Loading...
PCRES 2001-090PLANNING COMMISSION RESOLUTION 2001-090 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA QUINTA, CALIFORNIA, RECOMMENDING CERTIFICATION OF A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR ENVIRONMENTAL ASSESSMENT 2001-418 PREPARED FOR GENERAL PLAN AMENDMENT 2001-077, ZONE CHANGE 2001-100, AND ANNEXATION, ESTABLISHING PRE -ANNEXATION DESIGNATIONS FOR 240 ACRES ENVIRONMENTAL ASSESSMENT 2001-418 APPLICANT: NRI, LA QUINTA LIMITED PARTNERSHIP COUNTRY CLUB OF THE DESERT WHEREAS, the Planning Commission of the City of La Quinta, California, did, on the 26th day of June, 2001 hold a duly noticed Public Hearing to consider Environmental Assessment 2001-418 for General Plan Amendment 2001-077, Zone Change 2001-100, and annexation, generally located at the southwest corner of Monroe Street and Avenue 52, more particularly described as follows: APN 767-200-002, 003, 004, 005, 007, 008, 009, AND 010 WHEREAS, said Environmental Assessment has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1 970" (as amended; Resolution 83-68 adopted by the La Quinta City Council) in that the Community Development Department has prepared an Initial Study (EA 2001-418) and has determined that although the proposed General Plan Amendment 2001-077 and Zone Change 2001-100 could have a significant adverse impact on the environment, there would not be a significant effect in this case because appropriate mitigation measures were made a part of the assessment and included in the conditions of approval and a Mitigated Negative Declaration of Environmental Impact should be filed; and, WHEREAS, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said Planning Commission did find the following facts, findings, and reasons to justify recommending certification of said Environmental Assessment: The proposed General Plan Amendment 2001-077 and Zone Change 2001-100 will not be detrimental to the health, safety, or general welfare of the community, either indirectly, or directly, in that no significant unmitigated impacts were identified by Environmental Assessment 2001-418. 2. The proposed General Plan Amendment 2001-077 and Zone Change 2001-011 will not have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife population to drop below self G AW PDOCS\PCResCCDEAAnnex.wpd Planning Commission Resolution 2001-090 Environmental Assessment 2001-418 NRI, La Quinta Limited Partnership - Country Club of the Desert Adopted: July 26, 2001 sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of rare or endangered plants or animals or eliminate important examples of the major periods of California history or prehistory. 3. There is no evidence before the City that the proposed project will have the potential for an adverse effect on wildlife resources or the habitat on which the wildlife depends. 4. The proposed General Plan Amendment 2001-077 and Zone Change 2001-100 do not have the potential to achieve short-term environmental goals, to the disadvantage of long-term environmental goals, as no significant effects on environmental factors have been identified by the Environmental Assessment. 5. The proposed General Plan Amendment 2001-077 and Zone Change 2001-100 will not result in impacts which are individually limited or cumulatively considerable when considering planned or proposed development in the immediate vicinity, as development patterns in the area will not be significantly affected by the proposed project. 6. The proposed General Plan Amendment 2001-077 and Zone Change 2001-100 will not have environmental effects that will adversely affect the human population, either directly or indirectly, as no significant impacts have been identified which would affect human health, risk potential or public services. 7. There is no substantial evidence in light of the entire record that the project may have a significant effect on the environment. 8. The Planning Commission has considered the Environmental Assessment 2001- 418 and the Environmental Assessment reflects the independent judgement of the City. 9. The City has on the basis of substantial evidence, rebutted the presumption of adverse effect set forth in 14 CAL Code Regulations 753.5(d). 10. The location and custodian of the City's records relating to this project is the Community Development Department located at 78-495 Calle Tampico, La Quinta, California. NOW THEREFORE, BE IT RESOLVED by the Planning Commission of the City of La Quinta, California, as follows: G:\WPDOCS\PCResCCDEAAnnex.wpd Planning Commission Resolution 2001-090 Environmental Assessment 2001-418 NRI, La Quinta Limited Partnership - Country Club of the Desert Adopted: July 26, 2001 1 . That the above recitations are true and correct and constitutes the findings of the Planning Commission for this Environmental Assessment. 2. That it does hereby recommend to the City Council certification of Environmental Assessment 2001-418 for the reasons set forth in this Resolution and as stated in the Environmental Assessment Checklist and Addendum on file in the Community Development Department. 3. That Environmental Assessment 2001-418 reflects the independent judgement of the City. PASSED, APPROVED and ADOPTED at a regular meeting of the La Quinta Planning Commission held on this 26th day of June, 2001, by the following vote, to wit: AYES: Commissioners Abels, Butler, Kirk, Tyler, and Chairman Robbins NOES: None ABSENT: None ABSTAIN: None Q STEVE ROBBINS, Chairman City of La Quinta, California ATTEST: JER�`IIE Y� RM, N, Community Development Director Cit of La Qui ta, California G:\W PDOCS\PCResCCDEAAnnex. wpd ENVIRONMENTAL CHECKLIST FORM 1 . Project Title: General Plan Amendment 2001-077, Change of Zone 2001- 100, Pre -Annexation land use designation and zoning 2. Lead Agency Name and Address: City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 3. Contact Person and Phone Number: Jerry Herman, 760-777-7125 4. Project Location: Bounded on the north by Avenue 52, on the east by Monroe Street, on the south by Avenue 53, and east of the existing City limits. 5. Project Sponsor's Name and Address: NRI/LQLP 81-100 Avenue 53 La Quinta, CA 92253 6. General Plan Designation: Proposed: Low Density Residential 7. Zoning: Proposed: Low Density Residential 8. Description of Project: (Describe the whole action involved, including but not limited to later phases of the project, and any secondary, support, or off -site features necessary for its implementation. Attach additional sheets if necessary.) General Plan Amendment and Change of Zone to assign land use and zoning designations for an annexation application to the City of La Quinta. The proposed designation is Low Density Residential. The current County General Plan designation is 2B 2-5 units per acre. 9. Surrounding Land Uses and Setting: Briefly describe the project's surroundings. North: Developed polo grounds South: Approved golf and low density residential development, Country Club of the Desert West: Approved golf and low density residential development, Country Club of the Desert East: Vacant desert lands and agriculture 10. Other agencies whose approval is required (e.g., permits, financing approval, or participation agreement.) Local Agency Formation Commission G:\WPDOCS\EAChecklistCCAnnex.WPD Environmental Factors Potentially Affected: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Hazards and Hazardous Public Services Materials Agriculture Resources Hydrology and Water Quality Recreation Air Quality Land Use Planning Transportation/Traffic Biological Resources Mineral Resources Utilities and Service Systems Cultural Resources Noise Mandatory Findings Geology and Soils Population and Housing Determination (To be completed by the Lead Agency.) On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared 0 I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the applicant. A MITIGATED NEGATIVE DECLARATION will be prepared. O I find that the proposed project MAY have a significant effect on the environment, and an X ENVIRONMENTAL IMPACT REPORT is required. 0 I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Signature May 24, 2001 Date M— O G: \W PDOCS\EAChecklistCCAnnex. W PD Evaluation of Environmental Impacts: 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the reference information sources show that the impact simply does not apply to projects like the one involved (e.g. the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project -specific factors as well as general standards (e.g. the project will not expose sensitive receptors to pollutants, based on a project -specific screening analysis). 2) All answers must take account of the whole action involved, including off -site as well as on- site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) "Potentially Significant Impact' is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Potentially Significant Unless Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact' to a "Less Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVIII, "Earlier Analysis," may be cross-referenced). 5) Earlier analysis may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). Earlier analysis are discussed in Section XVIII at the end of the checklist. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) The analysis of each issue should identify: a) the significance criteria or threshold used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance G:\WPDOCS\EAChecklistCCAnnex.WPD Issues (and Supporting Information Sources): Would the proposal result in potential impacts involving AESTHETICS: Would the project: a) Have a substantial adverse effect on a scenic vista? (General Plan Exhibit CIR-5) b) Damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? (General Plan EIR, page 5-12 ff.) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (Application materials) d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? (Application materials) 11. AGRICULTURAL RESOURCES:. In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model prepared by the California Dept. Of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland) to non-agricultural use? (Master Environmental Assessment 5-29, 5-32) b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? (Zoning Map) c) Involve other changes in the existing environment which, due to their location or nature, could individually or cumulatively result in loss of Farmland, to non-agricultural use? (Aerial photographs) Ill. AIR QUALITY: Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable Air Quality Attainment Plan or Congestion Management Plan? (SCAQMD CEQA Handbook) b) Violate any stationary source air quality standard or contribute to an existing or projected air quality violation? (SCAQMD CEQA Handbook) c) Result in a net increase of any criteria pollutant for which the project region is non -attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? (SCAQMD CEQA Handbook) d) Expose sensitive receptors to substantial pollutant concentrations? (Project Description) Potentially Potentially Significant Less Than Significant Unless Significant No Impact Mitigated Impact Impact X X X X hN 2 V X M X G:\WPDOCS\EAChecklistCCAnnex.WPD IV e) Create objectionable odors affecting a substantial number of people? (Project Description) BIOLOGICAL RESOURCES: Would the project: a) Have a substantial adverse impact, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? (Master Environmental Assessment, Exhibit 5-1) b) Have a substantial adverse impact on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? (Master Environmental Assessment, p. 5-2 ff.) c) Adversely impact federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) Either individually or in combination with the known or probable impacts of other activities through direct removal, filling, hydrological interruption, or other means? (Master Environmental Assessment, p. 5-2 ff.) d) Interfere substantially with the movement of any resident or migratory fish or wildlife species or with established resident or migratory wildlife corridors, or impede the use of wildlife nursery sites? (Master Environmental Assessment, p. 5-2 ff.) e) Conflict with any local policies or ordinances protecting biological resources such as a tree preservation policy or ordinance? (La Quinta Municipal Code; General Plan) f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Conservation Community Plan, or other approved local, regional, or state habitat conservation plan? (Master Environmental Assessment 5-5) V. CULTURAL RESOURCES: Would the project: a) Cause a substantial adverse change in the significance of a historical resource which is either listed or eligible for listing on the National Register of Historic Places, the California Register of Historic Resources, or a local register of historic resources? (General Plan EIR, p. 4-77 ff.) b) Cause a substantial adverse change in the significance of a unique archaeological resources (i.e., an artifact, object, or site about which it can be clearly demonstrated that, without merely adding to the current body of knowledge, there is a high probability that it contains information needed to answer important scientific research questions, has a special and particular quality such as being the oldest or best available example of its type, or is directly associated with a scientifically recognized important prehistoric or historic event or person)? (General Plan EIR, p. 4-77 ff.) c) Disturb or destroy a unique paleontological resource or site? (Lakebed Delineation Map) d) Disturb any human remains, including those interred outside of formal cemeteries? (General Plan EIR, p. 4-77 ff.) X X X X X X ►1 X X M G:\WPDOCS\EAChecklistCCAnnex.WPD VI. GEOLOGY AND SOILS: Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? (General Plan EIR, Exhibit 4.2-3, page 4-35) ii) Strong seismic ground shaking? (General Plan EIR, page 4-30 ff.) iii) Seismic -related ground failure, including liquefaction? (General Plan EIR, page 4-30 ff.) iv) Landslides? (General Plan EIR, page 4-30 ff.) b) Result in substantial soil erosion or the loss of topsoil? (General Plan EIR, page 4-30 ff) c) Be located on a geological unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on - or off -site landslides, lateral spreading, subsidence, liquefaction or collapse? (General Plan EIR, page 4-30 ff.) d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? (General Plan EIR, page 4-30 ff.) e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal system where sewers are not available for the disposal of waste water? (Master Environmental Assessment 5-32) VII. HAZARDS AND HAZARDOUS MATERIALS: Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? (Application Materials) b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment? (Application Materials) c) Reasonably be anticipated to emit hazardous materials, substances, or waste within one -quarter mile of an existing or proposed school? (Application Materials) d) Is the project located on a site which is included on a list of hazardous materials sites complied pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (Riverside County Hazardous Materials Listing) X X X X X X X X 0 91 0 X G:\ W PDOCS\EAChecklistCCAnnex. W PD e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) f) For a project within the vicinity of a private airstrip; would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? (Master Environmental Assessment p. 6-11) h) Expose people or structures to the risk of loss, injury or death involving wildlands fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (General Plan land use map) Vlll. HYDROLOGY AND WATER QUALITY: Would the project: a) Violate Regional Water Quality Control Board water quality standards or waste discharge requirements? (Master Environmental Assessment 6-26, 6-27) b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (i.e., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted? (General Plan FIR, page 4-57 ff.) c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of stream or river, in a manner which would result in substantial erosion or siltation on- or off -site? (General Plan FIR, page 4-30 ff.) d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off -site? (General Plan FIR, page 4-30 ff.) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems to control? (General Plan FIR, page 4-30 ff.) f) Place housing within a 100-year floodplain, as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? (Master Environmental Assessment 6-13) g) Place within a 100-year floodplain structures which would impede or redirect flood flows? (Master Environmental Assessment 6-13) X X 01 X X X X X X X X IX. LAND USE AND PLANNING: Would the project: a) Physically divide an established community? (Specific Plan Project Description) I I I X G:\WPDO CS\EAChecklistCCAnnex. W PD b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purposes of avoiding or mitigating an environmental effect? (Master Environmental Assessment 2-11) c) Conflict with any applicable habitat conservation plan or natural communities conservation plan? (Master Environmental Assessment 5-5) X. MINERAL RESOURCES: Would the project: a) Result in the loss of availability of a known mineral resource classified MRZ-2 by the State Geologist that would be of value to the region and the residents of the state? (Master Environmental Assessment 5-29) b) Result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? (Master Environmental Assessment 5-29) X1. NOISE: Would the project result in: a) Exposure of persons to, or generation of, noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? (General Plan FIR, page 4-157 ff.) b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? (General Plan FIR, page 4-157 ff.) c) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? (General Plan EIR, page 4-157 ff.) d) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? (Master Environmental Assessment) e) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive levels? (General Plan map) XII. POPULATION AND HOUSING: Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure) ? (General Plan, page 2-14) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (Application Materials) X X X X X M M KI X X G:\WPDOCS\EAChecklisiCCAnnex.WPD XIII. XIV c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? (Application Materials) PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? (General Plan MEA, page 4-3 ff. ) Police protection? (General Plan MEA, page 4-3 ff. ) Schools? (General Plan MEA, page 4-9 ff. ) Parks? (General Plan; Recreation and Parks Master Plan) other public facilities? (General Plan MEA, page 4-14 ff. ) RECREATION: a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? (Application Materials) b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Application Materials) XV. TRANSPORTATIONITRAFFIC: Would the project: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? (General Plan EIR, page 4-126 ff.) b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? (General Plan EIR, page 4-126 ff.) c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (General Plan FIR, page 4-126 ff.) d) Substantially increase hazards to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? (General Plan EIR, page 4-126 ff.) e) Result in inadequate emergency access? (Application Materials) X X X X X M a X X X X X G:\WPDOCS\EAChecklistCCAnnex.WPD f) Result in inadequate parking capacity? (Application Materials) g) Conflict with adopted policies supporting alternative transportation (e.g., bus turnouts, bicycle racks)? (Application Materials) XVI. UTILITIES AND SERVICE SYSTEMS: Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (General Plan MEA, page 4- 24 ) b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, page 4-24 ) c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, page 4-27) d) Are sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? (General Plan MEA, page 4-20) e) Has the wastewater treatment provider which serves or may serve the project determined that it has adequate capacity to serve the projects projected demand in addition to the provider's existing commitments? (General Plan MEA, page 4-20) f) Is the project served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (General Plan MEA, page 4-28) XVII. MANDATORY FINDINGS OF SIGNIFICANCE: a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have the potential to achieve short-term, to the disadvantage of long-term, environmental goals? c) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current project, and the effects of probable future projects)? d) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? XVIII. EARLIER ANALYSIS. X X X X X X X X G4 X M X G:\WPDOCS\EAChecklistCCAnnex.WPD 10 Earlier analysis may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case a discussion should identify the following on attached sheets. a) Earlier analysis used. Identify earlier analysis and state where they are available for review. The EIR for Country Club of the Desert (SCH #99061 109) was used in the preparation of this checklist and addendum. b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. Not applicable. c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site -specific conditions for the project. See attached Addendum. SOURCES: Master Environmental Assessment, City of La Quinta General Plan 1992. SCAQMD CEQA Handbook. General Plan, City of La Quinta, 1992. City of La Quinta Municipal Code Draft and Final Environmental Impact Report, SCH No. 99061109, Country Club of the Desert, August 2000. G:\WPDOCS\EAChecklistCCAnnex.WPD 11 ADDENDUM FOR ENVIRONMENTAL ASSESSMENT 2001-418 I. d) The proposed annexation will not result in an increase in light or glare in and of itself. Buildout of the parcel, however, will generate light, since the proposed project will occur on a currently vacant parcel. The land use designation to be placed on the parcel will result in low density residential units, which generate low levels of light. The project will be required to meet the City's standards for outdoor lighting, which will ensure that lighting is directed downward and contained within the site. These standards will mitigate the potential impacts of light and glare to a less than significant level. II. c) Portions of the annexation area have been in agriculture for some time. Annexation of the land, and the imposition of land use designations, will not impact the agricultural use of the land. In the long term, however, the land will be developed in low density residential land uses. This development will result in the loss of 240 acres of agriculture in the Valley. Currently there are two parcels (769-200-002 & 003) which are under the Williamson Act contract. The applicant has filed a Notice of Non -renewal for these parcels. These two parcels are isolated and surrounded by approved residential development, and does not represent a significant change in agricultural uses. The loss of this land will be less than significant. III. c) & d) The primary source of air pollution in the City is the automobile. Although annexation will not cause an increase in air emissions in and of itself, the buildout of the project will. The proposed land use designation for the project site is low density residential, 0-4 units per acre. At this density, a maximum of 960 single family residences would be possible. Based on calculations provided by the Institute of Traffic Engineers, 960 units could generate up to 9,187 trips per day'. As shown in the Table below, buildout of the annexation area will not exceed any SCAQMD thresholds. Running Exhaust Emissions (pounds/day) PM10 PM10 PM10 CO ROC NOx Exhaust Brakes Tires 50 mph 284.74 10.95 58.41 Daily Threshold* 550 75 100 1.22 1.22 150 Based on 9,187 trips/day and average trip length of 6 miles, using EMFAC7G Model provided by California Air Resources Board. Assumes catalytic light autos at 75°F. * Operational thresholds provided by SCAQMD for assistance in determining the significance of a project. Institute of Transportation Engineers, "Trip Generation, 6the Edition." Rate calculated for single family residential, at 9.57 trips per day. The Coachella Valley is a non -attainment area for PM 10 (particulate matter of 10 microns or smaller). In order to control PM10, the City has imposed standards and requirements on development to control dust. Although no immediate project is proposed, the disturbance of the site for construction will eventually have an impact on air quality from PM 10. These impacts can be mitigated by the mitigation measures below. 1. No earth moving activity shall be undertaken without the review and approval of a PM 10 Management Plan. The applicant shall submit same to the City Engineer for review and approval. 2. Construction equipment shall be properly maintained and serviced to minimize exhaust emissions. 3. Existing power sources should be utilized where feasible via temporary power poles to avoid on -site power generation. 4. Construction personnel shall be informed of ride sharing and transit opportunities. 5. Cut and fill quantities will be balanced on site. 6. Any portion of the site to be graded shall be pre -watered to a depth of three feet prior to the onset of grading activities. 7. Watering of the site or other soil stabilization method shall be employed on an on -going basis after the initiation of any grading activity on the site. Portions of the site that are actively being graded shall be watered regularly to ensure that a crust is formed on the ground surface, and shall be watered at the end of each work day. 8. All disturbed areas shall be treated to prevent erosion until the site is constructed upon. Pad sites which are to remain undeveloped shall be seeded with either a desert wildflower mix or grass seed. 9. Landscaped areas shall be installed as soon as possible to reduce the potential for wind erosion. 10. SCAQMD Rule 403 shall be adhered to, insuring the clean up of construction -related dirt on approach routes to the site. 11. All grading activities shall be suspended during first and second stage ozone episodes or when winds exceed 25 miles per hour. 12. All buildings on the project site shall conform to energy use guidelines in Title 24 of the California Administrative Code. G:\WPDOCS\EAAddCCAnnex.WPD 13. The project shall provide for non -motorized transportation facilities and shall implement all feasible measures to encourage the use of alternate transportation measures. 14. Bicycle racks and/or other mandated alternative transportation provisions shall be included in project design, in conformance with City ordinances in effect at the time of development. With the implementation of these mitigation measures, the impacts to air quality from buildout of the annexation area will not be significant. Moreover, improvements in technology which are likely to reduce impacts, particularly from motor vehicles or transit route improvements in the future are not included in the analysis. IV. a) The annexation area was previously studied for biological resource s2. The biological analysis concluded that four types of habitat occur on the site: Desert Scrub, Agriculture, Pasture and Disturbed. No species of concern were identified in site surveys conducted specifically for Coachella Valley Fringe -toed Lizard, Palm Springs Ground Squirrel, Palm Springs Pocket Mouse and Flat Tailed Horned Lizard. The area was, however, identified as having mesquite hummocks, which provide important habitat for a number of desert species. The proposed annexation area includes several mesquite hummocks. In order to mitigate this potential impact, the following mitigation measures shall be implemented: 1. Prior to the issuance of grading permits, the project proponent(s) shall submit an on -site biological resource analysis identifying the total acreage of mesquite hummocks on the 240 acre site, or any portion thereof proposed for development. 2. Prior to construction or site preparation activities, the project proponent(s) shall enter into a Memorandum of Understanding (MOU) with the California Department of Fish and Game and an appropriate non- profit organization whose purpose is to acquire and manage land for the purpose of protecting special status plants and wildlife. This MOU shall provide the organization chosen the financial resources necessary to purchase and manage the equivalent acreage identified in mitigation measure #1 of mesquite hummock habitat in the Willow Hole area. V. b) Annexation of the project site will not, in of itself, have an impact on cultural resources. Buildout of the site, however, could impact such resources. A "Biological Assessment for the Country Club of the Desert Project," Michael Brandman Associates, May 2000, GAW PDOCS\EAAdd CCAnnex.WPD cultural resource survey was conducted for the subject property3. The survey found a number of resources in the area, but only very limited resources on the annexation area property. In order to ensure that buried resources are not lost if they occur, the following mitigation measure shall be implemented: 1 . A qualified archaeological monitor shall be present during all demolition, earth moving and grading activities. The monitor shall be empowered to stop or redirect activities on the site should a resource be identified. A final report shall be filed with the Community Development Department prior to occupancy. VI. a) i) & i0 The proposed project lies in a Zone III groundshaking zone. The property, as with the rest of the City, will be subject to significant ground movement in the event of a major earthquake. The site is not subject to liquefaction°. In order to protect the City from hazards associated with groundshaking, the City has adopted the Uniform Building Code, and the associated construction requirements for seismic zones. The City Engineer will require the preparation of site -specific geotechnical analysis in conjunction with the submittal of grading plans (please see below). This requirement will ensure that impacts from ground failure are reduced to a less than significant level. VI. b) & c) The subject property is subject to soil erosion due to wind. The City will impose requirements for a PM10 management plan, which will control this hazard (please see above). The soils on the property will also be examined through an on -site soil analysis required prior to issuance of grading permits. These requirements will reduce potential impacts to a less than significant level. Vill. b) 3 a All development adds to demand for groundwater. Domestic water is provided by the Coachella Valley Water District, which extracts groundwater from a number of wells in the Lower Thermal sub -basin. At the time the site is developed, the project will be required to retain storm flows on -site, which will encourage percolation of storm water into the ground. The project proponent will also be required to implement the City's standards for water conserving plumbing fixtures. Finally, the proposed project will be required to meet the requirements of the City's water -conserving landscaping ordinance, which requires that projects demonstrate that landscaping plans are water -efficient. "A Phase I Cultural Resource Investigation of the Country Club of the Desert Project Area..." McKenna et. al., September 1999. "Draft Environmental Impact Report, Country Club of the Desert," SCH 499061109, Impact Sciences, August 2000. G:\WPDOCS\EAAddCCAnnex.WPD These mitigation measures will reduce potential impacts to a less than significant level. VIII. c)-e) When the annexation area is developed, impermeable surfaces will be created, which will change drainage patterns in a rain event. Any project on the site will be required to meet the City's standards for retention of the 100 year storm on - site. This will control the amount of runoff which exits the site during a storm. The site's drainage plan will be reviewed and approved by the City Engineer prior to the issuance of grading permits. This will ensure that impacts to the City's flood control system are reduced to a less than significant level. IX. b) The County of Riverside currently has jurisdiction over the annexation area. The land use designation for the subject property under the County General Plan is 2B, which allows 2 to 5 units per acre. The City's proposed designation will therefore somewhat reduce this density, resulting in an overall reduction in impacts from development of the property. The character of the property will not be changed by the proposed action, insofar as residential development would be expected to occur on this site under either jurisdiction. Finally, the adjacent lands to the west are being developed in residential units in a low density, and the project site will provide a logical extension of this development. The impacts to land use are not expected to be significant. XI. a) b) & c) The noise environment in the annexation area is generally quiet, due to limited development and low traffic volumes. The ultimate development of the site will result in an increase in noise levels, particularly noise generated by automobiles. The proposed land use designation will result in residential land uses on the site, which are considered sensitive receptors. In order to ensure that these sensitive receptors are not subject to noise impacts, the following mitigation measure shall be implemented: 1 . Any project on the subject property shall be required to complete a noise analysis which includes current conditions and anticipated buildout noise levels, and which includes mitigation measures to ensure that exterior and interior noise levels meet City standards in effect at that time. The analysis shall be reviewed and approved by the Community Development Department prior to issuance of building permits. XIII. a) Both annexation and construction of the subject property will result in potential impacts for both police and fire services. The property, once developed, will generate property tax. These taxes will contribute to the City's General Fund, and off -set the potential impact to police and fire service. The project will also be required to pay school fees, as required by law. The proposed project is not expected to have a significant impact on municipal services or facilities. G:\WPDOCS\EAAddCCAnnex.WPD XV. a) & b) The ultimate development of the subject property will result in fewer trips than under the County General Plan designation, insofar as the City land use designation proposed does not allow as many residential units as does the County. Furthermore, the buildout of the project will result in improvements on both Avenue 52 and Monroe which will improve circulation in the area. The impact of buildout of the annexation area is not expected to be significant. XVI. b)-f) Although the annexation will have no impact on utilities, the ultimate buildout of the site will have an impact on utilities and public services. However, the overall impacts of the project on these services is not expected to be significant, insofar as these suppliers will charge the residents for their services, and provide improvements to these services as needed. In addition, connection fees will be required of the project proponent at construction of the project. These fees and charges will mitigate the potential impacts to a less than significant level. n--k UlonnrCXPAArArr Annov knian