PCRES 2001-149PLANNING COMMISSION RESOLUTION 2001-149 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA QUINTA, CALIFORNIA, RECOMMENDING CERTIFICATION OF A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT PREPARED FOR GENERAL PLAN AMENDMENT 2001-082, SPECIFIC PLAN 2001-054, CONDITIONAL USE PERMIT 2001-066 AND SITE DEVELOPMENT PERMIT 2001-711 ENVIRONMENTAL ASSESSMENT 2001-433 APPLICANT: RLF DEVELOPMENT WHEREAS, the Planning Commission of the City of La Quinta, California, did, on the 11 th day of December, 2001 hold a duly noticed Public Hearing to consider Environmental Assessment 2001-433 for General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 located at the southeast corner of Avenue 52 and Jefferson Street, more particularly described as follows: APN 760-290-005 WHEREAS, said Environmental Assessment has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" (as amended; Resolution 83-68 adopted by the La Quinta City Council) in that the Community Development Department has prepared an Initial Study (EA 2001-433) and has determined that although the proposed General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 could have a significant adverse impact on the environment, there would not be a significant effect in this case because appropriate mitigation measures were made a part of the assessment and included in the conditions of approval and a Mitigated Negative Declaration of Environmental Impact should be filed; and, WHEREAS, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said Planning Commission did find the following facts, findings, and reasons to justify recommending certification of said Environmental Assessment: The proposed General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 will not be detrimental to the health, safety, or general welfare of the community, either indirectly, or directly, in that no significant unmitigated impacts were identified by Environmental Assessment 2001-433. 2. The proposed General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 will not have the potential to degrade the quality of the environment, substantially PAPC Reso & C0A\Bart1et1EAReso-433.wpd Planning Commission Resolution 2001-149 Environmental Assessment 2001-433 RLF Development Adopted: December 11, 2001 reduce the habitat of a fish or wildlife population to drop below self sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of rare or endangered plants or animals or eliminate important examples of the major periods of California history or prehistory. 3. There is no evidence before the City that the proposed project will have the potential for an adverse effect on wildlife resources or the habitat on which the wildlife depends. 4. The proposed General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 do not have the potential to achieve short-term environmental goals, to the disadvantage of long-term environmental goals, as no significant effects on environmental factors have been identified by the Environmental Assessment. 5. The proposed General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 will not result in impacts which are individually limited or cumulatively considerable when considering planned or proposed development in the immediate vicinity, as development patterns in the area will not be significantly affected by the proposed project. 6. The proposed General Plan Amendment 2001-082, Specific Plan 2001-054, Conditional Use Permit 2001-066 and Site Development Permit 2001-711 will not have environmental effects that will adversely affect the human population, either directly or indirectly, as no significant impacts have been identified which would affect human health, risk potential or public services. 7. There is no substantial evidence in light of the entire record that the project may have a significant effect on the environment. 8. The Planning Commission has considered the Environmental Assessment 2001- 433 and the Environmental Assessment reflects the independent judgement of the City. 9. The City has on the basis of substantial evidence, rebutted the presumption of adverse effect set forth in 14 CAL Code Regulations 753.5(d). 10. The location and custodian of the City's records relating to this project is the Community Development Department located at 78-495 Calle Tampico, La Quinta, California. PAPC Reso & COA\BartlettEAReso-433.wpd Planning Commission Resolution 2001-149 Environmental Assessment 2001-433 RLF Development Adopted: December 11, 2001 NOW THEREFORE, BE IT RESOLVED by the Planning Commission of the City of La Quinta, California, as follows: 1. That the above recitations are true and correct and constitutes the findings of the Planning Commission for this Environmental Assessment. 2. That it does hereby recommend to the City Council certification of Environmental Assessment 2001-433 for the reasons set forth in this Resolution and as stated in the Environmental Assessment Checklist and Addendum on file in the Community Development Department. 3. That Environmental Assessment 2001-433 reflects the independent judgement of the City. PASSED, APPROVED and ADOPTED at a regular meeting of the La Quinta Planning Commission held on this 11th day of December, 2001, by the following vote, to wit: AYES: COMMISSIONERS BUTLER, ROBBINS, AND CHAIRMAN ABELS NOES: COMMISSIONERS KIRK AND TYLER ABSENT: NONE ABSTAIN: NONE (r WV116* CQU�S ABELS, Chairman ity of a Quinta, California ATTEST: 1Y HOMAN, Community Development Director of La Quinta, California RTC Reso & C0A\Bart1ettEAReso-433.wpd Environmental Checklist Form 1 . Project Title: General Plan Amendment 2001-082, Specific Plan 2001- 054, Conditional Use Permit 2001-066, Site Development Permit 2001-711. Pueblo Plaza Shopping Center. 2. Lead Agency Name and Address: City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 3. Contact Person and Phone Number: Christine di lorio, 760-777-7125 4. Project Location: Southeast corner of Avenue 52 and Jefferson Street 5. Project Sponsor's Name and Address: RLF Development 77043 Iroquois Drive Indian Wells, CA 92210 6. General Plan Designation: Neighborhood Commercial 7. Zoning: Neighborhood Commercial 8. Description of Project: (Describe the whole action involved, including but not limited to later phases of the project, and any secondary, support, or off -site features necessary for its implementation. Attach additional sheets if necessary.) General Plan Amendment to shorten the distance between signalized intersections on Major. Specific Plan to establish development standards and design guidelines for the construction of a neighborhood shopping center on 15.15 acres, including supermarket, drug store and seven ancillary pads. Conditional Use Permit for the location of a service station at the northwest corner of the property. Site Development Permit for the development plans of the supermarket, drug store and bank building. 9. Surrounding Land Uses and Setting: Briefly describe the project's surroundings. North: Avenue 52, Low Density Residential South: All -American Canal, Low Density Residential West: Jefferson Street, Low Density Residential East: Low Density Residential 10. Other agencies whose approval is required (e.g., permits, financing approval, or participation agreement.) Not applicable G:\WPDOCS\Env Asses\9ar11e1EACkIst.WPD 1 Environmental Factors Potentially Affected: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Hazards and Hazardous Public Services Materials Agriculture Resources Hydrology and Water Quality Recreation Air Quality Land Use Planning Transportation/Traffic Biological Resources Mineral Resources Utilities and Service Systems Cultural Resources Noise Mandatory Findings Geology and Soils Population and Housing Determination (To be completed by the Lead Agency.) On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the applicant. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier FIR pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier FIR. including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. C-�� 07C4 P` 111 zv./a l Signature Date Evaluation of Environmental Impacts: C 111 u LK ON G:\WPDOCS\Env Asses\Sanle1EACkIst.WPD adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the reference information sources show that the impact simply does not apply to projects like the one involved (e.g. the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project -specific factors as well as general standards (e.g. the project will not expose sensitive receptors to pollutants, based on a project -specific screening analysis). 2) All answers must take account of the whole action involved, including off -site as well as on- site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) `Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Nepative Declaration: Potentially Significant Unless Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from `Potentially Significant Impact" to a "Less Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVIII, "Earlier Analysis," may be cross-referenced). 5) Earlier analysis may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). Earlier analysis are discussed in Section XVIII at the end of the checklist. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) The analysis of each issue should identify: a) the significance criteria or threshold used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance G:%WPDOCS\Env Asses\Bar11etEACk1st.WPD Issues (and Supporting Information Sources): Would the proposal result in potential impacts involving AESTHETICS: Would the project: a) Have a substantial adverse effect on a scenic vista? (General Plan Exhibit CIR-5) b) Damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? (General Plan EIR, page 5-12 ff.) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (Application materials) d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? (Application materials) 11, AGRICULTURAL RESOURCES:. In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model prepared by the California Dept. Of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland) to non-agricultural use? (Master Environmental Assessment 5-29, 5-32) b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? (Zoning Map) c) Involve other changes in the existing environment which, due to their location or nature, could individually or cumulatively result in loss of Farmland, to non-agricultural use? (Aerial photographs) III. .AIR QUALITY: Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable Air Quality Attainment Plan or Congestion Management Plan? (SCAQMD CEQA Handbook) b) Violate any stationary source air quality standard or contribute to an existing or projected air quality violation? (SCAQMD CEQA Handbook) c) Result in a net increase of any criteria pollutant for which the project region is non -attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? (SCAQMD CEQA Handbook) d) Expose sensitive receptors to substantial pollutant concentrations? (Project Description) e) Create objectionable odors affecting a substantial number of people? (Project Description) IV. BIOLOGICAL RESOURCES: Would the project: Potentially Potentially Significant Less Than Significant Unless Significant No Impact Mftigated Impact Impact X X X X X X 91 X El M X G:\WPDOCSIEnv Asses\Ban1etEACkIst.WPD a) Have a substantial adverse impact, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? (Master Environmental Assessment, Exhibit 5-1) b) Have a substantial adverse impact on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? (Master Environmental Assessment, p. 5-2 ff.) c) Adversely impact federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) Either individually or in combination with the known or probable impacts of other activities through direct removal, filling, hydrological interruption, or other means? (Master Environmental Assessment, p. 5-2 ff.) d) Interfere substantially with the movement of any resident or migratory fish or wildlife species or with established resident or migratory wildlife corridors, or impede the use of wildlife nursery sites? (Master Environmental Assessment, p. 5-2 ff.) e) Conflict with any local policies or ordinances protecting biological resources such as a tree preservation policy or ordinance? (La Quinta Municipal Code; General Plan) f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Conservation Community Plan, or other approved local, regional, or state habitat conservation plan? (Master Environmental Assessment 5-5) V. CULTURAL RESOURCES: Would the project: a) Cause a substantial adverse change in the significance of a historical resource which is either listed or eligible for listing on the National Register of Historic Places, the California Register of Historic Resources, or a local register of historic resources? ("Cultural Resources Assessment of a 15 acre Parcel...," Archaeological Associates, July 2001) b) Cause a substantial adverse change in the significance of a unique archaeological resources (i.e., an artifact, object, or site about which it can be clearly demonstrated that, without merely adding to the current body of knowledge, there is a high probability that it contains information needed to answer important scientific research questions, has a special and particular quality such as being the oldest or best available example of its type, or is directly associated with a scientifically recognized important prehistoric or historic event or person)? ("Cultural Resources Assessment of a 15 acre Parcel...," Archaeological Associates, July 2001) c) Disturb or destroy a unique paleontological resource or site? (Lakebed Delineation Map) d) Disturb any human remains, including those interred outside of formal cemeteries? ("Cultural Resources Assessment of a 15 acre Parcel...," Archaeological Associates, July 2001) Vl. GEOLOGY AND SOILS: Would the project: `I a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Pr1nlO Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? (General Plan EIR, Exhibit 4.2-3, page 4-35) X X X AI 0.1 X X KI X X G:\WPDOCS\Env Asses\Bart1etEACk1st.WPD ii) Strong seismic ground shaking? (General Plan MEA, Exhibit 6-2, page 6-7) iii) Seismic -related ground failure, including liquefaction? (General Plan MEA, Exhibit 6-2, page 6-7) iv) Landslides? (General Plan MEA, Exhibit 6-2, page 6-7) b) Result in substantial soil erosion or the loss of topsoil? (General Plan MEA, Exhibit 6-2, page 6-7) c) Be located on a geological unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on - or off -site landslides, lateral spreading, subsidence, liquefaction or collapse? ("Geotechnical Investigation Proposed 7 Lot Residential Subdivision...;. Sladden Engineering, August 2001) d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or Property? (General Plan EIR, page 4-30 ff.) e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal system where sewers are not available for the disposal of waste water? (Master Environmental Assessment 5-32) VIL HAZARDS AND HAZARDOUS MATERIALS: Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? (Application Materials) b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment? (Application Materials) c) Reasonably be anticipated to emit hazardous materials, substances, or waste within one -quarter mile of an existing or proposed school? (Application Materials) d) Is the project located on a site which is included on a list of hazardous materials sites complied pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (Riverside County Hazardous Materials Listing) e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) f) For a project within the vicinity of a private airstrip; would the project result in a safety hazard for people residing or working in the project area? (General Plan land use map) g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? (Master Environmental Assessment p. 6-11) h) Expose people or structures to the risk of loss, injury or death involving wildlands fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (General Plan land use map) VIII. HYDROLOGY AND WATER QUALITY: Would the project: X X X X X X X X X X X X X X X G:IWPDOCS1Env AssesTartletEACkIst.WPD 6 a) Violate Regional Water Quality Control Board water quality standards or waste discharge requirements? (Master Environmental Assessment 6-26, 6-27) b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (i.e., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted? (General Plan EIR, page 4-57 ff.) c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of stream or river, in a manner which would result in substantial erosion or siltation on- or off - site? (General Plan EIR, page 4-30 ff.) d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off -site? (General Plan EIR, page 4-30 ff.) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems to control? (General Plan EIR, page 4-30 ff.) f) Place housing within a 100-year floodplain, as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? (Master Environmental Assessment 6-13) g) Place within a 100-year floodplain structures which would impede or redirect flood flows? (Master Environmental Assessment 6-13) X. LAND USE AND PLANNING: Would the project: a) Physically divide an established community? (Specific Plan Project Description) b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purposes of avoiding or mitigating an environmental effect? (Master Environmental Assessment 2-11) c) Conflict with any applicable habitat conservation plan or natural communities conservation plan? (Master Environmental Assessment 5- 5) X. MINERAL RESOURCES: Would the project: a) Result in the loss of availability of a known mineral resource classified MRZ-2 by the State Geologist that would be of value to the region and the residents of the state? (Master Environmental Assessment 5-29) b) Result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? (Master Environmental Assessment 5-29) XI. NOISE: Would the project result in: X X X X X X X Exposure of persons to, or generation of, noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? (General Plan MEA, Exhibit 6- X 4, page 6-17) X El G1 X 91 G:IWPDOCS%Env Asses1Bart1etEACk1s1.WPD 7 b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? (General Plan MEA, Exhibit 6- 4, page 6-17) c) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? (General Plan MEA, Exhibit 6-4, page 6-17) d) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? (Master Environmental Assessment) e) For a project within the vicinity of a private airstrip, would the Project expose people residing or working in the project area to excessive levels? (General Plan map) XII. POPULATION AND HOUSING: Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? (General Plan, page 2-14) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (Application Materials) c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? (Application Materials) XIII. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? (General Plan MEA, page 4-3 ff. ) Police protection? (General Plan MEA, page 4-3 ff. ) Schools? (General Plan MEA, page 4-9 ff. ) Parks? (General Plan; Recreation and Parks Master Plan) Other public facilities? (General Plan MEA, page 4-14 ff. ) XIV. RECREATION: R V4 917 R1 X R t.7 X X X X X a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? X (Application Materials) G:\WPDOCS\Env Asses\BertletEACkIst.WPD b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Application Materials) X XV. TRANSPORTATIONITRAFFIC: Would the project: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? (General Plan EIR, page 4-126 ff.) b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? (General Plan EIR, page 4-126 ff.) c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (General Plan EIR, page 4-126 ff.) d) Substantially increase hazards to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? (General Plan EIR, page 4-126 ff.) e) Result in inadequate emergency access? (Application Materials) f) Result in inadequate parking capacity? (Application Materials) g) Conflict with adopted policies supporting alternative transportation (e.g., bus turnouts, bicycle racks)? (Application Materials) XVI. UTILITIES AND SERVICE SYSTEMS: Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (General Plan MEA, page 4-24 b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan AEA, page 4-24 ) c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (General Plan MEA, page 4-27) d) Are sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? (General Plan MEA, page 4-20) e) Has the wastewater treatment provider which serves or may serve the project determined that it has adequate capacity to serve the projeces projected demand in addition to the provider's existing commitments? (General Plan MEA, page 4-20) n Is the project served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (General Plan MEA, page 4-28) �VII. AtiANDATORY FINDINGS OF SIGNIFICANCE: X X X X X X X X X X X X X G:\WPDOCS\Env Asses\6an1etEACk1s1.WPD a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have the potential to achieve short-term, to the disadvantage of long-term, environmental goals? c) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current project, and the effects of probable future projects)? d) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? XVIII EARLIER Analysis. 12 ro ro X Earlier analysis may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case a discussion should identify the following on attached sheets. a) Earlier analysis used. Identify earlier analysis and state where they are available for review. No earlier analysis were used in this review. b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. Not applicable. c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site -specific conditions for the project. See attached Addendum. SOURCES: Master Environmental Assessment, City of La Quinta General Plan 1992. SCAQMD CEQA Handbook. General Plan, City of La Quinta, 1992. City of La Quinta Municipal Code Cultural Resources Assessment of a 15 Acre Parcel Located Southeast of the Intersection of Jefferson Street and Avenue 52.... Archaeological Associates, July 2001. G:\WPDOCS\Env Asses\Bart1etEACk1st.WPD 10 Addendum for Environmental Assessment 2001-433 Planning Commission Resolution 2001-149 III. a) The proposed project will generate air pollution primarily from the operation of motor vehicles. The 120,700 square feet of commercial development could generate approximately 5,180 trips per day'. Based on this trip generation, the project at buildout will generate the following pollutants. Running Exhaust Emissions (pounds/day) PM10 PM10 PM10 CO ROC NOx Exhaust Brakes Tires 50 mph 133.79 5.15 27.44 -- 0.57 0.57 Daily Threshold* 550 75 100 150 Based on 5,180 trips/day and average trip length of 5 miles, using EMFAC7G Model provided by California Air Resources Board. Assumes catalytic light autos at 75°F. * Operational thresholds provided by SCAQMD for assistance in determining the significance of a project and the need for an EIR. As demonstrated in the Table above, the proposed project will not exceed any threshold for the generation of moving emissions, as established by the South Coast Air Quality Management District in determining the need for an EIR. The impacts to air quality relating to chemical pollution are not expected to be significant. III. c) The Coachella Valley is a non -attainment area for PM10 (particulate matter of 10 microns or smaller). The construction of the proposed project has the potential to generate dust, which could contribute to the PM 10 problem in the area. In order to control PM10, the City has imposed standards and requirements on development to control dust. The applicant will be required to submit such a plan prior to initiation of any earth moving activity at the site. In addition, the potential impacts associated with PM10 can be mitigated by the mitigation measures below. 1. Construction equipment shall be properly maintained and serviced to minimize exhaust emissions. Institute of Transportation Engineers, "Trip Generation, 6th Edition." Rate calculated for shopping centers, at 42.92 trips per day. G:\WPDOCS\Env Asses\BartlettAdd.WPD 1 2. Existing power sources should be utilized where feasible via temporary power poles to avoid on -site power generation. 3. Construction personnel shall be informed of ride sharing and transit opportunities. 4. Cut and fill quantities will be balanced on site. 5. Any portion of the site to be graded shall be pre -watered to a depth of three feet prior to the onset of grading activities. 6. Watering of the site or other soil stabilization method shall be employed on an on -going basis after the initiation of any grading activity on the site. Portions of the site that are actively being graded shall be watered regularly to ensure that a crust is formed on the ground surface, and shall be watered at the end of each work day. 7. All disturbed areas shall be treated to prevent erosion until the site is constructed upon. Pad sites which are to remain undeveloped shall be seeded with either a desert wildflower mix or grass seed, or chemical stabilizer. 8. Landscaped areas shall be installed as soon as possible to reduce the potential for wind erosion. Perimeter landscaping on Avenue 52 and Jefferson Street, and the retention basin landscaping shall be completed with the first phase of development. 9. SCAQMD Rule 403 shall be adhered to, insuring the clean up of construction -related dirt on approach routes to the site. 10. All grading activities shall be suspended during first and second stage ozone episodes or when winds exceed 25 miles per hour. 11 All buildings on the project site shall conform to energy use guidelines in Title 24 of the California Administrative Code. With the implementation of these mitigation measures, the impacts to air quality from buildout will not be significant. V. b) A cultural resource survey was conducted for the subject property2. The assessment found no surficial deposits, but identified the area as a high wind 2 " Cultural Resources Assessment of 15 Acre Property...,"" Archaeological Associates, July 2001. G:\WPDOCS\Env Asses\BartlettAdd.WPD 2 zone which can regularly cover or uncover artifacts. As a result, the report recommends the imposition of the following mitigation measure: A qualified archaeological monitor shall be present during all earth moving and grading activities. The monitor shall be empowered to stop or redirect activities on the site should a resource be identified. A final report shall be filed with the Community Development Department prior to issuance of a certificate of occupancy for any building on the project site. VI. a)i)&i0 The proposed project lies in a Zone III groundshaking zone. The property, as with the rest of the City, will be subject to significant ground movement in the event of a major earthquake. Structures on the site will be required to meet the City's standards for construction, which include Uniform Building Code requirements for seismic zones. The City Engineer will require the preparation of site -specific geotechnical analysis in conjunction with the submittal of grading plans (please see below). This requirement will ensure that impacts from ground shaking are reduced to a less than significant level. VI. b) The subject property is subject to soil erosion due to wind. The City will implement requirements for a PM10 management plan, and additional mitigation measures have been included in the Air Quality discussion above. These mitigation measures will reduce potential impacts to a less than significant level. VIII. b) Domestic water is provided by the Coachella Valley Water District, which extracts groundwater from a number of wells in the Lower Thermal sub -basin. The development of the project site will require some domestic water, although as a commercial development the use of water on the site will be much less than residential development. The project proponent will be required to implement the City's standards for water conserving plumbing fixtures and on - site retention, which both aid in reducing the potential impacts associated with groundwater. The proposed project will also meet the requirements of the City's water -conserving landscaping ordinance. These standards will reduce potential impacts to a less than significant level. VIII. c)-d) The City requires that all construction projects retain the 100 year 24 hour storm on -site. This will control the amount of runoff which exits the site during a storm. The project's drainage plan will be reviewed and approved by the City Engineer prior to the issuance of grading permits. The Specific Plan includes a provision for the use of the site's retention basin as a plant nursery. This use will significantly reduce the capacity of the G:\WPDOCS\Env Asses\BartlettAdd.WPD 3 retention basin, will potentially negate the standards imposed by the City, and could pose a significant hazard to adjoining property in the event of a flooding hazard. In order to mitigate this impact, the following mitigation measure shall be implemented: 1 . The retention basin shall be used for passive open space only, and shall not be utilized as a plant nursery at any time. XI. a) The current noise environment at the project site ranges from 50 to 60 dBA CNEL, with higher levels in areas close to both Avenue 52 and Jefferson. The proposed project will not be a sensitive receptor, but will be located next to future sensitive receptors to the east. The proposed project will generate noise from compactors, trash enclosures and other stationary sources, in addition to the traffic noise which will occur on -site. The proposed site plan shows that the loading docks, compactors and trash enclosures will be located closest to the residential lands to the east. This potentially could impact residential units to the east in the future. Therefore, the following mitigation measures will be implemented: 1 . An 8 foot wall shall be constructed along the entire length on the eastern property line. The wall shall be completed prior to issuance of occupancy permits for any building on the site. 2. All deliveries occurring on the east side of the proposed market and Shops A and B shall occur between the hours of 7 a.m. and 7 p.m., Monday through Saturday. No deliveries shall be permitted on Sundays. 3. No loudspeaker system (such as those operated for drive -through windows) shall be permitted at Pad F. 4. Prior to the issuance of grading permits, the project proponent shall submit to the Community Development Department for review and approval, a noise analysis which demonstrates that the noise levels east of the property line shall meet City standards after construction of the supermarket building, Shops A and B, and Pad F. XI. c) Noise levels will also be affected by construction activities on the site. Should the residential development be occupied prior to, or during the construction of the shopping center, the residents could be adversely impacted by construction noise. In order to mitigate these impacts, the following mitigation measures shall be implemented: 1. All internal combustion equipment operating within 500 feet of any occupied residential unit shall be fitted with properly operating mufflers and air intake silencers. G:\WPDOCS\Env Asses\BartlettAdd.WPD 4 2. All stationary construction equipment (e.g. generators and compressors) shall be located as far as practical from adjacent, occupied residential units. 3. Construction activities shall be limited to the hours prescribed in the La Quinta Municipal Code. These mitigation measures will reduce the potential impacts associated with noise at the subject property to a less than significant level. XIII. a) The proposed development will have a direct impact on public services and will be served by the County Sheriff and Fire Department, acting under City contract. Site development will generate property tax and sales taxes which will offset the costs of added police and fire services. The project area will be required to pay the mandated school fees as development occurs. These fees mitigate the students generated, and offset the impacts to schools. The collection of property tax, and the generation of sales tax will generate revenues to the City to offset the added costs associated with the provision of municipal services. The project will be required to participate in the City's Impact Fee Program, which helps to offset roadway improvement costs. Site development is not expected to have a significant impact on municipal services or facilities. XV. a) The proposed project site is designated for neighborhood commercial development, and as such was analysed in the City's General Plan EIR. The potential impacts associated with traffic generation from the site have been addressed in that document, and incorporated into the City's roadway standards, which the proposed project will be required to implement. The City has also initiated an Impact Fee Program, designed to offset improvement costs on City roadways. The project will be required to participate in this program. These requirements will serve to reduce the potential impacts associated with traffic generation at the site to a less than significant level. XV. d) The proposed project includes the amendment of the City's General Plan to reduce the separation required on Major Arterials for intersection spacing. The current standard is 2,600 feet for Major Arterials. The proposed General Plan Amendment would reduce this standard to 1,060 feet for commercial frontage on Major Arterials. In order to analyze this potential change in General Plan G:\WPDOCS\Env Asses\Bart1ettAdd.WPD5 3 standards, an analysis was commissioned'. The analysis found that the proposed change would not cause a hazard at the project location, although it should not be implemented along certain segments of Washington Street, and on Highway 111 west of Washington Street. At the project site, the standard is determined to be safe, assuming the following mitigation measure is implemented: 1. Traffic signal operations in areas where minimum intersection spacing occurs on Major and Primary Arterials shall be interconnected and optimized, and intersection geometrics shall be determined based upon City level of service criteria. The implementation of this mitigation measure at the project site will reduce potential impacts associated with design features to a less than significant level. Letter dated November 30, 2001, John Kain of Urban Crossroads, Inc. G:\WPDOCS\Env Asses\BartlettAdd.WPD 6 e \ / \ \{ /\{\ \ \\/> § \ )\\\ CL / _ r } \ / )/\/\ / / 3 z z { ) d \ @ / u \ { / \\ \� uu « § E \ ] \ § 7 = { ° / y § / / ) ( 2 - / 7 / ■ § m! � / � § u z ,u K .± \\\\ 03, / wEa. 0.Ewb 53 \( ) . zE k \ (/ Cl. c \ \ 6 ` \ \ w / ( \ / \ 3 E u / § : a \§ \ / 2 \ \ } k r . - J2 ) k } \ § r ® \ ( \ \ zz ( 0 \� £) u0 2 � ( i u § R / / \/ k )) \ (/ §z «2 . §$ // z � § § Ln § 7 } f\ \� uu 2 § u ) \ g ƒ I (/ / \\ � 2 ) ) ) \ - \§ / ( k e $t p2F W F A W CQ U p z d°w U a W UU G W N ti G G G G G C C ^ a o o c o 0 0 0 0 U a a c a c a O G �o L bb F v. i0 N 0 A U tl o 0 M. 0 •= o 0 0 Du cn M on ou cn cp c G c c .` G c c O G G G E E E OC t) > E E E c ,G E y C r 7—Z c aEi aEi Q o p o 0 0.= z to �c p � p a •o �o ;E E ai U U U U la a7 cn m c � o aci U n. o 5_ ;n E •o r E u w o g g :: s a c $ �, c � °' o �, •c a E m ti¢ 3 r c U c p A T y o Y r: r a m - 4 w a •� iC U a c`�i Q z z 0 .E l.L W F d G U n Z U cw UU ¢ w F � U a c C� Z O F F a O }}O RI O �h p0 � F zz 00 .. x w U Z O z O F d � U � A 5 iG