05-0066 (SFD)r
u
:03:20:0]51]
t�l� icv
=I,AQUINTA BUILDING & SAFETY DEPARTMENT
4CE , T• 04 (760),777-7012
78-495 CALLE TAMPICO FAX (760) 777-7011
LA QUINTA, CALIFORNIA 92253 INSPECTION REQUESTS (760) 777-7153
BUILDING PERMIT
Application Number . . . .05-0.0000066 Date 2/01/05
Property Address . . . . . 77170 CALLE COLIMA
APN: 774-033-025-15 -000000-
Application description . . . DWELLING,- SINGLE FAMILY DETACHED
Property Zoning . . . COVE RESIDENTIAL
Application valuation . . 119596 "
Owner
------------------------
POWER FINANCE
P.O. BOX 134 .
LA QUINTA CA 92253
Contractor
------------------------
CONTEMPORARY HOMES INCORP
P.O. BOX 1141
LA QUINTA CA 92253
WCC: STATE FUND
WC: 16764082004
07/01/05
CSLB: 736920
03/31/05
CCC: B
------ Structure Information
SINGLE FAMILY DWELLING
-----
Construction Type
TYPE V - NON RATED
Occupancy Type . . .
. . . DWELLG/LODGING/CONE <=10
Flood Zone
NON -AO FLOOD ZONE
Other struct info . .
. . . .CODE EDITION 2001 CBC
# BEDROOMS
3.00,
FIRE.SPRINKLERS NO
GARAGE SQ FTG
480.00
PATIO SQ FTG
36.00.
NUMBER OF UNITS
1.00
1ST FLOOR'SQUARE FOOTAGE
1918.00
------------------------------------
-m
BUILDING PERMIT
Additional desc
Permit Fee
709.50 Plan Check Fee
461.18
Issue"Date
Valuation . . . .
119596
Qty Unit Charge
Per
Extension
BASE FEE
639.50
20.00 3.5000
THOU BLDG 100,001-500,000
70.00
----------------------------
Permit . . . . . .
------------------------------------------------
MECHANICAL
Additional desc
Permit Fee . . . .
59.00 Plan Check Fee
14.75
Issue Date . . . .
Valuation
0
Qty Unit Charge
Per
Extension
BASE FEE
15.00
1.00 9.0000
EA MECH FURNACE <=100K
9.00
1.00 9.0000
EA MECH B/C <=3HP/100K BTU
9.00
3.00 6.5000
EA MECH.VENT FAN
19.50
P.O. BOX 1504 VOICE (760) 777-7012
78-495 CALLE TAMPICO FAX (760) 777-7011
LA QUINTA, CALIFORNIA 92253 INSPECTIONS (760) 777-7153
BUILDING & SAFETY DEPARTMENT
Application Number: OJr - 4 (o Date:
Applicant: �y Architect or Engineer:
Applicant's Mailing Address: Architect or Engineer's Address:
Lic. No.:
BUILDING PERMIT DECLARATIONS
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals
Code, and my License is in full force and effect.
License Class License No.
Date Contractor
OWNER -BUILDER DECLARATION
1 hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any
city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed
statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business
and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects
the applicant to a civil penalty of not more than five hundred dollars ($500).):
U I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044,
Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work
himself or herself or through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is
\� sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.).
�] 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors'
(� State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to
the Contractors' State License Law.).
U I am exempt under Sec. , BA P.C. for this reason
Date 7L Iw Owner C/ 1 UX� l'�
WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations
— I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the perfonnance
of the work for which this permit is issued.
— I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My workers' compensation insurance carrier and policy number are:
Carrier Policy Number
-IL41 certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers'
compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
.a
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND
CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.).
Lender's Name
Lender's Address
APPLICANT ACKNOWLEDGEMENT
IMPORTANT Application is hereby made to.the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application.
1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit
issued as a result of this application, the owner, and the applicant, each agrees to, and shall, defend, indemnify and hold harmless the City of La Quinta, its
officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or
cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives of this county to enter upon the above-mentioned property for inspection purposes.
n ^��e'G5 Signature (Applicant or Agent): � 1
Application Number . . . . 05-00000066
Page 2
Date 2/01/05
Qty Unit
Charge
Per
Extension
1.00
6.5000
EA MECH EXHAUST HOOD
6.50
-----------------------------------------
Permit . . .
. . .
----------------------------------
ELEC-NEW RESIDENTIAL
Additional desc
. .
Permit Fee .
. . .
106.73 Plan Check Fee
26.68
Issue Date .
. . .
Valuation . . . .
0
Qty Unit
Charge
Per
Extension
BASE FEE
15.00
1918.00
.0350
ELEC NEW RES - 1 OR 2 FAMILY
67.13
480.00
.0200
ELEC GARAGE OR NON-RESIDENTIAL
9.60
1.00
15.0000
EA ELEC TEMPORARY POWER POLE
15.00
----------------------------------------------------------------------------
Permit . . .
. .
PLUMBING
Additional desc
Permit Fee .
. . .
129.00 Plan Check Fee
32.25
Issue Date.
Valuation . . . .
0
Qty Unit
Charge
Per
Extension
BASE FEE
15.00
10.00
6.0000
EA PLB FIXTURE
60.00
1.00.
15.0000
EA PLB BUILDING SEWER
15.00
1.00
7.5000
EA PLB WATER HEATER/VENT
7.50
1.00
3.0000
EA PLB WATER INST/ALT/REP
3.00
1.00
9.0000
EA PLB LAWN SPRINKLER SYSTEM
9.00
6.00
.7500
EA PLB GAS PIPE >=5
4.50
1.00
15.0000
EA PLB GAS METER
15.00
----------------------------------------------------------------------------
Permit . . .
. . .
GRADING PERMIT
Additional desc
. .
Permit Fee .
. . .
15.00 Plan Check Fee
.00
Issue Date
Valuation . . . .
0
Qty Unit
Charge
Per
Extension
BASE FEE
15.00
----------------------------------------------------------------------------
Special Notes
and Comments
1918 S.F. SFD
PERMIT
DOES NOT INCLUDE
BLOCK WALL, POOL/SPA
OR DRIVEWAY
APPROACH
----------------------------------------------------------------------------
Other Fees ...
. . .
. . . . ART IN PUBLIC PLACES -RES
.00
DIF COMMUNITY CENTERS -RES,
97.00
DIF CIVIC CENTER - RES
366.00
0
Page 3
Application Number . . . . . 05-00000066 Date 2/01/05
---_-------------------------------------------------------------------------
Other Fees . . . . . . ENERGY REVIEW FEE 46.12
DIF FIRE PROTECTION -RES 97.00
DIF LIBRARIES - RES 225.00
DIF PARK MAINT.FAC - RES 5.00
DIF PARKS/REC - RES 502.00
STRONG MOTION (SMI) - RES 11.95
DIF STREET MAINT�FAC-RES 15.00
DIF TRANSPORTATION - RES 1098.00
Fee summary Charged
Permit Fee Total 1019.23
Plan Check Total 534.86
Other Fee Total 2463.07
Grand Total 4017.16
Paid Credited Due
---------- ---------- ----------
.00 .00 1019.23
250.00 .00 284.86
00 00 2463.07
250.00 .00 3767.16
Building 9 � _
Address V
Mailing n
Address
O D7, 00(0 G
PO. BOX 1504 APPLICATION ONLY
78-495 CALLE TAMPICO
&t�,,(,,LA QUINTA, CALIFORNIA 92253
BUILDING: TYPE CONST. 8r- k OCC. GRP. _
I3 A.P. Number :Z-7 n3.3— 6a5— cI 1 �
Tel.1&14--9V7e)_]Project
Legal Description
o Description
---i7/l0
& Classif. I Lic. #
Arcn., tngr.,�
Designer
Addr
City i, ipState
�L.(� t7lye),
Lic. #
7under
ACTOR'S DECLARATION
I hereby affirm t licerovisions of Chapter 9 (commencing with Section
7000) of Divisi f the fessions Code, and my license is in full force and
effect.
OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for the following
reason: (Sec. 7031.5, Business and Professions Code: Any city or county which requires a
permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also
requires the applicant for such permit to file a signed statement that he is licensed pursuant to
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of
Division 3 of the Business and Professions Code, or that he is exempt therefrom, and the basis
for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects
the applicant to a civil penalty of not more than five hundred dollars (8500).
❑ 1, as owner of the property, or my employees with wages as their sole compensation, will do
the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Profes-
sions Code: The Contractor's License Law does not apply to an owner of property who builds
or improves thereon and who does such work himself or through his own employees, provided
that such improvements are not intended or offered for sale. If, however, the building or im-
provement is sold within one year of completion, the owner -builder will have the burden of
proving that he did not build or improve for the purpose of sale).
❑ I, as owner of the property, am exclusively contracting with ' ensed contractors to construct
the project. (Sec. 7044, Business and Professions Code a Contractor's License Law does
not apply to an owner of property who builds or impro hereon, and who contracts for such
projects with a contractor(s) licensed pursuant to ontractor's License Law.)
❑ 1 am exempt under Sec. B.8 . or this reason
Date Owner
WORKE S COMPENSATION DECLARATION
I hereby affirm that I have a certificate of consent to self -insure, or a certificate of Worker's
Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)
Policy No. Company
❑ Copy is filed with the city. ❑ Certified copy is hereby furnished.
CERTIFICATE OF EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars (8100) valuation
or less).
I certify that in the performance of the work for which this permit is issued, I shall not
employ any person in any manner so as to become subject to Workers' Compensation Laws of
California.
Date Owner
NOTICE TO APPLICANT If, after making this Certificate of Exemption you should become
subject to the Workers' Compensation Provisions of the Labor Code, you must forthwith
comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work
for which this permit is issued. (Sec. 3097, Civil Code.)
Lender's Name
Lender's Address
This is a building permit when properly filled out, signed and validated, and is subject to
expiration if work thereunder is suspended for 180 days.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives of this city to enter the above-mentioned
property for inspection purposes.
Signature of applicant Date
Mailing Address
City, State, Zip
WHITE = BUILDING DEPARTMENT
ZONE: BY:
Minimum Setback Distances:
Front Setback from Center Line
Rear Setback from Rear Prop. Line
Side Street Setback from Center Line
Side Setback from Property Line
FINAL DATE—
Issued by:
Validated by:—
Validation:
YELLOW = APPLICANT
INSPECTO
Date Permit
PINK = FINANCE
SFt. / No.
Size Stories
Stories
No. Dw. Z
.Units
Nevx_ Add ❑ Alter ❑
Repair ❑ Demolition ❑
Estimated Valuation
PERMIT
AMOUNT
Plan Chk. Dep.
tom. 0io
Plan Chk. Bal.
Const.
Mech.
Electrical
Plumbing
S.M.I.
Grading
Driveway Enc.
Infrastructure
TOTAL
REMARKS
ZONE: BY:
Minimum Setback Distances:
Front Setback from Center Line
Rear Setback from Rear Prop. Line
Side Street Setback from Center Line
Side Setback from Property Line
FINAL DATE—
Issued by:
Validated by:—
Validation:
YELLOW = APPLICANT
INSPECTO
Date Permit
PINK = FINANCE
CERTIFICATE OF COMPLIANCE
Desert Sands Unified School District
47950 Dune Palms Road BERMUDA DUNES
/�
�} Cr RANCHO MIRAGE
Date 2/3/05 La Quetta, CA 92253 INDIAN WELLS
QLAALM
OUINTA
No. 26857 (760) 771-8515
lNolo yr�
Owner Power Finance APN # 774-033-025
Address Jurisdiction La Quinta
City Zip Permit #
Tract # Study Area
Type Single Family Residence No. of Units 1
Lot # No. Street S.F. Lot # No. Street S.F.
Unit 1 77170 Calle Colima 1918 Unit 6
Unit 2 Unit 7
Unit 3 Unit 8
Unit 4 Unit 9
Unit 5 Unit 10
Comments
At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patiostwalkways, residential additions under 5
00 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooking, eating or sanitation) or replacement mobile ho
mes. It has been determined that the above-named owner is exempt from paying school fees at this time due to the following reason:
EXEMPTION NOT APPLICABLE
This certifies that school facility fees imposed pursuant to
Education Code Section 17620 and Government Code 65995 Et Seq.
in the amount of $2.24 X 1,918 S.F. or $4,296.32 have been paid for the property listed above and that
building permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued.
Fees Paid By Cc/Valley Independent Bank - Betsy Aceves Check No. 319511
Name on the check Telephone
Funding Residential
By Dr, Doris Wilson
Superintendent
Fee collected /exempted by Shar n McGilvrey Payment Recd $0.00
$4,296.32 Over/Under
Signature c
NOTICE: Pursuant to Government Code Section 66020(d)(1), this Will serve to notify you that the 90 -day approval period in which you may protest the fees o
r other payment identified above Will begin to run from the date on which the building or installation permit for this project is issued, or from the date on which
those amounts are paid to the District( S) or to another public entity authorized to collect them on the Districtes) behalf, whichever is earlier.
NOTICE: This Document NOT VALID if Duplicated
Embossed Original -Building Department/Applicant Copy - Applicant/Receipt Copy -Accounting fj
12/13/2001'11:11 AM PAGE 2/005 Fax Server
ECORDING REQUESTED BY
rst American Title Company
ID WHEN RECORDED MAIL TO:
ver Finance Associates, Inc,
170 Avenida Bermudas, #1
Quinta, CA 92253
Space Abow This Une for Recorderls Use Only
GRANT DEED
A.P.N.: 774-033-025-1 T.R.A. No.020-015 File No.: RPO -1711187 (sl)
The Undersigned Granwr(s) Declare(s): DOCUMENTARY TRANSFER TAX $104.50; CITY TRANSFER TAX $0.00,
X computed on the consideration or full value of aroperty conveyed, OR
computed on the consideration or full value less value of liens and/or encumbrances remaining at time of sale,
unincorporated area; (X) City of Le Quince, and
j Exempt from transfer tbx; Reason:
FOR A VALUABLE CONSIDERATION, receipt of which Is hereby acknowledged,
William R. Riley, Trustee of The William A- Riley 1994 Trust
hereby GRANT(s) to William Thomas Buffin, a Married Man, as His Sole and Separate Property and
Power Finance Associates, Inc., a California Corporation
the following described property in the City of La Qulnta, County of Riverside, State of California:
LOT 15 IN BLOCK 181 OF UNIT NO. 18, OF SANTA CARMELITA AT VALE LA QUINTA, AS
SHOWN BY MAP ON FILE~ IN BOOK 19 PAGES 30 AND 31 OF MAPS, RECORDS OF RIVERSIDE
COUNTY, CALIFORNIA,
Dated: 12-113/2004
£/Z 'd 9998'ON
Mai Tax Statements To! SAME AS ABOVE
N1ddfl8 NV111IM Nd£0:1 9002 ' 1UHr
r
RC DISTRICT - PLANNING REVIEW FORM
to
This form is to be used by CDD. staff for review of single family dwellings in the RC (Cove
Residential) District per Section 9.50.090 of the Zoning Code. Its purpose is to determine: 1)
that the proposed housing design does not duplicate the same architectural style of any house
within 200 feet of the applicant, .and/or 2) if there is a need for the applicant to file for Master
Design Guidelines. If the applicant does need to file a Master Design Guideline, please transmit
this information to the Building and Safety Department as part of your correction list. Please
attach additional explanations as necessary.
APPLICANT:
SITE ADDRESS: 7 rl - 17b
APN 7-
d 3 3 -
�a s CASE NO.:
�� 3
LEGAL:
LOT
BLOCK UNIT
S.C.@V.L.Q.
CHECK AND APPROVED.BY: � _�� /ViSIS GT DATE: ///9/0s -
Inform
/9loS
Inform the assigned Building plan. checker upon your assignment to this case. The CDD
Executive Secretary maintains a log book to track applications. and assign case numbers.
REQUIRED ITEM
Y.
N
COMMENT/CORRECTION
Verify legal and APN information
Consistent with MDG on file (as
applicable)
/h
.MDG filing required (5 filings
since 9/3/98)
Architectural variety within 200
feet of the surrounding area:
Architectural design features.
Approved bjG }Beso
0 City Council
;Nommunity Dev. Dept.
Initials
Case No. /2c OS:10.r3 / zzoS
0 With Conditions
Other Requirements:
OV -10-2005 08:47 PM
CERTIFICATE OF FIl
Project Title
77-/70
VERIFICATION AND DIAGNOSTIC TE
1_
�• /o 0
Ifying Signature ate
Irm:_� -
5treetAddress: 7,q"a6 tf'4wrov� 6/ 'c le.
Dat /
2!'u. �n mat
Builder Name
Plan Number
Sample Group Number
Sample House Number
HERS Provider: C HEt X �'5-
City/State/21p: /- a 4107. % 1 cool 1;u ,r
Copies to: Builder, HERS Provider
P. 01
HERS RATER COMPLIANCE STATEM K
The house was: Tested ❑ Approved as part of sample testing, but was not tested
As the HERS rater providing dlagnoatic testing and field verification, I certify that the houses Identified on this form
com y with the diagnostic tested compliance requirements as checked on this form.
Distribution system Is fully ducted (i.e., does not use building cavities as plenums or platform returns In lieu
f ducts)
Where cloth backed, rubber adhesive duct tape Is Installed, masilc and drawbands are used in combination
with cloth backed, rubber adhesive duct tape to seal leeks at duct connections.
MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT
Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage)
Measured
Duct Pressurization Test Results (CFM ® 25 Pa) values
Test Leakage Flow In CFM_
If fan flow is calculated as 400cfm/ton x number of tons enter
calculated value here 2
If fan flow is measured enter measured value here
/J G
Leakage Percentage (100 x Test Leakage/Fan Flow) X 7+ d+
Check Box for Pass or Fall (Pass¢6% or less)138ss
Fail
THERMOSTATIC EXPANSION VALVE (TXV) or Commission approved equivalent
��Yas ❑ No Thermostatic Expansion Valve (or Commission approved
equivalent) Is installed and Access Is provided for inspection
❑
Yes Is a pass
Pass Fall
Q MINIMUM REQUIREMENTS FOR DUCT DESIGN COMPLIANCE CREDIT
• ❑ Yes ❑ No ACCA Manual D Design requirements have been met
(rater has verified that actual Installation matches values in
CF -1 R and design on plan.
2. O Yes ❑ No TXV is installed Fan flow has been
or verified. If no TXV,
verified fan flow matches design from CF -111.
Measured Fan Flow =
� d
Yes for both 1 and 2 is a Pass
Pass Fall
,.�..".'j� ��9�1� - '"i1— t't� Cat( �a�� M A - �QN •-t�"1�14 - �3�� 0 2.S -; t�T-t� lS
ti TITLE 24 REPORT
S dv t ( --. Sa &4--, F c
Title 24 Report for:
Thomas Buffin Power Brokers
Seville Santa Fe -Alf Orientations
La Quinta, CA 92253
Project Designer:
Frank A. Moreno
45-400 Big Canyon Street
Indio, CA 92201
760-200-9956
Report. Prepared By:
Frank A. Moreno
Power Brokers
51370 Avenida Bermudas Suite 1
La Quinta, CA 92253
(760) 564-8470
r
Job (dumber:
00101
Date:
12/23/2004
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC (415) 897-6400.
EnergyPro 3.1 By EnergySoft Job Number: 00101 User Number: 6115
k--)
I TABLE OF CONTENTS
Cover Page
Table of Contents
Form CF -1 R Certificate of Compliance
Form MF -1 R Mandatory Measures Checklist
Form C -2R Computer Method Summary
HVAC System Heating and Cooling Loads Summary
1
2
3
6
8
12
EnergyPro 3.1 By EnergySoft Job Number: 00101 User Number: 6115
Certificate of Compliance: Residential (Part 1 of 2) CF -1 R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
Seville Santa Fe -All Orientations La Quinta
Project Address Building Permit #
Power Brokers (760) 564-8470 Plan Check / Date
Documentation Author Telephone
Computer Performance 15 Field Check I Date
Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only
GENERAL INFORMATION
Total Conditioned Floor Area: 1,918f? Average Ceiling Height: 10.0 ft
Total Conditioned Slab Area: 1,918 ft2
Building Type:
(check one or more)
® Single Family Detached ❑ Addition
❑ Single Family Attached ❑ Existing Building
❑ Multi -Family ❑ Existing Plus Addition
Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor
Number of Dwelling Units: 1.00
Number of Stories: 1 ❑ Raised Floor
Component
Const.
Frame Assembly Location/Comments
Type U -Value (attic, garage, typical, etc.
R-38 Roof (R.38.2x14.16) Wood 0.028 Exterior Roof
R-13 Wall w/1" EPS Wood 0.059 Exterior Wall
Slab On Grade n/a 0.756 Covered Slab w/R-0.0 Perimeter Insulation
FENESTRATION
Shading Devices
Type Orientation
Area
Fenestration
Exterior
Overhang Side Fins
SF
Shading
Yes / No
Yes / No
Front
53.4
0.55
0.53
Bug Screen
❑X
❑
❑ X❑
Front
18.1
0.57
0.55
Bun Screen
191
❑
❑ N
Front
16.7
0.60
0.53
Bug Screen
0
❑
❑ X❑
Left
62.0
0.60
0.53
Bug Screen
❑x
❑
❑ X❑
Left
38.0
0.57
0.55
Bug Screen
X❑
❑
❑ X❑
Left
33.4
0.55
0.53
Bug Screen
X❑
❑
❑ 0
Rear
33.4
0.55
.0.53
Bun Screen
Q
❑
❑ ❑X
Rear
38.0
0.57
0.55
Bug Screen
X❑❑
❑ 191
Right
53.0
0.60
0.53
Bug Screen
a
ElElo
El
11
❑❑
El F1
❑
❑
❑ ❑
Run Initiation Ti e: 12/23104
09:35:06 Run
Code: 1103823306
Ener Pro 3.1 By Ener
Soft
User Number: 6115
Job Number: 00101
Page: 3 of 12
Certificate of Compliance: Residential (Part 2 of 2) CF -1 R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
HVAC SYSTEMS Note: Input Hydronlc or Combined Hydronic data under Water Heating Systems, except Design Heating Load.
Distribution
Heating Equipment Minimum Type and Duct or
Type (furnace, heat Efficiency Location Piping Thermostat Location /
pump, etc.) (AFUE/HSPF)(ducts, attic, etc.) R -Value Type Comments
Central Fumace 92% AFUE Ducts in Attic 42 Sethack Res HVAC
Cooling Equipment Minimum
Type (air conditioner, Efficiency
heat pump, evap, cooling) (SEER)
Duct
Location
(attic, etc.)
Duct
R -Value
Thermostat Location 1
Type Comments
Split Air Conditioner 12.0 SEER
Ducts in Attic
42
Setback
Res HVAr
WATER HEATING SYSTEMS
Rated 1
Tank
Energy Fact! 1 External
Water Heater Water Heater
System Name Type
Distribution
Type
# in Input
Syst. Btu/hr
Cap.
(gal)
or Recovery Standby Tank Insul.
Efficiency Loss (%) R -Value
Standard Gas 50 gal or Less Small Gas
Standard
1 40.000
_ 5D
0.53 n/a 12
For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input and Recovery Efficiency.
REMARKS
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with
overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification
and field verification by an approved HERS rater.
Designer or Owner (per Business & Professions Code) Documentation Author
Name: Name: Frank A. Moreno
Title/Firm: Frank A. Moreno Title/Firm: Power Brokers
Address: 45-400 Big Canyon Street Address: 51370 Avenida Bermudas Suite 1
Indio, CA 92201 La Quinta, CA 92253
Telephone: 760-200-9956
Lic. #:
l2- 23-84'
(signature) (date)
Enforcement Agency
Name:
Title/Firm: _
Address:
Telephone:
Telephone: (760) 564-8470
(signature) (date)
IEnergyPro 3.1 By EnergySoft User Number: 6115 Job Number: 00101 Page:4 of 12 1
Certificate of Compliance: Residential (Addendum) CF -1 R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
>ased on the adequacy of the special justification and documentation submitted. Plan Field
The DHW System "Standard Gas 50 gat or Less" Energy Factor = 0.530. An EF below 0.58 requires an R-12 External Blanket.
The HVAC System 'Res HVAC' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual.
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R. Plan I Field
The HVAC System 'Res HVAC' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide
verification of the TXV, or measure the Refrigerant Charge and Airflow.
The HVAC System 'Res HVAC' is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage
performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form.
Run Initiation Time: 12/23/04 09:36:06 Run Code,• 110 823306
EnergyPro 3.1 By EnergySoft User Number: 6115 Job Number: 00101 Page:5 of 12
Mandatory Measures Checklist: Residential (Page 1 of 2) MF -IR
NOTE: Lowrise resideri t buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instnitctions: Check or initial applicable boxes or enter N/A if not applicable.
DESIGNER
ENFORCEMENT
Building Envelope Measures
a4150(a): Minimum R-19 ceiling insulation.
§150(b): Loose fill insulation manufacturer's labeled R -Value.
'§150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does
not apply to exterior mass walls).
a' § 150(d): Minimum R-13 raised floor insulation in framed floors or equivalent.
❑§150(1): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no
greater than 2.0 permrinch.
§118: Insulation specified or installed meets insulation quality standards. Indicate type and form.
® §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field fabricated) have label with certified LI -Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
§150(8): Vapor barriers mandatory in Climate Zones 14 and 16 only.
E] §150(f): Special infiltration harrier installed to comply with Section 151 meets Commission quality standards.
El§150(e):
Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning gas pilots allowed.
Space Conditioning, Water Heating and Plumbing System Measures
a§110-13: HVAC equipment, ureter heaters, showerheads and faucets certified by the Commission.
® §150(h): Heating and/or cooling toads calculated in accordance with ASHRAE, SMACNA or ACCA.
M§150(1): Setback thermostat on all applicable heating and/or cooling systems.
FXJ §1500): Pipe and Tank Insulation
1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater)
3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external
insulation or R-16 combined intemaVextemal insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55 degrees F. insulated.
6. Piping insulating between heating source and indirect hot water tank.
EnergyPro 3.1 By EnergySoft User Number: 6115 Job Number: 00101 Page:6 of 12
Mandatory Measures Checklist: Residential (Page 2 of 2) MF -1 R
NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable.
DESIGNER
ENFORCEMENT
Space Conditioning, Water Heating and Plumbing System Measures: (continued)
a 1150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601,
603, 604 and Standard 6-3; ducts insulated to a minimum installed level of RA.2 or enclosed entirely in
conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system
that meets the applicable requirements of UL181, UL181A, or UL181 B. If mastic or tape is used to seal openings
greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used, Building cavities shall not
be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be
sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and
drawbands.
2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other
than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building
cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be
compressed to cause reductions in the cross-sectional area of the ducts.
3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive
duct tapes unless such a tape is used in combination with mastic and drawbands.
4. Exhaust fan systems have back draft or automatic dampers.
5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually
operated dampers.
6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture,
equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable
for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam
insulation shall be protected as above or painted with a coating that is water retardant and provides shielding
from solar radiation that can cause degradation of the material.
❑ § 114: Pool and Spa Heating Systems and Equipment
1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance
heating, and no pilot.
2. System is installed with at least 35' of pipe between filler and heater for future solar, cover for outdoor pools or
spas.
a. At least 36" of pipe between fitter and heater for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation pump time switch.
§115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no
continuously burning pilot light. (Exception: Non-electricai cooking appliances with pilot < 159 Stu/hr)
❑§118 (f): Cool Roof material meet specked criteria
Lighting Measures
❑ §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 Iumenstwatt or greater for
general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting
control panel at an entrance to the kitchen.
❑ §150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of
40 tumensMatt or greater switched at the entrance to the room or one of the alternative to this requirement
allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved.
3.1 By EnergySoft User Number: 6115 Job Number: 00101 Page:7 of 12
Computer Method Summary (Part 1 of 3) C -2R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
Seville Santa Fe -All Orientations La Quinta
Project Address Building Permit #
Power Brokers (760) 564-8470
Documentation Author Telephone Plan Check/Date
Computer Performance 15 Field ChecklDate
Compliance Method (Package or Computer) Cimate Zone
Source Energy Standard
Use (kBtu/sf-yr) Design
Space Heating 1.74
Facing
North Margin
❑
❑
❑
F
Facing
East Margin
R-1 3 Wall W11_EP-S sst Floor 7nne
R-13 Wall W/1 " EPG 1St„Floor 7onp
R-13 Wall w/1" FPS 1st Floor 7nnP
R-1-1 Wall w/1" FPS 1ct Flnnr 7nnP
Facing
South Margin
_90
Facing
West Margin
0.77 0.98
0.72 1.03
1.08 0.66
1.22 0.53
Space Cooling 32.94
34.03 -1.09
33.91 -0.97
31.66 1.28
Run Iniflation Time: 12123/04 9Code:
30.32 2.62
Domestic Hot Water 13.38
13.26 0.13
13.26 0.13
13.26 0.13
13.26 0.13
48.06 0.01
47.88 0.19
46.00 2.07
44.79 3.28
Totals 48.07
This C -2R describes the front facing North occurrence of a four cardinal orientation analysis. Features are identical in all orientations.
Total Conditioned Floor Area: 1,918 ft 2
Building Type: Single Fam Detached Floor Construction Type: ❑ Raised Floor ❑X Slab Floor
Building Front Orientation: All Four Orientations Total Fenestration Area: 18.0%
Number of Dwelling Units: 1.00 Total Conditioned Volume: 19,180 ft'
Number of Stories: 1 Total Conditioned Slab Area: 1,918 ft
BUILDING ZONE INFORMATION # of Thermostat Vent
Zone Name Floor Area Volume Units Zone Type Type Hgt. Area
RPsIVAC 191 1911A0 1 ne Conditioned Setback - 2 -nla
OPAQUE SURFACES Solar
Act. Gains
Type Area U -Val. Azm. Tilt YIN Form 3 Reference
Location I Comments
Rnnf1.918 0.028 _0 `22
WAIT 224 0 059 _0 _90
Wall 367 0.059 gd An
Wall 249 0.059 180 90
❑°H
°❑❑
❑❑
F1
HH
°❑❑
❑❑
❑❑
❑❑
❑
❑
❑
F
R -3R Roof /R 38 2Y14 1 R) 1gt Floor 7nna
R-1 3 Wall W11_EP-S sst Floor 7nne
R-13 Wall W/1 " EPG 1St„Floor 7onp
R-13 Wall w/1" FPS 1st Floor 7nnP
R-1-1 Wall w/1" FPS 1ct Flnnr 7nnP
WAI 124 0.059 270
_90
Run Iniflation Time: 12123/04 9Code:
3.1 By EnergySoft User Number: 6115 00101 Page:8 of 12
Computer Method Summary (Part 2 of 3) C -2R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
FENESTRATION SURFACES
# Type
Area
U-
Factor
SHGC
Act.
Azm.
Glazing Type
Tilt
Location/
Comments
.i_.
Window Front
(North)
20.0
0,550
0.53
_a
90. Double NonMtl Tinted Default_
1st Floor Zone
2
Window Front
(North)
6.0
0.570
0.55
0
90 Double NonMtl Tinted Default
1st Floor Zone
3
Window Front
(North)
6.7
0.600
0.53
0
90 Double NonMtl Tinted Default
1st Floor Zone
4
Window Front
(North)
2.7
0.570
0.55
0
90 Double NonMtl Tinted Default
1st Floor Zone
5
Window Front
(North)
33.4
0.550
0.53
0
90 Double NonMtl Tinted Default
1st Floor Zone
6
Window Front
(North)
10.0
0.600
0.53
_Q
_900 Double NonMtl Tinted Default
Ist Floor Zone
L
Window Front
(North)
_ 6.7
0,570
0.55
0
_ 90 Double NonMt1 Tinted Default
1 st Floor Zone
8
Window Front
(North)
2.7
0.570
0.55
0
90 Double NonMtl Tinted Default
1 st Floor Zone
6
Window Left
(East)
15.0
0.600
_ 0.53
90
90 Qouble NonMtl Tinted Default
1 st Floor Zone
1Q
Window Left
(East1
6.0
0.570
0.55
90
90 Qouble NonMtl Tinted Default
1 st Floor Zone
11
Window Left
(East
15.0
0.600
0.53
90
90 Double NonMtl Tinted Default
1 st Floor Zone
12
Window Left
(East)
6.0
0.570
0.55
90
90 Double NonMtl Tinted Default
1 st Floor Zone
1U
Window Left
(East)..
16.0
0.600
0.53
90_
90
Double NonMtl Tinted Default
1st Floor Zone
14
Window Left
(East)
8.0
0.570
0.55
90
90 Double NonMtl Tinted Defautt
1 st Floor Zone
15
Window Left
(East)
16.0
0.600
0.53
90
90 Double NonMt1 Tinted Default
1st Floor Zone
16
Window Left
(East)
8.0
0.570
0.55
90
90 Double NonMtl Tinted Default
1 st Floor Zone
17
Window Left
(East)
33.4
0.550
0.53
90
90 Double NonMtl Tinted Default
1 st Floor Zone
18
Window Left
(East)
10.0
0.570
0.55
90
90 Double NonMtl Tinted Default
1st Floor Zone
1A
Window Rear
(South)
33.4
0.550
0.53
180
90 Qouble NonMtl Tinted Default
1 st Floor Zone
20
Window Rear
(South)
10.0
0.570
0.55
180
90 Double NonMtl Tinted Default
1 st Floor Zone
21
Window Rear
(South)
12.0
0.570
0.55
180
90 Double NonMtl Tinted Default
1st Floor Zone
22
Window Rear
(South)
16.0
0.570
0.55
180
90 Qouble NonMtl Tinted Default
1st Floor Zone
23
Window Riqht
(West)
9.0
0.600
0.53
270
90 Double NonMt1 Tinted Default
1 st Floor Zone
24
Window Right
(West)
20.0
0.600
0.53
270
90 Double NonMt1 Tinted Default
1st Floor Zone
25
Window Right
(West)
4.0
0.600
0.53
270
90 Double NonMtl Tinted Default
1 st Floor Zone
26
Window Right
(West)
20.0
0.600
0.53
270
90 Double NonMt1 Tinted Default
1 st Floor Zone
INTERIOR AND EXTERIOR SHADING
Window
Overhang Left Fin
Right Fin
#
Exterior Shade Type
SHGC
Hgt.
Wd.
Len. Hgt.
LEA. REA. Dist. Len.
Hgt. Dist. Len. Hgt.
1
Bug Screen
0.76
6.6
3.0
6.0
0.1
6.0 6.0
2
Bun Screen
0.76
2.0
3.0
6.0
0.1
6.0 6.0
3
Bug Screen
0.76
5.0
1.3
1.0
0.1
1.0 1.0
4
Bug Screen
0.76
2.0
1.3
1.0
0.1
1.0 1.0
5
Bun Screen
0.76
6 6
5.0
1.0
0.1
1.0 1.0
6
Bug Screen
0.76
2.0
5-0
1.0 01
_ 1.0 1.0
7
Bug Screen
0.76
5.0
1.3
1.0
0.1
1.0 1.0
8
Bug Screen
0.76
2.0
1.3
1.0
0.1
1.0 1.0
9
Bug Screen
0.76
5.0
3.0
0.0
0.0
0.0 0.0
10
Bug Screen
0.76
2.0
3.0
0.0
0.0
0.0 0.0
Ti
Bug Screen
0.76
5.0
3.0
0.0
0.0
0.0 0.0
12
Bug Screen
0.76
2.0
3.0
0.0
0.0
0.0 0.0
13
Bug Screen
0.76
4.0
4.0
0.0
0.0
0.0 0.0
14
Bug Screen
0.76
2.0
4.0
0.0
0.0
0.0 0.0
15
Bug Screen
0.76
4.0
4.0
0.0
0.0
0.0 0.0
16
Bug Screen
0.76
2.0
4.0
0.0
0.0
0.0 0.0
17
Bug Screen
0.76
6.6
5.0
0.0
0.0
0.0 0.0
18
Bug Screen
0.76
2.0
5.0
0.0
0.0
0.0 0.0
19
Bug Screen
0.76
6.6
5.0
0.0
0.0
0.0 0.0
20
Bug Screen
0.76
2.0
5.0
0.0
0,0
0.0 0.0
21
Bug Screen
0.76
2.0
6.0
0.0
0.0
0.0 0.0
22
Bug Screen
0.76
4.0
4.0
0.0
0.0
0.0 0.0
_
23
Bug Screen
0.76
3.0
3.0
0.0
0.0
0.0 0.0
_
24
Bug screen
0.76
4.0
5.0
0.0
0.0
0.0 0.0
25
Bug Screen
0.76
1.0
4.0
0.0
0.0
0.0 0.0
26
Bug Screen
0.76
4.0
5.0
0.0
0.0
0.0 0.0
I EnemvPro 3.1 By EneravSoft User Number: 6115 Job Number: 00101 Paae:9 of 12 1
Computer Method Summary (Part 3 of 3) C -2R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
THERMAL MASS FOR HIGH MASS DESIGN
Area Thick. Heat Inside Location
Type (sf i (in.) Cap. Cond. Form 3 Reference R -Val. Comments
PERIMETER LOSSES
Run Initiation Time: 12/23/04 09:35:06 Run Code: 1103823306
EnergyPro 3.1 By EnermySoft User Number: 6115 Job Number. 00101 Page: 10 of 12
F2 Insulation
Type Length
Factor R -Val. Depth Location / Comments
Slab Perimeter 90
0.76 0.0 � 0 1 st Floor Zone
HVAC SYSTEMS
Heating Equipment
Minimum Distribution Type
Type (furnace, heat
Efficiencyy and Location Duct Thermostat
Location /
pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type
Comments
Central Furnace
92°%AFUE Ducts in Attic 4.2 Setback
Res HVAC
Hydronic Piping Pipe
Pipe Insul.
System Name Length
Diameter Thick.
Cooling Equipment
Minimum Duct
Type (air conditioner,
Efficiency Location Duct Thermostat
Location /
heat pump, evap. cooling)
(SEER) (attic, etc,) R -Value Type
Comments
Split Air Conditioner
12.O SEER Ducts in Attic 4.2 Setback
Res HVAC
WATER HEATING SYSTEMS
Rated' Tank
Energy Fact! 1 Tank insul.
Water Heater
Water Heater Distribution # in Input Cap.
or Recovery Standby R -Value
System Name
Type Type Syst. (Btu/hr) (gal)
Efficiency Loss (%) Ext.
Standard Gas 50 gal or Less
Small Gas Standard —1_ 40-000 50
0.53 n/a 12
1 For small gas storage (rated input <=
75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated
input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters,
list Rated Input, and Recovery Efficiency.
Run Initiation Time: 12/23/04 09:35:06 Run Code: 1103823306
EnergyPro 3.1 By EnermySoft User Number: 6115 Job Number. 00101 Page: 10 of 12
Computer Method Summary (Addendum) C -2R
Thomas Buffin Power Brokers 12/23/2004
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
)asea on the adequacy of vie special justitication and documentation submitted. Plan I Field
The DHW System "Standard Gas 50 gal or Less" Energy Factor = 0.530. An EF below 0.58 requires an R-12 External Blanket.
The HVAC System "Res HVAC' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual.
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R.
Plan
Field
The HVAC System 'Res HVAC' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide
verification of the TXV, or measure the Refrigerant Charge and Airflow.
The HVAC System "Res HVAC" is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage
performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form.
Run Initiation Time: 12/23/04 09. 5:06 Run Code: 1103823306
EnergyPro 3.1 By EnergySoft User Number: 6115 Job Number. 00101 Page: 11 of 12
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Thomas Buffin Power Brokers 12/23/2004
SYSTEM NAME FLOOR AREA
Res HVAC 1,918
26.0 OF
)�
Outside Air
0 cfm
69.4 of
69.4 of 69.4 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel Latent
I I CFM
I Sensible
1,518
37,166
-569
674
25,108
0
1,858
1,255
0
0
0
0
0
0
0
0
0
1,858
1,256
40,883 -569 27 619
BDP CO.563AN060-A 45,100 3,512 112,000
Total Adjusted System Output 5,100 3,5t2 1t2,0o0
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Aug 2 pm Jan -12 am
Supply Fan Heating Coil
2055 cfm
h Return Air Ducts `S
Supply Air Ducts
104.4 of
ROOM
70.0 of
I
115.0 / 73.5 of 78.8 / 62V,2��A
55.0 / 53.5 of
Supply Air Ducts
Outside Air
0 cfm Supply Fan Cooling Coil 55.8 / 53.9 of
2055 cfm 40.5% R.H. ROOMS
78.8/62.3 of 78.0 / 62.0 of
Return Air Ducts
EnergyPro 3.1 By EnergySoft User Number: 6115 Job Number: 00101 Page: 12 of 12