Residential Plan Check Correction List Page 3 of 3
f Hot Purple Energy
870 Research Dr. STE 6 Palm Springs, CA 92262
0- 760.322.4433 F- 760.322.4435
info@hotpurpleEnergy.com
Lic.# 940550 (61,C46)
Mr. Ortega,
In response to the revisions you have requested, I have put together a list to help expedite the process. The
plans have been modified to reflect 95 Modules( SunPower 240 Watt ). I have double checked all of the
electrical calculations to make sure that the PV system is safe and operating at peak efficiency.
SECTION A - GENERAL
1) Assessor's parcel number (APN) and Complete legal description is located on Cover sheet of plans.
2) Each sheet is signed with preparer's name, telephone number, and wet signature.
3) Structure served shall be supplied by only one service. Revised drawing. See Sheet 3.0
SECTION B — SOLAR
I. General
1) Reconciled Notes.
II. Circuit Requirements
1) The size of conductor specified on plan is being shown as corrected per factors in Table 690.7 (31
to 23 Degrees —1.12) All Arrays within 600 V -DC allowable voltage. Shown on Sheet 3 Single line
drawing. [40 AMPS ALLOWABLE WITH 10 AWG/THWN-2] - [55 AMPS ALLOWABLE WITH 8
AWG/THWN-21 (see NEC TABLE C.1) SYSTEM DESIGN DOES NOT EXCEED ALLOWABLE AMPS AT ANY
POINT IN THE PHOTOVOLTAIC CIRCUIT, WITH ALL CORRECTION FACTORS CONS[ DERED. (NEC -690.8)
2) NEC 690.8 is displayed on sheet 3.1s Electrical line drawing notes, and compliant with that code.
calculations shown on sheet 3.1
III. Disconnecting Means
1) Means shall be provided to disconnect all current -carrying conductors of a photovoltaic power
source from all other conductors in a building or structure. CEC 690.13 — A/C Disconnect added
to plans See Sheet 3 Single line Drawing.
IV. Wiring Methods
P.O. BOX 1504
LA QUINTA, CALIFORNIA 92247-1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
BUILDING & SAFETY DEPAR$'MENT
RESIDENTIAL PLAN CHECK CORRECTION LIST (SOLAR)
DATE.:,NOVEMBER 3 2011
STATUS:. SECOND REVIEW
PLAN CHECKED.BY: AJ ORTEGALV
TELEP_H.ONE NVMBER:,Q60)018,_1
(760) 777, 7012
FAX (760) 777-7011
ADDRESS: 54-038 AVENIDA BERMUb;kS:
DESCRIPTION: PV SOLAR SYSTEM
APPLICANT: ROBERT OWEN
PLAN CHECK #: 11-1093
This submittal has been checked for compliance with the 2010 California Residential, Mechanical, Electrical;,
Plumbing, Energy, and Green Building Codes, and the City of La Quinta Municipal Code.
APPLICANT: BUILDING DEPARTMENT STAFF:
The following items are being returned to you for DO NOT accept any resubmittal unless ALL of the
correction: following items are included:
2- SOLAR (REDLINED) PLAN 2- SOLAR (REDLINED) PLAN
3- UNMARKED PLAN SET 1- CORRECTION LIST w/responses
3- SPECIFICATION SHEETS 2- REVISED PLAN SETS
1- CORRECTION LIST 1-. ASSESSORS SITE/FLOOR PLAN
c
it F4nd
INSTRUCTIONS TO APPLICANT:
1) Provide a written response to each comment on the following pages, noting specifically where the correction
can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not
acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses
.such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check.
2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or
Calculations as necessary.
3) Return all red -marked Plans and/or Calculations with your resubmittal.
4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number
and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents
prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and
Professions Code Section 5536. Resubmittals will not be accepted with signatures missing.
3
5) Return this list, your written responses, and all documents listed above with your resubmittal.
Residential Plan Check Correction List (SOLAR) Page I of 3
SECTION A - GENERAL
X
Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and
telephone number and wet -signature. If the preparer is a licensed architect or engineer, all documents
.prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and
Professions Code'5536. Resubmittals will not be accepted with signatures missing.
( building!or other structure served shall be supplied by only one service. (CEC §230.2) Multiple meters not
1 owed, revise drawings for single service only. Multiple building services have been removed and a
400A service is now shown — Unclear as to what is being proposed. Fully specify the scope of work to be
permitted on plans.
SECTION B — SOLAR
I. General
Reconcile noted information shown on single line diagram. See P review redlined plan. Please provide a
response for each item, either on returned redlined plan or in letter. See 2"d review redlined plan.
H. Circuit Requirements
XNo corrections remain.
III. Disconnecting Means
No corrections remain.
IV. Wiring Methods
All PV system wiring must be made using one of the specific installation/materials methods included in the
(CEC §690.31, Chapter 3) Run locations not specified on single `line,,4iagram,:please.;Mbry locations on site
plan or sped on single line diagram. Add de -rating and adjustment factors to wiring and conduit schedule —
�i Conduit Fill/Conduit Location/Temperature. Site plan still unclear _ Strings have not been identified, nor
has which inverter each array terminates at. Additionally, please provide conductor sizing schedule per
array/inverter, not based on conductor size.
Conduits exposed to sunlight on rooftops, where conductors or cables are installed, the adjustments shown in
�1 Table 310.15(B)(2)(c) shall be added to the outdoor temperature to determine the applicable ambient
temperature for application of the correction factors in Table 310.16. (CEC §310.15(B)(2)(c)) Adjust
V conductor sizes accordingly. Site plan still unclear — Plans include correction table but does not specify
where or which conductors require adjustment.
V. Grounding
Grounding information not shown on plans. System grounding, Equipment grounding, Equipment bonding
V� and Array grounding shall be designed and specified on plan per California Electrical Code Article 690, Part
V. Fully sped all required information and design on plans. DC Ground Electrode Conductor still has
not been included on single line diagram — per Section 690.47(C), a separate Grounding Electrode
onductor and Equipment Ground Conductor is required. Fully specify on plan each conductor.
��� Specify a size for do grounding electrode conductor per CEC §250.166, 690.41. Conductor not shown.
Residential Plan Check Correction List (SOLAR) Page 2 of 3
City of La. Quinta
VI. Marking, Connection .to Other Sources, Storage Batteries and Systemsbver 600 Volts
XProvide schedule with the location of all required markings and labels for the proposed photovoltaic system.-
(CEC §690) Please update signage sheet per 2010 California Electrical Code requirements. Locations of
required signage not shown. Additionally,. system attributes are required to be shown per Sections
690.17, 690.53 and 690.54 — Revise schedule accordingly.
The output of a utility -interactive inverter shall be permitted to be connected to the load side of the service
disconnecting means of the other source at any distribution equipment on premises. Where such a connection
is made, the interconnection provisions of CEC Section 690.64(B)(1) through (B)(7) shall apply. Verify main
service and equipment busbar ratings and provide evidence of 200amp service with 225amp bus. See
previous comments. Additionally, please provide residential load calculation to determine and justify
electrical service requirements.
SECTION C - STRUCTURAL
1) No corrections apply.
SECTION D - MISCELLANEOUS COMMENTS
1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise
Plans as necessary and provide written response, noting where correction can be found.
2) Provide one copy each of the Site Plan and Floor Plan for the County Assessor's office. While not required
for resubmittal, this administrative item must be addressed prior to issuance of building permit.
END CORRECTION LIST
As further information is provided and reviewed, additional corrections may be required.
Residential Plan Check Correction List Page 3 of 3
Hot Purple Energy
870 Research Dr. STE 6 Palm Springs, CA 92262
0- 760.322.4433 F- 760.322.4435
info@hotpurpleEnergy.com
Lic.# 940550 (131,C46)
Mr. Ortega,
SECTION A - GENERAL
1) All Sheets signed
2) 400A Panel Change -out to be conducted by electrical contractor.
SECTION B — SOLAR
I. General
1) Reconciled Notes.
IV. Wiring Methods
1) Run Locations specified on Sheet 2 Roof Plan and Sheet 4 NEC code sheet. De -rate and
adjustment factors added. Conduit schedule listed. Conduit fill for 1" EMT = (16) THWN-2
Allowable (system design does not exceed 10 conductors at any point. Table C.1)
Temperature rating of THWN-2 = 90 C (194 F) Ambient Temp. = 114-122 + 40 F degrees
[Table 310.15(B)(2)(c)] = 162 F degrees.
THWN-2 ACCEPTABLE IN THESE CONDITIONS WITH ALL CORRECTION FACTORS
CONSIDERED.
2) Slight Adjustments to made to Conductor Sizing(Array#1).
V. Grounding
1) All grounding specifications made on Roof Plan And NEC Code Sheet
2) DC Grounding conductor electrode = 8 AWG Shown in Accordance with CEC 250.166 and
690.41 see Sheet 3.0 —Single Line Drawing.
VI. Marking, Connection to other sources, Storage Batteries and Systems over 600 Volts
1) Schedule of NEC 690 markings and labels found on Sheet 4 —NEC Code Sheet.
etn.#
Qtt Of La Qutfhta
Building a Safety Ditdsion
P.O. Box 1504,78-495 Calte Tampico
L4.Quinta, CA 92253 -:(760) 777-7012
Building Permit Application* and Tracking Sheet
Perrnit #
Oq�
\V,
Project Add[ess: 7 6 Q C RAJVTAJ
Owner's Name:.
A P. Number.
Address: _ yd 16. 4 ve Ai W4.(3 C i2 n1 W4
Legal Description:
Contractor. 0T 19/ i E
City, ST, Zip: L A 40 t Np4 oA 2 2
Telephone:
Address: 870 9-E S'EA ✓Z t -I Qr 51 6
ProjeetDescription: ..
City, sr, zip: )04-INI S PQ i N 6-1CA 1220
V S a 1,4 n /N S LL l I
Telephone: 76 Q Z Z -'1413 3
ty Lie. #;
State Lie. 4:
Arch., Engr., Designer W I4OUS:
Address: CA X4'e -A_5 Co N T" (4w
City., ST, Zip: f o r
Telephone: Construction Type:. SQ 1A i? Occupancy: of .
State Lie. #:n Project type (circle one): New d' Alter Repair Demo
Name of Contact Person: ANQn F w A. OAVIS%d1J Sq. Ft.: S (P # Stories: � # Units:
Telephone # of Contact Person: 2 11 % Estimated Value of Project ,
APPLICANT: DO NOT WRITE BELOW THIS UNE
N Submittal Req'd Rec'dCltpC�Q_ 1VG" . ll !r] I ,. -1 PERMIT FEES.
Plan Sets
Plan Cheek submitted : itfm Amount
'
Structural Cates
1 ..l
Reviewed, ready fof r,eorrecdo L n tPlan Check Deposit.
11
TrussCales.
Called Contact Person Plan Check Balance. ^
Tide 24 Cates
Plans picked up 1 =-� --.— . . Construction
Flood plain plan
Plans resubmitted.. 'O 1 Mechanical -�
Grading plan
2" Review, ready for rrecdon issue
Electrical
SubcontactorList
Called Contact Person Plumbing
Grant Deed
I Plans picked up l /� S.M.I.
H.O.A. Approval
Plans resubmitted a 20M Grading .�.
W HOUSE:-
3" Review; ready for correcdo ne f 110 il Developer Impact Fee
Planning Approval
Called Contact Person
.I.P.P.
Pub. Wks. Appr
Date of permit issue Simc�
School Fees
Total Permit Fees ` ?.
Lo l eel ISO q - sCL*a 0& 'C S A44 VP: 9UM490)
it 14
31
�-r
Fronius IG Plus PV Inverter
The first complete solution. Reliable. Proven. Smart. - - -
_._____-____ _ ---------
An outstanding addition to the family: The next
generation Fronius IG Plus inverter builds on a
successful model with multiple enhancements,
including maximum power harvest, a built-in six
circuit string combiner, integrated, lockable DC
Disconnect, significantly improved efficiency, and
unbeatable reliability. New, larger power stages
expand the proven Fronius IG family from 2 to
12 kW in a single inverter.
POWERING YOUR FUTURE
MOW
&ter
Am
r
q.
INPUT DATA Fronius IG Plus I 3.0-1 ..... I 3.8-1 ..... I 5.0-1 ..... I 6.0-1 ..... I 7.5-1_.. I 10.0-1 ...... I 11.4-1 ..... I 11.4-3--..- 112.0-3,.-,-.r
Recommended PV-Power(Wp)
2500-3450
3200-4400
4250-5750
5100-6900
6350-8600
8500-11500
9700-13100
1 9700-13100
10200-13800
MPPT-Voltage Range 230 ... 500 V
DC Startup Voltage 245 V
Max. Input Voltage (at 1000 W/m=
14°F (-10°C) in open circuit operation) 600 V
Nominal Input Current
8.3 A
10.5 A
13.8 A
16.6 A
20.7 A
27.6 A
31.4 A
31.4 A
33.1 A
Max. usable Input Current
14.0 A
17.8 A
23.4 A
28.1 A
35.1 A
46.7 A
53.3 A
53.3 A
56.1 A
Admissible conductor size (DC) No. 14 - 6 AWG
Number of DC Input Terminals 6
Max. Current per DC Input Terminal 20 A; Bus bar available for higher input currents
nUTPUT DATA Fronius IG Plus I 3.0-1 ..... I 3.8-1 ..... I 5.0-1_.. I 6.0-1 ..... I 7.5-1 ..... I 10.0-1 ...... I 11.4-1 ..... I 11.4-3 _ .. 112.0-3.._.___
Nominal output power (PAcnj
3000 W
3800 W
5000 W
6000 W 7500 W 9995 W
11400 W
11400 W
12000 W
Max. continuous output power
104°F (40°C) 208 V / 240 V / 277 V
3000 W
3800 W
5000 W
6000 W 7500 W 9995 W
11400 W
11400 W
12000 W
Nominal AC output voltage
Consumption during operation
208 V / 240 V / 277 V
15 W
208 V / 240 V
277 V
Operating AC voltage range 208 V
(default) 240 V
277 V
Controlled forced ventilation, variable fan speed
Enclosure Type
183 - 229 V (-12 / +10 %)
211 - 264 V (-12 / +10 %)
244 - 305 V (-12 / +10 %)
Unit Dimensions (W x H x D)
17.1 x 24.8 x 9.6 in.
Max. continuous 208 V
output current 240 V
277 V
14.4 A
12.5 A
10.8 A
18.3 A
15.8 A
13.7 A
24.0 A
20.8 A
18.1 A
28.8 A
25.0 A
21.7 A
36.1 A
31.3 A
27.1 A
48.1 A
41.7 A
36.1 A
54.8 A
47.5 A
41.2 A
31.6 A"
27.4 A"
n.a.
n.a.
n.a.
14.4.A"
Admissible conductor size (AC)
-4 ... 122°F (-20... +50°C)
Compliance
No. 14 - 4 AWG
Max. continuous utility back feed current
0 A
Nominal output frequency
60 Hz
Operating frequency range
59.3 - 60.5 Hz
Total harmonic distortion
<3%
Power factor
1
GENERAL DATA Fronius IG Plus I 3.0-1._.. I 3.8-1._ I 5.0-1 ,,,,, I 6.0-1 ,,,,, I 7.5-1 ,,,,, I 10.0-1 ,,,. I 11.4-1 I 11.4-3 ___ 112.0-3,._-.,_
Max. Efficiency
Internal GFDI (Ground Fault Detector/Interrupter); in accordance with UL 1741-2005 and NEC Art. 690
96.2%
Internal diode
CEC Efficiency 208 V
240 V
277 V
95.0%
95.5%
95.5%
95.0%
95.5%
95.5%
95.5%
95.5%
96.0%
95.5%
96.0%
96.0%
95.0%
95.5%
96.0%
95.0%
95.5%
96.0%
95.5%
96.0%
96.0%
95.0%
95.5%
n.a.
n.a.
n.a.
96.0%
Consumption in standby (night)
< 1 W
Consumption during operation
8 W
15 W
22W
Cooling
Controlled forced ventilation, variable fan speed
Enclosure Type
NEMA 3R
Unit Dimensions (W x H x D)
17.1 x 24.8 x 9.6 in.
17.1 x 36.4 x 9.6 in.
17.1 x 48.1 x 9.6 in.
Power Stack Weight
31 lbs. (14 kg)
57 lbs. (26 kg)
82 lbs. (37 kg)
Wiring Compartment Weight
24 lbs. (11 kg)
26 lbs. (12 kg)
26 lbs. (12 kg)
Admissible ambient operating temperature
-4 ... 122°F (-20... +50°C)
Compliance
UL 1741-2005, IEEE 1547-2003, IEEE 1547.1, ANSI/IEEE C62.41, FCC Part 15 A& B, NEC Article 690, C22.2 No. 107.1-01 (Sept. 2001)
PROTECTION
DEVICES Fronius IG Plus I 3.0-1..... I 3.8-1.._. I 5.0-1 ..... 6.0-1.._. I 7.5-1.... I 10.0-1. _ I 11.4-1 _ 11.4-3 12.0-3
Ground fault protection
Internal GFDI (Ground Fault Detector/Interrupter); in accordance with UL 1741-2005 and NEC Art. 690
DC reverse polarity protection
Internal diode
Islanding protection
Internal; in accordance with UL 1741-2005, IEEE 1547-2003 and NEC
Over temperature
Output power derating / active cooling
Complies with Canadian standard C22.2 No. 107.1-01 (Sept. 2001).
per Phase
Fronius USA LLC Solar Electronic Division
10421 Citation Drive, Suite 1100, Brighton, Michigan, 48116
E -Mail: pv-us@fronius.com
www.fronius-usa.com
M
Fronius USA LLC - Products - Grid -Connected PV Inverters
Fronius IG Plus / IG Plus V 10.0-1 / 11.4-1 / 11.4-3
Delta / 12.0-3 WYE 277
+ Maximum Earnings Security
+ Highest Reliability
+ First Universal Inverter
This three power stage inverter is availaable in 10.0, 11.4 and 12.0 kW. Best suited for
large residential and commercial applications.
Available IG Plus I IG Plus V Three Stage Inverters:
10.0-1 UNI
11.4-1 UNI
11.4-3 Dena
12.0-3 WVE277
Technical Data
Fronius IG Plus
10.0-
11.4-
11.4-
12.0-3WVE277
1 UNI
1 UNI
3Delta
Input data
Recommended PV -Power (kWp)
8.5-11.5
9.7-13.1
9.7-13.1
10.2-13.8
MPPT-Voltage range
230 - 500 V
Max. Input voltage range
600 V
(at 1000 W/m2 14°F (-10°C) in open
circuit operation)
Nominal Input Current
27.6 A
31.4 A
31.4 A
33.1 A
Max. usable Input Current
46.7 A
53.3 A
53.3 A
56.1 A
Admissible conductor size (DC)
No. 14-6 AWG
Output data
Nominal output power (PAC nom)
9995 W
11400 W
11400 W
12000 W
Page 1 of 5
http://www.fronius.com/cps/rde/xchg/SID-177ECB63-13773A85/fronius_usa/hs.xsl/2714_... 9/19/2011
Fronius USA LLC - Products - Grid -Connected PV Inverters
Max. continupous output power
9995 W 11400 W
11400 W 12000 W
104-F (40-C) 208 V / 240 V /
208 V
95.0% 95.5% 95.0% n.a.
277 V
95.5% 96.0% 95.5% n.a.
277 V
Nominal AC output voltage
208 V / 240 V / 277 V
208 V 1240 277 V
Consumption during operation
22W
V
Operating AC voltage range (default)
Enclosure Type
NEMA 3R
208 V
183 - 229 V (-12 / +10 %)
Power Stage Weight
240 V
211 - 264 V (-12 / +10 %)
26 lbs. (12 kg)
277 V
244 - 305 V (-12 / +10 %)
temperature
Maximum continuous output current
Compliance
UL 1741-2005, IEEE1547-2003, IEEE 1547.1, ANSI/IEEE
208 V
48.1 A 54.8 A
31.6 A' n.a.
240 V
41.7 A 47.5 A
27.4 A' n.a.
277 V
36.1 A 41.2 A
n.a. 14.4 A'
Admissible conductor size (AC)
No. 14 - 4 AWG
Max. continuous utility back feed
0 a
current
Nominal frequency
60 Hz
Operating frequency range
59.3 - 60.5 Hz
Total harmonic distortion
<3%
Power factor
1
General data
Max. Efficiency
96.2%
CEC Efficiency
accordance with UL 1741-2005 and NEC Art. 690
208 V
95.0% 95.5% 95.0% n.a.
240 V
95.5% 96.0% 95.5% n.a.
277 V
96.0% 96.0% n.a. 96.0%
Consumption in standby (night)
< 1 W
Consumption during operation
22W
Cooling
Controlled forced ventilation, variable speed fan
Enclosure Type
NEMA 3R
Unit Dimensions (W x H x D)
17.1 x 48.1 x 9.6. in.
Power Stage Weight
82 lbs. (37 kg)
Wiring Compartment Weight
26 lbs. (12 kg)
Admissing ambient operating
-13 ... 131-F (-25... + 55°C)
temperature
Compliance
UL 1741-2005, IEEE1547-2003, IEEE 1547.1, ANSI/IEEE
C62.41,
FCC Part 15 A&B, NEC Article 690, C22. 2 No. 107.1-01
(Sept. 2001)
Safety equipment
Ground fault protextion
. Internal GFDI (Ground Fault Detector/Interrupter); in
accordance with UL 1741-2005 and NEC Art. 690
DC reverse polarity protevtion
Internal diode
Islanding protection
Internal; in accordance with UL 1741-2005, IEEE 1547-2003
and NEC
Over temperature
Output power derating / active cooling
Page 2 of 5
http://www.fronius.com/cps/rde/xchg/SID-177ECB 63-13773A85/fronius_usa/hs.xsl/2714_... 9/19/2011
BEyEFITS
Highest Efficiency
SunPowerTm Solar Panels are the most
efficient photovoltaic panels on the
market today.
More Power
Our panels prodktce more power in
the some amo.int of space—up to 50%
mo -e than conventional designs and
100% more thor thin film solar panels.
Reduced Installction Cost
More power per panel means fewer
panels per ins -al . This saves both time
and money.
Reliable and Robust Design
Prov --n materials, tempered front glass,
and a sturdy anodized frame allow
panel to operate reliably in multiple
mounting configurations.
SPR-240E-WHT-D
qV
SERIES
The SunPower""" 240 Solar Panel provides today's highest efficiency and
performance. Utilizing 72 all back -contact solar cells, the SunPower
240 delivers a total panel conversion efficiency of 19.3%. The panel's
reduced voltage -temperature coefficient, anti -reflective glass and
exceptional low -light performance attributes provide outstanding energy
delivery per peak power watt.
20%
15%
10%
5%
0%
SunPower's High Efficiency Advantage
18% 19%
Thin Film Conventional SunPower SunPower
E 18 Series E 19 Series
C &us
11
Electrical Data -
Measured a standard Test Conditions (STq: k—s rice of I000W/ms. AM 1.5, and cell tempwaft. 25• C
Peak Power (+5/-3%)
Pmax
240 W
Efficiency
n
19.3
Rated Voltage
Vmpp
40.5 V
Rated Current
Impp
5.93 A
Open Circuit Voltage
Voc
48.6 V
Short Circuit Current
Isc
6.30 A
Maximum System Voltage
UL
600 V
Temperature Coefficients
Power (P)
-0.38% / K
Voltage (Voc)
-132.5mV / K
Current (Isc)
3.5mA / K
NOCT
45° C +/-2° C
Series Fuse Rating
20 A
I-V Curve
1000 W/m' m 50° C
6
1000 W/m'
5
Q 4 Soo W/
t 3 l
( 500 W/m'
�24 1 +.
OIr 200 W/mi — - -
0 10 20 30 40 50 60
Voltage M
Current/voltage characteristics with dependence on imodiance and module temperature.
Tested Operating Conditions
Temperature -40a F to +1 BY F (-40° C to + 85' C)
Max load 113 psf 550kg/m2 (5400 Pa) front — e.g. snow;
50 psf 245kg/m2 (2400 Pa) front and back — e.g. wind
Impact Resistance Hail 1 in (25 mm) at 52mph (23 m/s)
Warranties and Certifications
Warranties 25 year limited power warranty
10 year limited product warranty
Certifications Tested to UL 1703. Class C Fire Rating
Dimensions
4 Grounding Holes 2X 1200
[47.241
MM 2X (.81 12 06.6 4X 180
ilNl [.261 [7.07]
2X 30 2X 577 8X 04.2 4X 231
11.191 I 122.701 [.171 [9.09]
TT T
F 2X 11.0
[.431
798 6X 754
[31.42] 2X 04.2 [29.69]
1.17]
II y y y
1559 46 I I 4X 322 2X 915 2X 199.5
[61.39] (1.81] "'lll Ilt"`--- t 12.6911 136.021 [7.85]
4X 12 2X 1535
[.47] [60.451
CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT.
Visit sunpowercorp.com for details
SUNPOWER and the SUNPOWER logo am trademarks or registered trademarks of SunPower Corporation. Su n poWercorp. conA
0 November 2010 SunPower Corporation. All rights msemd. Specificctiau included in this dotosheet are subject to change without notice. Document 4001-65327 Rev" / LTR EN
Mechanical Data
Solar Cells
72 SunPower all -back contact monocrystalline
Front Glass
High transmission tempered glass with
anti -reflective (AR) coating
Junction Box
IP -65 rated with 3 bypass diodes
Dimensions: 32 x 155 x 128 (mm)
Output Cables
1 000m length cables / MultiContoct (MC4) connectors
Frame
Anodized aluminum alloy type 6063 (black)
Weight
3 3. 1 lbs. (15.0 kg)
I-V Curve
1000 W/m' m 50° C
6
1000 W/m'
5
Q 4 Soo W/
t 3 l
( 500 W/m'
�24 1 +.
OIr 200 W/mi — - -
0 10 20 30 40 50 60
Voltage M
Current/voltage characteristics with dependence on imodiance and module temperature.
Tested Operating Conditions
Temperature -40a F to +1 BY F (-40° C to + 85' C)
Max load 113 psf 550kg/m2 (5400 Pa) front — e.g. snow;
50 psf 245kg/m2 (2400 Pa) front and back — e.g. wind
Impact Resistance Hail 1 in (25 mm) at 52mph (23 m/s)
Warranties and Certifications
Warranties 25 year limited power warranty
10 year limited product warranty
Certifications Tested to UL 1703. Class C Fire Rating
Dimensions
4 Grounding Holes 2X 1200
[47.241
MM 2X (.81 12 06.6 4X 180
ilNl [.261 [7.07]
2X 30 2X 577 8X 04.2 4X 231
11.191 I 122.701 [.171 [9.09]
TT T
F 2X 11.0
[.431
798 6X 754
[31.42] 2X 04.2 [29.69]
1.17]
II y y y
1559 46 I I 4X 322 2X 915 2X 199.5
[61.39] (1.81] "'lll Ilt"`--- t 12.6911 136.021 [7.85]
4X 12 2X 1535
[.47] [60.451
CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT.
Visit sunpowercorp.com for details
SUNPOWER and the SUNPOWER logo am trademarks or registered trademarks of SunPower Corporation. Su n poWercorp. conA
0 November 2010 SunPower Corporation. All rights msemd. Specificctiau included in this dotosheet are subject to change without notice. Document 4001-65327 Rev" / LTR EN
Is
Hot Purple Energy
820, RESOrch Dr. SGE 6 PiIm Springs; CA 9 262
8- 760.37,x.01433 F- 760,322A435
info@hvt0urpteEnerg4=c,oM
itz.#t 940550 (03.0 6)
Project Information
Homeowner, ROBERT OWEN
Contact Info: R.Owen@HotpurpleEnergy.com.
Site LocationAPN# 5403$ Avenida Bermudas, La Quinta CA 9 .253-APN#: 774225019-9
Legal Descri tion: Lot 1MB 019/082 Santa Carmelita at gale la Quinta unit 27..
Table of Contents:
gm U•l
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
DATE 11 i tl BY
—&==-.
0 =A"4 fit co4w .0--
J
• Site Placa A9-1
e Army Plan pg. 2 e
• Single Lim pg.3 ; • -....-x....
* Conductor Sizing Schd. pg. 4
Signage Sheet & Specifications pg. S
SCOPE CSF WORIK: WORK SHALL CONSIST OF INSTALLATION OF (95) SUNIPOWER SOLAR. MODULES (SPR-24,0E-WHT-O)
ALONG WITH (3) PRONIUS USA — (2) IG PLUS 6.0-1(240v) — (1) ICS PLUS 10_1 (240x) INVERTER AND .ALL APPROPRIATE
MOUNTING HARDWARE (PROFESSIONAL SOLAR. PRODUCTS INC.)
*NOTE: THIS PROJECT SHALL COMPLY WITH THE 2010 CALIFORNIA BUILDING CODE, WHICH ADOPTS THE 2009 IPG,,.
2009 UMC, 2009 UPC AND.T E 2006 NEC..
It
u
ROOF COVERINIGS SHALL BE DESIGNED,
INSTALLED, AND MAINTAINED IN
ACCORDANCE WITH THIS CODE AND ARRAY#3 WIRES WILL RUN
APPROVED MANUFACTURER'S THROUGH RACEWAY
INSTRUCTIONS SUCH THAT THE ROOPN ROOF INTO INVERTER#3
COVERINGS SHALL SERVE TO PROTECT LOCATED IN ATRIUM,
THE BUILDING OR STRUCTURE. - CB1503
(6) 10AWG THWN2
STRANDED COPPER
WIRE.
ARRAY # 2 W I RES WILL RUN
THROUGH RACEWAY
IN ATTIC, THEN ROOF
INTO INVERTER# 2
.LOCATED IN ATRIUM
1 "EMT
(6) 10AWG THWN2
STRANDED COPPER
WIRE.
ARRAY#2 (27) MODULES - (3 STRINGS OF 9)
ALL B -VENTS AND PLUMBING VENTS SHALL EXTEND AT
LEAST 6 INCHES ABOVE THE ARRAY(S). B -VENTS SHALL
EXTEND AT LEAST 2 FT. ABOVE THE ARRAY AT HIGHEST
PART OF ARRAY WITHIN 10 FT. UMC 305 AND NEC 110.28
8 AWG GRND
ARRAY# 1(44) MODULES
(4 STR I NGS OF 11)
(8) 10AWG
STRANDED
WIRE.
8 AWG GR
NEC 250A
ROOF PLA
ROBERT OWEN
54038 AVENIDA BERMUDAS
LA QUINTA CA 92253
2 INTEGRATOR
'i
=R HOT PURPLE ENERGY
870 Research Dr.
PALM SPRINGS CA 92262
O: 760.322.4433
F: 76D.322.4435
ln.fo@HQ#purpleEnergy.com
NOT ES
'ICE PANEL/ C DISCON,/•OCPD ,
PANELS ON TILE SECTIONS �.
ARRAY# 1 WIRES WILL I U BE Mt�UN I EL) F .LUSH,
ARRAY# 3 RUN THROUGH NOT TO EXCEED 8" ,
(24) MODULES PANELS ON FLAT SECTIONS
(3 STRNGS OF 8) RACEWAY I N ATTIC, TO BE MOUNTED ON '10-18
THEN ROOFINTO EGREE TILT, NOT TMJ
INVERTER# 1 LOCATE 'EXCEED 18 ",OR BE SEEN
IN ATRIUM. FROM STREETV VIEW..
CITY OF LA UIJIN IA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION amu_ x,22. yy3 Z
DATE BYE L-
CITY OF LA QUINTA
BUILDING & SAFETY DEPT
APPROVED
FOR CONSTRUCTION
DATE BY -
L
it ROBERT OWEN-54038 AVENIDA BERK-04S, LA QUINTA CA 9,2253
I "ODULES IN SERI
r1- 361 -1 ------
2l A-0 KLES lN SERI
MODULES IN, SERI
I EMT K-2[(8 10AWG]l
+8AVVG GRKD,
INVERTER #1
A11 labe is are shown confir m. ed with NE&59- 0 -(SEE AT -TACHE D PAG jE)
ARRAY #2
-.o-IW K m -W--F A -1 v gp- RI �
9 MODUI-ES IN S
1 9 MODULE.-$ IIN ---%F-R(�j
ARRAY 0 3
i -dfafl
�8 WIDUM-a IN srmutbl
8 MODULES IN SERINS
I U.l" 1.
ILITY SERVICE
i(i) 400A BUSS
(1) 3 -40A MA 11 N GCP D
I t 1� VETER
(2)40A Off,
60A OCPn-L
690.54
I" ENT TI-,rWl'q-2[(G-J0AWG] i" EMT Tl.1--HN-2[(6),--i0AVVr,-ll NEK 693.9(Q
-v8AVVG- GRr!Dr,
SAW G 010 Ll
V71 690,17(4)
L 123-
IL 659064(7)
I N
FTI # 2' INVERTER #3
P�
-1- 4
TA 600 VDC !A WO VOC
D,C- Disc nett
V I\Ec 6@,0, 1�qcz)
EMTvi/ (3
6AWG THWN-2
+6 -AWG GRND.
--------------------------------t---------
4 GROUNDING ELECTRODE
'IA -WO VDCt
ELECTRICAL LINEDIAGRAM
HOT PURPLE ENERGY
------ ------- --
Z
B701 RESEARCH DR. STE 6:
I BlAffw/ (3)
PALH &PRINGS, CA4,2262
A DISCONNEC
71
8A- VVG THWN 2
,N&'IA3R RATBD +6AXWG GRI\D. 60.522.4433. F: 760.522.4435
(NEC 690-17) iNro@HOTPURPLc-EHr=RGY.com
CITY OF LA QUINTA
_gLal-DLUG - AFw je
_FTy nFpT
APPROVED
FOR CONSTRUCTION
DATE BY
3
APPROVED
FOR CONSTRUCTION
DATE BY.
.�
ELECTRICAL LINE DIAGRAM NOTES
PV MODULE RATINGS
HOT PURPLE ENERGY
870 RESEARCH DR. STE 6
(NEC -690.51)
MODULE MFR= SUNPOYWER
PALM SPRINGS, CA -92262
MODULE MODEL = SPR-240E-WHT-D
760.322.4433,
F; 760.322.4435
RATING = 240WATTS@STC;
INFO@HOTPURPLEENERGY. COH
RATING = 218.BWATTSOPTC.
ROBERT OWEN-54038 AVENIDA BERMUDAS, LA QUINTA CA 92253
Voc = 48.6 V, VP MAY, =40.5V
ISc = 6.30 A, IP MAY, = 5.93 A
ARRAY RATINGS (1,2,&3)
INVERTER RATING (1,2,&3)
TABLE310.16 AMPACITY, #l0-THINN-�=40A
INVERTER #I RATING(NEC690.B(B)1)
TABLE310.I6 AMPACITY, #6 -THIN -2=75A
ARRAY#I RATING-(I0;56K1 -,DC)
ADJUSTED TEMPERATURE:
[41.7A X 1.25 =52.125 (60A OCPD)]
AMBIENT HIGH TEMPERATURE: 122 F
(NEC -690.51)
122 F + 40 F[TABLE310.15(B)(2)(C)]=162 F
MFR=FRONIUS USA
TEMP. CORRECTION FACTOR= .82[TABLE310.I6]
4 STRINGS OF II IN SERIES
TEMP. CORRECTION FACTOR= .41[TABLE310.16]
MODEL = IG PLUS 10.0-1 (240 V)
NEW AMPACITY= 75A X .82 = 61.5A
Voc x 1.12 = 598.75(NEC 690.7)
RACEWAY ADJUSTMENT FACTOR= .70[310.15(B)(2)(A)]
OUTPUT AC VOLTAGE = 240 VAC
VP MAY, = 405.OVDC
NEW AMPACITY= 40A X .41 X .70 = 11.4BA
MAX.OUTPUT CURRENT = 41.7A
[5�.1�5A(Isc) < b1.5A](#b-THIh�N-2 ALLOWABLE)
Isc X 1.56= 7.87 A [NEC 690.8(A)]
EFFICIENCY = 95.5 % CEC
[7.87A(Isc) < 11.48A](#10-THWN-2, ALLOWABLE)
ARRAY #2 RATING-(6.48KVV-DC)
TABLE310.16 AMPACITY, #10-THWN-2=40A
INVERTER #2 RATING(NEC690.8(B)I)
TABLE310.I6 AMPACITY, #8-THWN-2=55A
(NEC -690.51)
ADJUSTED TEMPERATURE:
[25A X 1.25 = 31.25(40A OCPD)]
AMBIENT HIGH TEMPERATURE: 122 F
122 F + 40 F[TABLE310.15(B)(2)(C)]=162 -FARRAY
#2 (31.25A = 8 AWG ALLOWABLE)
TEMP. CORRECTION FACTOR= .82[TABLE310.161
3 STRINGS OF 9 I N SERIES
TEMP. CORRECTION FACTOR= . 41 [TABLE310.1 b]
MFR=FRONIUS USA
NEW AMPACITY= 55A X . 82= 45 . IA
Voc Y, 1.12 = 489.88 (NEC690.7)
RACEWAY ADJUSTMENT FACTOR= .70[�310.15(B)(2)(A)]
MODEL =1G PLUS 6.0-1(240 V)
VP MAY, = 364.5VDCNEIN
AMPACITY= 40A X .41 X .70 = 11.48A
-
-
OUTPUT AC VOLTAGE 240 VAC
[31.25A(Isc) < 45.IA](#8-THWN-2 ALLOWABLE)
ISc X 1,56 =7.87A [NEC 690.8(A)]
(7.87A = 10 AWG ALLOWABLE)
[7.87A(Isc) < 11.48A](#Io-THWN-2 ALLOWABLE)
MAX. OUT CURRENT = 25A KW
.EFFICIENCY = 96% CEC
INVERTER #3 RATING(NEC690.8(B)I)
TABLE310.16 AMPACITY, #8-THWN-2=55A
ARRAY #3 RATING-(5.76KVMt-DC)
TABLE310.I6 AMPACITY, #10-THtihlN-2=40A
[25-A X 1.25 = 31.25(40A OCPD)]
AMBIENT, HIGH TEMPERATURE: 122T
(NEC -690.51)
ADJUSED TEMPERATURE:
T
ARRAY #3 (31;25 A = BAWG ALLOWABLE)
TEMP. CORRECTION FACTOR= .82[TABLE310.16]
3 STRINGS OF 8 IN SERIES
1.22 F + 40 F[TABLE310.15(B)(2)(C)]=162 F
MFR =FRONIUS USA
NEW AMPACITY= 55A X .82= 45.IA
Voc Y, i.12 = �435.4b (NECb90.7)
TEMP. CORRECTION FACTOR= .41[TABLE310.Ib].
=1G PLUS 6.0-1(240 V)
VP MAY, = 32L►.OVDC
RACEWAY ADJUSTMENT FACTOR= .70[310.15(B)(�)(A)]
,MODEL
OUTPUT AC VOLTAGE = 240 VAC
[31.25A(Isc) < 45.IA](#B-THWN-2 ALLOWABLE)
ISC X 1.56 =7.87A [NEC 690.8(A)]
NEW AMPACITY= 40A X .41 X .70 = 11.48A
MAX. OUT CURRENT = 25A KW
(7.87A =10 AWG ALLOWABLE)
[7.87A(Isc) < 11.48A](#Io-THWN-2 ALLOWABLE)
EFFICIENCY = 96% CEC
CITY OF LA QUINTA
�w
APPROVED
FOR CONSTRUCTION
DATE BY.
.�
MMMMxN UGH
S117
FMId M
'K.
L
PISA-, ff -, OR M1 'S", '-LZ, MUF-
L NMI, ir - R: I IWPA
, -,A2&j
690.5(,0) -; INVERTER
VOTE Rk �, IMS, 111 �', Ur
k M
1M
10M
INSM"PRUTIM 11-ITAILAT"I
STT Pmr EffME-Ce MAT4Aft MaTil
6190.64(B)(7) - PAN ELBOARD
M
N t oil
I M
I -ICA I L
Istim NST mim 1
N
Mw I
E mm -RG C O 0
AC T T, I -P.
PCl1RRET
PIER)MON AC V' LTACIE
690.-17/690.,54 - AC DISCONNECT
Fq1
:3
103 SIN
LNT TIDE
ANS SCA SIS f'IAY
6 &Sj -t E Mjil 00A. `G
MIRGHM-0 WON[ I
6010.111/690.53 - DC DISCONNECT
TM us supp" FAM MME soup=*
uumm AM
690.56(B)/705.110 - SERYI
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
DATE
BY -
t -j A J+isiI
7-