Loading...
11-1093 (SOL)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Tjbf 4 -4 Q" BUILDING & SAFETY DEPARTMENT BUILDING PERMIT VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 11/17/11 Application Number: 11-00001093 - Owner: Property Address: 54038 AVENIDA BERMUDAS OWEN ROBERT J APN: 774-225-018-4 -000000-. 54038 AVENIDA BERMUDAS Application description: SOLAR LA QUINTA, CA 92253 ID Q Property Zoning: COVE RESIDENTIAL Application valuation: 95680 g : Contractor: 6.� aid ` 2011, (� Applicant: Architect or Engineer: HOT PURPLE INC _ 870 RESEARCH DRIVE; #6 Ci'!'XO l..AOUil TA PALM SPRINGS, CA 92262 0r -p -r (760)322-4432 �I/� LiC. No.: 940550 ------------------------------'------------------------------------------------------------------- LICENSED CONTRACTOR'S DECLARATION WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with I hereby affirm under penalty of perjury one of the following declarations: Section 7000) of Division 3 of the Busin and Professionals Cod and my License is in full force and effect. _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided Licens ss: -C46 Licens 940550 for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issu ed. ate: ntractor: _ I. have and will maintain workers' compensation. insurance, as required by Section 3700 of the Labor I U I I .Code, for the performance of the work for which this permit is issued. My workers' compensation OWNER -BUILDER DECLARATIO insurance carrier and policy number are: - I hereby aXTpenalty of perjury that I am exempt from the Contractor's State License Law for the Carrier STATE FUND Policy Number 2380013903 following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to _ I certify that, in the performance of the work for which this permit is issued, I shall not employ any construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the person in.any manner so as to become subject to the workers' compensation laws of California, . permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State and agre5th ifIshoal ecome subject to the workers' compensation provisions of Section License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or 3700 of abor C , I comply ose provisions. that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: ta: plicant: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The WARM G: FAILURE TO SECURE WORKERS' COMPENSATION OVERAGE IS U AWFUL, AND SHALL Contractors' State License Law does not apply to an owner of property who builds or improves thereon, SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND and who does the work himself or herself through his or her own employees, provided that the DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN improvements are not intended or offered for sale. If, however, the building or improvement is sold within SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). 1 _ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractoi(s) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. , BAP.C. for this reason Date- . Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director -of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for ' whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county dinances and state laws relating t i 'ng construction, and hereby authorize representatives of this cp ty to enter upon above-mentioned pr art for i ett0tl'pe�poses gnature (Applicant or Agent): Application Number . . . . . 11-00001093 Permit . . . ELEC-MISCELLANEOUS INV FEE Additional desc . . Permit Fee . . . . 60.00 Plan Check Fee 7.50 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 5/15/12 Qty Unit Charge Per Extension BASE FEE 30.00 1.00 30.0000 EA ELEC PWR APP >10 TO <=50 30.00 ---------------------------------------------------------------------------- Permit . . . SOLAR PERMIT INV FEE Additional desc . Permit Fee . . . . 63.00 Plan Check Fee 7.88 Issue Date . . . . Valuation . . . . 95680 Expiration Date . . . 5/15/12 Qty Unit Charge Per Extension BASE FEE 30.00 . 1.00 15.0000 EA SOLAR COLLECTOR 1,001-2000 15.00 3.00 6.0000 EA SOLAR EQUIP MISCELLANEOUS 18.00 ------------'---------------------------------------------------------------- Special Notes and Comments 22.8kW SOLAR ARRAY - (95) 240W SUNPOWER PANELS W/ (3) FRONIUS.INVERTERS - (2) 6.0-1 & (1) 10.0 [1,615SF) THIS PERMIT DOES NOT INCLUDE 400 AMP SERVICE PANEL UPGRADE REQUIRED FOR SYSTEM APPROVAL. ***INVESTIGATION FEE ASSESSED PER 2010 CALIFORNIA RESIDENTIAL CODE CHAPTER 1 §108.6 FOR WORK COMMENCING BEFORE PERMIT ISSUANCE*** 2010 CALIFORNIA BUILDING CODES. November 16, 2011 7:45:28 AM AORTEGA -- ------------------------------------------------------------ Other Fees . . . . . .. . . . BLDG STDS ADMIN (SB1473) -------------- 4.00 Fee summary Charged Paid ------------------------------------- Credited -------------------- Due Permit Fee Total 123.00 .00 .00 123.00 Plan Check Total 15.38 .00 .00 15.38 Other Fee Total 4.00 .00 .00 4.00 Grand Total 142.38 .00 .00 142.38 LQPERMIT P.O.TWY Box 1504 LA QUINTA, CALIFORNIA 92247-1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPARTMENT RESIDENTIAL PLAN CHECK CORRECTION LIST (SOLAR) DATE: OCTOBER 14, 2011. STATUS: FIRST REVIEW (PLANiCHECI b Be' . EY T19G * ' k` ITEL_ fiON> �1U_Thft: (�'7 WIP-7418' (760) 777'7012 FAX (760) 77777011 ADDRESS: 54-038 AVENIDA BERMUDAS DESCRIPTION: PV SOLAR SYSTEM r' �:-APPLYCA�NT:a ROBrR'i'=O-WET4 F-hWeiffiCK #: 11-1093 r This submittal has been checked for compliance with the 2010 California Residential, Mechanical, Electrical, Plumbing, Energy, and Green Building Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 1- SOLAR (REDLINED) PLAN 2- UNMARKED PLAN SET 3- SPECIFICATION SHEETS 1- CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: , 1- SOLAR (REDLINED) PLAN 1- CORRECTION LIST w/responses 2- REVISED PLAN SETS 1- ASSESSORS SITENLOOR PLAN INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or Calculations as necessary. 3) Return all red -marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 5) Return this list; your written responses, and all documents listed above with your resubmittal. Residential Plan Check Correction List (SOLAR) Page 1 of 3 SECTION A -.GENERAL Provide Assessor's Parcel Number (APN) and a Complete Legal Description on the first sheet of Plans. Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and wet -signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code'5536. Resubmittals will not be accepted with signatures missing. 3) A building or other structure served shall be supplied by only one service., (CEC §230.2) Multiple meters not allowed, revise drawings for single service only. ,,I' l Wrl "Am O&W TD ?too V SECTION B -SOLAR 0 ' I. General P econcile noted information shown on single line diagram. See 1S' review redlined plan. Please provide a response for each item, either on returned redlined plan or in letter. H. Circuit Requirements del)eIn a do photovoltaic source circuit or output circuit, the maximum photovoltaic system voltage for that circuit shall be calculated as the sum of the rated open -circuit voltage of the series -connected photovoltaic modules corrected for the lowest expected ambient temperature. (CEC §690.7) The size of conductor specified on plan is not being shown as corrected per factors in Table 690.7. (31 to 23 Degrees —1.12) Please provide conductor sizing schedule showing all NEC adjustment factors. ?The Circuit conductors and Overcurrent devices shall be sized to carry not less than 125% of the maximum L currents as calculated in 690.8(A). (CEC §690.8(B)1) Please see above correction for required information to be shown on plan. M. Disconnecting Means Means shall be provided to disconnect all current -carrying conductors of a photovoltaic power source from all other conductors in a building or other structure. (CEC §690.13) provide AC Disconnect per 690.17 - Disconnect shall be readily accessible, externally operable, plainly indicating whether open or closed and rating sufficient for the nominal circuit voltage and current. IV. Wiring Methods W( I All PV system wiring must be made using one of the specific instal lation/materials methods included in the C� All §690.31, Chapter 3) Run locations not specified on single line diagram, please show locations on site plan or specify on single line diagram. Add de -rating and adjustment factors to wiring and conduit /schedule — Conduit Fill/Conduit Location/Temperature. 'j Where direct current photovoltaic source or output circuits of a utility -interactive inverter from a building - integrated system are run inside a building, they shall be contained in metallic raceways or enclosures. (CEC §690.31 (E)). Adjust accordingly. 3 Where the number of current -carrying conductors in a raceway exceed three (3) the allowable ampacity of each conductor shall be reduced as shown in Table 310.15(B)(2)(a). (CEC §310.15(B)(2)) Adjust accordingly. Residential Plan Check Correction List (SOLAR) Page 2 of 3 City of La Quinta 4, Conduits. exposed to sunlight on rooftops, where conductors or cables are installed, the. adjustments shown -in Table 310.15(B)(2)(c) shall be added to the outdoor temperature to determine the applicable ambient temperature for application of the correction factors in Table 310.16. (CEC §310.15(B)(2)(c)) Adjust conductor sizes accordingly. 5t'C� �t 'ytw�. uw�,�ri '" �r -r tt�b Ce��O►�n'LS Ol►.PDertfd � �� V. Grounding E)Grounding information not shown on plans. System grounding, Equipment grounding, Equipment bonding nd Array grounding shall be designed and specified on plan per California Electrical Code Article 690, Part V. Fully specify all required information and design on plans. &AKecify a size for do grounding electrode conductor per CEC §250.166, 690.41. Conductor not shown. VI. Marking, Connection to Other Sources, Storage Batteries and Systems Over 600 Volts I Provide schedule with the location of all required markings and labels for the proposed photovoltaic system. CEC §690) Please update signage sheet per 2010 California Electrical Code requirements. 2 The output of a utility -interactive inverter shall be permitted to be connected to the load side of the service disconnecting means of the other source at any distribution equipment on premises. Where such a connection is made, the interconnection provisions of CEC Section 690.64(B)(1) through (13)(7) shall apply. Verify main service and equipment busbar ratings and provide evidence of 200amp service with 225amp bus. If' ��#M1•�UC .. �. l�� C,Are.�� Qi:iy,�f� CTION C - STRUCTURAL 1) No corrections apply. SECTION D - MISCELLANEOUS COMMENTS 1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as necessary and provide written response, noting where correction can be found. 2) Provide one copy each of the Site Plan and Floor .Plan for the County Assessor's office. While not required for resubmittal; this administrative item must be addressed prior to issuance of building permit. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 3 of 3 f Hot Purple Energy 870 Research Dr. STE 6 Palm Springs, CA 92262 0- 760.322.4433 F- 760.322.4435 info@hotpurpleEnergy.com Lic.# 940550 (61,C46) Mr. Ortega, In response to the revisions you have requested, I have put together a list to help expedite the process. The plans have been modified to reflect 95 Modules( SunPower 240 Watt ). I have double checked all of the electrical calculations to make sure that the PV system is safe and operating at peak efficiency. SECTION A - GENERAL 1) Assessor's parcel number (APN) and Complete legal description is located on Cover sheet of plans. 2) Each sheet is signed with preparer's name, telephone number, and wet signature. 3) Structure served shall be supplied by only one service. Revised drawing. See Sheet 3.0 SECTION B — SOLAR I. General 1) Reconciled Notes. II. Circuit Requirements 1) The size of conductor specified on plan is being shown as corrected per factors in Table 690.7 (31 to 23 Degrees —1.12) All Arrays within 600 V -DC allowable voltage. Shown on Sheet 3 Single line drawing. [40 AMPS ALLOWABLE WITH 10 AWG/THWN-2] - [55 AMPS ALLOWABLE WITH 8 AWG/THWN-21 (see NEC TABLE C.1) SYSTEM DESIGN DOES NOT EXCEED ALLOWABLE AMPS AT ANY POINT IN THE PHOTOVOLTAIC CIRCUIT, WITH ALL CORRECTION FACTORS CONS[ DERED. (NEC -690.8) 2) NEC 690.8 is displayed on sheet 3.1s Electrical line drawing notes, and compliant with that code. calculations shown on sheet 3.1 III. Disconnecting Means 1) Means shall be provided to disconnect all current -carrying conductors of a photovoltaic power source from all other conductors in a building or structure. CEC 690.13 — A/C Disconnect added to plans See Sheet 3 Single line Drawing. IV. Wiring Methods P.O. BOX 1504 LA QUINTA, CALIFORNIA 92247-1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPAR$'MENT RESIDENTIAL PLAN CHECK CORRECTION LIST (SOLAR) DATE.:,NOVEMBER 3 2011 STATUS:. SECOND REVIEW PLAN CHECKED.BY: AJ ORTEGALV TELEP_H.ONE NVMBER:,Q60)018,_1 (760) 777, 7012 FAX (760) 777-7011 ADDRESS: 54-038 AVENIDA BERMUb;kS: DESCRIPTION: PV SOLAR SYSTEM APPLICANT: ROBERT OWEN PLAN CHECK #: 11-1093 This submittal has been checked for compliance with the 2010 California Residential, Mechanical, Electrical;, Plumbing, Energy, and Green Building Codes, and the City of La Quinta Municipal Code. APPLICANT: BUILDING DEPARTMENT STAFF: The following items are being returned to you for DO NOT accept any resubmittal unless ALL of the correction: following items are included: 2- SOLAR (REDLINED) PLAN 2- SOLAR (REDLINED) PLAN 3- UNMARKED PLAN SET 1- CORRECTION LIST w/responses 3- SPECIFICATION SHEETS 2- REVISED PLAN SETS 1- CORRECTION LIST 1-. ASSESSORS SITE/FLOOR PLAN c it F4nd INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses .such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or Calculations as necessary. 3) Return all red -marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 3 5) Return this list, your written responses, and all documents listed above with your resubmittal. Residential Plan Check Correction List (SOLAR) Page I of 3 SECTION A - GENERAL X Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and wet -signature. If the preparer is a licensed architect or engineer, all documents .prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code'5536. Resubmittals will not be accepted with signatures missing. ( building!or other structure served shall be supplied by only one service. (CEC §230.2) Multiple meters not 1 owed, revise drawings for single service only. Multiple building services have been removed and a 400A service is now shown — Unclear as to what is being proposed. Fully specify the scope of work to be permitted on plans. SECTION B — SOLAR I. General Reconcile noted information shown on single line diagram. See P review redlined plan. Please provide a response for each item, either on returned redlined plan or in letter. See 2"d review redlined plan. H. Circuit Requirements XNo corrections remain. III. Disconnecting Means No corrections remain. IV. Wiring Methods All PV system wiring must be made using one of the specific installation/materials methods included in the (CEC §690.31, Chapter 3) Run locations not specified on single `line,,4iagram,:please.;Mbry locations on site plan or sped on single line diagram. Add de -rating and adjustment factors to wiring and conduit schedule — �i Conduit Fill/Conduit Location/Temperature. Site plan still unclear _ Strings have not been identified, nor has which inverter each array terminates at. Additionally, please provide conductor sizing schedule per array/inverter, not based on conductor size. Conduits exposed to sunlight on rooftops, where conductors or cables are installed, the adjustments shown in �1 Table 310.15(B)(2)(c) shall be added to the outdoor temperature to determine the applicable ambient temperature for application of the correction factors in Table 310.16. (CEC §310.15(B)(2)(c)) Adjust V conductor sizes accordingly. Site plan still unclear — Plans include correction table but does not specify where or which conductors require adjustment. V. Grounding Grounding information not shown on plans. System grounding, Equipment grounding, Equipment bonding V� and Array grounding shall be designed and specified on plan per California Electrical Code Article 690, Part V. Fully sped all required information and design on plans. DC Ground Electrode Conductor still has not been included on single line diagram — per Section 690.47(C), a separate Grounding Electrode onductor and Equipment Ground Conductor is required. Fully specify on plan each conductor. ��� Specify a size for do grounding electrode conductor per CEC §250.166, 690.41. Conductor not shown. Residential Plan Check Correction List (SOLAR) Page 2 of 3 City of La. Quinta VI. Marking, Connection .to Other Sources, Storage Batteries and Systemsbver 600 Volts XProvide schedule with the location of all required markings and labels for the proposed photovoltaic system.- (CEC §690) Please update signage sheet per 2010 California Electrical Code requirements. Locations of required signage not shown. Additionally,. system attributes are required to be shown per Sections 690.17, 690.53 and 690.54 — Revise schedule accordingly. The output of a utility -interactive inverter shall be permitted to be connected to the load side of the service disconnecting means of the other source at any distribution equipment on premises. Where such a connection is made, the interconnection provisions of CEC Section 690.64(B)(1) through (B)(7) shall apply. Verify main service and equipment busbar ratings and provide evidence of 200amp service with 225amp bus. See previous comments. Additionally, please provide residential load calculation to determine and justify electrical service requirements. SECTION C - STRUCTURAL 1) No corrections apply. SECTION D - MISCELLANEOUS COMMENTS 1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as necessary and provide written response, noting where correction can be found. 2) Provide one copy each of the Site Plan and Floor Plan for the County Assessor's office. While not required for resubmittal, this administrative item must be addressed prior to issuance of building permit. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 3 of 3 Hot Purple Energy 870 Research Dr. STE 6 Palm Springs, CA 92262 0- 760.322.4433 F- 760.322.4435 info@hotpurpleEnergy.com Lic.# 940550 (131,C46) Mr. Ortega, SECTION A - GENERAL 1) All Sheets signed 2) 400A Panel Change -out to be conducted by electrical contractor. SECTION B — SOLAR I. General 1) Reconciled Notes. IV. Wiring Methods 1) Run Locations specified on Sheet 2 Roof Plan and Sheet 4 NEC code sheet. De -rate and adjustment factors added. Conduit schedule listed. Conduit fill for 1" EMT = (16) THWN-2 Allowable (system design does not exceed 10 conductors at any point. Table C.1) Temperature rating of THWN-2 = 90 C (194 F) Ambient Temp. = 114-122 + 40 F degrees [Table 310.15(B)(2)(c)] = 162 F degrees. THWN-2 ACCEPTABLE IN THESE CONDITIONS WITH ALL CORRECTION FACTORS CONSIDERED. 2) Slight Adjustments to made to Conductor Sizing(Array#1). V. Grounding 1) All grounding specifications made on Roof Plan And NEC Code Sheet 2) DC Grounding conductor electrode = 8 AWG Shown in Accordance with CEC 250.166 and 690.41 see Sheet 3.0 —Single Line Drawing. VI. Marking, Connection to other sources, Storage Batteries and Systems over 600 Volts 1) Schedule of NEC 690 markings and labels found on Sheet 4 —NEC Code Sheet. etn.# Qtt Of La Qutfhta Building a Safety Ditdsion P.O. Box 1504,78-495 Calte Tampico L4.Quinta, CA 92253 -:(760) 777-7012 Building Permit Application* and Tracking Sheet Perrnit # Oq� \V, Project Add[ess: 7 6 Q C RAJVTAJ Owner's Name:. A P. Number. Address: _ yd 16. 4 ve Ai W4.(3 C i2 n1 W4 Legal Description: Contractor. 0T 19/ i E City, ST, Zip: L A 40 t Np4 oA 2 2 Telephone: Address: 870 9-E S'EA ✓Z t -I Qr 51 6 ProjeetDescription: .. City, sr, zip: )04-INI S PQ i N 6-1CA 1220 V S a 1,4 n /N S LL l I Telephone: 76 Q Z Z -'1413 3 ty Lie. #; State Lie. 4: Arch., Engr., Designer W I4OUS: Address: CA X4'e -A_5 Co N T" (4w City., ST, Zip: f o r Telephone: Construction Type:. SQ 1A i? Occupancy: of . State Lie. #:n Project type (circle one): New d' Alter Repair Demo Name of Contact Person: ANQn F w A. OAVIS%d1J Sq. Ft.: S (P # Stories: � # Units: Telephone # of Contact Person: 2 11 % Estimated Value of Project , APPLICANT: DO NOT WRITE BELOW THIS UNE N Submittal Req'd Rec'dCltpC�Q_ 1VG" . ll !r] I ,. -1 PERMIT FEES. Plan Sets Plan Cheek submitted : itfm Amount ' Structural Cates 1 ..l Reviewed, ready fof r,eorrecdo L n tPlan Check Deposit. 11 TrussCales. Called Contact Person Plan Check Balance. ^ Tide 24 Cates Plans picked up 1 =-� --.— . . Construction Flood plain plan Plans resubmitted.. 'O 1 Mechanical -� Grading plan 2" Review, ready for rrecdon issue Electrical SubcontactorList Called Contact Person Plumbing Grant Deed I Plans picked up l /� S.M.I. H.O.A. Approval Plans resubmitted a 20M Grading .�. W HOUSE:- 3" Review; ready for correcdo ne f 110 il Developer Impact Fee Planning Approval Called Contact Person .I.P.P. Pub. Wks. Appr Date of permit issue Simc� School Fees Total Permit Fees ` ?. Lo l eel ISO q - sCL*a 0& 'C S A44 VP: 9UM490) it 14 31 �-r Fronius IG Plus PV Inverter The first complete solution. Reliable. Proven. Smart. - - - _._____-____ _ --------- An outstanding addition to the family: The next generation Fronius IG Plus inverter builds on a successful model with multiple enhancements, including maximum power harvest, a built-in six circuit string combiner, integrated, lockable DC Disconnect, significantly improved efficiency, and unbeatable reliability. New, larger power stages expand the proven Fronius IG family from 2 to 12 kW in a single inverter. POWERING YOUR FUTURE MOW &ter Am r q. INPUT DATA Fronius IG Plus I 3.0-1 ..... I 3.8-1 ..... I 5.0-1 ..... I 6.0-1 ..... I 7.5-1_.. I 10.0-1 ...... I 11.4-1 ..... I 11.4-3--..- 112.0-3,.-,-.r Recommended PV-Power(Wp) 2500-3450 3200-4400 4250-5750 5100-6900 6350-8600 8500-11500 9700-13100 1 9700-13100 10200-13800 MPPT-Voltage Range 230 ... 500 V DC Startup Voltage 245 V Max. Input Voltage (at 1000 W/m= 14°F (-10°C) in open circuit operation) 600 V Nominal Input Current 8.3 A 10.5 A 13.8 A 16.6 A 20.7 A 27.6 A 31.4 A 31.4 A 33.1 A Max. usable Input Current 14.0 A 17.8 A 23.4 A 28.1 A 35.1 A 46.7 A 53.3 A 53.3 A 56.1 A Admissible conductor size (DC) No. 14 - 6 AWG Number of DC Input Terminals 6 Max. Current per DC Input Terminal 20 A; Bus bar available for higher input currents nUTPUT DATA Fronius IG Plus I 3.0-1 ..... I 3.8-1 ..... I 5.0-1_.. I 6.0-1 ..... I 7.5-1 ..... I 10.0-1 ...... I 11.4-1 ..... I 11.4-3 _ .. 112.0-3.._.___ Nominal output power (PAcnj 3000 W 3800 W 5000 W 6000 W 7500 W 9995 W 11400 W 11400 W 12000 W Max. continuous output power 104°F (40°C) 208 V / 240 V / 277 V 3000 W 3800 W 5000 W 6000 W 7500 W 9995 W 11400 W 11400 W 12000 W Nominal AC output voltage Consumption during operation 208 V / 240 V / 277 V 15 W 208 V / 240 V 277 V Operating AC voltage range 208 V (default) 240 V 277 V Controlled forced ventilation, variable fan speed Enclosure Type 183 - 229 V (-12 / +10 %) 211 - 264 V (-12 / +10 %) 244 - 305 V (-12 / +10 %) Unit Dimensions (W x H x D) 17.1 x 24.8 x 9.6 in. Max. continuous 208 V output current 240 V 277 V 14.4 A 12.5 A 10.8 A 18.3 A 15.8 A 13.7 A 24.0 A 20.8 A 18.1 A 28.8 A 25.0 A 21.7 A 36.1 A 31.3 A 27.1 A 48.1 A 41.7 A 36.1 A 54.8 A 47.5 A 41.2 A 31.6 A" 27.4 A" n.a. n.a. n.a. 14.4.A" Admissible conductor size (AC) -4 ... 122°F (-20... +50°C) Compliance No. 14 - 4 AWG Max. continuous utility back feed current 0 A Nominal output frequency 60 Hz Operating frequency range 59.3 - 60.5 Hz Total harmonic distortion <3% Power factor 1 GENERAL DATA Fronius IG Plus I 3.0-1._.. I 3.8-1._ I 5.0-1 ,,,,, I 6.0-1 ,,,,, I 7.5-1 ,,,,, I 10.0-1 ,,,. I 11.4-1 I 11.4-3 ___ 112.0-3,._-.,_ Max. Efficiency Internal GFDI (Ground Fault Detector/Interrupter); in accordance with UL 1741-2005 and NEC Art. 690 96.2% Internal diode CEC Efficiency 208 V 240 V 277 V 95.0% 95.5% 95.5% 95.0% 95.5% 95.5% 95.5% 95.5% 96.0% 95.5% 96.0% 96.0% 95.0% 95.5% 96.0% 95.0% 95.5% 96.0% 95.5% 96.0% 96.0% 95.0% 95.5% n.a. n.a. n.a. 96.0% Consumption in standby (night) < 1 W Consumption during operation 8 W 15 W 22W Cooling Controlled forced ventilation, variable fan speed Enclosure Type NEMA 3R Unit Dimensions (W x H x D) 17.1 x 24.8 x 9.6 in. 17.1 x 36.4 x 9.6 in. 17.1 x 48.1 x 9.6 in. Power Stack Weight 31 lbs. (14 kg) 57 lbs. (26 kg) 82 lbs. (37 kg) Wiring Compartment Weight 24 lbs. (11 kg) 26 lbs. (12 kg) 26 lbs. (12 kg) Admissible ambient operating temperature -4 ... 122°F (-20... +50°C) Compliance UL 1741-2005, IEEE 1547-2003, IEEE 1547.1, ANSI/IEEE C62.41, FCC Part 15 A& B, NEC Article 690, C22.2 No. 107.1-01 (Sept. 2001) PROTECTION DEVICES Fronius IG Plus I 3.0-1..... I 3.8-1.._. I 5.0-1 ..... 6.0-1.._. I 7.5-1.... I 10.0-1. _ I 11.4-1 _ 11.4-3 12.0-3 Ground fault protection Internal GFDI (Ground Fault Detector/Interrupter); in accordance with UL 1741-2005 and NEC Art. 690 DC reverse polarity protection Internal diode Islanding protection Internal; in accordance with UL 1741-2005, IEEE 1547-2003 and NEC Over temperature Output power derating / active cooling Complies with Canadian standard C22.2 No. 107.1-01 (Sept. 2001). per Phase Fronius USA LLC Solar Electronic Division 10421 Citation Drive, Suite 1100, Brighton, Michigan, 48116 E -Mail: pv-us@fronius.com www.fronius-usa.com M Fronius USA LLC - Products - Grid -Connected PV Inverters Fronius IG Plus / IG Plus V 10.0-1 / 11.4-1 / 11.4-3 Delta / 12.0-3 WYE 277 + Maximum Earnings Security + Highest Reliability + First Universal Inverter This three power stage inverter is availaable in 10.0, 11.4 and 12.0 kW. Best suited for large residential and commercial applications. Available IG Plus I IG Plus V Three Stage Inverters: 10.0-1 UNI 11.4-1 UNI 11.4-3 Dena 12.0-3 WVE277 Technical Data Fronius IG Plus 10.0- 11.4- 11.4- 12.0-3WVE277 1 UNI 1 UNI 3Delta Input data Recommended PV -Power (kWp) 8.5-11.5 9.7-13.1 9.7-13.1 10.2-13.8 MPPT-Voltage range 230 - 500 V Max. Input voltage range 600 V (at 1000 W/m2 14°F (-10°C) in open circuit operation) Nominal Input Current 27.6 A 31.4 A 31.4 A 33.1 A Max. usable Input Current 46.7 A 53.3 A 53.3 A 56.1 A Admissible conductor size (DC) No. 14-6 AWG Output data Nominal output power (PAC nom) 9995 W 11400 W 11400 W 12000 W Page 1 of 5 http://www.fronius.com/cps/rde/xchg/SID-177ECB63-13773A85/fronius_usa/hs.xsl/2714_... 9/19/2011 Fronius USA LLC - Products - Grid -Connected PV Inverters Max. continupous output power 9995 W 11400 W 11400 W 12000 W 104-F (40-C) 208 V / 240 V / 208 V 95.0% 95.5% 95.0% n.a. 277 V 95.5% 96.0% 95.5% n.a. 277 V Nominal AC output voltage 208 V / 240 V / 277 V 208 V 1240 277 V Consumption during operation 22W V Operating AC voltage range (default) Enclosure Type NEMA 3R 208 V 183 - 229 V (-12 / +10 %) Power Stage Weight 240 V 211 - 264 V (-12 / +10 %) 26 lbs. (12 kg) 277 V 244 - 305 V (-12 / +10 %) temperature Maximum continuous output current Compliance UL 1741-2005, IEEE1547-2003, IEEE 1547.1, ANSI/IEEE 208 V 48.1 A 54.8 A 31.6 A' n.a. 240 V 41.7 A 47.5 A 27.4 A' n.a. 277 V 36.1 A 41.2 A n.a. 14.4 A' Admissible conductor size (AC) No. 14 - 4 AWG Max. continuous utility back feed 0 a current Nominal frequency 60 Hz Operating frequency range 59.3 - 60.5 Hz Total harmonic distortion <3% Power factor 1 General data Max. Efficiency 96.2% CEC Efficiency accordance with UL 1741-2005 and NEC Art. 690 208 V 95.0% 95.5% 95.0% n.a. 240 V 95.5% 96.0% 95.5% n.a. 277 V 96.0% 96.0% n.a. 96.0% Consumption in standby (night) < 1 W Consumption during operation 22W Cooling Controlled forced ventilation, variable speed fan Enclosure Type NEMA 3R Unit Dimensions (W x H x D) 17.1 x 48.1 x 9.6. in. Power Stage Weight 82 lbs. (37 kg) Wiring Compartment Weight 26 lbs. (12 kg) Admissing ambient operating -13 ... 131-F (-25... + 55°C) temperature Compliance UL 1741-2005, IEEE1547-2003, IEEE 1547.1, ANSI/IEEE C62.41, FCC Part 15 A&B, NEC Article 690, C22. 2 No. 107.1-01 (Sept. 2001) Safety equipment Ground fault protextion . Internal GFDI (Ground Fault Detector/Interrupter); in accordance with UL 1741-2005 and NEC Art. 690 DC reverse polarity protevtion Internal diode Islanding protection Internal; in accordance with UL 1741-2005, IEEE 1547-2003 and NEC Over temperature Output power derating / active cooling Page 2 of 5 http://www.fronius.com/cps/rde/xchg/SID-177ECB 63-13773A85/fronius_usa/hs.xsl/2714_... 9/19/2011 BEyEFITS Highest Efficiency SunPowerTm Solar Panels are the most efficient photovoltaic panels on the market today. More Power Our panels prodktce more power in the some amo.int of space—up to 50% mo -e than conventional designs and 100% more thor thin film solar panels. Reduced Installction Cost More power per panel means fewer panels per ins -al . This saves both time and money. Reliable and Robust Design Prov --n materials, tempered front glass, and a sturdy anodized frame allow panel to operate reliably in multiple mounting configurations. SPR-240E-WHT-D qV SERIES The SunPower""" 240 Solar Panel provides today's highest efficiency and performance. Utilizing 72 all back -contact solar cells, the SunPower 240 delivers a total panel conversion efficiency of 19.3%. The panel's reduced voltage -temperature coefficient, anti -reflective glass and exceptional low -light performance attributes provide outstanding energy delivery per peak power watt. 20% 15% 10% 5% 0% SunPower's High Efficiency Advantage 18% 19% Thin Film Conventional SunPower SunPower E 18 Series E 19 Series C &us 11 Electrical Data - Measured a standard Test Conditions (STq: k—s rice of I000W/ms. AM 1.5, and cell tempwaft. 25• C Peak Power (+5/-3%) Pmax 240 W Efficiency n 19.3 Rated Voltage Vmpp 40.5 V Rated Current Impp 5.93 A Open Circuit Voltage Voc 48.6 V Short Circuit Current Isc 6.30 A Maximum System Voltage UL 600 V Temperature Coefficients Power (P) -0.38% / K Voltage (Voc) -132.5mV / K Current (Isc) 3.5mA / K NOCT 45° C +/-2° C Series Fuse Rating 20 A I-V Curve 1000 W/m' m 50° C 6 1000 W/m' 5 Q 4 Soo W/ t 3 l ( 500 W/m' �24 1 +. OIr 200 W/mi — - - 0 10 20 30 40 50 60 Voltage M Current/voltage characteristics with dependence on imodiance and module temperature. Tested Operating Conditions Temperature -40a F to +1 BY F (-40° C to + 85' C) Max load 113 psf 550kg/m2 (5400 Pa) front — e.g. snow; 50 psf 245kg/m2 (2400 Pa) front and back — e.g. wind Impact Resistance Hail 1 in (25 mm) at 52mph (23 m/s) Warranties and Certifications Warranties 25 year limited power warranty 10 year limited product warranty Certifications Tested to UL 1703. Class C Fire Rating Dimensions 4 Grounding Holes 2X 1200 [47.241 MM 2X (.81 12 06.6 4X 180 ilNl [.261 [7.07] 2X 30 2X 577 8X 04.2 4X 231 11.191 I 122.701 [.171 [9.09] TT T F 2X 11.0 [.431 798 6X 754 [31.42] 2X 04.2 [29.69] 1.17] II y y y 1559 46 I I 4X 322 2X 915 2X 199.5 [61.39] (1.81] "'lll Ilt"`--- t 12.6911 136.021 [7.85] 4X 12 2X 1535 [.47] [60.451 CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. Visit sunpowercorp.com for details SUNPOWER and the SUNPOWER logo am trademarks or registered trademarks of SunPower Corporation. Su n poWercorp. conA 0 November 2010 SunPower Corporation. All rights msemd. Specificctiau included in this dotosheet are subject to change without notice. Document 4001-65327 Rev" / LTR EN Mechanical Data Solar Cells 72 SunPower all -back contact monocrystalline Front Glass High transmission tempered glass with anti -reflective (AR) coating Junction Box IP -65 rated with 3 bypass diodes Dimensions: 32 x 155 x 128 (mm) Output Cables 1 000m length cables / MultiContoct (MC4) connectors Frame Anodized aluminum alloy type 6063 (black) Weight 3 3. 1 lbs. (15.0 kg) I-V Curve 1000 W/m' m 50° C 6 1000 W/m' 5 Q 4 Soo W/ t 3 l ( 500 W/m' �24 1 +. OIr 200 W/mi — - - 0 10 20 30 40 50 60 Voltage M Current/voltage characteristics with dependence on imodiance and module temperature. Tested Operating Conditions Temperature -40a F to +1 BY F (-40° C to + 85' C) Max load 113 psf 550kg/m2 (5400 Pa) front — e.g. snow; 50 psf 245kg/m2 (2400 Pa) front and back — e.g. wind Impact Resistance Hail 1 in (25 mm) at 52mph (23 m/s) Warranties and Certifications Warranties 25 year limited power warranty 10 year limited product warranty Certifications Tested to UL 1703. Class C Fire Rating Dimensions 4 Grounding Holes 2X 1200 [47.241 MM 2X (.81 12 06.6 4X 180 ilNl [.261 [7.07] 2X 30 2X 577 8X 04.2 4X 231 11.191 I 122.701 [.171 [9.09] TT T F 2X 11.0 [.431 798 6X 754 [31.42] 2X 04.2 [29.69] 1.17] II y y y 1559 46 I I 4X 322 2X 915 2X 199.5 [61.39] (1.81] "'lll Ilt"`--- t 12.6911 136.021 [7.85] 4X 12 2X 1535 [.47] [60.451 CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. Visit sunpowercorp.com for details SUNPOWER and the SUNPOWER logo am trademarks or registered trademarks of SunPower Corporation. Su n poWercorp. conA 0 November 2010 SunPower Corporation. All rights msemd. Specificctiau included in this dotosheet are subject to change without notice. Document 4001-65327 Rev" / LTR EN Is Hot Purple Energy 820, RESOrch Dr. SGE 6 PiIm Springs; CA 9 262 8- 760.37,x.01433 F- 760,322A435 info@hvt0urpteEnerg4=c,oM itz.#t 940550 (03.0 6) Project Information Homeowner, ROBERT OWEN Contact Info: R.Owen@HotpurpleEnergy.com. Site LocationAPN# 5403$ Avenida Bermudas, La Quinta CA 9 .253-APN#: 774225019-9 Legal Descri tion: Lot 1MB 019/082 Santa Carmelita at gale la Quinta unit 27.. Table of Contents: gm U•l CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE 11 i tl BY —&==-. 0 =A"4 fit co4w .0-- J • Site Placa A9-1 e Army Plan pg. 2 e • Single Lim pg.3 ; • -....-x.... * Conductor Sizing Schd. pg. 4 Signage Sheet & Specifications pg. S SCOPE CSF WORIK: WORK SHALL CONSIST OF INSTALLATION OF (95) SUNIPOWER SOLAR. MODULES (SPR-24,0E-WHT-O) ALONG WITH (3) PRONIUS USA — (2) IG PLUS 6.0-1(240v) — (1) ICS PLUS 10_1 (240x) INVERTER AND .ALL APPROPRIATE MOUNTING HARDWARE (PROFESSIONAL SOLAR. PRODUCTS INC.) *NOTE: THIS PROJECT SHALL COMPLY WITH THE 2010 CALIFORNIA BUILDING CODE, WHICH ADOPTS THE 2009 IPG,,. 2009 UMC, 2009 UPC AND.T E 2006 NEC.. It u ROOF COVERINIGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND ARRAY#3 WIRES WILL RUN APPROVED MANUFACTURER'S THROUGH RACEWAY INSTRUCTIONS SUCH THAT THE ROOPN ROOF INTO INVERTER#3 COVERINGS SHALL SERVE TO PROTECT LOCATED IN ATRIUM, THE BUILDING OR STRUCTURE. - CB1503 (6) 10AWG THWN2 STRANDED COPPER WIRE. ARRAY # 2 W I RES WILL RUN THROUGH RACEWAY IN ATTIC, THEN ROOF INTO INVERTER# 2 .LOCATED IN ATRIUM 1 "EMT (6) 10AWG THWN2 STRANDED COPPER WIRE. ARRAY#2 (27) MODULES - (3 STRINGS OF 9) ALL B -VENTS AND PLUMBING VENTS SHALL EXTEND AT LEAST 6 INCHES ABOVE THE ARRAY(S). B -VENTS SHALL EXTEND AT LEAST 2 FT. ABOVE THE ARRAY AT HIGHEST PART OF ARRAY WITHIN 10 FT. UMC 305 AND NEC 110.28 8 AWG GRND ARRAY# 1(44) MODULES (4 STR I NGS OF 11) (8) 10AWG STRANDED WIRE. 8 AWG GR NEC 250A ROOF PLA ROBERT OWEN 54038 AVENIDA BERMUDAS LA QUINTA CA 92253 2 INTEGRATOR 'i =R HOT PURPLE ENERGY 870 Research Dr. PALM SPRINGS CA 92262 O: 760.322.4433 F: 76D.322.4435 ln.fo@HQ#purpleEnergy.com NOT ES 'ICE PANEL/ C DISCON,/•OCPD , PANELS ON TILE SECTIONS �. ARRAY# 1 WIRES WILL I U BE Mt�UN I EL) F .LUSH, ARRAY# 3 RUN THROUGH NOT TO EXCEED 8" , (24) MODULES PANELS ON FLAT SECTIONS (3 STRNGS OF 8) RACEWAY I N ATTIC, TO BE MOUNTED ON '10-18 THEN ROOFINTO EGREE TILT, NOT TMJ INVERTER# 1 LOCATE 'EXCEED 18 ",OR BE SEEN IN ATRIUM. FROM STREETV VIEW.. CITY OF LA UIJIN IA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION amu_ x,22. yy3 Z DATE BYE L- CITY OF LA QUINTA BUILDING & SAFETY DEPT APPROVED FOR CONSTRUCTION DATE BY - L it ROBERT OWEN-54038 AVENIDA BERK-04S, LA QUINTA CA 9,2253 I "ODULES IN SERI r1- 361 -1 ------ 2l A-0 KLES lN SERI MODULES IN, SERI I EMT K-2[(8 10AWG]l +8AVVG GRKD, INVERTER #1 A11 labe is are shown confir m. ed with NE&59- 0 -(SEE AT -TACHE D PAG jE) ARRAY #2 -.o-IW K m -W--F A -1 v gp- RI � 9 MODUI-ES IN S 1 9 MODULE.-$ IIN ---%F-R(�j ARRAY 0 3 i -dfafl �8 WIDUM-a IN srmutbl 8 MODULES IN SERINS I U.l" 1. ILITY SERVICE i(i) 400A BUSS (1) 3 -40A MA 11 N GCP D I t 1� VETER (2)40A Off, 60A OCPn-L 690.54 I" ENT TI-,rWl'q-2[(G-J0AWG] i" EMT Tl.1--HN-2[(6),--i0AVVr,-ll NEK 693.9(Q -v8AVVG- GRr!Dr, SAW G 010 Ll V71 690,17(4) L 123- IL 659064(7) I N FTI # 2' INVERTER #3 P� -1- 4 TA 600 VDC !A WO VOC D,C- Disc nett V I\Ec 6@,0, 1�qcz) EMTvi/ (3 6AWG THWN-2 +6 -AWG GRND. --------------------------------t--------- 4 GROUNDING ELECTRODE 'IA -WO VDCt ELECTRICAL LINEDIAGRAM HOT PURPLE ENERGY ------ ------- -- Z B701 RESEARCH DR. STE 6: I BlAffw/ (3) PALH &PRINGS, CA4,2262 A DISCONNEC 71 8A- VVG THWN 2 ,N&'IA3R RATBD +6AXWG GRI\D. 60.522.4433. F: 760.522.4435 (NEC 690-17) iNro@HOTPURPLc-EHr=RGY.com CITY OF LA QUINTA _gLal-DLUG - AFw je _FTy nFpT APPROVED FOR CONSTRUCTION DATE BY 3 APPROVED FOR CONSTRUCTION DATE BY. .� ELECTRICAL LINE DIAGRAM NOTES PV MODULE RATINGS HOT PURPLE ENERGY 870 RESEARCH DR. STE 6 (NEC -690.51) MODULE MFR= SUNPOYWER PALM SPRINGS, CA -92262 MODULE MODEL = SPR-240E-WHT-D 760.322.4433, F; 760.322.4435 RATING = 240WATTS@STC; INFO@HOTPURPLEENERGY. COH RATING = 218.BWATTSOPTC. ROBERT OWEN-54038 AVENIDA BERMUDAS, LA QUINTA CA 92253 Voc = 48.6 V, VP MAY, =40.5V ISc = 6.30 A, IP MAY, = 5.93 A ARRAY RATINGS (1,2,&3) INVERTER RATING (1,2,&3) TABLE310.16 AMPACITY, #l0-THINN-�=40A INVERTER #I RATING(NEC690.B(B)1) TABLE310.I6 AMPACITY, #6 -THIN -2=75A ARRAY#I RATING-(I0;56K1 -,DC) ADJUSTED TEMPERATURE: [41.7A X 1.25 =52.125 (60A OCPD)] AMBIENT HIGH TEMPERATURE: 122 F (NEC -690.51) 122 F + 40 F[TABLE310.15(B)(2)(C)]=162 F MFR=FRONIUS USA TEMP. CORRECTION FACTOR= .82[TABLE310.I6] 4 STRINGS OF II IN SERIES TEMP. CORRECTION FACTOR= .41[TABLE310.16] MODEL = IG PLUS 10.0-1 (240 V) NEW AMPACITY= 75A X .82 = 61.5A Voc x 1.12 = 598.75(NEC 690.7) RACEWAY ADJUSTMENT FACTOR= .70[310.15(B)(2)(A)] OUTPUT AC VOLTAGE = 240 VAC VP MAY, = 405.OVDC NEW AMPACITY= 40A X .41 X .70 = 11.4BA MAX.OUTPUT CURRENT = 41.7A [5�.1�5A(Isc) < b1.5A](#b-THIh�N-2 ALLOWABLE) Isc X 1.56= 7.87 A [NEC 690.8(A)] EFFICIENCY = 95.5 % CEC [7.87A(Isc) < 11.48A](#10-THWN-2, ALLOWABLE) ARRAY #2 RATING-(6.48KVV-DC) TABLE310.16 AMPACITY, #10-THWN-2=40A INVERTER #2 RATING(NEC690.8(B)I) TABLE310.I6 AMPACITY, #8-THWN-2=55A (NEC -690.51) ADJUSTED TEMPERATURE: [25A X 1.25 = 31.25(40A OCPD)] AMBIENT HIGH TEMPERATURE: 122 F 122 F + 40 F[TABLE310.15(B)(2)(C)]=162 -FARRAY #2 (31.25A = 8 AWG ALLOWABLE) TEMP. CORRECTION FACTOR= .82[TABLE310.161 3 STRINGS OF 9 I N SERIES TEMP. CORRECTION FACTOR= . 41 [TABLE310.1 b] MFR=FRONIUS USA NEW AMPACITY= 55A X . 82= 45 . IA Voc Y, 1.12 = 489.88 (NEC690.7) RACEWAY ADJUSTMENT FACTOR= .70[�310.15(B)(2)(A)] MODEL =1G PLUS 6.0-1(240 V) VP MAY, = 364.5VDCNEIN AMPACITY= 40A X .41 X .70 = 11.48A - - OUTPUT AC VOLTAGE 240 VAC [31.25A(Isc) < 45.IA](#8-THWN-2 ALLOWABLE) ISc X 1,56 =7.87A [NEC 690.8(A)] (7.87A = 10 AWG ALLOWABLE) [7.87A(Isc) < 11.48A](#Io-THWN-2 ALLOWABLE) MAX. OUT CURRENT = 25A KW .EFFICIENCY = 96% CEC INVERTER #3 RATING(NEC690.8(B)I) TABLE310.16 AMPACITY, #8-THWN-2=55A ARRAY #3 RATING-(5.76KVMt-DC) TABLE310.I6 AMPACITY, #10-THtihlN-2=40A [25-A X 1.25 = 31.25(40A OCPD)] AMBIENT, HIGH TEMPERATURE: 122T (NEC -690.51) ADJUSED TEMPERATURE: T ARRAY #3 (31;25 A = BAWG ALLOWABLE) TEMP. CORRECTION FACTOR= .82[TABLE310.16] 3 STRINGS OF 8 IN SERIES 1.22 F + 40 F[TABLE310.15(B)(2)(C)]=162 F MFR =FRONIUS USA NEW AMPACITY= 55A X .82= 45.IA Voc Y, i.12 = �435.4b (NECb90.7) TEMP. CORRECTION FACTOR= .41[TABLE310.Ib]. =1G PLUS 6.0-1(240 V) VP MAY, = 32L►.OVDC RACEWAY ADJUSTMENT FACTOR= .70[310.15(B)(�)(A)] ,MODEL OUTPUT AC VOLTAGE = 240 VAC [31.25A(Isc) < 45.IA](#B-THWN-2 ALLOWABLE) ISC X 1.56 =7.87A [NEC 690.8(A)] NEW AMPACITY= 40A X .41 X .70 = 11.48A MAX. OUT CURRENT = 25A KW (7.87A =10 AWG ALLOWABLE) [7.87A(Isc) < 11.48A](#Io-THWN-2 ALLOWABLE) EFFICIENCY = 96% CEC CITY OF LA QUINTA �w APPROVED FOR CONSTRUCTION DATE BY. .� MMMMxN UGH S117 FMId M 'K. L PISA-, ff -, OR M1 'S", '-LZ, MUF- L NMI, ir - R: I IWPA , -,A2&j 690.5(,0) -; INVERTER VOTE Rk �, IMS, 111 �', Ur k M 1M 10M INSM"PRUTIM 11-ITAILAT"I STT Pmr EffME-Ce MAT4Aft MaTil 6190.64(B)(7) - PAN ELBOARD M N t oil I M I -ICA I L Istim NST mim 1 N Mw I E mm -RG C O 0 AC T T, I -P. PCl1RRET PIER)MON AC V' LTACIE 690.-17/690.,54 - AC DISCONNECT Fq1 :3 103 SIN LNT TIDE ANS SCA SIS f'IAY 6 &Sj -t E Mjil 00A. `G MIRGHM-0 WON[ I 6010.111/690.53 - DC DISCONNECT TM us supp" FAM MME soup=* uumm AM 690.56(B)/705.110 - SERYI CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY - t -j A J+isiI 7-