MUP 2006-840I
P.O. Box 1504
LA QUANTA, CALIFORNIA 92247-1504
78-495 CAi-i..r•. TAMPICO (760) 777-7000
LA QUANTA, CALIFORNIA 92253 FAX (760) 777-7101
October 13, 2006
Mr. Nolen Sparks
La Quinta Orchard Partners
P.O. Box 1716
La Quinta, CA 92253
SUBJECT: MINOR USE PERMIT 2006-840
CASITA: 79-315 BROOKVILLE
Dear Mr. Sparks:
Your request for approval of Minor Use Permit 2006-840, allowing the construction of a
casita at 79-315 Brookville in La Quinta, is hereby approved. You may now contact the
Building & Safety Department for your building permit.
Enclosed is the approved original Deed Restriction for this Minor Use Permit. It must be
signed by the owner in front of a Notary Public. The original approved documents are
then to be recorded with the County Recorder, with a recorded copy given to the City for
our files.
The Community Development Department will sign the job card when the recorded copy
is received, which would provide our clearance to the Building & Safety Department to
issue the building final inspection. Until the recorded copy is received by the Community
Development Department, your Minor Use Permit is not complete and a final inspection
will not be conducted by the Building & Safety Department.
Should you have any questions, please call me at (760) 777-7125.
Sincerely,
ERIC CEJA
Assistant Planner
Attachments
c. Building and Safety Department
CITY OF ISA QUINTA - PUBLIC WORKS/ENGINEERING DEPARTMENT
GREEN SHEET (PUBLIC WORKS CLEARANCE) FOR BUILDING PERMITS
Fort updated & effective 8/25/2005 .
Please DO NOT submit the Green Sheet (Public Works . Clearance), Packet to the Public
Works/Engineering Department until ALL requirements listed below are complete. Incomplete
applications or' applications which cannot. be processed will be returned to Applicant. Green Sheet
approvals will be forwarded to the Building Department directly.by Public Works.
Date: OZ 7-8 o ? Developer: L4- Q•.) rN "tA 01ZCH-od ,,ZD PgfL'7 e tZ
Tract No.: ZcoS Tract Name: 15-maU4-s It 0,• :Q Lot No.(s): 1(p
Address(s): 7q 31-5 �r2oo�c}r� r_fr�
The following are the requirements for Public Works. Clearance to authorize issuance of a building
permit from the Building/Safety Department.
CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4 AND #5 BELOW.
TRACT HOMES_: PROVIDE ITEMS 41, #2, #3, #4 (AS APPLICABLE) AND #6 BELOW.
COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS- #1, #2, #3 AND #5 BELOW.
1.
Attach Pad Elevation Certificates in compliance with the approved design elevation for
building pad (maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must
be current (within 6 months of current date). If a precise grading plan creates the pad for
approval, please withhold green sheet submittal until a Pad Elevation Certificate can be
provided.
2.
Attach geotechnical certification of grading plan compliance.
3
Attach recorded final map showing proposed building locations are legal lots.
Attach a completed <1 acre per lot or infill project Fugitive Dust Control project information
form, PM10 plan & agreement or provide alternative & valid City approved PM10 plan set
reference number or hard copy.plan. PM10 plans for commercial and residential developments
eyond 1 lot) are submitted separately with grading plans and='are, subject to additional
r?
VK��
requirements.
fA 75
Attach an approved precise grading plan for the building location(s). AO flood zone
developments will require an approved flood plain development plan.
1 6.
S
Attach an approved rough grading plan for the building location(s).
�.� I have
d"`�
reviewed and confirmed the requirements listed above as presented and find the improvements
¢��► to be
sufficiently complete for construction of tf proposed building(s)/structure(s) on the subject
Q�Q lot(s).
Pursuant to ings t abov proje ay be released for buildin pe it issuance.
ly �,1e
R I Recommended by: Dated: b 0
.kv
Q"J`4
? r
f e Declined for approval for reason(s) as follow(s), please correct and resubmit:
d°`'fray:1
aft— `
Pc� i
°feo
x.15 E CNZAD A- ._
TAPWDEPT\STAFF\Goble\Green Sheet PW Release\050824GREEN SHEET COVERdoc
V '•�
City of La Quinta - PM 10 Proiect Information (<1 acre per Lot or Infill Proiect)* Page 1 of 3
Form updated & effective 8/25/2005
Project Information
Project Phase
Project Contractor:
'
Project Phase
(Check One):
Construction
Demolition
Demolition
Project Name:
ZS q�[ci A 5 C 'aA NC4.t� (-A q.J(-..)"rA
Project Tract
Number:
Z (oS 2 -
Lot Number(s):
Anticipated Start Date:
Project Street
Address:
1 3(5- 3 t?ACV-V! LLE
tA- tPJ t "' -r4 f CA g Z Z s
Anticipated Completion:
Total acres in active
construction (<1 acre per
Lot):
.Project Contact
Information
Please Note: Dust control is required 24 hours a day, 7 days a week,
regardless of construction status. Person listed below is responsible for
dust control during business and non- business hours.
Name:
Title:
Qt -4 tZSL-
Com any Name:
Mailing Address:
PC> SW 1-tt (P .
City:
C -N tDu t -t r k
State:
CA
Zip Code:
Z 2 4 -
Primary
Telephone
Number:
�
Fax:
(
24 Hour
Access/Emergency.
Phone:�
Cell Phone:
(
PM 10 Certificate
Number:
00 Cr/• - r0 2 - 'z
* Expanded PM 10 plans for commercial and residential developments > 1 acre are required by the
City of La Quinta.
T:\PWDEPT\STAFF\Goble\Green Sheet PW Release\050824MIN1 PM 10 PACKET GREEN SHEET.doc
PM 10 (<1 acre per Lot or Infill Project) Fugitive Dust Control Plan Page 2 of 3
Plan updated & effective 8/25/2005
This plan shall take into account applicable SCAQMD Rule 403 regulations. Training may be obtained by
contacting SCAQMD (Sharon Zamora (909) 396-2183). This plan shall consist of the following action items:
WATERING: Continuous watering is required to prevent dust and must occur a minimum of 4
times daily.
Water shall be applied to dry soils to stop:
• Visible dust emissions over 20% opacity
• Visible dust emissions that travel over 100 feet.
• Water source 3/4 inch water meter at front (south) side of pad.
EDUCATION: Responsible Dust Control Individual and key personnel shall attend SCAQMD
PM 10 class and obtain PM 10 certificate number prior to construction activity.
• WEATHER MONITORING:. Wind predictions shall be monitored.
• SIGNAGE: - Use, Coachella Valley Fugitive Dust Control Plan Handbook Construction Site Signage
Guidelines.
• TRAFFIC: Construction traffic shall not be allowed on the pad, unless absolutely necessary. If
vehicles operate on pad, pad shall be kept firm and moist through hose watering or sprinklers.
Fugitive Dust shall be prevented by fencing off site to prevent unauthorized traffic on pad. (15 mph
maximum traffic speed).
• PARKING: Parking is not allowed on the pad. All vehicles must park on street (at designated areas
only).
• TRACK OUT: Provide 24 hour street cleaning and track out system as approved by City Public
Works Inspector. (No dirt on public or private roads). Track out shall be cleaned up within one hour
of incident.
• DIRT PILES: Dirt piles shall be limited to 50 cubic yards and built per California Building Code
grading requirements. Piles shall be kept moist or covered with tarp material. Larger dirt piles will
require stockpile or grading permit.
• FENCING: Provide PM10 fencing at perimeter of public roads and where applicable. Wood slat
fencing can be installed at rear of property and return 20 feet on either side if HOA restrictions apply.
Block walls can replace PM 10 fencing during the construction phase.
• EQUIPMENT: Extra hoses and sprinklers shall be maintained on site.
• EXCAVATION MEASURES: All areas to be excavated or graded shall be pre -watered. Water shall
be applied during excavation or grading operations also.
• DUMP TRUCKS: Open top dump trucks to be wet down, moist and tatped prior to leaving site.
• INACTIVE SITE: Within 10 days of ceasing of activities, re -vegetate or permanently stabilize as
required.
City of La Quinta - Site Specific Construction Phase PM 10 AErreement PalZe 3 of 3
Agreement updated & effective 8/25/2005
The signature of the property owner (or authorized representative):
• Shall act as his/her acknowledgement of dust control requirements and their enforceability,
pursuant to AQMD Rules 403 and 403.1;
• Shall constitute and agreement to comply with all project conditions as identified in the
approved dust control plan;
The property owner (or authorized representative
• Acknowledges that dust control is required 24 hours a day, 7 days a week, throughout the
period of project performance, regardless of project size or status;
• Shall ensure that each and every contractor/subcontractor and all. other persons associated
with the project shall be in continuous compliance with all requirements of the approved dust
control plan;
• Shall take all necessary precautions to minimize dust, even if additional measures beyond
those fisted in the dust control plan are necessary;
• Shall authorize representative of the City/County to enter upon the above mentioned property
for inspection and/or abatement purposes; and
• Shall hold harmless the City/County and its representatives from liability for any actions
related to this dust control plan or any City/County initiated abatement activities.
Signature of Property Owner or Authorized Representative
13G� � jC� �COoCiC
Printed Name
S
Title
Company
0 TRISTATE LANd SURVEYORS & CIVIl ENgiNEERS
78-120 CAFE ESTAdo, SUITE 102, LA QUINTAL CALIFORNIA 92253
(760) 564-0271 (800) 363.6306 FAX (760) 564.0279
February 13, 2007
Mr. Paul Goebel
CITY OF LA QUINTA
78-495 Calle Tampico
La Quinta, California 92253
RE: Pad Certification
The Estancias
Lot 16, Tract 26524
Dear Mr. Goebel:
This letter is to certify that a field survey was made of the existing pad in the City of La Quinta.
Lot 16 of Tract 26524 was found to be in conformance with the approved Grading Plan.
The following are the results of our survey:
LOT # PLAN GRADE MEAN ELEVATION
16 43.2 43.25
If you have any questions, please do not hesitate to call.
Sincerely,
�/, o %UYW. 1/4100t
���� �AfVD
Ken Nussbaum Stj,
Gtr
LS 6298 KEN �`�' NUSSBAUM 0
_► No. 6298
N Exp.
Q